supporting sustainability U S installation of a Sunbeam Universal system (solar panels facing south). > see p. 3-4 Installation of a Sunbeam Symmetrical system (‘east-west’ configuration). > see p. 5-6 This installation guide describes the installation of Sunbeam Nova systems for mounting solar modules on flat roofs. Installation always needs to be based on a configuration and ballast plan generated by the Sunbeam Calculator software. Please keep a copy of the configuration and ballast plan and this installation guide with your project documentation. If you have any questions about the installation, please contact Sunbeam BV (for contact details see last page). Universal Symmetrical Sunbeam Nova Installation guide ENG
Transcript
Page 1: Sunbeam Nova ENG...Sunbeam BV Project test test Dakrandzones volgens Eurocode Hiernaast is aangegeven welke afstanden tot de dakrand gelden bij een rechthoekig gebouw. U bent zelf

supporting sustainability

U

S

installation of a Sunbeam Universal system (solar panels facing south). > see p. 3-4

Installation of a Sunbeam Symmetrical system (‘east-west’ configuration). > see p. 5-6

This installation guide describes the installation of Sunbeam Nova systems for mounting solar modules on flat roofs.

Installation always needs to be based on a configuration and ballast plan generated by the Sunbeam Calculator software.

Please keep a copy of the configuration and ballast plan and this installation guide with your project documentation.

If you have any questions about the installation, please contact Sunbeam BV (for contact details see last page).

Universal

Symmetrical

Sunbeam NovaInstallation guide

ENG

Page 2: Sunbeam Nova ENG...Sunbeam BV Project test test Dakrandzones volgens Eurocode Hiernaast is aangegeven welke afstanden tot de dakrand gelden bij een rechthoekig gebouw. U bent zelf

2

U

U

U

U

U

S

S

S

2

Base unitsThe base units support the system. They are available in several lengths, enabling you to vary the distance between the rows.

CarriersAttach the carriers to the base units to form a stable triangular base for mounting the solar panels.

Ballast racks and wind platesIn addition to carrying ballast and deflecting wind, these planar elements have an important secondary function: they reinforce the system’s matrix configuration.

Main parts

Various parts

carrier Symmetrical

‘east-west’

base unit M (with ‘connector’) base unit E (without ‘connector’)

optional

carrier Universal

south-facing

ballast rack wind plate

mid clampalso in black

end clampalso in black

clamp screw short screwcarriers, ballast racks, wind plates

rubber blockfor gravel roofs

polyester sheetfoot rubber mat

General

Page 3: Sunbeam Nova ENG...Sunbeam BV Project test test Dakrandzones volgens Eurocode Hiernaast is aangegeven welke afstanden tot de dakrand gelden bij een rechthoekig gebouw. U bent zelf

Sunbeam BV

testProject test

Dakrandzones volgens Eurocode

Hiernaast is aangegeven welke afstandentot de dakrand gelden bij een rechthoekiggebouw.U bent zelf verantwoordelijk voor hetbepalen en aanhouden van de dakzones.De ballastwaarden die dit programmaaangeeft zijn alleen geldig indien hetgehele systeem in zone H staat.

50

5,0

100

5,0

40,0

90,0

10,100

1

2

3

4

5

6

7

8

9

10

11

12

1 2 3 4 5 6 7 8 9 10

8,77

0

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

A

25

100 x

m

50 m

1

Resultaten

veldnaam

gebouwhoogte

dakmaten

grind

stuwdruk

dakbedekking

m2

940 N/m2

87

aantal modules

oppervlak systeem

23,5 kg/m2totaalgewicht

22 kPadruk per voet

ballast

2055

1 x

kg

11 12

m

m

bitumen

30 x 30 x 4,5 cm (9 kg)

36

positie met 1 ballastplaat

cijfer = aantal tegels @ 9 kg

module + windplaat

Benodigde onderdelen

Module

Stoeptegel

Ligger

Ligger eindstuk

Voet

Drager

Ballastplaat

Windplaat

Eindklem

Middenklem

Klemschroef

Korte schroef

Dop voor de liggers

Rubber mat (dun)

Rubber H-blok

Polyester vlies

stuks

stuks

stuks

stuks

stuks

stuks

stuks

stuks

stuks

stuks

stuks

stuks

stuks

stuks

stuks

stuks36

110

35

7

42

22

36

24

60

84

202

49

14

0

0

0

optie

12,5

12,5

v 2.50 26-03-2019 | 16:41:14Sunbeam Calculator Nova www.sunbeam.solar | [email protected] | +31 (0)30 43 00 333

3/8

3

Preparation and safety

• Make sure the roof is empty and clean.• Make sure the delivery is complete.• Work accurately and systematically.• Don’t place heavy pallets directly on the roof.

The local load on the roof may become very high.

• Beware of parts and packaging blowing away in the wind and sharp-edged parts damaging the top layer of the roof.

• Always observe adequate safety measures, such as placing bannisters along the roof edge.

