NYC Department of Education Building Condition Assessment Survey 2018-2019 M387 Architectural Inspection Inspection Type Last Edited Time In InspectionId SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, 701 FORT WASHINGTON AVE, MANHATTAN, NY, 10040 School: 1317 2019-01-10 04:34AM 2019-06-27 04:04PM ARCHITECTURAL - SENIOR 1330 2019-01-10 07:12AM 2019-01-10 01:19PM ARCHITECTURAL - ASSOCIATE Asset Data Question Answer Was the Building Fully Accessible for Inspection? Yes Principal(s) Information Principal Name Kelsey Depalo Principal Organization Success Academy Charter School - Washington Heights - New York 1 Meeting with Principal? No Principal Feedback Principal questionnaire was returned with following comments 1 - The Gymnasium water leakage from above has damaged the floor. 2- There are issues with Heating and Cooling in the building. Custodian Was not present Fireman Gerardo Rodriguez Building Square Footage 65,000 Comments on the Area (Square Feet) None Comments on the Stories (Floors) plus Basements 3+B+SB+PH Comments on the Year Built 1890 Comments on the Student Population 480 Comments on the Staff Population 70 Comments on the Number of Classrooms 24 Weather Fair Facade Photo Fort Washington Avenue - East view Page 1 of 27 Print Date: 7/3/2019 Mobile Validity Version 2.0 (P)
Transcript
Page 1: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Inspection Type Last EditedTime InInspectionId

SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, 701 FORT WASHINGTON AVE, MANHATTAN, NY, 10040School:

1317 2019-01-10 04:34AM 2019-06-27 04:04PMARCHITECTURAL - SENIOR

1330 2019-01-10 07:12AM 2019-01-10 01:19PMARCHITECTURAL - ASSOCIATE

Asset DataQuestion Answer

Was the Building Fully Accessible for Inspection? Yes

Principal(s) Information

Principal Name Kelsey Depalo

Principal Organization Success Academy Charter School - Washington Heights - New

York 1

Meeting with Principal? No

Principal Feedback Principal questionnaire was returned with following comments

1 - The Gymnasium water leakage from above has damaged the

floor.

2- There are issues with Heating and Cooling in the building.

Custodian Was not present

Fireman Gerardo Rodriguez

Building Square Footage 65,000

Comments on the Area (Square Feet) None

Comments on the Stories (Floors) plus Basements 3+B+SB+PH

Comments on the Year Built 1890

Comments on the Student Population 480

Comments on the Staff Population 70

Comments on the Number of Classrooms 24

Weather Fair

Facade Photo

Fort Washington Avenue - East view

Page 1 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 2: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural InspectionMain Entrance Photo

Fort Washington

Roof Photo

Roof 1 - Southeast view

No System UpgradedHave any Systems/Major Building Components been upgraded?

Have there been any New Building Additions? No New Construction

Tandem No Tandem

Leased Space? Yes

Year Leased 2014

Inspection Type Partial Inspection

Priority ConditionExist

Last Year?

Priority

Category

Condition

Description

Component

Affected

Location

Description

Person(s)

Notified

Person(s)

Title

Photo

Image

No condition recorded

Structural Engineer Required

Structural

Condition Type

Condition

Description

Component

Affected

Location

Description

Person(s)

Notified

Person(s)

Title

Photo

Image

No condition recorded

Accessibility

Accessibility Status Question Response

Physical Breakdown Structure Exists Complies Required Deficiency

FUNCTIONAL ACCESSIBILITY

Exterior Routes

NoExterior Entrances & Exits

SADDLE HEIGHT > 1/2"

NoNoExterior H/C Lifts

Page 2 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 3: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Physical Breakdown Structure Exists Complies Required Deficiency

