A Progress Report on K-12 Basic Education Program of Manresa School
Objectives of the Progress Report
1. To make all the stakeholders fully understand the K-12 Program and its implementation.
2. To share actions and strategies towards the transition to K -12 from the old basic education curriculum.
MS Accomplishments1. Administrators’ Professional Development - October 2010; SY 2011-2012 to SY 2012-2013 The school’s administrators attended a series
of seminars from PAASCU, CEM and CEAP Summit conferences on K-12 Basic Education Program .
- January 19, 2012 An Advisory Council meeting was held wherein
the administrators and coordinators discussed the K-12 Goals and the stand of Dep. Ed. on the curriculum reform.
MS Accomplishments1.Administrators and Coordinators’ Professional
DevelopmentFebruary 16, 2012; March 31, 2012 The administrators and coordinators underwent the
Strategic Planning session with an invited resource person on curriculum development. A follow –up administrators’ workshops on SWOT analysis was conducted as well.
April 11 and 26, 2012The Elementary Asst. Principal, some coordinators and teachers were sent by the school to seminars on K-12 Mother Tongue and Spiral Approach.
MS Accomplishments
1. Administrators’ Professional Development May 15-16, 2012 The Hijas de Jesus Schools’ RCA’s and
Principals with the Provincial Superior convened a roundtable discussion on educative mission and they reflected together on the future of the F.I. schools in the face of the K-12 educational program of the government.
MS Accomplishments1. Administrators and Coordinators’
Professional Development Aug. 29-31, 2012 The CEAP National Convention with con –
current session on K-12 was attended by the administrators.Sept.18-19, 2012; October 9-10 and 12, 2012Administrators’ Seminars on K-12 Transition Management organized by different organizations were participated in by MS members of administration.
MS Accomplishments
1.Administrators and Coordinators’ Professional Development
November 23, 2012 Members of the administration attended the
Annual PAASCU Convention with a theme: “The Future of Accreditation: Building on Strengths, Navigating Change.” The convention focused on the changes facing the educational system.
MS Accomplishments
2. Teachers’ Professional DevelopmentFebruary 29, 2012 The teachers underwent the SWOT analysis
workshops with an emphasis on re – articulating the school’s V-M and assessing the internal and external environment that have a contribution to the school’s curriculum and instruction and other services.
MS Accomplishments2. Teachers’ Professional DevelopmentMay 2, 2012Gr.7 English, Math and Science teachers, coordinators and administrators attended the K-12 Unpacking Gr. 7 curriculum.May 8, 2012An Update Session on K-12 Program and its Key features and Curriculum Model was given to all faculty during the In – service training .
MS Accomplishments2. Teachers’ Professional Development May 9-10, 2012 The teachers underwent the SWOT Analysis
Workshops by subject area during the In – Service Training that contributed to planning frameworks.
November 16, 2012 Grades VII to Year III Advisers with some members
of Administration had benchmarking in San Beda College, Muntinlupa City and Colegio de San Agustin, Makati City.
MS Accomplishments2. Teachers’ Professional Development
November 17, 2012 The Preschool, Elementary and High School teachers had a school-based seminar in Manresa School about Spiral-Progression Approach by an invited resource person. All the participants engaged themselves in the simulation activities on inquiry-based approach.
MS Accomplishments
3. Curriculum and Instruction February 2012
The Kinder and Prep pupils were given an oral diagnostic test in reading to assess the reading ability in preparation for Grade I level.
MS Accomplishments
3. Curriculum and Instruction
March 12-23, 2012 The Preparatory pupils in SY 2011-2012
with the reading difficulty attended a two week reading class to better prepare them in Grade I level.
MS Accomplishments
3. Curriculum and InstructionMarch 6, 2012 The school conducted a survey on the
parents’ educational goals to all Grade VI to Yr. III levels before the end of the SY 2011-2012 in order to know the parents’ aspirations that are important in the curriculum development.
MS Accomplishments
3. Curriculum and InstructionMay 11, 2012; May to June 2012
May 14 -31, 2012The Grade 1 and 7 teachers with the subject area coordinators studied and made the subject syllabi following the K-12 Curriculum Guides during the in – service training .
