European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 1
Strategic Energy Review and
Priority Interconnection Plan
Regulators’ Electricity Infrastructure Workshop Brussels, 13 February 2007
Dr Wolfgang Kerner, DG TREN, B1
European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 2
OUTLINE
Need for Common Energy Policy
Energy for a Changing World
Completion of the Internal Market
European Grid for a European Electricity & Gas Market
Priority Interconnection Plan
Conclusions
European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 3
Need for common European Energy policy Increasing import dependence of EU
Coherent energy mix
Completion of Internal Energy Market
Need for European Transmission Grid
“It has become apparent to the European citizens as well as to the policy makers that Europe must develop a common energy policy.”
“Increasingly interlinked regional and national markets give customers the benefit of better service quality, a wider choice of the energy mix and competitive prices.”
European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 4
Energy for a Changing WorldSustainability – Competitiveness - Security of supply
The “ENERGY PACKAGE” published on 10 January 2007 includes:http://ec.europa.eu/energy/energy_policy/index_en.htm
1°) Core Strategic energy objective 2°) Number of strategic reports
Energy Policy for Europe
Report a) : Strategic European Energy Review (SEER)
Communications being part of the Energy package
Reports b) – j) : Priority Interconnection Plan
3°) Concrete action plan
Core objectives for EU by 2020 (relative to 1990)
Reduce Greenhouse Gas emissions by 20% (80 % of GHG from energy; CO2 emission are 75% of GHG)
Improve energy efficiency by 20%
Increase share of renewable energy to 20% Increase use of biofuels in transport to 10%
European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 5
Energy for a Changing World
Communications being part of the Energy package:
b) Renewable Energy Road Map c) Report on progress in renewable electricity (under Directive
2001/77/EC) d) Biofuels progress report (under Directive 2003/30) e) Prospects for the internal gas and electricity market, and f) Final Report of the energy sector inquiry g) Priority interconnection plan h) Sustainable power generation from fossil fuels: aiming at near-zero
emissions by 2020 i) Draft Nuclear Illustrative Programme presented under Art. 40 of the
Euratom Treaty for opinion of the Economic and Social Committee (PINC)
j) Towards a Strategic Energy Technology Plan
European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 6
Energy Action Plan
On 10 January 2007, a first package of concrete measures:
A report on the implementation by the Member States of the internal market of gas and electricity & results of the sectoral enquiry of DG Competition.
A Priority Interconnection Plan for electricity and gas networks;
Proposals to promote sustainable power generation from fossil fuels;
A renewable energy roadmap and other initiatives to promote renewables, notably bio-fuels for transport;
An indicative nuclear programme for the Community (PINC);
A Communication preparing a European Energy Strategic Technology Plan.
European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 7
Completion of the Internal Energy Market
Ownership unbundling To split vertically integrated companies - or by full Independent System Operator - ISO
Functioning European wide Regulation with Effective Regulation in every Member State
Europe wide electricity and gas networks - At the heart of a well functioning European market - Sufficient transmission capacity needs to be available - Increased investment in the network with a pan European objective is needed.
