STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage to Parent Plan 2012-2013 Goal 2012-2013 Progress Narrative 1 Maintain and continue to improve the quality and effectiveness standards for the practices of assessing student learning at the course, program and institutional levels across the College, including credit, non-credit, extra- curricular programs and student support services 1E,2A,2B,2E, 3C,7A The ETS Proficiency Profile is to be administered in each Wayne College section of 3400:210 Humanities in the Western Tradition I and 3400:221 Humanities in the World Since 1300. Will develop new Program Review focused on assessment of student learning as required by HLC. ETS Proficiency Profile completed. 1A Continue to develop and evaluate assessment data collection, analysis, and management Part-time faculty members will have the option to begin using the FAIR system beginning fall 2012. FAIR system now available to all instructors. 1B Maintain the established program review cycle by conducting program reviews of all credit programs in 2012 Complete program review for Engineering. Completed with the exception of the Engineering program. Library Credit Programs Institutional Research Learning Support Services Academic Plan College Wide Plan Dan Deckler Assessment Plan for Credit & NonCredit Instruction Continuing Education & Workforce Development (CWED) 1
Transcript
Page 1: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Sub Plans:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

1 Maintain and continue to improve the quality

and effectiveness standards for the practices

of assessing student learning at the course,

program and institutional levels across the

College, including credit, non-credit, extra-

curricular programs and student support

services

1E,2A,2B,2E,

3C,7A

The ETS Proficiency Profile is to be

administered in each Wayne College

section of 3400:210 Humanities in the

Western Tradition I and 3400:221

Humanities in the World Since 1300.

Will develop new Program Review

focused on assessment of student

learning as required by HLC.

ETS Proficiency Profile completed.

1A Continue to develop and evaluate assessment

data collection, analysis, and management

Part-time faculty members will have

the option to begin using the FAIR

system beginning fall 2012.

FAIR system now available to all

instructors.

1B Maintain the established program review cycle

by conducting program reviews of all credit

programs in 2012

Complete program review for

Engineering.

Completed with the exception of the

Engineering program.

Library

Credit Programs

Institutional Research

Learning Support Services

Academic Plan

College Wide Plan

Dan Deckler

Assessment Plan for Credit & NonCredit Instruction

Continuing Education & Workforce Development (CWED)

1

Page 2: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Sub Plans:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Library

Credit Programs

Institutional Research

Learning Support Services

Academic Plan

College Wide Plan

Dan Deckler

Assessment Plan for Credit & NonCredit Instruction

Continuing Education & Workforce Development (CWED)

1C Maintain annual assessment plans and

progress evaluations in all credit programs

Develop a new comprehensive

assessment plan that meets the

requirements of HLC.

The new program review process /

plan was developed and submitted to

the HLC in June 2013. The new process

was approved by the HLC in July 2013

to begin piloting in the Fall of 2013 and

2014.

1D Establish program review criteria and conduct

review of non-credit programs and extra-

curricular programs

Refine format and computerize the

collection of data to provide a more

professional report.

2

Page 3: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Sub Plans:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Library

Credit Programs

Institutional Research

Learning Support Services

Academic Plan

College Wide Plan

Dan Deckler

Assessment Plan for Credit & NonCredit Instruction

Continuing Education & Workforce Development (CWED)

2 Maintain and grow student success

programming and initiatives

1C,1D,2A,

2D,5F

Fall 2012: Students on Academic

Probation may be required to work

with an academic mentor.

Fall 2012 and Spring 2013: The

Learning Center will work more closely

with Student Services to assist

probationary students in bringing up

their GPA.

Summer 2012: Voluntary AMP.

Advisors will emphasize importance of

an academic mentor to entering adult

students, provisionally admitted

students, students taking at least one

development class, all late enrolling

students.

3

Page 4: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Sub Plans:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Library

Credit Programs

Institutional Research

Learning Support Services

Academic Plan

College Wide Plan

Dan Deckler

Assessment Plan for Credit & NonCredit Instruction

Continuing Education & Workforce Development (CWED)

2A Maintain the Academic Mentoring Program

(AMP) and other student success programming

offered in the Learning Center

Same as above Summer 2012: Very little voluntary AMP

participation

Fall 2012: Students on probation after

Spring 2012 were required to attend

Strengthening Academic Success (SAS)

summer institute, rather than AMP.

