13-15, Boulevard Eiffel B.P. 30 21604 LONGVIC CEDEX FRANCE (33) 3.80.38.33.00 Fax: (33) 3.80.38.33.71www.sundyne.com SundynePUMP BUDGETARY QUOTATION Prepared for L&T Hydrocarbon Engineering, India Inquiry Reference FRBN-MER-QE-R2-002-REV01 Project FARABI NORMALPARAFFIN AND DERIVATIVES COMPLEX End User FARABI YANBU PETROCHEMICALS COMPANY SAUDI ARABIA Equipment AROMATIC HYDROCARBON & HYDROCARBON PUMPS SUNDYNE Ref. P-21250-SA Date October 18, 2021 Rev. REV 00
Transcript

13-15, Boulevard Eiffel − B.P. 30 • 21604 LONGVIC CEDEX FRANCE • (33) 3.80.38.33.00 • Fax: (33) 3.80.38.33.71• www.sundyne.com

SundynePUMP

BUDGETARY QUOTATION

Prepared for L&T Hydrocarbon Engineering, India

Inquiry Reference FRBN-MER-QE-R2-002-REV01

Project FARABI NORMALPARAFFIN AND DERIVATIVES COMPLEX

End User FARABI YANBU PETROCHEMICALS COMPANY SAUDI ARABIA

Equipment AROMATIC HYDROCARBON & HYDROCARBON PUMPS

SUNDYNE Ref. P-21250-SA

Date October 18, 2021

Rev. REV 00

THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION OF ACCUDYNE INDUSTRIES. NEITHER RECEIPT NOR POSSESSION THEREOF CONFERS ANY RIGHT TO REPRODUCE OR

USE OR DISCLOSE IN WHOLE OR IN PART ANY SUCH INFORMATION WITHOUT WRITTEN AUTHORIZATION FROM ACCUDYNE INDUSTRIES.

PUMPS

COMPRESSORS

GENUINE PARTS

SERVICE

Brands

Sundyne

Marelli

Sunflo

Ansimag

HMD/Kontro

Sundyne France:

Sundyne International S.A.

13-15 Bld. Eiffel - B.P. 30

21604 Longvic Cedex

France

Phone: +33 380 383300

Fax: +33 380 383366

www.sundyne.com

L&T Hydrocarbon Engineering

Dijon, Monday, October 18, 2021

Dear Sir,

Further to receipt of the request for budgetary quotation we take

pleasure in submitting our best budgetary offer ref # P-21250-SA REV 00 for your

consideration. We have taken note of all your requirements and have paid particular attention

in optimizing the best pump selection, considering our experience on similar service. We are confident that our proposal will meet your approval and should you have

any queries, please do not hesitate to contact us. Issued By: Geneviève PEPIN

[email protected]

Sundyne Pump Application Phone #: (33) 0 3 80 38 33 32 (Direct line) Phone #: (33) 0 3 80 38 33 00 (Switchboard)

India

Distribution: MASCOT DYNAMICS

Advait PATNE, Sundyne Sales

Checked by: Jébastien VACHER Pump & Compressor Application Manager

FIRM QUOTATION

FARABI NORMALPARAFFIN AND DERIVATIVES COMPLEX

L&T Hydrocarbon Engineering

P-21250-SA

REV 00 Sheet: 2 of 8

THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION OF ACCUDYNE INDUSTRIES. NEITHER RECEIPT NOR POSSESSION THEREOF CONFERS ANY RIGHT TO REPRODUCE OR USE OR DISCLOSE IN WHOLE OR IN PART ANY SUCH INFORMATION WITHOUT WRITTEN AUTHORIZATION FROM ACCUDYNE INDUSTRIES.

13-15, Boulevard Eiffel − B.P. 30 • 21604 LONGVIC CEDEX FRANCE • (33) 3.80.38.33.00 • Fax: (33) 3.80.38.33.71• www.sundyne.com

PRELIMINARY NOTES 3

SCOPE OF SUPPLY 4

1. SUNDYNE HIGH SPEED INTEGRALLY GEARED PUMP OH6 4

2. MAIN DRIVER AND COUPLING 4

3. SKID PACKAGE 4

4. TEST & INSPECTIONS 5

5. SPECIAL TOOLS 5

6. PROJECT MANAGEMENT 5

COMMERCIAL SECTION 6

1 Prices 6

2 Validity and Delivery 6

3 Country of Origin 6

4 Payments 6

5 Order Placement 6

6 Terms & conditions 7

7 Quality assurance 7

8 Health, Safety & Environment 7

9 Sundyne product general information 7

NOT INCLUDED 8

ATTACHMENTS 8

FIRM QUOTATION

FARABI NORMALPARAFFIN AND DERIVATIVES COMPLEX

L&T Hydrocarbon Engineering

P-21250-SA

REV 00 Sheet: 3 of 8

THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION OF ACCUDYNE INDUSTRIES. NEITHER RECEIPT NOR POSSESSION THEREOF CONFERS ANY RIGHT TO REPRODUCE OR USE OR DISCLOSE IN WHOLE OR IN PART ANY SUCH INFORMATION WITHOUT WRITTEN AUTHORIZATION FROM ACCUDYNE INDUSTRIES.

13-15, Boulevard Eiffel − B.P. 30 • 21604 LONGVIC CEDEX FRANCE • (33) 3.80.38.33.00 • Fax: (33) 3.80.38.33.71• www.sundyne.com

PRELIMINARY NOTES

We have put forward pump selected from our well proven Sundyne vertical in line centrifugal process pumps, type OH6, high speed integrally geared models, described in the table below normally built to specifications API 610 11th edition with the attached published standard exceptions (Attachment 3). Please note that we have included only for the scope of supply detailed within our offer. This quotation is based on the information supplied at the time of enquiry. However, should this equipment has to be made to specific requirements not advised or supplied at the time of the enquiry - we reserve the right to re-design, re-cost and update delivery period. Still different options, with increased technical content and environmental safety are available and might be offered upon request. It would be desirable to discuss and agree on a more customised package in order to present a more accurate and dedicated proposal. Do not hesitate in contacting us for any matter. Reference documents:

FRBN-MER-QE-R2-002 Rev 01

FIRM QUOTATION

FARABI NORMALPARAFFIN AND DERIVATIVES COMPLEX

L&T Hydrocarbon Engineering

P-21250-SA

REV 00 Sheet: 4 of 8

THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION OF ACCUDYNE INDUSTRIES. NEITHER RECEIPT NOR POSSESSION THEREOF CONFERS ANY RIGHT TO REPRODUCE OR USE OR DISCLOSE IN WHOLE OR IN PART ANY SUCH INFORMATION WITHOUT WRITTEN AUTHORIZATION FROM ACCUDYNE INDUSTRIES.

13-15, Boulevard Eiffel − B.P. 30 • 21604 LONGVIC CEDEX FRANCE • (33) 3.80.38.33.00 • Fax: (33) 3.80.38.33.71• www.sundyne.com

SCOPE OF SUPPLY

1. Sundyne high speed integrally geared pump OH6

Integrally-geared centrifugal pump. Designed and manufactured per API 610, 11th Edition, with the attached published standard exceptions (Attachment 3).

1.1 Process end materials Sundyne pump design offered fewer wetted parts to minimize costly special metallurgy and all machineable alloys are available. Pump design offered heavy duty casing and replaceable diffusers (except for LMV-3x2 & LMV-3x6) to allow suction pressure up to 1000 psig and simple field conversions for process change.

1.2 Mechanical seal With a single seal housing design, Sundyne offered three seal arrangements configurations to meet your needs: single, double and tandem. Engineered seals are also available. Sundyne pumps are fitted with a proprietary non-cartridge mechanical seal design which does not comply with API 682. However, it is a well proven modular arrangement that does not require field setting. Please refer to the attached publication for further details.

1.3 Gearbox assembly Sundyne offered reliable AGMA class 11 gearboxes with over 15,000 units installed. Reliable, trouble-free operation is obtained from the integral lubrication system which provides controlled pressurized oil flow to the bearings and gears. The lubrication system includes a wet sump, internal positive displacement pump, which is driven by the low speed shaft and an integral oil filter. Additional items such as auxiliary pre-lube oil pump (required on some configurations), heat exchanger (water or air), pressure/ temperature switches, vibration detection system, etc. are also available. If offered, temperature, pressure gauge and water heat exchanger will be mounted directly on the gearbox and will be as per standard Sundyne offered a gearbox exchanges program with full warranty rebuilt gearbox available in exchange for used one.

1.4 Vibration and temperature probes As a standard, vibration and temperature monitoring are excluded from Sundyne scope of supply. However both can be proposed in option: Bently Nevada for vibration monitoring, and thermocouple or PT100 for bearing temperature monitoring.

2. Main driver and coupling

In standard, couplings are flexible type, provided with a coupling guard in aluminium. Motor in standard is TEFC, IEC, vertically mounted, fixed speed and low voltage. However any particular requirement will be reviewed (non-sparking coupling guard, NEMA, ATEX, space heater)

3. Skid package

Depending on the requirement the following option can be offered (not limited to): - Noise enclosure, ATEX - Common or separate baseplate for auxiliaries - Junction box and wiring for instrumentation

FIRM QUOTATION

FARABI NORMALPARAFFIN AND DERIVATIVES COMPLEX

L&T Hydrocarbon Engineering

P-21250-SA

REV 00 Sheet: 5 of 8

THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION OF ACCUDYNE INDUSTRIES. NEITHER RECEIPT NOR POSSESSION THEREOF CONFERS ANY RIGHT TO REPRODUCE OR USE OR DISCLOSE IN WHOLE OR IN PART ANY SUCH INFORMATION WITHOUT WRITTEN AUTHORIZATION FROM ACCUDYNE INDUSTRIES.

13-15, Boulevard Eiffel − B.P. 30 • 21604 LONGVIC CEDEX FRANCE • (33) 3.80.38.33.00 • Fax: (33) 3.80.38.33.71• www.sundyne.com

- Painting: off-shore, high temperature, or corrosive resistant - External lube oil priming kit - Oil heater and tracing - Most API 610 piping plans (52, 53, 54, …)

4. Test & Inspections

Sundyne can perform many special tests to meet your needs, for example: • Performance Test - standard • Pump Case Hydrostatic Test - standard • NPSH Suppression Test - optional • Radiography Inspection - optional • Liquid Penetrant Inspection - optional • Mill Test Reports or Material Certificates - optional • Magnetic Particle Inspection - optional • Hardness Testing – optional The full range performance and acceptance test will be undertaken using a Sundyne shop motor, test bench water cooler, the contract seals or shop seal system in accordance with Sundyne standard test procedures (see attached Sundyne testing procedure for your reference). After successful testing has been completed on the test stand, the pumps will be painted and mounted on the contract base plate along with the auxiliaries. Although we would perform an in-house functional test of the auxiliary lubrication system to ensure satisfactory operation. Sundyne cannot perform a functional test of the instrumentation. This can only be done on site when the instruments are hooked up to the DCS / IPS systems. Bare pump (without auxiliaries i.e. API Plan 53 A or B) with shop test motor will be tested. Vibration readings shall be taken according to Sundyne Test procedure. The maximum full speed vibration measured on the gearbox bearing plate at six (6) flow points equivalent to customer minimum flow, midway between minimum flow and rated flow, 95% of rated flow, rated flow, 105% of rated flow and 120% of rated flow (if possible) shall not exceed a filtered velocity and unfiltered velocity according to figure 34 of API 610 11th edition. For units fitted with non-contacting radial vibration probes, the maximum filtered displacement shall not exceed 0,038 mm peak to peak (or 0.051 mm peak to peak unfiltered).

5. Special tools

No special tools are required.

6. Project management

A Project manager will be named as your main contact from Purchase Order to start up for any required information. He will be in charge to coordinate the order review, the communication with all Sundyne departments, the contact with suppliers, the project scheduling, the workshop planning, and the documentation. This offer does not include provision for any meeting at customer office with Sundyne Dijon representative. Final documentation will be provided in English language as per enclosed detailed scope of supply.

FIRM QUOTATION

FARABI NORMALPARAFFIN AND DERIVATIVES COMPLEX

L&T Hydrocarbon Engineering

P-21250-SA

REV 00 Sheet: 6 of 8

THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION OF ACCUDYNE INDUSTRIES. NEITHER RECEIPT NOR POSSESSION THEREOF CONFERS ANY RIGHT TO REPRODUCE OR USE OR DISCLOSE IN WHOLE OR IN PART ANY SUCH INFORMATION WITHOUT WRITTEN AUTHORIZATION FROM ACCUDYNE INDUSTRIES.

13-15, Boulevard Eiffel − B.P. 30 • 21604 LONGVIC CEDEX FRANCE • (33) 3.80.38.33.00 • Fax: (33) 3.80.38.33.71• www.sundyne.com

COMMERCIAL SECTION

1 Prices

Pump Item # Sundyne

Pump Model Mechanical seal

arrangement Quantity

Unit Price (€)

Total Price (€)

202-P-01 A/B LMV-311 Dual Unpressurised Seals 2

202-P-01 A/B Commissioning Spares as per Class 1 1

202-P-03 A/B LMV-311 Dual Pressurised Seals 2

202-P-03 A/B Commissioning Spares as per Class 1 1

203-P-01 A/B LMV-331N Dual Pressurised Seals 2

203-P-01 A/B Commissioning Spares as per Class 1 1

203-P-02 A/B LMV-311 Dual Pressurised Seals 2

203-P-02 A/B Commissioning Spares as per Class 1 1

TOTAL FOR ORDER

Option #

Option Description Quantity Unit Price

(Euros) Total Price

(Euros)

1 Class 2 2 Years Recommended Spare Parts 1 See attached lists to quote

2 Class 3 Capital Spare Parts Lists 1 See attached lists to quote

3 SPS378 Rev1 Field Service Training Quote See offer attached to quote

4 SPS379 Rev1 Field Service Assistance Quote See offer attached to quote

The prices quoted are FCA Longvic Factory (as per INCOTERMS 2010) in Euros, fixed and firm for the duration of the contract, exclusive of taxes, and include export packing as defined in below attached detailed scope of supply.

2 Validity and Delivery

The prices quoted herein will remain valid during 90 days The delivery is estimated to be around 46 weeks

3 Country of Origin

The pump and packaging will be done in Longvic (21604), France or in Arvada (Colorado), United States

4 Payments

The payments terms will be reviewed later

5 Order Placement

Any resulting Purchase Order should be addressed as follows

Sundyne France Sundyne International S.A.

FIRM QUOTATION

FARABI NORMALPARAFFIN AND DERIVATIVES COMPLEX

L&T Hydrocarbon Engineering

P-21250-SA

REV 00 Sheet: 7 of 8

THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION OF ACCUDYNE INDUSTRIES. NEITHER RECEIPT NOR POSSESSION THEREOF CONFERS ANY RIGHT TO REPRODUCE OR USE OR DISCLOSE IN WHOLE OR IN PART ANY SUCH INFORMATION WITHOUT WRITTEN AUTHORIZATION FROM ACCUDYNE INDUSTRIES.

13-15, Boulevard Eiffel − B.P. 30 • 21604 LONGVIC CEDEX FRANCE • (33) 3.80.38.33.00 • Fax: (33) 3.80.38.33.71• www.sundyne.com

13-15, Boulevard Eiffel-B.P.30 21604 Longvic Cedex

FRANCE

6 Terms & conditions

Will be as per attached Sundyne terms and conditions of sale.

7 Quality assurance

Please find attached a copy of Sundyne’s current ISO 9001:2015 certificate.

8 Health, Safety & Environment

Please find attached a copy of Sundyne’s current ISO 14001:2015 certificate.

9 Sundyne product general information

You can use the flowing link to have more general information about Sundyne pumps

http://www.sundyne.com/Products/Pumps

FIRM QUOTATION

FARABI NORMALPARAFFIN AND DERIVATIVES COMPLEX

L&T Hydrocarbon Engineering

P-21250-SA

REV 00 Sheet: 8 of 8

THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION OF ACCUDYNE INDUSTRIES. NEITHER RECEIPT NOR POSSESSION THEREOF CONFERS ANY RIGHT TO REPRODUCE OR USE OR DISCLOSE IN WHOLE OR IN PART ANY SUCH INFORMATION WITHOUT WRITTEN AUTHORIZATION FROM ACCUDYNE INDUSTRIES.

13-15, Boulevard Eiffel − B.P. 30 • 21604 LONGVIC CEDEX FRANCE • (33) 3.80.38.33.00 • Fax: (33) 3.80.38.33.71• www.sundyne.com

NOT INCLUDED

1. Unit Control Panel,

2. Remote control units (RCU) for auxiliary electric motors,

3. Motor Control Center (MCC),

4. Monitory system

5. Cable tray and wiring on site between skid, UCP and MCC,

6. Safety valves other than the ones shown on attached P&I drawing,

7. Lube oil rundown tank

8. Complete unit test

9. Lifting system (spreader bar, slings, shackles) with single point,

10. Fire and gas detection and protection system,

11. Any civil work,

12. Erection on site,

13. First fill of lubricants.

14. Any third party inspection charges.

15. Any installation, commissioning or other site work.

16. Any special tooling.

17. Anything not specifically mentioned in the present Bid

ATTACHMENTS

Attachment 1 - Scope of supply

Attachment 2 - Preliminary Pump Data Sheet and Curves

Attachment 3 - Sundyne Terms and Conditions of sale

Attachment 4 - ISO 9001:2015 certificate

Attachment 5 - ISO 14001:2015 certificate

Attachment 6 - Recommended Spare Parts Lists

Attachment 7 - Pump Standard Cross Sectional Drawing

Attachment 8 - Preliminary Utility List

Attachment 9 - Deviations list to Specification & Comments Exceptions API 610 11th Edition & API 682 4th Edition

Attachment 10 - Field Service Training and Assistance and Extended Warranty Quotes

Attachment 11 - Completed Scope of Supply Tables 1A, 1B & 1C

Quote Number: 224816-1End User: Farabi Yanbu Petrochemicals Company

Table of Contents

Quotations and Specifications

202-P-01 A/B LMV-311 Purge Pumps ........................................................................ 2

202-P-03 A/B LMV-311 PEP Column Sidedraw Pumps ............................................. 12

203-P-01 A/B LMV-331N API Heavy Duty Pump ....................................................... 22

203-P-02 A/B LMV-311 Desorbant Pumps ................................................................. 32

Quotation Summary ........................................................................................................ 42

Industry Exceptions ........................................................................................................ 44

Page 1 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Sundyne Pump Quotation

To: L&T INDIA Attention:

Quotation No.: 224816-1Channel Partner Ref No.: P-21250-SAInquiry No.: Item No.: 202-P-01 A/BDate: 18-October-2021Expiration Date: 30-June-2022

Qty Description Price Each Price Total

2

UnitLMV-311 Z-Series - API Heavy Duty Pump, Flow - 44.25 m3hr, Differential Head -459.8 meters - Build Code AProvision for Insulation Only

DriverFrom VL, 75.0 KW, 3574.0 rpm, 460V5/-5%/3Ph/60Hz+/-2.5%, 280S.

Seals and Wet-EndPump O-Ring, UC - Fluorocarbon - Viton A316SS standard cylindrical InducerSuction and Discharge Flanges, 600 lbs RF, Ra 3.2-6.3 (125-250 microInch)Bypass Orifice, Multiple Flanged 1/2" 600RF3/4" Casing Studs and Nuts in InconelTandem Seal Assy Configuration (Liq/Liq)Lower, JohnCrane (SE04AA10..)_ Secondary Seal Lower, UC - Fluorocarbon (VitonA)_ Stationary SealFace Lower, RA - Carbon Graphite_ Mating Rings, RE - Tungsten Carbide (6-8% Cobalt Binder)_ Retainer and Srpings - 316 SSUpper Mechanical Seal JohnCrane (SE04AA05..)_ Secondary Seal Upper, TA - Polytetrafluoroethyene (PTFE)_ Stationary SealFace Upper, RA - Carbon Graphite_ Retainer and Srpings Upper - 316 SSPort-1 Basic Piping Carbon Steel, Sch160, Socket Weld Connection

General AccessoriesStandard flange height, 187mm (7.38 inch) to nozzle center linePump Case Sole plate, Machined for Supporting FrameBaseplate, API610 carbon Steel for Pump & APICasing Earthing BossBaseplate Earthing BlockAnchor bolts, Set 6 off J-shapeNameplates, 304SS, 100x50mmBaseplate 2" flanged drain connection - 150#RF without Valve

Pump Drain kitBasic Piping Carbon Steel, Sch160, Butt WeldFlange, Carbon Steel, WeldNeck, 600# RFGate Valve Carbon Steel, Flange Connection, 600# RFTwo Plan Bracing on Drain pipingDrain Piping to Skid EdgeWith Blind FlangeAdder for fugitive emission for the Gate valve

Pump Vent KitBasic Piping Carbon Steel, Sch160, Butt Weld ConnectionFlange, Carbon Steel, WeldNeck, 600# RFGate Valve Carbon Steel, Flange Connection, 600# RF

Form No: FO-APP-QUOT-005 (rev.0)

Page 2 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Two Plan Bracing on Vent pipingVent Piping to Skid EdgeVent Connection Size to be of 3/4" minimumAdder for fugitive emission for the Gate valve

Flush PlanP-13 Modified, CarbonSteel sch160, ButtWeld, Flange WeldNeck 600# RFOrifice, Single

Seal SystemAPI Plan 52Vessel is built in accordance with ASME VIII div. 1 & API 682 3rd edition32 Liters Reservoir (8" Sch 40) in ASTM A312 Grade TP 316/316L - Weldedconnections with flangesType reflex level indicator fitted on Buffer reservoir with threaded connectionsAll connections are butt welded, except for valves and the cooling coil which are socketweldedDrain, Vent and Buffer fluid filling lines are in 3/4" and contain each a gate valveAll lines are in ASTM A312 Grade TP 316/316L schedule 80Buffer fluid filling option: Quick connection with check valveSimple cooling coil in 316L SSCooling water inlet / outlet lines in 1/2" with 150# RF Flanges1 Pressure gauge WIKA 233 (DN 100 mm) on vent line - connection in 1/2" NPT1 Pressure transmitter as per specifications with a coated aluminum housing on ventlinePressure gauge & Pressure transmitter fitted with a block & bleed manifold SAMI foreach instrumentLow & High level transmitter as per specifications with a coated aluminum housingLevel Alarm fitted with a block & bleed manifold SAMI (5 valves)Sunshade for all instruments1 Pressure gauge ATEX certified as per specifications on outlet line for liquid barriercontrol - connection in 1/2" NPT1 Temperature gauge ATEX certified as per specifications with thermowell on outlet linefor liquid barrier control - connection in 1/2" NPTOutlet Line enlargement from 3/4" to 1"1/2 for installation of 1" BW Thermowell toinstall 100mm TG StemPlan 52 Buffer inlet / outlet lines in 3/4" with 600# RF FlangesCooling Coil to be in Duplex Stainless Steel instead of 316L SSPressure Instruments to be installed at a height lower than1500mm

Seal System interconnecting pipingButt welded piping in 316 SS with 600# RF FlangesPiping in 3/4" schedule 80

Seal Housing connections for seal systemButt welded piping with 600# RF Flanges in In Carbon Steel Material upto first flangesIn Carbon Steel Material upto first flangesSeal housing connection on port 2 & 7 is butt welded

Gearbox and Heat ExchangerSundyne Gearbox 200-HPGearbox mechanical seal Assy - SE04AA98ALiquid cooler - 3X18, 4Pass, Brass shell, Cast-Iron bonnet, 90Cu/10Ni tubesLube oil cooler not according to TEMA CMagnetic Drain Plug to be provided on Gearbox

Gearbox vibration and temperature monitoring2 Vibration adaptors (mechanical M8 x 1.25 mounting thread) located on the gearbox(on two perpendicular axis)

API Cooling PlansAPI Cooling Plan A connected together with the buffer cooling coil, 150lbs, CarbonSteel, RF Flanged, Socket Welded. Connections on Heat Exchanger itself areScrewed.Thermal relief valve screwed on API planTemperature Gage added on Cooling Water Line

Lube Oil Control KitStandard pressure gauge, fitted on the gearbox - as per API 610 - paragraph 9.1.3.6Standard temperature gauge, fitted on the gearbox - as per API 610 - paragraph9.1.3.6

Form No: FO-APP-QUOT-005 (rev.0)

Page 3 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Driver AccessoriesDriver Adaptor for spacer coupling, IEC frame size 280SDriver Fixation Bolts, in 304 Stainless SteelNon sparking Aluminum coupling guardcoupling, NonSparking Metastream (TSKS-0075)Coupling Assembly on MotorCoupling Puller Holes

InspectionMaterial Certificate of Conformity EN10.204 type 3.1, Pump Case - Seal HousingMaterial Certificate of Conformity EN10.204 type 3.1, Casing StudsMaterial Certificate of Conformity EN10.204 type 3.1, Diffuser Insert & CoverMaterial Certificate of Conformity EN10.204 type 3.1, Shaft SleevesMaterial Certificate of Conformity EN10.204 type 3.1, Main Baseplate MaterialsMill Test Report Certificate (equivalent to EN10.204 type 3.1), Impeller & InducerMill Test Report Certificate (equivalent to EN10.204 type 3.1), High Speed ShaftMill test Report EN10.204 type 3.1, Auxiliary Process Fluid Piping (pressure containingcomponents)Material Certificate of Conformity EN10.204 type 3.1, Plan 52 Buffer system weldedpartsMaterial Certificate of Conformity EN10.204 type 3.1, Welding Consumable for Plan 52reservoirMaterial Certificate of Conformity EN10.204 type 3.1, on coupling main componentsLiquid Dye Penetrant (certified only), Auxiliary Process Fluid Piping (pressurecontaining components) for 100% of weldsLiquid Dye Penetrant (certified only), Impeller & InducerLiquid Dye Penetrant (certified only), Pump Case - Seal Housing (machined surfaces)Liquid Dye Penetrant (certified only), Main Baseplate WeldsLiquid Dye Penetrant (certified only), Plan 52 Buffer reservoir for 100% of weldsLiquid Dye Penetrant (certified only), Buffer/Quench Piping Plan for 100% of weldsRockwell Hardness test (certified only), Impeller & InducerRockwell Hardness test (certified only), Pump Case - Seal HousingRockwell Hardness test (certified only), High Speed ShaftMagnetic Particle Inspection (certified only), Pump CaseMaterial traceability, Pump wetted parts & Auxiliary Process Fluid Piping (pressurecontaining components only)Ultrasonic test (certified only), High Speed ShaftPositive Material Inspection (with carbon), Pump wetted parts - witnessedPositive Material Inspection (with carbon), Buffer/Quench Piping Plan - witnessedPositive Material Inspection scope may include following parts: Flange, Orifice, Piping(greater than or equal to 1"), Fitting (greater than or equal to 1"), Valve BodyPositive Material Inspection is only applicable on stainless steel and high alloy steelequipmentsX Ray, Buffer/Quench Piping Plan for 10% of weldsX Ray, Plan 52 Buffer reservoir for 10% of welds (1 spot on one weldment)X Ray, Auxiliary Process Fluid Piping (pressure containing components) for 10% ofweldsX Ray, Pump Case (Casting)Visual control of the welds of the Plan 52 Buffer systemCleanliness inspection on the Plan 52 Buffer system with certificateFinal Shop Inspection, Pump Dimensional & documentation review - witnessedAs per Inspection Level C3.1 Material Certificate for Mechanical Seal Retainers

TestHydrostatic Test Inspection - Witnessed all unitsHydrostatic Test Liquid will include a wetting agent to reduce surface tension as perrequested in API 610, 11th edition (Par. 8.3.2.7)Hydrostatic Test Inspection on the Plan 52 Buffer system according to ASME VIII -certified onlyPerformance & NPSH Test - WitnessedOverall and Discrete frequencies (for each shaft) Vibration MeasurementMechanical Run Test, with shop motor and shop coupling - WitnessedExtended Mechanical Run Test - Witnessed, 4 hours all units

Form No: FO-APP-QUOT-005 (rev.0)

Page 4 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Sound Level Measurements, according ISO 9614-2 and ISO 11203 - Witnessed allunits, according ISO 9614-2 and ISO 11203Dismantling Inspection after test, wet end & gearbox - Certified OnlyMechanical Rerun, after dismantling (gearbox only)Impeller and Inducer Balancing as per Sundyne procedure - Certified OnlyHigh Speed Shaft Assembly Balancing as per Sundyne procedure - Certified OnlyVibrations Measurement & FFT Spectrum (range: 5 to 1000 Hz) done at each point ofthe performance test, on X axis - Witnessed all units

Paint and StoragePump and Accessories, Do Not Paint Stainless Steel SurfacesPump and Accessories paint, Off-Shore Service with colour change RAL RALPlan 52 Buffer reservoir will remain unpainted (pickling & passivation)Plan 52 Buffer bracket in Carbon Steel with an off-shore paintDriver paint system - Off-Shore with colour change RAL RAL7035Stand paint - Off-Shore Service with colour change RAL RALPump LongTerm Storage for Carbon Steel Unit

PackingFlange Shipping Cover plate 1/4" Carbon SteelVacuum Packing for Bare Unit without kitsDriver Vacuum PackingPump packing - Sundyne standard export box made of plywood 10mm thicknessDriver packing, Sundyne standard export box made of plywood 10mm thickness

DocumentationQuality Control PlanInstallation Operating & Maintenance, (customer specification), Master Book (baseprice)Installation Operating & Maintenance per customer specification, adder for API BufferAPI52/53Installation Operating & Maintenance per customer specification, adder for Main Driver1 final copies of customized IOMCertification Dossier, (customer specification), Master Book (base price)Certification Dossier per customer specification, adder for API BufferCertification Dossier per customer specification, adder for Main DriverOne copy of customized Certification Dossier submitted for approval1 final copies of Certification Dossier per Customer specificationCertification Dossier, (customer specification), Submital of Sundyne ProceduresGeneral Arrangement drawing - Autocad format DXFCross Section drawing - Autocad format DXFP&ID - Autocad format DXFWelding Map - Autocad format DXFHook Up - PDF formatFinal Documentation on CD-ROM per Customer specificationFinal Documentation on CD-ROM per Customer specification, adder for API BufferFinal Documentation on CD-ROM per Customer specification, adder for Main Driver1 copie of final Documentation on CD-ROMSpare Parts Interchangeability Record SPIR - Excel FormWelding book for the Plan 52 Buffer system with: welder qualification, weldingprocedure and welding process qualification according to ASME IX

CertificationATEX Certification, per directive 2014/34/UE for Zone 2U-Stamp certificate for Plan 52 Buffer ReservoirCoupling ATEX Certified & Marked for Zone2

WarrantyExtended Sundyne warranty. 12 Months from Start-Up - 40 Months from Shipment

BUDGET ESTIMATE

Unit and Driver Total

46 weeks ex-factory from receipt of PO In light of the Covid-19 situation, which is beyond our control, any delivery dates are simply estimates.Sundyne is not in a position to confirm delivery time, but is doing its best to mitigate the effects while

Form No: FO-APP-QUOT-005 (rev.0)

Page 5 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

following local, national and international guidelines and mandates. It shall be reassessed and agreed attime of Purchase Order issuance.

This quotation is subject to the Terms and Conditions of Sale enclosed within. This quotation is valid if accepted by Sundyne within 90 days fromthe date hereof. This Quotation and any subsequent Purchase Order acceptance is subject to French, European and US Laws and regulations governing thecontrol of exports. Any changes to those laws or regulations, preventing Sundyne International S.A. from honoring its commitments under thisquotation or Purchase Order, will be considered as a Force Majeure because such changes are beyond any party's control and could not havebeen reasonably foreseen. This expressly includes changes to trade and export compliance laws and regulations.

Payment Terms: to be reviewed in due date Sundyne France INCO Terms: FCA Longvic Factory (Non-Containerized)

Genevieve Pepin Applications Engineer Phone: +33 3 80 38 33 32 Email: [email protected]

Form No: FO-APP-QUOT-005 (rev.0)

Page 6 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

OPERATING CONDITIONS

Liquid Hydrocarbon Capacity(m3/hr) Norm 32.1 Rated 44.25

Suct Temp (C) 78.0 Max 78.0 Disch.Press (kgf/cm2) 30.63

[email protected] 0.567 Suct.Press (kgf/cm2) Max 6.69 Rated 4.56

[email protected] (kgf/cm2-a) 3.56 Diff.Press(kgf/cm2) 26.07 Diff.Head (m) 459.8

[email protected] (cp.) Norm 0.14 Max NPSHA (m) 35.3

Spec.Heat (kj/kg K) 2.6 Corr./Eros. caused by

CONSTRUCTION

Casing Mounting Vertical-Inline Casing Split Radial Inducer Type Cylindrical - 12 - 2

Diffuser Single Throat Diff.Dia (mm) 16.7 Style Z-Series Impeller Type Open

Mechanical Seal Type Dual Unpressurized

Seal Part No. Upper SE04AA05A Primary SE04AA10A Imp.Dia (mm) Rated 134.1

API Seal Code Upper none Primary Max 137.4

Api Flush Plans Flush Plan M13 and Buffer Plan 52 Min 128.1

Nozzle

CONNECTIONS

Size

ANSI

Rating

ANSI

Facing

ANSI

Finish

micronM

Position

Suction 3 in 600 lbs RF 3.2-6.3 Side

Discharge 2 in 600 lbs RF 3.2-6.3 Side

Pressure Casing

CONNECTIONS

Size

ANSI

Rating

ANSI

Facing

ANSI

Finish

micronM

Connection Type Valve

Drain 1" 600 lbs RF 3.2-6.3 Butt Weld / Flanged PN100

Vent 1/2" 600 lbs RF 3.2-6.3 Butt Weld / Flanged PN100

MATERIALS

Minimum Design Metal Temperature: 10.0 (deg C)

Sundyne Pump Build Code A Seal Rotat.Face Tungsten Carbide - Cobalt

Case/Seal Hsg

ASTM A216 gd WCB / ASTM A350 LF2

Seal Secondary Fluorocarbon

Diffuser ASTM A350 LF2 Studs ASTM 1014

Impeller 316SS Inducer 316SS

Shaft 4140 Steel Shaft Sleeves 316SS

Seal Metal Parts 316SS/316SS Pump O-Rings Fluorocarbon

GEARBOX X Yes No BEARING BOX Yes X No

Gear Ratio 3.182 Lubrication Pressurized Oil-Filtered

Heat Exchanger Liquid Cooler Cooling Load (kW) 2.966

Type 5x18, Brass Shell & 90Cu/10Ni Tubes, 4 pass

RATED PERFORMANCE

NPSHR, Water @ rated capacity (m) 6.07 Stages 1 RPM 11372

Rated Power (kW) 59.1 Rated Pump Efficiency (%) 53.1

Max Power Rated Imp. (kW) 66.5 Max Head Rated Imp. (m) 515.83

Minimum Continuous Stable Flow (m3/hr) 15.49

with control valve within 3.048 (m) of pump discharge

Motor Rotation (viewed from top of motor) CCW

Specific Speed 12.7 rpm.m3/s.m Suction Specific Speed 326.0

Seal Cavity Press (kgf/cm2) Rated 6.22 Max 9.98

Typical noise level (db) 85.0 @ 1.0 (m)(Pump only)

AUXILIARY PIPING REQUIREMENTS

Gearbox Cooling Water Piping Supplied by Sundyne

Seal Flush Cooling Water Piping N/A

Seal Buffer/Barrier Cooling Water Piping Supplied by Sundyne

Buffer/Barrier Interconnecting Piping Supplied by Sundyne

Cooling Water Requirements (m3/hr) @ 36.0 (C)

Gearbox heat exchanger 2.5

Seal Flush 0.0

Seal Buffer/Barrier 0.0

Total 2.50

TEST REQUIREMENTS

Shop Test Wit Certified Obs

Hydrostatic Yes No No

Performance Yes No No

NPSH Yes No No

Dismantle/Inspect No Yes No

Surface Inspect Yes No No

Extended Mechanical Text (4H) Yes No No

Sound Level Test Yes No No

WEIGHT (kg)

Pump & Gearbox 345 Driver 0

Base/Stand 0 Auxiliaries 0 TOTAL 345

TURBINE DRIVE by Sundyne Yes X No

Rating RPM Qty

Mfr

Steam Press (kgf/cm2) Inlet Outlet

Steam Temp (C) Inlet Outlet

Steam Rate (*)

Shaft Type

Coupling Mfr/Type

Form No: FO-APP-QUOT-005 (rev.0)

SUNDYNE PUMP SPECIFICATION SHEET

Applicable to Proposal Metric with Bar

Single-Stage Overhung OH6

Purchaser L&T, , INDIA Quote No. 224816-1 Rev 1 Date 18-Oct 2021 Serial No. P-21250-SA-1

Owner/User Farabi Yanbu Petrochemicals Company Job No. By Genevieve Pepin No. Required 2

Service Purge Pumps Item No 202-P-01 A/B Req Model Number LMV-311

Location , SAUDI ARABIA Unit Purchase Oder No. Inquiry No.

