Success Story Of Investments In Renewable Energy Sector In Uttar Pradesh
Transcript
Page 1: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Success Story Of

Investments In Renewable Energy Sector In

Uttar Pradesh

Page 2: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

J A K S O N

Page 3: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

* AAI, Raipur

JaksonA Synopsis

Page 4: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

General Overview Leading Power Solutions Provider 7 decades in existence Over 1 million sq. ft. of combined

manufacturing space Over 2000 employees pan India 4 manufacturing plants Global Training Centre

and 2 Service Centers 22 offices in India 20 MW IPP in Rajasthan, 10 MW IPP

in Uttar Pradesh Network of 54 dealers, 65 channel partners Overseas Offices in Nepal, Bangladesh

& Singapore

Page 5: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Power Distribution

Generating Sets

Electrical Contracting

Solar Business Hospitality

Global Training Center

International Business

Defense & Oil

Business Areas

Page 6: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Growth Story

0

50

100

150

200

250

300

06-'07 07-'08 08-'09 09-'10 10-'11 11-'12 12-'13 13-'14 14-'15 15- '16

110 119138

160

197 188

232 236 229

288

Valu

e

Year

690 744864

1002

1230 1176

1452 1475 1450

1800

USD MillionsINR Cr.

‘15-’16 projected

Page 7: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

* AAI, Raipur

JaksonInvestments in Uttar Pradesh

Page 8: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Jakson’s Investment in UP

Jakson’s WorkshopLocation: Sec 11 NoidaArea: 1015 sq. mtr.

1980

Page 9: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Head Office cum FactoryLocation: Hosiery Complex, Noida

Area: 153000 sq. ft.

1999

Jakson’s Investment in UP

Page 10: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Knowledge Boulevard- An IT Infrastructure BuildingArea: 665000 sq. ft.

Location: Sec 62, Noida

2004

Jakson’s Investment in UP

Page 11: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Panel Manufacturing UnitArea: 200000 sq. ft.

Covered Area: 10000 sq. mtr. (Approx.)Location: Ecotech 3, Gr. Noida

2007

Jakson’s Investment in UP

Page 12: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

New Head Office BuildingArea: 153000 sq. ft.

Location: Hosiery Complex, Noida

2011

Jakson’s Investment in UP

Page 13: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Global Training Center cum Engine Rebuild FacilityArea: 86000 sq. ft.

Location: Ecotech 3, Gr. Noida

2012

Jakson’s Investment in UP

Page 14: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Engine Rebuild FacilityArea: 20000 sq. ft.

Location: Unnao, Kanpur

2013

Jakson’s Investment in UP

Page 15: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Solar Power PlantCapacity: 10 MWLocation: Lalitpur

2015

Jakson’s Investment in UP

Page 16: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Renewable Products Manufacturing UnitArea: 200000 sq. ft.

Covered Area: 8000 sq. mtr. (Approx.)Location: Ecotech 3, Gr. Noida

2015

Jakson’s Investment in UP

Page 17: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Jakson’s Investment in UP

SummarySr. No. Facility Investment in

INR (Cr)

1 Head Office 24

2 Knowledge Boulevard 230

3 Panel Manufacturing Plant 21

4 Global Training Centre 17

5 Engine Re-built Facility 5

6 10 MW Solar Power Plant 80

7 Renewable Products Manufacturing Plant 50

Total Current Investments 427

Another investment of 240 Cr for a 30 MW Solar Power Plant has been committed for FY 2015-16

Total Investments in Renewables in UP 370 Cr

Page 18: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

* AAI, Raipur

JaksonInvestments in Renewables

Page 19: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Current Land Based IPP’s - 60 MW

20 MW Solar Power Plant in Bap, Rajasthan in operation since March 2012

10 MW Solar Plant in Uttar Pradesh commissioned in March, 2015

30 MW Solar plant in UP . Plant to be commissioned by March, 2016

Current Rooftop IPP’s - 550 kWp

200kWp in Chennai 250 kWp for Delhi Metro Rail Corporation 100kWp for Airport Authority of India, Raipur

Plan to own 200 MW solar power plants in three years

Solar IPP

* Bap, Rajasthan

* AAI, Raipur

Launch of 10 MW Solar Power Plant at Laiatpur UP

Page 20: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Jakson Solar Products - Manufacturing

Design & manufacture of innovative solar power products for various applications -

