1 Maintain and continue to improve the quality
and effectiveness standards for the practices
of assessing student learning at the course,
program and institutional levels across the
College, including credit, non-credit, extra-
curricular programs and student support
services
1E,2A,2B,2E,
3C,7A
The ETS Proficiency Profile is to be
administered in each Wayne College
section of 3400:210 Humanities in the
Western Tradition I and 3400:221
Humanities in the World Since 1300.
Will develop new Program Review
focused on assessment of student
learning as required by HLC.
ETS Proficiency Profile completed.
1A Continue to develop and evaluate assessment
data collection, analysis, and management
Part-time faculty members will have
the option to begin using the FAIR
system beginning fall 2012.
FAIR system now available to all
instructors.
1B Maintain the established program review cycle
by conducting program reviews of all credit
programs in 2012
Complete program review for
Engineering.
Completed with the exception of the
Engineering program.
Library
Credit Programs
Institutional Research
Learning Support Services
Academic Plan
College Wide Plan
Dan Deckler
Assessment Plan for Credit & NonCredit Instruction
Continuing Education & Workforce Development (CWED)
1
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Sub Plans:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Library
Credit Programs
Institutional Research
Learning Support Services
Academic Plan
College Wide Plan
Dan Deckler
Assessment Plan for Credit & NonCredit Instruction
Continuing Education & Workforce Development (CWED)
1C Maintain annual assessment plans and
progress evaluations in all credit programs
Develop a new comprehensive
assessment plan that meets the
requirements of HLC.
The new program review process /
plan was developed and submitted to
the HLC in June 2013. The new process
was approved by the HLC in July 2013
to begin piloting in the Fall of 2013 and
2014.
1D Establish program review criteria and conduct
review of non-credit programs and extra-
curricular programs
Refine format and computerize the
collection of data to provide a more
professional report.
2
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Sub Plans:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Library
Credit Programs
Institutional Research
Learning Support Services
Academic Plan
College Wide Plan
Dan Deckler
Assessment Plan for Credit & NonCredit Instruction
Continuing Education & Workforce Development (CWED)
2 Maintain and grow student success
programming and initiatives
1C,1D,2A,
2D,5F
Fall 2012: Students on Academic
Probation may be required to work
with an academic mentor.
Fall 2012 and Spring 2013: The
Learning Center will work more closely
with Student Services to assist
probationary students in bringing up
their GPA.
Summer 2012: Voluntary AMP.
Advisors will emphasize importance of
an academic mentor to entering adult
students, provisionally admitted
students, students taking at least one
development class, all late enrolling
students.
3
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Sub Plans:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Library
Credit Programs
Institutional Research
Learning Support Services
Academic Plan
College Wide Plan
Dan Deckler
Assessment Plan for Credit & NonCredit Instruction
Continuing Education & Workforce Development (CWED)
2A Maintain the Academic Mentoring Program
(AMP) and other student success programming
offered in the Learning Center
Same as above Summer 2012: Very little voluntary AMP
participation
Fall 2012: Students on probation after
Spring 2012 were required to attend
Strengthening Academic Success (SAS)
summer institute, rather than AMP.
Spring 2013: Learning Support Services
participated in Feb. 2013 Academic
Intervention Sessions, emphasizing our
services, workshops, and AMP.
Spring 2013: Students on probation after
F12 were enrolled in AMP
F 12 and Sp13: "Peanut Butter and Jelly"
4
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Sub Plans:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Library
Credit Programs
Institutional Research
Learning Support Services
Academic Plan
College Wide Plan
Dan Deckler
Assessment Plan for Credit & NonCredit Instruction
Continuing Education & Workforce Development (CWED)
2B Evaluate the feasibility of expanding weekend
programming and summer weekend schedule
to support access and accommodate student’s
lifestyle needs
Continue to monitor Saturday
enrollment and opportunities to
expand course offerings.
The OAA has been evaluating Saturday
enrollment and the BBA completion
program at Wayne College will be a
Saturday only program modeled after
the Saturday MBA program.