Page 7 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

MOTOR DRIVE by Sundyne X Yes No SITE CONDITIONS

Rating 75.0 KW RPM 3574 Volts/Phase/Hertz

460V5/-5%/3Ph/60Hz

+/-2.5% Qty 2

Ambient Temperature (C) Min. 10.0 Max. 42.0

Mfr From VL S.F. 1 Frame 280S Relative Humidity (%) Min. Max. 100 F.L. Amps L.R. Amps Insulation F use B Enclosure IP55 Site elevtion above 1000 meters (3280 feet) false

Shaft Type Coupling Coupling Mfr/Type Metastream TSKS - TSKS-0075 Hazadous Area Certification IECEx

Thrust Capacity (Kgf) n/a Up Down Area Class ExnAIICT3 Hazardous Area Zone 2G (Category 3G)

Bearing Lubrication Hazardous Area Certification Scope Electrical Equipment

Only

Special Notes Gaz Group IIB

Temperature Class T3

Hazardous Area Process Fluid Max Suct Temp 78.0 deg C Process Fluid Flash Point 0.0 deg C

REMARKS

ISO 13709 2nd EDITION / API 610 11TH EDITION GOVERNS, EXCEPT AS NOTED ON ATTACHED LIST OF EXCEPTIONS.Certificate of material conformance.Bypass orifice, 600 lb RF flange, 316 SS, sized to carry _____ m3/H at _____ meters TDH.Carbon steel 1/4 covers with gaskets for kit flanges.Carbon steel 1/4 covers with gaskets for pump flanges.Modified API Plan 13 requires a line piped from the seal housing back to the supply vessel, sized to carry 0.22-0.45 m3/H.Witnessed hydrostatic test.Vibration readings witnessed, during performance test and NPSH inspectionMechanical run test with shop electric motor, witnessed, (max. 1/2h), after formal commitment is made.Extended mechanical run test: 4 hoursCommon base plate for Pump and AccessoriesThe predicted curve is guaranteed 7% rising from the Rated Flow to the Min.Flow 15.49 m3/hr.MAWP = 40.8Kg/cm²g@120°C & Hydrotest Pressure = 61.2kg/cm²g@20°C

Form No: FO-APP-QUOT-005 (rev.0)

SUNDYNE PUMP SPECIFICATION SHEET

Applicable to Proposal Metric with Bar

Single-Stage Overhung OH6

Purchaser L&T, , INDIA Quote No. 224816-1 Rev 1 Date 18-Oct 2021 Serial No. P-21250-SA-1

Owner/User Farabi Yanbu Petrochemicals Company Job No. By Genevieve Pepin No. Required 2

Service Purge Pumps Item No 202-P-01 A/B Req Model Number LMV-311

Location , SAUDI ARABIA Unit Purchase Oder No. Inquiry No.

Page 8 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

SUNDYNE PUMP - PREDICTED PUMP PERFORMANCE DATA Date:

Quote Number: By:

Customer L&T / FARABI Item Number 202-P-01A/B na

Pump serial No. Pumped liquid Hydrocarbon Rated Point

Size and type 3 x 2 OH6 Specific Gravity 0.567 Flowrate m3/hr 44.25

No. of stages 1 Temperature 78 °C Head m 459.8

Speed, r/min 11372 Kinematic Viscosity 0.139 cP NPSHR m 6.1

Specific Speed 12.70 Suct° Specific Speed 326 m3/s,m Power kW 59.1

Pump Model LMV311 Minimum Flow 15.49 m3/hr Calculated efficiency %: 53.1

18-Oct-21

P-21250-SA Units: SI G.PEPIN

Curve No.

460

15.49 53.10

28.8 46.5

Allowable Operating Region

Preferred Operation Region

290

340

390

440

490

540

13.3 18.3 23.3 28.3 33.3 38.3 43.3 48.3 53.3

m

m3/hr

Head

59.1

30

40

50

60

70

13.3 18.3 23.3 28.3 33.3 38.3 43.3 48.3 53.3

kW

m3/hr

Power

53.1

0

10

20

30

40

50

60

13.3 18.3 23.3 28.3 33.3 38.3 43.3 48.3 53.3

(%)

m3/hr

Efficiency

6.1

5.4

5.9

6.4

6.9

7.4

13.3 18.3 23.3 28.3 33.3 38.3 43.3 48.3 53.3

m

m3/hr

NPSHR

Impeller diameterMax

As proposed

Min

137.41 mm

134.11 mm

128.07 mm

Page 10 of 50 Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Page 11 of 50 Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Sundyne Pump Quotation

To: L&T INDIA Attention:

Quotation No.: 224816-1Channel Partner Ref No.: P-21250-SAInquiry No.: Item No.: 202-P-03 A/BDate: 18-October-2021Expiration Date: 30-June-2022

Qty Description Price Each Price Total

2

UnitLMV-311 Concentric-Bowl - API Heavy Duty Pump, Flow - 63.0 m3hr, Differential Head- 262.7 meters - Build Code AProvision for Insulation Only

DriverFrom VL, 75.0 KW, 3572.0 rpm, 460V5/-5%/3Ph/60Hz+/-2.5%, 280S.

Seals and Wet-EndPump O-Ring, TR - Dupont Kalrez 6375316SS standard cylindrical InducerSuction and Discharge Flanges, 600 lbs RF, Ra 3.2-6.3 (125-250 microInch)Bypass Orifice, Single plateDischarge Orifice, Standard with tab3/4" Casing Studs and Nuts in InconelDouble Seal Assy ConfigurationLower, JohnCrane (SE04AA02..)_ Secondary Seal Lower, TA - Polytetrafluoroethyene (PTFE)_ Stationary SealFace Lower, RA - Carbon Graphite_ Mating Rings, RE - Tungsten Carbide (6-8% Cobalt Binder)_ Retainer and Srpings - 316 SSUpper Mechanical Seal JohnCrane (SE04AA05..)_ Secondary Seal Upper, TA - Polytetrafluoroethyene (PTFE)_ Stationary SealFace Upper, RA - Carbon Graphite_ Retainer and Srpings Upper - 316 SSPort-1 Basic Piping Carbon Steel, Sch160, Socket Weld Connection

General AccessoriesStandard flange height, 187mm (7.38 inch) to nozzle center linePump Case Sole plate, Machined for Supporting FrameBaseplate, API610 carbon Steel for Pump & APICasing Earthing BossBaseplate Earthing BlockAnchor bolts, Set 6 off J-shapeNameplates, 304SS, 100x50mmBaseplate 2" flanged drain connection - 150#RF without Valve

Pump Drain kitBasic Piping Carbon Steel, Sch160, Butt WeldFlange, Carbon Steel, WeldNeck, 600# RFGate Valve Carbon Steel, Flange Connection, 600# RFTwo Plan Bracing on Drain pipingDrain Piping to Skid EdgeWith Blind FlangeAdder for fugitive emission for the Gate valve

Pump Vent KitBasic Piping Carbon Steel, Sch160, Butt Weld ConnectionFlange, Carbon Steel, WeldNeck, 600# RF

Form No: FO-APP-QUOT-005 (rev.0)

Page 12 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Gate Valve Carbon Steel, Flange Connection, 600# RFTwo Plan Bracing on Vent pipingVent Piping to Skid EdgeVent Connection Size to be of 3/4" minimumAdder for fugitive emission for the Gate valve

Seal SystemAPI Plan 53BVessel is built in accordance with ASME VIII div. 1 & API 682 3rd edition20 Liters Reservoir (Sch 20) in ASTM A312 Grade TP 316/316L - Welded connectionswith flangesBladder inside reservoir in Nitrile (NBR)Time between 2 refills of reservoir is 28 daysAll connections are butt weldedDrain, Vent and Barrier fluid filling lines are in 3/4" and contain each a gate valveGas valve 1/4 inch for N2 filling on reservoirN2 charging kitAll lines are in ASTM A312 Grade TP 316/316L schedule 80Barrier fluid filling line contains a check valve and a Y-strainer (800 microm.)Barrier fluid filling option: Quick connection with check valveTrolley with hand pump for barrier fluid fillingShell & Tube heat exchanger (shell and tube in 316 SS) in accordance with ASME VIIIdiv. 1Cooling water inlet / outlet lines in 1/2" with 150# RF Flanges1 Pressure transmitter as per specifications with a coated aluminum housing for liquidbarrier controlSunshade for all instruments1 Pressure gauge ATEX certified as per specifications on outlet line for liquid barriercontrol - connection in 1/2" NPTPressure gauge & Pressure transmitter fitted with a block & bleed manifold SAMI foreach instrument1 Temperature gauge ATEX certified as per specifications with thermowell on outlet linefor liquid barrier control - connection in 1/2" NPTOutlet Line enlargement from 3/4" to 1"1/2 for installation of 1" BW Thermowell toinstall 100mm TG StemPlan 53B Barrier inlet / outlet lines in 3/4" with 600# RF FlangesAPI 53B cooler not as per TEMA C nor U stamp

Seal System interconnecting pipingButt welded piping in 316 SS with 600# RF FlangesPiping in 3/4" schedule 80

Seal Housing connections for seal systemButt welded piping in 316 SS with 600# RF FlangesPiping in 3/4" schedule 80Seal housing connection on port 2 & 7 is butt welded

Gearbox and Heat ExchangerSundyne Gearbox 200-HPGearbox mechanical seal Assy - SE04AA98ALiquid cooler - 3X9, 4Pass, Brass shell, Cast-Iron bonnet, 90Cu/10Ni tubesLube oil cooler not according to TEMA CMagnetic Drain Plug to be provided on Gearbox

Gearbox vibration and temperature monitoring2 Vibration adaptors (mechanical M8 x 1.25 mounting thread) located on the gearbox(on two perpendicular axis)

API Cooling PlansAPI Cooling Plan A connected together with the buffer cooling coil, 150lbs, CarbonSteel, RF Flanged, Socket Welded. Connections on Heat Exchanger itself areScrewed.Thermal relief valve screwed on API planTemperature Gage added on Cooling Water Line

Lube Oil Control KitStandard pressure gauge, fitted on the gearbox - as per API 610 - paragraph 9.1.3.6Standard temperature gauge, fitted on the gearbox - as per API 610 - paragraph9.1.3.6

Driver Accessories

Form No: FO-APP-QUOT-005 (rev.0)

Page 13 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Driver Adaptor for spacer coupling, IEC frame size 280SDriver Fixation Bolts, in 304 Stainless SteelNon sparking Aluminum coupling guardcoupling, NonSparking Metastream (TSKS-0075)Coupling Assembly on MotorCoupling Puller Holes

InspectionMaterial Certificate of Conformity EN10.204 type 2.1, Casing StudsMaterial Certificate of Conformity EN10.204 type 3.1, Pump Case - Seal HousingMaterial Certificate of Conformity EN10.204 type 3.1, Diffuser Insert & CoverMaterial Certificate of Conformity EN10.204 type 3.1, Shaft SleevesMaterial Certificate of Conformity EN10.204 type 3.1, Main Baseplate MaterialsMill Test Report Certificate (equivalent to EN10.204 type 3.1), Impeller & InducerMill Test Report Certificate (equivalent to EN10.204 type 3.1), High Speed ShaftMill test Report EN10.204 type 3.1, Auxiliary Process Fluid Piping (pressure containingcomponents)Material Certificate of Conformity EN10.204 type 3.1, Plan 53B Barrier system weldedpartsMaterial Certificate of Conformity EN10.204 type 3.1, Welding Consumable for Plan53B reservoirMaterial Certificate of Conformity EN10.204 type 3.1, on coupling main componentsLiquid Dye Penetrant (certified only), Auxiliary Process Fluid Piping (pressurecontaining components) for 100% of weldsLiquid Dye Penetrant (certified only), Impeller & InducerLiquid Dye Penetrant (certified only), Pump Case - Seal Housing (machined surfaces)Liquid Dye Penetrant (certified only), Main Baseplate WeldsLiquid Dye Penetrant (certified only), Plan 53B Barrier reservoir for 100% of weldsLiquid Dye Penetrant (certified only), Buffer/Quench Piping Plan for 100% of weldsRockwell Hardness test (certified only), Impeller & InducerRockwell Hardness test (certified only), Pump Case - Seal HousingRockwell Hardness test (certified only), High Speed ShaftMagnetic Particle Inspection (certified only), Pump CaseMaterial traceability, Pump wetted parts & Auxiliary Process Fluid Piping (pressurecontaining components only)Ultrasonic test (certified only), High Speed ShaftPositive Material Inspection (with carbon), Pump wetted parts - witnessedPositive Material Inspection (with carbon), Buffer/Quench Piping Plan - witnessedPositive Material Inspection scope may include following parts: Flange, Orifice, Piping(greater than or equal to 1"), Fitting (greater than or equal to 1"), Valve BodyPositive Material Inspection is only applicable on stainless steel and high alloy steelequipmentsX Ray, Buffer/Quench Piping Plan for 10% of weldsX Ray, Plan 53B Barrier reservoir for 10% of welds (1 spot on one weldment)X Ray, Auxiliary Process Fluid Piping (pressure containing components) for 10% ofweldsX Ray, Pump Case (Casting)Visual control of the welds of the Plan 53B Barrier systemCleanliness inspection on the Plan 53B Barrier system with certificateFinal Shop Inspection, Pump Dimensional & documentation review - witnessedAs per Inspection Level B3.1 Material Certificate for Mechanical Seal Retainers

TestHydrostatic Test Inspection - Witnessed all unitsHydrostatic Test Inspection on the Plan 53B Barrier system according to ASME VIII -certified onlyPerformance & NPSH Test - WitnessedOverall and Discrete frequencies (for each shaft) Vibration MeasurementMechanical Run Test, with shop motor and shop coupling - WitnessedExtended Mechanical Run Test - Witnessed, 4 hours all unitsSound Level Measurements, according ISO 9614-2 and ISO 11203 - Witnessed allunits, according ISO 9614-2 and ISO 11203Dismantling Inspection after test, wet end & gearbox - Certified OnlyMechanical Rerun, after dismantling (gearbox only)

Form No: FO-APP-QUOT-005 (rev.0)

Page 14 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Impeller and Inducer Balancing as per Sundyne procedure - Witnessed one unit onlyHigh Speed Shaft Assembly Balancing as per Sundyne procedure - Certified OnlyVibrations Measurement & FFT Spectrum (range: 5 to 1000 Hz) done at each point ofthe performance test, on X axis - Witnessed all units

Paint and StoragePump and Accessories, Do Not Paint Stainless Steel SurfacesPump and Accessories paint, High Temperature Service RAL 9006 Grey AluminiumPlan 53B Barrier reservoir will remain unpainted (pickling & passivation)Plan 53B Barrier bracket in Carbon Steel with an off-shore paintDriver paint system - Off-Shore with colour change RAL RAL7035Stand paint - Off-Shore Service with colour change RAL RALPump LongTerm Storage for Carbon Steel Unit

PackingFlange Shipping Cover plate 1/4" Carbon SteelVacuum Packing for Bare Unit without kitsDriver Vacuum PackingPump packing - Sundyne standard export box made of plywood 10mm thicknessDriver packing, Sundyne standard export box made of plywood 10mm thickness

DocumentationQuality Control PlanInstallation Operating & Maintenance, (customer specification), Master Book (baseprice)Installation Operating & Maintenance per customer specification, adder for API BufferAPI52/53Installation Operating & Maintenance per customer specification, adder for Main Driver1 final copies of customized IOMCertification Dossier, (customer specification), Master Book (base price)Certification Dossier per customer specification, adder for API BufferCertification Dossier per customer specification, adder for Main DriverOne copy of customized Certification Dossier submitted for approval1 final copies of Certification Dossier per Customer specificationCertification Dossier, (customer specification), Submital of Sundyne ProceduresGeneral Arrangement drawing - Autocad format DXFCross Section drawing - Autocad format DXFP&ID - Autocad format DXFWelding Map - Autocad format DXFHook Up - PDF formatFinal Documentation on CD-ROM per Customer specificationFinal Documentation on CD-ROM per Customer specification, adder for API BufferFinal Documentation on CD-ROM per Customer specification, adder for Main Driver1 copie of final Documentation on CD-ROMSpare Parts Interchangeability Record SPIR - Excel FormWelding book for the Plan 53B Barrier system with: welder qualification, weldingprocedure and welding process qualification according to ASME IX

CertificationATEX Certification, per directive 2014/34/UE for Zone 2U-Stamp certificate for Plan 53B Barrier ReservoirCoupling ATEX Certified & Marked for Zone2

WarrantyExtended Sundyne warranty. 12 Months from Start-Up - 40 Months from Shipment

BUDGET ESTIMATE

Unit and Driver Total

46 weeks ex-factory from receipt of PO In light of the Covid-19 situation, which is beyond our control, any delivery dates are simply estimates.Sundyne is not in a position to confirm delivery time, but is doing its best to mitigate the effects whilefollowing local, national and international guidelines and mandates. It shall be reassessed and agreed attime of Purchase Order issuance.

Form No: FO-APP-QUOT-005 (rev.0)

Page 15 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

This quotation is subject to the Terms and Conditions of Sale enclosed within. This quotation is valid if accepted by Sundyne within 90 days fromthe date hereof. This Quotation and any subsequent Purchase Order acceptance is subject to French, European and US Laws and regulations governing thecontrol of exports. Any changes to those laws or regulations, preventing Sundyne International S.A. from honoring its commitments under thisquotation or Purchase Order, will be considered as a Force Majeure because such changes are beyond any party's control and could not havebeen reasonably foreseen. This expressly includes changes to trade and export compliance laws and regulations.

Payment Terms: to be reviewed in due date Sundyne France INCO Terms: FCA Longvic Factory (Non-Containerized)

Genevieve Pepin Applications Engineer Phone: +33 3 80 38 33 32 Email: [email protected]

Form No: FO-APP-QUOT-005 (rev.0)

Page 16 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

OPERATING CONDITIONS

Liquid Aromatic Hydrocarbon Capacity(m3/hr) Norm 45.9 Rated 63.0

Suct Temp (C) 133.0 Max 133.0 Disch.Press (kgf/cm2) 23.80

[email protected] 0.748 Suct.Press (kgf/cm2) Max 6.22 Rated 4.15

[email protected] (kgf/cm2-a) 3.9 Diff.Press(kgf/cm2) 19.65 Diff.Head (m) 262.7

[email protected] (cp.) Norm 0.22 Max NPSHA (m) 16.6

Spec.Heat (kj/kg K) 2.14 Corr./Eros. caused by 91.0907wt% Benzene

CONSTRUCTION

Casing Mounting Vertical-Inline Casing Split Radial Inducer Type Cylindrical - 02

Diffuser Double Throat Diff.Dia (mm) 14.7 Style Dual Log-Spiral Impeller Type Open

Mechanical Seal Type Dual Pressurized

Seal Part No. Upper SE04AA05A Primary SE04AA02A Imp.Dia (mm) Rated 149.4

API Seal Code Upper none Primary Max 152.4

Api Flush Plans Barrier Plan 53B Min 127

Nozzle

CONNECTIONS

Size

ANSI

Rating

ANSI

Facing

ANSI

Finish

micronM

Position

Suction 3 in 600 lbs RF 3.2-6.3 Side

Discharge 2 in 600 lbs RF 3.2-6.3 Side

Pressure Casing

CONNECTIONS

Size

ANSI

Rating

ANSI

Facing

ANSI

Finish

micronM

Connection Type Valve

Drain 1" 600 lbs RF 3.2-6.3 Butt Weld / Flanged PN100

Vent 1/2" 600 lbs RF 3.2-6.3 Butt Weld / Flanged PN100

MATERIALS

Minimum Design Metal Temperature: 10.0 (deg C)

Sundyne Pump Build Code A Seal Rotat.Face Tungsten Carbide - Cobalt

Case/Seal Hsg

ASTM A216 gd WCB / ASTM A350 LF2

Seal Secondary PTFE

Diffuser ASTM A350 LF2 Studs ASTM 1014

Impeller 316SS Inducer 316SS

Shaft 4140 Steel Shaft Sleeves 316SS

Seal Metal Parts 316SS/316SS Pump O-Rings Dupont Kalrez 6375

GEARBOX X Yes No BEARING BOX Yes X No

Gear Ratio 2.317 Lubrication Pressurized Oil-Filtered

Heat Exchanger Liquid Cooler Cooling Load (kW) 2.23

Type 3x9, Brass Shell & 90Cu/10Ni Tubes, 4 pass

RATED PERFORMANCE

NPSHR, Water @ rated capacity (m) 3.74 Stages 1 RPM 8275

Rated Power (kW) 64.0 Rated Pump Efficiency (%) 54.8

Max Power Rated Imp. (kW) 74.8 Max Head Rated Imp. (m) 342.55

Minimum Continuous Stable Flow (m3/hr) 36.66

with control valve within 3.048 (m) of pump discharge

Motor Rotation (viewed from top of motor) CCW

Specific Speed 16.3 rpm.m3/s.m Suction Specific Speed 407.1

Seal Cavity Press (kgf/cm2) Rated 5.94 Max 10.38

Typical noise level (db) 85.0 @ 1.0 (m)(Pump only)

AUXILIARY PIPING REQUIREMENTS

Gearbox Cooling Water Piping Supplied by Sundyne

Seal Flush Cooling Water Piping N/A

Seal Buffer/Barrier Cooling Water Piping Supplied by Sundyne

Buffer/Barrier Interconnecting Piping Supplied by Sundyne

Cooling Water Requirements (m3/hr) @ 36.0 (C)

Gearbox heat exchanger 2.5

Seal Flush 0.0

Seal Buffer/Barrier 0.0

Total 2.50

TEST REQUIREMENTS

Shop Test Wit Certified Obs

Hydrostatic Yes No No

Performance Yes No No

NPSH Yes No No

Dismantle/Inspect No Yes No

Surface Inspect Yes No No

Extended Mechanical Text (4H) Yes No No

Sound Level Test Yes No No

WEIGHT (kg)

Pump & Gearbox 345 Driver 0

Base/Stand 0 Auxiliaries 0 TOTAL 345

TURBINE DRIVE by Sundyne Yes X No

Rating RPM Qty

Mfr

Steam Press (kgf/cm2) Inlet Outlet

Steam Temp (C) Inlet Outlet

Steam Rate (*)

Shaft Type

Coupling Mfr/Type

Form No: FO-APP-QUOT-005 (rev.0)

SUNDYNE PUMP SPECIFICATION SHEET

Applicable to Proposal Metric with Bar

Single-Stage Overhung OH6

Purchaser L&T, , INDIA Quote No. 224816-1 Rev 1 Date 18-Oct 2021 Serial No. P-21250-SA-2

Owner/User Farabi Yanbu Petrochemicals Company Job No. By Genevieve Pepin No. Required 2

Service PEP Column Sidedraw Pumps Item No 202-P-03 A/B Req Model Number LMV-311

Location , SAUDI ARABIA Unit Purchase Oder No. Inquiry No.

Page 17 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

MOTOR DRIVE by Sundyne X Yes No SITE CONDITIONS

Rating 75.0 KW RPM 3572 Volts/Phase/Hertz

460V5/-5%/3Ph/60Hz

+/-2.5% Qty 2

Ambient Temperature (C) Min. 10.0 Max. 42.0

Mfr From VL S.F. 1 Frame 280S Relative Humidity (%) Min. Max. 100 F.L. Amps L.R. Amps Insulation F use B Enclosure IP55 Site elevtion above 1000 meters (3280 feet) false

Shaft Type Coupling Coupling Mfr/Type Metastream TSKS - TSKS-0075 Hazadous Area Certification IECEx

Thrust Capacity (Kgf) n/a Up Down Area Class ExnAIICT3 Hazardous Area Zone 2G (Category 3G)

Bearing Lubrication Hazardous Area Certification Scope Electrical Equipment

Only

Special Notes Area classification : Zone-2, Gas Group IIA/IIB, Temperature class T3 Gaz Group IIB

Temperature Class T3

Hazardous Area Process Fluid Max Suct Temp 133.0 deg C Process Fluid Flash Point deg C

REMARKS

ISO 13709 2nd EDITION / API 610 11TH EDITION GOVERNS, EXCEPT AS NOTED ON ATTACHED LIST OF EXCEPTIONS.Certificate of material conformance.Bypass orifice, NPT, 316 SS, sized to carry _____ m3/H at _____ meters TDH.The rated pump efficiency shown above excludes the effect of the discharge orifice.Inclusion of the orifice reduces the effective efficiency to 52.7 %.Pump gross head before orifice 273.3 metersDischarge orifice plate, Plate 316 SS w/handle (RF).Carbon steel 1/4 covers with gaskets for kit flanges.Carbon steel 1/4 covers with gaskets for pump flanges.Dual pressurized (double) seal arrangement - A product compatible barrier fluid must be supplied by customer.Maximum nitrogen pressure (N2 precharge) shall be 90% of low alarm barrier fluid pressure: 0.9*(Max seal cavity pressure + 2.04) kg/cm2g at ambient temperature (to be completed after performance test).Maximum barrier fluid pressure for precharge shall not exceed 4 times nitrogen pressure (N2 precharge).Witnessed hydrostatic test.Vibration readings witnessed, during performance test and NPSH inspectionMechanical run test with shop electric motor, witnessed, (max. 1/2h), after formal commitment is made.Extended mechanical run test: 4 hoursCommon base plate for Pump and AccessoriesThe predicted curve is guaranteed 7% rising from the Rated Flow to the Min.Flow 36.66 m3/hr.MAWP = 40.8Kg/cm²g@330°C & Hydrotest Pressure = 67.1Kg/cm²g@20°C Max Design Temperature acceptable for quote O-Rings is 275°C

Form No: FO-APP-QUOT-005 (rev.0)

SUNDYNE PUMP SPECIFICATION SHEET

Applicable to Proposal Metric with Bar

Single-Stage Overhung OH6

Purchaser L&T, , INDIA Quote No. 224816-1 Rev 1 Date 18-Oct 2021 Serial No. P-21250-SA-2

Owner/User Farabi Yanbu Petrochemicals Company Job No. By Genevieve Pepin No. Required 2

Service PEP Column Sidedraw Pumps Item No 202-P-03 A/B Req Model Number LMV-311

Location , SAUDI ARABIA Unit Purchase Oder No. Inquiry No.

Page 18 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

SUNDYNE PUMP - PREDICTED PUMP PERFORMANCE DATA Date:

Quote Number: By:

Customer L&T / FARABI Item Number 202-P-03A/B na

Pump serial No. Pumped liquid Aromatic Hydrocarbon Rated Point

Size and type 3 x 2 OH6 Specific Gravity 0.748 Flowrate m3/hr 63.00

No. of stages 1 Temperature 133 °C Head m 262.7

Speed, r/min 8275 Kinematic Viscosity 0.215 cP NPSHR m 3.7

Specific Speed 16.78 Suct° Specific Speed 407 m3/s,m Power kW 64.0

Pump Model LMV311 Minimum Flow 36.66 m3/hr Calculated efficiency %: 52.6

Curve No.

18-Oct-21

P-21250-SA Units: SI G.PEPIN

263

36.66 75.6041.0 66.2

Allowable Operating RegionPreferred Operation Region

112

162

212

262

312

362

28.1 38.1 48.1 58.1 68.1 78.1

m

m3/hr

Head

64.0

22

32

42

52

62

72

82

28.1 38.1 48.1 58.1 68.1 78.1

kW

m3/hr

Power

52.6

0

10

20

30

40

50

60

28.1 38.1 48.1 58.1 68.1 78.1

(%)

m3/hr

Efficiency

3.7

2.4

2.9

3.4

3.9

4.4

4.9

28.1 38.1 48.1 58.1 68.1 78.1

m

m3/hr

NPSHR

Impeller diameterMax

As proposed

Min

152.40 mm

149.35 mm

127.00 mm

Page 20 of 50 Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Page 21 of 50 Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Sundyne Pump Quotation

To: L&T INDIA Attention:

Quotation No.: 224816-1Channel Partner Ref No.: P-21250-SAInquiry No.: Item No.: 203-P-01 A/BDate: 18-October-2021Expiration Date: 30-June-2022

Qty Description Price Each Price Total

2

UnitLMV-331N Concentric-Bowl - API Heavy Duty Pump, Flow - 66.0 m3hr, DifferentialHead - 431.0 meters - Build Code AProvision for Insulation OnlyNoise Blanket provided to meet the noise requirement of 85dBA for the proposed sckid

DriverFrom VL, 160.0 KW, 3578.0 rpm, 460V5/-5%/3Ph/60Hz+/-2.5%, 315M.

Seals and Wet-EndPump O-Ring, TR - Dupont Kalrez 6375316SS standard cylindrical InducerSuction and Discharge Flanges, 600 lbs RF, Ra 3.2-6.3 (125-250 microInch)Bypass Orifice, Multiple Flanged 1/2" 600RFDischarge Orifice, Standard with tab7/8" Casing Studs and Nuts in Carbon SteelDouble Seal Assy ConfigurationLower, JohnCrane (SE04AA02..)_ Secondary Seal Lower, TA - Polytetrafluoroethyene (PTFE)_ Stationary SealFace Lower, RA - Carbon Graphite_ Mating Rings, RE - Tungsten Carbide (6-8% Cobalt Binder)_ Retainer and Srpings - 316 SSUpper Mechanical Seal JohnCrane (SE04AA05..)_ Secondary Seal Upper, TA - Polytetrafluoroethyene (PTFE)_ Stationary SealFace Upper, RA - Carbon Graphite_ Retainer and Srpings Upper - 316 SSPort-1 Basic Piping Carbon Steel, Sch160, Socket Weld Connection

General AccessoriesStandard flange height, 187mm (7.38 inch) to nozzle center linePump Case Sole plate, Machined for Supporting FrameBaseplate, API610 carbon Steel for Pump & APICasing Earthing BossBaseplate Earthing BlockAnchor bolts, Set 6 off J-shapeNameplates, 304SS, 100x50mmBaseplate 2" flanged drain connection - 150#RF without Valve

Pump Drain kitBasic Piping Carbon Steel, Sch160, Butt WeldFlange, Carbon Steel, WeldNeck, 600# RFGate Valve Carbon Steel, Flange Connection, 600# RFTwo Plan Bracing on Drain pipingDrain Piping to Skid EdgeWith Blind FlangeAdder for fugitive emission for the Gate valve

Pump Vent KitBasic Piping Carbon Steel, Sch160, Butt Weld Connection

Form No: FO-APP-QUOT-005 (rev.0)

Page 22 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Flange, Carbon Steel, WeldNeck, 600# RFGate Valve Carbon Steel, Flange Connection, 600# RFTwo Plan Bracing on Vent pipingVent Piping to Skid EdgeVent Connection Size to be of 3/4" minimumAdder for fugitive emission for the Gate valve

Seal SystemAPI Plan 53BVessel is built in accordance with ASME VIII div. 1 & API 682 3rd edition20 Liters Reservoir (Sch 20) in ASTM A312 Grade TP 316/316L - Welded connectionswith flangesBladder inside reservoir in Nitrile (NBR)Time between 2 refills of reservoir is 28 daysAll connections are butt weldedDrain, Vent and Barrier fluid filling lines are in 3/4" and contain each a gate valveGas valve 1/4 inch for N2 filling on reservoirN2 charging kitAll lines are in ASTM A312 Grade TP 316/316L schedule 80Barrier fluid filling line contains a check valve and a Y-strainer (800 microm.)Barrier fluid filling option: Quick connection with check valveTrolley with hand pump for barrier fluid fillingShell & Tube heat exchanger (shell in carbon steel / tube in 316 SS) in accordance withASME VIII div. 1Cooling water inlet / outlet lines in 1/2" with 150# RF Flanges1 Pressure transmitter as per specifications with a coated aluminum housing for liquidbarrier controlSunshade for all instruments1 Pressure gauge ATEX certified as per specifications on outlet line for liquid barriercontrol - connection in 1/2" NPTPressure gauge & Pressure transmitter fitted with a block & bleed manifold SAMI foreach instrument1 Temperature gauge ATEX certified as per specifications with thermowell on outlet linefor liquid barrier control - connection in 1/2" NPTOutlet Line enlargement from 3/4" to 1"1/2 for installation of 1" BW Thermowell toinstall 100mm TG StemPlan 53B Barrier inlet / outlet lines in 3/4" with 600# RF FlangesAPI53B cooler not U-stamp, not Tema C

Seal System interconnecting pipingButt welded piping in 316 SS with 600# RF FlangesPiping in 3/4" schedule 80

Seal Housing connections for seal systemButt welded piping in 316 SS with 600# RF FlangesPiping in 3/4" schedule 80Seal housing connection on port 2 & 7 is butt welded

Gearbox and Heat ExchangerSundyne Gearbox 400-HPGearbox mechanical seal Assy - SE04AA98ALiquid cooler - 3X18, 4Pass, Brass shell, Cast-Iron bonnet, 90Cu/10Ni tubesLube oil cooler not according to TEMA CMagnetic Drain Plug to be provided on Gearbox

Gearbox vibration and temperature monitoring2 Vibration adaptors (mechanical M8 x 1.25 mounting thread) located on the gearbox(on two perpendicular axis)

API Cooling PlansAPI Cooling Plan A connected together with the buffer cooling coil, 150lbs, CarbonSteel, RF Flanged, Socket Welded. Connections on Heat Exchanger itself areScrewed.Thermal relief valve screwed on API planTemperature Gage added on Cooling Water Line

Lube Oil Control KitStandard pressure gauge, fitted on the gearbox - as per API 610 - paragraph 9.1.3.6Standard temperature gauge, fitted on the gearbox - as per API 610 - paragraph9.1.3.6

Form No: FO-APP-QUOT-005 (rev.0)

Page 23 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Driver AccessoriesDriver Adaptor for spacer coupling, IEC frame size 315MDriver Fixation Bolts, in 304 Stainless SteelNon sparking Aluminum coupling guardcoupling, NonSparking Metastream (TSKS-0135)Coupling Assembly on MotorCoupling Puller Holes

