STADE
TABLE
Janua
NEW CHAN GENE DIVIS
000
DIVIS
1111111111
DIVIS
22222222
DIVIS
3333333333333
SUMMANDARD SPARTMENTE OF CONTE
ary, 2015
W ITEMS INCO
NGES TO ST
ERAL COMM
SION 000 – IN01 – TERMIN02 – ABBREV03 – DEFINIT
SION 100 – G01 – CLEARI06 – COMMO08 – SOLID R16 – DITCHIN31 – METAL 36 – SUBDRA40 – CONCR41 – CONCR42 – PRECAS67 – BACKFI
SION 200 – PA08 – COLD M59 – BITUMIN60 – ASHPAL61 – ASPHAL62 – PARTIA63 – FULL DE65 – CHIP SE67 – PULVER
SION 300 – ST01 – PORTLA02 – CONCR04 – REINFO05 – TENSIO11 – STEEL H21 – STEEL S31 – PRECAS35 – STEEL S42 – BRIDGE44 – FINGER45 – STEEL B51 – WATER65 – ENGINE
MARY OF RPECIFICATT of TRANS
ENTS
ORPORATED
TANDARD DR
MENTS………
NTRODUCTIONOLOGIE ……VIATIONS …TIONS ………
GRADING ……NG …………
ON EXCAVATROCK EXCAVNG ……………PIPE – LARGAIN …………
RETE PIPE …RETE PIPE – LST CONCRETLL FOR STR
AVEMENT STMILLING – ASNOUS TACK LT CONCRETLT CONCRET
AL DEPTH REEPTH RECYCEAL …………RIZING ………
TRUCTURESAND CEMENT
RETE IN STRUORCING STEEON SPLICES …H PILES ……SHEET PILE ST PRESTRESUPERSTRUE POT BEARIR JOINT ASSEBALLASTWA
RPROOFING …EERED FILL …
REVISIONSTIONS FORSPORTATIO
D INTO 2015 S
RAWINGS.……
………………
ON ………………………………………………
…………………
…………………………………
TION …………VATION ……………………GE ……………………………………………LARGE ………TE BOX CULUCTURES …
TRUCTURESSPHALT CON
COAT ………TE – METHOTE – ERS ……
ECYCLING …CLING ………………………
…………………
S ………………T CONCRETUCTURES …EL ……………………………
…………………COFFERDAM
ESSED CONCUCTURE ……NGS …………EMBLIES ……
ALL ANGLE …………………………………
S FOR JANUR HIGHWAYON and INF
SUMMARY
STANDARD S
…………………
…………………
…………………………………
……………………………………
………………………………………………………………………………………
………………………………………………………………………LVERT …………………………
S ………………CRETE ………
…………………D SPECIFICA…………………………………
……………………………………………………
………………E ……………………………
…………………………………
…………………MS ……………CRETE BEAM………………
……………………………………
…………………………………………………
UARY, 201Y CONSTRUFRASTRUC
SPECIFICATI
…………………
…………………
………………………………
…………………………………
…………………………………………………
…………………………………………………………………………………………………………
……………………………………
………………………………
…………………ATION ………………………
………………………………………………………………………
……………………………………………………………………
……………………………………………………MS ………………………………………………………………
………………………………………………………
5 UCTION CTURE
ON …………
…………………
………………
………………………………………………………………………
…………………………………………………
……………………………………………………………………………………
……………………………………………………
…………………………………
………………………………………………………………………………………………………
…………………
………………………………………………………………………
…………………………………………………
……………………………………
…………………………………
……………………………………………………
……….
………
……….
………. ………. ………
…………
………... ……….
………… …….. ………
……….. ………. ……….
………. ……… ……..
……… …………
……… ……….. ……….. ……….. ……… ………
……….
…….. ………. ………..
……….. ……… ………
……….. ………. ………
………... ………..
………. ……….. ………..
Page 1
3
3
3
4444
5555666669
10
111111111112131414
1515151818181919212121212121
TA
Jan
DI
DI
DI
DI
DI
BLE OF CON
nuary, 2015
IVISION 400 –401 – STOR404 – PREC416 – CUR
IVISION 500 –510 – GUID512 – GUID515 – ENER520 – CAST529 – CON554 – OVE555 – OVE571 – PAVE
IVISION 600 –604 – JUTE608 – RAN614 – HYD617 – ROO621 – TEM622 – FISH623 – CULV630 – SOIL
IVISION 800 –810 – FIXE812 – EXTR825 – MOB
IVISION 900 –931 – SCAL932 – PRIV933 – HEAV946 – WOR947 – DISP948 – ENVI953 – AUD958 – FOR
S
NTENTS
– MUNICIPALRM SEWER PCAST CATCHB AND GUTT
– TRAFFIC CDE POSTS …DE RAIL ……RGY-ABSORT-IN-PLACE CCRETE-ENCRHEAD SIGNRHEAD SIGNEMENT MAR
– ENVIRONME MATS ………DOM RIPRAPROSEEDING
OT WADS ……PORARY WA
H RESCUE …VERT EROSI
L REINFORCE
– PAYMENTSD RATES ……RA WORK …
BILIZATION …
– STANDARDLES AND WE
VATE TRUCKVY EQUIPME
RK PROGRESPOSAL AREAIRONMENTAITED SAFETYMWORK ……
SUMSTANDARD
DEPARTM
L ………………PIPE …………H BASIN ……TER …………
CONTROL DE………………………………
RBING GUIDECONCRETE
CASED ROADN STRUCTURN STRUCTURKINGS ………
MENTAL ……………………P ……………
G …………………………………ATER CONTR………………ON PROTECEMENT ………
S & ADJUSTM………………………………
…………………
D CONDITIONEIGHING PROS ……………
ENT …………SSION ………
AS ……………AL REQUIREMY PROGRAM
…………………
MMARY OF D SPECIFICMENT of TR
SUMMA
…………………………………
…………………………………
EVICES ……………………………………………E RAIL TERMBARRIER ……
DBED DUCT …RE FOUNDATRE ………………………………
………………………………………………
…………………………………ROL WORKS
…………………CTION ………………………
MENTS ………………………
……………………………………
NS ……………OCEDURES …
…………………………………
……………………………………MENTS ………M …………………………………
REVISIONSCATIONS FRANSPORT
ARY
………………………………
……………………………………
………………………………………………………INAL …………………………………………TION ……………………………………………
………………………………………………………
………………………………………………
…………………………………………………
……………………………………………………………………
…………………………………
……………………………………………………………………………………………………………………………
S FOR JANFOR HIGHWTATION and
…………………………………
…………………………………
……………………………………………………………………
…………………………………
…………………………………………………
………………………………………………………
……………………………………………………………………
……………………………………
…………………………………………………………………
………………………………
………………………………………………………………………………………………………………………
NUARY, 201WAY CONSTd INFRAST
…………… …………….
………….. …………...
…………….. ………….. …………... …………
…………… …………….
…………... …………...
…………….
………….. …………… ……………
…………… ……………. ………….. …………..
…………… …………….
…………….. …………… ………….
…………….
…………….. …………….
…………... ………….. ………….. …………...
……………. …………….. …………….
15 TRUCTIONRUCTURE
Page
22222222
232323232323232424
252525252525262626
27272727
282830303032323233
N
e 2
2222
333333344
555555666
7777
880002223
STADE
INTRO
Janua
NEW I
56666
CHAN
3556666
FORE The fo Requirthey ha GENE renum
PS
PLEA
SUMMANDARD SPARTMENT
ODUCTION
ary, 2015
TEMS INCOR
529 CON617 ROO622 FISH623 CULV630 SOIL
GES TO STA
161-1 Case161-2 Case161-3 Case161-4 Case161-5 Case351-4 Deck510-1 Guide529-1 Conc617-1 Root 621-1 Temp623-1 End T623-2 End T
WORD – US
ollowing was a
rements of thead appeared
RAL COMME
bering Plesubnum
ThrPS
ASE NOTE: tthe
MARY OF RPECIFICATT of TRANS
RPERATED I
CRETE-ENCOT WADS
RESCUE VERT EROSI
L REINFORCE
ANDARD DRA
e 1.1 - Cross Ce 1.2 - Cross Ce 2.1 - Cross Ce 2.2 - Cross Ce 3.1 – Storm k at Barrier Wae Post Details
crete-EncasedWad Detail in
porary WorkinTreatment forTreatment for
E OF NEW B
added to the F
e Notice of Tehere in their e
ENTS
ease note thabsequent artimbers may al
roughout this.
throughout the changes an
REVISIONSTIONS FORSPORTATIO
N 2015 STAN
CASED DUCT
ION PROTECEMENT
AWINGS
Culvert: SubgCulvert: SubgCulvert: OrigiCulvert: OrigiDrainage Cuall/Curb – Tos (Revision) d Duct Bank Sn Pool (Additing Pad (Additr Culverts ≤ 1r Culverts ≤ 1
BRUNSWICK
Foreword:
ender are incentirety.
at after additcles may haso have been
s document P
he documennd revisions
S FOR JANUR HIGHWAYON and INF
SUMMARY
NDARD SPEC
T BANK SYST
CTION
grade Above Ograde Above Onal Ground Anal Ground Alvert Longitudrch Applied W
System (Addiion) tion) 500mm ID - R500mm ID - R
PROVINCIAL
orporated by
tions and revave had to bn updated to c
Particular Spe
nt, text in Italmade to spe
UARY, 201Y CONSTRUFRASTRUC
CIFICATION F
TEM
Original GrouOriginal Grou
Above SubgraAbove Subgradinal to the CeWaterproofing
ition)
Roadway ForRoadway For
L STANDARD
reference an
visions weree renumberecorrespond to
ecifications sh
lic font indiecifications.
5 UCTION CTURE
FOR HIGHWA
und - Trench ≤und - Trench >ade - Trench ≤ade – Trench entreline of R
g Detail (Addit
reslope 3:1 orreslope Flatte
DS
nd shall form p
e made, maned. Cross refo changes.
hall be referr
icates autho
AY CONSTRU
≤ 1.2m Deep > 1.2m Deep ≤ 2.2m Deep > 2.2m Deep
Roadway (Revtion)
r Steeper (Ader Than 3:1 (A
part of the Co
ny of the ferencing
red to as
or's commen
Page 3
UCTION
(Revision) (Revision) (Revision)
p (Revision) vision)
ddition) Addition)
ontract as if
ntary on
INT
Jan
DIV 001 The 001
002 002 Org DEDT Ter CH 003 003 Day
Pro
Pub
Sta
TRODUCTION
nuary, 2015
VISION 000- I
1 – TERMINO
e following ar
1.6 CROSS-R
.1 Cross-can be
.1 Inclu
or Cundeto or
.2 Septhe wthe indic“List
.3 Stan
2- ABBREVIA
2.1
ganizations
LG I
rms
BDC
3 – DEFINITIO
3.2
ylight – shall rbasis from th
ofessional EngProvince of N
blic Holiday -Brunswick D
atutory Holidayday fixed byCanada Dayas a general
S
N
INTRODUCT
OLOGY
rticles were ad
REFERENCES
-references foe categorized
usive – refereConstruction (xer the Item whr the performa
parate Item – rwork under threquirements cates that thet of Approxima
ndard Drawing
ATIONS
The following
Department oDepartment o
Canadian Hig
ONS
The following
refer to the hohe Environme
gineer – shallNew Brunswic
- shall includeDay, Labour D
y – shall incluy proclamationy, New Brunswl day of thanks
SUMSTANDARD
DEPARTM
ION
dded:
S
orm an importas follows:
ence to a portixxx.4) sectionhere the referance of the re
reference to ahe Item where
of…” the croe cross-refereate Quantities
g – reference
g abbreviation
of Environmeof Transporta
ghway Bridge
g definitions w
ours between ent Canada W
mean a qualck, and as def
e the followinay, Remembr
ude the follown of the Govewick Day, Labsgiving, Reme
MMARY OF D SPECIFICMENT of TR
SUMMA
tant role in the
ion of anothen, indicating thrence is notedquirements of
another Specie the referencoss-referencednced Item is
s” of the tende
to the applica
ns were upda
nt and Local ation and Infra
e Design Cod
were added:
sunrise to sunWeather websit
lified Professifined by and b
ng Days onlyrance Day, an
wing Days onlyernor in Councbour Day, theembrance Da
REVISIONSCATIONS FRANSPORT
ARY
e interpretatio
r Specificationhat the cross-rd. There will bef the cross-ref
fication Item (ce is noted is d Item. The ca separate u
er documents.
able drawing.
ted:
Government astructure (Ne
e
nset. Sunrise te.
onal Engineebound by the
: New Year’snd Christmas
y: New Year’scil for the cele
e day fixed byay, Christmas
S FOR JANFOR HIGHWTATION and
n of the Stand
n Item, in genreferenced see no separateferenced sect
(Item xxx), ind carried out “
cross-referencunit payment a.