Spring 2013: Learning Support Services

participated in Feb. 2013 Academic

Intervention Sessions, emphasizing our

services, workshops, and AMP.

Spring 2013: Students on probation after

F12 were enrolled in AMP

F 12 and Sp13: "Peanut Butter and Jelly"

4

Page 5: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Sub Plans:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Library

Credit Programs

Institutional Research

Learning Support Services

Academic Plan

College Wide Plan

Dan Deckler

Assessment Plan for Credit & NonCredit Instruction

Continuing Education & Workforce Development (CWED)

2B Evaluate the feasibility of expanding weekend

programming and summer weekend schedule

to support access and accommodate student’s

lifestyle needs

Continue to monitor Saturday

enrollment and opportunities to

expand course offerings.

The OAA has been evaluating Saturday

enrollment and the BBA completion

program at Wayne College will be a

Saturday only program modeled after

the Saturday MBA program.

5

Page 6: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Sub Plans:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Library

Credit Programs

Institutional Research

Learning Support Services

Academic Plan

College Wide Plan

Dan Deckler

Assessment Plan for Credit & NonCredit Instruction

Continuing Education & Workforce Development (CWED)

2C Develop and pilot an adult student learning

community and/or other learning communities

- Program-specific learning

communities will not be offered for

2012-2013. Future of program-specific

or other content-based LCs TBD.

-Faculty stipends will encourage

consistent faculty participation.

- Continue to offer Developmental

Learning Community (CFLC)

- Continue to offer Provisional Learning

Community (BSLC)

- Increase collaboration between

Student Services regarding

programming needs focusing on the

needs of developmental and non-

traditional students.

No progress.

6

Page 7: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Sub Plans:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Library

Credit Programs

Institutional Research

Learning Support Services

Academic Plan

College Wide Plan

Dan Deckler

Assessment Plan for Credit & NonCredit Instruction

Continuing Education & Workforce Development (CWED)

2D Implement the recommendations of the

Student Engagement Workgroup

Implement co-curricular transcript and

associated programming.

2E Create and implement a five-year plan for

creating a Learning Commons

Continue the work of the Teaching

Learning Collaborative Work Group to

determine needs of students, faculty,

and staff and provide opportunities

and resources to meet those needs.

TLC is now an official College

Committee. The TLC website has been

updated, a SharePoint site created, a

service request tab created, and

regular emails sent to announce

opportunities and request ideas for

programming needs. Feedback is

discussed at TLC meetings.

7

Page 8: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Sub Plans:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Library

Credit Programs

Institutional Research

Learning Support Services

Academic Plan

College Wide Plan

Dan Deckler

Assessment Plan for Credit & NonCredit Instruction

Continuing Education & Workforce Development (CWED)

2F Offer faculty reading circles and/or mini-

symposiums on teaching, learning, and

assessment

Incorporate opportunities for teaching,

learning, and assessment into

programming for the new Teaching

Learning Collaborative (TLC).

The TLC sponsored: Two Webinars:

“Perfecting the Blend: Designing

Blended Course Interactions” and “The

Flipped Approach to a Learner-

Centered Class”; Six Technology Show

& Tell workshops; and an Educational

Technology Open House with Hands-

on classroom technology assistance on

Sympodiums, Document cameras,

Tech- enhanced classrooms, Distant

Learning classrooms, and cameras for

video recording.

8

Page 9: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Sub Plans:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Library

Credit Programs

Institutional Research

Learning Support Services

Academic Plan

College Wide Plan

Dan Deckler

Assessment Plan for Credit & NonCredit Instruction

Continuing Education & Workforce Development (CWED)

3 Develop new educational pathways and

programs

1D,2A,2B,

2D,3C,3E,4C,

6B

Evaluate opportunities with Summit

College, College of Business, Social

Work, and Nursing to determine

collaborative academic programs.

Continue to explore the possibility of

offering a Geospatial Intelligence

program along with the College of

Wooster.

The BBA completion program will

begin this fall semester. The four-year

Social Work completion program will

begin spring, 2014.

3A Create a Non-Credit to Credit Pathway Work

Group to study and target new

program/pathway opportunities

Identify additional pathways that align

with Wayne College academic

programming.

3B Create an Industry Advisory group to help

identify and articulate career pathway training

and education needs

Create a new Industry Advisory Group.

3C Maintain and expand off-site PSEOP, including

the Orrville Academy, as financially feasible

Review financial impact of new Orrville

Academy model.