InspectionMaterial Certificate of Conformity EN10.204 type 3.1, Pump Case - Seal HousingMaterial Certificate of Conformity EN10.204 type 3.1, Casing StudsMaterial Certificate of Conformity EN10.204 type 3.1, Diffuser Insert & CoverMaterial Certificate of Conformity EN10.204 type 3.1, Shaft SleevesMaterial Certificate of Conformity EN10.204 type 3.1, Main Baseplate MaterialsMill Test Report Certificate (equivalent to EN10.204 type 3.1), Impeller & InducerMill Test Report Certificate (equivalent to EN10.204 type 3.1), High Speed ShaftMill test Report EN10.204 type 3.1, Auxiliary Process Fluid Piping (pressure containingcomponents)Material Certificate of Conformity EN10.204 type 3.1, Plan 53B Barrier system weldedpartsMaterial Certificate of Conformity EN10.204 type 3.1, Welding Consumable for Plan53B reservoirMaterial Certificate of Conformity EN10.204 type 3.1, on coupling main componentsLiquid Dye Penetrant (certified only), Auxiliary Process Fluid Piping (pressurecontaining components) for 100% of weldsLiquid Dye Penetrant (certified only), Impeller & InducerLiquid Dye Penetrant (certified only), Pump Case - Seal Housing (machined surfaces)Liquid Dye Penetrant (certified only), Main Baseplate WeldsLiquid Dye Penetrant (certified only), Plan 53B Barrier reservoir for 100% of weldsLiquid Dye Penetrant (certified only), Buffer/Quench Piping Plan for 100% of weldsRockwell Hardness test (certified only), Impeller & InducerRockwell Hardness test (certified only), Pump Case - Seal HousingRockwell Hardness test (certified only), High Speed ShaftMagnetic Particle Inspection (certified only), Pump CaseMaterial traceability, Pump wetted parts & Auxiliary Process Fluid Piping (pressurecontaining components only)Ultrasonic test (certified only), High Speed ShaftPositive Material Inspection (with carbon), Pump wetted parts - witnessedPositive Material Inspection (with carbon), Buffer/Quench Piping Plan - witnessedPositive Material Inspection scope may include following parts: Flange, Orifice, Piping(greater than or equal to 1"), Fitting (greater than or equal to 1"), Valve BodyPositive Material Inspection is only applicable on stainless steel and high alloy steelequipmentsX Ray, Buffer/Quench Piping Plan for 10% of weldsX Ray, Plan 53B Barrier reservoir for 10% of welds (1 spot on one weldment)X Ray, Auxiliary Process Fluid Piping (pressure containing components) for 10% ofweldsX Ray, Pump Case (Casting)Visual control of the welds of the Plan 53B Barrier systemCleanliness inspection on the Plan 53B Barrier system with certificateFinal Shop Inspection, Pump Dimensional & documentation review - witnessedAs per Inspection Level A3.1 Material Certificate for Mechanical Seal Retainers

TestHydrostatic Test Inspection - Witnessed all unitsHydrostatic Test Inspection on the Plan 53B Barrier system according to ASME VIII -certified onlyPerformance & NPSH Test - WitnessedOverall and Discrete frequencies (for each shaft) Vibration MeasurementMechanical Run Test, with shop motor and shop coupling - WitnessedExtended Mechanical Run Test - Witnessed, 4 hours all unitsSound Level Measurements, according ISO 9614-2 and ISO 11203 - Witnessed allunits, according ISO 9614-2 and ISO 11203Dismantling Inspection after test, wet end & gearbox - Witnessed all units

Form No: FO-APP-QUOT-005 (rev.0)

Page 24 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Mechanical Rerun, after dismantling (gearbox only)Impeller and Inducer Balancing as per Sundyne procedure - Witnessed all unitsHigh Speed Shaft Assembly Balancing as per Sundyne procedure - Certified OnlyVibrations Measurement & FFT Spectrum (range: 5 to 1000 Hz) done at each point ofthe performance test, on X axis - Witnessed all units

Paint and StoragePump and Accessories, Do Not Paint Stainless Steel SurfacesPump and Accessories paint, Off-Shore Service RAL 7004 GreyPlan 53B Barrier reservoir will remain unpainted (pickling & passivation)Plan 53B Barrier bracket in Carbon Steel with an off-shore paintDriver paint system - Off-Shore with colour change RAL RAL7035Stand paint - Off-Shore Service with colour change RAL RALPump LongTerm Storage for Carbon Steel Unit

PackingFlange Shipping Cover plate 1/4" Carbon SteelVacuum Packing for Bare Unit without kitsDriver Vacuum PackingPump packing - Sundyne standard export box made of plywood 10mm thicknessDriver packing, Sundyne standard export box made of plywood 10mm thickness

DocumentationQuality Control PlanInstallation Operating & Maintenance, (customer specification), Master Book (baseprice)Installation Operating & Maintenance per customer specification, adder for API BufferAPI52/53Installation Operating & Maintenance per customer specification, adder for Main Driver1 final copies of customized IOMCertification Dossier, (customer specification), Master Book (base price)Certification Dossier per customer specification, adder for API BufferCertification Dossier per customer specification, adder for Main DriverOne copy of customized Certification Dossier submitted for approval1 final copies of Certification Dossier per Customer specificationCertification Dossier, (customer specification), Submital of Sundyne ProceduresGeneral Arrangement drawing - Autocad format DXFCross Section drawing - Autocad format DXFP&ID - Autocad format DXFWelding Map - Autocad format DXFHook Up - PDF formatFinal Documentation on CD-ROM per Customer specificationFinal Documentation on CD-ROM per Customer specification, adder for API BufferFinal Documentation on CD-ROM per Customer specification, adder for Main Driver1 copie of final Documentation on CD-ROMSpare Parts Interchangeability Record SPIR - Excel FormWelding book for the Plan 53B Barrier system with: welder qualification, weldingprocedure and welding process qualification according to ASME IX

CertificationATEX Certification, per directive 2014/34/UE for Zone 2U-Stamp certificate for Plan 53B Barrier ReservoirCoupling ATEX Certified & Marked for Zone2

WarrantyExtended Sundyne warranty. 12 Months from Start-Up - 40 Months from Shipment

BUDGET ESTIMATE

Unit and Driver Total

46 weeks ex-factory from receipt of PO In light of the Covid-19 situation, which is beyond our control, any delivery dates are simply estimates.Sundyne is not in a position to confirm delivery time, but is doing its best to mitigate the effects whilefollowing local, national and international guidelines and mandates. It shall be reassessed and agreed attime of Purchase Order issuance.

Form No: FO-APP-QUOT-005 (rev.0)

Page 25 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

This quotation is subject to the Terms and Conditions of Sale enclosed within. This quotation is valid if accepted by Sundyne within 90 days fromthe date hereof. This Quotation and any subsequent Purchase Order acceptance is subject to French, European and US Laws and regulations governing thecontrol of exports. Any changes to those laws or regulations, preventing Sundyne International S.A. from honoring its commitments under thisquotation or Purchase Order, will be considered as a Force Majeure because such changes are beyond any party's control and could not havebeen reasonably foreseen. This expressly includes changes to trade and export compliance laws and regulations.

Payment Terms: to be reviewed in due date Sundyne France INCO Terms: FCA Longvic Factory (Non-Containerized)

Genevieve Pepin Applications Engineer Phone: +33 3 80 38 33 32 Email: [email protected]

Form No: FO-APP-QUOT-005 (rev.0)

Page 26 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

OPERATING CONDITIONS

Liquid Aromatic Hydrocarbon Capacity(m3/hr) Norm 48.0 Rated 66.0

Suct Temp (C) 106.0 Max 106.0 Disch.Press (kgf/cm2) 38.22

[email protected] 0.789 Suct.Press (kgf/cm2) Max 6.75 Rated 4.22

[email protected] (kgf/cm2-a) 2.13 Diff.Press(kgf/cm2) 34.0 Diff.Head (m) 431.0

[email protected] (cp.) Norm 0.26 Max NPSHA (m) 38.6

Spec.Heat (kj/kg K) 1.97 Corr./Eros. caused by 99.76 wt% Benzene

CONSTRUCTION

Casing Mounting Vertical-Inline Casing Split Radial Inducer Type Cylindrical - 03 - 01

Diffuser Double Throat Diff.Dia (mm) 13.5 Style Dual Log-Spiral Impeller Type Open

Mechanical Seal Type Dual Pressurized

Seal Part No. Upper SE04AA05A Primary SE04AA02A Imp.Dia (mm) Rated 150.4

API Seal Code Upper none Primary Max 152.4

Api Flush Plans Barrier Plan 53B Min 127

Nozzle

CONNECTIONS

Size

ANSI

Rating

ANSI

Facing

ANSI

Finish

micronM

Position

Suction 3 in 600 lbs RF 3.2-6.3 Side

Discharge 2 in 600 lbs RF 3.2-6.3 Side

Pressure Casing

CONNECTIONS

Size

ANSI

Rating

ANSI

Facing

ANSI

Finish

micronM

Connection Type Valve

Drain 1" 600 lbs RF 3.2-6.3 Butt Weld / Flanged PN100

Vent 1/2" 600 lbs RF 3.2-6.3 Butt Weld / Flanged PN100

MATERIALS

Minimum Design Metal Temperature: 10.0 (deg C)

Sundyne Pump Build Code A Seal Rotat.Face Tungsten Carbide - Cobalt

Case/Seal Hsg

ASTM A216 gd WCB / ASTM A350 LF2

Seal Secondary PTFE

Diffuser ASTM A350 LF2 Studs ASTM A193-B7

Impeller 316SS Inducer 316SS

Shaft 4140 Steel Shaft Sleeves 316SS

Seal Metal Parts 316SS/316SS Pump O-Rings Dupont Kalrez 6375

GEARBOX X Yes No BEARING BOX Yes X No

Gear Ratio 2.8769 Lubrication Pressurized Oil-Filtered

Heat Exchanger Liquid Cooler Cooling Load (kW) 5.946

Type 5x18, Brass Shell & 90Cu/10Ni Tubes, 4 pass

RATED PERFORMANCE

NPSHR, Water @ rated capacity (m) 4.64 Stages 1 RPM 10295

Rated Power (kW) 114.9 Rated Pump Efficiency (%) 55.3

Max Power Rated Imp. (kW) 133.0 Max Head Rated Imp. (m) 540.01

Minimum Continuous Stable Flow (m3/hr) 42.53

with control valve within 3.048 (m) of pump discharge

Motor Rotation (viewed from top of motor) CCW

Specific Speed 14.3 rpm.m3/s.m Suction Specific Speed 440.9

Seal Cavity Press (kgf/cm2) Rated 6.95 Max 12.97

Typical noise level (db) 85.0 @ 1.0 (m)(Pump only)

AUXILIARY PIPING REQUIREMENTS

Gearbox Cooling Water Piping Supplied by Sundyne

Seal Flush Cooling Water Piping N/A

Seal Buffer/Barrier Cooling Water Piping Supplied by Sundyne

Buffer/Barrier Interconnecting Piping Supplied by Sundyne

Cooling Water Requirements (m3/hr) @ 36.0 (C)

Gearbox heat exchanger 2.5

Seal Flush 0.0

Seal Buffer/Barrier 0.0

Total 2.50

TEST REQUIREMENTS

Shop Test Wit Certified Obs

Hydrostatic Yes No No

Performance Yes No No

NPSH Yes No No

Dismantle/Inspect Yes No No

Surface Inspect Yes No No

Extended Mechanical Text (4H) Yes No No

Sound Level Test Yes No No

WEIGHT (kg)

Pump & Gearbox 358 Driver 0

Base/Stand 0 Auxiliaries 0 TOTAL 358

TURBINE DRIVE by Sundyne Yes X No

Rating RPM Qty

Mfr

Steam Press (kgf/cm2) Inlet Outlet

Steam Temp (C) Inlet Outlet

Steam Rate (*)

Shaft Type

Coupling Mfr/Type

Form No: FO-APP-QUOT-005 (rev.0)

SUNDYNE PUMP SPECIFICATION SHEET

Applicable to Proposal Metric with Bar

Single-Stage Overhung OH6

Purchaser L&T, , INDIA Quote No. 224816-1 Rev 1 Date 18-Oct 2021 Serial No. P-21250-SA-3

Owner/User Farabi Yanbu Petrochemicals Company Job No. By Genevieve Pepin No. Required 2

Service Regenerant Pumps Item No 203-P-01 A/B Req Model Number LMV-331N

Location , SAUDI ARABIA Unit Purchase Oder No. Inquiry No.

Page 27 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

MOTOR DRIVE by Sundyne X Yes No SITE CONDITIONS

Rating 160.0 KW RPM 3578 Volts/Phase/Hertz

460V5/-5%/3Ph/60Hz

+/-2.5% Qty 2

Ambient Temperature (C) Min. 10.0 Max. 42.0

Mfr From VL S.F. 1 Frame 315M Relative Humidity (%) Min. Max. 100 F.L. Amps L.R. Amps Insulation F use B Enclosure IP55 Site elevtion above 1000 meters (3280 feet) false

Shaft Type Coupling Coupling Mfr/Type Metastream TSKS - TSKS-0135 Hazadous Area Certification IECEx

Thrust Capacity (Kgf) n/a Up Down Area Class ExnAIICT3 Hazardous Area Zone 2G (Category 3G)

Bearing Lubrication Hazardous Area Certification Scope Electrical Equipment

Only

Special Notes Area classification : Zone-2, Gas Group IIA/IIB, Temperature class T3 Gaz Group IIB

Temperature Class T3

Hazardous Area Process Fluid Max Suct Temp 106.0 deg C Process Fluid Flash Point 0.0 deg C

REMARKS

ISO 13709 2nd EDITION / API 610 11TH EDITION GOVERNS, EXCEPT AS NOTED ON ATTACHED LIST OF EXCEPTIONS.Certificate of material conformance.Bypass orifice, 600 lb RF flange, 316 SS, sized to carry _____ m3/H at _____ meters TDH.The rated pump efficiency shown above excludes the effect of the discharge orifice.Inclusion of the orifice reduces the effective efficiency to 53.2 %.Pump gross head before orifice 448.3 metersDischarge orifice plate, Plate 316 SS w/handle (RF).Carbon steel 1/4 covers with gaskets for kit flanges.Carbon steel 1/4 covers with gaskets for pump flanges.Dual pressurized (double) seal arrangement - A product compatible barrier fluid must be supplied by customer.Maximum nitrogen pressure (N2 precharge) shall be 90% of low alarm barrier fluid pressure: 0.9*(Max seal cavity pressure + 2.04) kg/cm2g at ambient temperature (to be completed after performance test).Maximum barrier fluid pressure for precharge shall not exceed 4 times nitrogen pressure (N2 precharge).Witnessed hydrostatic test.Vibration readings witnessed, during performance test and NPSH inspectionMechanical run test with shop electric motor, witnessed, (max. 1/2h), after formal commitment is made.Extended mechanical run test: 4 hoursCommon base plate for Pump and AccessoriesThe predicted curve is guaranteed 7% rising from the Rated Flow to the Min.Flow 42.53 m3/hr.MAWP = 54.7kg/cm²g@140°C & Hydrotest Pressure = 82.1kg/cm²g@20°C

Form No: FO-APP-QUOT-005 (rev.0)

SUNDYNE PUMP SPECIFICATION SHEET

Applicable to Proposal Metric with Bar

Single-Stage Overhung OH6

Purchaser L&T, , INDIA Quote No. 224816-1 Rev 1 Date 18-Oct 2021 Serial No. P-21250-SA-3

Owner/User Farabi Yanbu Petrochemicals Company Job No. By Genevieve Pepin No. Required 2

Service Regenerant Pumps Item No 203-P-01 A/B Req Model Number LMV-331N

Location , SAUDI ARABIA Unit Purchase Oder No. Inquiry No.

Page 28 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

SUNDYNE PUMP - PREDICTED PUMP PERFORMANCE DATA Date:

Quote Number: By:

Customer L&T / FARABI Item Number 203-P-01A/B na

Pump serial No. Pumped liquid Aromatic Hydrocarbon Rated Point

Size and type 3 x 2 OH6 Specific Gravity 0.789 Flowrate m3/hr 66.00

No. of stages 1 Temperature 106 °C Head m 431.0

Speed, r/min 10281 Kinematic Viscosity 0.255 cP NPSHR m 4.6

Specific Speed 14.72 Suct° Specific Speed 441 m3/s,m Power kW 114.9

Pump Model LMV331N Minimum Flow 42.07 m3/hr Calculated efficiency %: 53.1

18-Oct-21

P-21250-SA Units: SI G.PEPIN

Curve No.

431

42.07 79.2042.9 69.3

Allowable Operating RegionPreferred Operation Region

204

254

304

354

404

454

504

554

31.9 41.9 51.9 61.9 71.9 81.9

m

m3/hr

Head

11…

42

62

82

102

122

142

31.9 41.9 51.9 61.9 71.9 81.9

kW

m3/hr

Power

53.1

0

10

20

30

40

50

60

31.9 41.9 51.9 61.9 71.9 81.9

(%)

m3/hr

Efficiency

4.6

3.3

3.8

4.3

4.8

5.3

5.8

6.3

31.9 41.9 51.9 61.9 71.9 81.9

m

m3/hr

NPSHR

Impeller diameterMax

As proposed

Min

152.40 mm

150.88 mm

127.00 mm

Page 30 of 50 Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Page 31 of 50 Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Sundyne Pump Quotation

To: L&T INDIA Attention:

Quotation No.: 224816-1Channel Partner Ref No.: P-21250-SAInquiry No.: Item No.: 203-P-02 A/BDate: 18-October-2021Expiration Date: 30-June-2022

Qty Description Price Each Price Total

2

UnitLMV-311 Concentric-Bowl - API Heavy Duty Pump, Flow - 63.0 m3hr, Differential Head- 315.7 meters - Build Code AProvision for Insulation OnlyNoise Blanket provided to meet the noise requirement of 85dBA for the proposed sckid

DriverFrom VL, 110.0 KW, 3580.0 rpm, 460V5/-5%/3Ph/60Hz+/-2.5%, 315S.

Seals and Wet-EndPump O-Ring, TR - Dupont Kalrez 6375316SS standard cylindrical InducerSuction and Discharge Flanges, 600 lbs RF, Ra 3.2-6.3 (125-250 microInch)Bypass Orifice, Multiple Flanged 1/2" 600RFDischarge Orifice, Standard with tab3/4" Casing Studs and Nuts in InconelDouble Seal Assy ConfigurationLower, JohnCrane (SE04AA02..)_ Secondary Seal Lower, TA - Polytetrafluoroethyene (PTFE)_ Stationary SealFace Lower, RA - Carbon Graphite_ Mating Rings, RE - Tungsten Carbide (6-8% Cobalt Binder)_ Retainer and Srpings - 316 SSUpper Mechanical Seal JohnCrane (SE04AA05..)_ Secondary Seal Upper, TA - Polytetrafluoroethyene (PTFE)_ Stationary SealFace Upper, RA - Carbon Graphite_ Retainer and Srpings Upper - 316 SSPort-1 Basic Piping Stainless Steel, Sch160, Socket Weld Connection

General AccessoriesStandard flange height, 187mm (7.38 inch) to nozzle center linePump Case Sole plate, Machined for Supporting FrameBaseplate, API610 carbon Steel for Pump & APICasing Earthing BossBaseplate Earthing BlockAnchor bolts, Set 6 off J-shapeNameplates, 304SS, 100x50mmBaseplate 2" flanged drain connection - 150#RF without Valve

Pump Drain kitBasic Piping Carbon Steel, Sch160, Butt WeldFlange, Carbon Steel, WeldNeck, 600# RFGate Valve Carbon Steel, Flange Connection, 600# RFTwo Plan Bracing on Drain pipingDrain Piping to Skid EdgeWith Blind FlangeAdder for fugitive emission for the Gate valve

Pump Vent KitBasic Piping Stainless Steel, Sch160, Butt Weld Connection

Form No: FO-APP-QUOT-005 (rev.0)

Page 32 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Flange, Stainless Steel, WeldNeck, 600# RFGate Valve Stainless Steel, Flange Connection, 600# RFTwo Plan Bracing on Vent pipingVent Piping to Skid EdgeVent Connection Size to be of 3/4" minimumAdder for fugitive emission for the Gate valve

Seal SystemAPI Plan 53BVessel is built in accordance with ASME VIII div. 1 & API 682 3rd edition20 Liters Reservoir (Sch 20) in ASTM A312 Grade TP 316/316L - Welded connectionswith flangesBladder inside reservoir in Nitrile (NBR)Time between 2 refills of reservoir is 28 daysAll connections are butt weldedDrain, Vent and Barrier fluid filling lines are in 3/4" and contain each a gate valveGas valve 1/4 inch for N2 filling on reservoirN2 charging kitAll lines are in ASTM A312 Grade TP 316/316L schedule 80Barrier fluid filling line contains a check valve and a Y-strainer (800 microm.)Barrier fluid filling option: Quick connection with check valveTrolley with hand pump for barrier fluid fillingShell & Tube heat exchanger (shell in carbon steel / tube in 316 SS) in accordance withASME VIII div. 1Cooling water inlet / outlet lines in 1/2" with 150# RF Flanges1 Pressure transmitter as per specifications with a coated aluminum housing for liquidbarrier controlSunshade for all instruments1 Pressure gauge ATEX certified as per specifications on outlet line for liquid barriercontrol - connection in 1/2" NPTPressure gauge & Pressure transmitter fitted with a block & bleed manifold SAMI foreach instrument1 Temperature gauge ATEX certified as per specifications with thermowell on outlet linefor liquid barrier control - connection in 1/2" NPTOutlet Line enlargement from 3/4" to 1"1/2 for installation of 1" BW Thermowell toinstall 100mm TG StemPlan 53B Barrier inlet / outlet lines in 3/4" with 600# RF FlangesAPI 53B cooler not as per TEMA C nor U stamp

Seal System interconnecting pipingButt welded piping in 316 SS with 600# RF FlangesPiping in 3/4" schedule 80

Seal Housing connections for seal systemButt welded piping in 316 SS with 600# RF FlangesPiping in 3/4" schedule 80Seal housing connection on port 2 & 7 is butt welded

Gearbox and Heat ExchangerSundyne Gearbox 200-HPGearbox mechanical seal Assy - SE04AA98ALiquid cooler - 3X18, 4Pass, Brass shell, Cast-Iron bonnet, 90Cu/10Ni tubesLube oil cooler not according to TEMA CMagnetic Drain Plug to be provided on Gearbox

Gearbox vibration and temperature monitoring2 Vibration adaptors (mechanical M8 x 1.25 mounting thread) located on the gearbox(on two perpendicular axis)

API Cooling PlansAPI Cooling Plan A connected together with the buffer cooling coil, 150lbs, CarbonSteel, RF Flanged, Socket Welded. Connections on Heat Exchanger itself areScrewed.Thermal relief valve screwed on API planTemperature Gage added on Cooling Water Line

Lube Oil Control KitStandard pressure gauge, fitted on the gearbox - as per API 610 - paragraph 9.1.3.6Standard temperature gauge, fitted on the gearbox - as per API 610 - paragraph9.1.3.6

Form No: FO-APP-QUOT-005 (rev.0)

Page 33 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Driver AccessoriesDriver Adaptor for spacer coupling, IEC frame size 315SDriver Fixation Bolts, in 304 Stainless SteelNon sparking Aluminum coupling guardcoupling, NonSparking Metastream (TSKS-0135)Coupling Assembly on MotorCoupling Puller Holes

InspectionMaterial Certificate of Conformity EN10.204 type 2.1, Shaft SleevesMaterial Certificate of Conformity EN10.204 type 3.1, Pump Case - Seal HousingMaterial Certificate of Conformity EN10.204 type 3.1, Casing StudsMaterial Certificate of Conformity EN10.204 type 3.1, Diffuser Insert & CoverMaterial Certificate of Conformity EN10.204 type 3.1, Main Baseplate MaterialsMill Test Report Certificate (equivalent to EN10.204 type 3.1), Impeller & InducerMill Test Report Certificate (equivalent to EN10.204 type 3.1), High Speed ShaftMill test Report EN10.204 type 3.1, Auxiliary Process Fluid Piping (pressure containingcomponents)Material Certificate of Conformity EN10.204 type 3.1, Plan 53B Barrier system weldedpartsMaterial Certificate of Conformity EN10.204 type 3.1, Welding Consumable for Plan53B reservoirMaterial Certificate of Conformity EN10.204 type 3.1, on coupling main componentsLiquid Dye Penetrant (certified only), Auxiliary Process Fluid Piping (pressurecontaining components) for 100% of weldsLiquid Dye Penetrant (certified only), Impeller & InducerLiquid Dye Penetrant (certified only), Pump Case - Seal Housing (machined surfaces)Liquid Dye Penetrant (certified only), Main Baseplate WeldsLiquid Dye Penetrant (certified only), Plan 53B Barrier reservoir for 100% of weldsLiquid Dye Penetrant (certified only), Buffer/Quench Piping Plan for 100% of weldsRockwell Hardness test (certified only), Impeller & InducerRockwell Hardness test (certified only), Pump Case - Seal HousingRockwell Hardness test (certified only), High Speed ShaftMagnetic Particle Inspection (certified only), Pump CaseMaterial traceability, Pump wetted parts & Auxiliary Process Fluid Piping (pressurecontaining components only)Ultrasonic test (certified only), High Speed ShaftPositive Material Inspection (with carbon), Pump wetted parts - certified onlyPositive Material Inspection (with carbon), Buffer/Quench Piping Plan - certified onlyPositive Material Inspection (with carbon), Auxiliary Process Fluid Piping (pressurecontaining components) - certified onlyPositive Material Inspection scope may include following parts: Flange, Orifice, Piping(greater than or equal to 1"), Fitting (greater than or equal to 1"), Valve BodyPositive Material Inspection is only applicable on stainless steel and high alloy steelequipmentsX Ray, Buffer/Quench Piping Plan for 10% of weldsX Ray, Plan 53B Barrier reservoir for 10% of welds (1 spot on one weldment)X Ray, Auxiliary Process Fluid Piping (pressure containing components) for 10% ofweldsX Ray, Pump Case (Casting)Visual control of the welds of the Plan 53B Barrier systemCleanliness inspection on the Plan 53B Barrier system with certificateFinal Shop Inspection, Pump Dimensional & documentation review - witnessedAs per Inspection Level C3.1 Material Certificate for Mechanical Seal Retainers

TestHydrostatic Test Inspection - Witnessed all unitsHydrostatic Test Inspection on the Plan 53B Barrier system according to ASME VIII -certified onlyPerformance & NPSH Test - WitnessedOverall and Discrete frequencies (for each shaft) Vibration MeasurementMechanical Run Test, with shop motor and shop coupling - WitnessedExtended Mechanical Run Test - Witnessed, 4 hours all units

Form No: FO-APP-QUOT-005 (rev.0)

Page 34 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Sound Level Measurements, according ISO 9614-2 and ISO 11203 - Witnessed allunits, according ISO 9614-2 and ISO 11203Dismantling Inspection after test, wet end & gearbox - Certified OnlyMechanical Rerun, after dismantling (gearbox only)Impeller and Inducer Balancing as per Sundyne procedure - Certified OnlyHigh Speed Shaft Assembly Balancing as per Sundyne procedure - Certified OnlyVibrations Measurement & FFT Spectrum (range: 5 to 1000 Hz) done at each point ofthe performance test, on X axis - Witnessed all units

Paint and StoragePump and Accessories, Do Not Paint Stainless Steel SurfacesPump and Accessories paint, Off-Shore Service RAL 7004 GreyPlan 53B Barrier reservoir will remain unpainted (pickling & passivation)Plan 53B Barrier bracket in Carbon Steel with an off-shore paintDriver paint system - Off-Shore with colour change RAL RAL7035Stand paint - Off-Shore Service with colour change RAL RALPump LongTerm Storage for Carbon Steel Unit

PackingFlange Shipping Cover plate 1/4" Carbon SteelVacuum Packing for Bare Unit without kitsDriver Vacuum PackingPump packing - Sundyne standard export box made of plywood 10mm thicknessDriver packing, Sundyne standard export box made of plywood 10mm thickness

DocumentationQuality Control PlanInstallation Operating & Maintenance, (customer specification), Master Book (baseprice)Installation Operating & Maintenance per customer specification, adder for API BufferAPI52/53Installation Operating & Maintenance per customer specification, adder for Main Driver1 final copies of customized IOMCertification Dossier, (customer specification), Master Book (base price)Certification Dossier per customer specification, adder for API BufferCertification Dossier per customer specification, adder for Main DriverOne copy of customized Certification Dossier submitted for approval1 final copies of Certification Dossier per Customer specificationCertification Dossier, (customer specification), Submital of Sundyne ProceduresGeneral Arrangement drawing - Autocad format DXFCross Section drawing - Autocad format DXFP&ID - Autocad format DXFWelding Map - Autocad format DXFHook Up - PDF formatFinal Documentation on CD-ROM per Customer specificationFinal Documentation on CD-ROM per Customer specification, adder for API BufferFinal Documentation on CD-ROM per Customer specification, adder for Main Driver1 copie of final Documentation on CD-ROMSpare Parts Interchangeability Record SPIR - Excel FormWelding book for the Plan 53B Barrier system with: welder qualification, weldingprocedure and welding process qualification according to ASME IX

CertificationATEX Certification, per directive 2014/34/UE for Zone 2U-Stamp certificate for Plan 53B Barrier ReservoirCoupling ATEX Certified & Marked for Zone2

WarrantyExtended Sundyne warranty. 12 Months from Start-Up - 40 Months from Shipment

BUDGET ESTIMATE

Unit and Driver Total

46 weeks ex-factory from receipt of PO In light of the Covid-19 situation, which is beyond our control, any delivery dates are simply estimates.Sundyne is not in a position to confirm delivery time, but is doing its best to mitigate the effects while

Form No: FO-APP-QUOT-005 (rev.0)

Page 35 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

following local, national and international guidelines and mandates. It shall be reassessed and agreed attime of Purchase Order issuance.

This quotation is subject to the Terms and Conditions of Sale enclosed within. This quotation is valid if accepted by Sundyne within 90 days fromthe date hereof. This Quotation and any subsequent Purchase Order acceptance is subject to French, European and US Laws and regulations governing thecontrol of exports. Any changes to those laws or regulations, preventing Sundyne International S.A. from honoring its commitments under thisquotation or Purchase Order, will be considered as a Force Majeure because such changes are beyond any party's control and could not havebeen reasonably foreseen. This expressly includes changes to trade and export compliance laws and regulations.

Payment Terms: to be reviewed in due date Sundyne France INCO Terms: FCA Longvic Factory (Non-Containerized)

Genevieve Pepin Applications Engineer Phone: +33 3 80 38 33 32 Email: [email protected]

Form No: FO-APP-QUOT-005 (rev.0)

Page 36 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

OPERATING CONDITIONS

Liquid Aromatic Hydrocarbon Capacity(m3/hr) Norm 45.8 Rated 63.0

Suct Temp (C) 106.0 Max 106.0 Disch.Press (kgf/cm2) 29.10

[email protected] 0.788 Suct.Press (kgf/cm2) Max 6.75 Rated 4.23

[email protected] (kgf/cm2-a) 2.13 Diff.Press(kgf/cm2) 24.87 Diff.Head (m) 315.7

[email protected] (cp.) Norm 0.26 Max NPSHA (m) 38.8

Spec.Heat (kj/kg K) 1.97 Corr./Eros. caused by 99.76 wt% Benzene

CONSTRUCTION

Casing Mounting Vertical-Inline Casing Split Radial Inducer Type Cylindrical - 03 - 01

Diffuser Double Throat Diff.Dia (mm) 13.9 Style Dual Log-Spiral Impeller Type Open

Mechanical Seal Type Dual Pressurized

Seal Part No. Upper SE04AA05A Primary SE04AA02A Imp.Dia (mm) Rated 149.4

API Seal Code Upper none Primary Max 152.4

Api Flush Plans Barrier Plan 53B Min 127

Nozzle

CONNECTIONS

Size

ANSI

Rating

ANSI

Facing

ANSI

Finish

micronM

Position

Suction 3 in 600 lbs RF 3.2-6.3 Side

Discharge 2 in 600 lbs RF 3.2-6.3 Side

Pressure Casing

CONNECTIONS

Size

ANSI

Rating

ANSI

Facing

ANSI

Finish

micronM

Connection Type Valve

Drain 1" 600 lbs RF 3.2-6.3 Butt Weld / Flanged PN100

Vent 1/2" 600 lbs RF 3.2-6.3 Butt Weld / Flanged PN100

MATERIALS

Minimum Design Metal Temperature: 10.0 (deg C)

Sundyne Pump Build Code A Seal Rotat.Face Tungsten Carbide - Cobalt

Case/Seal Hsg

ASTM A216 gd WCB / ASTM A350 LF2

Seal Secondary PTFE

Diffuser ASTM A350 LF2 Studs ASTM 1014

Impeller 316SS Inducer 316SS

Shaft 4140 Steel Shaft Sleeves 316SS

Seal Metal Parts 316SS/316SS Pump O-Rings Dupont Kalrez 6375

GEARBOX X Yes No BEARING BOX Yes X No

Gear Ratio 2.538 Lubrication Pressurized Oil-Filtered

Heat Exchanger Liquid Cooler Cooling Load (kW) 2.422

Type 5x18, Brass Shell & 90Cu/10Ni Tubes, 4 pass

RATED PERFORMANCE

NPSHR, Water @ rated capacity (m) 4.05 Stages 1 RPM 9085

Rated Power (kW) 79.9 Rated Pump Efficiency (%) 55.5

Max Power Rated Imp. (kW) 93.0 Max Head Rated Imp. (m) 414.92

Minimum Continuous Stable Flow (m3/hr) 39.32

with control valve within 3.048 (m) of pump discharge

Motor Rotation (viewed from top of motor) CCW

Specific Speed 15.6 rpm.m3/s.m Suction Specific Speed 421.0

Seal Cavity Press (kgf/cm2) Rated 6.36 Max 11.59

Typical noise level (db) 85.0 @ 1.0 (m)(Pump only)

AUXILIARY PIPING REQUIREMENTS

Gearbox Cooling Water Piping Supplied by Sundyne

Seal Flush Cooling Water Piping N/A

Seal Buffer/Barrier Cooling Water Piping Supplied by Sundyne

Buffer/Barrier Interconnecting Piping Supplied by Sundyne

Cooling Water Requirements (m3/hr) @ 35.0 (C)

Gearbox heat exchanger 2.5

Seal Flush 0.0

Seal Buffer/Barrier 0.0

Total 2.50

TEST REQUIREMENTS

Shop Test Wit Certified Obs

Hydrostatic Yes No No

Performance Yes No No

NPSH Yes No No

Dismantle/Inspect No Yes No

Surface Inspect Yes No No

Extended Mechanical Text (4H) Yes No No

Sound Level Test Yes No No

WEIGHT (kg)

Pump & Gearbox 345 Driver 0

Base/Stand 0 Auxiliaries 0 TOTAL 345

TURBINE DRIVE by Sundyne Yes X No

Rating RPM Qty

Mfr

Steam Press (kgf/cm2) Inlet Outlet

Steam Temp (C) Inlet Outlet

Steam Rate (*)

Shaft Type

Coupling Mfr/Type

Form No: FO-APP-QUOT-005 (rev.0)

SUNDYNE PUMP SPECIFICATION SHEET

Applicable to Proposal Metric with Bar

Single-Stage Overhung OH6

Purchaser L&T, , INDIA Quote No. 224816-1 Rev 1 Date 18-Oct 2021 Serial No. P-21250-SA-4

Owner/User Farabi Yanbu Petrochemicals Company Job No. By Genevieve Pepin No. Required 2

Service Desorbent Pumps Item No 203-P-02 A/B Req Model Number LMV-311

Location , SAUDI ARABIA Unit Purchase Oder No. Inquiry No.