NoNoExterior Ramps and Railings

Interior Routes

NoNoCorridor and Lobby H/C Lifts

NoYesInterior Corridor Doors And Hardware

NoInterior Corridors & Lobbies

CHANGE IN ELEVATION

NoYesInterior Elevators

CAB SIZE < 51 IN. DEEP

YesInterior Lobby Doors And Hardware

NoInterior Ramps

Rooms & Spaces

Art Rooms

Yes NoRoom B3

NOT ON ACCESSIBLE ROUTE

NoAuditorium

Cafeteria

Yes NoBasement

NOT ON ACCESSIBLE ROUTE

Classrooms

Yes NoNone on Accessible Route

NOT ON ACCESSIBLE ROUTE

NoComputer Rooms

Gymnasium

Yes NoSub- Basement ( Church )

NOT ON ACCESSIBLE ROUTE

Library

Yes YesRoom 103B

Main Office

Yes Yes1st Floor

Multi-purpose Room

Yes Yes1st Floor

Nurse's Office

Yes NoRoom F

NOT ON ACCESSIBLE ROUTE

NoPool

Science Lab

Yes YesRoom D and E

Toilet Rooms (boys)

Yes NoNone on Accessible Route

NOT ON ACCESSIBLE ROUTE

Toilet Rooms (girls)

Yes NoNone on Accessible Route

NOT ON ACCESSIBLE ROUTE

Toilet Rooms (staff)

Yes NoNone on Accessible Route

NOT ON ACCESSIBLE ROUTE

Page 3 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 4: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Building Template

Inspection

Question Response

Architectural

ATHLETIC FIELDS Does not exist

EXTERIOR Inspected

InspectedAREAWAY

Instance on Facade V Inspected

3- FairInstance Condition

Instance Quantity 1

Instance Quantity Uom EACH

AREAWAY GRATINGS:MINOR RUSTINGDeficiency

Deficiency Location/Instance

20Deficiency Quantity

Quantity Uom S.F.

Potential Action MAINTENANCE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Playground near Gymnasium

Violations No violations recorded

InspectedAWNINGS AND CANOPIES

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

Page 4 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 5: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

EXTERIOR

InspectedCHIMNEY

MetalMaterial Type(s)

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedCOPING

Condition 4- Between Fair and Poor

METAL:OPEN TRANSVERSE JOINTS WITH DAMAGED

CAULKING

Deficiency

Deficiency Location/Instance

400Deficiency Quantity

Quantity Uom L.F.

Potential Action MAINTENANCE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

All Roofs

Violations No violations recorded

Does not existCORNICE

InspectedDOORS

InspectedDOOR HARDWARE

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedDOORS AND FRAMES

Condition 3- Fair

METAL CLAD:DETERIORATED DOOR AND FRAME -

MINOR DETERIORATION

Deficiency

Deficiency Location/Instance

4Deficiency Quantity

Quantity Uom EACH

Potential Action MAINTENANCE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Page 5 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 6: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

EXTERIOR

DOORS

DOORS AND FRAMES

Deficiency Photo 1

Exit Door at Gymnasium

Deficiency Photo 2

Exit Door at Detailed view

Violations No violations recorded

InspectedLINTELS

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedTRANSOM/SIDE LIGHT

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedEXTERIOR SOFFITS

Condition 4- Between Fair and Poor

CONCRETE:MINOR CRACKS/SPALLINGDeficiency

Roof Plan Reference

Elevation

20Deficiency Quantity

Quantity Uom S.F.

Potential Action REPAIR

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Page 6 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 7: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

EXTERIOR

EXTERIOR SOFFITS

Deficiency Photo 1

Main entrance

Violations No violations recorded

InspectedEXTERIOR WALLS

MasonryMaterial Type(s)

50,000Replacement Quantity

Replacement Uom S.F.

Instance on All Facades Inspected

2- Between Good and FairInstance Condition

Instance Quantity 50,000

Instance Quantity Uom S.F.

No deficiencies recordedDeficiency

Does not existLOADING DOCK

InspectedLOUVER

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedPARAPETS

MasonryMaterial Type(s)

6,000Replacement Quantity

Replacement Uom C.F.

Instance on All Facades Inspected

2- Between Good and FairInstance Condition

Instance Quantity 6,000

Instance Quantity Uom CF

No deficiencies recordedDeficiency

Does not existPLAZA DECK

InspectedROOF

InspectedROOFING

Replacement Quantity 22,000

Replacement Uom S.F.

