    STREAK 1000 OCTOCOPTERInstruction Manual

    1

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    2/25

    Contents

    1. Safety Notes........................................................................................................................................................3

    2. Check List............................................................................................................................................................4

    3. Equipment Required For ssem!"y....................................................................................................................#4 ssem!"y Steps $ %otor and ESC So"derin&.......................................................................................................'

    (.) ssem!"y Steps $ *ody.....................................................................................................................................+

    (.1 ssem!"y Steps $ F,- and ,S %ount..........................................................................................................14

    (.2 ssem!"y Steps / F"i&ht direction indicator....................................................................................................1(

    (.3 ssem!"y Steps $ %otors and ,rops...............................................................................................................1#

    (.4 ssem!"y Steps $ *ipod Landin& ear...........................................................................................................1+

    (.( ssem!"y Steps $

    %u"ticopter Contro""er %ountin& 0""ustration.......................................................................................................2)

    #. uick Co""apsi!"e 0""ustration...........................................................................................................................21

    '. im!a" %ountin& 0""istration.............................................................................................................................23

    +. Specification......................................................................................................................................................24

    End f %anua"......................................................................................................................................................2(

    2

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    3/25

    1. Safety NotesDo fly only in safe areas and always away from other people! Do not operate RC aircraft within the

    vicinity of homes or crowds of people. RC machine are prone to accidents, failures, and crashes dueto a variety of reasons including pilot error, radio interference, and lack of maintenance. Pilot areresponsible for their actions and damage or injury occuring during the operation of RC aircraftmachine.

    hen flying the aicraft, the fast rotating props of treak "### may cause serious injuries with anyaccident occurred. $herefore please keep in mind that safety at first during the flight.

    The ONLY Flying direction suitable for Streak 1000:

    %ake sure you have installed your own &e'acopter Controller and the Props in the correct directionaccording to the factory(s manual of the Controller.

    3

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    4/25

    2. Check ListPlease Check the Follo !arts"

    )pc Propeller "*'*.+P -C* Pcs

    )pc Propeller "*'*.+P-CC * Pcs

    /arge Current Power01C2oard -2lack0 2luecolor with 3 pairs 2attery Cable.

    ervo 1'tension ire - 4#cm 5 pcs

    )6 wire Red - *7cm 5 pcs

    )6 wire 2lack - *7cm 5 pcs

    "pcs ' Direction 8ndicatingticker )lware 2rushless %otor 47"79"7 :;*## -

  • 8/13/2019 Streak1000OctManual.pdf

    5/25

    2attery upport Damper 5pcs pare crew Pack "pcs

    Fra#e Parts:

    %ain rame )ssembly" set

    P; > 6P %ounting )ssembly"Pcs -left/anding 6ear rame )ssembly" Pcs -right

    %otor %ount with ?uick /ock%ount )ssembly* sets

    %otor %ount with i'ed )rm)ssembly* sets

    /eading 6ear )ssembly3 sets

    /anding 6ear kid -*3# mm3 pcs

    (

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    6/25

    3. Equipment Required For Assem!y

    *#) 1C-= 33.3; -e.g.&obbying lyun *#) 1C5 pcs

    4.7mm 2ullet Connector-emale for 5pcs 1C3* pcs

    @;A %ode BctCopter Controller-e.g. D8 :9%" pcs

    Connectors or 2atteries andPower 2oard3 pairs

    $ransmitter -+C& or above" pcs

    Receiver -+Ch or above" pcs

    = /ipo Charger"pcs

    = /iPo 2attery 47##9+7##m)h33.3; - ill be connected inParallel

    3pcs

    #

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    7/25

    " Assem!y Steps # $otor and ESC So!derin%

    tep ".ou will received 5 motors in )/"###C2.

    tep 3.or the new motors, $hread /ock must be applied tothe two %4 et crews which is pre9inserted in themotor.-$his is a must for safety flying.

    tep 4.8nstall the Porp %ount to the motor using 4pcs %4&e' Cap crew. -)pply little amount of $hread /ockerwhen assembly metal to metal parts.

    tep *.Double check the prop mount which must be installedto the motor securely.

    ". older 2lack and Red )6 wires to the 1C.3. older 4pcs 4.7mm 2ullet Connectors -emale tothe 1C.4. Connect ervo 1'tension ire to the ignalConnector of 1C and secure it using )dhesive $ape.

    '

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    8/25

    &.' Assem!y Steps # (ody

    tep "./oosen the screw circled above as to uninstall theEpper %ain frame from the %ain rame )ssembly.

    tep 3./ower %ain rame with Power01C 2oardpreinstalled -on the left and the Epper %ain rame-on the right.

    tep 4.older 3 pairs 2attery Cable to the Power.1C 2oard.

    tep *.Close view of step 4 soldering.

    tep 7.Prepare four %otor %ount with i'ed )rm )ssembly

    tep =.Close view of %otor %ount with i'ed )rm )ssembly.