Page 37 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

MOTOR DRIVE by Sundyne X Yes No SITE CONDITIONS

Rating 110.0 KW RPM 3580 Volts/Phase/Hertz

460V5/-5%/3Ph/60Hz

+/-2.5% Qty 2

Ambient Temperature (C) Min. 10.0 Max. 42.0

Mfr From VL S.F. 1 Frame 315S Relative Humidity (%) Min. Max. 100 F.L. Amps L.R. Amps Insulation F use B Enclosure IP55 Site elevtion above 1000 meters (3280 feet) false

Shaft Type Coupling Coupling Mfr/Type Metastream TSKS - TSKS-0135 Hazadous Area Certification IECEx

Thrust Capacity (Kgf) n/a Up Down Area Class ExnAIICT3 Hazardous Area Zone 2G (Category 3G)

Bearing Lubrication Hazardous Area Certification Scope Electrical Equipment

Only

Special Notes Area classification : Zone-2, Gas Group IIA/IIB, Temperature class T3 Gaz Group IIB

Temperature Class T3

Hazardous Area Process Fluid Max Suct Temp 106.0 deg C Process Fluid Flash Point 0.0 deg C

REMARKS

ISO 13709 2nd EDITION / API 610 11TH EDITION GOVERNS, EXCEPT AS NOTED ON ATTACHED LIST OF EXCEPTIONS.Certificate of material conformance.Bypass orifice, 600 lb RF flange, 316 SS, sized to carry _____ m3/H at _____ meters TDH.The rated pump efficiency shown above excludes the effect of the discharge orifice.Inclusion of the orifice reduces the effective efficiency to 53.4 %.Pump gross head before orifice 328.4 metersDischarge orifice plate, Plate 316 SS w/handle (RF).Carbon steel 1/4 covers with gaskets for kit flanges.Carbon steel 1/4 covers with gaskets for pump flanges.Dual pressurized (double) seal arrangement - A product compatible barrier fluid must be supplied by customer.Maximum nitrogen pressure (N2 precharge) shall be 90% of low alarm barrier fluid pressure: 0.9*(Max seal cavity pressure + 2.04) kg/cm2g at ambient temperature (to be completed after performance test).Maximum barrier fluid pressure for precharge shall not exceed 4 times nitrogen pressure (N2 precharge).Witnessed hydrostatic test.Vibration readings witnessed, during performance test and NPSH inspectionMechanical run test with shop electric motor, witnessed, (max. 1/2h), after formal commitment is made.Extended mechanical run test: 4 hoursCommon base plate for Pump and AccessoriesThe predicted curve is guaranteed 7% rising from the Rated Flow to the Min.Flow 39.32 m3/hr.MAWP= 44.1kg/cm²g@140°C & hydrotest pressure = 66.1kg/cm²g@20°C

Form No: FO-APP-QUOT-005 (rev.0)

SUNDYNE PUMP SPECIFICATION SHEET

Applicable to Proposal Metric with Bar

Single-Stage Overhung OH6

Purchaser L&T, , INDIA Quote No. 224816-1 Rev 1 Date 18-Oct 2021 Serial No. P-21250-SA-4

Owner/User Farabi Yanbu Petrochemicals Company Job No. By Genevieve Pepin No. Required 2

Service Desorbent Pumps Item No 203-P-02 A/B Req Model Number LMV-311

Location , SAUDI ARABIA Unit Purchase Oder No. Inquiry No.

Page 38 of 50

Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

SUNDYNE PUMP - PREDICTED PUMP PERFORMANCE DATA Date:

Quote Number: By:

Customer L&T / FARABI Item Number 203-P-02A/B na

Pump serial No. Pumped liquid Aromatic Hydrocarbon Rated Point

Size and type 3 x 2 OH6 Specific Gravity 0.788 Flowrate m3/hr 63.00

No. of stages 1 Temperature 106 °C Head m 315.7

Speed, r/min 9064 Kinematic Viscosity 0.255 cP NPSHR m 4.1

Specific Speed 16.01 Suct° Specific Speed 420 m3/s,m Power kW 79.9

Pump Model LMV311 Minimum Flow 38.03 m3/hr Calculated efficiency %: 53.3

Curve No.

18-Oct-21

P-21250-SA Units: SI G.PEPIN

316

38.03 75.6041.0 66.2

Allowable Operating RegionPreferred Operation Region

127

177

227

277

327

377

427

29.0 39.0 49.0 59.0 69.0 79.0

m

m3/hr

Head

79.9

28

48

68

88

29.0 39.0 49.0 59.0 69.0 79.0

kW

m3/hr

Power

53.3

0

10

20

30

40

50

60

29.0 39.0 49.0 59.0 69.0 79.0

(%)

m3/hr

Efficiency

4.1

2.6

3.6

4.6

5.6

6.6

29.0 39.0 49.0 59.0 69.0 79.0

m

m3/hr

NPSHR

Impeller diameterMax

As proposed

Min

152.40 mm

149.86 mm

127.00 mm

Page 40 of 50 Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Page 41 of 50 Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Sundyne Quotation Summary

To: L&T INDIA

Attention:

Quotation No.: 224816-1 Channel Partner Ref No.: P-21250-SA Inquiry No.: Item No.: Date: 18-October-2021 Expiration Date: 30-June-2022

Qty Description

Price Each Price Total

2

202-P-01 A/B LMV-311 Purge Pumps

INCO Terms: FCA Longvic Factory (Non-Containerized)

1

202-P-01A/B Commissioning Spare Parts

INCO Terms: FCA Longvic Factory (Non-Containerized)

2

202-P-03 A/B LMV-311 PEP Column Sidedraw Pumps

INCO Terms: FCA Longvic Factory (Non-Containerized)

1

202-P-03A/B Commissioning Spare Parts

INCO Terms: FCA Longvic Factory (Non-Containerized)

2

203-P-01 A/B LMV-331N API Heavy Duty Pump

INCO Terms: FCA Longvic Factory (Non-Containerized)

1

203-P-01A/B Commissioning Spare Parts

INCO Terms: FCA Longvic Factory (Non-Containerized)

2

203-P-02 A/B LMV-311 Desorbant Pumps

INCO Terms: FCA Longvic Factory (Non-Containerized)

1

203-P-02A/B Commissioning Spare Parts

INCO Terms: FCA Longvic Factory (Non-Containerized)

BUDGET ESTIMATE

Page 42 of 50 Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

ALL UNITS AND DRIVERS TOTAL

This quotation is subject to the Terms and Conditions of Sale enclosed within. This quotation is valid if accepted by Sundyne within 90 daysfrom the date hereof. Payment Terms: to be reviewed in due date Sundyne France

Genevieve Pepin Applications Engineer Phone: +33 3 80 38 33 32 Email: [email protected]

Page 43 of 50 Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Page : 1 of 3 GENERAL TERMS AND CONDITIONS OF SALES

SUNDYNE INTERNATIONAL S.A.

Rev. November 21.2019

1. SCOPE These Terms & Conditions of Sale (hereinafter referred as to “T&CSG”) apply to all sales of Goods. Applicable Terms and Conditions for services will be provided upon request. The placing of an order by the Purchaser is subject to these T&CSG in their entirety and is deemed acceptance of these T&CSG provided in the Quotation. Accordingly, the Purchaser expressly waives applicability of its own terms and conditions even if those terms are presented subsequent to these. Purchaser expressly accepts that any acknowledgement or delivery of Goods by Seller are only made subject to these T&CSG and by accepting delivery Purchaser acknowledges these T&CSG. Any change to these T&CSG is subject to the Seller's express acceptance in writing. The Purchaser may not claim any form of implied acceptance of either its own terms and conditions or any changes to these T&CSG whatsoever. These T&CSG supersede any and all previous communications, representations or agreements, either oral or written, between the parties with respect to the subject matter.

2. DEFINITION AND INTERPRETATION In these T&CSG, except where the context otherwise requires, the following words and expressions shall have the following meanings: Agreement shall mean documentation applicable to the Order limited to Sundyne Code of Ethics, available upon request, Quotation issued by the Seller, the Order issued by the Purchaser to the extent confirmed by the Order Acknowledgment sent by the Seller and any appendix expressly mentioned therein. Confidential information shall mean all confidential and proprietary information including without limitation know-how, intellectual property, ideas, designs, concepts, plans, data, customer details, employee details and other technical, financial or commercial information, together with all notes, records, extracts, copies, reproductions or analysis of any such information, which (whether before, on or after the date of the Order and whether in oral, written, visual, electronic or whatever form or on whatever media or by way of demonstrations or in any manner) is obtained directly or indirectly by or on behalf of one Party (“the Receiving Party”) from or on behalf of the other (“the Disclosing Party”) and which is expressly marked as confidential or which a reasonable person would consider to be confidential. End-User shall mean ultimate user of the Goods. Event of Force Majeure shall mean any cause or circumstance whatsoever beyond either Party’s reasonable control provided the same arises without fault or negligence of the affected Party. Event of Force Majeure includes an Act of God, fire, explosion, failure of public utilities or civil commotion, floods, hurricanes, earthquakes, windstorms, tornadoes, act of terrorism, war (whether declared or not), restrictive governmental Laws or decisions, strikes, lockouts, labor trouble. Goods shall mean any materials, machinery, equipment, articles, parts, tools, consumables, hardware, software and the like items to be provided as per the Agreement. Industry Practices shall mean objective norms as defined in the Quotation. Intellectual Property Rights shall mean all copyright, database rights, topography rights, design rights, trademarks, trade names, trade secrets, utility models, patents, domain names and any other intellectual property rights of a similar nature (whether or not registered) subsisting anywhere in the world in or associated with the Goods. Law shall mean any applicable international, national, municipal or state treaty, statute, ordinance, customs regulations (import and export) or other law, regulation or by-law or any rule, code or direction or any license, consent, permit, authorization or other approval (whether governmental or non-governmental) including any conditions attached thereto as applicable per the Agreement. Order shall mean the purchase order issued by the Purchaser which shall not be binding on the Seller until the Order Acknowledgement as defined below is issued by the Seller. Order Acknowledgment shall mean the written confirmation sent by the Seller to the Purchaser. Unless otherwise mutually agreed between the Parties, Order Acknowledgment is subject to these T&CSG’s and Purchaser expressly waives any other terms and conditions including its own issued after the Order Acknowledgment. Party shall mean either the Seller or the Purchaser. Parties shall mean the Seller and the Purchaser. Person shall mean any individual, firm, partnership, trust, joint venture, company, corporation, body corporate, unincorporated body, association, organization, any government or state or any agency or a government or state, or any local or municipal authority or other governmental body. Purchaser shall mean the Person who issues the Order. Quotation shall mean the written proposal issued by the Seller to the Purchaser in its latest revision and including these T&CSG. Seller shall mean SUNDYNE INTERNATIONAL S.A. Third Party shall mean any person who is not expressly a Party to the Agreement. For the purpose of the Agreement, except wherever the context otherwise requires: - Words denoting the singular include the plural and vice versa; - Reference to each Party herein include references to its successors in title, permitted assigns and novatees; - The words “include”, “including” and “in particular” shall not be interpreted as limiting the generality of any of the foregoing words; - Reference to “writing” or “written” includes fax, e-mail and similar means of communication; - All references to date and time periods in this Agreement shall be construed in accordance with the Gregorian calendar; - All references to an Incoterm shall be read as per the agreed upon Incoterms version issued by the International Chamber of Commerce

3. FORMATION OF THE CONTRACT Quotation shall only be considered as binding if the Order strictly conforms to the Quotation, in its latest revision and subject to receipt of an End-user certificate duly signed and stamped by the Purchaser and/or the End-User as may be required by the Seller. Unless stated otherwise, the Quotation is valid for one (1) month after the issuance date thereof. Sale is considered to have been concluded once the Seller issues an Order Acknowledgement. The Seller shall endeavor to issue an Order Acknowledgement within 8 working days provided (a) the Order strictly conforms to the Quotation, (b) all technical clarifications have been finalized and (c) all information regarding the End-User as may be reasonably required to be fully compliant with any applicable Laws including export obligations has been provided. Once the Order Acknowledgement is sent to the Purchaser, the Agreement is considered as binding. The Purchaser must notify any error or omission appearing in the Order Acknowledgment within seventy-two (72) hours of its receipt. Thereafter, the Order is considered final, and no claims regarding such error or omission will be accepted.

4. MODIFICATION - ORDER AMENDMENTS No alteration to or variation of this Agreement or any Order shall take effect unless and until the same is in writing and signed on behalf of each of the Parties by a duly authorized representative, taking into consideration, as the case may be, the impact on the Price, time of delivery and the planning or any other contractual obligation affected by such change.

5. SUBCONTRACTING - ASSIGNMENT OF THE CONTRACT The Seller reserves the right to subcontract, without the prior agreement of the Purchaser, all or part of the design, procurement, services and other works which are the object the Agreement.

Neither Party may assign, transfer, charge or otherwise encumber, create any trust over or deal in any manner with the Agreement or any right, benefit or interest under it nor transfer, novate any of that Party’s obligations under it without the prior written consent of the other Party which might not be unreasonably withheld or delayed.

6. TESTS AND TRIALS The Goods are manufactured in full compliance with applicable Industry Practices. Any specific control, test or inspection demanded by the Purchaser and not expressly stated in the Quotation and not accepted in the Order Acknowledgment will be at the exclusive expense of the Purchaser.

7. PRICES

All Prices shown in the Price List, order acknowledgement or otherwise quoted are in Euros unless otherwise specified by Seller. Seller may adjust prices prior to shipment to reflect any extraordinary changes in material costs or availability. Written quotations automatically expire 30 days after submission to Purchaser and are subject to withdrawal or revision within that 30-day period. Seller reserves the right to make corrections due to any typographical or engineering errors, or because of incomplete or inaccurate information provided by Purchaser. Prices shown in any published literature are maintained as a general source of information only and are not quotations or offers to sell. Unless otherwise stated, all sums payable by the Purchaser under the Agreement are exclusive of VAT and all other applicable taxes, duties and levies, which shall (if and to the extent applicable) be payable by the Purchaser at the rate and in the manner from time to time prescribed by Law. Prices are also exclusive of any customs duty for non-packed Goods on an ex-works basis. Any Order with a net value exclusive of VAT, taxes (including withholding tax), customs duty of less than one thousand (1000) Euros or the equivalent amount in any other currency will be subject to a flat administration fee of seventy (70) Euros.

8. PAYMENT TERMS Means and terms of Payment The Agreement defines the applicable payment terms. Except otherwise specified, payment must be made before the Goods are dispatched. Payments shall be made by direct bank transfer to the Seller’s nominated bank account or by such other means as may be agreed between the Parties from time to time. Unless otherwise agreed, payments shall be made in Euros, net and without application of any discount at thirty (30) days net form invoice date.

Consequences of late payment Any late payment will give rise from the first day of late payment to: (a) interest at the most recent European Central Bank refinancing rate, plus 10 percent; (b) and a fixed debt-recovery fee of forty (40) Euros. Should the debt recovery expenses incurred exceed the fixed-fee allowance; additional compensation will be demanded on submission of supporting evidence. Such interest and debt-recovery fee shall be paid within ten (10) days from the date of issuance of the invoice. Without prejudice to any other remedy it may have, in case of late payment, the Seller is entitled to (i) withdraw credit, (ii) suspend performance and (iii) terminate the Agreement. Any suspension under this clause will result in any time lost being added to the delivery date.

Prohibition of set-offs All sums payable by the Purchaser under this Agreement are payable in full, without set-off, reduction, withholding or counterclaim on any account whatsoever.

9. DELIVERY DATE The Seller will use reasonable endeavors to make the Goods available to the Purchaser on the date defined in the Order Acknowledgment. In any event, and independently of any Order Acknowledgment, the delivery date will be modified, including following circumstances: - The Seller does not have all the information necessary to execute the Agreement; - The Seller has not received the first(s) payment(s) due under the Agreement; - The Seller has not received the letter of credit, where applicable; - The execution of the Agreement is suspended due to any Event of Force Majeure. If liquidated damages are agreed between the Parties, notwithstanding anything to the contrary, such liquidated damages will be the sole remedy to the exclusion of any other rights and remedies arising out or in connection with late delivery.

10. PACKING The Quotation is based on the Seller's standard packing conditions and at the Purchaser's expense. Any specific packing request set out in the specifications will be charged separately. Packaging shall be neither returned, nor subject to a deposit.

11. DELIVERY - TRANSFER OF RISK – TRANSFER OF TITLE

Delivery and transfer of risk Unless otherwise agreed, Goods are provided ex-works at the Seller’s premises. Delivery and transfer of risk shall take place pursuant to the Incoterms agreed by the Parties. It is the Purchaser’s obligation to verify the visual conformity of the Goods both in quantitative and qualitative terms and to inform the Seller of any non-conformity in this respect of which it becomes aware within fifteen (15) calendar days of delivery. Failing this, any such non-conformities cannot be the subject of any claim made by the Purchaser against the Seller. Partial deliveries The Seller reserves the right to carry out partial deliveries of the Goods covered by the Order. In the event of partial delivery, each batch shall be regarded as a separate sale subject to the conditions of the Agreement. The Purchaser is deemed to have accepted the transfer of risk of the Goods delivered as stipulated in the Agreement on a pro-rata basis for the actual delivered quantity. Payment of each batch must be made in accordance with the payment terms stipulated in the Agreement. Transfer / Retention of title The Seller retains title to the Goods until the effective payment in full of the principal and other charges. Failure to make any due payment may, at Seller’s option, lead to the recall of the Goods and the termination of the Agreement for Purchaser’s breach. In the event of the exercise of any such right, any down payments already made will be irrevocably retained by the Seller as indemnity, without prejudice to the ability of the Seller to obtain full compensation in respect of any prejudice suffered. Within the meaning of this clause, the submission of bills or of any security which create an obligation to pay does not constitute payment. Consequently, the Purchaser must store the delivered Goods separately and marked as being the property of the Seller until the price has been paid in full. The Purchaser shall indemnify and hold the Seller harmless of any and all costs arising out or in connexion with the enforcement of this clause (including any legal fees). Storage If the Purchaser does not take delivery of the Goods on the date stated in the Agreement for reasons not attributable to the Seller:

- Free storage period shall be limited to one (1) month - The Purchaser shall nonetheless be obliged to make payment according to the schedule

originally set out, without prejudice to the application of storage expenses.

Page 45 of 50 Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Page : 2 of 3 GENERAL TERMS AND CONDITIONS OF SALES

SUNDYNE INTERNATIONAL S.A.

Rev. November 21.2019

- Any storage exceeding above thirty (30) Days-free-storage will be at Purchaser’s account and Goods could be placed in a warehouse at Purchaser’s risk and expenses.

12. BREXIT

When the United Kingdom ceases to be a member of the European Union (such cessation referred to as a “Brexit”), then with effect from the date of such event,

a) if there is any change in the laws applicable to the sale of products in the United Kingdom, or the import/export of products to or from the United Kingdom, then each party is responsible for ensuring its own compliance with such revised laws;

b) if tariffs, VAT, duties, excise taxes on importation, or other charges are imposed upon the sale, licensing or other transfer of goods to or from the United Kingdom to or from a member state of the European Union, those tariffs will be paid by Purchaser unless prohibited by applicable law;

c) Seller is excused to the extent its performance or delivery is prevented or delayed due to Brexit-related conditions affecting such performance or delivery; including but not limited to additional, new, or delayed customs checks on goods shipped (or key personnel employees traveling) between the EU and the United Kingdom, changes in maritime shipping routes, the imposition of hard borders, air traffic interruptions, market dis-integration, insurance or funding issues; and

d) If any other material adverse effect on the activities contemplated under this Agreement or the rights or obligations of either party hereunder occur, then the parties shall negotiate in good faith an adjustment or amendment to the terms hereof if necessary to preserve each party’s rights, as such rights were reasonably contemplated by the parties as of the Effective Date. If the parties cannot agree to an adjustment or amendment pursuant to this Section 12(d) within 15 days after Seller’s written notice to Purchaser, then Seller may terminate this Agreement without penalty

13. INTELLECTUAL PROPERTY RIGHTS Notwithstanding anything to the contrary and except an express license is granted, each Party shall remain the exclusive owner of the Intellectual Property Rights it owns, develops or uses, whether such ownership, development or usage arises before, during or after the Agreement. The Seller warrants to the Purchaser that the Goods do not constitute a breach of any pre-existing rights nor any other form of infringement of Intellectual Property Rights, and indemnifies it against any action or claim in this respect, provided that: (a) Seller has been informed in advance and in writing of the existence of such a claim and within a reasonable timeframe for it to be able to prepare its defense, (b) payment has been received for the Goods, and (c) the Purchaser provides the Seller with the necessary opportunity, authority, information and assistance for it to be able to take on exclusive control of the defense against such claims or legal action, including arbitration, mediation, settlements and appeals. This obligation does not apply in respect of any claims/infringement action or any other Intellectual Property Rights resulting from the use of the specifications provided by the Purchaser or derived from the design created by the latter, or from changes or modifications to the equipment imposed by it. Should the liability of the Seller be recognized by any jurisdiction, the Seller shall at its sole option: (1) obtain from the Purchaser the right to use the Goods under the conditions defined by the Agreement; or (2) replace it with a reasonably equivalent Good; or (3) modify it to make it usable without contravening any Third Party rights and in compliance with the Agreement; or (4) recall the Goods, refund the Order Price to the Purchaser less an obsolescence discount. Should the Goods supplied by the Seller for the Purchaser be produced in accordance with the Purchaser's designs, samples or instructions, or were been designed exclusively by the Seller, or were combined with other Goods not supplied by the Seller, the Purchaser will have to defend, guarantee and indemnify the Seller under equivalent conditions to the aforementioned obligation placed upon the Seller.

14. CONFIDENTIALITY Each Party shall maintain the confidentiality of the other Party’s Confidential Information and shall not, without the prior consent of the other use, disclose, copy or modify the other Party’s Confidential Information (or permit others to do so) other than as strictly necessary for the performance of its rights and obligations under the Agreement. Each Party undertakes to disclose the other Party’s Confidential Information only to whom and to the extent to which, such disclosure is necessary for the purposes contemplated under this Agreement and to procure that such persons are made aware of and agree to observe an equivalent confidentiality obligation. Each Party shall give notice to the other of any unauthorized misuse, disclosure, theft or other loss of the other Party’s Confidential Information immediately upon becoming aware of the same. The provisions of this confidentiality obligation shall not apply to information which: - Is or comes into the public domain through no fault of the Receiving Party, its officers, employees,

agents or contractors; - Is lawfully received from a Third Party free of any obligation of confidence at the time of disclosure; - Is demonstrably independently developed by the Receiving Party, its officers, employees, agents or

contractors; - Is required by Law, by court or by governmental order to be disclosed provided that, to the extent

permitted by Law, and prior to any disclosure, the Receiving Party notifies the Disclosing Party and, at the Disclosing Party’s request and cost, assist the Disclosing Party in opposing any such disclosure.

This confidentiality obligation shall survive for five (5) years after the Order Acknowledgment date.

15. WARRANTY The Seller guarantees the Goods for eighteen (18) months following delivery date, except for spare parts thereof for which warranty period is twelve (12) months. Any claim shall be raised to the Seller in writing within ten (10) working days of becoming aware of the same and shall enclose the corresponding purchase invoice. Failing that, the Purchaser implicitly waives all right of recourse regarding warranty. The Seller’s warranty covers replacement or repair of proven defective parts or Goods at its sole option: (a) returned to its workshops; or (b) returned to its distributor or authorized service center workshop; or (c) or in case the Goods could not be returned for financial or practical reasons, default or defect shall be assessed on-site. In case of absence of Seller’s responsibility, the Purchaser will bear the costs incurred by the Seller to cover report fees for an amount determined on a case-by-case basis. If the Seller’s responsibility is established under the warranty, the Seller’s liability is limited to replacing or repairing the defective parts at its own expense, excluding any other costs (such as, without limitation dismantling, reassembling and approach (including emptying of the tanks)). The Seller shall reserve the right to modify all or part of its Goods to comply with its warranty obligations. The replacement or the repair of one or more parts for whatever reason shall extend the warranty period for twelve (12) months or till the end of the warranty period whichever occurs first. The warranty shall not apply in the following circumstances: fair wear and tear, installation not compliant with Industry Practice and/or the Seller's instruction manual, lack of monitoring or maintenance, willful act on the part of the Purchaser, its employees or Third Parties, accident, any modification to the operating conditions, chemical attack, corrosion or erosion. All Seller’s information and recommendations are subject in all cases to the verification and acceptance of the Purchaser, whose liability in this respect cannot be excluded, whether in whole or in part and shall not provide any warranty against wear and tear or chemical action.

The warranty shall automatically end: (a) if the storage of the Goods by the Purchaser fails to comply with the Seller’s recommendations and with Industry Practices or maintenance manuals; (b) in the event of the Goods being worked on or dismantled without the express written agreement of the Seller or in the event of such work being carried out by a person not approved in writing by the Seller; (c) if original parts have been replaced by other parts non-supplied by the Seller. Warranty claim shall not affect payment terms. The foregoing warranties are exclusive and are given and accepted in lieu of any and all other warranties, express or implied, including without limitation, the implied warranties of merchantability and fitness for a particular purpose whether or not arising from course of dealing, course of performance, usage of trade or otherwise. No agreement varying or extending the foregoing warranties will be binding upon Seller unless in writing, signed by a duly authorized officer of Seller.

16. TERMINATION Either Party may terminate the Agreement at any time by giving notice to the other: - if the other Party is in material breach of the Agreement which, if remediable, it fails to remedy

within forty-five (45) days of notice from the terminating Party requiring it to do so; - In case of Events of Force Majeure exceeding ninety (90) days; Immediately on the termination of the Agreement: - All outstanding payment shall be due and owing (same for any sums subjects to bona-fide dispute,

under the Agreement in accordance with its terms); - Each Party is entitled to ask the other Party to destroy or to deliver all copies of any Confidential

Information supplied by or on behalf of the other Party pursuant to the Agreement; - Each Party shall cease any further use of the Intellectual Property Rights of the other Party

pursuant to the Agreement. Termination of the Agreement is exclusive of any other rights or remedy the Terminating Party may have had under the Agreement or at Law. The provisions that either are expressed to survive the termination of the Agreement or from their nature or context it is contemplated that they are to survive such termination, shall survive termination of the Agreement. In case of termination for convenience, Seller will be entitled to recover a termination fee based as the case may be on: (a) the price for all material ordered to suppliers; and (b) the Seller’s supplier termination fees; and (c) the price of the Goods already delivered or finished at the time of termination; and (d) the price of Goods in progress on a prorate basis; and (e) a reasonable mark-up. However, the termination fee shall be limited to the Order price.

17. LIABILITY By placing an Order, the Purchaser recognizes that the Seller has made available the information required to be able to assess the suitability of the Goods and to take the necessary precautions to limit any malfunction. The Seller assumes no obligation or responsibility in relation to the precision or lack thereof of the information communicated by the Purchaser; the Seller is under no obligation to verify the pertinence or accuracy of such information. Notwithstanding anything to the contrary in the Agreement and to the extent permitted by Law, the aggregate liability of the Seller to the Purchaser, whether in contract, tort (including negligence) or otherwise, will be limited to the Order value. Notwithstanding anything else in the Agreement, in no event shall the Seller or any of its affiliates, subsidiaries, or representative be liable to the Purchaser or any Third Party for any loss of production, profit, revenue or income, or for any consequential, incidental, indirect, exemplary, special or punitive damages, including any damages for business interruption, loss of use, or loss of data, whether arising out of breach of contract, tort (including negligence) or otherwise, regardless of whether such damages were foreseeable and whether or not the Purchaser was advises of the possibility of such damages arising under the Agreement, any statute or tort.

18. FORCE MAJEURE Neither Party shall be liable for any loss or damage suffered or incurred by the other Party arising from the first Party’s delay in performing or failure to perform its obligations hereunder to the extent that and for so long as such delay or failure results from an Event of Force Majeure. The affected Party shall notify the other Party within five (5) working days (or a longer period if the context otherwise requires) of becoming aware of the same of such Event of Force Majeure and the manner and the extent to which its obligations are likely to be prevented or delayed. Each Party shall use all reasonable endeavors to mitigate the extent of the excusable delay or failure arising from or in connection with an Event of Force Majeure and its adverse consequences and to recommence performance of the affected obligations as soon as and to the extent reasonably practicable. If any Event of Force Majeure occurs, the date(s) for performance of the obligation(s) affected shall be postponed for so long as is made necessary by the Event of Force Majeure provided that if any event of Force Majeure continues for a period of or exceeding ninety (90) days, either Party shall have the right to terminate this Agreement forthwith on written notice to the other Party. In case of such termination the Purchaser shall pay the Seller in full for all work undertaken prior to the date of termination and for all commitments entered into by the Seller in respect of this Agreement (including any contracts entered into with any Third party).

19. TRADE COMPLIANCE Both Parties are responsible for complying with any applicable Laws, including French, E.U. and U.S. regulations regarding control of exports. The Purchaser is responsible for providing any information for the Seller to determine if the Order is subject to any export control Law. Hence, Purchaser shall duly fill-in and sign an end-user statement or a customer statement of end-use (as required by the Seller) on a format acceptable to the Seller and to keep Seller updated of any changes impacting this document during the execution of the Contract. Should any of the Goods be regarded as being dual use as per applicable regulations, Seller undertakes to: (1) inform the Purchaser of the classification of the Good, (2) provide the necessary documents to the Purchaser, and, if the Seller is the exporter, (3) endeavors to obtain the necessary export authorizations. The Seller cannot, however, guarantee the success of any such license requests, or that they will be kept in force. Purchaser shall not export, re-export, transfer, or otherwise dispose of the Products directly or indirectly, except as permitted by applicable laws and regulations. Purchaser shall not do anything that would cause the Seller or its affiliates to be in breach of applicable laws and regulations. Furthermore, Purchaser shall protect, indemnify and hold harmless the Seller and its affiliates from any fines, damages, costs, losses, liabilities, penalties, and expenses incurred as a result of Purchaser’s failure to comply with this clause.

20. APPLICABLE LAW - COMPETENT COURT – ARBITRATION The Agreement and any non-contractual obligations arising out of or in connection with it shall be governed by and construed in accordance with French Law. The Parties agree to exclude application of the International Convention of Vienna regarding Sales of Goods as may be amended from time to time. The Parties shall endeavor to settle by negotiation any dispute arising out of or in connection with the Agreement and all the consequences thereof. Such dispute shall be duly notified by the claiming Party to the other Party, in the forms required under the Agreement, and the Parties shall endeavor to settle such dispute by negotiation within fifteen (15) days from receipt of said notice. In case of failure to settle the dispute by negotiation within the period of time above-mentioned, the claiming Party shall notify to the other Party its intention to submit the dispute to the jurisdiction or arbitration court mentioned below.

Page 46 of 50 Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Page : 3 of 3 GENERAL TERMS AND CONDITIONS OF SALES

SUNDYNE INTERNATIONAL S.A.

Rev. November 21.2019

If the Parties are both located in a Country member of the European Union: The Parties irrevocably agree that Paris Commercial Court shall have exclusive jurisdiction to settle any dispute arising out or in connection with this Agreement. If one of the Parties is located outside European Union: The dispute shall then be finally settled under the Rules of Arbitration of the International Chamber of Commerce by one (1) arbitrator appointed in accordance with the said Rules. Unless the Parties agree upon another place, the arbitration shall be held in Paris, France. Unless both Parties are located in countries where French is one of the official languages, arbitrator shall be fluent in English language and the arbitration shall be conducted in the English language. The arbitrator shall decide according to Law and not ex aequo et bono. The tribunal of arbitration’s award shall be in writing and shall be final and binding upon the Parties. Each Party waives, to the fullest extent permitted by Law, any right to apply to any court of Law and/or other judicial authority to determine any preliminary point of Law and/or review any question of Law and/or the merits. However, any Party may make an application to any court having jurisdiction for judgment to be entered on the award and/or for the enforcement of any award, including any award granting interlocutory relief and any order for the obtaining of potential evidence which the arbitrator direct be produced as part of the arbitration. The Parties undertake to keep strictly confidential the contents of the arbitration proceedings, the decision and any award of the tribunal of arbitration except to the extent necessary for the enforcement of such award. No action for breach of sale, any contract resulting from this quotation or any covenant or warranty arising therefrom, shall be brought more than one (1) year after the cause of action has accrued.

21. OTHER PROVISIONS Waiver: The failure by the Seller to invoke any of the clauses of these T&CSG cannot be validly interpreted as constituting a waiver to its rights under the aforementioned T&CSG, except when expressly agreed in writing. Severability: If at any time any provision of these T&CSG shall be found by any court or administrative body of competent jurisdiction to be invalid, illegal or unenforceable, such illegality, invalidity or unenforceability shall not affect the other provisions of these T&CSG which shall remain in full force and effect. In the event that the circumstances referred to the first paragraph of this article occur, the Parties agree to attempt to substitute for any invalid, illegal, or unenforceable provision a valid, legal and enforceable provision which achieves, to the greatest extent possible the same effect as would have been achieved by the invalid, illegal or unenforceable provision. Mitigation of loss: Both Parties shall take all reasonable steps to mitigate any loss resulting from any breach of the Agreement by the other Party. Language: It is under the responsibility of the Purchaser to specify the language of the documentation to be supplied otherwise it will be supplied in French and/or English.

Page 47 of 50 Sundyne International S.A., 12-15 Bd Eiffel, B.P. 30 | 21604 Longvic Cedex, France | Phone: +33 380 383300 | Fax: +33 380 383366

Current issue date: 28 May 2021 Original approval(s):Expiry date: 27 May 2024 ISO 9001 - 12 June 1991 Certificate identity number: 10355243

Certificate of Approval

Daniel Oliva Marcilio de Souza

Area Operations Manager - South Europe

Issued by: LRQA France SAS

for and on behalf of: Lloyd's Register Quality Assurance Limited

Lloyd's Register Group Limited, its affiliates and subsidiaries, including Lloyd's Register Quality Assurance Limited (LRQA), and their respective officers, employees or agents are, individually and collectively, referred to in this clause as 'Lloyd's Register'. Lloyd's Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant Lloyd's Register entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract.Issued by: LRQA France SAS, Tour Swiss Life, 1 Boulevard Marius Vivier Merle,Cedex 03, 69443 Lyon, France for and on behalf of: Lloyd's Register Quality Assurance Limited, 1 Trinity Park, Bickenhill Lane, Birmingham B37 7ES, United Kingdom

Page 1 of 1

This is to certify that the Management System of:

SUNDYNE INTERNATIONAL SA13-15 Boulevard Eiffel, BP 30, 21604 Longvic Cedex, France

has been approved by Lloyd's Register to the following standards:

ISO 9001:2015Approval number(s): ISO 9001 – 0027845

The scope of this approval is applicable to:

ISO 9001:2015Design, manufacturing and sales of fluid handling solutions based on centrifugal pumps and centrifugal or diaphragm compressors

Current issue date: 28 May 2021 Original approval(s):Expiry date: 27 May 2024 ISO 14001 - 28 May 2009 Certificate identity number: 10355245

Certificate of Approval

Daniel Oliva Marcilio de Souza

Area Operations Manager - South Europe

Issued by: LRQA France SAS

for and on behalf of: Lloyd's Register Quality Assurance Limited

Lloyd's Register Group Limited, its affiliates and subsidiaries, including Lloyd's Register Quality Assurance Limited (LRQA), and their respective officers, employees or agents are, individually and collectively, referred to in this clause as 'Lloyd's Register'. Lloyd's Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant Lloyd's Register entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract.Issued by: LRQA France SAS, Tour Swiss Life, 1 Boulevard Marius Vivier Merle,Cedex 03, 69443 Lyon, France for and on behalf of: Lloyd's Register Quality Assurance Limited, 1 Trinity Park, Bickenhill Lane, Birmingham B37 7ES, United Kingdom

Page 1 of 1

This is to certify that the Management System of:

SUNDYNE INTERNATIONAL SA13-15 Boulevard Eiffel, BP 30, 21604 Longvic Cedex, France

has been approved by Lloyd's Register to the following standards:

ISO 14001:2015Approval number(s): ISO 14001 – 0027844

The scope of this approval is applicable to:

ISO 14001:2015Design, manufacturing and sales of fluid handling solutions based on centrifugal pumps and centrifugal or diaphragm compressors

Current issue date: 28 May 2021 Original approval(s):Expiry date: 27 May 2024 ISO 45001 - 26 April 2021 Certificate identity number: 10355241

Certificate of Approval

Daniel Oliva Marcilio de Souza

Area Operations Manager - South Europe

Issued by: LRQA France SAS

for and on behalf of: Lloyd's Register Quality Assurance Limited

Lloyd's Register Group Limited, its affiliates and subsidiaries, including Lloyd's Register Quality Assurance Limited (LRQA), and their respective officers, employees or agents are, individually and collectively, referred to in this clause as 'Lloyd's Register'. Lloyd's Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant Lloyd's Register entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract.Issued by: LRQA France SAS, Tour Swiss Life, 1 Boulevard Marius Vivier Merle,Cedex 03, 69443 Lyon, France for and on behalf of: Lloyd's Register Quality Assurance Limited, 1 Trinity Park, Bickenhill Lane, Birmingham B37 7ES, United Kingdom

Page 1 of 1

This is to certify that the Management System of:

SUNDYNE INTERNATIONAL SA13-15 Boulevard Eiffel, 21604 LONGVIC, France

has been approved by Lloyd's Register to the following standards:

ISO 45001:2018Approval number(s): ISO 45001 – 0027846

The scope of this approval is applicable to:

Manufacturing and sales of fluid handling solutions based on centrifugal pumps and centrifugal or diaphragm compressors

SUNDYNE QUOTE SPARE PARTS Sundyne International SA

13-15, Boulevard Eiffel, B.P. 30, 21604 LONGVIC CEDEX FRANCE ¤ Phone(33) 3.80.38.33.00 ¤ Fax: (33) 3.80.38.33.71¤ www.sundyne.com

Rev.0 by Genevieve PEPIN Date : 13/10/2021

Customer Name : Farabi Yanbu Petrochemicals Company

Quote No : P-21250-SA

Model : LMV-311

Item No : 202-P-01 A/B

Quantity : 2

* Item Location Numbers that begin with * are spare part items.

