Excavating the window well which is then used wherever possible as the access point for the Damp Treat team avoiding disruption to the remainder
of the property
Drainage channel is laid around the perimeter and covered with pea gravel
First fix plumbing is installed ready for installation of radiators etc
A reinforced screed has been laid over the floor membrane and independent studwork erected around the walls