Date post: | 07-Apr-2018 |
Category: |
Documents |
Upload: | girish-bhat |
View: | 222 times |
Download: | 0 times |
of 68
8/6/2019 Successfully Designed
1/68
Successfullydesigned, developed
and implemented a
complete regression
test for the
entiresystem.
Used
Quality Centerand
8/6/2019 Successfully Designed
2/68
8/6/2019 Successfully Designed
3/68
the possibilities
of system failurewith UAT.
Involved inattending meetings
with the businessusers and reviewing
the developed
scripts toensure that
8/6/2019 Successfully Designed
4/68
they were in
accordance to thebusiness users
expectations.Environment: Java,
AS400, Quality
Center 9.0, Xml,
TFS, Visual Studios
2005, Office2000.Blockbuster
8/6/2019 Successfully Designed
5/68
Inc, McKinney, TX
May07 Aug07Role:QA Analyst
The BlockbusterInc assists the
media inproviding
company specificand home
8/6/2019 Successfully Designed
6/68
entertainmentindu
stry related
information. The
Project was aonline application
called ePAF(ElectronicPayrol
l ApplicationForm) which
8/6/2019 Successfully Designed
7/68
8/6/2019 Successfully Designed
8/68
change, and Pay
change.Responsibilities:
Reviewed the
Business
RequirementDocuments (
BRD
8/6/2019 Successfully Designed
9/68
) and the Functional
Specifications.
Involved in writing
Test Plansby going through the
design andfunctional
specifications.
8/6/2019 Successfully Designed
10/68
Reviewed the
Designs andspecifications and
createdTest cases
based on the
content.
Participated and
coordinated in
8/6/2019 Successfully Designed
11/68
Test Case
Walkthroughs.
Performed bothManual
andAutomated Testing
of the application.
8/6/2019 Successfully Designed
12/68
Involved in
preparing the Testdata for interpreting
thePositive/Negative/R
egression
results based on the
design requirements.
8/6/2019 Successfully Designed
13/68
The Test sets that
covered all aspectsof the application
functionality werescheduled
andexecuted using
Quality Center
.
8/6/2019 Successfully Designed
14/68
Generated
automated testscripts using
WinrunnerTSL, based on
system requirements
for theweb-based
application and
added check pointson the new builds.
8/6/2019 Successfully Designed
15/68
Created automatedtest scripts by using
Winrunner for data
verification andvalidations.
Successfully
designed, developed
and implemented acomplete regression
8/6/2019 Successfully Designed
16/68
test for the
entiresystem.
Used Rendezvous
concept ofLoadRunner
to generate peakload onto the server
therebystressing it,
8/6/2019 Successfully Designed
17/68
and measuring its
performance.
Ran the
LoadRunnerScenarios with
various user-mixincrementing in
constant ratios,
thusreaching the
8/6/2019 Successfully Designed
18/68
peak load of 1500
Virtual Users.
Used
Quality Centeras a Test
management anddefect tracking tool.
Interacted withBusiness users for
8/6/2019 Successfully Designed
19/68
UAT (User
AcceptanceTesting), and tested
the possibilitiesof system failure
with UAT.
Involved in
attending meetings
with the business
8/6/2019 Successfully Designed
20/68
users and reviewing
the developedscripts toensure that
they were inaccordance to the
business users
expectations.
Environment:
ASP.NET, Oracle8i,Java, Load Runner
8/6/2019 Successfully Designed
21/68
9.0, Win Runner
9.2, Quality Center9.0,Office
2000.Sprint PCS,Overland Park, KS
Aug 06
April07QA
AnalystResponsibilit
ies:
8/6/2019 Successfully Designed
22/68
Reviewed the
BusinessRequirement
Documents (BRD)and the Functional
Specifications.
Involved in writing
Test Plans
8/6/2019 Successfully Designed
23/68
by going through the
design andfunctional
specifications.Reviewed the
Designs andspecifications and
created
Test cases
8/6/2019 Successfully Designed
24/68
based on the
content.
