+ All Categories
Home > Documents > Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store.

Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store.

Date post: 27-Dec-2015
Category:
Upload: gilbert-ellis
View: 218 times
Download: 4 times
Share this document with a friend
Popular Tags:
18
Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store
Transcript
Page 1: Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store.

Stores ModuleFlexible Packaging

Planned Flow of the Software# 005 = Main Store

Page 2: Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store.

File # 005 Covers the next cell of this flow chart

Purchase indent

Indent Approval

Purchase Order

PO checking

PO Approval

Gate Entry

Quantity MRRQA – QC

Excise Bill Passing Payment

Page 3: Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store.

Shows pending GE, for which MRR not made

Quantity Verification

ST 38 Verification

Excise copy of bill received ?

Sub-Topics Covered

Page 4: Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store.

Main Stores inward “Entry Starts now”

Page 5: Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store.

Select the Inventory Module

Page 6: Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store.

Select the Transaction and then Select Material Receipt (INWARD) to receive material from Gate to Store

Page 7: Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store.
Page 8: Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store.

Select Gate Entry No.

Page 9: Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store.

Check total weight and total reel count in Grid 1 and Grid 2 By click on “Check Data in Grid” Button and Press Save

Page 10: Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store.

As additional control MRR system asks you to fill the required fields Like • Excise Doc. Received or not• Test Certificate Received or not • Condition of Goods

Page 11: Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store.
Page 12: Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store.
Page 13: Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store.

Questions

Value• Any need of Rate in the MRR ? NO• Any need of Value in the MRR ? NO• So, remove the rate and value in MRR = YesOther Points• Highlight the “shortage” = YES

Page 14: Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store.

Going to QC

• Print MRR before QC ?– Recommendation by Finsys = YES– Print first, QC does in ERP as well as on the paper

+ signs it

Page 15: Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store.

Next

.

Page 16: Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store.

Urgent Quality Analysis Required

Page 17: Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store.

Such alert goes out to all QC membersDirect on their screens

Line Ruke wali hai, jaldi QC ok karo bhai

Page 18: Stores Module Flexible Packaging Planned Flow of the Software # 005 = Main Store.

Finsys Infotech Limited.New Delhi Office : Suite 200, 2F, Elegance Tower, Jasola Distt Centre, New Delhi, India

Development Centre : TB-06, Crown Plaza Mall, Sector 15A, Faridabad, Haryana 121007, India

Mumbai Office : Unit 1, Level 2, B Wing, Regus, Times Square, Andheri Kurla Road, Andheri (East), Mumbai, Pin-400059 India

www.finsys.co.in

info[at]finsys.in


Recommended