5
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Sub Plans:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Library
Credit Programs
Institutional Research
Learning Support Services
Academic Plan
College Wide Plan
Dan Deckler
Assessment Plan for Credit & NonCredit Instruction
Continuing Education & Workforce Development (CWED)
2C Develop and pilot an adult student learning
community and/or other learning communities
- Program-specific learning
communities will not be offered for
2012-2013. Future of program-specific
or other content-based LCs TBD.
-Faculty stipends will encourage
consistent faculty participation.
- Continue to offer Developmental
Learning Community (CFLC)
- Continue to offer Provisional Learning
Community (BSLC)
- Increase collaboration between
Student Services regarding
programming needs focusing on the
needs of developmental and non-
traditional students.
No progress.
6
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Sub Plans:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Library
Credit Programs
Institutional Research
Learning Support Services
Academic Plan
College Wide Plan
Dan Deckler
Assessment Plan for Credit & NonCredit Instruction
Continuing Education & Workforce Development (CWED)
2D Implement the recommendations of the
Student Engagement Workgroup
Implement co-curricular transcript and
associated programming.
2E Create and implement a five-year plan for
creating a Learning Commons
Continue the work of the Teaching
Learning Collaborative Work Group to
determine needs of students, faculty,
and staff and provide opportunities
and resources to meet those needs.
TLC is now an official College
Committee. The TLC website has been
updated, a SharePoint site created, a
service request tab created, and
regular emails sent to announce
opportunities and request ideas for
programming needs. Feedback is
discussed at TLC meetings.
7
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Sub Plans:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Library
Credit Programs
Institutional Research
Learning Support Services
Academic Plan
College Wide Plan
Dan Deckler
Assessment Plan for Credit & NonCredit Instruction
Continuing Education & Workforce Development (CWED)
2F Offer faculty reading circles and/or mini-
symposiums on teaching, learning, and
assessment
Incorporate opportunities for teaching,
learning, and assessment into
programming for the new Teaching
Learning Collaborative (TLC).
The TLC sponsored: Two Webinars:
“Perfecting the Blend: Designing
Blended Course Interactions” and “The
Flipped Approach to a Learner-
Centered Class”; Six Technology Show
& Tell workshops; and an Educational
Technology Open House with Hands-
on classroom technology assistance on
Sympodiums, Document cameras,
Tech- enhanced classrooms, Distant
Learning classrooms, and cameras for
video recording.
8
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Sub Plans:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Library
Credit Programs
Institutional Research
Learning Support Services
Academic Plan
College Wide Plan
Dan Deckler
Assessment Plan for Credit & NonCredit Instruction
Continuing Education & Workforce Development (CWED)
3 Develop new educational pathways and
programs
1D,2A,2B,
2D,3C,3E,4C,
6B
Evaluate opportunities with Summit
College, College of Business, Social
Work, and Nursing to determine
collaborative academic programs.
Continue to explore the possibility of
offering a Geospatial Intelligence
program along with the College of
Wooster.
The BBA completion program will
begin this fall semester. The four-year
Social Work completion program will
begin spring, 2014.
3A Create a Non-Credit to Credit Pathway Work
Group to study and target new
program/pathway opportunities
Identify additional pathways that align
with Wayne College academic
programming.
3B Create an Industry Advisory group to help
identify and articulate career pathway training
and education needs
Create a new Industry Advisory Group.
3C Maintain and expand off-site PSEOP, including
the Orrville Academy, as financially feasible
Review financial impact of new Orrville
Academy model.
9
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Sub Plans:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Library
Credit Programs
Institutional Research
Learning Support Services
Academic Plan
College Wide Plan
Dan Deckler
Assessment Plan for Credit & NonCredit Instruction
Continuing Education & Workforce Development (CWED)
3D Monitor and evaluate the effectiveness of the
Associate of Technical Studies Degree pathway
for career center graduates/completers and
CEWFD program completers
Look for opportunities to link academic
programs at the career center and
CEWFD program to an Associate of
Technical Studies Degree.
3E Maintain effective communication between
Wayne College faculty and administrators and
counterparts on the Akron campus to
maximize programming opportunities at
Wayne College
Encourage faculty to continue and/or
enhance collaboration with Akron
Campus departments.