  These items are included in assemblies/kits of pump gearbox items or are repair kits.

Class1: Minimum recommended spare parts necessary to perform a startup, and inspection of a new unit

Class2: Minimum recommended spare parts necessary to cover 1-2 years of normal operation

Class3: Minimum recommended spare parts necessary for critical services or units that will be installed in remote locations

ITEMClass

1

Class

2

Class

3

- BEARING (DE & NDE) 0 1 1

DESCRIPTION

MAIN MOTOR

Quantity for 2 pumps

Page 1 de 3

SUNDYNE QUOTE SPARE PARTS Sundyne International SA

13-15, Boulevard Eiffel, B.P. 30, 21604 LONGVIC CEDEX FRANCE ¤ Phone(33) 3.80.38.33.00 ¤ Fax: (33) 3.80.38.33.71¤ www.sundyne.com

Rev.0 by Genevieve PEPIN Date : 13/10/2021

Customer Name : Farabi Yanbu Petrochemicals Company

Quote No : P-21250-SA

Model : LMV-311

Item No : 202-P-01 A/B

Quantity : 2

* Item Location Numbers that begin with * are spare part items.

  These items are included in assemblies/kits of pump gearbox items or are repair kits.

Class1: Minimum recommended spare parts necessary to perform a startup, and inspection of a new unit

Class2: Minimum recommended spare parts necessary to cover 1-2 years of normal operation

Class3: Minimum recommended spare parts necessary for critical services or units that will be installed in remote locations

ITEMClass

1

Class

2

Class

3

115 INPUT SHAFT, SEAL 2 1 1

* 115A LOWER LIP SEAL 4 2 0

* 125A IDLER SHAFT LOWER BALL BEARING 0 1 1

* 125B IDLER SHAFT UPPER BALL BEARING 0 1 1

* 125C INPUT SHAFT LOWER BALL BEARING 0 1 1

* 125D INPUT SHAFT UPPER BALL BEARING 0 1 1

151A HSS, OUTPUT BEARING 0 0 1

151B HSS, INPUT BEARING 0 0 1

154D LOWER BEARING LOCK WASHER 0 0 3

154E UPPER BRNG LOCK WASHER 0 0 3

155A LOWER THRUST WASHER 0 0 1

155B UPPER THRUST WASHER 0 0 1

160 INTERNAL LUBE PUMP 0 0 1

185 LUBE OIL FILTER 4 5 0

23A LUBE PUMP SPRING 0 0 1

51D GBOX SEAL ROTATING 0 1 1

* 60C GBOX MECHANICAL SEAL 2 0 0

60C GBOX MECHANICAL SEAL 0 1 1

936AG GBOX HOUSING SEALING 4 2 2

936N LUBE MANIFOLD O-RING 4 2 2

936T LUBE BEARING PLATE O-RING 4 2 2

A130 HIGH SPEED SHAFT ASSY 0 0 1

Quantity for 2 pumps

GEARBOX

DESCRIPTION

Page 2 de 3

SUNDYNE QUOTE SPARE PARTS Sundyne International SA

13-15, Boulevard Eiffel, B.P. 30, 21604 LONGVIC CEDEX FRANCE ¤ Phone(33) 3.80.38.33.00 ¤ Fax: (33) 3.80.38.33.71¤ www.sundyne.com

Rev.0 by Genevieve PEPIN Date : 13/10/2021

Customer Name : Farabi Yanbu Petrochemicals Company

Quote No : P-21250-SA

Model : LMV-311

Item No : 202-P-01 A/B

Quantity : 2

* Item Location Numbers that begin with * are spare part items.

  These items are included in assemblies/kits of pump gearbox items or are repair kits.

Class1: Minimum recommended spare parts necessary to perform a startup, and inspection of a new unit

Class2: Minimum recommended spare parts necessary to cover 1-2 years of normal operation

Class3: Minimum recommended spare parts necessary for critical services or units that will be installed in remote locations

ITEMClass

1

Class

2

Class

3

10 INDUCER STUD 0 1 1

2 IMPELLER 0 0 1

4 IMPELLER KEY 2 1 1

5 TAB WASHER 2 1 2

87A GASKET THERMAL BARRIER 4 2 2

9 INDUCER 0 0 1

916S GBOX TO SEAL HOUSING LOWER WASHER 0 0 4

936B DIFFUSER SEALING 2 1 1

936C DIFFUSER SEALING 2 1 1

* RK O-RING REPAIR KIT 2 1 1

50A DOUBLE / TANDEM LOWER SHAFT SLEEVE 0 1 1

50B DOUBLE / TANDEM UPPER SHAFT SLEEVE 0 1 1

51A SINGLE & TANDEM SEAL LOWER ROTATING FACE 2 1 1

51B TANDEM SEAL UPPER ROTATING FACE 2 1 1

* 60A LOWER MECHANICAL SEAL 2 0 0

60A LOWER MECHANICAL SEAL 0 1 1

* 60B UPPER MECHANICAL SEAL 2 0 0

60B UPPER MECHANICAL SEAL 0 1 1

916A LWR SEAL LOCK WASHER 0 0 3

916B UPPER SEAL LOCK WASHER 0 0 3

Quantity for 2 pumps

PUMP

DESCRIPTION

Page 3 de 3

SUNDYNE QUOTE SPARE PARTS Sundyne International SA

13-15, Boulevard Eiffel, B.P. 30, 21604 LONGVIC CEDEX FRANCE ¤ Phone(33) 3.80.38.33.00 ¤ Fax: (33) 3.80.38.33.71¤ www.sundyne.com

Rev.0 by Genevieve PEPIN Date : 13/10/2021

Customer Name : Farabi Yanbu Petrochemicals Company

Quote No : P-21250-SA

Model : LMV-311

Item No : 202-P-03 A/B

Quantity : 2

* Item Location Numbers that begin with * are spare part items.

  These items are included in assemblies/kits of pump gearbox items or are repair kits.

Class1: Minimum recommended spare parts necessary to perform a startup, and inspection of a new unit

Class2: Minimum recommended spare parts necessary to cover 1-2 years of normal operation

Class3: Minimum recommended spare parts necessary for critical services or units that will be installed in remote locations

ITEMClass

1

Class

2

Class

3

- BEARING (DE & NDE) 0 1 1

DESCRIPTION

MAIN MOTOR

Quantity for 2 pumps

Page 1 de 3

SUNDYNE QUOTE SPARE PARTS Sundyne International SA

13-15, Boulevard Eiffel, B.P. 30, 21604 LONGVIC CEDEX FRANCE ¤ Phone(33) 3.80.38.33.00 ¤ Fax: (33) 3.80.38.33.71¤ www.sundyne.com

Rev.0 by Genevieve PEPIN Date : 13/10/2021

Customer Name : Farabi Yanbu Petrochemicals Company

Quote No : P-21250-SA

Model : LMV-311

Item No : 202-P-03 A/B

Quantity : 2

* Item Location Numbers that begin with * are spare part items.

  These items are included in assemblies/kits of pump gearbox items or are repair kits.

Class1: Minimum recommended spare parts necessary to perform a startup, and inspection of a new unit

Class2: Minimum recommended spare parts necessary to cover 1-2 years of normal operation

Class3: Minimum recommended spare parts necessary for critical services or units that will be installed in remote locations

ITEMClass

1

Class

2

Class

3

115 INPUT SHAFT, SEAL 2 1 1

* 115A LOWER LIP SEAL 4 2 0

* 125A IDLER SHAFT LOWER BALL BEARING 0 1 1

* 125B IDLER SHAFT UPPER BALL BEARING 0 1 1

* 125C INPUT SHAFT LOWER BALL BEARING 0 1 1

* 125D INPUT SHAFT UPPER BALL BEARING 0 1 1

151A HSS, OUTPUT BEARING 0 0 1

151B HSS, INPUT BEARING 0 0 1

154D LOWER BEARING LOCK WASHER 0 0 3

154E UPPER BRNG LOCK WASHER 0 0 3

155A LOWER THRUST WASHER 0 0 1

155B UPPER THRUST WASHER 0 0 1

160 INTERNAL LUBE PUMP 0 0 1

185 LUBE OIL FILTER 4 5 0

23A LUBE PUMP SPRING 0 0 1

51D GBOX SEAL ROTATING 0 1 1

* 60C GBOX MECHANICAL SEAL 2 0 0

60C GBOX MECHANICAL SEAL 0 1 1

936AG GBOX HOUSING SEALING 4 2 2

936N LUBE MANIFOLD O-RING 4 2 2

936T LUBE BEARING PLATE O-RING 4 2 2

A130 HIGH SPEED SHAFT ASSY 0 0 1

Quantity for 2 pumps

GEARBOX

DESCRIPTION

Page 2 de 3

SUNDYNE QUOTE SPARE PARTS Sundyne International SA

13-15, Boulevard Eiffel, B.P. 30, 21604 LONGVIC CEDEX FRANCE ¤ Phone(33) 3.80.38.33.00 ¤ Fax: (33) 3.80.38.33.71¤ www.sundyne.com

Rev.0 by Genevieve PEPIN Date : 13/10/2021

Customer Name : Farabi Yanbu Petrochemicals Company

Quote No : P-21250-SA

Model : LMV-311

Item No : 202-P-03 A/B

Quantity : 2

* Item Location Numbers that begin with * are spare part items.

  These items are included in assemblies/kits of pump gearbox items or are repair kits.

Class1: Minimum recommended spare parts necessary to perform a startup, and inspection of a new unit

Class2: Minimum recommended spare parts necessary to cover 1-2 years of normal operation

Class3: Minimum recommended spare parts necessary for critical services or units that will be installed in remote locations

ITEMClass

1

Class

2

Class

3

10 INDUCER STUD 0 1 1

2 IMPELLER 0 0 1

4 IMPELLER KEY 2 1 1

5 TAB WASHER 2 1 2

87A GASKET THERMAL BARRIER 4 2 2

9 INDUCER 0 0 1

916S GBOX TO SEAL HOUSING LOWER WASHER 0 0 4

936B DIFFUSER SEALING 2 1 1

936C DIFFUSER SEALING 2 1 1

* RK O-RING REPAIR KIT 2 1 1

50A DOUBLE / TANDEM LOWER SHAFT SLEEVE 0 1 1

50B DOUBLE / TANDEM UPPER SHAFT SLEEVE 0 1 1

51B TANDEM SEAL UPPER ROTATING FACE 2 1 1

* 60A LOWER MECHANICAL SEAL 2 0 0

60A LOWER MECHANICAL SEAL 0 1 1

* 60B UPPER MECHANICAL SEAL 2 0 0

60B UPPER MECHANICAL SEAL 0 1 1

916A LWR SEAL LOCK WASHER 0 0 3

916B UPPER SEAL LOCK WASHER 0 0 3

Quantity for 2 pumps

PUMP

DESCRIPTION

Page 3 de 3

SUNDYNE QUOTE SPARE PARTS Sundyne International SA

13-15, Boulevard Eiffel, B.P. 30, 21604 LONGVIC CEDEX FRANCE ¤ Phone(33) 3.80.38.33.00 ¤ Fax: (33) 3.80.38.33.71¤ www.sundyne.com

Rev.0 by Genevieve PEPIN Date : 13/10/2021

Customer Name : Farabi Yanbu Petrochemicals Company

Quote No : P-21250-SA

Model : LMV-331N

Item No : 203-P-01 A/B

Quantity : 2

* Item Location Numbers that begin with * are spare part items.

  These items are included in assemblies/kits of pump gearbox items or are repair kits.

Class1: Minimum recommended spare parts necessary to perform a startup, and inspection of a new unit

Class2: Minimum recommended spare parts necessary to cover 1-2 years of normal operation

Class3: Minimum recommended spare parts necessary for critical services or units that will be installed in remote locations

ITEMClass

1

Class

2

Class

3

- BEARING (DE & NDE) 0 1 1

DESCRIPTION

MAIN MOTOR

Quantity for 2 pumps

Page 1 de 3

SUNDYNE QUOTE SPARE PARTS Sundyne International SA

13-15, Boulevard Eiffel, B.P. 30, 21604 LONGVIC CEDEX FRANCE ¤ Phone(33) 3.80.38.33.00 ¤ Fax: (33) 3.80.38.33.71¤ www.sundyne.com

Rev.0 by Genevieve PEPIN Date : 13/10/2021

Customer Name : Farabi Yanbu Petrochemicals Company

Quote No : P-21250-SA

Model : LMV-331N

Item No : 203-P-01 A/B

Quantity : 2

* Item Location Numbers that begin with * are spare part items.

  These items are included in assemblies/kits of pump gearbox items or are repair kits.

Class1: Minimum recommended spare parts necessary to perform a startup, and inspection of a new unit

Class2: Minimum recommended spare parts necessary to cover 1-2 years of normal operation

Class3: Minimum recommended spare parts necessary for critical services or units that will be installed in remote locations

ITEMClass

1

Class

2

Class

3

115 INPUT SHAFT, SEAL 2 1 1

* 115A LOWER LIP SEAL 4 2 0

* 125A IDLER SHAFT LOWER BALL BEARING 0 1 1

* 125B IDLER SHAFT UPPER BALL BEARING 0 1 1

* 125C INPUT SHAFT LOWER BALL BEARING 0 1 1

* 125D INPUT SHAFT UPPER BALL BEARING 0 1 1

151A HSS, OUTPUT BEARING 0 0 1

151B HSS, INPUT BEARING 0 0 1

154D LOWER BEARING LOCK WASHER 0 0 3

154E UPPER BRNG LOCK WASHER 0 0 3

155A LOWER THRUST WASHER 0 0 1

155B UPPER THRUST WASHER 0 0 1

160 INTERNAL LUBE PUMP 0 0 1

175 RELIEF VALVE 0 0 1

185 LUBE OIL FILTER 4 5 0

51D GBOX SEAL ROTATING 0 1 1

* 60C GBOX MECHANICAL SEAL 2 0 0

60C GBOX MECHANICAL SEAL 0 1 1

936AG GBOX HOUSING SEALING 4 2 2

936N LUBE MANIFOLD O-RING 4 2 2

936T LUBE BEARING PLATE O-RING 4 2 2

A130 HIGH SPEED SHAFT ASSY 0 0 1

Quantity for 2 pumps

GEARBOX

DESCRIPTION

Page 2 de 3

SUNDYNE QUOTE SPARE PARTS Sundyne International SA

13-15, Boulevard Eiffel, B.P. 30, 21604 LONGVIC CEDEX FRANCE ¤ Phone(33) 3.80.38.33.00 ¤ Fax: (33) 3.80.38.33.71¤ www.sundyne.com

Rev.0 by Genevieve PEPIN Date : 13/10/2021

Customer Name : Farabi Yanbu Petrochemicals Company

Quote No : P-21250-SA

Model : LMV-331N

Item No : 203-P-01 A/B

Quantity : 2

* Item Location Numbers that begin with * are spare part items.

  These items are included in assemblies/kits of pump gearbox items or are repair kits.

Class1: Minimum recommended spare parts necessary to perform a startup, and inspection of a new unit

Class2: Minimum recommended spare parts necessary to cover 1-2 years of normal operation

Class3: Minimum recommended spare parts necessary for critical services or units that will be installed in remote locations

ITEMClass

1

Class

2

Class

3

10 INDUCER STUD 0 1 1

2 IMPELLER 0 0 1

5 TAB WASHER 2 1 2

87A GASKET THERMAL BARRIER 4 2 2

9 INDUCER 0 0 1

916S GBOX TO SEAL HOUSING LOWER WASHER 0 0 4

936B DIFFUSER SEALING 2 1 1

936C DIFFUSER SEALING 2 1 1

* RK O-RING REPAIR KIT 2 1 1

50A DOUBLE / TANDEM LOWER SHAFT SLEEVE 0 1 1

50B DOUBLE / TANDEM UPPER SHAFT SLEEVE 0 1 1

51B TANDEM SEAL UPPER ROTATING FACE 2 1 1

* 60A LOWER MECHANICAL SEAL 2 0 0

60A LOWER MECHANICAL SEAL 0 1 1

* 60B UPPER MECHANICAL SEAL 2 0 0

60B UPPER MECHANICAL SEAL 0 1 1

916A LWR SEAL LOCK WASHER 0 0 3

916B UPPER SEAL LOCK WASHER 0 0 3

Quantity for 2 pumps

PUMP

DESCRIPTION

Page 3 de 3

SUNDYNE QUOTE SPARE PARTS Sundyne International SA

13-15, Boulevard Eiffel, B.P. 30, 21604 LONGVIC CEDEX FRANCE ¤ Phone(33) 3.80.38.33.00 ¤ Fax: (33) 3.80.38.33.71¤ www.sundyne.com

Rev.0 by Genevieve PEPIN Date : 13/10/2021

Customer Name : Farabi Yanbu Petrochemicals Company

Quote No : P-21250-SA

Model : LMV-311

Item No : 203-P-02 A/B

Quantity : 2

* Item Location Numbers that begin with * are spare part items.

  These items are included in assemblies/kits of pump gearbox items or are repair kits.

Class1: Minimum recommended spare parts necessary to perform a startup, and inspection of a new unit

Class2: Minimum recommended spare parts necessary to cover 1-2 years of normal operation

Class3: Minimum recommended spare parts necessary for critical services or units that will be installed in remote locations

ITEMClass

1

Class

2

Class

3

- BEARING (DE & NDE) 0 1 1

DESCRIPTION

MAIN MOTOR

-

Quantity for 2 pumps

Page 1 de 3

SUNDYNE QUOTE SPARE PARTS Sundyne International SA

13-15, Boulevard Eiffel, B.P. 30, 21604 LONGVIC CEDEX FRANCE ¤ Phone(33) 3.80.38.33.00 ¤ Fax: (33) 3.80.38.33.71¤ www.sundyne.com

Rev.0 by Genevieve PEPIN Date : 13/10/2021

Customer Name : Farabi Yanbu Petrochemicals Company

Quote No : P-21250-SA

Model : LMV-311

Item No : 203-P-02 A/B

Quantity : 2

* Item Location Numbers that begin with * are spare part items.

  These items are included in assemblies/kits of pump gearbox items or are repair kits.

Class1: Minimum recommended spare parts necessary to perform a startup, and inspection of a new unit

Class2: Minimum recommended spare parts necessary to cover 1-2 years of normal operation

Class3: Minimum recommended spare parts necessary for critical services or units that will be installed in remote locations

ITEMClass

1

Class

2

Class

3

115 INPUT SHAFT, SEAL 2 1 1

* 115A LOWER LIP SEAL 4 2 0

* 125A IDLER SHAFT LOWER BALL BEARING 0 1 1

* 125B IDLER SHAFT UPPER BALL BEARING 0 1 1

* 125C INPUT SHAFT LOWER BALL BEARING 0 1 1

* 125D INPUT SHAFT UPPER BALL BEARING 0 1 1

151A HSS, OUTPUT BEARING 0 0 1

151B HSS, INPUT BEARING 0 0 1

154D LOWER BEARING LOCK WASHER 0 0 3

154E UPPER BRNG LOCK WASHER 0 0 3

155A LOWER THRUST WASHER 0 0 1

155B UPPER THRUST WASHER 0 0 1

160 INTERNAL LUBE PUMP 0 0 1

185 LUBE OIL FILTER 4 5 0

23A LUBE PUMP SPRING 0 0 1

51D GBOX SEAL ROTATING 0 1 1

* 60C GBOX MECHANICAL SEAL 2 0 0

60C GBOX MECHANICAL SEAL 0 1 1

936AG GBOX HOUSING SEALING 4 2 2

936N LUBE MANIFOLD O-RING 4 2 2

936T LUBE BEARING PLATE O-RING 4 2 2

A130 HIGH SPEED SHAFT ASSY 0 0 1

Quantity for 2 pumps

GEARBOX

DESCRIPTION

Page 2 de 3

SUNDYNE QUOTE SPARE PARTS Sundyne International SA

13-15, Boulevard Eiffel, B.P. 30, 21604 LONGVIC CEDEX FRANCE ¤ Phone(33) 3.80.38.33.00 ¤ Fax: (33) 3.80.38.33.71¤ www.sundyne.com

Rev.0 by Genevieve PEPIN Date : 13/10/2021

Customer Name : Farabi Yanbu Petrochemicals Company

Quote No : P-21250-SA

Model : LMV-311

Item No : 203-P-02 A/B

Quantity : 2

* Item Location Numbers that begin with * are spare part items.

  These items are included in assemblies/kits of pump gearbox items or are repair kits.

Class1: Minimum recommended spare parts necessary to perform a startup, and inspection of a new unit

Class2: Minimum recommended spare parts necessary to cover 1-2 years of normal operation

Class3: Minimum recommended spare parts necessary for critical services or units that will be installed in remote locations

ITEMClass

1

Class

2

Class

3

10 INDUCER STUD 0 1 1

2 IMPELLER 0 0 1

4 IMPELLER KEY 2 1 1

5 TAB WASHER 2 1 2

87A GASKET THERMAL BARRIER 4 2 2

9 INDUCER 0 0 1

916S GBOX TO SEAL HOUSING LOWER WASHER 0 0 4

936B DIFFUSER SEALING 2 1 1

936C DIFFUSER SEALING 2 1 1

* RK O-RING REPAIR KIT 2 1 1

50A DOUBLE / TANDEM LOWER SHAFT SLEEVE 0 1 1

50B DOUBLE / TANDEM UPPER SHAFT SLEEVE 0 1 1

51B TANDEM SEAL UPPER ROTATING FACE 2 1 1

* 60A LOWER MECHANICAL SEAL 2 0 0

60A LOWER MECHANICAL SEAL 0 1 1

* 60B UPPER MECHANICAL SEAL 2 0 0

60B UPPER MECHANICAL SEAL 0 1 1

916A LWR SEAL LOCK WASHER 0 0 3

916B UPPER SEAL LOCK WASHER 0 0 3

Quantity for 2 pumps

PUMP

DESCRIPTION

Page 3 de 3

Sundyne LMV-311Pump and Gearbox Cross Section

Single Seal Arrangement

OptionalInducer and Alignment Pins

Arvada, CO 80007 USA, +1-303-425-0800, FAX: +1-303-425-0896, Longvic Cedex, France, +33-380-383300, FAX: +33-380-383371www.sundyne.com

OptionalDual Unpressurized

(Tandem) Seal

OptionalInternal Centrifugal

Separator

OptionalDual Pressurized

(Double) Seal

OptionalCoupledInput Shaft

Note:1. Item numbers listed above identify only part location and must be used with parts list for specific pump.2. A combination of options may be used in a specific unit. Refer to instruction manual.3. A solid shaft and flexible coupling is used on some units instead of splined interconnecting shaft.

936J

60A

936J

50B60B

51C936J6651A

60B

52

60A

4

936J

51C

936J

50A

936V9190

936U905P916L

936Z

10936F

14B

9

5 (Ref)

915S5021B14A

60A

51A936J132 5936G936C

936A936D936B

905L 936E

936H 13936F

905J916E916M914D

120 110115 936M

920A

123A

122A

173

132B130

155A905M154D

158

174B174C

101A151B154E905N155B133B191924E151A914A911905A/915A3015936K

924G

905H916D

185140

920B920C122C123B125A174A

51D60C

924D87A

918D

180

125B924F123C920D132C125D174D936T936N

905R916N916P914G

or

23A186947A160924K101B102

909B916H914E &909C916J914F

125C

Instruction and Operation Manual

SA-07-11-86, Rev B Oct 2016115

LMV-331N Cross Section with Item Location Numbers

Figure 18. Pump and Gearbox Cross Section (single process seal configuration)

THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION OF ACCUDYNE INDUSTRIES. NEITHER RECEIPT NOR POSSESSION THEREOF CONFERS ANY RIGHT TO REPRODUCE OR

USE OR DISCLOSE IN WHOLE OR IN PART ANY SUCH INFORMATION WITHOUT WRITTEN AUTHORIZATION FROM ACCUDYNE INDUSTRIES.

CUSTOMER : L&T Hydrocarbon Engineering

USER : FARABI YANBU PETROCHEMICALS COMPANY

QUOTE N° : P-21250-SA

ITEMS N° : 202-P-01A/B & 202-P-03A/B & 203-P-01A/B &

203-P-02A/B

MODEL : (6) LMV-311 & (2) LMV-331N

PRELIMINARY UTILITY LIST REV.0

ELECTRICITY : Main motors : Items 202-P-01A/B & 202-P-03A/B: 75 kW (2 poles) 460V 3ph 60Hz Item 203-P-01A/B: 160 kW (2 poles) 460V 3ph 60Hz Item 203-P-02A/B: 110 kW (2 poles) 460V 3ph 60Hz

INSTRUMENTS ELECTRICITY : Transmitters : 24 V DC / 4-20 mA

COOLING WATER : Requirement for LMV-311 & LMV-331N Gearbox Cooler : 2.5m3/hr Estimated Requirement for API 52 & 53B Cooler : 1 - 1.5m3/hr

P-21250-SA

revision 0 14-Oct-21

Category A: Deviations as per Manufacturer’s standards design and can not be withdrawn in any circumstances including additional payment or time implication.

Category B: Deviations which have been proposed as technical alternative by Supplier. If not accepted by OWNER / PMC, Supplier shall follow the requisition requirement / specifications without any cost and time implications to Purchaser

Category C: Deviations having either ‘time’ or ‘cost’ or ‘time & cost’ implications. If not accepted by OWNER / PMC, Supplier shall inform implications for compliance to requisition requirement / specifications.

Category D : Not a deviation against any requisition requirements. Supplier’s clarification or basis for the offer.

Material Requisition for Integrally Geared Centrifugal Pumps (OH6) FRBN-MER QE-R2-002.pdf // Rev. 01

Para. Specification Requirement Sundyne comment on 14/10/2021

6.6 Document to be Submitted within period vis-à-vis LOI date Documents will be Submitted by Sundyne within period vis-à-vis LOA date, not LOI One

6.6 Foundation load data and equipment foundation drawing required to be provided within 6 weeks This is part of GA Drawing so will be provided within 8 Weeks from LOA

6.6 Filled in Data Sheet (As per Project format) to be provided within 4 Weeks This document will be provided within 6 Weeks from LOA by Sundyne

6.6 Utility List to be provided wihtin 2 Weeks This document will be provided within 8 Weeks from LOA by Sundyne

11.1 Supplier shall furnish cleats for insulation, as applicable per project specification No Cleats will be supplied by Sundyne as Insulation method / requirements unknown as part of LTHE scope of supply

Requirements for Vibration Measurement Annexure 4.11 - Requirements for Vibration Measurement.docx // Rev. /

Para. Specification Requirement Sundyne comment on 14/10/2021

1. (a) Vibration of each rotating machinery item of pumps train shall be recorded during shop testing.Vibration of Proposed OH6 Pumps only will be recorded during performance test on Sundyne Test

Bench.D

Rest of the

Document

Excepted is taken to all the other parts of this document as Small Skids with Light Weights are

proposed on which Vertical Pumps will be fitted without vertical stand so the requirements of this

document are not relevant.

D

Logistics Support Format Annexure-4.4_Logistic Support Format.doc // Rev. /

Para. Specification Requirement Sundyne comment on 14/10/2021

All Vendor will fill the format during detail Engineering only after P.O. Placement D

ITP - OH6 Type Centrifugal Pumps FPDC-LTHE-QA-MECH-IITP-022_IITP -OH6 Type Centrifugal Pumps .pdf // Rev. 2

Para. Specification Requirement Sundyne comment on 14/10/2021

§ 2.6 PWHT Procedures Part of PQR

§ 3.2 Fit-up & Welding (For Fabricated casing) Not Applicable D

§ 3.3 P.T examination on Final Weld & Machined Parts Final Weld Not Applicable for the proposed Casing D

§ 3.4 Visual and Dimensional Check after machining of Casing Fabrication

Not possible to do such check nor give some report about it as Casing Drawings are Sundyne proprietary so complete exception is

taken for this line

Sundyne informed that dimensional check (excluding suction and discharge flange check) will not be offered as these are

propritery items (Drawings are not available) and balance activities (like NDT and visual Inspection) shall be carried out as per IITP

A

§ 3.5 PMI Not Applicable as proposed Casing are in Carbon Steel Material

§ 3.6 Radiography Testing of Weld joints - Review of RT films Not Applicable

§ 4.2 Visual and Dimensional Check after machining of Shaft

Not possible to do such check nor give some report about it as Shaft Drawings are Sundyne proprietary so complete exception is

taken for this line

Sundyne informed that dimensional check will not be offered as these are propritery items (Drawings are not available) and

balance activities (NDT and visual Inspection) shall be carried out as per IITP .

A

§ 4.3 PMI Not Applicable as proposed Shaft is in 4140 Steel Material

§ 5.2 Visual and Dimensional Check after machining of Impeller

Not possible to do such check nor give some report about it as Impeller Drawings are Sundyne proprietary so complete exception is

taken for this line

Sundyne informed that dimensional check will not be offered as these are propritery items (Drawings are not available) and

balance activities (NDT and visual Inspection) shall be carried out as per IITP .

A

§ 6.7 R.T of Welds Not Applicable for proposed Baseplates. This is applicable for piping only . Percentage RT will be 10%

COMMENTS AND DEVIATIONS ON CUSTOMER’S SPECIFICATIONS

Herebelow are listed the specifications taken into account for Sundyne’s offer.

Documents that are not listed are considered not applicable and are fully deviated.

Cross reference specifications are not applicable or shall be reviewed separately if sent by customer.

Cost ImpactCATEGORYLTHE Response Open / Close Sundyne Response

Owner Department : Applications P-21250-SA_Deviation list to specifications.xlsx rev1

P-21250-SA

revision 0 14-Oct-21

Category A: Deviations as per Manufacturer’s standards design and can not be withdrawn in any circumstances including additional payment or time implication.

Category B: Deviations which have been proposed as technical alternative by Supplier. If not accepted by OWNER / PMC, Supplier shall follow the requisition requirement / specifications without any cost and time implications to Purchaser

Category C: Deviations having either ‘time’ or ‘cost’ or ‘time & cost’ implications. If not accepted by OWNER / PMC, Supplier shall inform implications for compliance to requisition requirement / specifications.

Category D : Not a deviation against any requisition requirements. Supplier’s clarification or basis for the offer.

COMMENTS AND DEVIATIONS ON CUSTOMER’S SPECIFICATIONS

Herebelow are listed the specifications taken into account for Sundyne’s offer.

Documents that are not listed are considered not applicable and are fully deviated.

Cross reference specifications are not applicable or shall be reviewed separately if sent by customer.

Cost ImpactCATEGORYLTHE Response Open / Close Sundyne Response

§ 8.2 Dimensional inspection of Coupling Alignment Not Applicable for the proposed pumps

§ 9.1 Hydrostatic Test of Pump/Vessel/Cooler/Filters Only possible to be H/W on Pumps + Welded Kits, only R on Vessel & API Plan Coolers and Not Applicable for LO Filters

§ 10.5 Mechanical Run Test Not possible to use Job Motors so will be performed but with Shop Test Motors A

§ 10.8 Complete Unit Test Not possible to use Job Motors in regards of Voltage and Hertz so will not be performed A

§ 10.11 Auxiliary Equipment test Not Applicable

§ 11 Electrical Motors Tests in accordance with IEC Standards and Sub-Supplier internal procedure

Notes 5) All pressure retaining parts … EN 10204 Type 2.2 Certification.

Please note that 3.1 Material Certificates will be provided for pressure Parts in contact with process as well as other main

components in contact with process such as inducer, impeller .. + for High Speed Shaft but only 2.1 Material Certificate

will be provided for the other components, not 2.2 as required.

D

Job Specification for Supply - Centrifugal Pump API 610 067401-0000-JSS-0910-001-C_Centrifugal Pump_API 610.pdf // Rev. C

Para. Specification Requirement Sundyne comment on 14/10/2021

§ 2.3 Codes and Standards

API 610 : Customer to refer to Sundyne Standard Comments and Exceptions List to API 610 11th

Edition attached to quote

API 682 is only applicable to Seal Systems not to Mechanical Seals which are as stated in comments

and exceptions List proprietary designed seals not in accordance with API 682.

API 614, API 670 and API 677 are Not Applicable for the proposed Pumps

D

§ 4.6.1. Constant level oiler shall be non-adjustable type (Trico or equivalent) with steel cage.Not applicable for the proposed pumps which are fitted with Gearbox with integral sight glass

indicating oil levelA

§ 4.6.5.Neoprene rubber shall not be used for Benzene services. Graffoil materials of suitable grades shoudl be

usedKalrez 6375 O-Rings have currently been proposed on items handling Benzene D

§ 4.6.8. LubricationConsidered as Not Applicable for the proposed Sundyne Pumps as those have internal pressurised

lubrication systemD

§ 4.6.9. Lube Oil piping shall be made of Stainless SteelLube Oil system proposed by Sundyne will be 100% Manufacturer Standard and will be in Stainless

Steel TubingD

§ 4.6.9. Lube Oil Coolers, shell & type type, shall be designed and manufactured according to TEMA C.

Lube Oil System proposed by Sundyne will be 100% Manufacturer Standard, Shell and Tube Coolers in

regards of their very small sizes shall be considered as integral part of the Gearbox, will be also 100%

manufacturer Standard and certainly not according to TEMA C .

D

§ 4.6.10. Instruments & Control

Only TG and PG are applicable for bare pump, which will be mounted directly on sundyne gear box due

to space constraints and are as per sundyne standard. For Seal plan instruments Sundyne will comply

to the project specifcations.

