+ All Categories
Home > Documents > Stony Brook Update

Stony Brook Update

Date post: 31-Jan-2016
Category:
Upload: kana
View: 54 times
Download: 0 times
Share this document with a friend
Description:
Stony Brook Update. T.K. Hemmick for the Stony Brook Crew. If cryos are cold, Why is it smoking?. Cryo compressor on loan ONLY unit in the United States. We are 1 st “loaner” customer for RICOR cryos. Cryo is cold and working. 1 st four Production GEMs are in evaporator!. - PowerPoint PPT Presentation
Popular Tags:
11
1 Stony Brook Update T.K. Hemmick for the Stony Brook Crew
Transcript
Page 1: Stony Brook Update

1

Stony Brook Update

T.K. Hemmick for the Stony Brook Crew

Page 2: Stony Brook Update

2

If cryos are cold, Why is it smoking?

• Cryo compressor on loan– ONLY unit in the United States.– We are 1st “loaner” customer for RICOR cryos.

• Cryo is cold and working.• 1st four Production GEMs are in evaporator!

Page 3: Stony Brook Update

3

For every pump that is recovered…

• Power failure (Friday night) killed Scroll pump.• Fortunately, our multiple troubles with scrolls left

us with a spare!• Installed Saturday morning (hope for the best)

Dead Alive

Page 4: Stony Brook Update

4

Need to make QE system faster.

• New dual-measure pAmmeter.• New LabVIEW-based QE DAQ.• Location via “string pot”• Dry run of system using

“current box” as source expected today.

Page 5: Stony Brook Update

5

More efficient data collection from GB

• Maestro (PC-based MCA software).– Automated Gain Saturation Curves:

• One spectrum every 5 minutes.• Root macros to plot gain curve.

– Automated Gain Map:• Prompts user VOCALLY to move cable to next signal.• New patch panel eliminates 50-ohm terminators.• Complete map (56 pads) in one hour!

Page 6: Stony Brook Update

6

Maestro

• File handling of last week was “by hand”.• Now uses multiple data fields from the user to ensure is all

correct.• Implemented via:

– Cygwin installation on Maestro machine.– Perl/Tk GUI for use interview.– Launches Maestro from perl

Page 7: Stony Brook Update

7

HBD is inside glove box waiting…

• Caps inside.• Thorough cleaning.• Test of GEM install.• Test of sides install.• Ready for production.

Page 8: Stony Brook Update

8

Valve-Legs Conflict.

• After a long series of discussions with Rob Pisani, we found the ideal orientation for the valves from the viewpoint of installation.

• Most orientations were impossible due to interference with HV box or magnet pole face.

• However the solution we found conflicts with legs.

Page 9: Stony Brook Update

9

Valves as presently installed.

Leg Mount Points

Gas Inlet

Temporary Bypass

Handle Orientation Vital

Page 10: Stony Brook Update

10

Comments on Valves:

• Install does not imply that valves must remain in this state permanently.– After all, if you can put on any plumbing inside of the

glovebox you can also take it off.

• Plumbing-based solutions (initially suggested by Rob) would interfere with the detector's rotation during GEM installation and thus would necessarily be applied only after the GEM installation was complete.

• We believe that it would be difficult but not impossible to work on the plumbing of the detector once it is inside the glove box.

• We have enough material (and time) to make new gussets with notches to accommodate the valves.

Page 11: Stony Brook Update

11

Schedule for Production

• First shot tomorrow (Wednesday July 18)• Two shots next week.• Photo-cathodes installed before July 28.• Plenty of time for mid-August delivery.


Recommended