InspectedLEADERS, GUTTERS, DOWNSPOUTS, SCUPPERS

2- Between Good and FairCondition

No deficiencies recordedDeficiency

InspectedROOF BARRIER

3- FairCondition

RAILINGS/PANELS:DETERIORATED, MINOR RUSTINGDeficiency

Deficiency Location/Instance

50Deficiency Quantity

Quantity Uom S.F.

Potential Action MAINTENANCE

Page 7 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 8: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

EXTERIOR

ROOF

ROOFING

ROOF BARRIER

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Roof 8

Violations No violations recorded

Does not existROOF CAGE

Does not existROOF FENCE

Does not existROOF HATCH/SMOKE HATCH

InspectedROOFING

Instance on Modified Bitumen:Roofs 1 to 5 Inspected

1- GoodInstance Condition

Instance Quantity 13,000

Instance Quantity Uom S.F.

“Does the roof have major mechanical equipment sitting on Dunnage

Steel less than 18" above the Roofing?"

No

Installation Year 2012

Source of Installation Year Custodial Staff

No deficiencies recordedDeficiency

Instance on Modified Bitumen:Roof 6 Inspected

2- Between Good and FairInstance Condition

Instance Quantity 3,000

Instance Quantity Uom S.F.

“Does the roof have major mechanical equipment sitting on Dunnage

Steel less than 18" above the Roofing?"

No

Installation Year 2012

Source of Installation Year Custodial Staff

No deficiencies recordedDeficiency

Instance on Modified Bitumen:Roofs 7and 8 Inspected

3- FairInstance Condition

Instance Quantity 6,000

Instance Quantity Uom S.F.

“Does the roof have major mechanical equipment sitting on Dunnage

Steel less than 18" above the Roofing?"

No

Installation Year 1995

Source of Installation Year Inspector Estimate

MODIFIED BITUMEN:FLASHING:CAP FLASHING MISSINGDeficiency

Deficiency Location/Instance

20Deficiency Quantity

Page 8 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 9: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

EXTERIOR

ROOF

ROOFING

ROOFING

Quantity Uom L.F.

Potential Action INSTALL NEW

PRIORITY 4Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Roof 7

Violations No violations recorded

MODIFIED BITUMEN:ROOFING:BEYOND USEFUL LIFEDeficiency

Modified Bitumen:Roofs 7and 8Deficiency Location/Instance

6,000Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 1Urgency of Action

LEVEL 2Purpose of Action

Violations No violations recorded

InspectedROOFING DRAINS

2- Between Good and FairCondition

No deficiencies recordedDeficiency

InspectedSPECIALTIES

InspectedBULKHEAD/PENTHOUSE

3- FairCondition

BULKHEAD/PENTHOUSE

WALLS/EXTERIOR:CRACKS/SPALLING - MINOR

Deficiency

Deficiency Location/Instance

30Deficiency Quantity

Quantity Uom S.F.

Potential Action REPAIR

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Roof 1- Bulkhead

Violations No violations recorded

Page 9 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 10: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

EXTERIOR

ROOF

SPECIALTIES

Does not existCUPOLA/ SPIRES/ TOWERS

Does not existDORMER

Does not existDUNNAGE STEEL

Does not existROOF/GRAVITY TANK

Does not existSKYLIGHT/ROOF VENT

InspectedSTAIRS/RAMPS: EXTERIOR

InspectedBUILDING CHEEK/FLANK WALLS

Condition 4- Between Fair and Poor

MASONRY UNIT:CRACKS/SPALLING - MINORDeficiency

Deficiency Location/Instance

25Deficiency Quantity

Quantity Uom S.F.

Potential Action REPAIR

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Facade A - South side Exit by the Cafeteria

Deficiency Photo 2

Facade A - South side Exit by the Cafeteria

Violations No violations recorded

InspectedRAILINGS

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedSTAIRS/RAMPS

Condition 3- Fair

STONE:OPEN JOINTSDeficiency

Deficiency Location/Instance

Page 10 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 11: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

EXTERIOR

STAIRS/RAMPS: EXTERIOR

STAIRS/RAMPS

10Deficiency Quantity

Quantity Uom L.F.

