Tom Hoffman, P.E.
R-1 Structures Engineer
STRUCTURAL ISSUES
8/14/2019 Structural Issues and 2009 Repairs
2/29
2
BRIDGE STATISTICS
BRIDGE IDENTIFICATION NUMBER: 5521180
AGE: Built in 1929
LENGTH: 14 spans,
2,184 feet ROADWAY WIDTH: 26.1 feet
STRUCTURE TYPE: Combination of thru truss, decktruss, and deck plate girders
BIKE / PED ACCOMMODATIONS: None
VERTICAL CLEARANCE ON BRIDGE: 14 feet
MAX VERTICAL CLEARANCE OVER WATER: 95 feet
AVERAGE ANNUALDAILY TAFFIC (2008): 3,150 vehicles per day
WEIGHT CAPACITY: -Restricted since 1994 to
less than 102,000 pounds.-Currently reduced to a singlelane/ 40 ton posting.
8/14/2019 Structural Issues and 2009 Repairs
3/29
3
RECENT WORK HISTORY
1990-91 Bridge Rehabil itat ion ProjectAppx $7.0 million in 1989 (Appx. $17.3 in 2007 dollars) Bearings - Some Cleaned, Some Replaced Spot Painting (Span 4-9, bearings)
Deck Replacement With Lightweight System Floor Beam Replacement and Strengthening (some spans) Joint Replacement Bridge Rail
Approach Slab Replacement Concrete Repairs on Piers and Abutments Pier 4 Compression Straps Added (Now occur on Piers 4-8)
-The first strapped in 1974 to arrest crack development
Emergency Repair Contract Compression Band Replacement - $125,000 in 2005
Pier Repairs - $100,000 in 2008
Steel Repairs - $1 m illion estimated in 2009 Maintenance Repair of Bridge Joints 2005, 2006, 2008
8/14/2019 Structural Issues and 2009 Repairs
4/29
4
INITIAL PROBLEM IDENTIFICATION
Bridge Condition Rating
Score 3.375 out of a possible 7 points (2009) Scores between 3 and 4 indicate serious deterioration or not
functioning as originally designed Problems are with main carrying members, bearings, joints,
concrete, paint, and wearing surface
Federal Sufficiency Rating
Score 29.2 (2008) out of a possible 100 points Scores less than 65 qualify for Federal funding
Load Restricted
40 Ton limit restricts all overloads, including log trucks and milktrucks
Limited roadw ay vertical clearance of 14-0 Trucks in excess of 14 have struck the bridge on several
occasions, requiring the bridge to be closed for repair
8/14/2019 Structural Issues and 2009 Repairs
5/29
5
Truss Terminology
8/14/2019 Structural Issues and 2009 Repairs
6/29
6
Channel Piers
8/14/2019 Structural Issues and 2009 Repairs
7/29
7
Concrete CompressionStrap Replacement
8/14/2019 Structural Issues and 2009 Repairs
8/29
8
Concrete Deterioration
8/14/2019 Structural Issues and 2009 Repairs
9/29
9
Concrete DeteriorationPier 3- Before
8/14/2019 Structural Issues and 2009 Repairs
10/29
10
Concrete DeteriorationPier 3- After
8/14/2019 Structural Issues and 2009 Repairs
11/29
11
Pier 8 Condition(Before)
8/14/2019 Structural Issues and 2009 Repairs
12/29
12
Pier 8 Condition
(After)
8/14/2019 Structural Issues and 2009 Repairs
13/29
13
Steel and Paint Condition
8/14/2019 Structural Issues and 2009 Repairs
14/29
14
Steel and Paint Condition
8/14/2019 Structural Issues and 2009 Repairs
15/29
15
Joints
8/14/2019 Structural Issues and 2009 Repairs
16/29
16
Bearings
8/14/2019 Structural Issues and 2009 Repairs
17/29
17
Recent Repairs-Floorbeams Pier 5 and 8
8/14/2019 Structural Issues and 2009 Repairs
18/29
8/14/2019 Structural Issues and 2009 Repairs
19/29
19
Recent Repairs-Bottom Chord
8/14/2019 Structural Issues and 2009 Repairs
20/29
20
Recent Repairs-Bottom Chord
8/14/2019 Structural Issues and 2009 Repairs
21/29
21
Recent Repairs-Steel Pier
8/14/2019 Structural Issues and 2009 Repairs
22/29
22
Recent Repairs-Steel Pier
8/14/2019 Structural Issues and 2009 Repairs
23/29
23
Recent Repairs-Gusset Plates
8/14/2019 Structural Issues and 2009 Repairs
24/29
24
8/14/2019 Structural Issues and 2009 Repairs
25/29
25
Other Yellow Flags
Many yellow flags for gussets and strap ties are not being addressedat this time. All red flags, and yellow flags of significance are being
repaired.
8/14/2019 Structural Issues and 2009 Repairs
26/29
26
8/14/2019 Structural Issues and 2009 Repairs
27/29
27
What Now?
1) Paint of Select Areas Some areas are beingblasted and painted to slow deterioration ofcritical areas.
2) Finish Chord Repairs
3) Finish Floorbeam Repairs and Add Troughs
4) Re-Inspect in the Spring Repair as Needed
5) Possibly Paint Selected Truss Members and underJoint Areas
-Chords of Spans 4, 5 and 9- Entire Truss of Spans 6 and span 8,
span 7 (splash zone down)- Under Joint Areas at Piers 3, 5 and 8
- Estimated at $6 Mil lion
8/14/2019 Structural Issues and 2009 Repairs
28/29
28
General Questions .
1) Why w as the load posting reduced?
2) What does it mean?
3) Does a single lane really make things better?
4) $64,000 question .Is the bridge safe?
8/14/2019 Structural Issues and 2009 Repairs
29/29
29
Questions????