(New Brunswew Brunswick
and sunset ti
er registered oAPEGNB By-
s Day, Good Day.
s Day, Good ebration of they proclamationDay, and Box
NUARY, 201WAY CONSTd INFRAST
dard Specifica
neral to the Mection forms pe payment for tion of the Item
dicating that sin accordancece to the full Iand appears
wick) k)
mes are avai
or licensed to -Laws and Co
Friday, Cana
Friday, Eastee birthday of n of the Govexing Day.
15 TRUCTIONRUCTUREDIVISION 00
Page
ation Items an
Materials (xxx.2part of the wo
the adherencm.
some portion e with…” or “tItem (Item xxxas such in th
lable on a dai
practice in thode of Ethics.
ada Day, Ne
er Monday, ththe Sovereig
ernor in Counc
N
00
e 4
nd
2) rk ce
of to x) he
ily
he
ew
he n, cil
STADE
GRAD
Janua
DIVISI 101- C The fo 101.4.
106 – C 106.4.2
The foof the s 106.4.2
108 – S The folAllowa 108.4.
SUMMANDARD SPARTMENT
DING
ary, 2015
ON 100- GRA
CLEARING
llowing article
14 Stockpias appr
COMMON EX
2.2 .3 WhusaWo
llowing articlestockpiled ma
2.2 .4 ComstoEng .1
.2
.3
.4
SOLID ROCK
llowing articleable Instantane
2 Blasting N .1 The C
Insur .2 Notw
condsamp
.1 A
thre
MARY OF RPECIFICATT of TRANS
ADING
e was added:
ling or loadingroved by the E
XCAVATION
here the Contable material rork, prior to the
es were addedaterials.
mmon materckpiled such gineer.
Stockpiling osupporting thensure maxi
Stockpiles smaterials, nocommon mamaintained a
Stockpiles sshall be shapthe edge of s
Work will inv
K EXCAVATIO
s were addedeous Charge
Near Wells or
Contractor shrance Policy s
withstanding 1ucting inspecpling for water
Any wells advhe course of equired for an
REVISIONSTIONS FORSPORTATIO
g of merchantEngineer.
tracts includesresulting from e placement o
d to ensure sto
rial salvaged that the mate
of common mhe entire weigmum recovery
shall not be por near propeaterial is notat all times.
shall be built iped to maintastockpiles sha
volve the re-ha
ON
d to detail the rLimits Based
r Structures
hall carry out submitted per
08.4.1.8.1, thctions on rer quality.
ersely affectethe Work, anny wells found
S FOR JANUR HIGHWAYON and INF
SUMMARY
able timber or
s Borrow, thecommon exc
of any materia
ockpiles are b
by the Conterial does not
material shall ght and dimenry of the stockp
placed near aerty lines, treet possible or
in layers not ain surface draall not be perm
andling of exc
requirements on Distance fr
a pre-blast sr 108.3.2.
he Owner wilsidential wel
ed by the Word/or will deted to be perma
UARY, 201Y CONSTRUFRASTRUC
r waste mater
e Contractors cavation eitheral under Item 1
built in such a
tractor for ret become sat
be done on nsion of the spiled material
a quarry/pit fe lines or drair practical an
exceeding onainage before mitted.
cavated mater
for blasting nefrom Blast and
survey in acco
l, before andlls within 50
rk, the Ownerrmine if repaianently dama
5 UCTION CTURE
rials, adjacent
shall conductr has been us121
a manner to en
e-use other tturated at a l
a well-drainestockpiles ands.
face, Strippinginage ditchesnd access to
ne metre in tthe next laye
rial from stock
ear wells or std Wave Veloc
ordance with
during the W00 m of area
r will provide ir or replacem
aged.
DI
to the highwa
t operations sed or shall be
nsure maximu
han as topsoocation appro
d, level based in such a m
g piles or pils such that reo the stockpi
hickness andr is begun. Du
piles.
tructures. Figucity was also a
the requirem
Work under tha of blasting
water temporment by the C
VISION 100
Page 5
ay, shall be
such that all e used in the
um recovery
oil shall be oved by the
e capable of manner as to
les of other trieval of all ile shall be
d each layer umping over
ure 108-A added.
ments of the
his Item, be g, including
rarily during Contractor is
GR
Jan
108
116 The 116
116
131 Thi 136 136
140 140
141 Thi 141 141
141
Thesub
RADING
nuary, 2015
8.4.2 .3 Thco
6 – DITCHING
e following art
6.4.2.1 The by th
6.4.9 Ditches and 616
1 – METAL PI
is Item was re
6 – SUBDRAI
6.2.2.3 CorrF66
0 – CONCRET
0.2.6.2 WeiEngreac
.1
1 – CONCRET
is Item was re
1.2.7 Weirs,
1.2.8 Backfi
.1 Ba
.2 If dewi
1.3.1.10.1 PIDo
e following artbmitted. 141.3
S
he Contractoontrolled, and
G
ticle was adde
tendered Quhe Engineer.
shall be stab6.4, at the end
IPE – LARGE
evised to inclu
IN
rugated polye7. (updated to
TE PIPE
rs/baffles shaineer and mo
ched.
When drilled drilled to a macrylic adhes
TE PIPE- LAR
evised to inclu
, baffles and c
ll material sha
ackfill materia
sufficient quaetermined by tith Item 167 fr
IPECAR desigocuments.
ticle was adde3.2.3 All pi
SUMSTANDARD
DEPARTM
r shall carry do no excee
ed for clarificat
antity include
ilized againstd of each day'
E
ude backfill an
ethylene pipe o reflect an a
all be reinforcoist cured for
holes and dowminimum deptsive such as E
RGE
de backfill and
cut-off walls sh
all be Class “A
l shall be obta
antities of suthe Engineer, rom a source a
gn input shall
ed to include ipe designs th
MMARY OF D SPECIFICMENT of TR
SUMMA
out the Word the requirem
tion.
s cleaning en
t erosion with 's ditching.
nd backfilling
and appurtendditional stan
ced and secua minimum o
wels are usedth of 75 mm
Epcon A7 or a
d backfilling a
hall be made w
A” per 167.2.
ained from wit
itable backfilladditional ba
approved by t
be in accord
additional piphat are not lis
REVISIONSCATIONS FRANSPORT
ARY
k such that vments of Figu
nds of drivewa
hay or straw
as part of the
nances confondard)
ured to the piof 72 hours, o
d to attach we, and the dowpproved equiv
as part of the I
with the same
hin the Work S
material areckfill shall be the Engineer.
ance with the
pe designs wested in the des
S FOR JANFOR HIGHWTATION and
vibrations froure 108-A.
ay culverts an
mulch, in acc
e Item. See fu
orming to AST
pe invert by or until 70% o
eirs/baffles to wels shall bevalent.
Item.
e concrete req
Site as approv
e not availablimported by t
e Supplement
ere design calsign tables in
NUARY, 201WAY CONSTd INFRAST
om drilling an
nd cross culve
cordance with
ull Item for rev
TM F405 and/
a method apof design stre
the invert, thee secured wit
quirements as
ved by the En
le within the the Contractor
t to Item 141
lculations are CAN/CSA A
15 TRUCTIONRUCTUREDIVISION 10
Page
nd blasting ar
erts as directe
h 616.2, 616.3
visions.
/or ASTM
pproved by thength has bee
e holes shall bth an epoxy o
the pipe.
ngineer.
Work Site, ar in accordanc
of the Contra
e required to b257.
N
00
e 6
re
ed
3,
he en
be or
as ce
act
be
STADE
GRAD
Janua
141.3.6
141.3.
The fodays. 141.4.
141.4.
Pipe D
(m1350
≥ 3
The fo 141.4.3
141.4.
SUMMANDARD SPARTMENT
DING
ary, 2015
6 The Conmaterial f
7 If the sou
shall subadvance
ollowing article
1.7 For proand pra
1.7.2 Convalso b
Diameter mm) to 2700 C
C3000
A
llowing article
3 Forms
.1 Forms s
.2 Forms s .3 Forms
permitte .4 Perman
made o
.5 The mindepth w
5 Finishing of
.1 All surfaccorda .1 All
remmixa la
.2 All
tota
MARY OF RPECIFICATT of TRANS
tractor shall from within th
urce of the sumit the propoof obtaining b
e was update
ojects estimateactically locate
venient telephbe provided.
Reinforc
Applicable Standards
CSA A257.2, CSA A257.3
CSA-S6 ASTM C1417
es were added
shall be a con
shall be clean
shall be comed.
nently exposeof steel, plastic
nimum cover with an approv
f Concrete Su
faces of the ance with the
surface voidmoval of the fx of cement aatex bonding
objectionableally removed
REVISIONSTIONS FORSPORTATIO
submit, upone Work Site.
upply of the bosed source, backfill materi
ed to indicate
ed to be of moed office space
one, internet,
ced Concrete
Additiona
CSA A23.1air content CSA A23.1air content corrosion in
d to be consis
nfiguration to e
n and free of m
mplete and in
ed sharp edgec, or clear stra
over form snaved cement gr
urfaces
precast cone following:
ds larger thanformwork, shaand fine sand agent.
e fins, projecto the Engine
S FOR JANUR HIGHWAYON and INF
SUMMARY
n request, th
ackfill materiain writing, forial from the p
that office sp
ore than 14 De at the fabric
facsimile, ph
Table 141
e Pipe Desig
al Standards / Concre
1 and A23.2, eof 5 to 8%.
1 and A23.2, eof 5 to 8%; ca
nhibitor at a ra
stent with Item
ensure compli
mortar prior to
nspected by t
es shall be chaight-grained w
ap-ties shall brout mix per 14
crete section
n 12 mm in all be filled tofrom the sam
ctions, offsetseer's satisfact
UARY, 201Y CONSTRUFRASTRUC
he proposed
al is located or the approvaroposed sour
pace is requir
Days duration cation plant to
otocopy, mail
-1 n and Fabric
Requirementete exposure clas
exposure clasalcium nitrite ate of 15 L/m³
m 142.
ance with the
application of
the Engineer
hamfered withwood placed o
be 50 mm and41.4.5.
ns shall rece
diameter ando their entire dme source as
s, streaks or tion.
5 UCTION CTURE
source of th
outside the Wal of the Enginrce.
red even if th
the manufactaccommodate
l and messag
cation Requi
ts for Dura
ss C-1; Untilof 20
ss C-1;
³.
Untilof 35
e allowable tole
f form coating
r before placi
h triangular fion the side ex
d the voids sh
eive an "Ordi
d cavities, ordepth with anused in the c
other surface
DI
he supply of
Work Site, theneer, at least
he project is le
turer shall proe the Enginee
ge handling se
rements
ation of Moist
min. concrete0 MPa is attain min. concrete
5 MPa is attain
erances.
.
ing of concre
illets, 19 mm xposed to conc
hall be filled to
inary Surface
r holes visibln approved ceconcrete and
e imperfectio
VISION 100
Page 7
the backfill
e Contractor 14 Days in
ess than 14
vide regular er.
ervices shall
Curing
e strength ned. e strength ned.
ete shall be
by 19 mm, crete.
o their entire
e Finish" in
e upon the ement grout incorporate
ns shall be
GR
Jan
To 141
The 141
141
141
141
Arti
RADING
nuary, 2015
.3
.2 Imm
cleadefe .1
.3 All r
ensure quality
1.4.6.7 Duri15 m .1
e following art
1.4.8.4 Whedrilleadhe
1.4.10.3 ExcaSupDocindicin th
.1
1.4.10.7.4
1.4.10.10 Pipetransleng
icles 141.4.10
S
If the concreFinish, the Cportions, or a
mediately aftearly marked aect.
The Contract
.1 Cement w .2 All defec
adjacent
ridges occurri
y concrete in
ing productionm3 of concrete
For concrete shall be carrie
ticles were rev
en drilled holeed to a minimesive such as
avation and bpply of backficuments. Exccated on Stanhe Contract Do
If OverexcavOverexcavaticompacted to
The 25 M dowplace using a
e sections witsverse directi
gth of the weir
0.13 to 141.4.
SUMSTANDARD
DEPARTM
ete surface dontractor sha
all of the conc
r the removaand the Cont
tor shall subm
washes of an
cts shall be surface.
ng at junction
culverts the fo
n, quality conte placed.
placements ued out per hal
vised.
es and dowelmum of 100 s Epcon A7 or
backfilling shalll shall be fravation shall
ndard Drawingocuments.
vation occurs,ion with an apo 95% of the m
wels shall be ian epoxy or ac
th weirs or baon, with a m.