D

§ 7.1 All the documents including the Supplier Data Book shall be in final code 3 at least one month before the

final inspection

Not acceptable, please replace this sentence by :

All the documents EXCLUDING the Supplier Data Book (as this one includes certificates only prepared

during final inspection) shall be in Code 2 at least one month before the final inspection

Job Specification for Supply - Packaged Units G446-2999-JSS-0195-0101_Job Spec Supply - Pkg Units.pdf // Rev. 1

Para. Specification Requirement Sundyne comment on 14/10/2021

§ 4.6 Transmissions Sundyne proposed pumps are fitted with proprietary designed Gearboxes

§ 4.6 Bearings (2) Vibration adaptors horizontal with a 90° separation will be provided

§ 4.6 Sealing API 614 is not applicable to the proposed pumps

§ 4.6 Shaft CouplingProposed couplings are with removable spacer however for pump maintenance : access to bearings or

seals, motors shall be removed as we are proposing here vertical pumps without vertical stands.

§ 4.7 Pressure Vessels Proposed Coolers are Shell & Tube Coolers but not TEMA C ones.

Owner Department : Applications P-21250-SA_Deviation list to specifications.xlsx rev1

P-21250-SA

revision 0 14-Oct-21

Category A: Deviations as per Manufacturer’s standards design and can not be withdrawn in any circumstances including additional payment or time implication.

Category B: Deviations which have been proposed as technical alternative by Supplier. If not accepted by OWNER / PMC, Supplier shall follow the requisition requirement / specifications without any cost and time implications to Purchaser

Category C: Deviations having either ‘time’ or ‘cost’ or ‘time & cost’ implications. If not accepted by OWNER / PMC, Supplier shall inform implications for compliance to requisition requirement / specifications.

Category D : Not a deviation against any requisition requirements. Supplier’s clarification or basis for the offer.

COMMENTS AND DEVIATIONS ON CUSTOMER’S SPECIFICATIONS

Herebelow are listed the specifications taken into account for Sundyne’s offer.

Documents that are not listed are considered not applicable and are fully deviated.

Cross reference specifications are not applicable or shall be reviewed separately if sent by customer.

Cost ImpactCATEGORYLTHE Response Open / Close Sundyne Response

§ 4.8 Piping, Valves, connections and piping components Tubing will be used on Sundyne Standard Lube Kit

§ 4.12 Minimum Equipment LayoutNo lifting gear consisting of spreader, shackles, slings etc .. Will be delivered with the proposed skids as

not necessary

§ 5.2Inspection : Final inspection can be performed if Supplier drawings have been issued final by Supplier

and stamped accordingly by Contractor

Cosmetic comments cannot be a reason for contractor not to stamp the final supplier drawings and

final inspeciton not to be performed.

§ 5.3 TestingIt is not possible for Sundyne to use Job Motors in regards of Voltage and Hertz for testing, so no

possibility to perform complete unit tests

§ 7.1Shipment preparation : All the documents including in the Vendor Data Book shall be final issued at least

one month before the final inspection.

It is not possible as some documents included in the Vendor Data Book will only be able to be

prepared during final inspection

Updated List of Attachments List of Attachments & Annexures_API 610 (OH6 Type) Pumps_Updated.xlsx // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

E.6. Motor Typical Control Schemes 067401-0000-DW-1664-001 Rev C Rev C listed where Rev B received D

F.5. Standard Specification for Flow Meters and Pressure Instruments 6-18-5 Dated 04-nov-14 Revision dated 04-nov-14 listed where one dated 04APR14 received D

Customer Datasheet for Item 202-P-01A/B 202-P-01 AB.pdf // Rev. 02

Para. Specification Requirement Sundyne comment on 14/10/2021

Sheet 5 Mechanical Seal

Sundyne uses a unique proprietary seal design that is not according to API 682. The Sundyne seal

design is a "semi-cartridge" type that does not require measuring, shimming or setting for installation.

Integrally geared compact stuffing box design does allow the installation of an "anti-sparking" throttle

bushing.

Sheet 5 Mechanical Seal Type : SinglePlease note that we are proposing a dual unpressurised seal arrangement instead of SIngle seal

arrangement in regards of the pumped process.

Sheet 5 Seal Flush Piping Plan : API Plan 13Please note that as we are proposing an API Plan 13M that will need to be connected on site by

customer as close as possible to the tank to increase its function of heat removal to a maximum.

Sheet 5 Buffer FluidCustomer to review the proposed buffer fluid stated as 50/50 water-glycol solution in regards of liquid

handled in the pump : Hydrocarbon

Sheet 6 Material Certification type 2.2 for non pressure partsAgreed as far as we are talking about parts in contact with process for others only type 2.1 Material

Certificate will be provided.

Sheet 7 Pump Notes : 1. Pump vendor to advise minmum continuous capacity Minimum Continuous Flow for the proposed pumps is of 15.5m3/hr

Sheet 7 Pump Notes: 29. Estimated minimum capacities Please note that the Minimum Flow of the proposed Pumps is of 15.5m3/hr

Customer Datasheet for Item 202-P-03A/B 202-P-03 AB.pdf // Rev. 02

Para. Specification Requirement Sundyne comment on 14/10/2021

Sheet 3 Other CapacityAn operating capacity is given at 22.9m3/hr where Minimum Flow of the proposed pump is of 36.66m3/hr so this value

must been reviewed by customerA

Sheet 5 Mechanical Seal

Sundyne uses a unique proprietary seal design that is not according to API 682. The Sundyne seal

design is a "semi-cartridge" type that does not require measuring, shimming or setting for installation.

Integrally geared compact stuffing box design does allow the installation of an "anti-sparking" throttle

bushing.

Sheet 5 Mechanical Seal Type : Unpressurised DualIn regards of process : 91.0907wt% Benzene Sundyne preferred to go for dual pressurised seal

arrangement

Owner Department : Applications P-21250-SA_Deviation list to specifications.xlsx rev1

P-21250-SA

revision 0 14-Oct-21

Category A: Deviations as per Manufacturer’s standards design and can not be withdrawn in any circumstances including additional payment or time implication.

Category B: Deviations which have been proposed as technical alternative by Supplier. If not accepted by OWNER / PMC, Supplier shall follow the requisition requirement / specifications without any cost and time implications to Purchaser

Category C: Deviations having either ‘time’ or ‘cost’ or ‘time & cost’ implications. If not accepted by OWNER / PMC, Supplier shall inform implications for compliance to requisition requirement / specifications.

Category D : Not a deviation against any requisition requirements. Supplier’s clarification or basis for the offer.

COMMENTS AND DEVIATIONS ON CUSTOMER’S SPECIFICATIONS

Herebelow are listed the specifications taken into account for Sundyne’s offer.

Documents that are not listed are considered not applicable and are fully deviated.

Cross reference specifications are not applicable or shall be reviewed separately if sent by customer.

Cost ImpactCATEGORYLTHE Response Open / Close Sundyne Response

Sheet 5 Auxiliary Flush Plan : API Plan 52 API Plan 53B proposed in regards of process and available Nitrogen pressure on site.

Sheet 6 Material Certification type 2.2 for non pressure partsAgreed as far as we are talking about parts in contact with process for others only type 2.1 Material

Certificate will be provided.

Sheet 7 Pump Notes : 1. Pump vendor to advise minmum continuous capacity Minimum Continuous Flow for the proposed pumps is of 36.66m3/hr

Sheet 7 Pump Notes: 29. Estimated minimum capacities Please note that the Minimum Flow of the proposed Pumps is of 36.66m3/hr

Customer Datasheet for Item 203-P-01A/B 203-P-01 AB.pdf // Rev. 1

Para. Specification Requirement Sundyne comment on 14/10/2021

Sheet 5 Mechanical Seal

Sundyne uses a unique proprietary seal design that is not according to API 682. The Sundyne seal

design is a "semi-cartridge" type that does not require measuring, shimming or setting for installation.

Integrally geared compact stuffing box design does allow the installation of an "anti-sparking" throttle

bushing.

Sheet 5 Mechanical Seal Type : Unpressurised DualIn regards of process : 99.76wt% Benzene Sundyne preferred to go for dual pressurised seal

arrangement

Sheet 5 Auxiliary Flush Plan : API Plan 52 API Plan 53B proposed in regards of process and available Nitrogen pressure on site.

Sheet 6 Material Certification type 2.2 for non pressure partsAgreed as far as we are talking about parts in contact with process for others only type 2.1 Material

Certificate will be provided.

Sheet 7 Pump Notes : 1. Pump vendor to advise minmum continuous capacity Minimum Continuous Flow for the proposed pumps is of 42.53m3/hr

Sheet 7 Pump Notes: 29. Estimated minimum capacities Please note that the Minimum Flow of the proposed Pumps is of 42.53m3/hr

Customer Datasheet for Item 203-P-02A/B 203-P-02 AB.pdf // Rev. 1

Para. Specification Requirement Sundyne comment on 14/10/2021

Sheet 3 Other CapacityAn operating capacity is given at 22.9m3/hr where Minimum Flow of the proposed pump is of 38.03m3/hr so this value

must been reviewed by customer

Sheet 5 Mechanical Seal

Sundyne uses a unique proprietary seal design that is not according to API 682. The Sundyne seal

design is a "semi-cartridge" type that does not require measuring, shimming or setting for installation.

Integrally geared compact stuffing box design does allow the installation of an "anti-sparking" throttle

bushing.

Sheet 5 Mechanical Seal Type : Unpressurised DualIn regards of process : 99.76wt% Benzene Sundyne preferred to go for dual pressurised seal

arrangement

Sheet 5 Seal Flush Piping Plan : API Plan 31 API Plan 53B proposed in regards of process and available Nitrogen pressure on site.

Sheet 5 Auxiliary Flush Plan : API Plan 52Agreed as far as we are talking about parts in contact with process for others only type 2.1 Material

Certificate will be provided.

Sheet 6 Material Certification type 2.2 for non pressure parts Minimum Continuous Flow for the proposed pumps is of 38.03m3/hr

Sheet 7 Pump Notes : 1. Pump vendor to advise minmum continuous capacity Please note that the Minimum Flow of the proposed Pumps is of 38.03m3/hr

Deviation List Format Deviation List Format.xls // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All Standard Sundyne Format supplied with this quote submission, customer's categories added on this

Supplier Compliance Format Supplier Compliance format.doc // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All This document will be completed and submitted when firm quote will be submitted

2 Years Spare Parts List OH6 Pumps_2 Years spare.doc // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All Modified as per Sundyne's recommendations

Owner Department : Applications P-21250-SA_Deviation list to specifications.xlsx rev1

P-21250-SA

revision 0 14-Oct-21

Category A: Deviations as per Manufacturer’s standards design and can not be withdrawn in any circumstances including additional payment or time implication.

Category B: Deviations which have been proposed as technical alternative by Supplier. If not accepted by OWNER / PMC, Supplier shall follow the requisition requirement / specifications without any cost and time implications to Purchaser

Category C: Deviations having either ‘time’ or ‘cost’ or ‘time & cost’ implications. If not accepted by OWNER / PMC, Supplier shall inform implications for compliance to requisition requirement / specifications.

Category D : Not a deviation against any requisition requirements. Supplier’s clarification or basis for the offer.

COMMENTS AND DEVIATIONS ON CUSTOMER’S SPECIFICATIONS

Herebelow are listed the specifications taken into account for Sundyne’s offer.

Documents that are not listed are considered not applicable and are fully deviated.

Cross reference specifications are not applicable or shall be reviewed separately if sent by customer.

Cost ImpactCATEGORYLTHE Response Open / Close Sundyne Response

Capital Spare Parts List OH6 Pumps_Capital spare.doc // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All Modified as per Sundyne's recommendations

Civil Load Data Civil Load Data.xlsx // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All

Sample of G.A. Drawings will be attached to supplied quote for information only to show an idea of

skid overall to customer while detailed information and so such required document completion will

only be able to be completed and sent in a later quote stage, when technical clarifications will be

finalised

Design Change Format Design Change Format.doc // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All Will be supplied after order placement if necessary

List of Sub-Supplier List of Sub Supplier.xlsx // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All Preliminary proposed list will be prepared and attached to firm quote

Lubricaiton Schedule Format Lubrication Schedule format.xls // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All Will be provided after P.O. Placement

Non-Disclosure Format for Farabi NDA format for FARABI _Rev1.docx // Rev. 1

Para. Specification Requirement Sundyne comment on 14/10/2021

All Assume that this has already been completed and signed from a commercial point of view

Special Tools & Tackles Format Special Tool & Tackles format.xlsx // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All Will be provided when firm quote provided : Only consists in Charging kit and Trolley for API Plan 53B

SPIR Format SPIR Format.XLSX // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All Will be provided after P.O. Placement

Utility Consumption List Sample Utility Consumption List.xls // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All Preliminary proposed list prepared and attached to quote

Weekly Process Report Format Weekly Progress Report.doc // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All Will be prepared after P.O. Placement only

Painting Specification G446-2999-SP-0195-001.pdf // Rev. 2

Para. Specification Requirement Sundyne comment on 14/10/2021

AllStandard Manufacturer proposed as possibility of this stated in the specification, painting instructions

proposal will be supplied later with firm quotation prepared

AllNot Considered by Siemens Motor Sub-Supplier : Painting suitable to corrosion grade C5I according

DIN EN ISO 12944-5, with final color RAL 7035.

Owner Department : Applications P-21250-SA_Deviation list to specifications.xlsx rev1

P-21250-SA

revision 0 14-Oct-21

Category A: Deviations as per Manufacturer’s standards design and can not be withdrawn in any circumstances including additional payment or time implication.

Category B: Deviations which have been proposed as technical alternative by Supplier. If not accepted by OWNER / PMC, Supplier shall follow the requisition requirement / specifications without any cost and time implications to Purchaser

Category C: Deviations having either ‘time’ or ‘cost’ or ‘time & cost’ implications. If not accepted by OWNER / PMC, Supplier shall inform implications for compliance to requisition requirement / specifications.

Category D : Not a deviation against any requisition requirements. Supplier’s clarification or basis for the offer.

COMMENTS AND DEVIATIONS ON CUSTOMER’S SPECIFICATIONS

Herebelow are listed the specifications taken into account for Sundyne’s offer.

Documents that are not listed are considered not applicable and are fully deviated.

Cross reference specifications are not applicable or shall be reviewed separately if sent by customer.

Cost ImpactCATEGORYLTHE Response Open / Close Sundyne Response

EPC Vendor List 067401-0000-NM-602-B_EPC Vendor List.pdf // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All No Comments as far as only major components considered being concerned

Protective Paint and Coatings 16940-00-SP-837 01.pdf // Rev. 1

Para. Specification Requirement Sundyne comment on 14/10/2021

AllStandard Manufacturer proposed as possibility of this stated in the specification, painting instructions

proposal will be supplied later with firm quotation prepared

AllNot Considered by Siemens Motor Sub-Supplier : Painting suitable to corrosion grade C5I according

DIN EN ISO 12944-5, with final color RAL 7035.

External High Temperature Insulation and Weathershielding 9-11-8 External High Temperature Insulation and Weathershielding.pdf // Rev. 06MAY14

Para. Specification Requirement Sundyne comment on 14/10/2021

All Not Applicable for Sundyne however provision will be provided

Basic Engineering Design Questionnaire 993995-A4-BEDQ Rev 02.pdf // Rev. 2

Para. Specification Requirement Sundyne comment on 14/10/2021

All Considered as For Information Only where applicable for Sundyne

Packing, Marking & Shipping Documentation Procedure G446-2999-PP-0030-1101_02_Packing Marking & shipping.pdf // Rev. 2

Para. Specification Requirement Sundyne comment on 14/10/2021

§ 1.2.11 All fluids shall be completely drained ..Please note that it will not be the case for the proposed pump gearboxes which will be shipped filled

with oil which is mandatory according to Sundyne Long Term Storage Procedure.

Document Numbering Procedure G446-2999-PP-0080-0101 Rev-02_Document Numbering Procedure.pdf // Rev. 2

Para. Specification Requirement Sundyne comment on 14/10/2021

All No Comments

Appendix 15 - Training Part B-Appendix 15-Training (Rev 00).pdf // Dated 31-MARS-16

Para. Specification Requirement Sundyne comment on 14/10/2021

1.0 Introduction 1.1 Please provide document number 067401-0000-RT-003

3.0

3.2

Training Objectives

The contractor shall … before the commencement of the course.Please replace six (6) months by two (2) months

4.0

4.1

Traning Plan

The contractor .. Review and approval.Please replace ninety (90) by sixty (60)

5.0

5.1

Training Manuals

Some specific training .. Languages.Please delete Arabic Languages

6.0

6.2.2Training Assesment evaluation and competency Please delete Panel Operator.

Annex 1 Overview of required training courses

* Please delete Modules Details for Detailed Plant Operation for operators

* Module details for Plant and Equipment Maintenance : Please replace 5 days by 3 days

* Please delete Module Details for DCS and electronic control system, licensor training, vendor

training, training for the employer's trainers and Project Interface Training.

Annex 2 Minimum Requirement for Training Please delete point excel table A-B-C

Royal Commission Environmental Regulations - Volume I RCER-2015-Volume I- FINAL-July 2, 2015.pdf // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All No Comments

Owner Department : Applications P-21250-SA_Deviation list to specifications.xlsx rev1

P-21250-SA

revision 0 14-Oct-21

Category A: Deviations as per Manufacturer’s standards design and can not be withdrawn in any circumstances including additional payment or time implication.

Category B: Deviations which have been proposed as technical alternative by Supplier. If not accepted by OWNER / PMC, Supplier shall follow the requisition requirement / specifications without any cost and time implications to Purchaser

Category C: Deviations having either ‘time’ or ‘cost’ or ‘time & cost’ implications. If not accepted by OWNER / PMC, Supplier shall inform implications for compliance to requisition requirement / specifications.

Category D : Not a deviation against any requisition requirements. Supplier’s clarification or basis for the offer.

COMMENTS AND DEVIATIONS ON CUSTOMER’S SPECIFICATIONS

Herebelow are listed the specifications taken into account for Sundyne’s offer.

Documents that are not listed are considered not applicable and are fully deviated.

Cross reference specifications are not applicable or shall be reviewed separately if sent by customer.

Cost ImpactCATEGORYLTHE Response Open / Close Sundyne Response

Royal Commission Environmental Regulations - Volume II RCER-2015-Volume II-FINAL-July 2, 2015.pdf // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All No Comments

Royal Commission Environmental Regulations - Volume III RCER-2015-Volume III- FINAL-July 2, 2015.pdf // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All No Comments

Job Specification for Supply PMI of Equipment and Piping 067401-0000-JSS-6300-004-A_PMI.pdf // Rev. A

Para. Specification Requirement Sundyne comment on 14/10/2021

All No Comments

Vendor Shop Inspection Procedure G446-2999-PP-0080-1201_02-Vendor Shop Inspection Procedure.pdf // Rev. 2

Para. Specification Requirement Sundyne comment on 14/10/2021

All No Comments

UOP Standard Specification for Centrifugal Pumps 5-11-11_Centrifugal Pumps.pdf // Rev. 28/06/2013

Para. Specification Requirement Sundyne comment on 14/10/2021

§ 1.2 References Exception is taken to b., c. and h.

§ 6.1.3. Pumps shall be suitable for instantaneous startup from ambient to full operating temperature Start-up authorized if all permissives are OK (lube oil pressure if any, seal pressure ..)

§ 6.7 Wear Rings and Running Clearances Not applicable to Sundyne high speed integrally geared pumps

§ 6.8 Supply of Throttle bushings Seal Chamber Dimensions of Sundyne High Speed Integrally Geared Pumps does not permit it.

§ 6.9.1.3. Shaft Stiffness Not applicable to Sundyne high speed integrally geared pumps

Guards for Machinery FPC- 2000-JSS-00-003_GUARDS FOR MACHINERY.pdf // Rev. 0

Para. Specification Requirement Sundyne comment on 14/10/2021

AllNot Applicable for the proposed pumps as those are Vertical with manufacturer proprietary design

coupling adaptor so means proprietary design coupling guard also then.

Special Purpose Couplings FPC-2000-JSS-00-007_SPECIAL PURPOSE COUPLINGS.pdf // Rev. 0

Para. Specification Requirement Sundyne comment on 14/10/2021

AllNot applicable for the proposed pumps as those are Vertical and proposed with proprietary designed

API 610 Coupling.A

Design Standards STD103 Earthing Connection Lug 067401-0000-STD-1681-001-A-DESIGN STANDARD EARTHING.pdf // Rev. A

Para. Specification Requirement Sundyne comment on 14/10/2021

All No Comments

UOP Standard Specification for Electric Motors 7-12-5 Electric Motors.pdf // Rev. 28DEC09

Para. Specification Requirement Sundyne comment on 14/10/2021

AllThis Specification refers to NEMA motors where Sundyne is proposing IEC Motors so Specification Not

Considered / Not applicable D

Induction Motors FPC-2000-JSS-00-004_INDUCTION MOTORS.pdf // Rev. 0

Para. Specification Requirement Sundyne comment on 14/10/2021

ForewordThe Engineering Equipment and Materials Users Association Publication No. 132 (1988), Specification for

Three-Cage Induction Motors is an integral part of this standard.

Not in our Hands --> Not Considered

§ 6.1.1A M10 brass earthing stud with nut, a cadmium plated carbon steel spring washer and a brass plain

washer shall be provided.

Earthing according SIEMENS Standard

Owner Department : Applications P-21250-SA_Deviation list to specifications.xlsx rev1

P-21250-SA

revision 0 14-Oct-21

Category A: Deviations as per Manufacturer’s standards design and can not be withdrawn in any circumstances including additional payment or time implication.

Category B: Deviations which have been proposed as technical alternative by Supplier. If not accepted by OWNER / PMC, Supplier shall follow the requisition requirement / specifications without any cost and time implications to Purchaser

Category C: Deviations having either ‘time’ or ‘cost’ or ‘time & cost’ implications. If not accepted by OWNER / PMC, Supplier shall inform implications for compliance to requisition requirement / specifications.

Category D : Not a deviation against any requisition requirements. Supplier’s clarification or basis for the offer.

COMMENTS AND DEVIATIONS ON CUSTOMER’S SPECIFICATIONS

Herebelow are listed the specifications taken into account for Sundyne’s offer.

Documents that are not listed are considered not applicable and are fully deviated.

Cross reference specifications are not applicable or shall be reviewed separately if sent by customer.

Cost ImpactCATEGORYLTHE Response Open / Close Sundyne Response

Electrical Installation Standard FPC-2000-JSS-00-009_ELECTRICAL INSTALLATION STANDARD.pdf // Rev. 0

Para. Specification Requirement Sundyne comment on 14/10/2021

AllNot Applicable for Sundyne however provision for the terminal boxes (main and auxiliary) and for the

motor frame will be provided by Sundyne

Earting Philosophy FPC-2000-JSS-00-015_EARTING PHILOSOPHY.pdf // Rev. 0

Para. Specification Requirement Sundyne comment on 14/10/2021

All

Standard yellow/green 6mm² cables will be used for instruments earthing

Standard yellow/green 25 mm² earthing cable will be used for mecanical equipment (pump case,

cooler…)

Electrical Design Basis G446-2999-CN-0715-001 R3_Electrical Design Basis.pdf // Rev. 3

Para. Specification Requirement Sundyne comment on 14/10/2021

§ 4.4.5Motors located in a hazardous area shall be certified as explosion protection type Ex-d, Ex-de (i.e. Ex-d

motor with Ex-e terminal box) or Ex-p.Motors Ex-na have been proposed as they are also accepted in Zone 2 : See Section 4.4.3.

§ 6.14.2 All the motors shall have energy efficient Efficiency Class IE3

§ 6.14.16For LV Motors, 15KW and above ground fault relay shall be provided Not part of this offer

Motor Typical Control Schemes Motor Typical Control Schemes.pdf // Rev. B

Para. Specification Requirement Sundyne comment on 14/10/2021

All Considered as For Information Only

Job Specification for Instrumentation Installation & Instrument Piping Design 067401-0000-JSD-1570-002-B_INSTRUMENT INSTALLATION & INST PIPING DESIGN.pdf // Rev. B

Para. Specification Requirement Sundyne comment on 14/10/2021

11 Wiring systemCable trays not included in Sundyne scope of supply (not for instrument, neither for motor power

supply).

13.5.3

13.5.5

Electrical tracing

Insulation material

Not supplied by Sundyne. However provision will be made for installation of electrical

tracing/insulation material that will be made by others.

13.1 Installation guidelinesPipe enlargement for thermowell on interconnecting piping will be from 3/4" to 1"1/2 instead of 3/4"

to 6".A

Earthing Principal Diaghram 067401-2000-DW-1570-001-B_EARTHING PRINCIPLE DIAGHRAM.pdf // Rev. B

Para. Specification Requirement Sundyne comment on 14/10/2021

All

Standard yellow/green 6mm² cables will be used for instruments earthing

Standard yellow/green 25 mm² earthing cable will be used for mecanical equipment (pump case,

cooler…)

A

UOP Standard Drawing for Pressure Gauge Piping Assemblies 6-101-7 Pressure Gauge Piping Assemblies.pdf // Rev. 26/03/2014

Para. Specification Requirement Sundyne comment on 14/10/2021

AllPressure gauge on the gearbox is direcly mounted on the gearbox, without use of 2-valve manifold. It

is supplied with a standard Sundyne 1/4" needle valve.A

UOP Standard Drawing for Pressure Instrument Piping Assemblies 6-102-6 Pressure Instrument Piping Assemblies.pdf // Rev. 26/03/2014

Para. Specification Requirement Sundyne comment on 14/10/2021

All No Comments

UOP Standard Drawing for Flow meters and Pressure Instruments 6-18-5 Flow Meters and Pressure Instruments.pdf // Rev. 04APR14

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE For Flow Meters and No Comment for Pressure Instruments

UOP Standard Drawing for Typical Level Instrument Installation 8-121-4 Typical Level Instrument Installation.pdf // Rev. 29APR11

Para. Specification Requirement Sundyne comment on 14/10/2021

NOT APPLICABLE

Owner Department : Applications P-21250-SA_Deviation list to specifications.xlsx rev1

P-21250-SA

revision 0 14-Oct-21

Category A: Deviations as per Manufacturer’s standards design and can not be withdrawn in any circumstances including additional payment or time implication.

Category B: Deviations which have been proposed as technical alternative by Supplier. If not accepted by OWNER / PMC, Supplier shall follow the requisition requirement / specifications without any cost and time implications to Purchaser

Category C: Deviations having either ‘time’ or ‘cost’ or ‘time & cost’ implications. If not accepted by OWNER / PMC, Supplier shall inform implications for compliance to requisition requirement / specifications.

Category D : Not a deviation against any requisition requirements. Supplier’s clarification or basis for the offer.

COMMENTS AND DEVIATIONS ON CUSTOMER’S SPECIFICATIONS

Herebelow are listed the specifications taken into account for Sundyne’s offer.

Documents that are not listed are considered not applicable and are fully deviated.

Cross reference specifications are not applicable or shall be reviewed separately if sent by customer.

Cost ImpactCATEGORYLTHE Response Open / Close Sundyne Response

UOP Standard Drawing for Pump Vent and Drain System 8-135-9 Pump Vent and Drain System.pdf // Rev. 22APR13

Para. Specification Requirement Sundyne comment on 14/10/2021

All Sundyne informed that the ones proposed are their Standard and cannot be deviated A

UOP Standard Drawing for Pump Drain System 8-137-8 Pump Drain System.pdf // Rev. 22APR13

Para. Specification Requirement Sundyne comment on 14/10/2021

All

Sundyne Pumps Drain Kits will consist of Butt welded Pipe of 1" as required with Welding Neck flanges

and ended by a flanged gate valve at skid edge as indicated on proposed scope of supply A

UOP Standard Drawing for Level Instrument Vent and Drain System 8-139-10 Level Instrument Vent and Drain System.pdf // Rev. 06/07/2014

Para. Specification Requirement Sundyne comment on 14/10/2021

All Reflex level gauge installed on API52 reservoir will have 3/4" Flanged connection.

UOP Standard Drawing for Level Instrument Drain System 8-141-10 Level Instrument Drain System.pdf // Rev. 06/07/2014

Para. Specification Requirement Sundyne comment on 14/10/2021

All Reflex level gauge installed on API52 reservoir will have 3/4" Flanged connection.

Basic Of Design - Instrumentation G446-2999-DB-0695-0001_01_BASIS OF DESIGN ÔÇô INSTRUMENTATION.pdf // Rev. 1

Para. Specification Requirement Sundyne comment on 14/10/2021

§25.4Temperature gauges or dial thermometers SHALL be bi-metallic type inserted in a thermowell and SHALL

be specified in accordance with the following table: stem diameter 6,35mm

Stem diameter in 6 mm.

Thermometer in gearbox is mounted directly in the gearbox (no use of thermowell)A

§ 25.6Stress and frequency calculations SHALL be performed to ensure that the thermowell design is suitable

for the required process conditions.Stress and frequency calculations is not supplied (API5x interconnecting lines and gearbox).

§ 25.6

In process lines smaller than 6", the required insertion length will be obtained by:

− Partly enlargement of the line diameter to 6"

− Insert in a bend of the line (against flow direction)

Thermowell used for temperature measurement of API53B interconnecting lines will be located in

elbow or under 45° angle. But there will not be in a 6" enlargement. A

§ 27Selection of the instrument measurement type SHALL be in accordance with the following table:

Reflex type level gauge is supplied on API52 reservoir

§ 31 GeneralPressure gauge on the gearbox is direcly mounted on the gearbox, without use of 2-valve manifold. It

is supplied with a standard Sundyne 1/4" needle valve.A

Appendix 2 Instrument connection Level gauge on API52 reservoir has flanged connection, 3/4".

Specification of Instrumentation for Packages G446-2999-SP-0695-0002_01_SPECIFICATION OF INSTRUMENTATION FOR PACKAGES.pdf // Rev. 1

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE for Sundyne so complete deviation to this document is taken A

UOP Standard Drawing for Thermowells 6-105-7 Thermowells.pdf // Rev. 30APR11

Para. Specification Requirement Sundyne comment on 14/10/2021

All

Pipe enlargement for thermowell on interconnecting piping will be from 3/4" to 1"1/2 instead of 3/4"

to 6".

Additionally neither Stress Calculations nor Wells with plug and chain Tests will be provided by

Sundyne

UOP Standard Drawing for Thermometer Assemblies 6-106-6 Thermometer Assemblies.pdf // Rev. 30APR11

Para. Specification Requirement Sundyne comment on 14/10/2021

AllStem diameter in 6 mm.

Thermometer in gearbox is mounted directly in the gearbox (no use of thermowell)A

UOP Standard Drawing for Thermocouple Terminal Head Assemblies 6-107-7 Thermocouple Terminal Head Assemblies.pdf // Rev. 30APR11

Para. Specification Requirement Sundyne comment on 14/10/2021

All Not reviewed as not applicable to our scope of supply.

Owner Department : Applications P-21250-SA_Deviation list to specifications.xlsx rev1

P-21250-SA

revision 0 14-Oct-21

Category A: Deviations as per Manufacturer’s standards design and can not be withdrawn in any circumstances including additional payment or time implication.

Category B: Deviations which have been proposed as technical alternative by Supplier. If not accepted by OWNER / PMC, Supplier shall follow the requisition requirement / specifications without any cost and time implications to Purchaser

Category C: Deviations having either ‘time’ or ‘cost’ or ‘time & cost’ implications. If not accepted by OWNER / PMC, Supplier shall inform implications for compliance to requisition requirement / specifications.

Category D : Not a deviation against any requisition requirements. Supplier’s clarification or basis for the offer.

COMMENTS AND DEVIATIONS ON CUSTOMER’S SPECIFICATIONS

Herebelow are listed the specifications taken into account for Sundyne’s offer.

Documents that are not listed are considered not applicable and are fully deviated.

Cross reference specifications are not applicable or shall be reviewed separately if sent by customer.

Cost ImpactCATEGORYLTHE Response Open / Close Sundyne Response

6-108-6 Thermowell And Skin Thermocouple Installation Assemblies.pdf // Rev. 30APR11

Para. Specification Requirement Sundyne comment on 14/10/2021

All

Sundyne informed that thermowell will be for Seal Plans only

Additionally neither Stress Calculations nor Wells with plug and chain Tests will be provided by

Sundyne

6-109-6 External Displacement Level Instrument Piping Assemblies.pdf // Rev. 18/10/2012

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

6-110-6 External Displacement Level Instrument Piping Assemblies-HF.pdf // Rev. 26/03/2014

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

6-112-4 Piping Arrangements At Orifice Plates.pdf // Rev. 11/01/2012

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

6-115-9 Orifice Meter Piping Assemblies.pdf // Rev. 26/03/2014

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

6-116-8 Orifice Meter Piping Assemblies.pdf // Rev. 18/10/2012

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

6-120-7 Orifice Meter Piping Assemblies.pdf // Rev. 11/01/2012

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

6-122-7 Powdered Catalyst Instrument Piping Assemblies.pdf // Rev. 26/03/2014

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

UOP Standard Drawing for Pressure Tap Reamer 6-123-5 Pressure Tap Reamer.pdf // Rev. 30APR11

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

UOP Standard Drawing for Steam Trap Piping Assemblies 6-127-4 Steam Trap Piping Assemblies.pdf // Rev. 11/01/2012

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

6-134-3 Piping Arrangements For Venturi Installations.pdf // Rev. 11/01/2012

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

UOP Standard Drawing for Orifice Meter Piping Assemblies for Liquid, Steam or Condensable Vapor Service for 300 &

600Lbs

UOP Standard Drawing for Orifice Meter Piping Assemblies for Dry Gas Service for 300 & 600Lbs

UOP Standard Drawing for Thermowell and Skin Thermocouple Installation Assemblies

UOP Standard Drawing for Orifice Meter Piping Assemblies for HF ACID Service

UOP Standard Drawing for Powdered Catalyst Instrument Piping Assemblies

UOP Standard Drawing for Piping Arrangements for Venturi Installations

UOP Standard Drawing for External Displacement Level Instrument Piping Assemblies - HF ACID SERVICE

UOP Standard Drawing for Piping Arrangement for Orifice Plate Installations

UOP Standard Drawing for External Displacement Level Instrument Piping Assemblies

Owner Department : Applications P-21250-SA_Deviation list to specifications.xlsx rev1

P-21250-SA

revision 0 14-Oct-21

Category A: Deviations as per Manufacturer’s standards design and can not be withdrawn in any circumstances including additional payment or time implication.

Category B: Deviations which have been proposed as technical alternative by Supplier. If not accepted by OWNER / PMC, Supplier shall follow the requisition requirement / specifications without any cost and time implications to Purchaser

Category C: Deviations having either ‘time’ or ‘cost’ or ‘time & cost’ implications. If not accepted by OWNER / PMC, Supplier shall inform implications for compliance to requisition requirement / specifications.

Category D : Not a deviation against any requisition requirements. Supplier’s clarification or basis for the offer.

COMMENTS AND DEVIATIONS ON CUSTOMER’S SPECIFICATIONS

Herebelow are listed the specifications taken into account for Sundyne’s offer.

Documents that are not listed are considered not applicable and are fully deviated.

Cross reference specifications are not applicable or shall be reviewed separately if sent by customer.