Potential Action REPOINT

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Main Entrance Side stair

Violations No violations recorded

InspectedWINDOWS

15,000Replacement Quantity

Replacement Uom S.F.

InspectedEXTERIOR GUARDS

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedLINTELS

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedWINDOWS

Material Type(s) Aluminum

Instance on Aluminum - Double Hung:Original Buildings Facades Inspected

1- GoodInstance Condition

Instance Quantity 8,000

Instance Quantity Uom S.F.

Installation Year 2012

Source of Installation Year Inspector Estimate

No deficiencies recordedDeficiency

Instance on Aluminum - Other:Annex, Gymnasium and Custodian

Office

Inspected

4- Between Fair and PoorInstance Condition

Instance Quantity 6,000

Instance Quantity Uom S.F.

Installation Year 1958

Source of Installation Year Inspector Estimate

ALUMINUM - OTHER:AIR/WATER INFILTRATIONDeficiency

Roof Plan Reference

Page 11 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 12: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

EXTERIOR

WINDOWS

WINDOWS

Elevation

Elevation Reference Facade G, H, k, L

350Deficiency Quantity

Quantity Uom L.F.

Potential Action REPLACE TRIM, SILLS OR WEATHERSTRIPPING

PRIORITY 5Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Nurses room F

Violations No violations recorded

Instance on Steel:Staircases - Original Building Inspected

3- FairInstance Condition

Instance Quantity 1,000

Instance Quantity Uom S.F.

Installation Year 2012

Source of Installation Year Inspector Estimate

STEEL:BROKEN PANEDeficiency

Roof Plan Reference

Elevation

Elevation Reference Facade G, L, M

20Deficiency Quantity

Quantity Uom S.F.

Potential Action MAINTENANCE

PRIORITY 5Urgency of Action

LEVEL 2Purpose of Action

Page 12 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 13: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

EXTERIOR

WINDOWS

WINDOWS

Deficiency Photo 1

Stair C - 2nd Floor Landings

Violations No violations recorded

INTERIOR Inspected

Does not existAUDITORIUM

CAFETERIA

Instance on Basement Inspected

Ceiling

Instance on Basement Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Door(s)

Instance on Basement Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Fixed Equipment

Instance on Basement Does not exist

Floor Finish

Instance on Basement Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Sliding-folding Partition

Instance on Basement Does not exist

Stage

Instance on Basement Does not exist

Walls

Instance on Basement Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Window Curtains/Shades/Blinds

Instance on Basement Does not exist

InspectedCLASSROOMS/CORRIDORS/ADMIN SPACES

InspectedCeiling

Condition 2- Between Good and Fair

ACOUSTIC TILES:DAMAGED/MISSINGDeficiency

Room B2Deficiency Location/Instance

10Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Page 13 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 14: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

INTERIOR

CLASSROOMS/CORRIDORS/ADMIN SPACES

Ceiling

Deficiency Photo 1

South of Room

Violations No violations recorded

GYPSUM BOARD:DAMAGED/DETERIORATEDDeficiency

Room B2Deficiency Location/Instance

15Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

South of Room

Violations No violations recorded

InspectedDoor(s)

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedFloor Finish

Condition 2- Between Good and Fair

TERRAZZO:CRACKSDeficiency

Corridor near Room 110, 113, 119 , 210Deficiency Location/Instance

35Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Corridor near Room 210

Violations No violations recorded

Does not existSpecialties

InspectedWalls

Condition 2- Between Good and Fair

Page 14 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 15: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