• Solar Inverter Sub-station• AJB/SCB/SMB• Containerized Solar Generator• Solar Mobile Generator• Solar Home Lighting & Street Light System• Solar RO System• Solar Water Pumping system• Module Mounting Structure (MMS)• SPV Module Manufacturing• HT Panels• LT Panels

Page 21: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Jakson’s Investment in Renewables

SummarySr. No. Facility Investment in

INR (Cr)

1 2X10 MW Solar Power Plants 200

2 10 MW Solar Power Plant 80

3 Renewable Products Manufacturing Plant 50

4 30 MW Solar Power Plant 240

Total Current Investments 570

Total Investments in Renewables in UP 370 Cr

UP accounts for 65% of Jakson’s investments in Renewables

Page 22: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

* AAI, Raipur

JaksonRenewables

Page 23: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Our Solar Business

Solar IPPs Solar EPC & Components

Solar Products & Systems

Selling power to Govt. entities and private customers through long term PPAs

Turnkey EPC for Utility scale & Rooftop power plants

On-grid & Off-grid solar systems

PV plant components

Portfolio of innovative solar products

Mini/Micro Grids Solar Pumping Systems Solar Street Lighting

Systems

Page 24: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

* AAI, Raipur

Jakson Solar Revenue

0100200300400500600

11

183

80207

512

Revenue

Series 1

All values in Crores

Page 25: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Solar IPP

Key Offerings Setting up of MW scale land based Solar Power Plants under long term PPAs to

sell power to Government entities. Setting up rooftop solar power plants on BOOT/ BOO basis under long term PPAs

to sell power to private customers.

Page 26: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Current Land Based IPP’s - 60 MW

20 MW Solar Power Plant in Bap, Rajasthan in operation since March 2012

10 MW Solar Plant in Uttar Pradesh commissioned in March, 2015

30 MW Solar plant in UP . Plant to be commissioned by March, 2016

Current Rooftop IPP’s - 550 kWp

200kWp in Chennai 250 kWp for Delhi Metro Rail Corporation 100kWp for Airport Authority of India, Raipur

Plan to own 200 MW solar power plants in three years

Solar IPP

* Bap, Rajasthan

* AAI, Raipur

Launch of 10 MW Solar Power Plant at Laiatpur UP

Page 27: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Solar EPC

F. Y. Land-based Rooftop Turnover(Cr.)

2011-12 1.05 MWp - 11

2012-13 23.0 MWp 220 KWp 152

2013-14 10 MWp 580 KWp 38

2014-15 33.5 MWp 3 MWp 130

2015-16 63 MWp underexecution

6 MWp under execution

280 Cr orders in hand under execution350 Cr total expected

TOTAL 131 MWp 10 MWp 681

Page 28: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

MW Order Under Execution

Sr. No. Customer Capacity Location

1. Punjlloyd 20 Mw Punjab

2. Oasis 3 Mw Punjab

3. Pinnacle 5 Mw UP

4. Jakson 30 Mw UP

5. BPCL 4 Mw MP

6. TR Energy 1 Mw Punjab

Total 63 Mw

Page 29: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Kw Order Under ExecutionSr. No. Customer Capacity in kWp Location

1. Maharashtra Sadan 150 Delhi

2. UPSC 100 Delhi

3. Nirman Bhawan 200 Delhi

4. Shastri Bhawan 250 Delhi

5. Yamuna Sports Complex 400 Delhi

6. PTC 500 Lucknow

7. Haldiram 500 Noida

8. Haldiram 225 Noida

9. IFFCO 235 Allahabad

10. CREST 1130 Chandiragh

11. RRECL 860 Rajasthan

12. IOCL 200 Gujarat

13. SECI 2500 UP & Haryana

Total 6200

Page 30: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Solar EPC & Components- Land Based Project References

10 MW- Lalitpur, UP 21 MW- Grid Connected Solar Power Project for Punj Lloyd, Punjab

Design , Engineering, Equipment Supply, Installation, Commissioning and O&M for 25 years

Design , Engineering, Equipment Supply Installation, Commissioning and O&M for 5 years.

Page 31: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Solar EPC & Components- Land Based Project References

20 MW, JPPL- Bap, Rajasthan 10 MW, NTPC- Talcher, Orissa

Design , Engineering, Equipment Supply, Installation, Commissioning and O&Mfor 25 yrs.

Design , Engineering, Equipment Supply (except PV Modules), Installation, Commissioning and O&M for 1 year.