The Associate Dean has been in
worked with CBA, Social Services, the
College of Fine Arts, and School of
Nursing to bring programs and courses
to Wayne College.
3F Expand partnerships with other educational
institutions to offer additional programming
and pathways
Explore possibility to offer a Geospatial
Intelligence program with the College
of Wooster.
With the closing of CACI this effort has
been cancelled.
10
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Sub Plans:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Library
Credit Programs
Institutional Research
Learning Support Services
Academic Plan
College Wide Plan
Dan Deckler
Assessment Plan for Credit & NonCredit Instruction
Continuing Education & Workforce Development (CWED)
4 Promote a culture of assessment and
accountability among instructional and
instructional support staff
7A, 7B, 7C,
7D, 7E
Work with Akron Campus departments
to implement any common
department assessments for both gen
ed and technical programs. Develop
comprehensive plan for Program
Review/Assessment and write follow-
up report for HLC.
UA General Education Assessment
Revision is ongoing. The Program
Review process has been approved by
the HLC and will be piloted starting in
Fall 2013.
4A Lead the development and implementation of
a student learning outcomes assessment
“dashboard”
Implement new learning outcomes
process once developed by the
General Education Review Committee.
4B Ensure the dissemination of learning outcome
assessment results to students and the
community
Work with Public Relations to
determine best way to disseminate
learning outcome assessment results.
No progress.
11
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Sub Plans:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Library
Credit Programs
Institutional Research
Learning Support Services
Academic Plan
College Wide Plan
Dan Deckler
Assessment Plan for Credit & NonCredit Instruction
Continuing Education & Workforce Development (CWED)
4C Conduct at least one process analysis and
improvement project in each department/area
reporting to the Office of Academic Affairs
Work with the Continuous
Improvement Committee to provide
training for directors of each
department/area reporting to the
Office of Academic Affairs. Conduct
one process analysis and improvement
project in each department/area.
No progress.
4D Maximize the value of information obtained
from student satisfaction, student
engagement, and student learning
standardized inventories through rigorous
analysis, cross-reference, and action plan
development
Review results of CCSSE and make
recommendations.
CCSSE Administered. Report and
observations available to Wayne
College community in Sharepoint
Institutional Research Documents.
12
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Sub Plans:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Library
Credit Programs
Institutional Research
Learning Support Services
Academic Plan
College Wide Plan
Dan Deckler
Assessment Plan for Credit & NonCredit Instruction
Continuing Education & Workforce Development (CWED)
5 Participate and contribute to the
implementation of the College’s twenty-year
campus development plan in areas related to
instruction and instructional support
1C,5A,5B,5F Monitor ADA population and
determine space needs to
accommodate required services.
The front entrance to the main
building needs an ADA door. Russ
Pugh has been made aware of this
need.
5A Lead studies into advances in classroom
instructional technology, science teaching and
learning, learning commons and instructional
support resources to assist in planning and
development of new teaching and learning
spaces
Continue the work of the Teaching
Learning Collaborative Work Group to
determine needs of students, faculty,
and staff and provide opportunities
and resources to meet those needs.
FDC to host a retreat based on
instructional technology.
See 2E above (determine needs).
TLC has developed the following
spaces / resources based on feedback:
Sympodium practice stations in the
library, Presentation practice space in
C-115, and a studio room for recording
lectures / tutorials in F-118.
NEED FEEDBACK FROM FDC
REGARDING RETREAT
13
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Sub Plans:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Library
Credit Programs
Institutional Research
Learning Support Services
Academic Plan
College Wide Plan
Dan Deckler
Assessment Plan for Credit & NonCredit Instruction
Continuing Education & Workforce Development (CWED)
5B Gather and maintain data to best project
classroom and instructional space needs
Review classroom usage to determine
future needs.
No progress.
5C Create and evaluate potential new models for
semester/facility scheduling to maximize
student access and facilities usage
Initiate a plan for block scheduling on
at least one technical program.
No progress.
5D Establish and carry out appropriate faculty
hiring goals to achieve appropriate full-time to
part-time ratios and to meet instructional
needs and priorities
Due to four additional full-time faculty
retirements effective May 2012,
appropriate staffing has become a top
priority. Use both tenure-track and
visiting faculty positions to meet
immediate needs.