9

Page 10: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Sub Plans:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Library

Credit Programs

Institutional Research

Learning Support Services

Academic Plan

College Wide Plan

Dan Deckler

Assessment Plan for Credit & NonCredit Instruction

Continuing Education & Workforce Development (CWED)

3D Monitor and evaluate the effectiveness of the

Associate of Technical Studies Degree pathway

for career center graduates/completers and

CEWFD program completers

Look for opportunities to link academic

programs at the career center and

CEWFD program to an Associate of

Technical Studies Degree.

3E Maintain effective communication between

Wayne College faculty and administrators and

counterparts on the Akron campus to

maximize programming opportunities at

Wayne College

Encourage faculty to continue and/or

enhance collaboration with Akron

Campus departments.

The Associate Dean has been in

worked with CBA, Social Services, the

College of Fine Arts, and School of

Nursing to bring programs and courses

to Wayne College.

3F Expand partnerships with other educational

institutions to offer additional programming

and pathways

Explore possibility to offer a Geospatial

Intelligence program with the College

of Wooster.

With the closing of CACI this effort has

been cancelled.

10

Page 11: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Sub Plans:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Library

Credit Programs

Institutional Research

Learning Support Services

Academic Plan

College Wide Plan

Dan Deckler

Assessment Plan for Credit & NonCredit Instruction

Continuing Education & Workforce Development (CWED)

4 Promote a culture of assessment and

accountability among instructional and

instructional support staff

7A, 7B, 7C,

7D, 7E

Work with Akron Campus departments

to implement any common

department assessments for both gen

ed and technical programs. Develop

comprehensive plan for Program

Review/Assessment and write follow-

up report for HLC.

UA General Education Assessment

Revision is ongoing. The Program

Review process has been approved by

the HLC and will be piloted starting in

Fall 2013.

4A Lead the development and implementation of

a student learning outcomes assessment

“dashboard”

Implement new learning outcomes

process once developed by the

General Education Review Committee.

4B Ensure the dissemination of learning outcome

assessment results to students and the

community

Work with Public Relations to

determine best way to disseminate

learning outcome assessment results.

No progress.

11

Page 12: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Sub Plans:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Library

Credit Programs

Institutional Research

Learning Support Services

Academic Plan

College Wide Plan

Dan Deckler

Assessment Plan for Credit & NonCredit Instruction

Continuing Education & Workforce Development (CWED)

4C Conduct at least one process analysis and

improvement project in each department/area

reporting to the Office of Academic Affairs

Work with the Continuous

Improvement Committee to provide

training for directors of each

department/area reporting to the

Office of Academic Affairs. Conduct

one process analysis and improvement

project in each department/area.

No progress.

4D Maximize the value of information obtained

from student satisfaction, student

engagement, and student learning

standardized inventories through rigorous

analysis, cross-reference, and action plan

development

Review results of CCSSE and make

recommendations.

CCSSE Administered. Report and

observations available to Wayne

College community in Sharepoint

Institutional Research Documents.

12

Page 13: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Sub Plans:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Library

Credit Programs

Institutional Research

Learning Support Services

Academic Plan

College Wide Plan

Dan Deckler

Assessment Plan for Credit & NonCredit Instruction

Continuing Education & Workforce Development (CWED)

5 Participate and contribute to the

implementation of the College’s twenty-year

campus development plan in areas related to

instruction and instructional support

1C,5A,5B,5F Monitor ADA population and

determine space needs to

accommodate required services.

The front entrance to the main

building needs an ADA door. Russ

Pugh has been made aware of this

need.

5A Lead studies into advances in classroom

instructional technology, science teaching and

learning, learning commons and instructional

support resources to assist in planning and

development of new teaching and learning

spaces

Continue the work of the Teaching

Learning Collaborative Work Group to

determine needs of students, faculty,

and staff and provide opportunities

and resources to meet those needs.

FDC to host a retreat based on

instructional technology.

See 2E above (determine needs).

TLC has developed the following

spaces / resources based on feedback:

Sympodium practice stations in the

library, Presentation practice space in

C-115, and a studio room for recording

lectures / tutorials in F-118.