Three different design of civil foundation used on Ash fill land

Page 32: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Solar EPC & Components- Rooftop Project References

100 KWp- Airport Authority of India, Raipur

80 KWp, KSNDMC-Bangalore

500 KWp, Haldiram-Noida

Design , Engineering, Equipment Supply , I&C and 2 year O&M

Provides 24x 7 power to all Critical (IT and lighting equipment) for the monitoring Centre

First Rooftop PV Project at Indian Airport

BOO Model with 25 Year PPA & O&M

Page 33: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Solar EPC & Components- Rooftop Project References

200 KWp-Shriram, Chennai

300 KWp, SandharAuto- Gurgaon Design

, Engineering, Equipment Supply , I&C and 2 year O&M

Design , Engineering, Equipment Supply , I&C

BOOT Model with 15 Year PPA & O&M

250 KWp, DMRC-Delhi Design

, Engineering, Equipment Supply , I&C

Page 34: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Jakson solar Products Overview

www.jakson.com

JAKSON GROUP

Page 35: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Solar EPC- Solar PV Plant Components

Range of Solar Products

MMSContainerized Solar Generator

SPV Modules Manufacturing

Solar Generator

Solar Home Lighting System

Solar RO System

AJB/SCB/SMB

HT/LT Panels

Page 36: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Solar Products- Financial - Indicators

FY: 2013-14 (in Cr.)

Solar Power Generating Products 0.1

Solar Inverter Sub-station 10.0

AJB/SCB/SMB/HT/LT Panels 2.1

Solar RO System 0.0

Others 0.2

Total 12.4

FY: 2012-13 (in Cr.)

Solar Power Generating Products 28

AJB/SCB/SMB/HT/LT Panels 2.1Total 30.1

FY: 2015-16 (in Cr.) Expected

Solar Inverter Sub-station 35Solar Power Generating Products 5

AJB/SCB/SMB/HT/LT Panels 15SHLS 5Solar RO System 10MMS 12Modules 40

Total 122

FY: 2014-15 (in Cr.)

Solar Inverter Sub-station 35.8

Solar Power Generating Products 0.1

AJB/SCB/SMB/HT/LT Panels 4.9SHLS 0.2Solar RO System 0.8MMS 3.9Others 0.5Total 46.2

Page 37: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

5MW- Value Labs, AP 5MW- Sunborne, Rajasthan

10MW- LEPL, Rajasthan 10MW- NVR, Rajasthan

SISS (Solar Inverter Sub-station)

D.C. Fuse box for connecting D.C. input from individual PV module stringcombiners.

DC Power Cabling

INVERTERs

AC POWER CABLING

Aux panel for feeding Auxiliary supply for lighting and Fan load and PLC panel (Optional) for SCADA connectivity.

Step Up Transformer 11 kv or 33 KV

RMU ( Ring main unit) for connection to grid.

• Solar Inverter Sub Station, conveniently termed as SISS, is a prefabricated, prewired Inverters cum HT/LT equipment COMPOSITE power block complete with D.C power cabling and A.C power cabling with suitable termination and equipped with components, ALL mounted in a thermally insulated enclosure.

Page 38: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

AJB/SCB/SMB

•Strings : 24/16/12/8 Nos.•DC Current : 120/160/200/250/300 Amps•Rated impulse withstand voltage : Uimp 8 (KV)•Maximum short circuit current per string : ISc STC 10 (A)•Communication Protocol : Modbus RS 485•Ambient temperature : -35°C to +55°C•Ingress protection : IP 65•Enclosure fabrication material : Polycarbonate / FRP GRP

Page 39: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

HT/LT Panels

Engineering for Performance - HT panels•11kV and 33kV Panels•Fixed nad Drawout execution•630A to 3150A 11KV/33kVVCB panels•25kA, 31.5kA and 40kA

Engineering for Performance - LT panels•Rated Service Voltage : 415V•Rated Frequency : 50Hz•Rated Insulation Voltage : 660V•Busbar system : TP-E or TPN-E•Rating of Busbar : 63-6000A•Fault Level Withstand : 10,25,35,50 & 65kA for 1S•Degree of Protection : IP42, 55, or 65

Page 40: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Containerized Solar Generator 12.5 KW- 25 KW

Energy Efficiency Solar Products

Page 41: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

PV Modules 3-300 Wp

Solar Products & Systems

Page 42: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

PV Module Manufacturing Line - 3Wp to 300Wp

•Layout of PV Module Line with Capacity - 65 MW •Commissioning Planned in Nov'2015