10.17 were ad
MMARY OF D SPECIFICMENT of TR
SUMMA
does not adeqall, as directedcrete, and rep
al of forms, aractor shall n
mit a repair pr
ny kind shall n
finished smo
ns of form pan
ollowing article
trol testing and
under 15 m3, af Days produc
ls are used tomm, and the
r approved eq
ll be carried oom excavatio
be carried gs 161-1 to 1
the Contracpproved backmaximum dry
inserted and gcrylic adhesive
affles shall beaximum insta
dded to includ
REVISIONSCATIONS FRANSPORT
ARY
quately fulfill d by the Engilace with new
ny part of thnotify the Eng
ocedure for a
not be used.
ooth, uniform
nels shall be g
es were adde
d test samplin
a minimum ofction.
o attach weirse dowels shauivalent.
out in accordanon or under out in accor61-5, or in th
ctor shall, at kfill material, pdensity.
grout them inte such as Epc
e installed witalled tolerance
de backfill and
S FOR JANFOR HIGHWTATION and
the requiremneer, entirely
w concrete.
e Work whicgineer of the
approval.
mly colour m
ground smoo
ed.
ng per 302.4 s
f one set of cy
s/baffles to thall be secure
nce with ItemItem 167, as
rdance with 1e case of an
his/her own eplaced in acc
to place with ncon A7 or an a
th the weir ore of 2% vertic
d backfilling as
NUARY, 201WAY CONSTd INFRAST
ments for Ordy remove cert
ch displays de location and
atched and
th.
shall be carrie
ylinders and a
he invert, the ed with an ep
s 161 and 16s identified in161.4 and toinduced trenc
expense, repcordance with
non shrink groapproved equi
r baffle top hocally over the
s part of the It
15 TRUCTIONRUCTUREDIVISION 10
Page
dinary Surfacain designate
efects shall bd extent of th
flush with th
ed out for eve
air content tes
holes shall bpoxy or acryl
6, respectiveln the Contrao the limits ach as specifie
pair and fill thItem 936, an
out secured intivalent.
orizontal in the full horizont
tem.
N
00
e 8
ce ed
be he
he
ry
sts
be lic
y. ct as ed
he nd
to
he tal
STADE
GRAD
Janua
142 – This Iteto back 142.2.2 The fowrap. 142.2.3
142.2.4
142.2.8
The fo 142.2.
142.2.
142.2. BOXCA 142.3.
The fo
142.4.
142.4.
142.4.
SUMMANDARD SPARTMENT
DING
ary, 2015
PRECAST CO
em was revisekfill and backf
2.2 Air cont
llowing article
3 Joint waterwith primersRub’r-Nek,
4 Exterior joinprimers rec
8.1 When ddrilled tadhesiv
llowing article
8.4 Weirs, Culvert
13 Reinforcinof 25 mm
14 Side form
CAR design inp
1.14 BOXCAthe Con
.1 BO
Co
llowing revisio
1.2.1 The rei55 mmsteel.
1.2.2 At joint
the bell
1.2.3 For circand the
MARY OF RPECIFICATT of TRANS
ONCRETE BO
ed to include filling being in
tent shall be 5
es were revise
proofing mates if recommensize per joint
nt wrap shall ommended by
drilled holes ato a minimumve such as Ep
e was added to
baffles and t.
ng supports sm of cover.
m spacers sha
put and outpu
AR design inpntract Docum
OXCAR designtract Docum
ons were done
nforcement R ± 10 mm. A
ts, the minimul and spigot.
cumferential e maximum co
REVISIONSTIONS FORSPORTATIO
OX CULVERT
backfill and bcluded in the
5 – 8%.
ed in order to
erial shall be nded and appseal manufac
be 300 mm y the manufac
and dowels am depth of 100pcon A7 or ap
o ensure the s
cut-off walls
shall be made
all be made e
ut are required
put and outpuents.
gn input shallments.
e to clarify the
Reinforcing stA minimum co
um concrete
steel, in the oncrete cover
S FOR JANUR HIGHWAYON and INF
SUMMARY
T
backfilling as pItem.
clarify the diff
Rub'r-Nek anproved by the cturer’s written
wide Conwracturer.
are used to at0 mm, and theproved equiva
same concret
shall be ma
e of plastic, s
ntirely of plas
d as part of the
ut, including p
l be in accor
e article.
teel bars or woncrete cover
cover shall b
bell and spigr shall be 50 m
UARY, 201Y CONSTRUFRASTRUC
part of the Item
ference in the
nd Conwrap, manufacturer
n recommend
ap, ConSeal
ttach weirs/bae dowels shaalent.
te is being use
ade with the
stainless stee
stic or entirely
e submittals a
printouts of o
rdance with
wire mesh shar of 13 mm is
be 13 mm for
got, the minimmm.
5 UCTION CTURE
m. See Item f
interior joint s
or an Enginer. Interior wate
dations, or app
CS-212 or a
affles to the iall be secured
ed for weirs, b
same concre
l, or galvanize
y of stainless s
as follows.
utputs for loa
the Supplem
all have a mins required for
all longitudin
mum concrete
DI
for all change
seal and the e
eer approved er tight joint sproved equiva
pproved equi
nvert, the hod with an epox
baffles and cu
ete requireme
ed steel with
steel.
ad cases as in
ment to Item
nimum concrer the ends of
nal steel from
e cover shall
VISION 100
Page 9
es pertaining
exterior joint
equivalent, seal shall be alent.
ivalent, with
les shall be xy or acrylic
ut-off walls.
ents as the
a minimum
ndicated on
142 of the
ete cover of longitudinal
m the end of
be 13 mm
GR
Jan
The
142
Arti 142
142
142
142
142
167 The 167
RADING
nuary, 2015
e following art
2.4.1.6 Theplan .1
.2
icles were rev
2.4.3.5 Theentir
2.4.7.3 Withpreffollopref
2.4.7.4 The epox
2.4.7.8 Placa stset i
2.4.7.11 Joinacco
.1
7 – BACKFILL
e following art
7.6.2 Haulag
S
ticles were ad
manufacturent to accommo
The office sadequate ligapproximatel Convenient tshall also be
vised as follow
minimum core depth with
h the end sefabricated holeowing placemfabricated inse
25 M dowelsxy or acrylic a
cement shall praight line usinto place and
nt seal and eordance with t
Joint seal sha
L FOR STRUC
ticle was delet
ge for backfill
SUMSTANDARD
DEPARTM
ded to be con
er shall proviodate the Eng
space shall bghting, and ly 20°C.
telephone, intprovided.
ws.
over over forman approved
ection in places as guides
ment of the eerts to a nomi
s shall be inseadhesive such
proceed upgraing industry md positioned to
exterior wrap the manufactu
all be placed a
CTURES
ted as haulag
, as approved
MMARY OF D SPECIFICMENT of TR
SUMMA
nsistent with It
de regular angineer.
be clean andventilation a
ternet, facsim
m snap-ties s cement grou
ce, the Contto a nominal
end section, 2nal depth of 1
erted and sech as Epcon A7
ade with the fmethods, withogether as rec
waterproofinurer's specific
around the en
ge is not paid s
d by the Engin
REVISIONSCATIONS FRANSPORT
ARY
tem 141.
nd practically
d furnished wand heating
mile, photocop
shall be 50 mut mix per 142
tractor shall depth of 150 25 mm diam50 mm into th
cured grouted7 or an approv
female end uph the bell end commended b
ng material acations.
ntire joint.
separately.
neer, shall be
S FOR JANFOR HIGHWTATION and
y located offic
with a suitabto provide
py, mail and
mm and the v2.4.6.
drill 30 mm mm into the
meter holes she cut-off wal
d into place usved equivalen
pgrade. Culveup grade. Ea
by the manufa
and appurtena
paid for in acc
NUARY, 201WAY CONSTd INFRAST
ce space at
ble office dea room te
message han
voids shall be
diameter hotop of the wa
shall be drillel.
sing the non-snt.
ert sections shach Culvert sacturer of the
ances shall
cordance with
15 TRUCTIONRUCTUREDIVISION 10
Page
the fabricatio
esk and chaemperature o
ndling service
e filled to the
oles using thall. Immediateed through th
shrink grout a
hall be joined section shall blifting device.
be installed
h Item 801.
N
00
10
on
ir, of
es
eir
he ely he
an
in be
in
STADE
PAVE
Janua
DIVISI 208 –
Article equiva The ar 259 – To ensapplica 259.4.
260 – Entire all cha
261 – The chSpecifi The reMix Re The fol261.2.
Cecab Cecab Article producper the The fol261.4.2
SUMMANDARD SPARTMENTMENT STRU
ary, 2015
ON 200- PAV
COLD MILLIN
208.4.3 wasalent.
rticle 208.4.3.
BITUMINOUS
sure that the ation, the follo
5 Bituminousover the ful .1 Immed
be swe
ASPHALT CO
Item was revnges.
Warm mix aRAP was reRequiremen
ASPHALT CO
hanges made fications.
quirement for equirements.
llowing article1.5.3 RAP sh
the coldaccorda
base RT 2N1 w
base RT 2N1 a
261.2.2.2.4.1ction. Any adjue changes to a
llowing article2.4.1.1.1 Pav
roll
MARY OF RPECIFICATT of TRANSCTURE
VEMENT STR
NG – ASPHA
s revised to s
4 was added
S TACK COA
surface to beowing article w
tack coat shl width of surf
iately prior toept clean.
ONCRETE –
vised to reflect
asphalt standaemoved from nts for the app
ONCRETE- E
to this Item ar
r the Number o.
was deleted. hall be free of d feed at the pance with AST
was added to
and Rediset L
was revised ustments to tharticle 261.2.2
was added foving in echelers.
REVISIONSTIONS FORSPORTATIO
RUCTURE
ALT CONCRE
specify that th
d to indicate th
AT
e treated withwas revised.
hall be appliefaces to be tr
o the applicati
METHOD SP
t current stan
ards were addthe Item proval of desig
END RESULT
re based off th
of Gyrations w
contaminationplant, in such aTM C136, unle
Table 261-2 a
Q were added
to indicate thahe JMF shall b2.2.5.1.
or paving in econ on the dr
S FOR JANUR HIGHWAYON and INF
SUMMARY
ETE
he equipment
hat there shal
h bituminous
d only when eated.
ion of the bitu
PECIFICATIO
dards. The fo
ded to the Item
gn mix formul
T SPECIFICA
he Item 261 -
was removed f
n and shall bea manner thatess other othe
as an approve
d as approved
at the Contracbe submitted to
chelon with vibriving lanes s
UARY, 201Y CONSTRUFRASTRUC
t shall have a
ll be no transv
tack coat is
the surface t
uminous tack
ON
ollowing outlin
m
la and aggreg
ATION (ERS)
2013 Supplem
from Table 26
e processed wt all particles perwise approv
ed anti-strippin
d warm mix te
ctor shall submto the Enginee
bratory rollersshall require
5 UCTION CTURE
a ski at least
verse slope c
swept clean
to be treated
k coat, the su
nes some of th
gate source ap
ment to the 20
61-1 Superpa
within 14 Days pass the 50 mved by the Eng
ng admixture.
echnologies.
mit the JMF prer prior to the
s. the use of tw
DI
t 7.6m long o
control used.
immediately
is dry, and s
urface to be tr
he changes, s
pproval
011 Standard
ave Asphalt C
of the introdumm sieve whengineer.
rior to beginninstart of lot pro
wo vibratory
VISION 200
Page 11
or approved
prior to the
swept clean
reated shall
see Item for
Concrete
uction into n tested in
ng oduction, as
breakdown
PAV
Jan
The261
The261
For261
TheNO
The(c)
262 Artiprocem The
The262
262
VEMENT ST
nuary, 2015
e following art1.4.3.8.1 Mate
conc
e requirement1.4.4.4.1 For
nuclimm
r smoothness 1.4.5.6.2.4.1.1
e following notOTES 3) Fo
Pr
e following not For Work Casample, the all samples e
2 – PARTIAL
icle 262.2.7.1operties cannment is appro
e strength req
e following ch2.4.7.3 For
Condire
.1
2.4.7.5 Priovisubitum262Den
.1
S
RUCTURES
ticle was reviserial placed incurrently with
t for asphalt roeach aspha
lear gauge omediately subm
testing the fol Smoothn
paving o
te was added or Contracts wrice.
te was added ategory 2 and remaining samexceeds 6.5%
DEPTH REC
1.6 was revisot be met. Tved, it shall b
quirements in
ITS (SoITS (D
hanges were mAlternative A
ntractor shall octed by the E
The slab samcontent, and
or to the plannal compactiominous mixtu.4.7.4. The co
nsity to the Th
The recycleddeflection, crrequirementsTheoretical M
SUMSTANDARD
DEPARTM
ed. n driveways anthe main lane
olling pattern wlt concrete mor equivalentmit a copy to
llowing article ness testing wperation.
d to Table 261with ≤ 3 millio
d to Table 261Work Catego
mples shall be% refer to Note
CYCLING
sed to allow The maximumbe paid per 26
Table 262-2 Test
oaked) / MTO Dry) / MTO LS
TSR
made under tA, prior to the pobtain two 15
Engineer.
mples will be tthe other to t
ned overlay ofn assessmenre shall be deompaction of heoretical Max
d cold bituminracking or shos are met wheMaximum Rel
MMARY OF D SPECIFICMENT of TR
SUMMA
nd aprons shaes.
was added as mix type the t. Upon comthe Engineer
was added. will be carried
-7 Acceptancon ESAL, a rej
-10 Unit Priceory 3, when thee tested for pee 1b.
for Portlandm amount allo62.6.6.
were updateM
LS-297 S-297
the Quality Asplanned over
50mm x 150m
tested for moitest for thickn
f the recyclednt of the surfacetermined by each slab shaximum Relativ
ous mixture soving under then the mean cative Density
REVISIONSCATIONS FRANSPORT
ARY
all only not be
follows. Contractor s
mpletion of th.
out as soon a
ce/Rejection jected Lot wil
e Adjustmene 75 µm sieveercent passing
d cement to owable shall
d as follows.Minimum Req
10225
ssurance sectlay of the recy
mm slab samp
isture contentess and comp
d cold bitumince to be overtesting the slall be determve Density.
shall be comphe weight of acompaction is.