Participated and
coordinated inTest Case
Walkthroughs.
Performed bothManual
8/6/2019 Successfully Designed
25/68
and
Automated Testingof the application.
Generatedautomated Test
Scripts usingWin Runner
TSL, based on
system requirements
8/6/2019 Successfully Designed
26/68
andadded check
points on newbuilds.
Extensivelyinvolved in testing
CSM module withactivities like Billing
account number
(BAN)creation,
8/6/2019 Successfully Designed
27/68
activate, suspend,
cancel, restoresubscribers, and
billing.
As a team member
was involved increating Detailed
Test Cases (DTC).
8/6/2019 Successfully Designed
28/68
Using DTCs
createdTest scripts.
Involved in testing
MPS module forusage details.
Backend testing
by querying the
database UsingToad
8/6/2019 Successfully Designed
29/68
.
Recorded Load
Runner Vuser
scripts implementingparameterization by
data driven wizardsinVirtual User
Generator.
8/6/2019 Successfully Designed
30/68
Interacted with
Business users forUAT
(User AcceptanceTesting), Tested the
possibilities
of system failure
with UAT
Used
8/6/2019 Successfully Designed
31/68
Test Director
as a Testmanagement and
defect tracking tool.Environment: HP-
UX, Oracle8i,
COBOL, TOAD 8.0,
Java, Quick Test Pro
8.2, Load Runner7.6,Win Runner 7.5,
8/6/2019 Successfully Designed
32/68
Test Director 8.0,
Office 2000.CapitalOne
,Richmond, VA, Feb
06 July 06QA
AnalystResponsibilit
ies:
Designed
8/6/2019 Successfully Designed
33/68
Test Plans
andTest cases
by going through theDesign, Functional
Requirements
anduser (Business)
Requirements
Documentation.
8/6/2019 Successfully Designed
34/68
Involved in
Manual Testingthe application.
PerformedFunctional Testing
andScenario Based
Testing
.
8/6/2019 Successfully Designed
35/68
Performed
Regression Testingduring various
phases ofdevelopment.
Created data driventests using
Win Runner
8/6/2019 Successfully Designed
36/68
to run the script for
varying data.
Conducted
Systemand
Integration Testing, debugged the
software errors and
interacted
8/6/2019 Successfully Designed
37/68
withDevelopers to
resolve technicalissues.
Created automatedtest scripts by using
Quick Test Profor data verification
and validations.
Conducted
8/6/2019 Successfully Designed
38/68
Backend Testing
by queryingdatabases.
The Test sets thatcover all aspects of
applicationfunctionality were
scheduled and
8/6/2019 Successfully Designed
39/68
executedusing Test
Director.
Created test
descriptions for allUse Cases kept
underLoad test
.
8/6/2019 Successfully Designed
40/68
Creating and
executingLOAD Test plans
.Interacted with
developers andreported the
software bugs
through
8/6/2019 Successfully Designed
41/68
Test Director
.
Interacted with
Business users forUAT
(User AcceptanceTesting), Tested the
possibilities
8/6/2019 Successfully Designed
42/68
of system failure
with UAT.
Involved in project
meetings with thebusiness users and
reviewing thedeveloped scripts
toensure that they
were in accordance
8/6/2019 Successfully Designed
43/68
to the business
users expectations.Environment:
WindowsNT/2000,Java, JavaScript,
Oracle9i, TOAD 8.0,
Quick Test Pro 8.2,
LoadRunner 7.6,Win
Runner 7.0, TestDirector 8.0ERIE
8/6/2019 Successfully Designed
44/68
Insurance Group,
Erie, PA July 05 Jan 06QA
testerResponsibilities:
CreatedTest Plans
, and generated
Test Cases
8/6/2019 Successfully Designed
45/68
for the application.
Performed
Manual Testing
on different modulesof the application.
Performed
Functional Testing
,Regression Testing
8/6/2019 Successfully Designed
46/68
,
System Testingand
Performance Testing.