• The roofing construction needs to be strong enough to carry the weight of the entire solar energy installation in addition to the regular wind, water and snow loads.

longest side L

Sizing tool

The sizing tool enables you to place the base units at exactly the required distance from each other.

Adjust the sizing tool by sliding the flanges protruding from the plastic sliders up against the side edges of the solar panels. Firmly tighten the screws at the bottom of the slider. If you don’t have a solar panel at hand, you can adjust the sizing tool using a measuring tape.

Configuration and ballast plan

Every Sunbeam project plan includes a configuration and ballast plan (for each individuel array of solar modules), which is prepared using the Sunbeam Calculator software. This picture shows the positions where ballast racks are needed. The numbers indicate the number of tiles to be placed in the racks. Boxes without numbers represent empty ballast racks used to facilitate installation.It is possible to use several types of ballast tiles, allowing for a large range of weights. Always make sure that the actual weight of the tiles matches the weight prescribed in the configuration and ballast plan!

Only systems that are installed according to a configuration and ballast plan generated with the current version of the Sunbeam Calculator at the time of ordering the system, are eligible for the Sunbeam product warranty. For more information about the warranty terms and conditions: see last page.

• The roofing material needs to be in good condition and should be able to withstand the maximum local pressure under the Sunbeam feet. When required, the maximum pressure can be lowered by placing additional feet under the system.

• Always ensure proper drainage of water under the system. When obstacles or gravel are blocking the free flow of water the system may be heightened with rubber blocks.

When in doubt about any of the above points please

consult a structural engineer or roofing expert.

Tools

hex tool 3/8 inchcordless drill

Phillips screwdriver chalk line + chalk

General

Page 4: Sunbeam Nova ENG...Sunbeam BV Project test test Dakrandzones volgens Eurocode Hiernaast is aangegeven welke afstanden tot de dakrand gelden bij een rechthoekig gebouw. U bent zelf

4

5 Nm

3/8

3 Nm4 m

5 m

3 m3/8

1

2

3

U

4

M

M

M or E

Ensure that the entire system is straight and squared, using tools such as a folding square or a laser, or by drawing a ‘3-4-5 triangle’. Always use the sizing tool to make sure the base units are at the correct distance from each other.

A triangle with sides of 3, 4 and 5 metres always has a square angle.

1. Placing the feet and the base units

Sunbeam Nova Universal

Place the base units on the roof in the order indicated in the configuration and ballast plan. Each row is terminated (at the northern end) with an additional foot.Caution: Do not assemble the base units yet!

Attach the ballast racks using the short screws. Tighten the screws firmly, but take care not to strip the thread.

Attach one foot per base unit by clicking it into place at the end without connector. The holes in the base unit line up with the ribs of the feet.

Repeat this with the end block at the opposite side. When assembling a Universal system, you must first carefully bend the carrier until it assumes the correct angle.

1. Insert the connector into the next base unit until it is up against the stop.2. Insert the yellow end block into the slit. 3. Push outwards to align the screw holes.

Attach the end blocks to the base units with the short screws. Make sure that the base units are inserted all the way, and that all the holes are aligned properly!

2. Placing the carriers

3. Aligning, squaring and placing the ballast racks

Page 5: Sunbeam Nova ENG...Sunbeam BV Project test test Dakrandzones volgens Eurocode Hiernaast is aangegeven welke afstanden tot de dakrand gelden bij een rechthoekig gebouw. U bent zelf

5 Nm

3/8

3 Nm

3/8

30 cm

> 30 cm

21 cm

U

5 Nm

3/8

5

5. Placing solar panels

When placing a solar panel, pay attention to the lip at the end of the carrier, which prevents the solar panels from falling down between the carriers.

Sunbeam Nova end clamps can be used universally for panels ranging from 23 to 46 mm in thickness. Fit the clamps using the long clamp screws.

4. Ballast

6. Finishing

The small hole above the central rib in the foot can be used for grounding the system or for attaching cable conduits.

Mount the wind plates at the backside of the carriers. Wind plates may overlap.Fix them in place with the short screws.

Tie cables running between panels with the cable clips. Additional cable clips can be ordered separately.

The mid clamps ensure a 10 mm gap between the panels. Fit them with the long clamp screws as well.

Place the ballast. To prevent bending of the ballast racks, put the ballast as much to the sides as possible.

position with ballast (number = number of

Only use ballast tiles with a width of either 30 or 21 cm. The use of gravel as ballasting material is not allowed.

The small black squares without a number indicate positions with empty ballast plates. These are used to ensure a higher system connectivity.

gravel

Sunbeam Nova Universal

Page 6: Sunbeam Nova ENG...Sunbeam BV Project test test Dakrandzones volgens Eurocode Hiernaast is aangegeven welke afstanden tot de dakrand gelden bij een rechthoekig gebouw. U bent zelf

6

3/8

3 Nm

S

1

2

3

5 Nm

3/8

4 m

5 m

3 m

6

Ensure that the entire system is straight and squared, using tools such as a folding square or a laser, or by drawing a ‘3-4-5 triangle’. Always use the sizing tool to make sure the base units are at the correct distance from each other.