    +

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    9/25

    tep +./oosen the screws of the /ower side. $he &ook ide

    must pointing to the )'is /ine of the /ower %ainrame for installation.

    tep 5.8nstall the %otor %ount with i'ed )rm )ssembly onto

    the /ower %ain rame. ollow the installationdirection as shown above. (Apply little amount ofThread Locker to the screws before installation.)

    tep F.8nstall four %otor %ount with i'ed )rm )ssemblyonto the specific position of /ower %ain rame.

    tep "#.Reserve the above four screw holes for the /anding6ear installation in the later steps.

    tep "".Prepare four %otor %ount with ?uick /ock %ount)ssembly.

    tep "3.Close view of %otor %ount with ?uick /ock %ount)ssembly.

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    10/25

    tep "4./oosen the screws and ?uick /ock %ount of the

    /ower side. $he &ook ide must pointing to the )'is/ine of the /ower %ain rame for installation.

    tep "*.8nstall the %otor %ount with ?uick /ock %ount

    )ssembly onto the /ower %ain rame. ollow theinstallation direction as shown above. (Apply littleamount of Thread Locker to the screws beforeinstallation.)

    tep "7.ecure ?uick /ock %ount using %4'5mm crews.(Apply little amount of Thread Locker to the screwsbefore installation.)

    tep "=.Repeat step "49"7 to secure other three %otor %ountwith ?uick /ock %ount )ssembly onto the /ower %ainrame.

    1)

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    11/25

  • 8/13/2019 Streak1000OctManual.pdf

    12/25

    tep 3".8nstall the Epper %ain rame onto the /ower %ain

    rame )ssembly. ecure the screws for the four%otor %ount with i'ed )rm )ssembly first. (Applylittle amount of Thread Locker to the screws beforeinstallation.)

    tep 33.ecure the screws with 4mm asher for the four

    %otor %ount with i'ed )rm )ssembly. (Apply littleamount of Thread Locker to the screws beforeinstallation.)

    tep 34.(Apply little amount of Thread Locker to the screwsbefore installation.)

    12

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    13/25

    tep 3".8nstall the /anding 6ear rame )ssembly onto the

    /ower %ain rame using %4'"#mm crews from step+. (Apply little amount of Thread Locker to the screwsbefore installation.)

    tep 33.ecure the 2ooms.

    tep 34.ecure the all 2ooms using the pre9installed %4screws on the %otor %ount )ssemblies. -%ake sureall 5 2ooms are completely secured.

    tep 3*.Perform Part $" %uick Colla!sible &llustrationshown bellow as to check the folding mechanism offor arms.

    13

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    14/25

    &.1 Assem!y Steps # F)* and +)S $ount

    tep ".Prepare the P; > 6P %ounting )ssembly.

    tep 3.6et ready for the installation of P; > 6P %ounting)ssembly onto %ain 2ody.

    tep 4.8nsert the P; > 6P %ounting )ssembly onto %ain2ody Rib and secure with %3'=mm &e' Cap crews.(Apply little amount of Thread Locker to the screws

    before installation.)

    tep *.8ndicate the forward flying direction.

    14

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    15/25

    &.2 Assem!y Steps , F!i%ht direction indicator

    tep ".Cut the Direction 8ndicating ticker with a width ofaround "##mm.

    tep 3.$ear the cover layer of the ticker before stick to thefront Carbon )rm 2oom.

    tep 4.8ndicate the forward flying direction.

    tep *.tick the Direction 8ndicating ticker -"##mm idthto the two Carbon )rm 2oom in the forward flyingfirection. )nd use three pieces of )dhesive $ape tosecure the Direction 8ndicating ticker.

    1(

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    16/25

    &.3 Assem!y Steps # $otors and )rops

    tep ".Prepare *pcs %4'5mm &e'Cap crews with *pcs4mm ashers to install the motors to the %otor%ounts.

    tep 3.8nsert a %4'5mm crew into a 4mm asher theninsert to the motor mount slot as to mount the %otorto it. -)pply little amount of $hread /ocker whenassembly metal to metal parts.

    tep 4.ecure the motor to the motor mount with *pcsscrews and washers.

    tep *.8nsert the %otor ires into the slot of motor mountand connect with motors.

    1#

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    17/25

    tep 7.Repeat tep " to * for other + motors. $est the motorfirst without propellers as to ensure the rotatingdirection is correct. 1'change any two motor wires tothe 1C as to reverse the direction if needed.

    tep =.)fter ensuring the motors are running in the correctdirection, prepare the )PC Props and Prop mountingscrew and washer from the motors.

    tep +.8nsert the Root &ole )dapter -with =mm innerdiameter to the bottom side of )PC Prop.

    tep 5.8nstall the Propeller to the motors and secure it withProp mount crew and asher. -Please refer to your%ulticopter Controller %anual to install the CC >C Props in the correct direction.