NEED FEEDBACK FROM FDC

REGARDING RETREAT

13

Page 14: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Sub Plans:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Library

Credit Programs

Institutional Research

Learning Support Services

Academic Plan

College Wide Plan

Dan Deckler

Assessment Plan for Credit & NonCredit Instruction

Continuing Education & Workforce Development (CWED)

5B Gather and maintain data to best project

classroom and instructional space needs

Review classroom usage to determine

future needs.

No progress.

5C Create and evaluate potential new models for

semester/facility scheduling to maximize

student access and facilities usage

Initiate a plan for block scheduling on

at least one technical program.

No progress.

5D Establish and carry out appropriate faculty

hiring goals to achieve appropriate full-time to

part-time ratios and to meet instructional

needs and priorities

Due to four additional full-time faculty

retirements effective May 2012,

appropriate staffing has become a top

priority. Use both tenure-track and

visiting faculty positions to meet

immediate needs.

Three new tenure-track faculty were

hired this summer and will be joining

Wayne College this fall. Two new

visting professor were requested,

approved and will be hired to begin

this fall.

14

Page 15: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

1 Support the program review process for credit

and non-credit programs as stated in the

Academic Plan

1B,1D Develop a plan to implement Program

Review that focuses on assessment as

required by HLC.

A plan has been developed and

approved by HLC.

1A Study and improve the Course Assessment

Report form, system, and archive to improve

compliance and usefulness

Expand the use of "FAIR" to all faculty. The "FAIR" instrument was made

available to all faculty this past spring

semester.

1B Establish criteria and format for non-credit

assessment-based program review in 2011-

2012 for implementation in 2012-13

Refine format and computerize the

collection of data to provide a more

professional report.

2 Maintain documented annual assessment

plans for all credit programs and establish

documented annual assessment plans for

programs in CEWFD and Student Services

1A,1C,1D Same as above.

3 Establish and maintain a student learning

outcomes “dashboard”

4A,4B Determine what student learning

outcomes should be included in the

dashboard.

3A Design dashboard contents and establish

maintenance system in 2011-12

Same as above.

3B Disseminate publically through appropriate

channels in 2011-12

Determine the most appropriate

channel to disseminate student

learning outcomes dashboard.

3C Evaluate effectiveness and usage for

improvement in 2012-13

Same as above.

Assessment Plan for Credit & NonCredit Instruction

Academic Plan

Dan Deckler

15

Page 16: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Assessment Plan for Credit & NonCredit Instruction

Academic Plan

Dan Deckler

4 Offer at least one reading circle/mini-

symposium on teaching, learning and

assessment per year

2F Work with the Assessment Committee,

Faculty Development Committee,

and/or the Teaching/Learning

Collaborative to offer a reading

circle/mini-symposium on teaching,

learning, and assessment.

The TLC sponsored: Two Webinars:

“Perfecting the Blend: Designing

Blended Course Interactions” and “The

Flipped Approach to a Learner-

Centered Class”; Six Technology Show

& Tell workshops; and an Educational

Technology Open House with Hands-

on classroom technology assistance on

Sympodiums, Document cameras,

Tech- enhanced classrooms, Distant

Learning classrooms, and cameras for

video recording.

4A Maintain partnership between Assessment

Work Group and Faculty Development

Committee as facilitators

Same as above. No progress.

4B Increase participation of part-time faculty and

non-credit instructional and student services

staff

Extend invitations of programming to

part-time faculty and non-credit

instructional and student services staff.

This has been done, especially with

CPs.

16

Page 17: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Assessment Plan for Credit & NonCredit Instruction

Academic Plan

Dan Deckler

5 Increase awareness of learning outcomes and

assessment practices and results among

students and community partners

4B Develop a comprehensive assessment

plan that increases awareness of

learning outcomes and assessment

practices.

A learning outcomes awareness

campaign including bookmarks and

framed posters was completed two

years ago as part of the HLC

comprehensive visit preparations.

Academic Assessment Work Group

continued efforts to promote the use

of CARS and new FAIRS assessment

reporting systems. The new Program

Review Process (pilot to being in Fall

2013) will continue to increase

awareness and use of these tools.

6 Create action plans based on results of Noel-

Levitz, CCSSE, and Educational Profile data

4D Bill Clark to develop a report that

summarizes results of Noel-Levitz,

CCSSE, and Educational Profile data

Completed and located in Sharepoint.

17

Page 18: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

1 Sustain Growth in Services and Quality Delivery 3ABCDE, 5D

College Plan

As of now, these goals remain the

same. The office is working with Akron

WDCE and MCUC to establish a more

centralized focus that will provide

more opportunities for growth and

reduce inefficiencies.