Three new tenure-track faculty were
hired this summer and will be joining
Wayne College this fall. Two new
visting professor were requested,
approved and will be hired to begin
this fall.
14
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
1 Support the program review process for credit
and non-credit programs as stated in the
Academic Plan
1B,1D Develop a plan to implement Program
Review that focuses on assessment as
required by HLC.
A plan has been developed and
approved by HLC.
1A Study and improve the Course Assessment
Report form, system, and archive to improve
compliance and usefulness
Expand the use of "FAIR" to all faculty. The "FAIR" instrument was made
available to all faculty this past spring
semester.
1B Establish criteria and format for non-credit
assessment-based program review in 2011-
2012 for implementation in 2012-13
Refine format and computerize the
collection of data to provide a more
professional report.
2 Maintain documented annual assessment
plans for all credit programs and establish
documented annual assessment plans for
programs in CEWFD and Student Services
1A,1C,1D Same as above.
3 Establish and maintain a student learning
outcomes “dashboard”
4A,4B Determine what student learning
outcomes should be included in the
dashboard.
3A Design dashboard contents and establish
maintenance system in 2011-12
Same as above.
3B Disseminate publically through appropriate
channels in 2011-12
Determine the most appropriate
channel to disseminate student
learning outcomes dashboard.
3C Evaluate effectiveness and usage for
improvement in 2012-13
Same as above.
Assessment Plan for Credit & NonCredit Instruction
Academic Plan
Dan Deckler
15
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Assessment Plan for Credit & NonCredit Instruction
Academic Plan
Dan Deckler
4 Offer at least one reading circle/mini-
symposium on teaching, learning and
assessment per year
2F Work with the Assessment Committee,
Faculty Development Committee,
and/or the Teaching/Learning
Collaborative to offer a reading
circle/mini-symposium on teaching,
learning, and assessment.
The TLC sponsored: Two Webinars:
“Perfecting the Blend: Designing
Blended Course Interactions” and “The
Flipped Approach to a Learner-
Centered Class”; Six Technology Show
& Tell workshops; and an Educational
Technology Open House with Hands-
on classroom technology assistance on
Sympodiums, Document cameras,
Tech- enhanced classrooms, Distant
Learning classrooms, and cameras for
video recording.
4A Maintain partnership between Assessment
Work Group and Faculty Development
Committee as facilitators
Same as above. No progress.
4B Increase participation of part-time faculty and
non-credit instructional and student services
staff
Extend invitations of programming to
part-time faculty and non-credit
instructional and student services staff.
This has been done, especially with
CPs.
16
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Assessment Plan for Credit & NonCredit Instruction
Academic Plan
Dan Deckler
5 Increase awareness of learning outcomes and
assessment practices and results among
students and community partners
4B Develop a comprehensive assessment
plan that increases awareness of
learning outcomes and assessment
practices.
A learning outcomes awareness
campaign including bookmarks and
framed posters was completed two
years ago as part of the HLC
comprehensive visit preparations.
Academic Assessment Work Group
continued efforts to promote the use
of CARS and new FAIRS assessment
reporting systems. The new Program
Review Process (pilot to being in Fall
2013) will continue to increase
awareness and use of these tools.
6 Create action plans based on results of Noel-
Levitz, CCSSE, and Educational Profile data
4D Bill Clark to develop a report that
summarizes results of Noel-Levitz,
CCSSE, and Educational Profile data
Completed and located in Sharepoint.
17
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
1 Sustain Growth in Services and Quality Delivery 3ABCDE, 5D
College Plan
As of now, these goals remain the
same. The office is working with Akron
WDCE and MCUC to establish a more
centralized focus that will provide
more opportunities for growth and
reduce inefficiencies.
We spent a lot of time this year in
trying to become one unit with Akron
and MCUC. This has been a challenge
and still a work in progress.
1A Create an opportunity funnel of at least
$50,000 or more in potential contract training
sales at all times that will meet annual
targeted revenue
This was maintained over the last fiscal
year. However, contract training was
down overall this year. There was on
major project that fell through. The
company received a large training
grant and then backed out.
