Storm tracking and scan scheduling
Transcript
Page 1: Storm tracking and scan scheduling. Processing tree (in minutes) 05:00 Nimrod rainfall data produced 10:00 Nimrod data from BADC now at Chilbolton 10:30.

Storm tracking andscan scheduling

Page 2: Storm tracking and scan scheduling. Processing tree (in minutes) 05:00 Nimrod rainfall data produced 10:00 Nimrod data from BADC now at Chilbolton 10:30.

Processing tree (in minutes)

05:00 Nimrodrainfall dataproduced

10:00 Nimrod datafrom BADC nowat Chilbolton

10:30 Nimrod datacut to size on400x400km grid

0:00 Met Office Radar networkVolume scan11:00 Tracking done.

File with storm propsand labels produced.

11:30 New scanprocedure submittedto Chilbolton radar

Page 3: Storm tracking and scan scheduling. Processing tree (in minutes) 05:00 Nimrod rainfall data produced 10:00 Nimrod data from BADC now at Chilbolton 10:30.

Scan Scheduling

Page 4: Storm tracking and scan scheduling. Processing tree (in minutes) 05:00 Nimrod rainfall data produced 10:00 Nimrod data from BADC now at Chilbolton 10:30.

Scan Scheduling

Prioritize storms that are already beingtracked

Page 5: Storm tracking and scan scheduling. Processing tree (in minutes) 05:00 Nimrod rainfall data produced 10:00 Nimrod data from BADC now at Chilbolton 10:30.

Scan Scheduling

Prioritize storms that are already beingtracked

Page 6: Storm tracking and scan scheduling. Processing tree (in minutes) 05:00 Nimrod rainfall data produced 10:00 Nimrod data from BADC now at Chilbolton 10:30.

Scan Scheduling

Issue when storms cross 0 azimuth line

Prioritize storms that are already beingtracked

Page 7: Storm tracking and scan scheduling. Processing tree (in minutes) 05:00 Nimrod rainfall data produced 10:00 Nimrod data from BADC now at Chilbolton 10:30.

Scan Scheduling

Issue when storms cross 0 azimuth line

Prioritize storms that are already beingtracked

Page 8: Storm tracking and scan scheduling. Processing tree (in minutes) 05:00 Nimrod rainfall data produced 10:00 Nimrod data from BADC now at Chilbolton 10:30.

Scan Scheduling

Issue when storms cross 0 azimuth line

Prioritize storms that are already beingtracked

Page 9: Storm tracking and scan scheduling. Processing tree (in minutes) 05:00 Nimrod rainfall data produced 10:00 Nimrod data from BADC now at Chilbolton 10:30.

Scan Scheduling

Issue when storms cross 0 azimuth line

Prioritize storms that are already beingtracked

Page 10: Storm tracking and scan scheduling. Processing tree (in minutes) 05:00 Nimrod rainfall data produced 10:00 Nimrod data from BADC now at Chilbolton 10:30.

Scan Scheduling

Issue when storms cross 0 azimuth line

Prioritize storms that are already beingtracked

Page 11: Storm tracking and scan scheduling. Processing tree (in minutes) 05:00 Nimrod rainfall data produced 10:00 Nimrod data from BADC now at Chilbolton 10:30.

Scan Scheduling

Issue when storms cross 0 azimuth line

Prioritize storms that are already beingtracked

Page 12: Storm tracking and scan scheduling. Processing tree (in minutes) 05:00 Nimrod rainfall data produced 10:00 Nimrod data from BADC now at Chilbolton 10:30.

64 Pulse pairs per ray Scan at 1deg/second

32 Pulse pairs per ray Scan at 2deg/second

Rays are equal width (azimuth)32 Pulse pairs = less data per ray (more noise?)2deg/second = faster scanning

Scan Options

Page 13: Storm tracking and scan scheduling. Processing tree (in minutes) 05:00 Nimrod rainfall data produced 10:00 Nimrod data from BADC now at Chilbolton 10:30.

64 Pulse pairs per ray Scan at 0.2deg/second

32 Pulse pairs per ray Scan at 0.2deg/second

Scan Options

Page 14: Storm tracking and scan scheduling. Processing tree (in minutes) 05:00 Nimrod rainfall data produced 10:00 Nimrod data from BADC now at Chilbolton 10:30.

Further work

• Automate process – John Nicol’s code waits for new Nimrod file to

arrive at Chilbolton, then cuts it to size– Add “wait” command to tracking code that looks

at list of filenames and waits for new Nimrod files to process

– Link tracking and scan scheduler

• Test code at Chilbolton• Test remote scanning display