In 2010 the Danish PBS and the Norwegian BBS companies merged into NETS converging into the leading provider of solution for payments, cards and information within Northern Europe. Each company had its test process defined, established, proved and operational. Denmark worked on a process, called OPUS, based on the waterfall model, classic, thoroughly defined and solid; whilst Norway defined and used their U04 process built on scrum principles, effective, result oriented and consolidated within the company. For a while both processes co-habited in happiness and harmony, developers, system architects, testers and users worked each comfortably with the existing approach from each side of the sea. One day management communicates that Nets will have one single IT-landscape, ergo one test process. At this time the saga of negotiating scrum through the laborious processes required in a waterfall-based organisation starts, whilst negotiating waterfall for scrum is kind of out of question - Not even a single hit in Google. Working on a common goal for defining test in a scrum approach and a waterfall model without getting stuck between departmental snags was an arduous task and demanded agile undertaking, my apologies for the epigram. The test team first priority is striving for quality, whichever path was taken. So this story does not finish with the test teams experiencing conflicts, management subjective or biased decisions and making fit together somehow the two processes. The main focus was directed towards quality full integrated in the project lifecycle, no matter the approach. At this point testers, business, process people, IT architect and developers had worked in partnership to achieve the “One IT-landscape” process and ensure quality in every phase: Squeezing two antagonist approaches into one single process, collaboration to achieve a common project lifecycle will set the basis for this presentation and further discussion.
22
Striving for Quality in One IT Landscape 1 Contribution to EuroSTAR 2011 Wednesday 23 rd November , session W18 By Fabian Scarano
Transcript
Page 1: 'Striving For Quality In One IT Landscape' by Fabian Scarano

Striving for Quality in One IT Landscape

1

Contribution to EuroSTAR 2011 Wednesday 23rd November , session W18

By Fabian Scarano

Page 2: 'Striving For Quality In One IT Landscape' by Fabian Scarano

2

Agenda

Nets: Merge of 3 companies & subsidiaries

Corporate strategy & IT principles

One IT Landscape

Project mandate

One IT test process

Approach to the Project

Test principles

Where are we today?

Page 3: 'Striving For Quality In One IT Landscape' by Fabian Scarano

x

- And Subsidiaries that became NetsThe Merging Companies

Page 4: 'Striving For Quality In One IT Landscape' by Fabian Scarano

Cards Payment & Information Services

Financial Acquiring eSecurity

Business units’ key solution areas (BU)

Terminal solutions Transaction handling Acquiring of inter-national card schemes Electronic ID schemes

eCommerce Clearing and settlement Acquiring of local schemes (DK) e-identity solutions

Payment service providing Mobile solutions Acquiring of private

label schemesDigital signature

services

Loyalty cards (merchants) Invoice services Value-added

acquirer services Authentication

solutions

Pre-paid cards (merchants)

Merchant portals

Archive and documentservices

Portals and VAS

Merchant Solutions

Transaction acquisition

Acquirer processing & services

Issuer processing& services

ATM solutions & services

Card scheme management

Emerging payments

Page 5: 'Striving For Quality In One IT Landscape' by Fabian Scarano

5

Corporate Strategy

Corporate Strategy

Corporate IT Strategy

Corporate IT Strategy

Ensure stability & security

Ensure stability & security

Reduce costs &realise cost synergies

Reduce costs &realise cost synergies

Enable business growth &

revenue synergies

Enable business growth &

revenue synergies

IT ContributionCorporate focus areas

A strategy at corporate level- Our IT strategy is anchored in corporate strategy

The northen Europe leader in paymenet, cards and information

services

1

2

4

3

Secure the trusted position- Safe and stable operations

Improve operational fitness through synergy realisation

Deliver on the potential of the three customer domains

Go for Nordic break-through positions

Page 6: 'Striving For Quality In One IT Landscape' by Fabian Scarano

6

Corporate IT Strategy Corporate IT Strategy

• Business Context and Success

• IT Contribution

• IT Principles

• IT Governance

• Enterprise Architecture

• People

• Sourcing

Corporate IT strategy- Structured approach towards Nets’ business success

Inspired by Gartner methodology, our approach is business driven – to help Nets to achieve its business goals.