INTERIOR

CLASSROOMS/CORRIDORS/ADMIN SPACES

Walls

No deficiencies recordedDeficiency

GYMNASIUM

Instance on Sub-Basement Inspected

Ceiling

Instance on Sub-Basement Inspected

2- Between Good and FairInstance Condition

ACOUSTIC TILES ON PLASTER:DAMAGED/MISSINGDeficiency

North of RoomDeficiency Location/Instance

10Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

North of Room

Violations No violations recorded

PLASTER:CRACKS/SPALLINGDeficiency

North of RoomDeficiency Location/Instance

10Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

North of Room

Violations No violations recorded

Door(s)

Instance on Sub-Basement Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Fixed Equipment

Instance on Sub-Basement Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Floor Finish

Instance on Sub-Basement Inspected

2- Between Good and FairInstance Condition

WOOD:DAMAGED/DETERIORATEDDeficiency

Page 15 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 16: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

INTERIOR

GYMNASIUM

Floor Finish

West of RoomDeficiency Location/Instance

100Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

West of Room

Violations No violations recorded

Seating

Instance on Sub-Basement Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Sliding-folding Partition

Instance on Sub-Basement Does not exist

Stage

Instance on Sub-Basement Inspected

Stage

Instance on Sub-Basement Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Stage Curtain Rigging

Instance on Sub-Basement Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Stage Curtains

Instance on Sub-Basement Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Walls

Instance on Sub-Basement Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Window Curtains/Shades/Blinds

Instance on Sub-Basement Does not exist

InspectedINTERIOR DOOR HARDWARE

Condition 3- Fair

No deficiencies recordedDeficiency

InspectedINTERIOR GUARDS

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

KITCHEN

Instance on Basement Inspected

Ceiling

Page 16 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 17: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

INTERIOR

KITCHEN

Ceiling

Instance on Basement Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Door(s)

Instance on Basement Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Floor Finish

Instance on Basement Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Walls

Instance on Basement Inspected

2- Between Good and FairInstance Condition

PLASTER:CRACKS/SPALLINGDeficiency

Northwest of RoomDeficiency Location/Instance

15Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Northwest of Room

Deficiency Photo 2

North West of Room

Violations No violations recorded

LIBRARY

Instance on Room 103B Inspected

Built-in Furnishing

Instance on Room 103B Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Ceiling

Instance on Room 103B Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Door(s)

Instance on Room 103B Inspected

Page 17 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 18: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

INTERIOR

LIBRARY

Door(s)

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Floor Finish

Instance on Room 103B Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Walls

Instance on Room 103B Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Does not existLOCKER ROOM

MULTI-PURPOSE ROOM

Instance on 1st Floor Inspected

Ceiling

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Door(s)

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Fixed Equipment

Instance on 1st Floor Does not exist

Floor Finish

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

TERRAZZO:CRACKSDeficiency

Northwest of RoomDeficiency Location/Instance

40Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Northwest of Room

Violations No violations recorded

Sliding-folding Partition

Instance on 1st Floor Does not exist

Stage

Instance on 1st Floor Inspected

Stage

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Page 18 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 19: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

INTERIOR

MULTI-PURPOSE ROOM

Stage

Stage Curtain Rigging

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Stage Curtains

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Walls

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Window Curtains/Shades/Blinds

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Does not existPOOLS

Does not existSCIENCE DEMO ROOM

SCIENCE LAB

Instance on Room E Inspected

YesAlternative Use

Instance on Room D Inspected

YesAlternative Use

Fixed Equipment

Instance on Room E Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Instance on Room D Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

SCIENCE PREP ROOM

Instance on Room E1 Inspected

YesAlternative Use

Instance on Room D1 Inspected

YesAlternative Use

Fixed Equipment

Instance on Room E1 Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Instance on Room D1 Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Does not existSHOWER ROOM

InspectedSTAIRS/RAMPS: INTERIOR

Do Letter Stair Signs Exist? Partially

InspectedCeiling

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedDoor(s)

Condition 2- Between Good and Fair

Page 19 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 20: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

INTERIOR

STAIRS/RAMPS: INTERIOR

Door(s)

No deficiencies recordedDeficiency

Does not existPartition

InspectedRailings

Condition 2- Between Good and Fair

METAL:DAMAGEDDeficiency

North of Gymnasium at BalconyDeficiency Location/Instance

10Deficiency Quantity

Quantity Uom L.F.