S FOR JANFOR HIGHWTATION and
included as p
shall establishhe rolling pa
as possible u
Requiremenll be paid at 5
nt for Gradatioe size exceedsg the 75 µm si
be incorporabe 0.5% pe
quirement (k00 50 5 300 50
tion. ycled cold bit
ples per kilom
t. One samplepaction
ous mixture, rlaid. Compacabs obtainedined by comp
pacted smootha loaded tands greater than
NUARY, 201WAY CONSTd INFRAST
part of a Lot w
h a rolling pattern the Co
pon completi
ts by Lot. 50% of the Co
on (UPAg): s 6.5% for theeve size. If th
ated into the er 262.2.7.1.6
kPa)
tuminous mixtetre at rando
e to test for m
the Owner shction of the red per 262.4.7.paring the Bu
h and showindem truck. Con or equal to 8
15 TRUCTIONRUCTUREDIVISION 20
Page
when paved
attern using ontractor sha
on of the
ontractors Un
e selected e average for
mix if certa6.1. If Portlan
ture, the m locations a
moisture
hall perform acycled cold 3. and lk Relative
ng minimal ompaction 83% of the
N
00
12
a all
it
r
in nd
as
a
STADE
PAVE
Janua
Revisio 262.6.
262.6.
263 – Article properis appr The st
The fo263.4.
263.4.
263.4.
The fo263.4.
SUMMANDARD SPARTMENTMENT STRU
ary, 2015
ons were mad
4 For eachshall pay $1000 fothan 40%cold bituContractoSundays
5 For eachOwner a paving is hours), un
FULL DEPTH
263.2.5.8 wrties cannot broved, it shall
trength require
ollowing revisi2.5.1 The g
contrmix.
2.5.2 The Cequip
2.5.3.2.2 Thgr
ollowing chang7.3 Prior to
compactaken b
.1 Thecrawhmixfreq
.2 Thethe
MARY OF RPECIFICATT of TRANSCTURE
de to the Bas
occurrence the Owner a r each Day th
% of the Contminous mixtuor shall be suand statutory
occurrence tpenalty of $not continuo
ntil paving res
H RECYCLIN
was revised be met. The ml be paid per 2
rements in TaTes
ITS (SoakeITS (Dry
ions were magrader used torol. Contracto
Contractor shpped with auto
he paver shalrade and trans
ges were mado the planned ction assessmby the Engine
e expanded aacking or shoven the mean x Theoretical quency of one
e density of the direct transm
REVISIONSTIONS FORSPORTATIO
sis of Paymen
that partial dpenalty of $1
hat partial deractor’s normure has not ubject to a py holidays, un
that paving is1000 for eacus (stopped osumes.
G
to allow for maximum amo263.6.6.
ble 263-2 west / Method ed) / MTO LS-
y) / MTO LS-29TSR
de with respeo shape the pr shall use eit
all use a paveomatic slope
l be equippedsverse slope.
de under the overlay of the
ment of the suer at a minim
asphalt surfacving under thecompaction isMaximum Ree per km.
he in-place exmission mode
S FOR JANUR HIGHWAYON and INF
SUMMARY
nt as follows:
depth recyclin1000 for eachepth recyclingmal work hour
commencedenalty of $10
ntil the recyclin
s not performh Day until pon any Day fo
Portland cemount allowabl
ere updated aMin
-297 97
ect to the gradpulverized mather a grader
er for placemcontrols.
d with automa
Quality Assure expanded aurface to be oum frequency
ce shall be coe weight of a s greater than
elative Density
xpanded asph with the prob
UARY, 201Y CONSTRUFRASTRUC
ng is not perfh Day until pag is not continrs), until partid within the 000 for each ng begins.
ed per 262.4paving commor more than
ment to be le shall be 1%
s follows. nimum Requi
100 5225 30
50
der/paver useaterial must bor paver for p
ment of the exp
atic screed co
rance sectionasphalt surfacoverlaid. Comy of 5 per lan
ompacted smoloaded tanden 83% of the y, as determi
halt mix shall be inserted 10
5 UCTION CTURE
formed per 2rtial depth recnuous (stoppeal depth recyperiod prescDay followin
4.4.4.2.1, the ences; and $40% of the C
incorporated % per 263.2.5
rement (kPa)50 00
ed. e equipped wplacement of
panded asph
ontrols for the
n. ce, the Owner
mpaction mease-km.
ooth and showem truck. Comaverage in-plned from sam
be measured00 mm into th
DI
262.4.4.2, thecycling commed on any Daycling resumecribed in 262ng that period
Contractor sh$1000 for eacContractor’s n
into the mix5.8.1. If Portla
)
with automaticthe expanded
alt mix. grade
e control of lon
r shall performsurements sh
wing minimal mpaction is aclace expande
mples taken a
d by a nucleahe finished ma
VISION 200
Page 13
Contractor mences; and ay for more es. recycled 2.4.4.2, the d, excluding
hall pay the ch Day that normal work
ix if certain and cement
c slope d asphalt
er shall be
ngitudinal
m a visual hall be
deflection, chieved ed asphalt at a
r gauge in at.
PAV
Jan
The 263
265 265 256
267 267
267
267
267
VEMENT ST
nuary, 2015
e following wa
3.6.5 For eaOwnepavinghours)
5 – CHIP SEA
5.4.2.1.1 G
6.4.3.2.1 Fidocrth
7 – PULVERIZ
7.4.1.1 Wtra
7.4.6 The re95% o
7.4.7 Final smore twith a
7.4.8 Grade
S
RUCTURES
as added to th
ach occurrenr a penalty og is not contin), until paving
AL
rader shall be
ne grading anouble seal. Thrown and supe Engineer;
ZING
Work under thisansitions to m
e-graded surfaof the maximu
shaping of thethan 30 mm f grader to me
er shall be equ
SUMSTANDARD
DEPARTM
he Basis of P
nce that pavinof $1000 for enuous (stoppeg resumes.
e equipped w
nd compactiohe road shall er elevation,
s Item shall alsatch into the e
ace material sum dry density
e pulverized sfrom the gradeet an accepta
uipped with a
MMARY OF D SPECIFICMENT of TR
SUMMA
Payment.
ng is not pereach Day unted on any Da
ith automatic
on of the Aggrbe compacteand shall com
so include excexisting condit
shall be compy as establish
surface shall es provided bable crown an
automatic slop
REVISIONSCATIONS FRANSPORT
ARY
rformed per til paving com
ay for more th
slope control
regate Base pd and shaped
mmence 1 Da
cavating and mtions, as direc
pacted in acched by a test
be in accordaby the Enginend super elev
pe control.
S FOR JANFOR HIGHWTATION and
263.4.5.5, thmmences; anhan 40% of th
l.
per 205.4 befod with a gradeay prior to chip
moving of pulvcted by the En
cordance with strip.
ance with Itemeer. The Contvation.
NUARY, 201WAY CONSTd INFRAST
he Contractornd $1000 for he Contractor
ore the first aer to meet anp sealing, as
verized materngineer.
Item 936 to a
m 941 and shtractor shall s
15 TRUCTIONRUCTUREDIVISION 20
Page
r shall pay theach Day tha
r’s normal wo
application of a acceptable directed by
rial in the
a minimum of
all not vary byhape the road
N
00
14
he at rk
a
f
y d
STADE
STRUC
Janua
DIVISI 301 – Additioadditio Concre Additioa spacof cut b The fo301.4.
301.4.
302 –
ChangEngine The fo302.4.4
The fo302.4.5
302.4.5
For bri For ste302.4.
The fo302.4.
SUMMANDARD SPARTMENTCTURES
ary, 2015
ION 300- STR
PORTLAND
onal curing reonal requirem
ete shall mee
onal requiremce free of stanback 25mm b
ollowing requir8.1 The Co
dischar
8.2 The Ow
CONCRETE
ges were madeer who revie
ollowing article4.8.1.2 Wh
floo
.1
ollowing revisi5.1.1 Trem
spaci
.1 Au
5.1.4.1.1 FraE
idge decks, b
eel girder brid7.5.6.4.1 For
Coaccper
ollowing revisi8.3.1 The c
placeconcr
MARY OF RPECIFICATT of TRANS
RUCTURES
CEMENT CO
equirements wents stated in
et the requirem
ments were adnding water, dbelow surface
rements wereontractor is rrge, the chara
wner shall car
IN STRUCTU
de to state thewed the conc
es were addehen the Contraor beams and
The Contracof the placSuperstructu
ions were mamie pipes sha
ing of 3.0 m. A
A concrete puused to charge
For a plan areate of not less
Engineer.
bull floats or m
dges the followr steel girder ntractor shalceptable to trmanent loads
ion was madecuring period fement and unrete placed be
REVISIONSTIONS FORSPORTATIO
ONCRETE
were added ton the Item.
ments of CSA
dded under ardirt and debrise. See Item fo
e added for teresponsible foacteristics spe
rry out Quality
URES
hat design mixcrete mix.
ed. actor carries ostringers sha
ctor shall submcement of aure.
de regarding ll be kept filleAll pipes shall
mp shall not e tremie pipes
a greater thans than 50 cub
magnesium tro
wing article wBridges, scr
l submit an the Owner, s imparted to t
e under curingfor concrete s
ntil 70% of theetween Novem
S FOR JANUR HIGHWAYON and INF
SUMMARY
o the Item. C
A A23.1 Expos
rticle 301.4.6 s, and form tie
or all changes
esting of the cor supplying ecified in the C
y Assurance T
ix proportion
out the surveyall be profiled b
mit the profileany falsework
tremie concreed with concbe used in co
be permitted s as part of an
n 100 square bic metres pe
owels shall be
was added. reed rails sha
analysis, stademonstratinthe girders, fo
g and protectishall be for a me minimum spmber 1st and M
UARY, 201Y CONSTRUFRASTRUC
Curing shall be
sure Class C-
Placement, ses shall be su
s.
concrete. concrete wh
Contract Doc
Testing.
shall be stam
ying under Itemby the Contra
s to the Engink, formwork
rete. crete while deontinuous rota
as a means n approved tre
metres, concr hour, unless
e used to rem
all be supporamped and
ng there will or approval by
ion of concretminimum of 7pecified compMay 1st).
5 UCTION CTURE
e in accordan
-1.
such as all couch that they
hich shall havcuments.
mped and sig
m 941, longituactor.
neer a minimuor other a
epositing andation to mainta
of tremie conemie placeme
crete shall be s otherwise a
move defects p
rted on the tsigned by abe no exc
y the Enginee
te. Days from thpressive stren
DI
nce with CSA
oncrete shall bcan be entire
ve, at the po
gned by the P
udinal girders
um of 7 Daysadditional loa
shall have aain concrete l
ncrete placement plan.
supplied and pproved in w
per 302.4.7.5
top girder flaa Professionacessive deforr.
he completion ngth is attaine
VISION 300
Page 15
A A23.1 and
be placed in ely removed
oint of final
Professional
, transverse
in advance ads on the
a maximum level.
ment may be
placed at a riting by the
5.4.1.
nge; or the al Engineer rmations or
of concrete ed (90% for
STR
Jan
Add 302
AddC45 302
Add 302
RUCTURES
nuary, 2015
ditional article
2.4.9.1 Gener
.1 Fobeatho
.1
.2 Thman
.3 Cu
co .4 Du
ce .5 Co
is
ditional requir57. The follow
2.4.12.6 .3
.4
.5
ditional requir
2.4.12.7 Perm
.1
S
es were adde
ral
or the purposetween Novemt or below 5 �ours.