1B Increase average enrollment per class for both
existing and new programming by 10%
annually to meet annual revenue targets
Open enrollment revenues stayed
about the same from 12 to 13. We will
not have the final amounts until after
the year close.
1C Increase individual and company tests and
assessments by at least 20% annually to
increase testing revenues $5000 or more for
each year
Testing stayed about the same.
Continuing Education & Workforce Development
Academic Plan
Amy Mast
18
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Continuing Education & Workforce Development
Academic Plan
Amy Mast
1D Research and obtain external grant funding of
at least $50,000 annually to support growth in
both contract and open enrollment
programming
We continue to implement the DOL H-
1B grant over the last year. The grant
was a little of 1million and will run
through November of 2015
2 Program and Product Development 1C, 2B and
3A, B, C, D,
E, of College
Plan and 3A,
B of
Academic
Plan
We did bring on severl new programs
in the last year. 1. Project
Management Essentials, which is one-
day FranklinCovey course on project
management skills. We ran it for the
first time and had 20 enrolled which
was excellent. 2. Offered a series of
DOL workshops, again well received
had betweent 30 and 40 people at
each workshop. 3. Bringing on an
online Electronic Health Record
Specialist program.
2A 20% of OCEWD’s programs are to be new or
reconfigured from existing programs in order
to meet the needs of the workforce both now
and in the future
See above for new programs.
19
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Continuing Education & Workforce Development
Academic Plan
Amy Mast
2B Identify programming needs through a variety
of resources which include federal, state and
local government agencies, national and state
professional organizations, chambers of
commerce, economic development councils,
other colleges and universities, businesses, and
training vendor
The office is involved with various
commmunity and state organizations.
3 Data-Driven for Continuous Improvement 7C and D
College Plan
and 1D
Academic
Plan
3A Develop an inquiry form on the website and
track weekly inquiries for both prospective
students and business inquiries
We have an email that is univeral to
our office that we respond to inquiries.
This has been proven to be effective,
since someone in the office is available
to respond.
3B Track weekly registrations (lead measure) to
reach enrollment targets for open enrollment
programs
We do monitor registrations several
weeks out. We make follow-up phone
calls, send additional Constant Contact
emails to boost or meet target
enrollments.
20
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Continuing Education & Workforce Development
Academic Plan
Amy Mast
3C Meet operating margins for key program areas
to remain financially solvent. Overall margin
for open enrollment is 40% and contract
training is 50-55%
The main problem this year financially
was the drop in contract training
reveunes. The contract training that is
sold continually meets the operating
margin of 55%
3D Maintain high levels of customer satisfaction
for all program areas. A minimum of 4 on a 5
point scale should be the target
We continue to receive high customer
service ratings. We continually monitor
these reports after each program.
Problems are addressed immediately
when customer satisfaction is lower
than expected.
3E Completion rates for career-training programs
90% or higher and 75% certification
attainment
Completion rates for career training
program are around 90%. We only
track those students who test here.
21
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
1 Review all credit programs 2012-2013 using
the Wayne College 2003 Program Review
model and the University of Akron 2005 model
1B Complete program review for
Engineering using UA model. Plan and
implement program assessment
review as required by HLC. Report due
July 2013.
Not completed.
2 Develop two pathways for non-credit to credit
programs
3ABDE Further explore computer networking
pathway and operationalize if deemed
viable.
2A Establish two industry advisory boards to help
identify and prioritize marketable job
skills/careers in the region to prioritize
pathway programs
Establish one industry advisory board
for Wayne County and one for Holmes
County.
2B Maintain and expand non-credit educational
partnerships with University/College CEWFD
and local career centers
Identify one non-credit educational
partnership with CEWFD and local
career centers, possibly network
security.
2C Monitor Associate of Technical Studies degree
enrollments and determine ways to maximize
market
Determine the viability of developing
an operational plan to identify
students who may benefit from an
Associate of Technical Studies.
No progress.
Credit Programs
Academic Plan
Dan Deckler
22
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Credit Programs
Academic Plan
Dan Deckler
3 Maintain and expand Off-site PSEOP program
as economically feasible
3C Evaluate economic feasibility of new
"Academy" model.
