Summary of WG5 activities (Engineering, Layout, Solenoid, Cost) K. Elsener, LCD meeting 21 February 2011 1
Transcript
Page 1: Summary of WG5 activities (Engineering, Layout, Solenoid, Cost)

1

Summary of WG5 activities(Engineering, Layout, Solenoid, Cost)

K. Elsener, LCD meeting 21 February 2011

Page 2: Summary of WG5 activities (Engineering, Layout, Solenoid, Cost)

2

Note: last WG5 summary was given in July 2010However: update on activities given at the IWLC, October 2010

H. Gerwig:MDI Integration at CLIChttp://ilcagenda.linearcollider.org/getFile.py/access?contribId=229&sessionId=83&resId=0&materialId=slides&confId=4507

A. Gaddi: B. Passive isolation: Pre-isolation for FF quadshttp://ilcagenda.linearcollider.org/getFile.py/access?contribId=232&sessionId=83&resId=1&materialId=slides&confId=4507

B. Cure:Study of a 5 Tesla large aperture coil for the CLIC detectorhttp://ilcagenda.linearcollider.org/getFile.py/access?contribId=91&sessionId=83&resId=0&materialId=slides&confId=4507

C. Herve:General Detector Motion System Issues (Push-Pull @ ILC)http://ilcagenda.linearcollider.org/getFile.py/access?contribId=161&sessionId=29&resId=1&materialId=slides&confId=4507

Today: some words on “what happened” since IWLC2010

Page 3: Summary of WG5 activities (Engineering, Layout, Solenoid, Cost)

3

WG5: one of the “CDR preparation Working Groups”

Draft of chapter 9: Superconducting solenoids and magnet systems http://indico.cern.ch/getFile.py/access?subContId=0&contribId=1&resId=0&materialId=1&confId=115032

Draft of chapter 11: Very forward calorimeters http://indico.cern.ch/getFile.py/access?contribId=1&resId=0&materialId=slides&confId=118318

Draft of chapter 13: Interaction region and detector integration http://indico.cern.ch/getFile.py/access?subContId=1&contribId=1&resId=1&materialId=2&confId=115032

Draft of chapter 16 : Cost methodology for a CLIC detectorhttp://indico.cern.ch/getFile.py/access?contribId=1&resId=1&materialId=2&confId=115041

+ MDI sections of CLIC accelerator CDR (now Vol. 1) in chapter 2: http://indico.cern.ch/getFile.py/access?contribId=4&resId=2&materialId=paper&confId=113417

in chapter 5: http://indico.cern.ch/getFile.py/access?contribId=4&resId=3&materialId=paper&confId=113417

+ several LCD Notes

Page 4: Summary of WG5 activities (Engineering, Layout, Solenoid, Cost)

4

Reminder: Layout and Integration

NB. will write a note on differences in geometries between GEANT4 and the Engineering Layout

Page 5: Summary of WG5 activities (Engineering, Layout, Solenoid, Cost)

5

Update: FF quads pre-isolator support

Reminder of passive support “block” in layout:

Page 6: Summary of WG5 activities (Engineering, Layout, Solenoid, Cost)

6

Update: FF quads pre-isolator support

Reminder of test set-up in point 5:

Page 7: Summary of WG5 activities (Engineering, Layout, Solenoid, Cost)

7

Update: FF quads pre-isolator support

Reminder of test set-up in point 5:

40 ton dead-load

4 tapered steel beams

Support beams

Page 8: Summary of WG5 activities (Engineering, Layout, Solenoid, Cost)

8

Update: FF quads pre-isolator support

Detailed calculations and proposed improvements (F. Ramos et al.) new measurement series to start 23 February 2011

1.1Hz

1.3Hz

6.7Hz

17.8Hz

57.2Hz

8.7Hz

31.5Hz 72.7H

z

Isolation

Initial design

New design

Page 9: Summary of WG5 activities (Engineering, Layout, Solenoid, Cost)

9

Update: anti-solenoidCDR model is now “frozen”

Low current superconducting coils12 – 0.1 – 3.5 – 15 – 28 A/mm2

Improved shape winding 80 A/mm2

Ferromagnetic disc (Permenorm 5000 s4)

Page 10: Summary of WG5 activities (Engineering, Layout, Solenoid, Cost)

10

Update: anti-solenoidCDR model is now “frozen”

Bz field profile along beam line (CLIC_SiD)

Page 11: Summary of WG5 activities (Engineering, Layout, Solenoid, Cost)

11

Update: SC conductor R&D – main detector magnet

Conductor overview

Atlas CS CMS

5T, 5 layer18kA, 40 strand cable

AA reinforcement

Pure Al stabilizer

Reinforced Al stabilizer

Rutherford SC cable

Atlas BT Atlas ECT

B. Curé - A. Gaddi / CERN Physics Dept.

Page 12: Summary of WG5 activities (Engineering, Layout, Solenoid, Cost)

12

Update: SC conductor R&D – main detector magnet

Preparations under way(in collaboration with KEK)

Collaboration with industrySchedule depends on “them”

-> first tests foreseen second half of 2011

B. Curé - A. Gaddi / CERN Physics Dept.

Co-extrusion press at Nexans

Page 13: Summary of WG5 activities (Engineering, Layout, Solenoid, Cost)

13

Update: Detector Costing and Costing Tool

“mini-meetings” on CLIC detector costing :

• list of agreed unit costs• draft chapter on detector costing• critical analysis of CLIC costing tool -> feedback -> new version, will starting using it 22 February

Goal: internal cost estimate, not part of CDR Vol. Phys. & Det. (but get relative contribution of costs – cost drivers, and an analysis of sensitivity to e.g. cost for steel, etc.)

Page 14: Summary of WG5 activities (Engineering, Layout, Solenoid, Cost)

14

Update: Detector Costing and Costing Toolagreed unit costs (CLIC and ILC detectors will use same costs)

Page 15: Summary of WG5 activities (Engineering, Layout, Solenoid, Cost)

15

Update: Detector Costing and Costing Tool


Recommended