We spent a lot of time this year in

trying to become one unit with Akron

and MCUC. This has been a challenge

and still a work in progress.

1A Create an opportunity funnel of at least

$50,000 or more in potential contract training

sales at all times that will meet annual

targeted revenue

This was maintained over the last fiscal

year. However, contract training was

down overall this year. There was on

major project that fell through. The

company received a large training

grant and then backed out.

1B Increase average enrollment per class for both

existing and new programming by 10%

annually to meet annual revenue targets

Open enrollment revenues stayed

about the same from 12 to 13. We will

not have the final amounts until after

the year close.

1C Increase individual and company tests and

assessments by at least 20% annually to

increase testing revenues $5000 or more for

each year

Testing stayed about the same.

Continuing Education & Workforce Development

Academic Plan

Amy Mast

18

Page 19: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Continuing Education & Workforce Development

Academic Plan

Amy Mast

1D Research and obtain external grant funding of

at least $50,000 annually to support growth in

both contract and open enrollment

programming

We continue to implement the DOL H-

1B grant over the last year. The grant

was a little of 1million and will run

through November of 2015

2 Program and Product Development 1C, 2B and

3A, B, C, D,

E, of College

Plan and 3A,

B of

Academic

Plan

We did bring on severl new programs

in the last year. 1. Project

Management Essentials, which is one-

day FranklinCovey course on project

management skills. We ran it for the

first time and had 20 enrolled which

was excellent. 2. Offered a series of

DOL workshops, again well received

had betweent 30 and 40 people at

each workshop. 3. Bringing on an

online Electronic Health Record

Specialist program.

2A 20% of OCEWD’s programs are to be new or

reconfigured from existing programs in order

to meet the needs of the workforce both now

and in the future

See above for new programs.

19

Page 20: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Continuing Education & Workforce Development

Academic Plan

Amy Mast

2B Identify programming needs through a variety

of resources which include federal, state and

local government agencies, national and state

professional organizations, chambers of

commerce, economic development councils,

other colleges and universities, businesses, and

training vendor

The office is involved with various

commmunity and state organizations.

3 Data-Driven for Continuous Improvement 7C and D

College Plan

and 1D

Academic

Plan

3A Develop an inquiry form on the website and

track weekly inquiries for both prospective

students and business inquiries

We have an email that is univeral to

our office that we respond to inquiries.

This has been proven to be effective,

since someone in the office is available

to respond.

3B Track weekly registrations (lead measure) to

reach enrollment targets for open enrollment

programs

We do monitor registrations several

weeks out. We make follow-up phone

calls, send additional Constant Contact

emails to boost or meet target

enrollments.

20

Page 21: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Continuing Education & Workforce Development

Academic Plan

Amy Mast

3C Meet operating margins for key program areas

to remain financially solvent. Overall margin

for open enrollment is 40% and contract

training is 50-55%

The main problem this year financially

was the drop in contract training

reveunes. The contract training that is

sold continually meets the operating

margin of 55%

3D Maintain high levels of customer satisfaction

for all program areas. A minimum of 4 on a 5

point scale should be the target

We continue to receive high customer

service ratings. We continually monitor

these reports after each program.

Problems are addressed immediately

when customer satisfaction is lower

than expected.

3E Completion rates for career-training programs

90% or higher and 75% certification

attainment

Completion rates for career training

program are around 90%. We only

track those students who test here.

21

Page 22: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

1 Review all credit programs 2012-2013 using

the Wayne College 2003 Program Review

model and the University of Akron 2005 model

1B Complete program review for

Engineering using UA model. Plan and

implement program assessment

review as required by HLC. Report due

July 2013.

Not completed.

2 Develop two pathways for non-credit to credit

programs

3ABDE Further explore computer networking

pathway and operationalize if deemed

viable.

2A Establish two industry advisory boards to help

identify and prioritize marketable job

skills/careers in the region to prioritize

pathway programs

Establish one industry advisory board

for Wayne County and one for Holmes

County.

2B Maintain and expand non-credit educational

partnerships with University/College CEWFD

and local career centers

Identify one non-credit educational

partnership with CEWFD and local

career centers, possibly network

security.

2C Monitor Associate of Technical Studies degree

enrollments and determine ways to maximize

market

Determine the viability of developing

an operational plan to identify

students who may benefit from an

Associate of Technical Studies.