Potential Action MAINTENANCE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

North of Gymnasium at Balcony

Violations No violations recorded

InspectedStairs and Landings

Condition 2- Between Good and Fair

TERRAZZO:CRACKSDeficiency

Stair A2Deficiency Location/Instance

30Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Stair A2, B2

Violations No violations recorded

InspectedWalls

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedSTRUCTURAL

InspectedCOLUMNS/BEAMS/BEARING WALLS

Condition 3- Fair

CONCRETE

COLUMNS/BEAMS:CRACKED/SPALLED/REINFORCEMEN

T EXPOSED

Deficiency

Attic storageDeficiency Location/Instance

40Deficiency Quantity

Quantity Uom S.F.

Page 20 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 21: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

INTERIOR

STRUCTURAL

COLUMNS/BEAMS/BEARING WALLS

Potential Action REPAIR

PRIORITY 4Urgency of Action

LEVEL 5Purpose of Action

Deficiency Photo 1

Slab structure at storage

Violations No violations recorded

InspectedFLOOR STRUCTURE

Condition 3- Fair

CONCRETE:CRACKS/SPALLED/REINFORCEMENT

EXPOSED

Deficiency

BasementDeficiency Location/Instance

80Deficiency Quantity

Quantity Uom S.F.

Potential Action REPAIR

PRIORITY 3Urgency of Action

LEVEL 5Purpose of Action

Deficiency Photo 1

Mechanical room

Violations No violations recorded

InspectedFOUNDATION WALLS

Material Type(s) Concrete

Condition 4- Between Fair and Poor

CONCRETE:WATER INFILTRATION IN NON-

INSTRUCTIONAL SPACE

Deficiency

BasementDeficiency Location/Instance

20Deficiency Quantity

Quantity Uom S.F.

Potential Action INSTALL WATERPROOFING

PRIORITY 5Urgency of Action

LEVEL 5Purpose of Action

Deficiency Photo 1

Basement-Mechanical room 2

Page 21 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 22: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

INTERIOR

STRUCTURAL

FOUNDATION WALLS

Violations No violations recorded

CONCRETE:WATER INFILTRATION IN INSTRUCTIONAL

SPACE

Deficiency

BasementDeficiency Location/Instance

30Deficiency Quantity

Quantity Uom S.F.

Potential Action INSTALL WATERPROOFING

PRIORITY 5Urgency of Action

LEVEL 6Purpose of Action

Deficiency Photo 1

Gymnasium- South side wall

Violations No violations recorded

InspectedROOF STRUCTURE

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

Does not existVAULTS-BUNKERS

InspectedTOILET ROOMS - STAFF

InspectedCeiling

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedDoor(s)

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedFloor Finish

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedStalls

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedWalls

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedTOILET ROOMS - STUDENTS

InspectedCeiling

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedDoor(s)

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedFloor Finish

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedStalls

Condition 2- Between Good and Fair

Page 22 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 23: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

INTERIOR

TOILET ROOMS - STUDENTS

Stalls

No deficiencies recordedDeficiency

InspectedWalls

Condition 2- Between Good and Fair

CERAMIC TILE:BROKEN/ MISSINGDeficiency

Boys Toilet Room at BasementDeficiency Location/Instance

10Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

South of Boys Toilet Room at Basement

Violations No violations recorded

LIFE SAFETY Inspected

Does not existF.D. HOLDING AREA

InspectedSTEEL STAIRS

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

SITE Inspected

Does not existCONTAINERIZATION

InspectedDRAINAGE SYSTEM FOR ASPHALT

InspectedCatch Basins/Manhole - Surrounded by Asphalt

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

Does not existCulverts - Asphalt Covering

InspectedDRAINAGE SYSTEM FOR CONCRETE

InspectedCatch Basins/Manhole - Surrounded by Concrete

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

Does not existCulverts - Concrete Covering

InspectedDRAINAGE SYSTEM FOR SOIL

InspectedCatch Basins/Manhole - Surrounded by Soil

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

Does not existCulverts - Soil Covering

Does not existDRINKING FOUNTAINS

InspectedFENCES

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

Does not existIRRIGATION SYSTEM

InspectedPAVING

InspectedDOT Sidewalk

Does not existAsphalt

InspectedConcrete

Page 23 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 24: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