Page 7: 'Striving For Quality In One IT Landscape' by Fabian Scarano

7

Demand: Expected impact

1. Secure the trusted position - safe and stable operations

3. Deliver on the potential of the three customer domains

2. Improve operational fitness through synergy realisation

2011 2012 2013 2014

Expected impact

4. Go for Nordic break-through positions

- Timeline Projection of the Transformation Programme

Page 8: 'Striving For Quality In One IT Landscape' by Fabian Scarano

8

Anchored in corporate strategy- Selected by IT Management & Enterprise Architecture Team

Page 9: 'Striving For Quality In One IT Landscape' by Fabian Scarano

Giving Birth to the New Test Process- Project Mandate

Establish the basis of the Mandate

Establish the basis of the Mandate

30. IT – Nets development methodologiesBenefit: n/aInvestment: inc. budgetQ3 2010 – Q4 2011

24. IT – Nets project modelBenefit: n/aInvestment: inc. budgetQ3 2010 – Q2 2011

24. IT – Nets project modelBenefit: n/aInvestment: inc. budgetQ3 2010 – Q2 2011

Objectives

Define, develop and implement Nets’ corporate common test process that: • Ensures compliance with the IT transformation programme• Supports quality and test of the corporate IT strategy• Focuses on business benefits at all stages and • Supports Nets’ core values

Where the IT transformation programme defined the following requirements for the test process:

• Flexible process that fits different needs• Must fulfil Nets common requirements to processes• Implementation of tools to support the process areas

Objectives

Define, develop and implement Nets’ corporate common test process that: • Ensures compliance with the IT transformation programme• Supports quality and test of the corporate IT strategy• Focuses on business benefits at all stages and • Supports Nets’ core values

Where the IT transformation programme defined the following requirements for the test process:

• Flexible process that fits different needs• Must fulfil Nets common requirements to processes• Implementation of tools to support the process areas

Page 10: 'Striving For Quality In One IT Landscape' by Fabian Scarano

UnderstandIn Nets any test initiative must

identify its critical drivers to

understand why the testing needs

to happen

UnderstandIn Nets any test initiative must

identify its critical drivers to

understand why the testing needs

to happen

PrioritiseAD/AM will

prioritise testing to maximise benefit and

reduce risk to the business

PrioritiseAD/AM will

prioritise testing to maximise benefit and

reduce risk to the business

Nets’ Test Principles – Defined to support the IT Principles & be applied by all test initiatives

FlexibilityAim to progress at

all times, plan flexibility and

eliminate dependencies.

FlexibilityAim to progress at

all times, plan flexibility and

eliminate dependencies.

Be ahead All test initiatives

will strive to expose early

discovery of flaws

Be ahead All test initiatives

will strive to expose early

discovery of flaws

Competencie

sNets will retain and acquire the

necessary resources to get

the right infrastructure in

place

Competencie

sNets will retain and acquire the

necessary resources to get

the right infrastructure in

place

Page 11: 'Striving For Quality In One IT Landscape' by Fabian Scarano

Legacy Test Processes- Two countries and two different methodologies

PBS

• Name: OPUS

• Based: Waterfall development approach

• Existing documentation: Templates 100% process coverage process description

• Test tools deployed and used for all projects

• Firmly anchored in the IT culture

PBS

• Name: OPUS

• Based: Waterfall development approach

• Existing documentation: Templates 100% process coverage process description

• Test tools deployed and used for all projects

• Firmly anchored in the IT culture

Page 12: 'Striving For Quality In One IT Landscape' by Fabian Scarano

12

OPUS

Page 13: 'Striving For Quality In One IT Landscape' by Fabian Scarano

U04

Identify Test Scenarios

Write test cases for the

Sprint

Identify TC to be run for the Sprint backlog

Is there a change?

Execute the Chosen Test Cases (req)

Test Analysis Test Preparation

Test Execution

Acceptance Test Test Closure

Test Model related to U04 -Development Model with test activities

Understand requirements

Start-up Execution of Sprint Production

Choose

Page 14: 'Striving For Quality In One IT Landscape' by Fabian Scarano

Approach to One IT Test process (1) –Basis to start the project

Method • Scrum • Prince2 inspired

Sourcing• Test Services department owns the project• Line manager takes the role of the business stakeholder• Reference group reviews the partial development• Project board, executive review and acceptance• Company’s Vice president is the sponsor

Communication plan• Test Website • Test forum• Coaching• Training sessions

Tools• Standard office tools • Sharepoint to bridge the two-locations gap

Method • Scrum • Prince2 inspired

Sourcing• Test Services department owns the project• Line manager takes the role of the business stakeholder• Reference group reviews the partial development• Project board, executive review and acceptance• Company’s Vice president is the sponsor

Communication plan• Test Website • Test forum• Coaching• Training sessions

Tools• Standard office tools • Sharepoint to bridge the two-locations gap

Page 15: 'Striving For Quality In One IT Landscape' by Fabian Scarano

Approach to One IT Test process (2)

• Define Project Plan • Resource allocation and workload (70,50,20,10,10,10)

•How to involve the rest of the AD & AM units actively

• Describe the backlog & play Poker

• Define Sprints

• Sprint planning Daily Scrums (twice a week) Sprint review and acceptance Retrospective

• Implement first cut of the model

• Define Project Plan • Resource allocation and workload (70,50,20,10,10,10)

•How to involve the rest of the AD & AM units actively

• Describe the backlog & play Poker

• Define Sprints

• Sprint planning Daily Scrums (twice a week) Sprint review and acceptance Retrospective

• Implement first cut of the model

Page 16: 'Striving For Quality In One IT Landscape' by Fabian Scarano

16

The New Process

Page 17: 'Striving For Quality In One IT Landscape' by Fabian Scarano

17

One IT Test process Backlog Definition

Player

Process Process Output PurposeApproved

by

Project Deliverables

CommentHow to demo

Sprint starts

Sprint stops

Estimate

Decide test strategy Test strategy To establish an agreement between the Test Manager, Project Manager and Project Owner about how the test assignment will be conducted.