Cold weathtemperaturwithin the n
he Contractoeet the inspend Regulation
uring and prompressive st
uring periodsessation of mo
ontractor shaallowed prior
rements werewing articles w
All tests musratios, the ha
.1 The aversingle tes
In the event concrete shaconsistent ba
.1 Subsequout by th
Concrete casEngineer and
rements for p
meability Tes
A minimum oshall be cure
.1 The cylin
SUMSTANDARD
DEPARTM
d for cold wea
se of this spmber 1st and�C, or in the
her curing andre is at or belnext 24 hour p
r shall ensurection requirens.
otection shaltrength is obta
s of freezingoist curing an
ll plan his/herr to being sub
e added statinwere added.
st be performeardened air vo
rage of all tesst greater tha
the hardenedall cease untasis.
uent testing toe Contractor
st with a nond may be subj
ermeability te
ting Frequenc
of two cylinded for a minim
nders shall be
MMARY OF D SPECIFICMENT of TR
SUMMA
ather requirem
pecification cod May 1st sha
Engineer’s o
d protection slow 5 °C, or period.
re that all boements and o
ll continue foained on field
temperaturend then be gra
r Work such tbjected to app
ng that harde
ed as per ASToid system sh
sts shall havean 0.260 mm.
d air void systtil it can be
o achieve a sat his own ex
ncompliant hject to remov
esting were ad
cy
rs shall be tamum of 56 Day
e prepared for
REVISIONSCATIONS FRANSPORT
ARY
ments.
old weather call be consideopinion, is like
shall be requiin the Engine
ilers used foroperating con
or 7 days and cured cylind
es the protecadually withdr
that after complication of de
ened air void t
TM C457. Rehall meet the f
e a spacing f
tem does notshown that
satisfactory haxpense.
ardened air val and replac
dded, as spec
ken for permeys per CSA A
r testing imme
S FOR JANFOR HIGHWTATION and
curing and pered to be whely to fall belo
red outside oeer’s opinion,
r heating, manditions of all
nd until 90% ers.
ction shall corawn in accor
mpletion of cue-icing chemic
testing shall b
egardless of wfollowing:
factor not exc
t meet these rthese requir
ardened air v
void system cement at the
cified in the fo
eability testinA23.1.
ediately after
NUARY, 201WAY CONSTd INFRAST
protection shahen ambient ow 5 �C with
of these dates is likely to fa
aterials, and l applicable P
of the minim
ontinue for 1rdance with 3
ring, a minimcals.
be performed
water to ceme
ceeding 0.23
requirementsrements can
void system s
shall be evaContractor’s
ollowing articl
g from each p
the 56 days o
15 TRUCTIONRUCTUREDIVISION 30
Page
all be in effetemperature
hin the next 2
s if the ambieall below 5 �
housing, shaProvincial Ac
mum specifie
12 hours afte02.4.9.7.
um of 28 Day
d as per ASTM
enting materi
0 mm, with n
s, production obe met on
shall be carrie
aluated by thown expense
les.
placement an
of curing.
N
00
16
ct is
24
nt C
all cts
ed
er
ys
TM
al
no
of a
ed
he e.
nd
STADE
STRUC
Janua
Table
Cou
Payme
302.6.6
SUMMANDARD SPARTMENTCTURES
ary, 2015
.2 The
.1
.2
.3 Forestcorbe adj
.4 In tand
.1
.2
302-5 and 30
Stre
Payment metre co
ulombs after correction
ent per cubic(% of U
6 Where coremain in
MARY OF RPECIFICATT of TRANS
.1 Where sat an ag
.1 The
e permeability
Results are
The averageresult greate
.1 A singlepaymen
r concrete mixtablish the relrrosion inhibit
subtracted ustments.
the event thatd conducted b
A minimum tested within
If referee tereferee testi
02-6 were rev
ength
per cubic omponent
Price
For
r corrosion in( ASTM C120
c metre for coUnit Price)
oncrete does nplace, there w
REVISIONSTIONS FORSPORTATIO
sample prepage not to exce
e age of cure a
y testing shal
to be provide
e must fall wer than 200 C
e result greatnt being reduc
x designs conationship bettor using an a
from tests
t testing resuby the Contra
of two coresn 7 Days of th
esting indicatng will prevai
vised as follow
Price ad
For Concret
50 MPa+
100%
Adjustment
Exposure Cl
nhibitor 02) 0
omponent
not meet the rwill be no pos
S FOR JANUR HIGHWAYON and INF
SUMMARY
aration or testeed 60 Days.
and the age a
l be carried o
ed to the Cont
within the pay Coulombs abo
ter than 200 ced to the nex
ntaining a caltween concreapproved test
containing
lts in a reducactor.
s shall be takhe original tes
tes the origiil.
ws. Table
djustment for
te in Structur
45-49 MP
95% -$5
Table for Resistan
lass C-XL in
0-500 500-1
$25 110%
$0105
requirements sitive payment
UARY, 201Y CONSTRUFRASTRUC
ting falls on a
at test date sh
out by the Ow
tractor within
range estabove the pay ra
Coulombs abxt lower level.
lcium nitrite cte, of similar ting plan. Thcorrosion in
ction in payme
ken from the st date.
nal test resu
302-5 r Control of S
res A, B , C a
Pa 40-44 M
50 90% -$
302-6 nce to Chlorid
CSA A23.1
1000 1000-1
0 5%
-$2100
for strength ot adjustments
5 UCTION CTURE
weekend, te
hall be reporte
ner.
3 Days of the
lished in Tabange.
bove the pay.
corrosion inhibmix proportio
he difference hibitor for c
ent, referee te
component i
ults are not
Strength
and D
MPa LesTo b
100 Remo(pe
de Ion Penetr
1500 1500-2
25 0%
-$595%
or hardened as for any of the
DI
sting shall be
ed.
e test being c
ble 302-6, wit
y range will r
bitor the Contons, with and
between thecalculation o
esting may be
n question a
representativ
s than 40MPabe reviewed b
Engineer
oval or 75% -$r 302.4.12.7.4
ration
2000 > 200
50 %
-$20075%
air voids, but ise properties.
VISION 300
Page 17
e conducted
completed.
th no single
result in the
tractor shall without the
e results will of payment
e requested
nd shall be
ve then the
a- by
$200 4)
0
0
s allowed to
STR
Jan
304 304
304
304
The 304
305 The 305
311 The 311
RUCTURES
nuary, 2015
4 – REINFOR
4.2.3 All reinSteel B
.1 Fofo
.2 Fobaan
.3 ReCo
.4 Re .5 Sp
4.2.4 ReinforeinforStanda
.1 HeEn
.2 Re .3 No
4.2.9 Tie wireinfor
e following art
4.4.1.2 The W(CRSI(RSIC
5 – TENSION
e following ar
5.1.1 This Item
1 – STEEL H
e following ar
1.4.2.4.1 This
S
RCING STEEL
nforcing steel Bars for Conc
or Grade W br No. 25 bars
or Grade W bars and smallnd No. 55 bars
einforcing steontract Docum
einforcing ste
piral bars in p
orcing steel srcing steel asard Practice,
eating shall nngineer.
einforcing ste
o field bendin
ire used to tircing bars sha
ticle was upda
Work shall bI), Placing Re
C), Manual of S
N SPLICES
rticle was revis
m consists of t
PILES
rticle was add
s pile shall be
SUMSTANDARD
DEPARTM
L
shall be newcrete Reinforc
bars, the minimand smaller,
ars, the pin der, 6 bar diams.
eel shall be inments.
el shall be fre
ier shafts sha
shall be bent recommendeunless otherw
not be used
el shall be fre
g of reinforcin
e stainless stall be Type 31
ated to reflect
e in accordaeinforcing SteStandard Pra
sed for clarific
the splicing of
ded under pile
used to dete
MMARY OF D SPECIFICMENT of TR
SUMMA
w billet steel coement", Grad
mum elongatiand 10% for N
iameter for thmeters for No
n the form of
ee of physical
all be Grade W
to proper shed in The Rewise noted in C
as an aid in
ee of physical
ng will be allow
teel, Fiber Re6LN or Type
a change in t
ance with CSeel Recommeactice.
cation.
f reinforcing st
e installation, r
ermine pile len
REVISIONSCATIONS FRANSPORT
ARY
onforming to de 400W, with
on at rupture No. 30 bars a
he 180� bend. 30 and No.
f deformed ro
defects.
W bars.
hape in a plainforcing SteeContract Docu
bending ste
defects.
wed unless au
einforced Pol316L stainles
the RSIC stan
SA A23.1, anended Practic
teel bars 25M
regarding the
ngth and mini
S FOR JANFOR HIGHWTATION and
current CAN/ the following
in a 200 mmand larger.
d tests shall be35 bars, and
ound bars un
ant having suel Institute of uments.
el, unless sp
uthorized by th
lymer (FRP) ss steel wire, 1
ndard practice
nd Concrete es Reinforcin
and larger.
e first pile driv
mize splices
NUARY, 201WAY CONSTd INFRAST
/CSA G30.18, additional req
m gauge length
e 4 bar diamed 8 bar diame
less otherwis
uitable deviceCanada, (RS
pecifically auth
he Engineer.
or other corr1.2 or 1.6 mm
e manual.
Reinforcing ng Steel Instit
ven.
and material
15 TRUCTIONRUCTUREDIVISION 30
Page
, "Billet Carboquirements:
h shall be 12%
eters for No. 2eters for No. 4
se noted in th
es for bendinSIC), Manual o
horized by th
rosion resistam in diameter.
Steel Instituttute of Canad
waste.
N
00
18
on
%
25 45
he
ng of
he
nt
te da
STADE
STRUC
Janua
321 – S The fo 321.3.
331- P Many r 331.4.
SUMMANDARD SPARTMENTCTURES
ary, 2015
STEEL SHEE
llowing article
1.1.1 The shcommedeterm
PRECAST PR
revisions wer
2 Curing of C
.1 When manufaprotect
.2 Heat tacceler
.3 When h
.1 He .2 The .3 The
.4 When ashall be
.1 The .2 The .3 In n
form .4 Wh
appste
.5 Du
tem
.6 Fornot
.7 Thiis r
.4 In the c
.1 The
MARY OF RPECIFICATT of TRANS
ET PILE COFF
e was added fo
heet piling sercially availabine the specif
RESTRESSED
re done under
Concrete
the ambientacturing facilition may be pe
reatment marated curing o
heated concre
ated concrete
e maximum te
e maximum c
accelerated ce carried out i
e accelerated
e accelerated
no instance sms or test cyl
here acceleraproved enclosam around th
uring the initimperature with
r the next stat to exceed 15
s temperaturreached.
case of the ap
e accelerated
REVISIONSTIONS FORSPORTATIO
FERDAMS
for clarification
ections and ble product sied volume of
D CONCRET
r Curing of Co
t temperatureties are proteerformed in a
ay be used or heated con
ete method is
e shall have a
emperature o
cooling rate of
curing methodin accordance
d curing shall
d curing shall
shall the steaminders.
ted curing is sure, designe
he beams with
ial curing pehin the enclos
age of curing,5 °C per hour
e shall be ma
pplication of s
d curing shall
S FOR JANUR HIGHWAYON and INF
SUMMARY
n.
corner detaselected to def the tremie co
E BEAMS
oncrete as sta
e in the plaected from thaccordance w
to Acceleratcrete as defin
s used for acc
a maximum pl
of the hardene
f the concrete
d is used for ae with CSA A
not begin bef
provide exce
m, radiant hea
used, The beed to ensure h a minimum
eriod (typicallysure shall be
the temperar to a minimum
aintained unti
steam, radiant
not begin bef
UARY, 201Y CONSTRUFRASTRUC
ils shown onetermine the oncrete in acc
ated below.
ant does nohe wind and
with CSA A23.
ted strength ned in CSA A
celerated stre
lastic concret
ed concrete s
e shall not exc
accelerated sA23.4 and the
fore the initial
ss moisture fo
at or forced a
eams shall befull circulatioloss of moist
y 4 to 5 houmaintained a
ature within thm of 40 °C an
l the required
t heat or force
fore the initial
5 UCTION CTURE
n the drawinminimum siz
cordance with
ot fall below direct rays fr1 and A23.4
developmenA23.4.
ngth develop
te temperatur
hall not excee
ceed 15 °C pe
strength devefollowing:
l set.
for proper hyd
air be directly
e maintained on of thorougure and heat.
urs after comat approximate
he enclosure nd a maximum
d strength for
ed air for acce
l set;
DI
ngs are baseze of the foo302.5.5.
5 °C and rom the sun, and per 302.4
nt may be a
ment:
re of 33 °C.
ed 60 °C.
er hour.
lopment: Hea
dration of the
y applied to th
on the castinghly saturated.
mpletion of cely 20 °C.
shall be raisem of 60 °C.
the transfer o
elerated curin
VISION 300
Page 19
ed on one oting and to
where the curing and
4.
attained by
at treatment
cement.
he concrete,
g bed in an d air and/or
casting) the
ed at a rate
of prestress
ng;
STR
Jan
Thecra 331 331
RUCTURES
nuary, 2015
.2
.3
.5 Theperi
.1
.6 Aftelowe
.6 Stre°C b27.6
.1
.2
.7 Afteuntil
.1
.8 Theentirper
.1 .2
.9 Form
e following arnes.
1.4.9.1.5 Be
1.4.9.1.7 Wsu
S
The acceleraand
In no instancforms or test
exposed surod.
If water is aconcrete tem
er the requireered at a rate
ess transfer shbut all beam6.1.
