    Research and field investigations have proven wood frame

    buildings fail at connection points.

    Wood buildings can survive high wind loads whenstructurally rated and tested lumber connectors are used to

    develop a continuous load path, effectively transferringloads from roof to foundation.

    This brochure illustrates a variety of structurally-rated

    products manufactured by USP Structural Connectors

    which will aid the designer in achieving continuous load

    paths. See USPs Full Line Catalog or appropriate codeevaluation reports for nail schedules, installations, andproduct limitations.

    Continuous Load Path

    USP704(1)-03

    High Wind ResistantConstruction

    Values for Spruce-Pine-Fir / Hem Fir

    Register on-line atWeb Site Watch and automatically

    receive product updates through your e-mail www.USPconnectors.com

    USP supplies quality products to build Stronger Safer Structures

    The product names and descriptions in the gray boxes next to the illustrations correspond

    with our CAD Library High Wind Illustrationfile names, available on our Web Site:

    www.USPconnectors.com/cad

    To achieve a

    Continuous Load Path:

    All structural membersmust be connected from

    roof to foundation.

  • 8/13/2019 Structural Connectors high wind

    2/6

    Foundation Connections

    USP Bearing Plate

    MP4F

    Uplift = 595#F1 = 595#

    MTW20Uplift = 740#

    USP STB seriesanchor bolt

    LSTA18Uplift = 735#

    AC5Uplift = 140F1 = 385#F2 = 385#

    TA51Uplift = 1080#

    LTW18Uplift = 630#

    or

    MTW18Uplift = 740#

    TDX5Uplift = 3135#

    (Standard washer required)

    TDX5Uplift = 3135#

    Load transfer plate(Standard washer required)

    USP STB series

    anchor bolt

    MTW18Uplift = 740#

    MTW18Uplift = 740#

    LSTA18Uplift = 735#

    RT12TUplift = 565#

    PS218-HDG

    AC5Uplift = 385#F1 = 385#

    F2 = 140#

    Stemwall toFirst Floor

    IMPORTANT:

    All loads shownin this brochure

    are in pounds

    at 133%

    Values for S-P-F / Hem Fir

    MP4FUplift = 595#

    F1 = 595#

    Block Foundation toFirst Floor

    TDX5 Holdown

    PS218-HDG

    LSTA18Uplift = 905#

    RS150Uplift = 945#

    JUS210Uplift = 945#

    MTW18Uplift = 740#

    Piling withFlush Joists

    JUS210Uplift = 945#

    JUS210Uplift = 945#

    Piling withSupported Joists

  • 8/13/2019 Structural Connectors high wind

    3/6

    Multi-Story Connections

    Note: See USPs Full Line Catalogor appropriate code evaluationreports for fastener schedules, installation, and product limitations.

    RT7Uplift = 535#F1 = 150#F2 = 150#

    RT10Uplift = 535#F1 = 150#F2 = 150#

    MSTA12Uplift = 535#

    (each)

    HPAHD22Uplift = 4095#

    ST1Uplift = 785#F1 = 565#F2 = 575#F3 = 575#

    SPTH4Uplift = 1260#

    LSTA12Uplift = 535#

    (each)

    TDX8Uplift = 7480#

    FA3Uplift = 1125#

    F1 = 655#F2 = 525#F3 = 520#

    RT3Uplift = 425#F1 = 130#F2 = 130#

    RT15Uplift = 455#

    F1 = 420#F2 = 195#

    MTW18

    Uplift = 740#

    SPT4Uplift = 630#

    Window and Door Openings

    IMPORTANT:All loads shownin this brochureare in pounds

    at 133%

    Download

    IntoW

    all

    Uplift

    Paralleltowall

    Out

    F1

    F1

    F2

    F2 or F3

    Values for S-P-F / Hem Fir

    USP STB seriesanchor bolt

    MSTA36Uplift = 645#

    LFTA6Uplift = 790#

    F1 = 605#F2 = 60#

    MTW18

    Uplift = 740#

    LFTA6Uplift =

    790#F1 = 605#F2 = 60#

    MP4FUplift = 595#

    F1 = 595#

    KLFTA

    Uplift = 875#

    MPA1FUplift = 570#

    F1 =565#

    TDX2Uplift = 1335#

    First Floor to Second Floor Studs

    (Nailed)

    MP4FUplift = 595#

    F1 = 595#

    MP4F

    Uplift = 595#F1 = 595#

    MP4FUplift = 595#

    F1 = 595#

    TDX2Uplift = 1335#

    First Floor to Second Floor Studs

    (Bolted)

    KFTA2

    Uplift = 133

    LSTA36Uplift = 645#

    RT7Uplift = 535#

    F1 = 150#F2 = 150#

    Window/Door Opening

    LTW18Uplift = 630#

  • 8/13/2019 Structural Connectors high wind

    4/6

    Rafter and Truss Connections

    Masonry Walls to Rafter or Truss

    RT15Uplift = 455#F1 = 420#F2 = 195#

    SPT24Uplift = 765#F1 = 560#F2 = 260#

    RT7Uplift = 535#F1 = 150#F2 = 150#

    RT15Uplift = 455#

    F1 = 420#F2 = 195#

    MTW16Uplift = 740#

    Note: When rafterspacing differs from

    stud spacing, transfer

    uplift and lateral loads

    by fastening rafter

    to both top plates.

    Then fasten both top

    plates to the studs.

