Stream Buffer Requirements. Level 1A: Fundamentals Education and Certification for Persons Involved in Land Disturbing Activities. Issued May 2009. Overview. What is a State Water? Who determines State Waters? Functions of State Water buffers Stream buffer requirements - PowerPoint PPT Presentation
23
1 Stream Buffer Requirements Level 1A: Fundamentals Education and Certification for Persons Involved in Land Disturbing Activities Issued May 2009
Transcript
Page 1: Stream Buffer Requirements

1

Stream Buffer Requirements

Level 1A: Fundamentals Education and Certification for Persons Involved in Land Disturbing Activities

Issued May 2009

Page 2: Stream Buffer Requirements

2

Overview

• What is a State Water?

• Who determines State Waters?

• Functions of State Water buffers

• Stream buffer requirements

• What if I need to do work within a State Waters buffer?

Page 3: Stream Buffer Requirements

3

What is a State Water???

• According to the GA E&SC Act of 1975, “State Waters” includes any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface or subsurface water, natural or artificial, lying within or forming a part of the boundaries of the State, which are not entirely confined and retained completely upon the property of a single individual, partnership, or corporation.

Page 4: Stream Buffer Requirements

4

State Waters

Page 5: Stream Buffer Requirements

5

Who determines State Waters?

• In areas where there is a certified local issuing authority, State Waters determinations are made by the issuing authority.

• In areas where there is not a certified issuing authority, GA EPD will confirm State Waters and buffer delineations as shown on ES&PC plans.

Page 6: Stream Buffer Requirements

6

Normal Stream Flow Definition

• Intermittent headwater streams with base flow during any period of the year will retain the 25-foot buffer protectionBase Flow: The rate of discharge of a

stream where the only contribution is subsurface

• ES&PC plan preparers and determining governments determine existence of base flow, based upon site topography, soils, and vegetation

Page 7: Stream Buffer Requirements

7

Defined Channel

Wrested Vegetation

Page 8: Stream Buffer Requirements

8

State Waters Shown on Plans

Page 9: Stream Buffer Requirements

9

Stream Buffers Rules

• Measured horizontally from point where vegetation has been wrestedwrested by normal stream flow or wave action

• 25 Feet25 Feet - Warm Water streams*

• 50 Feet50 Feet - Trout (cold) streams*

*Local issuing authorities may

require additional buffers!

Page 10: Stream Buffer Requirements

10

Trout Stream• Primary Trout Waters – streams supporting a self-

sustaining population of rainbow, brown, or brook trout as indicated in the Rules and Regulations for Water Quality Control, Chapter 391-3-6.

• Secondary Trout Waters- streams with no evidence of natural trout reproduction but capable of supporting trout throughout the year as indicated in the Rules and Regulations for Water Quality Control, Chapter 391-3-6.

NPDES Permits under Definitions

Page 11: Stream Buffer Requirements

11

Page 12: Stream Buffer Requirements

12

Page 13: Stream Buffer Requirements

13

Coastal Areas• Buffers for saltwater

marshes and tidally influenced streams are measured from the marsh jurisdictional line

• Determined by the Coastal Resources Division of the GA DNR, pursuant to the Coastal Marshland protection Act.

Page 14: Stream Buffer Requirements

14

Good Idea!

Page 15: Stream Buffer Requirements

15

Functions of Buffers

• Reduces storm runoff velocities

• Acts as a screen for “visual pollution”, reduces construction noise

• Improves aesthetics on the disturbed land

• Filters and increases infiltration of runoff

• Cools rivers and streams by providing shade

Page 16: Stream Buffer Requirements

16

Functions of Buffers

• Provides food and cover for wildlife and aquatic organisms

• Aids in flood protection

• Protects channel banks from scour and erosion

Page 17: Stream Buffer Requirements

17

What if I need to work in the buffer?• The minimum 25’ or 50’ (Trout Streams)

undisturbed State Waters buffer shall be maintained, except where the Director of GA EPD determines to allow a variance that is at least as protective of natural resources and the environment.

• Variances may only be issued by GA EPD, not by local issuing authorities.

• Be sure to obtain all necessary Federal permits (U.S. EPA, U.S. Army Corps of Engineers)

Page 18: Stream Buffer Requirements

18

Activities exempt from stream buffer variance requirements:

• Piping of small trout streams (average annual flow < 25 gallons/minute)

• Water line, sewer line crossings within 25° of the perpendicular

• Drainage structures on warm water streams

• Roadway drainage structures on warm and trout water streams

Page 19: Stream Buffer Requirements

19

Perpendicular Sewer Crossing

Page 20: Stream Buffer Requirements

20

Submitting for an GAEPD Stream Buffer Variance• Stream buffer variance application and checklist of

required information can be found at www.gaepd.org click on Documents Publications and Forms Watershed Protection Branch Erosion and Sedimentation

• Recommend consulting design professional for assistance with the variance process

• Contact Peggy Chambers, Michael Berry or Jean Shepherd at (404) 675-6240 with stream buffer questions.

• DNR Coastal Resources Division at (912) 264-7218

Page 21: Stream Buffer Requirements

21

Submitting for an GA EPD Stream Buffer Variance

• Within 60 days of receipt of a COMPLETE buffer variance application, the Division will either:– Provide written comments to the applicant,

or– Propose to issue a variance

• Public notice required

Page 22: Stream Buffer Requirements

22

Summary

• Buffers on state waters are valuable in protecting and conserving land and water resources.

• Some activities are exempt from stream buffer requirements– i.e. drainage structures, sewer crossings, etc.

• All non-exempt activities within a state water buffer require a GAEPD stream buffer variance

Page 23: Stream Buffer Requirements