On-going we maintain between 10 to 14 high
schools with which colaborate. The goal is 12
high schools per semester. Maintaining double
digits will be challenging, due to some IHL's
offering similar programs for no costs to the
district. Our budget may struggle with our
current aggreements, so free would be
impossible without business sponsors.
3A Launch the Orrville Academy Expand academy model to all PSEOP
partners if economically feasible.
The Orrville Academy was successfully
launced.
3B Establish systematic communication and
quality control standards and procedures to
ensure consistency of course content, delivery,
and assessment
Determine if the form should be
implemented by all general education
and technical program areas.
No progress.
4 Bring new programs (associate and/or
bachelor’s degree) to Wayne College via
partnerships with Akron departments and/or
other educational institutions
Continue these discussions with Akron
departments.
The BBA completion program will start
this fall and the four-year Social Work
program will begin spring 2014
23
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Credit Programs
Academic Plan
Dan Deckler
4A Partner with one Akron department to offer
300 and/or 400 level majors courses on our
campus
Ongoing discussions with Akron
departments in general education and
technical program areas.
Wayne College has added the following 300 and
400 level courses in the past three years:
2420:300 Supervision in a Technical
Environment
2420:301 Information Design
2420:302 Ethical Issues in the Workplace
2420:310 Leadership Principles and Practices in
Technical Organizations
2420:311 Community Service and Leadership in
a Global Context
2420:401 Leading Project Teams in Technical
Organizations
2420:402 Assessing and Improving Technical
Organizations
2420:421 Senior Seminar in Organizational
Supervision
3600:324 Social and Political Philosophy
5550:330 Exercise and Weight Control
5550:352 Strength and Conditioning
Fundamentals
5550:355 Exercise of Special Populations
7600:325 Intercultural Communication
7600:344 Group Decision Making
7600:345 Business and Professional Speaking
4B Partner with one educational institution to
bring a new associate degree to our campus
Determine what needs exist for our
service area and if a partnership is the
best way to approach this.
No progress.
24
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Credit Programs
Academic Plan
Dan Deckler
5 Develop alternate course delivery and
scheduling of classes to increase accessibility
2B,3E Develop a plan to pilot one co-hort
group technical program to improve
scheduling. Identify additional DL
opportunities.
The BBA completion program will be a
cohort of students meeting every
Saturday.
25
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
1 Continue the assessment of the student
experience at Wayne College
Continue ongoing assessment
1A Re-administer the Noel-Levitz Student
Satisfaction Inventory, interpret the results in
the context of provided norms, prior
performance, and other available indicators
and communicate findings to the College
community
1B, 6C Administer spring 2013.
1B Re-administer the Community College Survey
of Student Engagement (CCSSE) parallel to the
Noel-Levitz Student Satisfaction Inventory
1D Analyze results when available.
1C Continue standing Student Evaluation of
Instruction program. Improve automation of
the protocol
1D Continue ongoing assessment
2 Study and build an empirical model of student
enrollment and retention
Integrate data when available
2A Further study and develop a model and
student retention
1A Integrate data when available
2B Model and understand the relationship
between available leading demographic
indicators in the College service and student
enrollment suitable to set benchmarks and to
identify underserved areas
1A Add more exhibits where opportunities
present themselves
Institutional Research
Academic Plan
Bill Clark
26
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Institutional Research
Academic Plan
Bill Clark
2C Model and understand the relationship
between high school graduation rates and
enrollment suitable to set benchmarks and
identify schools in which the College is
underperforming in recruitment
4F Integrate ETS Proficiency Profile data
when available
2D Model and understand the relationship
between available student data including,
demographics, test, scores, enrollment, and
grades
1A Integrate ETS Proficiency Profile data
when available
2E Develop a series of discriminate functions
which predict the success or failure of students
based upon key variables such as admission
type and academic program
1A, 6B, 6C Integrate ETS Proficiency Profile data
when available
2F Construct and Maintain new College fact book 1A Add more exhibits where opportunities
present themselves
3 Assess student learning and course, program,
and institutional outcomes
Begin analysis of new data
3A Provide data to support assessment-based
program review of technical programs
6C, 1A Provide reports as requested
3B Restart assessment of general education
outcomes through establishment of protocol
using the ACT Proficiency Profile
6B,AP1A,
AP1B
Continue administration of ETS
Proficiency Profile and improve
protocol
27
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
1 Maintain effective student success programs 2AC
1A Continue to expand participation in the AMP
and RAMP programs; assessment and modify
annually to continuously improve effectiveness
and participation
Fall 2012: Students on Academic
Probation may be required to work
with an academic mentor.