No progress.

Credit Programs

Academic Plan

Dan Deckler

22

Page 23: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Credit Programs

Academic Plan

Dan Deckler

3 Maintain and expand Off-site PSEOP program

as economically feasible

3C Evaluate economic feasibility of new

"Academy" model.

On-going we maintain between 10 to 14 high

schools with which colaborate. The goal is 12

high schools per semester. Maintaining double

digits will be challenging, due to some IHL's

offering similar programs for no costs to the

district. Our budget may struggle with our

current aggreements, so free would be

impossible without business sponsors.

3A Launch the Orrville Academy Expand academy model to all PSEOP

partners if economically feasible.

The Orrville Academy was successfully

launced.

3B Establish systematic communication and

quality control standards and procedures to

ensure consistency of course content, delivery,

and assessment

Determine if the form should be

implemented by all general education

and technical program areas.

No progress.

4 Bring new programs (associate and/or

bachelor’s degree) to Wayne College via

partnerships with Akron departments and/or

other educational institutions

Continue these discussions with Akron

departments.

The BBA completion program will start

this fall and the four-year Social Work

program will begin spring 2014

23

Page 24: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Credit Programs

Academic Plan

Dan Deckler

4A Partner with one Akron department to offer

300 and/or 400 level majors courses on our

campus

Ongoing discussions with Akron

departments in general education and

technical program areas.

Wayne College has added the following 300 and

400 level courses in the past three years:

2420:300 Supervision in a Technical

Environment

2420:301 Information Design

2420:302 Ethical Issues in the Workplace

2420:310 Leadership Principles and Practices in

Technical Organizations

2420:311 Community Service and Leadership in

a Global Context

2420:401 Leading Project Teams in Technical

Organizations

2420:402 Assessing and Improving Technical

Organizations

2420:421 Senior Seminar in Organizational

Supervision

3600:324 Social and Political Philosophy

5550:330 Exercise and Weight Control

5550:352 Strength and Conditioning

Fundamentals

5550:355 Exercise of Special Populations

7600:325 Intercultural Communication

7600:344 Group Decision Making

7600:345 Business and Professional Speaking

4B Partner with one educational institution to

bring a new associate degree to our campus

Determine what needs exist for our

service area and if a partnership is the

best way to approach this.

No progress.

24

Page 25: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Credit Programs

Academic Plan

Dan Deckler

5 Develop alternate course delivery and

scheduling of classes to increase accessibility

2B,3E Develop a plan to pilot one co-hort

group technical program to improve

scheduling. Identify additional DL

opportunities.

The BBA completion program will be a

cohort of students meeting every

Saturday.

25

Page 26: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

1 Continue the assessment of the student

experience at Wayne College

Continue ongoing assessment

1A Re-administer the Noel-Levitz Student

Satisfaction Inventory, interpret the results in

the context of provided norms, prior

performance, and other available indicators

and communicate findings to the College

community

1B, 6C Administer spring 2013.

1B Re-administer the Community College Survey

of Student Engagement (CCSSE) parallel to the

Noel-Levitz Student Satisfaction Inventory

1D Analyze results when available.

1C Continue standing Student Evaluation of

Instruction program. Improve automation of

the protocol

1D Continue ongoing assessment

2 Study and build an empirical model of student

enrollment and retention

Integrate data when available

2A Further study and develop a model and

student retention

1A Integrate data when available

2B Model and understand the relationship

between available leading demographic

indicators in the College service and student

enrollment suitable to set benchmarks and to

identify underserved areas

1A Add more exhibits where opportunities

present themselves

Institutional Research

Academic Plan

Bill Clark

26

Page 27: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Institutional Research

Academic Plan

Bill Clark

2C Model and understand the relationship

between high school graduation rates and

enrollment suitable to set benchmarks and

identify schools in which the College is

underperforming in recruitment

4F Integrate ETS Proficiency Profile data

when available

2D Model and understand the relationship

between available student data including,

demographics, test, scores, enrollment, and

grades

1A Integrate ETS Proficiency Profile data

when available

2E Develop a series of discriminate functions

which predict the success or failure of students

based upon key variables such as admission

type and academic program

1A, 6B, 6C Integrate ETS Proficiency Profile data

when available

2F Construct and Maintain new College fact book 1A Add more exhibits where opportunities

present themselves

3 Assess student learning and course, program,

and institutional outcomes

Begin analysis of new data

3A Provide data to support assessment-based

program review of technical programs

6C, 1A Provide reports as requested

3B Restart assessment of general education

outcomes through establishment of protocol

using the ACT Proficiency Profile

6B,AP1A,

AP1B

Continue administration of ETS

Proficiency Profile and improve

protocol

27

Page 28: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

1 Maintain effective student success programs 2AC

1A Continue to expand participation in the AMP

and RAMP programs; assessment and modify

annually to continuously improve effectiveness

and participation

Fall 2012: Students on Academic

Probation may be required to work

with an academic mentor.