The Asst. Principals and Principal studied the curriculum guide of the K-12 and the guides were distributed to the coordinators for their area articulation during the in-service training. On- going follow up on Gr. 1 and 7 curriculum guides was given emphasis .
MS Accomplishments
3. Curriculum and InstructionJune 25 –July 25, 2012
The 19 accelerated Gr. 1 pupils were given an intensive Reading class .
September to October 2012
All the Gr. 1 pupils were given an oral reading diagnostic test in English to check their progress in reading skills.
MS Accomplishments3. Curriculum and Instruction Course Offering - Mother Tongue was offered as a separate subject in Gr. I level. - Music, Arts, and P.E. are separate subjects in Gr. I level. - Arts was offered as a separate subject in Grade 7. - A decongested curriculum in Gr. 1 and 7
MS Accomplishments3. Curriculum and Instruction October 20, 2012 The principal and asst. principals
conducted an initial curriculum audit that focused on matching the Gr. 1 and 7 syllabi in English, Math and Science with the K-12 Curriculum Guides to reinforce the competencies in the second and third term.
MS Accomplishments3. Curriculum and InstructionNovember 8, 2012 The Preschool Coordinator, Preschool Teachers
and Principal discussed the prescribed K-12 curriculum in the Preschool and considered the designed framework of the curriculum in order to decongest the existing Preschool curriculum but with an emphasis on basic skills in reading, writing and numeracy.
MS Accomplishments
3. Curriculum and Instruction November 20, 2012 The school’s request from an
invited consultant to critique the Pre – Assessment test items was confirmed.
MS Accomplishments4. Assemblies, Committee Meetings and
Consultation MeetingsSY 2011-2012; SY 2012-2013 Conducting assemblies, committee
meetings and consultation meetings were adopted in the development of the implementation of the K-12 Basic Education Program.
MS Accomplishments
4.Assemblies, Committee Meetings and Consultation Meetings
February 15, 2012 An orientation meeting on K-12 Program was given to all faculty and staff.February 17, 2012MSPA Officers, Section representatives, Grade VI and Preschool parents were provided an orientation on K-12 Program.
MS Accomplishments4. Assemblies, Committee Meetings and
Consultation MeetingsFebruary 29, 2012 The MSPA, Alumni and MSGSB representatives
joined the administration, faculty and staff in the SWOT Analysis Workshops on the school’s
V-M, curriculum and instruction and the challenges of K-12 Program.
MS Accomplishments4.Assemblies, Committee Meetings and
Consultation Meetings
June 14, 2012Old Parents’ Orientation on K-12 Program was held in Manresa School at the start of the school year.June 15, 2012The new parents were also given an Orientation on K-12 Program which was held in Manresa School.
MS Accomplishments4. Assemblies, Committee Meetings and
Consultation MeetingsSept. 3, 2012An open and consultative process was conducted by the RCA to the Core Group on Move–up plan.Sept. 4, 2012 A consultation dialogue about K-12 was initiated by the administration with the Asst. Superintendent of Dep. Ed Parañaque Division Office.
MS Accomplishments4. Assemblies, Committee Meetings and
Consultation MeetingsSept. 4, 2012The school’s application letter of the proposed Move –Up Transition Plan was submitted to the Office of the Dep. Ed. Undersecretary Yolanda Quijano.Oct. 2, 2012The second consultation meeting of the RCA with the core group focused on the approval of Dep. Ed as regards the proposed plan of Manresa School.
MS Accomplishments
4. Assemblies, Committee Meetings, Consultation Meetings
October 4, 2012 A general assembly of faculty and staff was
held wherein the RCA discussed the school’s plan on K-12 Program.
October 8-15, 2012 Small Group/ Area meetings on Move –
Up plan were considered.
MS Accomplishments
4. Assemblies, Committee Meetings, Consultation Meetings
October 16, 2012 A core group meeting on the K-12 Move - Up
Transition Plan was prioritized. The progress report of the implementation of K-12 and some steps in the Transition Program of the school were thoroughly discussed.
