Mobile Infrastructure andLong-term SolutionsThis presentation is designed to be amended before presentation to customers. You may want to remove all references to cost (indicated in red) which are included for the benefit of account managers. Full details are included in the Workplace Price guide.
2© 2010 SunGard. | www.sungard.co.uk
What are Mobile Infrastructure and Long-term Solutions?
Mobile Infrastructure Solutions
Solutions delivered in 48 hours or less and designed to mitigate the effects of a disaster.
Long-term Solutions
Computer Equipment Room (CER) or Workplace constructed on your car park, over 5–20 days and available
for long periods (up to 2 years or more).
3© 2010 SunGard. | www.sungard.co.uk
Long-term Solutions
Modular, high specification construction
1,000–13,700 sq ft of CER (63–344 kW cooling)
30–300 positions of Workplace Recovery
…or a combination ofWorkplace Recovery and CER
Erected within 5–20 days
Occupation for up to 2 years (longer with planning permission)
Minimal site preparation required
Initial survey included
Regularly tested
Cost-effective (£2,000 to £25,000 pa)
No invocation charge (cost +15% administration charge).
4© 2010 SunGard. | www.sungard.co.uk
Long-term Site Requirements
Site requirements Reasonably level site Hard standing Access for articulated vehicles Access for 25T crane Space for external air-conditioning
units, access ramps and generator
Optional preparation Power Communications Foundation pads (for green field sites) Planning permission.
5© 2010 SunGard. | www.sungard.co.uk
Long-term Construction Process
Foundations laid outand levelled
Flat pack units (4 per truck) lifted into position.
6© 2010 SunGard. | www.sungard.co.uk
Wall panels installed
Air-conditioning units positioned and connected.
Long-term Construction Process (continued)
7© 2010 SunGard. | www.sungard.co.uk
Long-term Construction Process (continued)
Raised floor installed
Small power installed(workplace only)
Cat6 structured cabling(workplace only).
8© 2010 SunGard. | www.sungard.co.uk
Long-term Construction Process (continued)
Furniture installed(workplace only)
Ramps and access stairs installed
Total erection time – 5 to 20 days.
9© 2010 SunGard. | www.sungard.co.uk
Mobile Infrastructure Package
Mitigates the effects of a disaster
Survey at an additional charge
Air-conditioning units (2.9kW to 63kW)
Power distribution units
Generators (6KVA–1000KVA)
Portable accommodation units
Cat6 structured cabling
Delivered within 12 hours
Cost-effective (£3,000 pa)
No invocation charge (cost +15% administration charge).
10© 2010 SunGard. | www.sungard.co.uk
Mobile UPS
400KVA containerised UPS
2 x 60KVA UPS (can be run in parallel to create 120KVA)
Delivered within 24 hours
No invocation charge (cost +15% administration charge)
Cost-effective(1,500 to £4,000 pa)
No invocation charge (cost +15% administration charge).
11© 2010 SunGard. | www.sungard.co.uk
Mobile Workplace
2 or 3 volumetric units deliveredwithin 24–36 hours
15 or 20 position desks and chairs
Integral air conditioning
Pre-installed Cat5e structuredcabling and small power
Avaya Prologix PBX with 15 or 20analogue extensions
Wireless intruder alarm system
Containerised 50kVA powergenerator set (for 4 weeks)
Cost-effective (£3,000 or £4,000 pa)
No invocation charge (cost +15% administration charge).
12© 2010 SunGard. | www.sungard.co.uk
Mobile Midrange Recovery Unit
Included within the Mobile Infrastructure Package but available separately
200 sq ft stand alone unit, complete with air-conditioning
Delivered within 24 hours
Cost-effective (£900 pa)
No invocation charge (cost +15% administration charge).
13© 2010 SunGard. | www.sungard.co.uk
Mobile Bank Branch provided for major Scottish bank
Incident control solution for Health & Safety Executive.
Bespoke Solutions
14© 2010 SunGard. | www.sungard.co.uk
Thank You