Page 43: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Solar Generator 0.5 – 2 KW

Energy Efficiency Solar Products

Page 44: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Solar Street Light

LED Street Lighting Solution

Energy Efficiency Solar Products

Page 45: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

40 & 100 Wp DC Home Lighting Systems

150 & 250 Wp AC Home Lighting Systems

Home Lighting System

Energy Efficiency Solar Products

Page 46: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Solar Home RO Systems Solar Outdoor RO Systems

Water Purification Products

Page 47: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Solar RO and pumping system

Solar Water Pumping Solution

Solar Water Purification with RO system

Page 48: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Module Mounting Structure (MMS)

•Jakson provides PV mounting solutions by MMS, a leader in the PV mounting industry for quality designs, durability and a variety of designs for ground, rooftop, and structure mounting systems to accommodate the needs of any type of solar array installation.

•The installation of high efficient setup for MMS Manufacturing is under process for Capacity of 17MW/months

Page 49: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Existing Facilities for MMS Manufacturing

Page 50: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Name of Buyer Description of Scope of Work Order Received Order ExecutedQty Order

Value (in Rs)

Qty Amount (in Rs)

Balance Qty Remarks

UPNEDA

1 KW SOLAR POWER PLANT WITH FAN,WATER PUMP AND RO SYSTEM

2 519,000 2 519,000 NIL

Complete Order Executed

UPNEDA

1 KW SOLAR POWER PLANT WITH FAN,WATER PUMP AND RO SYSTEM

30 7,785,000 30 7,785,000 NIL

Complete Order Executed

UPNEDA-New Order

1.1 KW SOLAR POWER PLANT WITH FAN,WATER PUMP AND RO SYSTEM

186 50,127,000 186

Order Recd in August2015

TWIF A/c BHEL50 LPH Solar Water RO System for school

4 212,000 4 212,000 NIL

Complete Order Executed

Environ Energy(Bhaskar Solar) 50LPH Solar RO for UPNEDA

51 1,652,000 51 1,652,000 NIL

Complete Order Executed

Su-kam 50LPH Solar RO for UPNEDA30

1,081,320 30 1,081,320 NIL Complete Order Executed

Authorised Channel Partners in UP (15 Nos)

Solar Modules/Home Lighting Systems/ Solar Generator/RO Systems/Street Lights etc for Retail Market Various 53,300,000

53,300,000

Regular Orders on Monthly basis-Network of over 200 Dealers

Total Value in Rs114,676,320

64,549,320

Total Value In Crore 11.47 6.45

Summary of Orders Executed / Under Execution by Solar Products & System Division in Uttar Pradesh

Page 51: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Jakson Solar Division has 15 Channel Partners with more than 200 Dealers &Sales/Service team of 14 Employees to Support customers in UP

Page 52: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

* AAI, Raipur

JaksonExperience in Renewables

in Uttar Pradesh

Bouquets

Page 53: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

* AAI, Raipur

Jakson Experience in Renewables in UPBouquets

• Absolutely transparent bidding process.

• Co-operative administration at Lucknow.Ministry of Renewables, UPNEDA & UPPCL

• Single Window Clearance System.

• No land conversion required for Solar Power Plants.

• True spirit of public private partnership being demonstrated by UPNEDA.

• Excellent co-operation by UPPTCL.

• No stamp duty for land for Solar Power Plants.

• No Environmental Impact Assessment (EIA) Report required for Solar Power Plants.

• VAT exemption for Solar Power Plant Components and Solar Products.

• Timely Payment for Electricity supplied.

Page 54: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

* AAI, Raipur

JaksonExperience in Renewables

in Uttar Pradesh

Areas for Improvements

Page 55: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

* AAI, Raipur

Jakson Experience in Renewables in UPAreas for Improvements

• Co-operative attitude of Lucknow administration needs to filter down to local Authorities.

• Quality Control for transmission lines constructed by UPPCL.

• Single Window Clearance System need to be made effective.

• Although green industry, Solar Power Plants be exempted from ‘Permit to Establish’ and ‘Permit to Operate’.

• Electricity Grid not stable.

Page 56: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Defective Transmission Line Insulators

Page 57: Success Story Of Investments In Renewable Energy Sector …upneda.org.in/sites/default/files/all/section/Re-Invest-jakson.pdf · used on Ash fill land. ... of India, Raipur. 80 KWp,

Jakson GroupA-43, Hosiery Complex

Noida- 201305, [email protected]

Thank You