Cost ImpactCATEGORYLTHE Response Open / Close Sundyne Response

6-139-6 Orifice Meter Piping Assemblies.pdf // Rev. 26/03/2014

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

6-140-6 Orifice Meter Piping Assemblies.pdf // Rev. 26/03/2014

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

6-142-5 Reactor Differential Pressure Instrument Piping Assembly.pdf // Rev. 26/03/2014

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

6-144-6 Differential Pressure Instrument Piping Assembly.pdf // Rev. 18/10/2012

Para. Specification Requirement Sundyne comment on 14/10/2021

All No Comments

6-146-5 Pressure Instrument Piping Assembly.pdf // Rev. 11/01/2012

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

6-147-5 Differential Pressure Instrument Piping Assembly.pdf // Rev. 26/03/2014

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

6-148-5 Reactor Differential Pressure Instrument Piping Assembly.pdf // Rev. 26/03/2014

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

6-151-4 Displacement Level And Gage Glass Flushing Oil Assembly.pdf // Rev. 11/01/2012

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

UOP Standard Drawing for Typical Analyser Installation 6-152-5 Typical Analyzer Installation.pdf // Rev. 26/03/2014

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

6-153-4 Knife Edge Type Heater Tube Skin Thermocouple Installation.pdf // Rev. 11/01/2012

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

UOP Standard Drawing for Differential Pressure Instrument Piping Assembly for 900, 1500 & 2500Lbs

UOP Standard Drawing for Differential Pressure Instrument Piping Assembly for 300 & 600Lbs

UOP Standard Drawing for Orifice Meter Piping Assemblies for Dry Gas Service for 900, 1500 & 2500Lbs

UOP Standard Drawing for Orifice Meter Piping Assemblies for Liquid, Steam or Condensable Vapor Service for 900, 1500

& 2500Lbs

UOP Standard Drawing for Reactor Differential Pressure Instrument Piping Assembly for 900, 1500 & 2500Lbs

UOP Standard Drawing for Knife Edge Type Heater Tube Skin Thermocouple Installation : CANCELLED

UOP Standard Drawing for Reactor Differential Pressure Instrument Piping Assembly for 150, 300 & 600Lbs

UOP Standard Drawing for Pressure Instrument Piping Assembly for HF ACID SERVICE

UOP Standard Drawing for Displacement Level and Gage Glass Flushing Oil Assembly

Owner Department : Applications P-21250-SA_Deviation list to specifications.xlsx rev1

P-21250-SA

revision 0 14-Oct-21

Category A: Deviations as per Manufacturer’s standards design and can not be withdrawn in any circumstances including additional payment or time implication.

Category B: Deviations which have been proposed as technical alternative by Supplier. If not accepted by OWNER / PMC, Supplier shall follow the requisition requirement / specifications without any cost and time implications to Purchaser

Category C: Deviations having either ‘time’ or ‘cost’ or ‘time & cost’ implications. If not accepted by OWNER / PMC, Supplier shall inform implications for compliance to requisition requirement / specifications.

Category D : Not a deviation against any requisition requirements. Supplier’s clarification or basis for the offer.

COMMENTS AND DEVIATIONS ON CUSTOMER’S SPECIFICATIONS

Herebelow are listed the specifications taken into account for Sundyne’s offer.

Documents that are not listed are considered not applicable and are fully deviated.

Cross reference specifications are not applicable or shall be reviewed separately if sent by customer.

Cost ImpactCATEGORYLTHE Response Open / Close Sundyne Response

6-155-5 Pressure Instrument Piping Assemblies.pdf // Rev. 26/03/2014

Para. Specification Requirement Sundyne comment on 14/10/2021

All No Comments

6-156-6 Flanged Multi-Thermowell Assembly With Integral Support.pdf // Rev. 18/10/2012

Para. Specification Requirement Sundyne comment on 14/10/2021

All

Sundyne informed that thermowell will be for Seal Plans only

Additionally neither Stress Calculations nor Wells with plug and chain Tests will be provided by

Sundyne

UOP Standard Drawing for Flanged Multi-Thermowell Assembly 6-158-5 Flanged Multi-Thermowell Assembly.pdf // Rev. 18/10/2012

Para. Specification Requirement Sundyne comment on 14/10/2021

All

Sundyne informed that thermowell will be for Seal Plans only

Additionally neither Stress Calculations nor Wells with plug and chain Tests will be provided by

Sundyne

6-159-3 Differential Pressure Instrument Piping Assembly For Dry Gas Service.pdf // Rev. 18/10/2012

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

6-160-3 Piping Arrangements For Vortex Flowmeter Installations.pdf // Rev. 18/10/2012

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

6-161-3 Non-Purged Reactor Differential Pressure Instrument Piping Assembly.pdf // Rev.

18/10/2012

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

6-162-3 Differential Pressure Instrument Piping Assembly For Dry Gas Service.pdf // Rev. 18/10/2012

Para. Specification Requirement Sundyne comment on 14/10/2021

All NOT APPLICABLE

Piping Material Specification G446-2999-SP-0585-0001 // Rev. 03

Para. Specification Requirement Sundyne comment on 14/10/2021

All

Please note that Standard Sundyne Cooling Water Piping Kit proposed consists of screwed connections

of Gearbox Standard Heat Exchanger Proposed with screwed Flow Gauge, Screwed Gate and Globe

Valves and Screwed Thermal Relief Valves with Socket Welded Flanges at Skid Egde for inlet and outlet.

Sundyne confirmed for tie in flanges and materials. Within pump skid the Connections for cooling

water plan will not be welded but screwed as per sundyne proprietary design

A

Valve Material Specification G446-2999-SP-0585-0002-Rev-02.pdf // Rev. 02

Para. Specification Requirement Sundyne comment on 14/10/2021

All Not yet reviewed will be reviewed later when firm quotaiton required to be provided

Technical Specification for Procurement of piping Items G446-2999-SP-0585-0003.pdf // Rev. 01

Para. Specification Requirement Sundyne comment on 14/10/2021

All Not yet reviewed will be reviewed later when firm quotaiton required to be provided

UOP Standard Drawing for Differential Pressure Instrument Piping Assembly for Dry Gas Service for 900, 1500 & 2500Lbs

UOP Standard Drawing for Differential Pressure Instrument Piping Assembly for Dry Gas Service for 150, 300 & 600Lbs

UOP Standard Drawing for Non-Purged Reactor Differential Pressure Instrument Piping Assembly for 150, 300 & 600Lbs

UOP Standard Drawing for Pressure Instrument Piping Assembly for 900, 1500 & 2500Lbs

UOP Standard Drawing for Flanged Multi-Thermowell Assembly with Integral Support

UOP Standard Drawing for Piping Arrangements for Vortex Flowmeter Installations

Owner Department : Applications P-21250-SA_Deviation list to specifications.xlsx rev1

P-21250-SA

revision 0 14-Oct-21

Category A: Deviations as per Manufacturer’s standards design and can not be withdrawn in any circumstances including additional payment or time implication.

Category B: Deviations which have been proposed as technical alternative by Supplier. If not accepted by OWNER / PMC, Supplier shall follow the requisition requirement / specifications without any cost and time implications to Purchaser

Category C: Deviations having either ‘time’ or ‘cost’ or ‘time & cost’ implications. If not accepted by OWNER / PMC, Supplier shall inform implications for compliance to requisition requirement / specifications.

Category D : Not a deviation against any requisition requirements. Supplier’s clarification or basis for the offer.

COMMENTS AND DEVIATIONS ON CUSTOMER’S SPECIFICATIONS

Herebelow are listed the specifications taken into account for Sundyne’s offer.

Documents that are not listed are considered not applicable and are fully deviated.

Cross reference specifications are not applicable or shall be reviewed separately if sent by customer.

Cost ImpactCATEGORYLTHE Response Open / Close Sundyne Response

Job Specification for Supply of Anchor Bolts 067401-0000-JSS-1700-002-B_Anch Bolt.pdf // Rev. B

Para. Specification Requirement Sundyne comment on 14/10/2021

All Sundyne proposes its own well proven anchor bolts : J shape in Carbon Steel material

Standard Design Drawing for Anchor Bolts 067401-0000-STD-1780-001-B.pdf // Rev. B

Para. Specification Requirement Sundyne comment on 14/10/2021

All Sundyne proposes its own well proven anchor bolts : J shape in Carbon Steel material

P&Ids for 202-P-01A/B, 202-P-03A/B, 203-P-01A/B and 203-P-02A/B Various

Para. Specification Requirement Sundyne comment on 14/10/2021

All Considered as for information only

MR Scope of Supply for Mechanical Items Table - 1A_Mechanical Scope-OH6 Pumps_Draft.docx // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All See completed and annoted file attached to quote

§ 5.3 Set of SS Shim Plates Not applicable as Vertical Pumps are proposed

§ 6.0 Coupling between pump and driver as per API 671 No, as per API 610 otherwise Vertical Stand required to be added to scope A

§ 8.3 Unitization of Pump with Driver on Base PlatePlease note that Motors are always disassembled and shipped separatey to avoid any damage during

shipment as we are currently proposing vertical unitsD

MR Scope of Supply for Electrical Items Table - 1B_Electrical Scope-OH6 Pumps.docx // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All See completed and annoted file attached to quote

§ 1.1 Skid / Foundation Mounted as per vendor recommendation Not applicable as Vertical Pumps are concerned here.

§ 4.1 Third party Inspection

In regards of motor voltage and Hertz it is not possible to use job motors in sundyne workshop for

complete unit test so if witnessed inspection required on motors it will be at motor sub-supplier

factory.

§ 7.1 Spare Parts for Erection, Pre commissioning and start-up Not applicable

§ 7.2 Capital /Insurance Spare Parts Not applicable

§ 7.2 Spare Parts for 2 years normal operation 1 set of bearings recommended which will be included together with pump spare parts proposal

§ 8.0 Special Tools & Tackles Not Applicable

MR Scope of Supply for Instrumentation Items Table - 1C_Instrumentation Scope-OH6 Pump.docx // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All See completed and annoted file attached to quote

All No Comments

Document List common for Mechanical, Electrical and Instrumentation Table - 2A_OH6 Pumps.docx // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All Commented document will be provided later when firm quotation provided

Document List common for Mechanical Items Table - 2B_OH6 Pumps.docx // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All Commented document will be provided later when firm quotation provided

Document List common for Electrical Items Table - 2C_OH6 Pumps.docx // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All Commented document will be provided later when firm quotation provided

Document List common for Instrumentation Items Table - 2D_OH6 Pumps.docx // Rev.

Para. Specification Requirement Sundyne comment on 14/10/2021

All Commented document will be provided later when firm quotation provided

Owner Department : Applications P-21250-SA_Deviation list to specifications.xlsx rev1

Category A: Deviations as per Manufacturer’s standards design and can not be withdrawn in any circumstances including additional payment or time implication.

Category B: Deviations which have been proposed as technical alternative by Supplier. If not accepted by OWNER / PMC, Supplier shall follow the requisition requirement / specifications without any cost and time implications to Purchaser

Category C: Deviations having either ‘time’ or ‘cost’ or ‘time & cost’ implications. If not accepted by OWNER / PMC, Supplier shall inform implications for compliance to requisition requirement / specifications.

Category D: Not a deviation against any requisition requirements. Supplier’s clarification or basis for the offer.

§Comments (C) /

Exceptions ( E)Subject Deviations / Comments

Open /

CloseCategory

3.50 C Rotor The rotor in a Sundyne pump is the high speed shaft rotating assembly only. A

6.1.4 E Head increase

A 5% head increase may not be possible with an impeller change only. Due

inherent design. the head change is achievable by change in gear ratio,

installing a new impeller / diffuser

A

6.1.9 C Nss Limits

This parameter is somewhat misleading as it is applied to Sundyne pumps.The

proposed pump utilizes an inducer before the flow reaches the impeller.

A centrifugal impeller is radial flow. This is where suction specific speed can be

used as an evaluation tool. The inducer is actually an axial flow type impeller.

When the flow reaches the radial flow impeller the suction specific speed is

greatly reduced. Sundyne's high speed pumps that use our family of inducers

typically have suction specific speeds from 18,000 to 32,000.

Since Sundyne Pumps are fitted with high efficiency inducers, the suction

specific speed exceeds 10,000 in metric units, due to high speed design and

low NPSHR

D

6.1.10 CViscosity

correction

Barske open impeller viscosity correction calculations, developed by Sundyne,

are similar to the Hydraulic Institute Standard's methods.

Sundyne confirmed that the viscosity corrections are not applicable for the

apllicable tags.

D

6.1.11 CHead rise &

parallel operation

Offered pumps have stable continuous head rise to min flow specified in the

pump data sheet.

Offered pumps have a continuously rising head/capacity curve to minimum

allowable flow, but rise is predicted to be below 10%.

The only guaranteed point is the rated point. Curve shape is not guaranteed.

Acceptance criteria will be in accordance with API-610 11th edition except as

amended by Sundyne’s standard API-610 11th comments and exceptions.

D

6.1.12 D Operating Region

Rated flow of 3 of the proposed items is not within the region of 80 % to 110 %

of best efficiency flowrate of the proposed pumps as required. No other

possibilities for Sundyne to propose something else in regards of performance

now required for those.

A

6.1.15 D ClearenceThe radial clearance between the diffuser throat and impeller may be less than

3%.A

6.1.26 C Performance testA calibrated test motor is used to test the pumps. Pump performance shall be

evaluated upon the results of the factory performance tests.D

ISO 13709:2009 / API-610 11th Edition Comments & Exceptions - Pump Model LMV-XXX

(Revision 0)

Category A: Deviations as per Manufacturer’s standards design and can not be withdrawn in any circumstances including additional payment or time implication.

Category B: Deviations which have been proposed as technical alternative by Supplier. If not accepted by OWNER / PMC, Supplier shall follow the requisition requirement / specifications without any cost and time implications to Purchaser

Category C: Deviations having either ‘time’ or ‘cost’ or ‘time & cost’ implications. If not accepted by OWNER / PMC, Supplier shall inform implications for compliance to requisition requirement / specifications.

Category D: Not a deviation against any requisition requirements. Supplier’s clarification or basis for the offer.

§Comments (C) /

Exceptions ( E)Subject Deviations / Comments

Open /

CloseCategory

ISO 13709:2009 / API-610 11th Edition Comments & Exceptions - Pump Model LMV-XXX

(Revision 0)

6.3.6 C MAWP

Due to the working principle of the Sundyne pump, the seal housing and seal is

not subject to discharge pressure during operation and can only be exposed to

discharge pressure if all of the following criteria apply:

1.- Pump is on standby, not running.

2.- Discharge pressure is present in the system (i.e. static pressure, or other

pump is running)

3.- Non return valve on discharge line is leaking

4.- Suction valve is closed allowing shut-in pressure.

5.- Relief valve is not fitted on suction side.

6.You may wish to consider the installation of a dissimilar check valve at the

pump discharge. The idea was to prevent the pump suction from being exposed

to the maximum pump discharge pressure.

D

6.3.12 E O ringO-ring sealing surfaces have a Ra surface finish of 2.03 micro-meters (80 micro

inches)A

6.3.13 C Jackscrews are not required for pump disassembly. A

6.4.3.9 CPipe nipples attached to the casing may be longer than 150 mm (6 in).

Buffer/Barrier fluid nipples are schedule 80 pipe.A

6.6.4 E

Sundyne uses stress concentration factors by R.E. Peterson with a ratio R/D of

0,025. The corner radii used in Sundyne designed keyways are larger than

specified by ASME B17.1. This reduces stress concentration in the keyway for

Sundyne designed shafts.

A

6.6.7 C A proprietary o-ring groove centers the shaft sleeve. A

6.7.1 CWear rings are not required on open impellers and semi-open impellers in

Sundyne pump.A

6.8 E Mechanical seal

Sundyne uses a unique proprietary seal design that is not completely

compatible with API 682. The Sundyne seal design is a "semi-cartridge" type

that does not require measuring, shimming or setting for installation.

Integrally geared compact stuffing box design does allow the installation of an

"anti-sparking" throttle bushing.

A

6.10.1.3 E Bearing Filler slot type bearings are used. A

6.10.2.4.a Clube oil

temperatureThe lube oil sump temperature only will be monitored during shop testing. A

6.10.2.5 E

Cooling , when required, is provided by use a shell and tube heat exchanger

with tubes less than 12 mm (0,50 in). Pumps are integrally geared type and

features an internal oil lubricating system and a gearbox heat exchanger as per

manufacturer standard. Where applicable Sundyne standard manufacturer lube

oil priming kit is offered as per described in the scope of supply.

A

6.10.2.6 E Sundyne integral gearboxes use a mechanical seal on the output shaft. A

6.11 C

This section is not applicable to high-speed integral gear (OH6) pumps.

Sundyne informed that there is internal LO system consisting of internal LO

Pump, LO filter and Oil Cooler (Sundyne Properitery design)

A

6.12.1.2 CThe materials of construction are as shown on the Sundyne Pump Specification

Sheets and exceeds these requirements.A

Category A: Deviations as per Manufacturer’s standards design and can not be withdrawn in any circumstances including additional payment or time implication.

Category B: Deviations which have been proposed as technical alternative by Supplier. If not accepted by OWNER / PMC, Supplier shall follow the requisition requirement / specifications without any cost and time implications to Purchaser

Category C: Deviations having either ‘time’ or ‘cost’ or ‘time & cost’ implications. If not accepted by OWNER / PMC, Supplier shall inform implications for compliance to requisition requirement / specifications.

Category D: Not a deviation against any requisition requirements. Supplier’s clarification or basis for the offer.

§Comments (C) /

Exceptions ( E)Subject Deviations / Comments

Open /

CloseCategory

ISO 13709:2009 / API-610 11th Edition Comments & Exceptions - Pump Model LMV-XXX

(Revision 0)

6.12.1.3 C

O-rings material selection and temperature rating will be as shown on the

Sundyne Pump Specification Sheet.

Sundyne informed that Max Temperature for proposed Fluorocarbon (Internal

Code 'UC') is 204°C and for proposed Kalrez 6375 (Internal Code 'TR') it is

275°C. Sundyne is not able to propose other solution in regards of required

design Temperature of 290°C and 330°C and so required L&T or End User to

give them their recommendations.

D

6.12.1.4 CThe materials of construction are as shown on the Sundyne Pump Specification

Sheets.D

6.13.2 C

The bearing manufacturer’s identity numbers are not shown (as standard) on

the nameplate

Sundyne informed that this is their standard deviation because of space

constraint on the gearbox for mounting the nameplate with additional information

except for the standard information. Sundyne standard nameplate will be

provided

A

7.1.3 D Jackscrews are not required with vertical inline pump train. D

7.1.6 CA Sundyne pump cannot run againt a closed valve

Sundyne does not recommed to run the pump below MCSF in any conditionsA

7.2.2.d ESundyne pumps will require that the motor be removed whenever the impeller is

to be removed.D

7.2.6 CSundyne uses a proprietary aerospace design for keys and keyways that

exceed ISO/R772 (ANSI/AGMA 9002 Commercial Class).A

7.5.2.4 EOrifice diameters less than 3 mm (0,12 in) may be required on API seal flush

plans.A

8.3 C Performance test

Offered pumps have stable continuous had rise to min flow specified in the

pump data sheet.

Offered pumps have a continuously rising head/capacity curve to minimum

allowable flow, but rise is predicted to be below 10%.

The only guaranteed point is the rated point.

Curve shape is not guaranteed.

Acceptance criteria will be in accordance with API-610 11th edition except as

amended by Sundyne’s standard API-610 11th comments and exceptions.

D

8.3.1.2 C

It may not always possible to use the job seals during the factory performance

test. (where mechanical seals with a high pressure balance have been selected

to run properly on light process, the use of job seals during pump performance

test (with water) would lead to mechanical malfunction)

A

8.3.3.3 a) EA Sundyne pump cannot be operated at shutoff and as such is not tested at that

point.A

8.3.3.3.c) E

The pump test speed may not be at the rated speed.

Sundyne pumps are designed and manufactured for specific process

conditions. Hence the internal parts of the pumps are specifically designed for

specific process conditions. Running the pump with specific gravity higher then

that of the process fluid may damage the internal parts

A

8.3.3.5.a E

A Sundyne pump cannot be operated at shutoff and as such is not tested at that

point.

Pump high speed (impeller) shaft displacement shall be recorded only in case

non-contacting probes are part of the Sundyne scope of supply.

A

D

Category A: Deviations as per Manufacturer’s standards design and can not be withdrawn in any circumstances including additional payment or time implication.

Category B: Deviations which have been proposed as technical alternative by Supplier. If not accepted by OWNER / PMC, Supplier shall follow the requisition requirement / specifications without any cost and time implications to Purchaser

Category C: Deviations having either ‘time’ or ‘cost’ or ‘time & cost’ implications. If not accepted by OWNER / PMC, Supplier shall inform implications for compliance to requisition requirement / specifications.

Category D: Not a deviation against any requisition requirements. Supplier’s clarification or basis for the offer.

§Comments (C) /

Exceptions ( E)Subject Deviations / Comments

Open /

CloseCategory

ISO 13709:2009 / API-610 11th Edition Comments & Exceptions - Pump Model LMV-XXX

(Revision 0)

9.1.3.7 CDynamic

balancing

Balancing to grade G2.5 is not always achievable due to the combination of low

mass and high speed. Sundyne balances rotating parts with a minimum residual

unbalance of 7g.mm.

A

10.2.2.1.a E ProposalA Sundyne is an engineered pump and a general arrangement drawings will be

available after receipt of an order. A typical drawing will be furnished, if required.D

10.2.2.1.

CE

A Sundyne is an engineered pump, bills of material lists will be available after

receipt of an order. A Sundyne is an engineered pump and a P&ID will be

available after receipt of an order.

D

10.2.3.e EInterchangeability spare parts list are available based on the order

requirements.D

10.2.4 E Sundyne standard curves will he provided. D

10.3.2.2 E Sundyne standard curves will he provided. D

10.3.4.1 EMaterials on Recommend Spares Lists and Parts Lists are defined by

Sundyne's part number and reference list.D

Category A: Deviations as per Manufacturer’s standards design and can not be withdrawn in any circumstances including additional payment or time implication.

Category B: Deviations which have been proposed as technical alternative by Supplier. If not accepted by OWNER / PMC, Supplier shall follow the requisition requirement / specifications without any cost and time implications to Purchaser

Category C: Deviations having either ‘time’ or ‘cost’ or ‘time & cost’ implications. If not accepted by OWNER / PMC, Supplier shall inform implications for compliance to requisition requirement / specifications.

Category D: Not a deviation against any requisition requirements. Supplier’s clarification or basis for the offer.

§Comments (C) /

Exceptions (E)Subject Deviations / Comments

Open /

CloseCategory

§ 6.1.6.10.3 E Non pressure retaining structural welding acc. To AWS D1,1 Complete exception is taken A

§ 10.3 E Testing

Not Applicable as proposed seals are non API 682

Seals but 100% Sundyne Standard Proprietary

designed seals so complete Deviation is taken

A

§ 11.1.6 C IOM with cross referenced list with BOM to be provided IOM Only will be provided A

(Revision 0)

API-682 4th Edition Comments & Exceptions

SSUUNNDDYYNNEE IINNTTEERRNNAATTIIOONNAALL SS..AA..

S.A. au capital 1 860 000 € RCS Dijon B 016 850 992 - APE 2813Z Siret 016 850 992 00013 - V.A.T. N° FR 80016850992

13-15, BOULEVARD EIFFEL - B.P. 3021604 LONGVIC CEDEXFRANCE

PHONE : +33 (0)3 80 38 33 00 FAX : +33 (0)3 80 38 34 16

WEB SITE : www.sundyne.com

Sold to : Ship To:

L&T HYDROCARBONENGINEERNG LIMITEDINDIA

FARABI YANBUPETROCHEMICALS COMPANYSAUDI ARABIA

Currency Customer V.A.T. N° V.A.T. Expiration date Payment Terms Incoterms Terms

EURO Art. 262-Ter I du CGI 31/12/2021 30 DAYS OF INVOICE NA

Line Item Qty Unit Price TotalQUOTE FOR A FIELD SERVICE INTERVENTION TO BE PERFORMED BY A SUNDYNE ENGINEERON SUNDYNE PUMPS LMV311/331 (P-21250-SA) CLIENT : L&T HYDROCARBON ENGINNERING LIMITED INDIAEND USER : FARABI YANBU PETROCHEMICAL COMPANY=======================================

Important Nota : With the current health situation and current travel restrictions related to Covid-19, Sundyne cannot guarantee that its FSE will be authorized to travel to Saudi Arabia at time of PO receipt.

MOB-DEMOB-SDN 1MOBILIZATION/DEMOBILIZATION SUNDYNE

1

FIXED RATEIncluding visa application, home rent car, flight ticket, travel days, and all living expenses until Dammam or Bahrein airport and returnValid for the mobilization/demobilization of a Sundyne engineer from Sundyne FranceRate for the mobilization/demobilization of an engineer from Abu Dhabi/Dubai : euro 5 974

SERV-WD-SDN 1SERVICE WEEK DAYS SUNDYNE

2

FIXED DAILY RATE based on 8 hours.Applicable 5 days per week

PREMIUMS on WORKDAY RATES : =========================== OVERTIME (Time beyond an 8 hour day plus weekends/holidays) 8 to 10 hour/day = 25% premium 10 to 12 hour/day = 50% premium Weekend (2 days) and holiday = 50% premium

QUOTATIONOur ref : SPS0000378 Date :

Revision : 1 Page : 1 / 4

15 Oct 2021Your ref :

SSUUNNDDYYNNEE IINNTTEERRNNAATTIIOONNAALL SS..AA..

S.A. au capital 1 860 000 € RCS Dijon B 016 850 992 - APE 2813Z Siret 016 850 992 00013 - V.A.T. N° FR 80016850992

13-15, BOULEVARD EIFFEL - B.P. 3021604 LONGVIC CEDEXFRANCE

PHONE : +33 (0)3 80 38 33 00 FAX : +33 (0)3 80 38 34 16

WEB SITE : www.sundyne.com

CALCULATION and DEFINITION of RATES : ==================================

MOBILIZATION / DEMOBILIZATION : ++++++++++++++++++++++++++++This is a fixed cost per trip that includes airfare, travel days leaving and returning, home costs to departing airport, airport parking, visa costs, work permit costs, first night accomodation and meal cost

BILLABLE TIME :+++++++++++++ 1) Billable time is calculated from the day the person departs home-office until he returns,including weekends and holidays (portal to portal)2) Each day is payable, worked or not3) Daily rate is not dividable ; Minimum charge is for one day at applicable daily rate4) Standby time is billed as per daily rates. Weekend standby days will be billed at weekday rate.

5) Since daily rates are all inclusive and fixed, no receipts will be provided

ACCOMMODATION / LOCAL TRANSPORTATION :+++++++++++++++++++++++++++++++++++++++ Transport to site to be provided by customer. Customer is in charge of our Field Service Engineer from destination airport to site. Daily pick up from hotel to plant (go and back) is also in charge of the customer.

SHORT NOTICE :++++++++++++++ Trip PO must be received no later than 10 days before scheduled departure. The Mob/Demob will be increased by 20% if received within 1 to 9 days of departure

MAXIMUM WORKED HOURS :++++++++++++++++++++++++ Field Service personnel are NOT required to perform, and may decline, work in excess of 12 hours per day. Workdays in excess of 16 hours are prohibited. 11 hours of rest are required before retunring to work.

MEDICAL CHECKS :++++++++++++++++ Every SISA FSE gets a yearly medical visit by a French government delegated doctor. No further medical examination of any kind will be made abroad.

TAXES :++++++ The quoted prices are net and do not include any possible withholding tax in the country of execution of this contract. If this withholding tax is believed to be applicable, your order shall clearly include for the additional tax amount.

ROTATION OF FSE :

QUOTATIONOur ref : SPS0000378 Date :

Revision : 1 Page : 2 / 4

15 Oct 2021Your ref :

Line Item Qty Unit Price Total

SSUUNNDDYYNNEE IINNTTEERRNNAATTIIOONNAALL SS..AA..

S.A. au capital 1 860 000 € RCS Dijon B 016 850 992 - APE 2813Z Siret 016 850 992 00013 - V.A.T. N° FR 80016850992

13-15, BOULEVARD EIFFEL - B.P. 3021604 LONGVIC CEDEXFRANCE

PHONE : +33 (0)3 80 38 33 00 FAX : +33 (0)3 80 38 34 16

WEB SITE : www.sundyne.com

++++++++++++++++Sundyne reserves the right to replace the Engineer or Technician every 4 weeks for onshore and every 2 weeks for offshore service. The Engineer/Technician will be replaced at the Customer's expense

TRIP CANCELLATION :++++++++++++++++++If a trip is cancelled prior to departure, cancellation charges (e.g. airfare, change fees, etc.) will be invoiced at actual cost + 15% admin fee

HAZARDOUS or HARSH LOCATION :+++++++++++++++++++++++++++++A daily surcharge is applied for time in hazardous or harsh environments. The daily surcharge is 418 euro.

SECURITY ARRANGEMENTS OPTION :+++++++++++++++++++++++++++++++ If the end user site is located in an area of the World where there are geopolitical or security concerns or problems, we reserve the right to decline any request for assistance. If we agree to attend site under these circumstances, we will apply special rates for the provision of labour, insurance, travel and security arrangements required to mitigate the risk associated with executing the project.

COVID-19 :+++++++++IF AN ISOLATION IS MANDATORY AT ARRIVAL IN THE COUNTRY OF EXECUTION OF WORKS, EACH DAY WILL BE BILLED 1 456 €. ALL EXPENSES LINKED TO COVID-19 WILL BE INVOICED AT COST.

PAYMENT TERMS :+++++++++++++++Net 30 days from invoice date or advance payment for "new" customer.

VALIDITY :++++++++End of 20212022 +3%

IN ACCORDANCE WITH OUR TERMS AND CONDITIONS

QUOTATIONOur ref : SPS0000378 Date :

Revision : 1 Page : 3 / 4

15 Oct 2021Your ref :

Line Item Qty Unit Price Total

SSUUNNDDYYNNEE IINNTTEERRNNAATTIIOONNAALL SS..AA..

S.A. au capital 1 860 000 € RCS Dijon B 016 850 992 - APE 2813Z Siret 016 850 992 00013 - V.A.T. N° FR 80016850992

13-15, BOULEVARD EIFFEL - B.P. 3021604 LONGVIC CEDEXFRANCE

PHONE : +33 (0)3 80 38 33 00 FAX : +33 (0)3 80 38 34 16

WEB SITE : www.sundyne.com

Sub Total :

Discount :

V.A.T. :

Freight :

Total to pay :

Misc :

THIS QUOTATION IS SUBJECT TO THE ATTACHED SUNDYNE INT'L S.A.

GENERAL TERMS AND CONDITIONS OF SALES EFFECTIVE

NOVEMBER 21, 2019

Paid to: SUNDYNE INTERNATIONAL S.A.BANK : SOCIETE GENERALE EUR BIC : SOGEFRPPIBAN : FR7630003007500002079089124BANK : BNP Dijon BIC : BNPAFRPPBGEIBAN : FR7630004004120001019702494

QUOTATIONOur ref : SPS0000378 Date :

Revision : 1 Page : 4 / 4

15 Oct 2021Your ref :

Line Item Qty Unit Price Total

SSUUNNDDYYNNEE IINNTTEERRNNAATTIIOONNAALL SS..AA..

S.A. au capital 1 860 000 € RCS Dijon B 016 850 992 - APE 2813Z Siret 016 850 992 00013 - V.A.T. N° FR 80016850992

13-15, BOULEVARD EIFFEL - B.P. 3021604 LONGVIC CEDEXFRANCE

PHONE : +33 (0)3 80 38 33 00 FAX : +33 (0)3 80 38 34 16

WEB SITE : www.sundyne.com

Sold to : Ship To:

L&T HYDROCARBONENGINEERING LIMITEDINDIA

FARABI YANBUPETROCHEMICALS COMPANYSAUDI ARABIA

Currency Customer V.A.T. N° V.A.T. Expiration date Payment Terms Incoterms Terms

EURO Art. 262 I CGI 31/12/2021 30 DAYS OF INVOICE NA

Line Item Qty Unit Price TotalQUOTE FOR A SUNDYNE TRAININGTO BE PERFORMED BY A SUNDYNE ENGINEERON SUNDYNE PUMPS LMV311/331 (P-21250-SA) CLIENT : L&T HYDROCARBON ENGINNERING LIMITED INDIAEND USER : FARABI YANBU PETROCHEMICAL COMPANY=======================================

Important Nota : With the current health situation and current travel restrictions related to Covid-19, Sundyne cannot guarantee that its FSE will be authorized to travel to Saudi Arabia at time of PO receipt.

MOB-DEMOB-SDN 1MOBILIZATION/DEMOBILIZATION SUNDYNE

1

FIXED RATEIncluding visa application, home rent car, flight ticket, travel days, and all living expenses until Dammam or Bahrein airport and returnValid for the mobilization/demobilization of a Sundyne engineer from Sundyne FranceRate for the mobilization/demobilization of an engineer from Abu Dhabi/Dubai : euro 5 974

TRAINING-WD-SDN 1SERVICE TRAINING WEEK DAYS SUNDYNE

2

FIXED DAILY RATE Applicable 5 days per weekbased on 8 hours.

++++++++++++++++++++++++++++++++++++++++++++++++++++++++++WE RECOMMEND A 3 DAY TRAINING COURSE. MAX 15 PARTICIPANTS++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

Optional :CD or USB KEY (english training content) :=======price : 1 123 €

QUOTATIONOur ref : SPS0000379 Date :

Revision : 1 Page : 1 / 4

15 Oct 2021Your ref :

SSUUNNDDYYNNEE IINNTTEERRNNAATTIIOONNAALL SS..AA..

S.A. au capital 1 860 000 € RCS Dijon B 016 850 992 - APE 2813Z Siret 016 850 992 00013 - V.A.T. N° FR 80016850992

13-15, BOULEVARD EIFFEL - B.P. 3021604 LONGVIC CEDEXFRANCE

PHONE : +33 (0)3 80 38 33 00 FAX : +33 (0)3 80 38 34 16

WEB SITE : www.sundyne.com

PREMIUMS on WORKDAY RATES : =========================== OVERTIME (Time beyond an 8 hour day plus weekends/holidays) 8 to 10 hour/day = 25% premium 10 to 12 hour/day = 50% premium Weekend and holiday = 50% premium

CALCULATION and DEFINITION of RATES : ==================================

MOBILIZATION / DEMOBILIZATION : ++++++++++++++++++++++++++++This is a fixed cost per trip that includes airfare, travel days leaving and returning, home costs to departing airport, airport parking, visa costs, work permit costs, first night accomodation and meal cost BILLABLE TIME :+++++++++++++ 1) Billable time is calculated from the day the person departs home-office until he returns, including weekends and holidays (portal to portal) 2) Each day is payable, worked or not 3) Daily rate is not dividable ; Minimum charge is for one day at applicable daily rate 4) Standby time is billed as per daily rates. Weekend standby days will be billed at weekday rate. 5) Since daily rates are all inclusive and fixed, no receipts will be provided ACCOMMODATION / LOCAL TRANSPORTATION :+++++++++++++++++++++++++++++++++++++++ Transport to site to be provided by customer. Customer is in charge of our Field Service Engineer from destination airport to site. Daily pick up from hotel to plant (go and back) is also in charge of the customer.

SHORT NOTICE :++++++++++++++ Trip PO must be received no later than 10 days before scheduled departure. The Mob/Demob will be increased by 20% if received within 1 to 9 days of departure MAXIMUM WORKED HOURS :++++++++++++++++++++++++ Field Service personnel are NOT required to perform, and may decline, work in excess of 12 hours per day. Workdays in excess of 16 hours are prohibited. 11 hours of rest are required before retunring to work. MEDICAL CHECKS :++++++++++++++++ Every SISA FSE gets a yearly medical visit by a French government delegated doctor. No further

QUOTATIONOur ref : SPS0000379 Date :

Revision : 1 Page : 2 / 4

15 Oct 2021Your ref :

Line Item Qty Unit Price Total

SSUUNNDDYYNNEE IINNTTEERRNNAATTIIOONNAALL SS..AA..

