Student Life Building Northampton Community College. Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Summary Acknowledgments. Kendall Slivka Construction Management Advisor: Robert Leicht. Student Life Building - PowerPoint PPT Presentation
Popular Tags:
22
Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Summary Acknowledgments Kendall Slivka Construction Management Advisor: Robert Leicht
Transcript
Page 1: Student Life Building Northampton Community College

Student Life BuildingNorthampton Community College

IntroductionProject Overview

Braced Frame AnalysisFire Suppression Analysis

Roofing Analysis Project Delivery Study

Summary Acknowledgments

Kendall Slivka Construction Management

Advisor: Robert Leicht

Page 2: Student Life Building Northampton Community College

Student Life BuildingNorthampton Community College

IntroductionProject Overview

Braced Frame AnalysisFire Suppression Analysis

Roofing Analysis Project Delivery StudyFinal Recomendations

Acknowledgments

General Building DataLocation Rt 715 & Railroad Drive

Pocono Township, Monroe County, PA

Occupant Northampton Community College

Function Gymnasium, Fitness Center, Cafeteria, Conference Rooms

Size 68,000 SF

Number of Stories One Story with Basement

Dates of Construction January 2012- January 2014

Project Delivery Method Design-Bid-Build

Cost $18 Million

LEED certification Silver

Page 3: Student Life Building Northampton Community College

Student Life BuildingNorthampton Community College

IntroductionProject Overview

Braced Frame AnalysisFire Suppression Analysis

Roofing Analysis Project Delivery StudyFinal Recomendations

Acknowledgments

“We believe that learning thrives when there is a sense of curiosity and excitement about the world

in which we live. As such, we value: Excellence, Innovation, Sustainability,

Accountability, Integrity, and Engagement.”

Page 4: Student Life Building Northampton Community College

Student Life BuildingNorthampton Community College

Introduction

Project Overview Braced Frame Analysis

Fire Suppression AnalysisRoofing Analysis

Project Delivery StudyFinal Recomendations

Acknowledgments

• Braced Frame AnalysisStructural Breadth

• Fire Suppression SystemMechanical Breadth

• Roofing Membrane Analysis

• Project Delivery Research

Page 5: Student Life Building Northampton Community College

Student Life BuildingNorthampton Community College

Introduction

Project Overview Braced Frame Analysis

Fire Suppression AnalysisRoofing Analysis

Project Delivery StudyFinal Recomendations

Acknowledgments

• Braced Frame AnalysisStructural Breadth

• Fire Suppression SystemMechanical Breadth

• Roofing Membrane Analysis • Project Delivery Research

Page 6: Student Life Building Northampton Community College

Student Life BuildingNorthampton Community College

Introduction

Project Overview Braced Frame Analysis

Fire Suppression AnalysisRoofing Analysis

Project Delivery StudyFinal Recomendations

Acknowledgments

• Braced Frame AnalysisStructural Breadth

• Fire Suppression SystemMechanical Breadth

• Roofing Membrane Analysis • Project Delivery Research

Page 7: Student Life Building Northampton Community College

Student Life BuildingNorthampton Community College

Introduction

Project Overview Braced Frame Analysis

Fire Suppression AnalysisRoofing Analysis

Project Delivery StudyFinal Recomendations

Acknowledgments

• Braced Frame AnalysisStructural Breadth

• Fire Suppression SystemMechanical Breadth

• Roofing Membrane Analysis • Project Delivery

Research

Page 8: Student Life Building Northampton Community College

Student Life BuildingNorthampton Community College

IntroductionProject Overview

Braced Frame AnalysisFire Suppression Analysis

Roofing Analysis Project Delivery StudyFinal Recomendations

Acknowledgments

Problem Statement: Braced walls interfere with building expansion and curtain walls.

Research Goal: Resize columns to withstand load, and compare costs of each alternative.

Page 9: Student Life Building Northampton Community College

Student Life BuildingNorthampton Community College

IntroductionProject Overview

Braced Frame AnalysisFire Suppression Analysis

Roofing Analysis Project Delivery StudyFinal Recomendations

Acknowledgments

Current System Estimate:

Frame Location Size LengthUnit Weight (lb/ft)

Total Weight (tons)

BF 1 8 and 9 W14X38 16.6 38 0.3154    HSS8X8X5/16 21.5 31.84 0.34228    W14X38 16.67 38 0.31673    HSS8X8X5/16 21.5 31.84 0.34228    W14X38 16.67 38 0.31673    HSS8X8X5/16 21.5 31.84 0.34228    W12X79 48 79 1.896    W12X65 50.77 65 1.650025           BF 2 D and C W24X55 22.5 44 0.495    HSS8X8X1/4 32.3 25.82 0.416993    W14X38 22.5 38 0.4275    HSS8X8X1/4 26.4 25.82 0.340824    W21X50 22.5 50 0.5625    W10X49 57 49 1.3965    W10X49 57 49 1.3965            System Estimate

$84,000

Page 10: Student Life Building Northampton Community College

Student Life BuildingNorthampton Community College

IntroductionProject Overview

Braced Frame AnalysisFire Suppression Analysis

Roofing Analysis Project Delivery StudyFinal Recomendations

Acknowledgments

System Estimate $94, 300

Proposed System Estimate:

Page 11: Student Life Building Northampton Community College

Student Life BuildingNorthampton Community College

IntroductionProject Overview

Braced Frame Analysis

Fire Suppression Analysis

Roofing Analysis Project Delivery StudyFinal Recomendations

Acknowledgments

Problem Statement: The system being used seems redundant and will be expensive.