SITE

PAVING

DOT Sidewalk

Concrete

4- Between Fair and PoorCondition

HEAVINGDeficiency

Along Cabrini Blvd and Fort Washington AvenueDeficiency Location/Instance

400Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Along Cabrini Blvd,

Violations No violations recorded

DAMAGED/DETERIORATED/MISSING SECTIONSDeficiency

Along Cabrini Blvd and Fort Washington AvenueDeficiency Location/Instance

1,675Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Along Cabrini Blvd,

Violations No violations recorded

DAMAGED CURBSDeficiency

Along Cabrini Blvd and Fort Washington AvenueDeficiency Location/Instance

50Deficiency Quantity

Quantity Uom L.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Along Cabrini Blvd,

Violations No violations recorded

Page 24 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 25: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

SITE

PAVING

DOT Sidewalk

Does not existPavers

InspectedSite Sidewalks & Walkways

Does not existAsphalt

InspectedConcrete

4- Between Fair and PoorCondition

CRACKS - MINORDeficiency

Near Stair C, Parking Area , Along Cabrini Blvd, near Main

Entrance

Deficiency Location/Instance

1,025Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Near Stair C, at Ground Hog Court

Deficiency Photo 2

Near Main Entrance

Violations No violations recorded

DAMAGED CURBSDeficiency

East Drive wayDeficiency Location/Instance

15Deficiency Quantity

Quantity Uom L.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

East Drive Way

Violations No violations recorded

HEAVINGDeficiency

Near Main EntranceDeficiency Location/Instance

50Deficiency Quantity

Quantity Uom S.F.

Page 25 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 26: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

SITE

PAVING

Site Sidewalks & Walkways

Concrete

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

South of Main Entrance

Violations No violations recorded

InspectedPavers

2- Between Good and FairCondition

No deficiencies recordedDeficiency

InspectedStudent Non-Use

Gravel Exists? No

Does not existAsphalt

InspectedConcrete

2- Between Good and FairCondition

No deficiencies recordedDeficiency

InspectedPavers

2- Between Good and FairCondition

No deficiencies recordedDeficiency

Does not existStudent Use

Does not existPLAYGROUNDS

Does not existPLAYING SURFACE

InspectedRETAINING WALLS

Condition 2- Between Good and Fair

Are there any Retaining Walls 6' OR higher facing public street/sidewalk? Yes

CAST IN PLACE CONCRETE:CRACKS/SPALLING - MINORDeficiency

Ground Hog CourtDeficiency Location/Instance

10Deficiency Quantity

Quantity Uom S.F.

Potential Action REPAIR

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

South of Ground Hog Court

Violations No violations recorded

CAST IN PLACE CONCRETE:CRACKS/SPALLING - MAJORDeficiency

West of Ground Hog CourtDeficiency Location/Instance

20Deficiency Quantity

Page 26 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)

Page 27: SUCCESS ACADEMY WASHINGTON HEIGHTS - MANHATTAN, … › bcas › enc_rpts › M387_A.pdf · 2019-07-03 · NYC Department of Education Building Condition Assessment Survey 2018-2019

NYC Department of Education

Building Condition Assessment Survey 2018-2019

M387Architectural Inspection

Question Response

SITE

RETAINING WALLS

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

West of Ground Hog Court

Violations No violations recorded

InspectedSEATING

InspectedBenches

Does not existConcrete

InspectedMetal/Wood/Plastic

2- Between Good and FairCondition

No deficiencies recordedDeficiency

Does not existBleachers

InspectedSITE WALLS (NOT RETAINING WALLS)

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedSTAIRS/RAMPS: EXTERIOR

InspectedRailings

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedSite Cheek/flank Walls

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedStairs/ramps

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

Page 27 of 27 Print Date: 7/3/2019Mobile Validity Version 2.0 (P)