Maximum teshall be 20 °C
Additional metarps, with ocables.
er transfer of sl the beam is
The beams stwo Days of d
Contractor/mre curing perbeam to reco
The maximum
Shop, girder daily basis du
ms shall not b
rticles were r
eams shall be
Where beams ubmit the
SUMSTANDARD
DEPARTM
ated curing s
ce shall the stcylinders.
rfaces of the c
applied for thmperature by m
d strength fo not exceedin
hall take placs must be k
emperature dC.
easures may r without an
stress the temat the ambien
shall not be edrying in warm
manufacturer iod by means
ord the tempe
m permissible
and enclosuuring product
be removed u
revised to ind
e handled/ere
are propose
MMARY OF D SPECIFICMENT of TR
SUMMA
hall provide e
team, radiant
concrete shal
is purpose, tmore than 10
or transfer of ng 15 °C per h
e when the ckept moist un
ifferential bet
be required additional he
mperature shnt air tempera
xposed to temm temperatur
shall provides of approvedrature throug
e temperature
ure temperatuion.
ntil the concr
dicate that be
ected by two o
ed to be hand
REVISIONSCATIONS FRANSPORT
ARY
excess moist
heat or force
ll have an exc
then this wat°C nor shall t
stress has bhour.
oncrete tempntil transfer, i
tween the gi
to prevent theeating source
hall be lowereature.
mperatures bres after the tr
e a continuoud accurate auhout the leng
e variation wit
ure records s
rete has obtai
eams shall b
or more crane
dled/erected
S FOR JANFOR HIGHWTATION and
ture for prope
ed air be direc
cess of moist
ter temperatuthis temperat
been reached
perature is bein accordanc
irder and the
ermal shock. e, draped ove
ed at a maxim
below freezingransfer of stre
us record of cutomatic reco
gth of the curin
thin the enclo
shall be subm
ned the spec
e handled an
es.
by a single c
NUARY, 201WAY CONSTd INFRAST
er hydration o
ctly applied to
ture during th
ure shall not ture exceed 6
d, the temper
etween abovece with CSA
e surrounding
This may incer the girders
mum rate of 1
g until they haess.
curing tempeording deviceng enclosure(
osure shall no
mitted to the
cified release
nd erected by
crane, the C
15 TRUCTIONRUCTUREDIVISION 30
Page 2
of the cemen
o the concrete
he entire curin
vary from th60 °C.
rature shall b
30 °C. and 4A23.4, claus
g environme
clude insulate and stressin
15 °C per hou
ave undergon
ratures for thes, spaced on(s).
ot exceed 5 °C
Engineer on
strength.
y two or mor
Contractor sha
N
00
20
nt;
e,
ng
he
be
40 se
nt
ed ng
ur
ne
he ne
C.
a
re
all
STADE
STRUC
Janua
335 – The fo
342 –
The torevised
344 – F Carbo 344.2.7
345 – Carbo 351 – W A new 351-4. 365 – The grcrushe
SUMMANDARD SPARTMENTCTURES
ary, 2015
STEEL SUPE
llowing Item w
BRIDGE POT
otal load for thd from 70MPa
FINGER JOIN
Zinc 11 and D
7 revised arCAN/CSA27 joules
STEEL BALL
Zinc 11 and D
WATERPROO
Standard Dra
ENGINEERE
radation limitsed rock base o
MARY OF RPECIFICATT of TRANS
ERSTRUCTU
was rewritten.
T BEARINGS
he ultimate lima to 65MPa.
NT ASSEMBL
Dimecote 9 we
rticle as followA G40.21M Gwhen tested
LASTWALL A
Dimecote 9 we
OFING
awing was ad
ED FILL
s for Engineeor 31.5 mm cr
REVISIONSTIONS FORSPORTATIO
URE
The coatings
mit state for Ta
LIES
ere added as
ws: Structural Grade 350WT
at minus 20 3
ANGLE
ere added as
dded for torch
ered Fill wererushed gravel
S FOR JANUR HIGHWAYON and INF
SUMMARY
s sections wer
able 342-4 A
approved coa
steel in fingeCategory 3 o
30°C.
approved coa
h applied wate
e revised andbase per 201
UARY, 201Y CONSTRUFRASTRUC
re removed fro
verage Cont
atings under th
er plate assemor with a certif
atings under th
erproofing for
d shall confo1.2. Table 365
5 UCTION CTURE
rom this Item.
tact Pressure
he Materials s
mblies shall mfied Charpy V
he Materials s
r bridge decks
orm to the gra5-1 was remo
DI
See Item for
e for TFE Ele
section.
meet the requV-notch impac
section.
s, Standard D
rading limits oved from the I
VISION 300
Page 21
full details.
ements was
uirements of ct energy of
Drawing
of 31.5 mm Item.
MU
Jan
DIV 401 The 401 401
401
404 Sho 404
The404
416 The416
UNICIPAL
nuary, 2015
VISION 400- M
1 – STORM S
e following art
1.4.2.4.2
1.4.2.5 All ostocEng
1.4.6.4 articnot sCon
4 – PRECAST
op drawings s
4.3.2 The Cbasins
.1 St.2 Ge.3 Le.4 Jo.5 Lo.6 Co
e following ar4.4.2 The C
and un
6 – CURB AN
e following ar6.4.4.1 Th
dis
S
MUNICIPAL
SEWER PIPE
ticles were add
The Pavemen
other materialsckpiled materiaineer.
cle revised as suitable for b
ntractor and s
T CATCH BA
shall be subm
Contractor shas, containing b
tation of catcheneral layout ength and weioint details; ocation of reinoncrete desig
rticle was addontractor shanderpinning ne
ND GUTTER
rticle was addhe Contractor sturb the surfa
SUMSTANDARD
DEPARTM
ded under exc
nt shall be exc
s shall be excaal shall be reu
follows: Stockackfill, as dethall be dispos
SIN
mitted in accor
all submit, in but not limited
h basin, DTI Cshowing catchght (mass) of
forcing steel (n strength, ag
ded. ll be responsibecessary to co
ded. shall neatly c
ace beyond th
MMARY OF D SPECIFICMENT of TR
SUMMA
cavation.
cavated separ
avated by maused to backfil
kpiled materiatermined by thsed of outside
rdance with It
accordance wto, the followi
ontract numbeh basin and aindividual sec
(including addge of test and
ble for the desomplete the W
cut the existinghe limits of exc
REVISIONSCATIONS FRANSPORT
ARY
rately.
terial type andl the excavatio
al not reused he Engineer, e the Work Si
tem 956 and t
with Item 956ing informatio
er and descripppurtenancesctions;
ditional reinforcshipping stren
sign and consWork.
g Pavement incavation.
S FOR JANFOR HIGHWTATION and
d stockpiled son to Subgrad
per 401.4.2.5shall becomeite.
the following
6, shop drawn:
ption; s;
cement arounngth.
struction of all
n a straight line
NUARY, 201WAY CONSTd INFRAST
eparately. Sede, as directed
5 and excavae the property
new articles.
ings for each
nd large openi
temporary sh
e so that the W
15 TRUCTIONRUCTUREDIVISION 40
Page 2
lected d by the
ted material y of the
h precast catc
ngs);
oring, bracing
Work does no
N
00
22
ch
g
ot
STADE
TRAFF
Janua
DIVISI 510 – Article with CA
512 – G The foaccord 512.2.
515 – The fo515.2. The fo515.4.
520 – This Itshall b This Itexposu 529 – New It 554 – 554.1.
SUMMANDARD SPARTMENTFIC CONTRO
ary, 2015
ION 500 - TR
GUIDE POST
510.2.7 was AN/CSA 080.
GUIDE RAIL
ollowing articldance with AA
4.1 Each se Na Ide Nu AA Cla
ENERGY-AB
ollowing article5 Posts sha
ollowing article4 The impa
installatio
CAST-IN-PLA
tem was revisbe installed on
tem was revisure C-XL.
CONCRETE-
tem incorpora
OVERHEAD
1 revised areinforced
MARY OF RPECIFICATT of TRANS
OL DEVICES
RAFFIC CONT
TS
revised to in.
le was addedASHTO M180
ection of guideme or brand ontification symmber and coaSHTO Spec #
ass and Type.
BSORBING G
e was removeall be a steel
e was removeact end of eacon if the line is
ACE CONCR
sed to indicaten the median
sed to indica
-ENCASED D
ated in the 20
SIGN STRUC
as follows: Thd concrete fou
REVISIONSTIONS FORSPORTATIO
TROL DEVIC
dicate that pr
d to clarify w0.
e rail, in accoof manufacturmbols or codeating lot; #; and
GUIDE RAIL T
ed as there ar“breakaway”
ed. ch EAGRT ms not on a hor
RETE BARRIE
e that delineabarrier every
te that concr
DUCT BANK S
15 edition.
CTURE FOU
is Item consiundation for a
S FOR JANUR HIGHWAYON and INF
SUMMARY
ES
reservation an
which marking
rdance with Arer; e for heat;
TERMINAL
re other typestype designe
may be offset rizontal curve
ER
ators shall be15 m on tang
rete shall be
SYSTEM
NDATION
sts of the excan overhead s
UARY, 201Y CONSTRUFRASTRUC
nd wood prod
gs are requir
AASHTO M18
s of post that d for the EAG
up to 600 mme, as determin
e available frogents and ver
supplied in a
cavation, shosign Structure
5 UCTION CTURE
ducts shall be
red on each
80, requires m
are acceptabGRT to be sup
m away from ned by the En
om the Ownerry 7.5 m on cu
accordance w
oring, construce.
DI
e supplied in a
section of g
markings as fol
ble. pplied on the
the line of thngineer.
r from stock. urves.
with CSA A23
ction and bac
VISION 500
Page 23
accordance
guide rail in
llows:
Contract.
he guide rail
Delineators
3.1, class of
ckfilling of a
TRA
Jan
555 The 555
555
571 Tabfromexc Tab(g/Ladd Thefollowetcon The 571
571
Crowid 571
Tesby
AFFIC CONT
nuary, 2015
5 – OVERHEA
e following ar
5.4 .4 Insp
.1
.2 .3 .4
5.4.5 .4
1 – PAVEMEN
ble 571-1 Mom the table. Tceed 600 mg/
ble 571-2 ChL) (Lead chroded to the tab
e note in Tabows: Non-tract film thicknenditions ≥ 80%
e following ar
1.4.2.3.2 Eqhaa
1.4.2.3.3 EqteDe
oss-hatching de per 571.4.6
1.4.6.7.2 reof
sting costs frothe Contracto
S
TROL DEVIC
AD SIGN STR
rticles were ad
pection and Te
A visual inspwelds as a re
.1 The inspwith CAN
The inspecto
Faulty welds
Corrected we
A minimum osecurely attathe same day
NT MARKING
odifications tThe following/kg.
hemical Propomate contentble: 3) Lead C
ble 571-3 Phycking time for
ess applied o%.
rticles were re
quipment shaatched islandwidth of 450
quipment shamplates withevices for Ca
line shall be 6.6.
evised as follof paint for Oil
om the appeaor is test resul
SUMSTANDARD
DEPARTMES
RUCTURE
dded.
esting
pection shall esult of the tra
ection shall bN/CSA W178.
or’s report sha
shall be corre
elds shall be r
of 20 m2 of sched until they it is erected
GS
to CGSB 1.20g note was ad
perties of Wt – min 87%)
Content (if pre
ysical Properr Regular Waton dry pavem
evised.
all be capables at a width omm and "Sto
all be capablh dimensionsnada, Part C
450 mm wid
ows: Overlay Based paint a
al shall be borlts fail per 57
MMARY OF D SPECIFICMENT of TR
SUMMA
be carried oansportation o
be carried out.2.
all be submitte
ected as spec
re-inspected.
ign panel (or e sign panels .
06-M-89, Chrdded to the ta
Waterborne Trwas deleted fsent) not to e
rties of Wateter Based str
ment having t
e of painting of 100 mm orp" bars at a w
e of paintings as per the1 supplied by
de per 571.4.
glass beads and 0.8 kg/L o
rne by the Ow1.4.7.4.2.
REVISIONSCATIONS FRANSPORT
ARY
out before erof the overhea
t by an indep
ed to the Eng
cified in CAN/
equivalent ware installed)
rome yellow (able: Lead C
raffic Paint, from the table
exceed 600 m
erborne Trafiping paint baemperature >
the longitudir 200 mm, anwidth of 400 6
g arrows ande Manual of y the Owner.
.6.5, and stop
shall be appof paint for W
wner if test res
S FOR JANFOR HIGHWTATION and
rection to enad sign Struc
pendent inspe
gineer before
/CSA W59.2,
weight in sand) shall be inst
(as PBCrO4) Content (if pre
Medium Chre. The followin
mg/kg.
ffic Paint wasased on 375 > 10 C, und
nal lines outlnd cross-hatc600 mm.
similar markUniform Tra
p bars shall
plied at a rateWater Based p
sults are satis
NUARY, 201WAY CONSTd INFRAST
sure there acture to the W
ector certified
erection of th
clause 5.12.
d filled bags wtalled upon th
was deleted esent) not to
rome Yellow ing note was
s revised as m (15 mils) der humidity
lining cross-ching bars at
kings, using affic Control
be 600 mm
e of 0.7 kg/L paint.
sfactory and
15 TRUCTIONRUCTUREDIVISION 50
Page 2
re no crackeWork Site.
in accordanc
e Structure.
which must bhe Structure o
N
00
24
ed
ce
be on
STADE
ENVIR
Janua
DIVISI 604 – The fol 604.4.3
608 – The fo 608.2.
