+ All Categories
Home > Documents > Summer 2014 PROJECT APPROVAL & ENVIRONMENTAL DOCUMENT PHASE

Summer 2014 PROJECT APPROVAL & ENVIRONMENTAL DOCUMENT PHASE

Date post: 18-Dec-2021
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
2
FOR MORE INFORMATION, PLEASE CONTACT THE PROJECT MANAGER, PAUL KRUPKA EMAIL [email protected] PHONE 650-504-2299 PROJECT WEB PAGE www.redwoodcity.org/101-84 FACT SHEET PROJECT APPROVAL & ENVIRONMENTAL DOCUMENT PHASE Preliminary Engineering Studies Community Outreach Environmental Studies Accommodate existing and projected traffic congestion Enhance mobility and safety for all users and modes; and Improve traffic operations at nearby intersections PROJECT GOALS 101/84 Woodside Road Interchange Improvement Project The City of Redwood City, in cooperation with the California Department of Transportation and the San Mateo County Transportation Authority, is proposing to reconstruct the Route 101/State Route 84 Woodside Road interchange. The intent is to modify the on- and off-ramp configuration at the interchange and adjacent local intersections to improve traffic flow, increase safety, and better accommodate pedestrian and bicycle access across Route 101. Engineering and traffic studies are well underway. Community outreach efforts included coordination with stakeholders and City Council, and a community workshop in Spring 2014. Preliminary alternatives have been developed for a second community meeting in Summer 2014. Initial environmental studies have begun, and preliminary design will continue to develop the most promising alternatives. Summer 2014
Transcript

FOR MORE INFORMATION, PLEASE CONTACT THE PROJECT MANAGER, PAUL KRUPKAEMAIL

[email protected]

PROJECT WEB PAGEwww.redwoodcity.org/101-84

FACT SHEET

PROJECT APPROVAL & ENVIRONMENTAL DOCUMENT PHASEPreliminary Engineering

Studies Community Outreach Environmental Studies

• Accommodate existing and projected traffic congestion• Enhance mobility and safety for all users and modes; and• Improve traffic operations at nearby intersections

PROJECT GOALS

101/84 Woodside Road Interchange Improvement Project

The City of Redwood City, in cooperation with the California Department of Transportation and the San Mateo County Transportation Authority, is proposing to reconstruct the Route 101/State Route 84 Woodside Road interchange. The intent is to modify the on- and off-ramp configuration at the interchange and adjacent local intersections to improve traffic flow, increase safety, and better accommodate pedestrian and bicycle access across Route 101.

Engineering and traffic studies are well underway. Community outreach efforts included coordination with stakeholders and City Council, and a community workshop in Spring 2014. Preliminary alternatives have been developed for a second community meeting in Summer 2014. Initial environmental studies have begun, and preliminary design will continue to develop the most promising alternatives.

Summer 2014

2014

2015

Web

site,

Fact

She

et, H

ot Li

ne a

nd O

utre

ach

Supp

ort

CS CM CSS

ENV

LEGE

ND:

COM

MUN

ITY S

TAKE

HOLD

ER M

EETI

NGS

(20)

COM

MUN

ITY M

EETI

NGS

(3)

COUN

CIL S

TUDY

SES

SION

S (4

)

ENVI

RONM

ENTA

L MEE

TING

S (2

)

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

S

copi

ng

UPDA

TED:

7/2

3/14

CSCS

CS

CMCM

CM

CSS

CSS

CSS

ENV

ENV

101/

84 W

oods

ide Ro

ad In

terc

hang

e Imp

rove

ment

Proje

ct

COM

MUN

ITY O

UTRE

ACH

SCHE

DULE

PROJ

ECT A

PPRO

VAL &

ENVIR

ONM

ENTA

L DOC

UMEN

T PHA

SE

Publ

ic M

eetin

g - D

raft

Envir

onm

enta

l Doc

umen

t Circ

ulat

ion

Envir

onm

enta

l Sco

ping

Mee

ting

FOCU

S•

Intro

duct

ion/O

vervi

ew•

Pur

pose

& Sc

hedu

le•

Exis

ting C

ondit

ions

• G

athe

r Inp

ut

FOCU

S•

Alte

rnat

ives P

rese

ntat

ion

• U

pdat

ed Pr

oject

Info

• A

ltern

ative

s Fee

dbac

k•

Env

ironm

enta

l Sco

ping

FOCU

S•

Alte

rnat

ives A

nalys

is

Res

ults

• N

arro

wing

of Al

tern

ative

s•

Fee

dbac

k

FOCU

S•

Alte

rnat

ives A

nalys

is Up

date

s•

Dra

ft Pr

oject

Repo

rt•

Dra

ft En

viron

ment

al Do

cume

nt

CSS

CS

Caltrans Approval


Recommended