MS Accomplishment4. Assemblies, Committee Meetings and Consultation
MeetingsOctober 23, 2012 A consultation meeting of the RCA with the core
group on the school’s plan for K-12 was conducted for the 3rd time.
October 25, 2012 A review of the school’s Transition Management
Plan was tackled by the administration and the core group.
MS Accomplishments
4. Assemblies, Committee Meetings and Consultation Meetings
October 25, 2012 As part of MS educative community, the MSPA
Officers and Board Members, Section Representatives from Gr. 1 to 7, and MSGSB officers attended the Consultation meeting on K-12 set by the school. Questions and suggestions about the transition plan of the school were addressed and taken into consideration.
MS Accomplishments
4. Assemblies, Committee Meetings and Consultation Meetings
October 29, 2012 An orientation meeting about the K-12
and Move-Up Transition Plan was provided to the parents of Grades 1 to 7. Some questions and clarifications were addressed during the meeting.
MS Accomplishments4. Assemblies, Committee Meetings and
Consultation Meetings Nov. 12, 2012 An orientation about the M-UTP and Summer
Bridge Categorized Program was provided to all the students from Grades 3 to 7. The students were given a chance to raise their questions and they were all answered and further explained for better understanding of their concerns.
MS Accomplishments
4. Assemblies, Committee Meetings and Consultation Meetings
November 15, 2012 The Grade 2 pupils were given a simple
orientation of the school’s M- UTP and Summer Bridge Categorized Program.
MS Accomplishments
4. Assemblies, Committee Meetings and Consultation Meetings
November 20, 2012 An orientation about Move- Up
Transition Plan was provided to the Preschool parents. The parents’ questions and concerns about M-UTP were addressed in the meeting.
MS Accomplishments5. On - Going Activities - Gr. 1 Oral Reading diagnostic test shall
be on going until December.- Gr.1 pupils shall undergo oral diagnostic test in Filipino in January 2013.
- Kindergarten pupils shall undergo Oral Diagnostic Test in reading before the end of the SY 2012-2013.
MS Accomplishments
5. On- Going Activities
- Training programs for teachers on Spiral – Progression approach and the K-12 Grading System
- Subject Area Linear sessions - Articulation workshops on Curriculum frameworks,
standards and competencies
MS Accomplishments
5. On – Going Activities - Development of instructional materials
- Utilization of action researches to improve the curriculum and instruction
- Research study on career path/ courses for Senior High
MS Accomplishments
5. On – Going Activities - Aligning of the existing Preschool Curriculum
with the prescribed K-12 Preschool Curriculum - Designing of Preschool instructional aids and
materials, teaching strategies and approaches - Matching the Kindergarten Curriculum with
the Grade 1 Curriculum
KINDERGARTEN GRADE 1
DOMAINS LEARNING AREAS CORE LEARNING AREAS
PHYSICAL HEALTH, WELL-BEING & MOTOR
DEVELOPMENT
CREATIVE AND AESTHETIC
DEVELOPMENT
SOCIAL EMOTIONALDEVELOPMENT
COGNITIVE / INTELLECTUALDEVELOPMENT
CHARACTER AND VALUES
DEVELOPMENT
LANGUAGE DEVELOPMENT
PHYSICAL EDUCATION & HEALTH,
MUSIC & ARTS
VALUES EDUCATION AND SOCIAL STUDIES
MATHEMATICS
SCIENCE
LANGUAGE
PHYSICAL EDUCATION AND HEALTH
MUSIC AND ARTS
EDUKASYONG PAGPAPAKATAO
ARALING PANLIPUNAN
MATHEMATICS
ENGLISH, FILIPINO AND MOTHER
TONGUEFigure 3. Kindergarten-Grade 1 Transition Paradigm
MS Accomplishments 5. On – Going Activities - Making of Pre – Assessment test by the subject
teachers
- Checking of Pre –Assessment test by the coordinators
- Consultation of Pre – Assessment test by an invited curriculum expert
- Preparation of the Pre-Assessment for Grade 1 to 7, Summer Subject Matter Budget, Modules for Summer Bridge Categorized Program and Summative Test.