European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 8
Operation European grid code - Capacity allocation rules (regulation 1228/2003) - Security rules (regulation 1228/2003) - Emergency operation rules Harmonised regulation (European Energy regulator) Physical security (critical infrastructure actions)
Organisation Office of Energy Observation: Monitoring, Transparency & Reporting Independent TSOs association? ISO European Energy regulator
European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 9
European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 10
Priority Interconnection Plan
Based on revised TEN-E guidelines (2006)- Key priority projects- European Coordinator- Obligation to MS to monitoring & coordination meetings
Structure of the PIP- Status of Projects of European Interest- Structural Problems- Way forward
REVISION OF TEN-E GUIDELINES
Transformers Day in Cordoba, Spain, October 20-21,2005
European Commission – DG Energy and Transport
11
UK and IrelandCons. 400 TWhExch.int. 2 TWh = 0,5%Exch.ext.12 TWh=3,0%
Central Western EuropeCons. 1310 TWhExch.int 97 TWh = 7,4%Exc.ext. 111 TWh=8,6%
Iberian marketCons. 303 TWhExch.int. 12 TWh = 4,0%Exch.ext. 9 TWh=3,0%
ItalyCons. 328 TWhExch.int. 0 TWh = 0,0%Exch.ext. 51 TWh=15,2%
South East EuropeCons. 207 TWhExch.int. 25 TWh = 12,1%Exch.ext. 20 TWh=9,7%
Central Eastern EuropeCons. 335 TWhExch.int 39 TWh = 11,6%Exch.ext. 70 TWh = 20,9%
Baltic countriesCons. 23 TWhExch. 3TWh = 13,0%Exch.ext 3TWh = 13,0%
Northern EuropeCons. 388 TWhExch.int 36 TWh = 9,3%Exch.ext. 28 TWh=7,2%
11 TWh
8 TWh
18TWh
1 TWh
9 TWh
41 TWh
8 TWh
12 TWh
15 TWh
2 TWh
35 TWh
3 TWh
1TWh
1 TWh
Cons. = ConsumptionExch.int. = Cross-border electricity inside regionExch.ext. = Cross-border electricity between regions
Electricity consumptionand exchanges in regionsin Europe in 2005
European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 12
European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 13
Statistics on projects progress
European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 14
Status of Projects of European Interest
Status of Implementation of the 42 Projects of European Interest
Action 1: Identification of the most important infrastructure encountering significant difficulties has been made
European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 15
European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 16
Structural Problems
Status of Implementation of the 42 Projects of European Interest
Action 2: Appointing European coordinators The Commission will propose early in 2007 the designation of European
Coordinators to facilitate the completion of the following projects:
For electricity: Power link between Germany, Poland and Lithuania, especially Alytus – Elk (back-to-
back station); Connection of offshore wind power in Northern Europe (Denmark, Germany and
Poland); Connection between France and Spain, especially Sentmenat (ES) – Bescanó (ES) –
Baixas (FR) line.
For gas: NABUCCO pipeline.
European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 17
Way forward
Open and transparent planning of grids according to consumer needs
Action 3: Coordinated planning at regional levels The Commission will propose in 2007 establishing a strengthened framework for TSOs responsible for
coordinated network planning
European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 18
Action 4: Streamlining of authorisation procedures The Commission will in 2007 begin revising the TEN-E
Guidelines with a view to requiring the Member States, with due regard to the subsidiarity principle, to set up national procedures under which planning and approval processes for projects of European interest should be completed in a maximum time span of five years.
Action 5: EU fundingFor specific purposes the Commission will examinein the 2008 revision of the Financial perspectives whether increased EU funding for TEN-E networksnecessary.
European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 19
Investment Levels
According to TSOs forecasts, mid term (up to year 2013) investments are around 4 b€ /yr.
A steadily high investment level is expected for up to 2023. IEA projections for total grid investment needs in the EU (2001-2010) are
49 b€. Cross-border investments are at present 200 M € / yr. The 32 electricity Projects of European interest require 6 b €. The resulting (cross-border) investments are then 700 – 800 M € / yr. Investments required to connect offshore wind farms to onshore grids are
in the range of 0.9 -1.3 b € /yr in the mid-term. In the long term a sharp increase to 1.7 -2.5 b € /yr is needed
European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 20
Conclusions
Planning at regional level
The fragmentation of the planning and authorisation rules needs to be overcome.
A time span of five years for planning, approval and construction should be the target.
Priorities → Responsibilities →Means→ Construction Wind power Transmission corridors
European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 21
Legislative action
Strong link between the TEN-E priorities and effective implementation procedures.
Revision of TEN-E Guidelines
European Energy and Network PolicyEuropean Commission – DG Energy and Transport
The Regulators' Electricity Infrastructure Workshop, Brussels, Belgium, 13 February 2007 22
04/12/2006
• • • •
Solar
Wind
Hydro
Bio
Geo•