Stormwater:Anne Arundel County
Edition
Chris Trumbauer, Councilman
Anne Arundel Co
• Population: 550,000 (2012)
Anne Arundel Co
• Population: 550,000 (2012)
• Shoreline: 500+ miles
Anne Arundel Co
• Population: 550,000 (2012)
• Shoreline: 500+ miles
• Swimming Advisory
Anne Arundel Co
• Population: 550,000 (2012)
• Shoreline: 500+ miles
• Swimming Advisory
• MS4 permit
Anne Arundel Co
• Population: 550,000 (2012)
• Shoreline: 500+ miles
• Swimming Advisory
• MS4 permit
• WIP Capital Cost: $897 M
Our WorkgroupDan Nees – Univ of MD Finance Center
Bob Burdon – AA Chamber of Commerce
Tom Ballentine – NAOIP
Eliot Powell – AA Co Homebuilders
Jerry Pesterfield – Community Rep
Suzanne Etgen – Water Stewards Academy
Erik Michelsen – South River Federation
Susan Zellers – Marine Trades Assoc
Doug Lashley – Greenvest
Eric DeVito – land use attorney
Chris Trumbauer – AA County Council
Dick Ladd – AA County Council
Staffed by Dept of Public Works
Our ProgramApplies only to improved properties with
impervious surface coverage
Two categories of assessment: Residential and Nonresidential
Fee is phased in over 3 years (60% / 80% / 100%)
Credits of up to 50% are available for multifamily residential and nonresidential properties to account for existing practices
Equivalent residential unit (ERU) is 2,940 sq ft
Residential FeeResidential properties are assessed based on
zoning classification
Tier 1 Low density (RA, RLD)Tier 2 Medium density (R1, R2, R5)Tier 3 High density (R10, R22)
Incentive program for rebates for the purchase, construction, and installation of qualifying practices (rain barrels, rain gardens, etc)
Residential FeeTier Impervious (median) Fee
1 7,304 $170
2 2,940 $85
3 1,204 $34
Nonresidential FeeApplies to commercial, industrial, multifamily
residential, farms, marinas, homeowner association property, private roads
Fee amount is based on actual impervious surface on the property (as a multiple of ERU amount)
Fee is “capped” as no more than 25% of the property’s base property tax rate
Credits given for existing practices, NPDES permits, clean marinas
Non-profit properties’ fee is $1
Program Revenue2014 2015 2016
Phase-in 60% 80% 100%
Fee revenue $13.3M $18.6M$23.2M
Bond revenue $19.9M $39.2M $58.5M
Program RevenueResidential Nonresidential
Count 152,923 16,799Total Imp (sf) 535,685,313 400,467,283
(acres) 12,298 9,193
Phased-in Fees $7,339,226 $5,975,676
% of Total Imp 57% 43% % of Total Fees 55% 45%
What will it fund?Replace/repair/upgrade culverts and
outfalls
Stream restoration projects
Improve/repair existing sediment ponds
Staff and contract services for project management and support
15
Central Sanitation FacilityMillersville, MD
16
Central Sanitation FacilityMillersville, MD
http://www.aacounty.org/DPW/Stormwater/WPRF.cfm