Fall 2012 and Spring 2013: The

Learning Center will work more closely

with Student Services to assist

probationary students in bringing up

their GPA.

Summer 2012: Voluntary AMP.

Advisors will emphasize importance of

an academic mentor to entering adult

students, provisionally admitted

students, students taking at least one

development class, all late enrolling

students.

Summer 2012: Very little voluntary

AMP participation.

Fall 2012: Students on probation after

Sp 2012 were required to attend SAS

rather than AMP.

Spring 2013: LSS participated in Feb.

2013 Academic Intervention Sessions

Spring 2013: Students on probation

after F 12 were enrolled in AMP

Learning Support Services

Academic Plan

Sue Horn

28

Page 29: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Learning Support Services

Academic Plan

Sue Horn

1B Continue to expand learning communities to

include more opportunities for students

- Program-specific learning

communities will not be offered for

2012-2013. Future of program-specific

or other content-based LCs TBD.

-Faculty stipends will encourage

consistent faculty participation.

- Continue to offer Developmental

Learning Community (CFLC)

- Continue to offer Provisional Learning

Community (BSLC)

- Increase collaboration between

Student Services regarding

programming needs focusing on the

needs of developmental and non-

traditional students.

Program-specific learning communities

were not offered.

Fall 2012: Faculty stipends encouraged

active Learning Community

participation.

Fall 2012: CFLC and BSLC were offered.

Spring 2013: Due to low enrollment,

no Learning Communities were

offered.

F 12 and Sp 13: Student Services and

LSS conferred regularly regarding

student needs.

29

Page 30: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Learning Support Services

Academic Plan

Sue Horn

1C Maintain and grow offerings including PB&J

Thursdays, etc.

- Work collaboratively with Student

Services to make SAS a worthwhile

offering for students on academic

probation.

- PB&J will be offered to all Learning

Communities during their meeting

times.

- PB&J will be open to all Wayne

students.

August 2012: Strengthening Academic

Skills (SAS) offered as a one-day

institute.

Fall 2012: PB&J workshops offered to

Learning Communities during their

meeting times.

F 12: PB&J workshops also open to all

Wayne students

Spring 2013: A full schedule of PB&J

workshops was open to all Wayne

students.

2 Evaluate and improve professional and peer

tutor training programs

2F,4C

2A Survey tutors and trainers regarding

effectiveness and satisfaction in 2011-12

Train new professional tutors in Level 1

certification.

Train peer tutors as appropriate to

their certification levels

"Internal survey" conducted November

2012 for peer and professional tutors

and student assistants.

30

Page 31: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Learning Support Services

Academic Plan

Sue Horn

2B Modify processes based on results in 2012-13

as needed

Implement tutor training changes

made during recertification process.

Make peer tutor pay scale consistent

with computer assistants.

Using the new tutor-training

curriculum:

Three new professional tutors were

trained and awarded Level 1 CRLA

tutor certification.

Three peer tutors advanced in their

CRLA certiification levels.

ALL student tutors are paid based upon

their training and experience.

3 With the library, Technical Support Services,

Business Office and Office of Academic Affairs

develop a plan to create a learning commons

2E,5A Spring 2013: The Learning Commons

concept was replaced by the Teaching

and Learning Collaborative, which

became a College committee within

the governance structure.

The Coordinator of the SLC computer

lab became a standing member of the

TLC.

3A Establish a team and conduct feasibility study

(2010-11)

TBD NA

31

Page 32: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Learning Support Services

Academic Plan

Sue Horn

3B Create 5 year plan; implement first phases of

plan 2011-12

NA

3C Evaluate and implement second phase 2012-

13

NA

4 Conduct staffing analysis and determine

staffing priorities for next 5 years

2

4A Establish on-going systematic tracking and

evaluation of ADA and personal counseling

student numbers and needs and service

provision

- Add staff and testing space as

suggested by analysis

- Analyze and implement changes and

develop training related to the Wayne

staff/faculty survey.