614- H The fo 614.2. 614.2.
Table
Seed FertilizHydrau
BinderMulch:Hay/stNote: A The fo614.4.
617 – New It
621- T There include
SUMMANDARD SPARTMENT
RONMENTAL
ary, 2015
ION 600- ENV
JUTE MATS
llowing article
3 Jute maprepareshaping
RANDOM RI
ollowing article
4 Random2.6 t/m3
HYDROSEED
ollowing article
9 Only proc
9.1 Proce
revised as fol
Ty
zer ulic Mulch: A
r (tackifer): A: traw bales/rolApplication ra
ollowing article7.3.1 Areas
hydro
ROOT WADS
tem incorpora
TEMPORARY
have been me:
This Item aMaterials fo
MARY OF RPECIFICATT of TRANS
L
VIRONMENT
was revised f
ats shall be ied ditches theg of the ditche
PRAP
e was revised
m riprap shall 3 and angular
DING
es were delet
cessed straw
essed form of
llows:
ype of Mater
All
Application rat
ls/processed ate per manuf
e was reviseds of poor or oseeded shal
S
ated in the 20
Y WATER CO
many revision
pplies to Culvor temporary w
REVISIONSTIONS FORSPORTATIO
TAL
for clarification
installed alonge same day ases, and prior to
d for clarificati
consist of clesurfaces suc
ted.
mulch shall b
f straw mulch
Applicatrial
e per manufa
straw facturer’s spe
d to eliminate no growth whl be reseeded
15 edition.
NTROL WOR
ns to this Ite
verts with a nworking pads
S FOR JANUR HIGHWAYON and INF
SUMMARY
n.
g the full lengs removal of oo hydroseedin
ion.
ean, hard, souh that the roc
be used for H
being shredd
Table 614-3tion Rates fo
acturer’s spec
ecifications.
misinterpretahich exceed d as determin
RKS
m, please re
ominal ID gres shall be supp
UARY, 201Y CONSTRUFRASTRUC
gth of all CE on which eros
ng.
und, durable rks interlock w
ydroseeding
ded straw.
3 or Hydroseed
“B” (kg/ha
125 375 500
cifications.
Per 616
ations of the afive percent
ned by the En
efer to Item fo
eater than 120plied in accor
5 UCTION CTURE
ditches and sion structures
rock, having awhen placed.
BM.
d
)
6.4
areas to be re(measured cgineer.
for full details
00 mm, unlesrdance with S
DI
all topsoiled s are removed
a density of n
"BM(kg/h
200375500
Straw only
eseeded. cumulatively)
s. Some of th
ss otherwise iStandard Draw
VISION 600
Page 25
ditches the d, after final
ot less than
M" ha) 0 5 0
per 616.4
of the area
he changes
indicated. wing 621-1.
ENV
Jan
622 New
623 New 630 New
VIRONMENT
nuary, 2015
The desand dracapacity
The follo
Penalty followedcapacity
2 – FISH RES
w Item incorp
3 – CULVERT
w Item incorp
0 – SOIL REIN
w Item incorp
S
TAL
sign of each awings of they. owing informaDrainage AreTime of ConcRunoff CoeffiDesign Flow Minimum Spewill not apply
d. The Contray.
SCUE
porated in the
T EROSION P
porated in the
NFORCEMEN
porated in the
SUMSTANDARD
DEPARTM
TWCW plan e TWCW des
ation is provideea centration icient (Q100) ecified Flow Cduring period
actor shall su
2015 edition
PROTECTION
2015 edition
NT
2015 edition
MMARY OF D SPECIFICMENT of TR
SUMMA
shall include signed to ac
ed on the draw
Capacity. ds of flow exceubmit docume
.
N
.
.
REVISIONSCATIONS FRANSPORT
ARY
the flow capcommodate
wings for each
eeding the floentation that v
S FOR JANFOR HIGHWTATION and
pacity, the proor exceed th
h watercourse
ow capacity prverifies that t
NUARY, 201WAY CONSTd INFRAST
oposed methohe minimum
e crossing:
rovided the TWthe flow exce
15 TRUCTIONRUCTUREDIVISION 60
Page 2
od, descriptiospecified flo
WCW plan waeeded the flo
N
00
26
on ow
as ow
STADE
PAYM
Janua
DIVISI 810 – A fixed262 anbe mareclaim The fix 812 –
The fo 812.3.
The foagency 812.3.
825 –
The fo 825.6.
SUMMANDARD SPARTMENT
MENTS & ADJ
ary, 2015
ION 800- PAY
FIXED RATE
d rate of $300nd 263. The qde at the fixe
med/recycled
xed rate for S
EXTRA WOR
ollowing article
7 .4 If delaythe appSite spe
.1 StaExt
ollowing articley.
8.2.3.2 TheExt
MOBILIZATIO
ollowing article
2 The total completedContract b
MARY OF RPECIFICATT of TRANSJUSTMENTS
YMENTS & A
ES
0.00 per tonnequantity for thid rate only if material.
teel H Pile Sp
RK
e was revised
ys occur that plicable rentaecifically for E
andby time shtra Work was
e was added
e Contractor stra Work, in o
ON
e was revised
of this Item wd in the Workbid or greater
REVISIONSTIONS FORSPORTATIO
S
ADJUSTMENT
e was added is item is for tadded in the
plices was rev
d to address s
are directly al rate for the
Extra Work.
hall not be paiordered.
in order to cla
shall provide order to be rei
d.
will be paid onk Area on Itemthan $250,00
S FOR JANUR HIGHWAYON and INF
SUMMARY
TS
to Table 801-the addition odesign mix fo
vised to $800
standby time.
ttributable to Equipment c
d for Equipm
arify how fuel
proof of the ambursed.
n the first Progms other than
00.
UARY, 201Y CONSTRUFRASTRUC
-1 Fixed Rateof Portland ceormula and in
0.00 per splice
the Extra Wocarrying out th
ent that was
l is reimburse
amount of fue
gress Estimatn this Item is
5 UCTION CTURE
tes for Portlanement as a stancorporated in
e in Table 81
ork, standby the Extra Work
on the Work
d for equipme
el, for Equipm
te, provided thgreater than
DI
nd Cement unabilizer and pnto the
0-1 Fixed Ra
time shall be k brought ont
Site at the tim
ent rented fro
ent utilized so
hat the value five percent
VISION 800
Page 27
nder Items payment will
ates.
paid at half to the Work
me the
om a rental
olely on
of the Work of the Total
STA
Jan
DIV 931 A s 931
The 931
ANDARD CO
nuary, 2015
VISION 900- S
1 – SCALES A
section on loa
1.3 LOADER
.1 The .2 Mea .3 Mea
Con .4 Loa
as m .5 Loa
conc .6 Loa .7 Loa
othe .8 Loa
will .9 The
loadwhe
.10 The
and
e truck platfor
1.4.4 MeasuContra
.1 AsCoCo
.1
.2 If resesc
.4 The temade
S
ONDITIONS
STANDARD C
AND WEIGH
der scales wa
R SCALES P
following pol
asurement Ca
asurement Cantractors are a
der scales wmaterials unde
der scales wicrete, concret
der scales wi
der scales wier material pri
der scales thnot be accept
Contractor sder scales to ether the scale
Contractor, acertified the
rm scales poli
urement Canaactors are ab
s a result of aontractor’s scontractor will
A report of office withi
the Contractoeleased from services. Oncechedule a re-i
est weights atavailable for
SUMSTANDARD
DEPARTM
CONDITIONS
ING PROCED
as added to th
OLICY
icy shall appl
anada is the o
anada will peabiding by the
ill be acceptaer Item 121, 1
ll not be accete, and any o
ll not be acce
ill not be accemarily used f
at do not comted for use on
shall be respocorrectly weies are owned
at his/her ownloader scales
icy was revise
ada will perfoiding by the p
a routine inspecale is non-cobe required to
the alterationn 7 Days.
or’s scale is pseizure by Me
e the scale hanspection.
t the Saint Johuse by the C
MMARY OF D SPECIFICMENT of TR
SUMMA
S
DURES
he Item.
y to the Cont
only company
erform periodie provisions o
able for weigh167, 201, 203
eptable for wether material
eptable for we
eptable for wefor landscapin
mply with the n the Owner’s
onsible for thgh, within de
d by his/her co
n expense, shs.
ed to reflect c
orm periodic mprovisions of t
ection, if a Meompliant, a noo have their d
n or repair sha
placed under seasurement Cs been broug
hn MC office ontractor or a
REVISIONSCATIONS FRANSPORT
ARY
tractor’s loade
y that may ins
ic marketplacof the Weights
hing of raw m3, 204, and 60
eighing manufconsisting of
eighing winter
eighing topsong purposes.
equipment res Work.
he mechanicasignated toleompany, subc
hall ensure th
current practic
marketplace mthe Weights a
easurement Cotice of non-codevice repaire
all be sent to
seizure, repaiCanada prior tght back into c
are for use bya Private Scal
S FOR JANFOR HIGHWTATION and
er scales used
spect and cert
ce monitorings and Measur
materials used08.
factured roadf binder comb
r sand or salt.
oil, ornamenta
estrictions on
al condition aerances, matecontractor, a s
hat Measurem
ces from Mea
monitoring insand Measures
Canada Inspeompliance wiled.
the nearest M
irs must be coto the scale bcompliance, M
y MC personnle Company.
NUARY, 201WAY CONSTd INFRAST
d on the Cont
tify loader sca
g inspections res Act and R
d in road con
d materials incbined with agg
.
al rocks and g
the certificate
and proper operials used onsupplier, or o
ment Canada
asurement Ca
spections to es Act and Reg
ector determinll be issued a
Measurement
ompleted andbeing put bacMeasurement
nel only and w
15 TRUCTIONRUCTUREDIVISION 90
Page 2
tract.
ales.
to ensure thaRegulations.
struction, suc
cluding asphagregates.
gravels, or an
e of inspectio
peration of thn the Contrac
other.
has inspecte
anada.
ensure that gulations.
nes that a and the
t Canada
d the scale k into t Canada may
will not be
N
00
28
at
ch
alt
ny
on
he ct,
ed
y
STADE
STAN
Janua
931.4.
931.4.
The fo 931.8.
SUMMANDARD SPARTMENTDARD COND
ary, 2015
.1 The thavin
.5 MC will d
.1 If, forcheckadjusagain
.1 Ucrebe
5 Upon therandom c
.1 The thavin
7 The Contproperly i931.3.8.1logo, the
ollowing was u
1 Table 931Measuremscales. Tto the We
AdvatAggreAll WeFleetwMettleWeigh
Note:*
MARY OF RPECIFICATT of TRANS
DITIONS
term "Private ng standard te
o control (ran
r measuremenk (random or stments or repn.
Upon request check, the MCeinspection. I
by a Private Sexpense.
request of thchecks in orde
term “Private ng standard te
tractor shall einstalled and and have affdate of testin
updated unde
1-1 lists the Pment Canadahe listed accreights and Me
tek Systems Iegate Equipmeigh Systemsway Inc. er-Toledo Inc.h-Tronix Cana
* identifies acinspection
REVISIONSTIONS FORSPORTATIO
Scale Compaest weights m
ndom) checks
nt errors, the unscheduled
pairs and requ
by the ContraC inspector wif the MC insp
Scale Compan
he Engineer, ter to verify ca
Scale Compaest weights m
ensure that a Pcalibrated insfixed thereon
ng inspection,
er Private Sca
Private Scale a have certifieredited Privateasures Act.
Accred
nc. ment (Atlantic) s (2002) Inc.