1. Placing the feet and the base units

Place the base units on the roof in the order indicated in the configuration and ballast plan.Add feet underneath the base units at each position where ballast is needed (see arrows).Each row is terminated with an additional foot. Caution: do not assemble the base units yet!

Attach the ballast racks using the short screws. Tighten the screws firmly, but take care not to strip the thread.

Attach one foot per base unit by clicking it into place at the end without connector. The holes in the base unit line up with the ribs of the feet.

Repeat this with the end block at the opposite side. Caution: makes sure that the ‘knee plate’ stays in position.

3. Aligning, squaring and placing the ballast racks

Sunbeam Nova Symmetrical

A triangle with sides of 3, 4 and 5 metres always has a square angle.

2. Placing the carriers

1. Insert the connector into the next base unit until it is up against the stop.2. Insert the yellow end block into the slit. 3. Push outwards to align the screw holes.

Attach the end blocks to the base units with the short screws. Make sure that the base units are inserted all the way, and that all the holes are aligned properly!

Page 7: Sunbeam Nova ENG...Sunbeam BV Project test test Dakrandzones volgens Eurocode Hiernaast is aangegeven welke afstanden tot de dakrand gelden bij een rechthoekig gebouw. U bent zelf

5 Nm

3/8

30 cm

> 30 cm

21 cm

S

5 Nm

3/8

7

5. Placing solar panels

When placing a solar panel, pay attention to the lip at the end of the carrier, which prevents the solar panels from falling down between the carriers.

Sunbeam Nova end clamps can be used universally for panels ranging from 23 to 46 mm in thickness. Fit the clamps using the long clamp screws.

4. Ballast

6. Finishing

Tie cables running between panels with the cable clips. Additional cable clips can be ordered separately.

The mid clamps ensure a 10 mm gap between the panels. Fit them with the long clamp screws as well.

Place the ballast. To prevent bending of the ballast racks, put the ballast as much to the sides as possible.

position with ballast (number = number of

Only use ballast tiles with a width of either 30 or 21 cm. The use of gravel as ballasting material is not allowed.

The small black squares without a number indicate positions with empty ballast plates. These are used to ensure a higher system connectivity.

gravel

Sunbeam Nova Symmetrical

The small hole above the central rib in the foot can be used for grounding the system or for attaching cable conduits.

Page 8: Sunbeam Nova ENG...Sunbeam BV Project test test Dakrandzones volgens Eurocode Hiernaast is aangegeven welke afstanden tot de dakrand gelden bij een rechthoekig gebouw. U bent zelf

8www.sunbeam.solar

Sunbeam BV Kwikstaartlaan 18 NL-3704 GS Zeist The Netherlands

+31 (0)30 - 43 00 333 [email protected]

‘Sunbeam’ is a registered trademark.

The Sunbeam design is protected by several international patents. The Sunbeam Nova

mounting system is tested and approved by TüV.

Standards and regulations

Health and safety• Depending on the country in which the system is installed, national health and safety regulations may apply. You must follow these strictly.• For the Netherlands: ‘Arbobesluit artikel 3.16 : Voorkomen valgevaar / artikel 7.23: Gebruik van arbeidsmiddelen voor werken op hoogte /

artikel 8.1 tot 8.3: Persoonlijke beschermingsmiddelen’.• For Belgium: ‘Algemeen Reglement voor de Arbeidsbescherming (ARAB)’.

Elektrical installation• Depending on the country in which the system is installed, national regulations may apply. You must follow these strictly.• For the Netherlands: NEN 1010. Chapter 7.12 deals specifically with solar power installations.• For the Netherlands: NPR 5310. Chapter 7.12 is linked to NEN 1010 providing practical guidelines.• For the Netherlands: NEN 3140 ‘voor het veilig werken aan laagspanningsinstallaties (tot 1000 V AC of 1500V DC)’.• For Belgium: ‘Algemeen Reglement op de Elektrische Installaties (AREI)’.

Roof construction and various loads• EN 1990: ‘Basis of structural design’ (including National Annexes e.g. for the Netherlands, Belgium, UK and Ireland).• EN 1991-1-3: ‘Actions on structures - Part 1-4: General actions – Snow Loads’ (including National Annexes).• EN 1991-1-4: ‘Actions on structures - Part 1-4: General actions – Wind actions’ (including National Annexes).• For the Netherlands: NEN 7250 ‘Zonne-energiesystemen – Integratie in daken en gevels – Bouwkundige aspecten’.• For Switzerland: SIA 260 ‘Grundlagen der Projektierung von Tragwerken’ / SIA 261 ‘Actions on structures’.

Warranty

Provided Sunbeam Nova is installed and maintained according to the instructions, SUNBEAM BV guarantees the system’s mechanical stability as well as its capability to withstand wind and snow loads conform the relevant Eurocodes.The default warranty period is 10 years.

For the specific warranty conditions, see www.sunbeam.solar/downloads

Sunbeam installation guide - April 2019

Sunbeam Nova Installation guide


Recommended