Research Goal: Redesign the system so that only one layer of sprinkler heads is needed.

Page 12: Student Life Building Northampton Community College

Student Life BuildingNorthampton Community College

IntroductionProject Overview

Braced Frame Analysis

Fire Suppression Analysis

Roofing Analysis Project Delivery StudyFinal Recomendations

Acknowledgments

Page 13: Student Life Building Northampton Community College

Student Life BuildingNorthampton Community College

IntroductionProject Overview

Braced Frame Analysis

Fire Suppression Analysis

Roofing Analysis Project Delivery StudyFinal Recomendations

Acknowledgments

Current System Estimate:

System Total $239,500

Page 14: Student Life Building Northampton Community College

Student Life BuildingNorthampton Community College

IntroductionProject Overview

Braced Frame Analysis

Fire Suppression Analysis

Roofing Analysis Project Delivery Study

Final RecommendationsAcknowledgments

Proposed System:

- Wet System- Code Requirements Remain

Same- Keep Water Storage Tank- Paint Exposed Ceiling Space

System Total $187,500

Page 15: Student Life Building Northampton Community College

Student Life BuildingNorthampton Community College

IntroductionProject Overview

Braced Frame AnalysisFire Suppression Analysis

Roofing Analysis Project Delivery Study

Final Recommendations Acknowledgments

Problem Statement: The single-ply TPO system may not be able to withstand the mixture of environmental factors and sloped angles.

Research Goal: Determine a new system that is proven to work, and will be economical.

Page 16: Student Life Building Northampton Community College

Roof Type Roof Section Area (ft2)1B 3 61901B 4 74671B 5 49261B 9 9401B 10 9201B 11 770  SUM 212132B 1 11549.72B 2 4556.722B 6 3020.942B 7 10748.75  SUM 29876.112A 8 5012A 12 6442A 13 440  SUM 1585

Student Life BuildingNorthampton Community College

IntroductionProject Overview

Braced Frame AnalysisFire Suppression Analysis

Roofing Analysis Project Delivery StudyFinal Recomendations

Acknowledgments

Current System:Single Ply TPO

4” insulation (2B)1½”

insulation(2A)Modified Bitumen

4” insulation (1B)

System Estimate $246,800

Page 17: Student Life Building Northampton Community College

Student Life BuildingNorthampton Community College

IntroductionProject Overview

Braced Frame AnalysisFire Suppression Analysis

Roofing Analysis Project Delivery StudyFinal Recomendations

Acknowledgments

Proposed System:Modified Bitumen

4” insulation 1 ½” insulation

System Estimate $307,570

Page 18: Student Life Building Northampton Community College

Student Life BuildingNorthampton Community College

IntroductionProject Overview

Braced Frame AnalysisFire Suppression Analysis

Roofing Analysis

Project Delivery StudyFinal Recommendations

Acknowledgments

Problem Statement: Constructability issues with retaining wall show a larger issue with the use of multiple prime contractors.

Research Goal: Study industry feelings toward multiple prime contracts to gauge what would be a better delivery method.

Page 19: Student Life Building Northampton Community College

Student Life BuildingNorthampton Community College

IntroductionProject Overview

Braced Frame AnalysisFire Suppression Analysis

Roofing Analysis

Project Delivery StudyFinal Recommendations

Acknowledgments

Multiple Prime Contracts:

-Pennsylvania Separation Act 1913

-Projects > $4,000

-Separated between 4 trades

-Publically Bid

-Risk stays with owner

Owner

Electric HVACGC Plumbing

CM

Page 20: Student Life Building Northampton Community College

Student Life BuildingNorthampton Community College

IntroductionProject Overview

Braced Frame AnalysisFire Suppression Analysis

Roofing Analysis

Project Delivery StudyFinal Recommendations

Acknowledgments

Industry Survey:

- Most polled from Pa

- Majority CM, contractor

- Prefer design-bid-build

- Prefer GMP contract

- Most familiar with CM at risk/multiple

prime

Page 21: Student Life Building Northampton Community College

Student Life BuildingNorthampton Community College

IntroductionProject Overview

Braced Frame AnalysisFire Suppression Analysis

Roofing Analysis Project Delivery Study

Final Recommendations Acknowledgments

Braced Frame Analysis

Fire Suppression Redesign

Roofing System Analysis

Delivery Method Study

Page 22: Student Life Building Northampton Community College

I’d like to thank everyone involved with my Thesis project;

- Team members at D’Huy Engineering, most especially Jim Hana and Joseph Herman. Thank you for taking the time to walk me through the site every chance you got, and thank you for your availability.- Rob Leicht, thank you for always steering me in the right direction.- Northampton Community College for allowing me to use their project- All participants in the industry survey- My structural option friends that helped with my structural systems- My sisters for helping me concentrate and keeping me focused- My family for always encouraging me. 