    Note: When rafters and stud spacing are

    equal, uplift and lateral loads may be trans-

    ferred directly from the rafters to the studs.

    RT20Uplift = 950#

    RT10Uplift = 535#

    F1

    = 150#F2 = 150#

    MTW20Uplift = 740#

    RT7Uplift = 1070#F1 = 300#F2 = 300#

    (Used in pairs)

    RT3Uplift = 425#

    F1 = 130#F2 = 130#

    RT7Uplift = 1070#F1 = 300#F2 = 300#(used in pairs)

    MTW12Uplift = 740#

    USP Bearing Plate

    Rafters-to-Studs Aligned

    Values for S-P-F / Hem Fir

    RT10Uplift = 535#

    F1 = 150#F2 = 150#

    MTW20Uplift = 740#

    RT16Uplift = 790#

    F1 = 545#F2 = 550#

    RT7Uplift = 535#F1 = 150#F2 = 150#

    Rafters-to-StudsStaggered

    Rafter-to-Top Plate Rafter-to-Bond Beam

    SPTH4

    Uplift = 1260#

    orSPT4Uplift = 630#

    DTCUplift = 720#F1 = 420#F2 = 635#

    HTA20Uplift = 1810#F1 = 590#F2 = 660#

    HUGT2Uplift = 6545#

    MSH218Uplift = 1840#

    RT16Uplift = 700#

    F1 = 545#F2 = 550#

    TA20Uplift = 1520#

    F1 = 245#F2 = 335#

  • 8/13/2019 Structural Connectors high wind

    5/6

    Download

    IntoW

    all

    Uplift

    Paralleltowall

    Out

    F1

    F1

    F2

    F2 or F3

    USPBearing Plate

    Single-Story Wood Frame

    RT10Uplift = 535#F1 = 150#F2 = 150#

    MTW20Uplift = 740#

    MTW20Uplift = 740#

    RT20Uplift = 950#

    RT20Uplift = 950#

    FA3Uplift = 965#

    F1 = 655#F2 = 525#

    SPT22Uplift = 510#

    F1 = 510#F2 = 260#

    SPT22Uplift = 510#

    F1 = 510#F2 = 260#

    SPT4

    Uplift = 630#

    RT3

    Uplift = 425#F1 = 130#F2 = 130#

    PAHD42Uplift = 2930#

    ST1Uplift = 785#F1 = 565#F

    2

    = 650#

    RT3Uplift = 425#F1 = 130#F2 = 130#

    ST1Uplift = 785#F1 = 565#F2 = 650#

    RT7Uplift = 535#

    F1 = 150#F2 = 150#

    (To stud)

    RT7Uplift = 535#F1 = 150#F2 = 150#

    (To truss)

    Studs-to-RaftersAligned

    FA3Uplift = 965#

    F1 = 655#F2 = 525#

    FA3Uplift = 965#

    F1 = 655#F2 = 525#

    RT7Uplift = 535#

    F1 = 150#F2 = 150#

    (To truss)

    SPT4

    Uplift = 630#

    SPT24Uplift = 765#

    F1 = 560#F2 = 260#

    RT7Uplift = 535#F1 = 150#F2 = 150#

    (To stud)

    RT3Uplift = 425#

    F1 = 130#F

    2= 130#

    Studs-to-RaftersStaggered

    IMPORTANT:

    All loads shownin this brochureare in pounds

    at 133%

    USP Bearing Plate

    Values for S-P-F / Hem Fir

    RT7Uplift = 535#F1 = 150#F2 = 150#

    (To truss)

    FA3Uplift = 965#

    F1 = 655#F2 = 525#

  • 8/13/2019 Structural Connectors high wind

    6/6

    Rafter to Plate or Ridge

    High End Connections I-Joists on Structural Ridge Beams

    Your Local USP Dealer / Distributor

    Rafter on Stud Wall I-Joists on Stud Wall

    High End Connections Rafter into flush Structural Ridge Beam

    As shown for 1-3/4 wide joist

    Note:A different MSH hanger may berequired depending on rafter width.

    Values for S-P-F / Hem Fir

    MSH1722I-Joist RafterTiedown

    LSTA24Uplift = 950#

    MSH1722Uplift = 1620#

    LTW/MTWI-Joist on

    Ridge Beam

    MTW12Uplift = 740#

    F1 = 95#

    LTW12Uplift = 630#F1 = 65#

    LSTA24Uplift = 950#

    TMPH2Uplift = 200#

    Pitch range from6/12 to 14/12

    TMP2Uplift = 220#

    Pitch range from1/12 to 6/12

    TMPH2I-Joist Rafter

    Support

    TMP2I-Joist Rafter

    Support

    MSTA24Uplift = 950#

    LSSH179Uplift = 740#

    IMPORTANT:

    All loads shown in this brochure

    are in pounds at 133%

    Download

    Uplift

    Paralleltowall

    Out

    F1

    F1

    F2

    F2 or F3

    LSSH179I-Joist Rafter

    Support

    IntoW

    all MPA1

    Uplift = 590#

    MP5Uplift = 515#

    RT10Uplift = 535#

    F1 = 150#F2 = 150#

    RT20Uplift = 950#

    RT7Uplift = 535#

    F1 = 150#F2 = 150#

    MTW20Uplift = 740#

    RT10RafterTiedown

    RT20I-Joist RafterTiedown

    MTW20I-Joist RafterTiedown

    RT7Rafter

    Tiedown


Recommended