Fall 2012 and Spring 2013: The
Learning Center will work more closely
with Student Services to assist
probationary students in bringing up
their GPA.
Summer 2012: Voluntary AMP.
Advisors will emphasize importance of
an academic mentor to entering adult
students, provisionally admitted
students, students taking at least one
development class, all late enrolling
students.
Summer 2012: Very little voluntary
AMP participation.
Fall 2012: Students on probation after
Sp 2012 were required to attend SAS
rather than AMP.
Spring 2013: LSS participated in Feb.
2013 Academic Intervention Sessions
Spring 2013: Students on probation
after F 12 were enrolled in AMP
Learning Support Services
Academic Plan
Sue Horn
28
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Learning Support Services
Academic Plan
Sue Horn
1B Continue to expand learning communities to
include more opportunities for students
- Program-specific learning
communities will not be offered for
2012-2013. Future of program-specific
or other content-based LCs TBD.
-Faculty stipends will encourage
consistent faculty participation.
- Continue to offer Developmental
Learning Community (CFLC)
- Continue to offer Provisional Learning
Community (BSLC)
- Increase collaboration between
Student Services regarding
programming needs focusing on the
needs of developmental and non-
traditional students.
Program-specific learning communities
were not offered.
Fall 2012: Faculty stipends encouraged
active Learning Community
participation.
Fall 2012: CFLC and BSLC were offered.
Spring 2013: Due to low enrollment,
no Learning Communities were
offered.
F 12 and Sp 13: Student Services and
LSS conferred regularly regarding
student needs.
29
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Learning Support Services
Academic Plan
Sue Horn
1C Maintain and grow offerings including PB&J
Thursdays, etc.
- Work collaboratively with Student
Services to make SAS a worthwhile
offering for students on academic
probation.
- PB&J will be offered to all Learning
Communities during their meeting
times.
- PB&J will be open to all Wayne
students.
August 2012: Strengthening Academic
Skills (SAS) offered as a one-day
institute.
Fall 2012: PB&J workshops offered to
Learning Communities during their
meeting times.
F 12: PB&J workshops also open to all
Wayne students
Spring 2013: A full schedule of PB&J
workshops was open to all Wayne
students.
2 Evaluate and improve professional and peer
tutor training programs
2F,4C
2A Survey tutors and trainers regarding
effectiveness and satisfaction in 2011-12
Train new professional tutors in Level 1
certification.
Train peer tutors as appropriate to
their certification levels
"Internal survey" conducted November
2012 for peer and professional tutors
and student assistants.
30
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Learning Support Services
Academic Plan
Sue Horn
2B Modify processes based on results in 2012-13
as needed
Implement tutor training changes
made during recertification process.
Make peer tutor pay scale consistent
with computer assistants.
Using the new tutor-training
curriculum:
Three new professional tutors were
trained and awarded Level 1 CRLA
tutor certification.
Three peer tutors advanced in their
CRLA certiification levels.
ALL student tutors are paid based upon
their training and experience.
3 With the library, Technical Support Services,
Business Office and Office of Academic Affairs
develop a plan to create a learning commons
2E,5A Spring 2013: The Learning Commons
concept was replaced by the Teaching
and Learning Collaborative, which
became a College committee within
the governance structure.
The Coordinator of the SLC computer
lab became a standing member of the
TLC.
3A Establish a team and conduct feasibility study
(2010-11)
TBD NA
31
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Learning Support Services
Academic Plan
Sue Horn
3B Create 5 year plan; implement first phases of
plan 2011-12
NA
3C Evaluate and implement second phase 2012-
13
NA
4 Conduct staffing analysis and determine
staffing priorities for next 5 years
2
4A Establish on-going systematic tracking and
evaluation of ADA and personal counseling
student numbers and needs and service
provision
- Add staff and testing space as
suggested by analysis
- Analyze and implement changes and
develop training related to the Wayne
staff/faculty survey.