- Increase collaboration between

Student Services regarding

programming needs focusing on the

needs of ADA, traditional, and non-

traditional students.

- Continue tracking ADA and personal

counseling needs and service

provision.

Fall 2012: Room B-106 was designated

as a testing room, complete with

privacy dividers.

Fall 2012: Personal Counselor and ADA

coordinator began reporting to

Student Services.

January 2013: ADA coordinator began

work.

Based on 2012-2013 faculty survey,

implemented additional training and

workshops, focusing on dealing with

distressed students and suicidal

students.

Created faculty handbook for dealing

with distressed students.

32

Page 33: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Learning Support Services

Academic Plan

Sue Horn

4B Establish on-going systematic tracking and

evaluation of faculty and student demands on

computer assistance and computer lab access

and needs

- Add staffing as suggested by analysis.

- Continue tracking student visits to the

computer lab in Tutor Trac.

- Continue encouraging and monitoring

faculty assistance.

April 2013: Full-time Coordinator of

the LC Computer Lab began work.

TutorTrac recorded all student visits to

the computer lab.

Coordinator of the LC computer lab

manually tracked faculty visits.

Based upon changes to the

Springboard platform, an on-campus

workshop was held for faculty.

2 "open labs" were also offered to

faculty.

33

Page 34: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

1

Innovate to improve library services,

technology, and resources

4

Continue rotation of reviewing and

updating all library policies on an

annual basis.

Complete the following policies:

• Information Literacy Policy

• Communication Plan

• Collection Development Policy

The communication plan is complete

and posted. A draft of the information

literacy plan is posted on SharePoint.

The Collection development policy is

still being developed with focus on e-

resources.

1A

Develop and implement a plan to continuously

improve the information literacy instruction

program

Complete the Information Literacy Plan

and gather feedback from

stakeholders.

The information literacy plan was

drafted and posted on SharePoint but

still requires feedback.

1B

Develop and implement a plan to continuously

improve overall library services, including

information / reference services

Complete the FY2012 Annual Report.

Develop an assessment plan for all

library services.

An annual report was not completed

for 2012 but is in the works for 2013.

Maureen has joined an assessment

work group through OhioLINK.

1C

Develop and implement a plan to continuously

improve library collections and resources

Continue implementation of 5-year

weeding plan.

Complete the collection development

plan.

5-year weeding plan continues as

planned. Collection development plan

is not yet complete. Table the

collection development plan until

ebook purchasing is underway.

1D

Review the current model of staffing and

provision of library services and implement

changes reflecting outreach to off-sight

locations and potential budgetary restrictions

Perform annual library usage study Fall

2012.

Perform annual question collection

study Spring 2013.

Both studies completed as planned.

Library

Academic Plan

Maureen Lerch

34

Page 35: STRATEGIC PLAN PROGRESS REPORT - University of Akron€¦ · STRATEGIC PLAN PROGRESS REPORT Plan: Parent Plan: Prepared By: Sub Plans: Priority Number & Letter Stated Priority Linkage

STRATEGIC PLAN PROGRESS REPORT

Plan:

Parent Plan:

Prepared By:

Priority

Number & LetterStated Priority

Linkage to

Parent Plan

2012-2013

Goal

2012-2013

Progress Narrative

Library

Academic Plan

Maureen Lerch

2

Transform library spaces into secure,

welcoming environments that enhance library

services and operational efficiency, and

anticipate the needs of current and future

users 2E,5A

See 2a and 2b for detail below.

2A

With the Learning Support Services, Technical

Support Services, Business Office and Office of

Academic Affairs develop a plan to create a

learning commons

Visit UAL Information Commons when

complete, interview participants to

gain insight on their model. Repurpose

the "old reference desk" to be used as

a TLC collaboration station.

Four library staff members met with

UAL faculty and staff to review

information commons space. Former

reference desk houses two Sympodium

SMART stations for faculty and student

use.

2B

Reconfigure library spaces to ensure ample

and flexible seating in a welcoming library

environment

Continue to implement portions of the

library space proposal, primarily

focusing on placement of furniture and

reuse of the empty reference stacks.

Furniture moved to increase space for

wheelchair access and group

interactions.