Process descriptionTemplate for test strategyGood practices?Checklist for test strategy

1 8Review requirements Accepted and baselined

requirementsTo ensure that the requirements support the business process and include enough information to develop and test according to the business needs

Process description Checklist

2 3Test planning Test plan To describe and reach agreement with the PM and the

central stakeholders concerning what is to be tested, when, where and by whom

Process descriptionTemplate for test plan.

1 5Functional test preparation Test cases/test specification To specify how the functional requirements will be

tested, in the case of system and Integration test, whilst the objective in UAT is to specify how the application supports the business needs and processes.

Process description Example of test techniques

Remember to cover all test levels (including acceptance)How test tools can support (ALM & QTP)Reusability of testsCandidate for split

3 13Non functional test preparation Test cases/test specification To specify how the non-functional requirements will be

testedProcess description Example of test techniques

How test tools can support (ALM & QTP etc)Reusability of tests

3 13Prepare test schedule Test schedule To ensure preparation of a detailed list of tasks and the

sequential order in which they should be performed. To enhance test plannig in general

Process descriptionExamples

3 2Preparing environment and data Test environments

Test dataTo ensure suitable environments configuration, generated data and transferred data for the planned tests.

Process descriptionGuidelines for data management

In smaller projects, the description of the test environment and the test data can be written in the test plan

4 8Review preparation Preparation phase accepted Ensure functionality coverage, data integrity,

understandable texts, apropriate test design and alignment with the objectives of the project

Process descriptionChecklist

4 3

Page 18: 'Striving For Quality In One IT Landscape' by Fabian Scarano

18

One IT Test process Backlog Definition

Player

Process Process Output PurposeApproved by

Project Deliverables

CommentHow to demo

Sprint starts

Sprint stops

Estimated

Thinking behind Backlog Definition – Abstraction process that showed “tricky”, whilst defining the backlog

Automate tests Automated test suite To create and run a test automatically where that will make the testing more efficientEnhance the testware

Good practicesGuidelines for automation 5

Regression test (prepare and run) Test results (various) including defects described

Ensure that the existing functionality works and performs as it did before the change

Good practicesGuidelines for regression tests

Regression takes out of preparation phase and develops here 4 5

Test report Test status report To inform management and stakeholders of status and risks according to plan.Marks the end of a test level or all test efforts with a recommendation

Test (Summary) Report template Good practices

3Run integration test Integration test report Assess the status of the solution in integration with it's

environment using the plans, specifications and schedules.Template for test reportGood practices

Approval Approval documents To assess to which extent the acceptance criteria are met

Process descriptionTemplate for acceptance docGood practicesBasis for acceptance

Describe the variety of acceptance test and proceduresCheck contract 5

Compliance Compliance report Ensure that the solution is compliant with regulatory requirements

Template for compliance reportGood practices

This item depends on the different areas Overlates til ADAM?UTGÅR

Page 19: 'Striving For Quality In One IT Landscape' by Fabian Scarano

One IT Test Process: challenges

• Describing a sound backlog

• Working in two different countries and locations

• Involving all company’s stakeholders

• Processing review from the reference group

• Anchoring the result throughout Nets

• Parallel corporate initiatives with direct impact on the test process (i.e. Release Management)

• Other process development not started (Project Model /Requirements)

• Common use of the test tool

• Describing a sound backlog

• Working in two different countries and locations

• Involving all company’s stakeholders

• Processing review from the reference group

• Anchoring the result throughout Nets

• Parallel corporate initiatives with direct impact on the test process (i.e. Release Management)

• Other process development not started (Project Model /Requirements)

• Common use of the test tool

Page 20: 'Striving For Quality In One IT Landscape' by Fabian Scarano

Where are we today?

Page 21: 'Striving For Quality In One IT Landscape' by Fabian Scarano

Summary

• Companies Merge Corporate IT Strategy

• One IT Landscape One IT Test Process

• Have a flexible process that can support Scrum and Waterfall methods

• Project approach and challenges

• IT Test Principles

• Companies Merge Corporate IT Strategy

• One IT Landscape One IT Test Process

• Have a flexible process that can support Scrum and Waterfall methods