Involved inrequirement and
development
8/6/2019 Successfully Designed
47/68
walkthroughs and
reviews.
Created automated
test scripts by usingWin Runner
for data verificationand validations.
8/6/2019 Successfully Designed
48/68
Developed SQL
Queries to check thedatabase integrity.
Evaluatedapplication testing
results and recordedthe discrepancies
using
Test Director
8/6/2019 Successfully Designed
49/68
to track,analyze and
report on them.Generated detailed
reports of Bugs,Pass-Fail report and
ComparisonChart.
Interacted with
developers and
reported the
8/6/2019 Successfully Designed
50/68
software bugs
through TestDirector.
Involved in projectmeetings start of
every week to keepup to the pace of the
project.
8/6/2019 Successfully Designed
51/68
Environment: Visual
Basic 6.0, ASP 3.0,Test Director8.0,
Win Runner 7.0,Oracle8i, Java,
SQL,XML.
Health Highway,
Inc, Santa Clara, CA
Jan 05 - June 05
8/6/2019 Successfully Designed
52/68
QA TesterResponsibilities:
Wrote detailed
Test Plans
outlining the test
schedules, hardwareand software
required, testdata, business
8/6/2019 Successfully Designed
53/68
functionalities to be
tested, testingstrategy to validate
the key businessprocess.
Involved in writingTest Cases for
testing the
functionality of the
8/6/2019 Successfully Designed
54/68
application, which
covered bothend toend test cases to test
a specificfunctionality. Wrote
Test Cases in Test
Director.
Executed the Tests
manually to verify
8/6/2019 Successfully Designed
55/68
the application
functionality.
Created automated
scripts using TSL inWinrunner
to performregression testing of
the moduleslike task
ID Creation.
8/6/2019 Successfully Designed
56/68
Inserted
synchronizationpoints to solve
timing problembetween test and
application.
Tested GUI and
functionality of the
application using
8/6/2019 Successfully Designed
57/68
multiple browsers
such asNetscape Navigator,
Microsoft Exploreron multi platforms
and interpreted the
negative/positive
results..
8/6/2019 Successfully Designed
58/68
Involved in
checking hyperlinksof the application.
Used SQL tovalidate backend
database changesand updates.
Tracked the defectsfound and sent them
8/6/2019 Successfully Designed
59/68
to the Developer
usingTest Director
.To report the status
of the softwaretesting through an
analysis of reported
defects.
8/6/2019 Successfully Designed
60/68
Environment: Quick
Test Pro(QTP), WinRunner 7.0, Test
Director 8.0,Bugzilla, DB2, SQL,
Java,HTML,
Weblogic, Windows
2000/XPDr.Reddys
Labs, Hyderabad,India Nov 03 - Nov
8/6/2019 Successfully Designed
61/68
04Software
TesterResponsibilities:
Analyzed thebusiness
requirements andwrote a detail
Test Plan
.
8/6/2019 Successfully Designed
62/68
Performed positive
and negative testing.
Performed security
testing of theproduct.
Generated various
reports for
Management about
8/6/2019 Successfully Designed
63/68
Test Defects and
Execution status.Environment: C++,
CGI and HTML on aWindows
Platform.NIIT,
Hyderabad, India
April 02 - Oct
03Software
8/6/2019 Successfully Designed
64/68
TesterResponsibilitie
s:
Involved in
preparingtest plan
andtest cases
8/6/2019 Successfully Designed
65/68
based on the
businessrequirements.
Involved inManual Testing
, for the GUI andFunctionality of the
application.
Performed
8/6/2019 Successfully Designed
66/68
installation
andconfiguration
of software required
for testing.Developed
SQL queries
8/6/2019 Successfully Designed
67/68
to check the data
base integrity.
Participated in
weekly assessmentmeetings with
business analystsand developers
Environment:
Windows 95, Java,
8/6/2019 Successfully Designed
68/68
Jdk1.1.6, Java script,
SQL Server, SQL.