Business Proposal Industrial Gas Turbine Aftermarket
July 2015
Machinery & Engine Business Division
2
I. STX Business Proposal
II. HANWHA (SAMSUNG) TECHWIN & Business History
III. Work Process
IV. References
V. STX Power Plant References
VI. Conclusion
C O N T E N T S
3
Refurbishment New Parts O&M
General Repair
Life Assessment
Life Extended Repair
Reverse Engineering & Manufacturing
Assessment, Reliable Test
Outsourcing
Planned / Routine O&M
I. STX Business Proposal
STX provides reliable ‘Refurbishment Service’ and ‘ New Part Supply’ with Samsung Techwin.
Gas Turbine
Clients
Main Components of Gas Turbine (General)
I. STX Business Proposal - Refurbishment & New Parts
Compressor Section + Hot Gas Path Components (Combustion, Turbine Section )
Compressor Section
Combustion Section Turbine Section
+
Much shorter deliver time than OEM Excellent quality equivalent to OEM
Quality assurance by SAMSUNG
Quality Improvement Short Delivery Time
Competitive price level comparing
with OEM
Competitive Price
Flexible and Customized Design
according to client’s demand
Reliable Operation
Advantage of SAMSUNG TECHWIN
I. STX Business Proposal - Refurbishment & New Parts
II. HANWHA (SAMSUNG) TECHWIN & Business History
• 1977 : Establishment of Company
• 1979 : Start overhaul maintenance for J79
• 1980 : Start to manufacture aero turbine
• 1985 : Start overhaul maintenance for J85
• 1986 : Designated supplier for KFP
(Korea Fighter Program)
• 1996 : Producing T700 under License
• 2002 : Producing Engine of F110(F15-K)
• 2003 : Producing Engine of F404(T-50)
• 2012 : Joint development of T700 with GE
• 2015 : Change name to Hanwha Techwin
Main Client & Technical Licensor
Main Client
Main Client & Technical Licensor
II. HANWHA (SAMSUNG) TECHWIN & Business History
Aero Turbine for aircraft(14 models) and naval ships(4 models)
Developing Program
License Products & Overhaul service
II. HANWHA (SAMSUNG) TECHWIN & Business History
Accumulated Engine Delivery
II. HANWHA (SAMSUNG) TECHWIN & Business History
OEM Parts Business
III. Work Process - Refurbishment
Inspection & Repair
III. Work Process - New Parts Manufacturing
Development Stage
III. Work Process - New Parts Manufacturing
Development Process
Manufacturing Process (Reverse Engineering)
III. Work Process - New Parts Manufacturing
III. Work Process - Life Assessment
III. Work Process - Life Assessment
Purpose and Necessity
IV. Reference - Repair
IV. Reference - Extended Repair
IV. Reference - Manufacturing
IV. Reference - Manufacturing
V. STX Reference
On-going Project
Completed Project
(As of Jan. 2015)
STX – World Leading Power Plant EPC Company (Diesel & Gas Engine)
V. STX Reference - America
MEXICO CFE 12K80MC x 1 set 42.8MW
PANAMA SoEnergy 8L22HLX x 8 sets 11.2MW
COLOMBIA PIL 8L22HLX x 5 sets 7MW
BRAZIL EPASA
18V32/40 x 38 sets 9L32/40 x 2 sets
340MW
Aratu-1 18V32/40 x 20 sets 175MW
Ongoing Project
Completed Project
(As of Jan. 2015)
V. STX Reference – Middle East & Africa
IRAQ
MOE Phase-1 16V34HLX x 28 sets 18V28/32S x 168 sets
900MW
NRC 16V34HLX x 12 set 85MW
Hanwha E&C 18V28/32S x 5 sets 18.5MW
IRAN PTA(STPC)-Daelim 12V32/40 x 1 set 4.7MW
SUDAN
Daewoo-ITMD 12V28/32H x 2 sets 5.6MW
Daewoo-NIC 12V28/32H x 3 sets 8.1MW
Daewoo-NCTC 12V28/32H x 4 sets 10.8MW
Sudan Port Corp. 8L28/32H x 2 sets 3MW
Ongoing Project
Completed Project
(As of Jan. 2015)
V. STX Reference - Asia
BANGLADESH
CPA 12V28/32H x 1 set 2.5MW
SPGC 16V34HLX x 7 sets 54MW
SPGC 16V34HLX x 7 sets 54MW
SEL 16V34HLX x 7 sets 54MW
VERL (Gas P·P) 18V28AGS x 4 sets 24MW
MALAYSIA LAHAD DATU 12V28/32H x 1 set 16.5MW
KUDAT 12V28/32H x 2 sets 4.4MW
INDONESIA
KIDECO 7th 8L28/32H x 3 sets 5.4MW
KIDECO 8th 8L28/32H x 3 sets 5.4MW
PLN 6L28/32H x 6 sets 8.1MW
Ongoing Project
Completed Project
(As of Jan. 2015)
24
Refurbishment New Parts O&M
General Repair
Life Assessment
Life Extended Repair
Reverse Engineering & Manufacturing
Assessment, Reliable Test
Outsourcing
Planned / Routine O&M
VI. Conclusion
STX provides reliable ‘Refurbishment Service’ and ‘ New Part Supply’ with Samsung Techwin.
Gas Turbine
Clients
Dispatching
Engineers
Condition
Check
Proposal
Submission Contract
Execute
Refurbishment
Refurbishment
Receiving
Samples
Reverse
Engineering
Proposal
Submission Contract
Execute
Manufacturing
New Parts
VI. Conclusion
STX and Techwin are ready to cooperate with you!
STX Contact Point
Seoul Office
Mr. J.W. Park
(82)2-316-9890 / (82)10-2038-8322 / [email protected]
Dubai Office
Mr. Alex Lim (LIM YONG TAEK)
(971)4-886-5154 / (971)50-181-3855 / [email protected]
Mr. Harish Sivadasan
(971)4-886-5154 / (971)50-9038-736 / [email protected]
Thank you!