Date post: | 13-Feb-2017 |
Category: |
Engineering |
Upload: | amit-verma |
View: | 474 times |
Download: | 10 times |
SUMMER TRAINING PPTOn
Coach Care Centre (SICK LINE)
Submitted by:- Amit Verma 1203340026
Serial No. Depot No. of based Coaches 1 Minor 50 – 1002 Medium 100 – 2503 Major Above 250
CLASSIFICATION OF COACHING MAINTENANCE DEPOTS
• ICF- Integral Coach Factory(Chennai)
• RCF- Rail Coach Factory( Kapurthala , Punjab)
• LHB- Link Holfmann Bushh (Fiat Bogies)
• HYBRID- LHB body on modified ICF bogies
COACHES
ICF/RCF LHB/HYBRID
Length over buffer 22296(mm) 24000(mm)
Length over head stock
21336(mm) 23540(mm)
Width 3245(mm) 3030(mm)
Codal life 25 years 30 years
DIMENSIONS OF COACH SHELL
Washing Line
1. Trip Schedule : After every trip by primary maintenance depot.
Sick Line
1. Schedule A : Monthly (1 month + 7 days)
2. Schedule B : Quarterly (3 months + 15 days)
3. Schedule C : After 180 days or 6 Months
4. IOH : Every 9 months
5. POH : Every 18 months
MAINTENANCE SCHEDULE AND CATEGORY
SICK LINE• Sick line is the workshop for the major and periodical
maintenance of the coaches.• It consists of modern facilities like pit for working
under frame And crane for separation of coach & bogie for repair of all type of defects.
1. Wheel and Axle Assembly
2. Bogie Maintenance
3. Buffer Maintenance
4. Air Brake System Maintenance
5. Trolley Maintenance
6. Lifting of Coaches
7. Riding Index
WORKS CARRIED OUT IN SICK LINE
1. Width of wheel = 127 mm2. Wheel Diameter = 915 (new), 825 (condemn)
Permissible diameter variation in wheel
Coaching
• On same axle – 0.5 mm• On same bogie – 5.0 mm• On same coach – 13.0 mm
Goods
• On same axle – 0.5 mm• On same bogie – 13.0 mm• On same coach – 25.0 mm
Fig. 1 Wheel profile (all length dimension are in mm)
Wheel and Axle Assembly
Wheels are fixed on the axle with the help of bearings.
Like wheel, it is also made up of steel.
Brake cylinder are attached to axle.
Braking discs are fixed on the axle
Fig. 2 Axle
Buffer height adjustmentCauses of low buffer height in ICF coaching stock :
a) excessive wear of wheel b) Due to loss of proper stiffness of coil spring c) Due to excessive wear on side bearer’s metal & bronze piece.
Maximum buffer height = 1105 mm [In empty condition] Minimum buffer height = 1030 mm [In loaded condition]
To achieve buffer height a standard size of wooden packing pieces are used which are kept below the Dash Pot Flange on axle Box wings of primary suspension.
Serial N0. Wheel Diameter (mm) Thickness of Wooden Packing (mm) 1. Below 889 up to 863 132. Below 863 up to 839 263. Below 839 up to 819 384. 819 & below 48
In Air Brake system compressed air is used for operating the brake system. The locomotive compressor charges the feed pipe and the brake pipes throughout the length of the train. The feed pipe is connected to the auxiliary reservoirs and the brake pipe is connected to the brake cylinders through the distributor valve. Brake application takes place by dropping the pressure in the brake pipe.
TYPES:1. Direct Release System- brakes are released immediately,
as soon as releasing of brakes is initiated. 2. Gradguate Release System - brake cylinder pressure can
be reduced gradually in steps in proportion to the increase in brake pipe pressure.
AIR BRAKE SYSTEM
• Single Pipe Air Brake System:- There is only one pipe called brake pipe running from loco to the brake van in order to get continuity of air for the application & release of brakes.
• Twin Pipe Air Brake System :- In addition to brake pipe, there is one more pipe called feed pipe , running loco to the brake van to charge the auxiliary reservoir continuously to 6 kg/cm2
Types of Gradguate Release System
Trolley MaintenanceParts of Trolley
1. Trolley Frame
2. Center pivot
3. Side Bearing
4. Brake Cylinder
Fig. 3 Trolley
Lifting of coaches
Require tools and equipments
1. With the use of Mechanical Jacks
2. With the use of Hydraulic Jacks
3. With the use of Electrical operated Travelling Crane
4. With the use of Whiting Jacks
PLATFORM TRAIN DUTY
Rolling In
Rolling out
Axle box feeling
Brake Power Certificate
Safe to Run
ROLLING IN/ROLLING OUT
When train enters in station Examiner staff take up positions on both sides inspect the train enters at the speed of 8 Km/hr
Whistling sound of hot axle boxes.
Any hanging part or loose fitting of vehicle.
Any component or spring suspension bracket loose/broken.
Abnormal behaviour of vehicle.
Axle box feeling
After the train come to halt, all axle boxes are felt within 20 minutes. The temp. of axle is checked by touching with hand
Temp. is found high then it is checked by the temp. gun which gives exact temp.
If this temp. is found more than 30 degree than atm. temp. then the cause is inspected and coach is sent to workshop
BRAKE POWER Certificate
This certificate is jointly signed by Guard , Driver, and C&W supervisor.
The incoming driver shall handover the brake power certificate to Reliving driver or Deposit it the nominated authority, who will give it to the outgoing Driver.
The outgoing driver and guard will satisfy themselves from the listed coach numbers that the Brake Power Certificate pertains to their train.
Safe to run
If all of above factors like no hanging parts brakes are working correctly the temp of axle box is with in range and the train is in good and safe condition of running then the train is announced as safe to run.
Riding is a quality of comfort experienced by passenger, depends not only upon acceleration, rate of change of acceleration & vibration but also some other factors as like noise, moisture temperature etc.Ride Index = b : Amplitude of acceleration f : Frequency of acceleration F(f) : a correction factor dependent on the frequency
Ride index for ICF: <3.5 for LHB<2.75
RIDING INDEX
THANK YOU ALL FOR YOUR KIND ATTENTION