- Increase collaboration between
Student Services regarding
programming needs focusing on the
needs of ADA, traditional, and non-
traditional students.
- Continue tracking ADA and personal
counseling needs and service
provision.
Fall 2012: Room B-106 was designated
as a testing room, complete with
privacy dividers.
Fall 2012: Personal Counselor and ADA
coordinator began reporting to
Student Services.
January 2013: ADA coordinator began
work.
Based on 2012-2013 faculty survey,
implemented additional training and
workshops, focusing on dealing with
distressed students and suicidal
students.
Created faculty handbook for dealing
with distressed students.
32
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Learning Support Services
Academic Plan
Sue Horn
4B Establish on-going systematic tracking and
evaluation of faculty and student demands on
computer assistance and computer lab access
and needs
- Add staffing as suggested by analysis.
- Continue tracking student visits to the
computer lab in Tutor Trac.
- Continue encouraging and monitoring
faculty assistance.
April 2013: Full-time Coordinator of
the LC Computer Lab began work.
TutorTrac recorded all student visits to
the computer lab.
Coordinator of the LC computer lab
manually tracked faculty visits.
Based upon changes to the
Springboard platform, an on-campus
workshop was held for faculty.
2 "open labs" were also offered to
faculty.
33
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
1
Innovate to improve library services,
technology, and resources
4
Continue rotation of reviewing and
updating all library policies on an
annual basis.
Complete the following policies:
• Information Literacy Policy
• Communication Plan
• Collection Development Policy
The communication plan is complete
and posted. A draft of the information
literacy plan is posted on SharePoint.
The Collection development policy is
still being developed with focus on e-
resources.
1A
Develop and implement a plan to continuously
improve the information literacy instruction
program
Complete the Information Literacy Plan
and gather feedback from
stakeholders.
The information literacy plan was
drafted and posted on SharePoint but
still requires feedback.
1B
Develop and implement a plan to continuously
improve overall library services, including
information / reference services
Complete the FY2012 Annual Report.
Develop an assessment plan for all
library services.
An annual report was not completed
for 2012 but is in the works for 2013.
Maureen has joined an assessment
work group through OhioLINK.
1C
Develop and implement a plan to continuously
improve library collections and resources
Continue implementation of 5-year
weeding plan.
Complete the collection development
plan.
5-year weeding plan continues as
planned. Collection development plan
is not yet complete. Table the
collection development plan until
ebook purchasing is underway.
1D
Review the current model of staffing and
provision of library services and implement
changes reflecting outreach to off-sight
locations and potential budgetary restrictions
Perform annual library usage study Fall
2012.
Perform annual question collection
study Spring 2013.
Both studies completed as planned.
Library
Academic Plan
Maureen Lerch
34
STRATEGIC PLAN PROGRESS REPORT
Plan:
Parent Plan:
Prepared By:
Priority
Number & LetterStated Priority
Linkage to
Parent Plan
2012-2013
Goal
2012-2013
Progress Narrative
Library
Academic Plan
Maureen Lerch
2
Transform library spaces into secure,
welcoming environments that enhance library
services and operational efficiency, and
anticipate the needs of current and future
users 2E,5A
See 2a and 2b for detail below.
2A
With the Learning Support Services, Technical
Support Services, Business Office and Office of
Academic Affairs develop a plan to create a
learning commons
Visit UAL Information Commons when
complete, interview participants to
gain insight on their model. Repurpose
the "old reference desk" to be used as
a TLC collaboration station.
Four library staff members met with
UAL faculty and staff to review
information commons space. Former
reference desk houses two Sympodium
SMART stations for faculty and student
use.
2B
Reconfigure library spaces to ensure ample
and flexible seating in a welcoming library
environment
Continue to implement portions of the
library space proposal, primarily
focusing on placement of furniture and
reuse of the empty reference stacks.
Furniture moved to increase space for
wheelchair access and group
interactions.
35