1 SunPine Biorefinery Second generation biofuel
Transcript
Page 1: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

1

SunPine Biorefinery Second generation biofuel

Page 2: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

2

SunPine AB

• Founded in 2006

• Environmental permission 2008-03

• Owners

KIRAM AB (Lars Stigsson)

Preem AB (from 2008-06)

Sveaskog (from 2008-06)

Södra Skogsägarna (from 2008-06)

• Investment approx. 32 million EUR

• Production start 2010-04

• 20+ employees

Page 3: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

3

Location

Page 4: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

4

Piteå Harbour

Page 5: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

5

Summer 2010

Page 6: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

6

SunPine AB …….about Crude Tall Oil (CTO)

CTO is a renewable, non food raw material.

CTO is a rest product from the kraft sulphate process. After the digester (anthraquinone can be used for increased yield), soap is separated from the black liquor and acidulated with sulphuric acid into CTO.

2-3 procent of the wood becomes CTO.

Swedish CTO volume is approx. 200 kton/year.

CTO main components are fatty acids, resin acids and neutral elements.

Sterols are part of the neutral elements and are today recovered and used in functional foods.

Page 7: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

7

Pine (Pinus) Spruce (Picea) Birch (Betula)

kg/ton % kg/ton % kg/ton %

Fatty acid 16 73 5 62 13 70

Resin acid 5 22 1,5 21 0 0

Neutral element 1,1 5 1,3 17 5 30

of which Beta-sitosterol

0,8 4 0,5 7 0,7 4

SunPine ……..about wood components

Page 8: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

8

SunPine – first phase Production facility for crude tall diesel

Feedstock Crude Tall Oil

Methanol

Products Crude Tall Diesel (55%)

Tall Oil Pitch (45%)

Capacity 100.000 m3/year (that is 2,5% of the swedish diesel volume)

Page 9: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

9

Page 10: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

10

The SunPine Process

(Catalyst)

CTO

Other non edible

Fatty acids

MEOH

Esterification Vacuum

Distillation

Resin

acid

2. Pitch

Plant

sterols

1. Crude Tall

Diesel

Pulpmills,

Heat plants

Preem

Gothenburg

Chemistry

/Food-

industries

Later

Later

Feedstock Process Products Buyer

Page 11: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

11

2006: Process development

Page 12: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

12

Steam Boiler 5 MW (3 and 9 bar) Hot oil (300 ºC)

Crude tall diesel tank 25 000 m3

Full scale production unit: 20 meters high at 4’th level 35 meters wide

Page 13: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

13

Methanol reactor

Condens tank and coolers

Thin-film evaporator

Vacuum system Spray condenser Steam Ejectors

Fractionation reactor (3mBar, bottom temp 240ºC)

Steam stripper Methanol condensers

Methanol

Turpentine decanter

Reactor flash

Esterification reactor

Turpentine Re-heat Flash tanks

Gas collection

Heat exchangers

Page 14: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

14

SunPine crude tall diesel Renewable feedstock for the refinery

at Preem in Gothenburg

ACP

Evolution

Diesel

Page 15: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

15

Traditional raw materials for renewable diesel fuels……….

Foto: David Castor, http://commons.wikimedia.org/wiki/File:Rapsf%C3%A4lt-1.jpg

Page 16: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

16

SunPine diesel

…and CO2 aspects

Page 17: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

17

Nov 2008: Frost protection

Page 18: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

18

May 2009: ”Green field”

Page 19: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

19

Aug 2009

Page 20: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

20

Nov 2009

Page 21: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

21

Dec 2009

Page 22: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

22

Feb 2010

Page 23: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

23

Feb 2010 (-30 ºC)

Page 24: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

24

Feb 2010: Boiler start

Page 25: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

25

April 2010: “Lysekil oilers”

Page 26: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

26

April 2010: Production start

Page 27: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

27

May 2010: Opening ceremony

Page 28: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

28

October 2010: Vessel to Preem

Page 29: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

29

October 2010: Maintenance shut

Page 30: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

30

Resin acids

Phytosterols

Valuable components in tall oil pitch

Page 31: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32

31

Future

Increase feed

Increase yield

Process optimization

Recovery of resin acids (30-40 % of pitch)

Recovery of anthraquinone

Recovery of phytosterols


Recommended