    1'

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    18/25

    &." Assem!y Steps # (ipod Landin% +ear.

    tep ".8nsert the /anding 6ear kid into the mounting hole ofCarbon iber /eading 6ear )ssembly. -$ipsI ou canrotate the /anding 6ear kid into the hole with lesseffort.

    tep 3.)djust the length of the /anding 6ear kid. 1ach sideof the /anding 6ear kid should be about "F7mm.

    tep 4.ecure /anding 6ear kid onto the Carbon iber/eading 6ear )ssembly using the %4 et crew

    which is pre9installed on the /anding 6ear kid %etal%ount.

    tep *.Repeat tep "94 to complete another side of 2ipod/anding 6ear )ssembly. -RemarksI $wo set of 2ipod

    /anding 6ear )ssemblies are not e'actly the samebut is in symmetry direction.

    1+

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    19/25

    tep 7.Correct two 2ipod /anding 6ear )ssemblies.

    tep =.8nsert the Carbon 2oom of 2ipod /anding 6ear)ssembly into the metal mount of /anding 6earrame )ssembly with the depth of appro'imately7mm.

    tep +.)djust the 2ipod /anding 6ear )ssembly to make the/anding 6ear kid be parallel to the /anding 6earrame )ssembly frame. )nd secure the /anding 6earrame )ssembly with the %4 crews.

    1

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    20/25

    &.& Assem!y Steps #

    $u!ticopter Contro!!er $ountin% -!!ustration.

    Bverall electronics mounting for reference. 8nstallation of :9%, ront ;iew.

    2ack ;iew. 6P Compass mounting for reference.

    2)

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    21/25

    . /uick Co!!apsi!e -!!ustration

    ith the ?uick Collapsible Design, you can fold fourarms of treak "### easily for easy transportationand storage. However you must follow the comingstep by step to fold the arms correctly, otherwise theLock ystem may damaged!

    tep ".our )rms of treak "### are locked with four $humbcrews with plit /ock ashers.

    /ower %ain rame ide Epper %ain rame ide

    tep 3.

    /oosen the above crews a little bit -normally loosen #.7 turns from complete tighten status, but do notloosen or tighten completely. Btherwise the )rms will not be foldable. "f you found that it is getting loosenafter the flight, secure the screws with Thread Locker again for secure flight.)djust the tightness of thesescrews for the smoothness to fold the arms, loosen it a little bit more if your folding arms are too tight.

    21

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    22/25

    tep 4./oosen the $humb crew and make sure it is nottouching the iber rames. $hen the four olding

    )rms can be folded or opened.

    tep *.%ake sure the )rm is fully folded or opened, and thentighten the $humb crew completely. 8t should

    throught two layer of the carbon fiber frames asshown above for secure flying.

    tep 7.)lways check if the above four crews on the Epper%ain rame are secured tightened completely forsecure flight. 8f you found that it is getting loosen,secure it with $hread /ocker. )t the same time, dotep 3 shown above from time to time to ensure asecure flying.

    22

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    23/25

    0. +ima! $ountin% -!!istration

    Step 1.

    0ndicate the %u"ti/im!a" %ount hich is insta""ed ith

    Landin& ear Frame ssem!"y.

    Step 2.

    %ountin& position for 50 CRNE 3 and CRNE 2

    im!a"s.

    Lensman series professiona" im!a"s i"" !e

    a6ai"a!"e soon..

    Step 3.

    %ountin& positions for other im!a"s such as S7 S/

    )383/a9is: im!a"; S7 Camera %ount

  • 8/13/2019 Streak1000OctManual.pdf

    24/25

    . Specification

    Kit:

    -Diagonal Wheelbase: 1030mm

    -Motor Mounting Frame Size: 13x22-34mmSha!t x S"re# Diagonal Distan"e$

    -%i&o' (an'ing )ear Dimension:

    1**mm+o& Wi'th$ x 4,,mm(o#er Wi'th$ x 34*mmeight$

    -(an'ing S.i' /i&e: 10x420mm

    -%i&o' (an'ing )ear Weight: 13,g

    -+otal Kit Weight: 1400g &&rox$Without le"troni"s /ro&s$-+otal Weight #ith Motors /ro&s 40 S5s WK-M: 36.g

    5arbon rm %ooms:

    -(ength: 3*0mm

    -Weight: 367g

    -+hi".ness: 1mm

    -Diameter: 22mm

    -3K Matt Sur!a"e

    /ro&eller:

    -Manu!a"turer: /5 /89/((8S in S

    -Size: 14;47 ?alue: 400K>

    -Stator Diameter: 36mm

    -Stator (ength: 16mm

    -/ro&ell#e Mount Diameter: ,mm

    -Motor Dimension: 426x36mm

    -Weight: 17*g #ith 36mm %ullet 5onne"tors an' /ro& Mount$

    24

    http://www.alwarerc.com/
  • 8/13/2019 Streak1000OctManual.pdf

    25/25

    - ,S (i/o %atter@

    -Max "ontinuous "urrent: 361*0se"$

    -Max out&ut &o#er: 760W1*0se"$

    -i'eos "oul' be !oun' on: htt&:==###@outube"om=#at"hC?u"&mExhg#0