S.A. au capital 1 860 000 € RCS Dijon B 016 850 992 - APE 2813Z Siret 016 850 992 00013 - V.A.T. N° FR 80016850992

13-15, BOULEVARD EIFFEL - B.P. 3021604 LONGVIC CEDEXFRANCE

PHONE : +33 (0)3 80 38 33 00 FAX : +33 (0)3 80 38 34 16

WEB SITE : www.sundyne.com

medical examination of any kind will be made abroad. TAXES :++++++ The quoted prices are net and do not include any possible withholding tax in the country of execution of this contract. If this withholding tax is believed to be applicable, your order shall clearly include for the additional tax amount. ROTATION OF FSE :++++++++++++++++Sundyne reserves the right to replace the Engineer or Technician every 4 weeks for onshore and every 2 weeks for offshore service. The Engineer/Technician will be replaced at the Customer's expense TRIP CANCELLATION :++++++++++++++++++If a trip is cancelled prior to departure, cancellation charges (e.g. airfare, change fees, etc.) will be invoiced at actual cost + 15% admin fee HAZARDOUS or HARSH LOCATION :+++++++++++++++++++++++++++++ A daily surcharge is applied for time in hazardous or harsh environments. The daily surcharge is 418 euro. SECURITY ARRANGEMENTS OPTION :+++++++++++++++++++++++++++++++ If the end user site is located in an area of the World where there are geopolitical or security concerns or problems, we reserve the right to decline any request for assistance. If we agree to attend site under these circumstances, we will apply special rates for the provision of labour, insurance, travel and security arrangements required to mitigate the risk associated with executing the project.

PAYMENT TERMS :+++++++++++++++Net 30 days from invoice date or advance payment for "new" customer. COVID-19 :+++++++++IF AN ISOLATION IS MANDATORY AT ARRIVAL IN THE COUNTRY OF EXECUTION OF WORKS, EACH DAY WILL BE BILLED 1 456 €. ALL EXPENSES LINKED TO COVID-19 WILL BE INVOICED AT COST.

VALIDITY :++++++++End of 2021+3% for 2022

IN ACCORDANCE WITH OUR TERMS AND CONDITIONS

===================================================================

RATES FOR A TRAINING AT SUNDYNE'S PREMISES :

QUOTATIONOur ref : SPS0000379 Date :

Revision : 1 Page : 3 / 4

15 Oct 2021Your ref :

Line Item Qty Unit Price Total

SSUUNNDDYYNNEE IINNTTEERRNNAATTIIOONNAALL SS..AA..

S.A. au capital 1 860 000 € RCS Dijon B 016 850 992 - APE 2813Z Siret 016 850 992 00013 - V.A.T. N° FR 80016850992

13-15, BOULEVARD EIFFEL - B.P. 3021604 LONGVIC CEDEXFRANCE

PHONE : +33 (0)3 80 38 33 00 FAX : +33 (0)3 80 38 34 16

WEB SITE : www.sundyne.com

===========================================Price per person for 3 days :1-3 persons =

This includes :A 3 day training course, USB keys with training content, 3 lunches, one dinner and local transportation.Travel, hotel and living expenses are not included

Sub Total :

Discount :

V.A.T. :

Freight :

Total to pay :

Misc :

THIS QUOTATION IS SUBJECT TO THE ATTACHED SUNDYNE INT'L S.A.

GENERAL TERMS AND CONDITIONS OF SALES EFFECTIVE

NOVEMBER 21, 2019

Paid to: SUNDYNE INTERNATIONAL S.A.BANK : SOCIETE GENERALE EUR BIC : SOGEFRPPIBAN : FR7630003007500002079089124BANK : BNP Dijon BIC : BNPAFRPPBGEIBAN : FR7630004004120001019702494

QUOTATIONOur ref : SPS0000379 Date :

Revision : 1 Page : 4 / 4

15 Oct 2021Your ref :

Line Item Qty Unit Price Total

SUNDYNE INTERNATIONAL S.A.

S.A. au capital 1 860 000 € RCS Dijon B 016 850 992 - APE 2813Z Siret 016 850 992 00013 - V.A.T. N° FR 80016850992

13-15, BOULEVARD EIFFEL - B.P. 3021604 LONGVIC CEDEXFRANCE

PHONE : +33 (0)3 80 38 33 00 FAX : +33 (0)3 80 38 34 16

WEB SITE : www.sundyne.com

Page 1 of 1

SUNDYNE WARRANTY EXTENSION OFFER W21/0227

Quote for a warranty extension for :

L&T INDIA / FARABI YANBU PETROCHEMICALS COMPANY SAUDI ARABIA

Products : SUNDYNE PUMPS LMV311/331 (P-21250-SA)

Please find herewith our UNPRICED proposal for the warranty extension up to 12 months from

commissioning or 40 months from supply, whichever is earlier :

This proposal is valid at the following mandatory conditions:

• The goods should be kept in the original packing during the whole storage on site and should follow our long

term storage procedure including auxiliaries.

• Pre-commissioning & Commissioning of the units will be performed by a Sundyne Service Engineer, at

customer’s cost, based on Sundyne Field Service rates and conditions.

• Costs of any parts found to be in need of replacement would be charged extra prices prevailing at the time

the pre-commissioning is carried out.

• Damaged parts due to normal wear are not included.

• This offer is valid 12 months after date of shipment of the units.

• Purchase order to be placed to the attention of Mr Quentin Baricault, Sundyne Field Service Manager

([email protected]) ; payment terms : net 30 days from invoice date.

Warranty quote according to : Sundyne T &C’s - Sundyne Warranty Policy

SUNDYNE signature + stamp

Name :

Position :

Date :

Customer/Owner signature + stamp

Name :

Position :

Date : Oct 18th, 2021

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MER-QE-R2-002

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

ALL RIGHTS RESERVED

THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF L&T CHIYODA LIMITED (LTC) AND THE

COPYRIGHT THEREIN IS VESTED IN LTC NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED IN ANY MANNER

OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF LTC.

TABLE 1A

(MECHANICAL ITEMS)

The broad scope of work / supply for mechanical items for integrally geared Pumps and its

associated Auxiliaries shall include design, engineering, manufacture, inspection, testing, painting,

packing and supply of material as mentioned in table below as a minimum. Supplier shall include

in their scope of work / supply all other items essential for proper erection, smooth, trouble free and

safe start-up, operation, shutdown as well as maintenance of the equipment / complete package.

Integrally geared Pumps and its associated Auxiliaries shall be suitable for the installation in

Hazardous Area in line with Hazardous Area Classification as specified in respective datasheets

(X): Required ( ): Not Required ( ) N. A.: Not Applicable

SL.

NO. ITEMS APPLICABLE FOR EACH

MACHINE

Re

qu

ire

d

fro

m B

idd

er

REMARKS

Bid

de

r’s

co

nfi

rma

tio

n

RE

V.

1.0 CENTRIFUGAL PUMP, DRIVER

AND RELATED AUXILIARIES

(X) (X) Yes

( ) No

( ) NA

1.1 (X) Integrally geared (OH6 type)

centrifugal pumps as per API 610,

11th Edition.

(X) Driven by Electric Induction

Motor

(X) (X) As per Data sheets

(X) As per Project Specifications

attached along with this

requisition (ATTACHMENT – 2).

(X) Yes

Including

comments

( ) No

( ) NA

1.2 (X) Material of Construction

(X) (X) Material for Pump shall be in

line with those specified in

respective datasheets.

(X) Yes

( ) No

( ) NA

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS APPLICABLE FOR EACH

MACHINE

Re

qu

ire

d

fro

m B

idd

er

REMARKS

Bid

de

r’s

co

nfi

rma

tio

n

RE

V.

(X) Pumps handling H2S service

shall be comply to NACE MR

0103

(X) Reduced hardness materials

are required in accordance with

API 610, 11th Ed.

1.3 Auxiliary Piping for Centrifugal

Pumps

(X) As per Datasheets and API 610

and Piping material Specification

(PMS)

(X) Yes

Including

comments

( ) No

( ) NA

1.3.1 Auxiliary Piping within the confines

of the base plate

(X) (X) Yes

( ) No

( ) NA

1.3.2 (X) Casing Drain piping with

isolation valve with blind flange

connection at the edge of base

plate.

(X) Casing Vent piping with Isolation

valve with flange connection as

close to top of pump casing & Seal

Auxiliaries

(X) (X) Casing drain size shall be ¾”

minimum as per UOP standard

drawing (8-135-9 and 8-137-8)

(X) Yes

( ) No

( ) NA

1.3.3 (X) Cooling Water piping

Cooling water circuit shall have

following items as a minimum,

(X) (X) Single inlet & outlet

connection for C.W. to be

manifold at the edge of base

plate with flange connection.

(X) Yes

( ) No

( ) NA

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS APPLICABLE FOR EACH

MACHINE

Re

qu

ire

d

fro

m B

idd

er

REMARKS

Bid

de

r’s

co

nfi

rma

tio

n

RE

V.

a) Isolation Valve (Gate Valve) in

supply line

b) Isolation Valve (Globe Valve),

Temperature Gauge, Thermal

Relief Valve and Flow Gauge in

return line.

(X) Piping material shall be

Carbon Steel as per Pipe Class

MS1

1.4 (X) Companion Flanges with bolts,

nuts and gaskets

( ) (X) By L&T

All Battery Limit Connections

shall be of standard sizes only.

( ) Yes

( ) No

( ) NA

1.5 (X) Companion Flanges with bolts,

nuts and gaskets

( X ) (X) By Supplier

Companion Flanges for Non –

Standard sizes with bolts, nuts

and gaskets

( ) Yes

( ) No

(X) NA

1.6 (X) Warm Up Orifice – Loose Supply

by Supplier.

(X) Warm up flow to be added to

rated flow by Supplier.

(X) (X) As per applicable datasheets

(X) Companion Flanges,

Gaskets & Fasteners by L&T

(X) Warm-up Line by L&T

(X) Supplier shall provide warm-

up scheme along with quotation.

( ) Yes

( ) No

(X) NA

Not

relevant for

the quoted

pumps

1.7 (X) Minimum flow by pass Orifice – (X) (X) As per applicable datasheets

(X) Loose Supply by Supplier

(X) Yes

( ) No

( ) NA

1.8 (X) Cleats for Hot insulation on

pump casing

(X) (X) As per applicable datasheets ( ) Yes

( ) No

(X) NA

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS APPLICABLE FOR EACH

MACHINE

Re

qu

ire

d

fro

m B

idd

er

REMARKS

Bid

de

r’s

co

nfi

rma

tio

n

RE

V.

(X) Supplier to provide provision

/ cleats for insulation (Insulation

by L&T).

Cleats not

provided,

provision

for

insulation

by L&T

considered

1.9 (X) Skin Thermocouple (X) (X) As per applicable datasheets

(X) Quantity shall be as per

vendor recommendation

( ) Yes

(X) No

As none

recommend

er by

Sundyne

( ) NA

2.0 Bearings For Centrifugal Pumps (X) (X) As per API 610, 11th Edition. (X) Yes

( ) No

( ) NA

1.

2.

2.1

(X) Radial Bearings

(X) Thrust Bearing

(X) (X) Sleeve Bearing (X) Yes

Journal

Bearings &

Ball

Bearings

( ) No

( ) NA

2.2 (X) Bearing Isolator. (X) (X) Yes

( ) No

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS APPLICABLE FOR EACH

MACHINE

Re

qu

ire

d

fro

m B

idd

er

REMARKS

Bid

de

r’s

co

nfi

rma

tio

n

RE

V.

( ) NA

2.3 (X) Magnetic Drain Plug (X) (X) Yes

( ) No

( ) NA

2.4 (X) Plugged Connection for Oil Mist

Lubrication System

(X) ( ) Yes

(X) No

No

possibility

to change

for such

type of

lubrication

for

Sundyne

Pumps’

proposed

Gearbox

( ) NA

3.0 MECHANICAL SEAL & SEAL

FLUSHING SYSTEM FOR

CENTRIFUGAL PUMP

(X) (X) As per API 682 4th Edition

(X) As per respective pump data

sheet and Seal Vendor’s

recommendation

(X) Yes

For Seal

Systems

(X) No for

Mechanical

Seals

100%

Sundyne

Standard

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS APPLICABLE FOR EACH

MACHINE

Re

qu

ire

d

fro

m B

idd

er

REMARKS

Bid

de

r’s

co

nfi

rma

tio

n

RE

V.

Proprietary

Design

( ) NA

1.

2.

3.

3.1

Mechanical Seal –

a) Process Fluid Side

b) Between Gear Box and

Pump (Lube Oil Side)

(X) (X) Suitable for maximum shut-

off pressure / casing design

pressure under static condition.

(X) Yes

for a)

(X) No

for b), not

relevant

and

possible

anywhere

( ) NA

3.2 Mechanical Seal Buffer System

(wherever applicable)

(X) (X) As per respective pump data

sheet

(X) Yes

modified as

per

Sundyne

recommend

ations

where

necessary

( ) No

( ) NA

3.3 Mechanical Seal Barrier System

(wherever applicable)

(X) (X) As per respective pump data

sheet

(X) Yes

modified as

per

Sundyne

recommend

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS APPLICABLE FOR EACH

MACHINE

Re

qu

ire

d

fro

m B

idd

er

REMARKS

Bid

de

r’s

co

nfi

rma

tio

n

RE

V.

ations

where

necessary

( ) No

( ) NA

3.4 (X) All Auxiliary Items including

tubing, valves and instrumentation

for

(X) API Cooling Plan as applicable

(X) Seal Flushing Plan as applicable

(X) (X) Seal tubing material shall be

as per datasheets

(X) Yes

( ) No

( ) NA

4.0 Lubrication System

(X) Self contained Lube oil System

with integral gear box with pump

(X) (X) Integral with Pumps within

pump skid

(As per Vendor Standard)

(X) Yes

( ) No

( ) NA

5.0 DRIVERS

1.

2.

3.

4.

5.

5.1

Electric Motor for all pumps as listed

above

(X) X) As per Equipment Data

sheets and Project

Specifications

(X) Hazardous area

classification as per Data sheets

and Scope of supply Electrical

(Table – 1B)

(X) Yes

( ) No

( ) NA

5.2 (X) Mounting of Driver on Base plate

(X) Mounting Driver Half Coupling

(X) (X) Yes for

Coupling

(X) No for

Motors as

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS APPLICABLE FOR EACH

MACHINE

Re

qu

ire

d

fro

m B

idd

er

REMARKS

Bid

de

r’s

co

nfi

rma

tio

n

RE

V.

Vertical

Pumps

proposed,

Motors

dismantled

for

shipment

( ) NA

5.3 (X) Set of SS Shim Plates

(X) Set Bolts for Mounting of Driver

(X) (X) Yes for

Bolts

(X) No for

Shim

Plates

( ) NA

6.0 COUPLING BETWEEN PUMP

AND DRIVER

(X) (X) As per API 610

(X) As per Guards for Machinery

(Doc. No FPC-2000-JSS-00-

003).

(X) Yes for

Coupling

(X) No for

Guards

which are

100%

Sundyne

Standard

( ) NA

6.

6.1

(X) With Spacer and Non Sparking

Coupling Guard

(X) (X) Coupling Service factor shall

be ≥ 1.5 over the driver name

plate rating as a minimum.

(X) Yes

( ) No

( ) NA

7.0 BASE PLATE (X) (X) Yes

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS APPLICABLE FOR EACH

MACHINE

Re

qu

ire

d

fro

m B

idd

er

REMARKS

Bid

de

r’s

co

nfi

rma

tio

n

RE

V.

( ) No

( ) NA

1.

2.

3.

4.

5.

6.

7.

8.

8.1

(X) Common Base Plate for Pump &

Motor for all Pump Items.

(a) Auxiliary items including seal

flushing system for pump

(b) Piping

(c) Accessories (as applicable)

(d) Fully wired Instruments on

skid

(X) X) Structure steel rigid

construction

(X) With Drain pan

(X) Yes

( ) No

( ) NA

8.2 (X) Unitization of Pump with Driver

on Base plate

(X) (X) At Pump Vendor’s shop (X) Yes

Motor will

however

been

shipped

separately ,

never

shipped

assembled

to avoid

damages

during

transport

( ) No

( ) NA

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS APPLICABLE FOR EACH

MACHINE

Re

qu

ire

d

fro

m B

idd

er

REMARKS

Bid

de

r’s

co

nfi

rma

tio

n

RE

V.

8.0 MISCELLENOUS

1.

2.

3.

4.

5.

6.

7.

8.

8.1

(X) Foundation Bolts, Nuts,

Stainless Steel Shims and

Washers.

(X) (X) Yes

( ) No

( ) NA

8.2 (X) Jacking Screws Provision for

leveling & alignment

(X) (X) Yes

( ) No

( ) NA

8.3 (X) Noise Level (X) (X) Noise level shall be ≤ 85

db(A) @ 1m distance for

complete pump train (Pump +

Driver + Coupling +

Auxiliaries)

(X) Noise level and Emissions

level limitation to be in

accordance with Royal

Commission Environmental

Regulations (RCER – 2015).

(X) Yes

( ) No

( ) NA

8.4 (X) Utility piping including support

within pump skid

(X) (X) Yes

( ) No

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS APPLICABLE FOR EACH

MACHINE

Re

qu

ire

d

fro

m B

idd

er

REMARKS

Bid

de

r’s

co

nfi

rma

tio

n

RE

V.

( ) NA

9.0 SUBMISSION OF DRAWINGS

AND DOCUMENTS

(X) (X) As per Table 2A, 2B, 2C &

2D attached along with this

requisition.

(X) Yes

including

comments

( ) No

( ) NA

10.0 SHOP INSPECTION &TESTING (X) (X) As per Indicative Inspection

and test Plan (IITP), Mechanical

data sheet attached in

ATTACHMENT-2, Project

Specifications & Applicable

Codes and Standards

(X) Yes

including

Comments

( ) No

( ) NA

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

10.1

(X) Performance / Mechanical Run

Test with Shop motor

(X) (X) As per API 610 and

Datasheet

(X) Yes

including

Comments

( ) No

( ) NA

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS APPLICABLE FOR EACH

MACHINE

Re

qu

ire

d

fro

m B

idd

er

REMARKS

Bid

de

r’s

co

nfi

rma

tio

n

RE

V.

10.2 (X) NPSH Test (as applicable) (X) (X) If NPSH Margin (NPSHA-

NPSHr) is less than 0.6m @

Rated Point

(X) Yes

( ) No

( ) NA

10.3 (X) Shop Inspection & Testing, NDT

for Main & Auxiliary Equipment

(X) (X) As per API 610 and

Datasheet

(X) Yes

( ) No

( ) NA

10.4 Positive Material Identification (PMI)

for applicable items

(X) (X) As per project specifications (X) Yes

( ) No

( ) NA

10.5 (X) Pump impeller dynamic

balancing

(X) (X) As per API 610, 11th Edition

and applicable project

specification attached along with

this requisition of enquiry.

(X) Yes but

as per

Sundyne

Standard

Balancing

Procedure

attached to

quote

( ) No

( ) NA

10.6 (X) Complete Unit test per pump

tag. (X) (X) Complete Unit test shall be

conducted with Job Motor for

one number of pump per pump

tag at reduced flow (specific

gravity for all pump is < water).

The detailed test procedure shall

be prepared by vendor for review

( ) Yes

(X) No In

regards of

Voltage of

the

proposed

motors no

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS APPLICABLE FOR EACH

MACHINE

Re

qu

ire

d

fro

m B

idd

er

REMARKS

Bid

de

r’s

co

nfi

rma

tio

n

RE

V.

during post order stage. As Job

motor is designed for 60 Hz

power supply, Shop VFD shall

be used if power supply

frequency in testing shop is not

60 Hz. Suitability of job motor

with VFD operation during

testing shall be ensured by

supplier.

way to use

those at

Sundyne

Facilities

( ) NA

11.0 PAINTING, PRESERVATION

&SHIPPING PREPARATION

(X) (X) As per Painting Specification

attached in Attachment-2 along

with this requirements.

(X) Yes

including

comments

( ) No

( ) NA

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

11.1

(X) Painting - Prime Coating &

Finish Paint

(X) (X) As per Project standard (X) Yes

including

comments

( ) No

( ) NA

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS APPLICABLE FOR EACH

MACHINE

Re

qu

ire

d

fro

m B

idd

er

REMARKS

Bid

de

r’s

co

nfi

rma

tio

n

RE

V.

11.2 (X) Sea worthy Export Packing,

forwarding and marking required

(X) (X) As applicable for Foreign

Bidder

(X) For 12 months of Outside

storage

(X) Yes

( ) No

( ) NA

11.3 Rust Prevention for Long Term

Storage

(X) (X) For 12 months of Outdoor

storage

(X) Yes

( ) No

( ) NA

11.4 Final Paint Color for Drive Motor (X) (X) Final Paint Color for Drive

Motor shall be RAL 7035

(X) Yes

( ) No

( ) NA

12.0 SPARE PARTS

12.1

(X) Spare parts for Erection and

commissioning

(X) (X) As per Vendor’s

Recommendation

(X) Yes

( ) No

( ) NA

12.2 (X) Capital Spares () (X) As listed in Annexure – 3 of

this requisition.

(X) Yes

( ) No

( ) NA

12.3 (X) Spares for Two (2) years normal

operation

( ) (X) As listed in Annexure – 3 of

this requisition.

(X) Yes

( ) No

( ) NA

13.0 SPECIAL TOOLS AND TACKLES (X) (X) As per Vendor’s

Recommendation

(X) To be included in base quote

(X) Yes

( ) No

( ) NA

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS APPLICABLE FOR EACH

MACHINE

Re

qu

ire

d

fro

m B

idd

er

REMARKS

Bid

de

r’s

co

nfi

rma

tio

n

RE

V.

14.0 FIELD SUPERVISION

(X) For Erection and Commissioning

(X) For Start-up

(X) (X) Supervision on per diem rate

basis

( ) Lump sum Quotation

(X) Yes

( ) No

( ) NA

15.0 NECESSARY SUPPORT &

PARTICIPATION IN HAZOP & SIL

STUDY (AS APPLICABLE)

(X) (X) Per Diem basis (X) Yes

( ) No

( ) NA

16.0 TRAINING (X) (X) Per diem rates

(X) As per training specification

attached along with this

specification

(X) Yes

( ) No

( ) NA

17.0 STATUTORY APPROVAL (X) ( ) Yes

( ) No

(X) NA

Notes: 1. Wherever attached Project Specifications indicate “Contractor”, it shall be read as Supplier.

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MER-QE-R2-002

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

ALL RIGHTS RESERVED

THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF L&T CHIYODA LIMITED (LTC) AND THE

COPYRIGHT THEREIN IS VESTED IN LTC NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED IN ANY MANNER

OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF LTC.

TABLE 1B

SCOPE OF WORK / SUPPLY FOR INTEGRALLY GEARED (OH6 TYPE)

CENTRIFUGAL PUMPS AND ASSOCIATED AUXILIARIES

(ELECTRICAL ITEMS)

The broad scope of work / supply for electrical items for integrally geared (OH6 type) Pumps and

its Associated Auxiliaries shall include design, engineering, manufacture, inspection, testing,

painting, packing and supply of material as mentioned below as a minimum according to the details

mentioned in datasheets & equipment Specifications.

All electrical equipment shall be suitable for the installation in Hazardous area in line with Hazardous

Area Classification as specified below

(X): Required ( ): Not Required ( ) N. A: Not Applicable

SL.

NO. ITEMS

SU

PP

LY

BY

SU

PP

LIE

R

REMARKS

Su

pp

lie

r’s

Co

nfi

rma

tio

n

RE

V.

1.0 ELECTRIC DRIVE MOTORS

1.1 (X) LV induction motor (Motor rating

≤ 160 kW) with terminal box & lugs

(X) Skid / Foundation Mounted as

per vendor recommendation.

(X) (X) As per enclosed Project

Electrical specifications, Data

sheets, ITPs and IEC codes

(X) Yes

including

comments

( ) No

S.No EQUIPMENT

TAG NO.

QTY

DESCRIPTION

Electrical Area

Classification

W S

1 202-P-01 A/B 1 1 Purge Pumps

2 202-P-03 A/B 1 1 PEP Column Side draw Pumps

3 203-P-01 A/B 1 1 Regerent Pumps

4 203-P-02 A/B 1 1 Desorbant Pumps

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS

SU

PP

LY

BY

SU

PP

LIE

R

REMARKS

Su

pp

lie

r’s

Co

nfi

rma

tio

n

RE

V.

(X) Voltage & frequency

variation:

LV Motors and Heaters shall be

suitable for Voltage and frequency

as mentioned below:

LV Motors : 460V with ± 5%

variation & 60Hz ± 2.5% variation

(X) All the motors supplied shall be

energy efficient.

(X) Starting current for LV motors

600% Subject to IEC tolerance.

(X) Suitable for starting at 80%

voltage

(X) The breakdown torque shall

not be less than 200% of full load

torque value & this shall be

inclusive of Negative tolerance.

(X) Motors shall be designed /

rated for 48°C. ambient

temperatures.

(X) DOL start.

(X) For 75 KW and above motors,

Space Heater (with Separate

terminal Box) & PTC (with

separate terminal box) shall be in

vendor scope with separate

terminal box (in line with the

Clause 6.14 of Electrical Design

( ) NA

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS

SU

PP

LY

BY

SU

PP

LIE

R

REMARKS

Su

pp

lie

r’s

Co

nfi

rma

tio

n

RE

V.

Basis, Doc no G446-2999-CN-

0715-001-R3).

(X) Motors shall be TEFC type.

(X) With main & auxiliary terminal

box

(X) Certification as per attached

MR specifications.

1.2 (X) Canopy for Motors (X) Provided by vendor for outdoor

motors

(X) Yes

( ) No

( ) NA

2.0 ACCESSORIES FOR ALL

MOTORS

2.1 (X) Local control station (LCS) with

Start/Stop switch and Ammeter (As

applicable) for LV induction motor.

( ) (X) By LTHE

2.2 (X) Cable glands and Lugs for

Electrical Power and control cables

( ) (X) By LTHE

2.3 (X) Terminal and junction boxes (X) (X) Separate terminal boxes shall

be provided for each of the

following i.e. space heater, PTC

(Thermistors) as applicable for

each motor.

(X) Yes

( ) No

( ) NA

2.4 (X) Insulation class for all Motors

shall be Class F & temperature rise

shall be limited up to Class B.

(X) (X) As per enclosed Electrical

specifications

(X) Yes

( ) No

( ) NA

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS

SU

PP

LY

BY

SU

PP

LIE

R

REMARKS

Su

pp

lie

r’s

Co

nfi

rma

tio

n

RE

V.

(X) Ingress protection of all outdoor

Motors shall be IP 55 as a minimum.

2.5 CABLES AND POWER SUPPLY

PHILOSOPHY ( )

(X) Supply, installation of all

cabling between Packages items

located separately (i.e. Motors,

LCP etc.) shall be by Purchaser.

(X) Purchaser shall provide

separate power supplies for all

electrical equipment. Vendor to

furnish the load list indicating all

required power supplies including

UPS, non-UPS power supply.

2.6 EARTHING

(X) (X) Supplier to provide provisions

in the skid for earthing connection

of equipment earth with plant earth

grid shall be by Purchaser.

Connection of all equipment within

package with earthing boss of skid

shall be done by Supplier.

(X) Earthing connections and

philosophy shall be as per

attached MR specification.

(X) Yes

Not done

for Motors

which are

shipped

separately

( ) No

( ) NA

3.0 SUBMISSION OF DRAWINGS

AND DOCUMENTS

(X) As per Table 2A & 2C of this

Requisition

(X) Yes

including

comments

( ) No

( ) NA

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS

SU

PP

LY

BY

SU

PP

LIE

R

REMARKS

Su

pp

lie

r’s

Co

nfi

rma

tio

n

RE

V.

4.0 SHOP INSPECTION AND

TESTING

(X) As Per Project Specification, Data

sheets, Applicable Codes &

Standards., ITPs

(X) Yes

including

comments

( ) No

( ) NA

4.1 Third party Inspection (X) (X) At Vendors shop. TPI shall be

appointed by L&T. (X) Yes

( ) No

( ) NA

5.0 PRESERVATION & SHIPPING

PREPARATION

(X) (X) Yes

( ) No

( ) NA

5.1 (X) Sea worthy export packing &

marking required.

(X) (X) As applicable, For Foreign

Supplier

(X) Yes

( ) No

( ) NA

6.0 SURFACE PREPARATION AND

PAINTING

6.1 (X) Surface Preparation, Prime coating and finish paints

(X) (X) As Per applicable Painting

Specifications attached along with

this requisition.

Doc No:-067401-0000-JSD-2310-

001-B.

Final paint shade shall be

informed to vendor during DE.

( ) Yes

(X) No as

per Motor

Supplier

Standard

proposed

( ) NA

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS

SU

PP

LY

BY

SU

PP

LIE

R

REMARKS

Su

pp

lie

r’s

Co

nfi

rma

tio

n

RE

V.

7.0 SPARE PARTS

7.1 Spare parts for Erection, Pre

commissioning and Start-up

(X) (X) As per Manufacturer’s

Standards.

( ) Yes

( ) No

(X) NA

7.2 Capital / Insurance Spares ( ) (X) As per Manufacturer’s

Standards and recommendation

(X) Yes

( ) No

( ) NA

7.3 Spare parts for 2 years normal

operation

( ) (X) As per manufacturer’s

standard

(X) Supplier to provide separate

priced quotation

(X) Yes

( ) No

( ) NA

8.0 SPECIAL TOOLS & TACKLES (X) As per Manufacturer’s Standards

and recommendation

( ) Yes

( ) No

(X) NA

Notes: 1. Wherever attached Project Specifications indicate “Contractor”, it shall be read

as Supplier.

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MER-QE-R2-002

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

ALL RIGHTS RESERVED

THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF L&T CHIYODA LIMITED (LTC) AND THE

COPYRIGHT THEREIN IS VESTED IN LTC NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED IN ANY MANNER

OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF LTC.

TABLE – 1C

SCOPE OF WORK / SUPPLY FOR INTEGRALLY GEARED (OH6 TYPE) CENTRIFUGAL PUMPS

AND ASSOCIATED AUXILIARIES

(INSTRUMENT ITEMS)

The scope of work / supply for electrical items for integrally geared Pumps and Associated Auxiliaries

shall include design, engineering, manufacture, inspection, testing, painting, packing and supply of

material as mentioned in the table below as a minimum. Supplier shall include in their scope of

work/supply all other item essential for proper erection, smooth, trouble free and safe start-up,

operation, shutdown as well as maintenance of the equipment / complete package.

All Instrument Items installed in the field shall be suitable for the hazardous area classification:

Zone-2 Gas group IIC, Temperature class T6.

(X): Required ( ): Not Required ( ) N. A.: Not Applicable

SL.

NO. ITEMS

SU

PP

LY

BY

SU

PP

LIE

R

REMARKS

Su

pp

lie

r’s

Co

nfi

rma

tio

n

RE

V.

1.0 INSTRUMENTATION FOR

INTEGRALLY GEARED

CENTRIFUGAL PUMPS AND

RELATED AUXILIARIES

(X) (X) As per project specifications

attached along with this

requisition.

(X) Yes

including

comments

( ) No

S.No EQUIPMENT

TAG NO.

QTY

DESCRIPTION

Instruments shall be as per

Area Classification

(Zone / Gas Group /

Temperature Class)

W S

1 202-P-01 A/B 1 1 Purge Pumps

2 202-P-03 A/B 1 1 PEP Column Sidedraw Pumps

3 203-P-01 A/B 1 1 Regerent Pumps

4 203-P-02 A/B 1 1 Desorbant Pumps

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS

SU

PP

LY

BY

SU

PP

LIE

R

REMARKS

Su

pp

lie

r’s

Co

nfi

rma

tio

n

RE

V.

( ) NA

2.0 FIELD MOUNTED INSTRUMENTS

FOR

2.1 (X) Pump Skid & Auxiliaries (X) (X) As per Supplier

recommendation.

(X) Yes

( ) No

( ) NA

2.2 (X) Pump Mechanical Seal and

Flushing Plan

(X) As per API 682, 4th Edition &

Project Specifications and

Mechanical Data Sheet attached

along with this requisition.

(X) Yes

including

comments

(X) No Not

for

Mechanical

Seals

( ) NA

2.3 (X) Instrument mounted on Drive

Motor

(X) ( ) Yes

( ) No

(X) NA

2.4 (X) Other Instruments as required

as per Sl. No. 1

(X) ( ) Yes

( ) No

(X) NA

3.0 FIELD JUNCTION BOXES (With

Blind Plugs)

Mounted on:

(X) Machine Base plate

(X) (X) Weatherproof to IP 65

&Certified with Ex’de’ for Non-IS

signal and Ex ‘I’ for IS signal as

per IEC 60529

(X) Aluminum coated / Stainless

( ) Yes

(X) No Not

Supplied

by

Sundyne

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS

SU

PP

LY

BY

SU

PP

LIE

R

REMARKS

Su

pp

lie

r’s

Co

nfi

rma

tio

n

RE

V.

(X) Auxiliary Skid(s) (if applicable)

(X) Local Gauge Board (If

applicable)

Steel MOC for Non-IS signal

& Polyester for IS signal.

as clarified

in TQ

( ) NA

4.0 CABLING, WIRING AND OTHER

INSTALLATION HARDWARE

4.1 (X) From Instruments up to skid

mounted junction box within above

mentioned skids

(X) ( ) Yes

(X) No

Junction

Box not

supplied by

Sundyne

( ) NA

4.2 (X) From skid mounted Junction

Boxes to Control Room / Rack

Room

( ) (X) By L&T

4.3 (X) Installation of all skid mounted

Instruments

(X) (X) Yes

( ) No

( ) NA

5.0 CABLE GLANDS

5.1 (X) For cables in Supplier’s scope (X) ( ) Yes

( ) No

(X) NA

5.2 (X) For Cables being supplied by ( ) (X) By L&T

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS

SU

PP

LY

BY

SU

PP

LIE

R

REMARKS

Su

pp

lie

r’s

Co

nfi

rma

tio

n

RE

V.

Purchaser

6.0 CABLE TRAYS

6.1 Cable Trays for Pre-installed

Cables within main as well as

auxiliary skids

(X) ( ) Yes

( ) No

(X) NA

6.2 Cable Trays for cables supplied

loose by Supplier

( ) (X) By L&T, if any ( ) Yes

( ) No

( ) NA

6.3 Cable Trays from Skid mounted

JBs up to the skid edge for laying

of purchaser main cables

(X) ( ) Yes

( ) No

(X) NA

7.0 INSTRUMENT IMPULSE LINE

FOR

7.1 On-Skid Instruments (X) (X) Impulse line as per Project

Specifications attached.

(X) Yes

( ) No

( ) NA

7.2 Off-skid Instruments (Loose

supplied), If any

(X) (X) Impulse line material Loose

supplied by Supplier for

installation by Purchaser

( ) Yes

( ) No

(X) NA

8.0 INSTALLATION HARDWARE (X) (X) All field Instrumentation shall

be supplied in pre-installed

condition

(X) Yes

( ) No

( ) NA

LINEAR ALKYL BENZENE PLANT-4 (LAB-4 PROJECT)

Document No.: FRBN-MR-XX-001

MATERIAL REQUISITION FOR INTEGRALLY GEARED

CENTRIFUGAL PUMPS (OH6)

SL.

NO. ITEMS

SU

PP

LY

BY

SU

PP

LIE

R

REMARKS

Su

pp

lie

r’s

Co

nfi

rma

tio

n

RE

V.

8.1 For Instruments (X) (X) Yes

( ) No

( ) NA

8.2 For Junction boxes and Cable

Trays

(X) ( ) Yes

( ) No

(X) NA

9.0 INSTRUMENT AIR

DISTRIBUTION INSIDE

PACKAGE SKID

(X) (X) Purchaser will provide single

point Instrument Air supply at

Package skid. Further internal

distribution shall be by supplier

( ) Yes

( ) No

(X) NA

Notes:

1. Wherever attached Project Specifications indicate “Contractor”, it shall be read as Supplier.


Recommended