. ada
ccredited Priva
S FOR JANUR HIGHWAYON and INF
SUMMARY
any" shall memeeting the req
s of contractor
scales have inspection), uest MC to re
actor to MC toill advise the Cpector is not any. In either c
the Contractoalibration of ce
any” shall memeeting the req
Private Scalespected by a
a test stickerthe technicia
ale Companie
Companies wed for calibratie Scale Com
Table dited Private
MLimited Tr
FrSaCAtFrQ
ate Scale Co
UARY, 201Y CONSTRUFRASTRUC
ean any of thequirements o
rs' scales thro
been rejectedthe Contracto
einspect the s
o inspect scaContractor ofavailable the Case, the reins
or shall engagertain scales.
an any of thequirements o
e Company haPrivate Scaler bearing the an's signature
es.
which have teing and checkpanies are au
931-1 e Scale Comp
Moncton, NB ruro, NS redericton, NBaint John, NBanada tlantic Canadredericton, NB
Quebec, QC mpanies that
5 UCTION CTURE
e companies lof 931.5.
oughout the y
d by an MC inor shall makescales to perm
ales rejected bf her/his availaContractor shspection will b
ge a Private S
e companies lof 931.6.
as verified thae Company asPrivate Scale
e, and any per
est standard wking contractouthorized to p
panies
506-85902-89
B 800-56B 506-64
800-66da B
800-56506-45888-49
t may perform
DI
listed in Table
year.
nspector at a the necessa
mit them to be
by MC on a coability to do th
hall arrange rebe at The Con
Scale Compan
isted in Table
at the scales s per 931.4.7e Company's rtinent remark
weights whichors' truck platperform testin
57-0909 6-8943 3-9344 8-2226 3-5456 5-7889
54-4010 6-9019
m initial
VISION 900
Page 29
e 931-1
control ry
e used
ontrol he einspection ntractor's
ny to do
e 931-1
have been .1 name or ks.
h tform g pursuant
STA
Jan
932 The 932
933 Thebe 933
946 Ma 946
946
946
ANDARD CO
nuary, 2015
2 – PRIVATE
e following ar
2.4.4 The Crequire
.1 O
.1
.2
.2 Om
.3 O
3 – HEAVY E
e following arno damage to
3.3.6 The athan 3
.1 Th
En
6 – WORK PR
ny changes w
6.1.2 Erodinclutype613
6.2.1 For or o946ther
6.2.2 Thetheror s
S
ONDITIONS
TRUCKS
rticles were ad
Contractor sements:
perator has sOccupationWorkplace Work Area
OHS and WSafety Assthe Associa
WATCM aw
perator has aterial.
perator has c
QUIPMENT
rticle was addo the culvert i
pproval of the3 m of fill.
he Contractongineer, in su
ROGRESSIO
were done to
dible materialude cohesive es of rock han.
the purposestherwise unst.3.3, are base
rein no later th
extent of eacrein) shall be shall be as ind
SUMSTANDARD
DEPARTM
dded to updat
shall ensure
successfully cnal Health andHazardous MTraffic Contr
WHMIS trainisociation (NBation of Safet
wareness trai
met the requ
carried out a p
ded to ensureif heavy equip
e Engineer is
or shall submupport of such
ON
Item 946 whi
includes anyand organic
ndled under It
s of this Item, tabilized on aed on the prehan 30 days a
ch Work Areasubmitted in w
dicated on the
MMARY OF D SPECIFICMENT of TR
SUMMA
te the require
that operat
completed thed Safety (OHMaterial Informrol Manual (W
ng courses sCSA); Safety
ty and Health
ining is availa
uired driver’s
pre-trip inspec
e that detailedpment hauls o
required prio
mit detailed ch request at le
ch are listed b
y material thatsoils handledem 107, 108
a Work Area a given Day, itmise of compafter beginnin
a (station limitwriting before
e approved ini
REVISIONSCATIONS FRANSPORT
ARY
ements for Pri
tors of “Priv
e following safS) Awarenesmation System
WATCM) Awar
shall be providy Services NeConsultants
able on the NB
licence for t
ction each da
d calculationsover the culve
or to Heavy Eq
calculations seast 7 Days b
below.
t has the poted under Item 1
or 121; and t
is an area oft is date specpleting and stang them. Work
s, estimated qe Work under itial and subs
S FOR JANFOR HIGHWTATION and
ivate Trucks.
vate Trucks”
fety training:s; m (WHMIS) trreness.
ded by the New Brunswicand Trainers
BDTI website
the type of “
ay that the “Tr
s are completert with less th
quipment hau
stamped and before hauling
ential to relea106, 107 or 12topsoil handle
f the Work Sitcific. having limabilizing erosk Areas may
quantities andItem 102, 10
sequent Work
NUARY, 201WAY CONSTd INFRAST
have met
raining; and
ew Brunswick (SSNB); or (ASHCAT).
e.
“Truck” being
ruck” is used.
ted to ensurehan 3 metres
uling over Cul
signed by ag is due to com
ase sediment.21; mudstone
ed under Item
te which has bmits that, notwion-prone cutvary in size, a
d duration of 06, 107, 108 ok schedules.
15 TRUCTIONRUCTUREDIVISION 90
Page 3
the followin
ck Constructior a member o
g used to ha
e that there wof fill.
lverts with les
a Professionammence.
typically e or similar
m 106, 107 or
been grubbedwithstanding ts and fills as follows:
cut/fill Work or 121 begins
N
00
30
ng
on of
ul
will
ss
al
d
,
STADE
STAN
Janua
946.2.
946.3.
946.3.
946.4
946.5
SUMMANDARD SPARTMENTDARD COND
ary, 2015
4 The 30one we
3 Work Alarge (pmulche
4 Stabilizcut the Contracerosion
UNCOM
.1 Wocomcondayare
.2 Gru
conthe616aba
.1
.3 WoItem30-mu
OTHER
.1 ErostaDo
.2 EropoiItem
.3 Are
failthe
.4 Are
by Item
MARY OF RPECIFICATT of TRANS
DITIONS
-Day period seek from comm
Areas that canper 946.2.1.2)ed under Item
zation is not reContractor inctor shall addn control meas
MPLETED W
ork Areas thatmpleted by thntinue diligenty period as die completed.
ubbed and strnstruction, or e potential for 6.4 at the Conandonment, w
Abandonmewithout validconditions dDENV or othContractor’s
ork Areas thatm 616, excep-day period anlched per 616
R
osion-prone ebilized in acccuments.
osion-prone cnts and contrm 602 and Ite
eas that have ure before hy
e Contractor’s
eas that have precipitation, m 812 and hy
REVISIONSTIONS FORSPORTATIO
shall begin themencement o
nnot be comp), or because616 as direc
equired on thendicates shall dress the releasures.
WORK AREAS
t have been ue end of the 3tly on the cutsrected by the
ripped Work Athat have beefines to be w
ntractor’s expwhichever is s
ent shall meand cause. Validdue to precipither regulatorys actions or fa
t are not compt that any expny Work Area6.2 and 616.4
embankmentscordance with
uts shall be erolled by Sediem 605, respe
been acceptaydroseeding h expense and
been acceptarunoff or slop
ydroseeded u
S FOR JANUR HIGHWAYON and INF
SUMMARY
e day that gruof grubbing, w
leted within thof prolongedted by the En
e top surfacebe excavated
ase of suspen
S
under continu30-Day periods and fills, wh
e Engineer pe
Areas that haen abandoned
washed into a pense by the esooner.
n ceasing cond cause wouldtation, or an oy agency to ceailure to act.
pleted at the posed areas tas the Contra4 at the Contr
s constructed Item 948 and
excavated sucment Control
ectively or as
ably shaped bhas been dond then hydros
ably shaped ape failure, shander Item 614
UARY, 201Y CONSTRUFRASTRUC
ubbing, strippwhichever is s
he 30-day ped wet weatherngineer.
of a fill or ond within one wnded solids th
ous and diliged shall be stahich and shaller Item 616, u
ave not been ud with cuts/filwatercourse,end of the 30-
nstruction on d include prolorder by the Eease Work fo
time of wintethe Contractoctor failed to
ractor’s expen
within 50 30d as elsewhe
ch that runoff l Fence and/ootherwise dir
but are damae, shall be ac
seeded under
and hydroseeall be repaired4.
5 UCTION CTURE
ping, cut, fill cosooner.
riod becauser, shall have a
n the floor of aweek after thehrough the ins
ent constructiabilized per 94 be stabilizedntil final shap
under continuls uncomplete, shall be mul-Day period o
the cuts and longed wet wEngineer or ofor reasons no
r shutdown shor failed to mumulch under
nse.
m of natural wre specified in
f is directed toor Erosion Corected by the
aged by precipcceptably repar Item 614.
eded, but are d, reshaped u
DI
onstruction be
cut/fill quantiall erodible m
a cut, or on the 30th day hostallation of a
ion but are no46.3.3. Work d each succesping and hydro
uous and/or ded, and whichched per 616
or by the 7th D
fills in a Workweather, unwo
fficials from Dt attributable
hall be mulchulch under a p946.4.2 shall
watercoursesn the Contrac
o one or two montrol Structur
Engineer.
pitation, runofaired and res
subsequentlyunder the pro
VISION 900
Page 31
egins, or
ities are too aterials
e part of a owever the applicable
ot shall ssive 30-oseeding
iligent h present 6.2 and Day after
k Area orkable site DFO, DELG
to the
hed under previous be
s shall be ct
more exit res per
ff or slope shaped at
y damaged visions of
STA
Jan
946
947 The 947
948 Thewat 948
953 BidAss 953
ANDARD CO
nuary, 2015
6.5 .5
.6
.7
7 – DISPOSA
e following ar
7.1.10 Disposappeaobtainsatisfaeither
8 – ENVIRON
e following artercourse, we
8.8.3 Fuel aground
3 – AUDITED
dders must nsociation as p
3.2 DETAIL
.1 Withthe RecCon
.1
S
ONDITIONS
If stabilizationthis Item, the(except SunduncompletedDay after aba
The “Item 94of work progr
Rock cuts shEngineer agrleft in place funless the roerodible mate
.1 Rock fillsincludingmaterial
AL AREA
rticle was revis
sal areas shaarance, and ning guidanceaction of the removed or s
NMENTAL RE
rticle was revietland or groun
and other hazdwater source
SAFETY PRO
ow submit thpart of their te
S
hin 12 Days aContractor s
cognition (COnstruction Safe
Tenders with
SUMSTANDARD
DEPARTM
n of erodible me Contractor sdays and statud, beginning oandonment, w
6 Work Progrression.
hall be subjectrees that somfor use at a laock cut foresloerial under 94
s shall be subg stabilization under 946.1.2
sed to ensure
all be construcshall be hy
e from the deEngineer. Wishaped to a u
EQUIREMENT
ised to ensurendwater sourc
zardous matere (private well
OGRAM
heir Certificatender. Articles
after tenders shall submit TR) issued unety Associatio
hout certificati
MMARY OF D SPECIFICMENT of TR
SUMMA
materials hasshall pay to thutory holidays
on the third dawhichever is s
ression Track
t to the Work me of the in sit
ter date. The opes and ditch46.1.2 or othe
bject to the Woif the slopes 2 or otherwise
e that slopes a
cted such thaydroseeded, scribed work indrows of ea
uniform and le
TS
e that fuel ance.
rials shall not), as identified
te of Recogns were revised
for the ContThe Bidder sder the Certifon (NBCSA),
on at tender o
REVISIONSCATIONS FRANSPORT
ARY
s not been pee Owner a pes) that the reqay following thsooner.
king Report” is
Area and 30-tu rock and/orstabilization
hes are to beerwise release
ork Area and are to be topse release sed
are construct
at the slopes amulched or progression
arth or debrisevel condition
d other hazar
t be stored wid in the field b
nition from thd as follows.
ract are openshall submit, ficate of Recoor approved
opening will b
S FOR JANFOR HIGHWTATION and
rformed by thenalty of $500quired Work rhe end of the
s considered
-Day requiremr blasted but urequirements
e topsoiled or e sediment.
30-Day requsoiled or are
diment.
ted stable.
are stable anotherwise s
details as nos on either sid.
rdous materia
ithin 100 m oby the Enginee
he New Brun
ned, and prioas part of thognition Progalternative.
be rejected.
NUARY, 201WAY CONSTd INFRAST
he 30th Day a0.00 $1000.00remains unsta30-Day perio
as official do
ments of 946.unexcavated s of 946.3 do are deemed
irements of 9deemed to be
nd left in a neastabilized agoted in Item 9de of the ent
als are not sto
of a watercourer.
nswick Const
or to award oheir tender, agram by the N
15 TRUCTIONRUCTUREDIVISION 90
Page 3
as described i0 for each Daabilized od or the 10th
cumentation
2 unless the rock may be not apply to be an
946.2, e an erodible
at and finishegainst erosio946 and to thtrance shall b
ored close to
rse, wetland o
truction Safe
f the Contraca Certificate oNew Brunswic
N
00
32
in ay
h
ed n,
he be
a
or
ty
ct, of ck
STADE
STAN
Janua
958 – 958.4
958.5
SUMMANDARD SPARTMENTDARD COND
ary, 2015
FORMWORK
CORROSIO .1 Tie wire
than the .2 Form ti
below t
.3 If hangconcret
.1 Ho
MARY OF RPECIFICATT of TRANS
DITIONS
K
ON PREVENT
es, form ties, e specified co
es shall be ofthe finished s
ger removal lete mortar cons
les less than
REVISIONSTIONS FORSPORTATIO
TION
bolts, hardwaover minus 10
f such a type urface of the
eaves a holesistent with th
13 mm may b
S FOR JANUR HIGHWAYON and INF
SUMMARY
are and other0 mm from the
that they canconcrete leav
e of 13 mm oe parent conc
be filled with a
UARY, 201Y CONSTRUFRASTRUC
r embedded me concrete su
n be entirely reving no metal
or more it shcrete and con
an Engineer ap
5 UCTION CTURE
metal items shurface.
emoved or cul within 50 mm
hall be cleanetaining latex.
pproved seala
DI
hall extend to
ut back 50 mmm of the surfa
ed and patch
ant, such as V
VISION 900
Page 33
within less
m or more ace.
hed utilizing
Vulkem 116.