+ All Categories
Home > Documents > Suomi NPP CrIS SDR Status · Jan. 25: First light image, 900 cm-1. BT 20-Jan-2012 12:54 to 23:57...

Suomi NPP CrIS SDR Status · Jan. 25: First light image, 900 cm-1. BT 20-Jan-2012 12:54 to 23:57...

Date post: 05-Aug-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
17
Suomi NPP CrIS SDR Status Yong Han, CrIS SDR Team Lead Suomi NPP EDR Product Provisional Readiness Review NOAA Center for Weather and Climate Prediction (NCWCP) 5830 University Research Park, College Park, Maryland January 17- 18, 2013
Transcript
Page 1: Suomi NPP CrIS SDR Status · Jan. 25: First light image, 900 cm-1. BT 20-Jan-2012 12:54 to 23:57 UTC from CCAST SDR processing system, UW/UMBC . 5 . CrIS SDR Highlights ... • The

Suomi NPP CrIS SDR Status

Yong Han, CrIS SDR Team Lead

Suomi NPP EDR Product Provisional Readiness Review NOAA Center for Weather and Climate Prediction (NCWCP)

5830 University Research Park, College Park, Maryland January 17- 18, 2013

Page 2: Suomi NPP CrIS SDR Status · Jan. 25: First light image, 900 cm-1. BT 20-Jan-2012 12:54 to 23:57 UTC from CCAST SDR processing system, UW/UMBC . 5 . CrIS SDR Highlights ... • The

Outlines

• CrIS operational concept and SDR specification

• CrIS SDR Cal/Val milestones and events

• SDR Provisional Product highlights

• Product issues

• Summary

2

Page 3: Suomi NPP CrIS SDR Status · Jan. 25: First light image, 900 cm-1. BT 20-Jan-2012 12:54 to 23:57 UTC from CCAST SDR processing system, UW/UMBC . 5 . CrIS SDR Highlights ... • The

CrIS Operational Concept

2,200 km Swath

NWP, EDR Applications

Decode Spacecraft

Data

±50° Cross track

Scans

3x3 Array of CrIS FOVs

(Each at 14-km

Diameter)

Ground Station

RDR = Raw Data Record SDR = Sensor Data Record EDR = Environmental Data Record

30 Earth Scenes

RDRs

EDRs

Co-Located ATMS SDRs

Global Temperature, Moisture, Pressure Profiles

CrIS on NPP

RDRs

Interferograms

Calibrated / Geolocated Spectra

SDRs

CrIS SDR Algorithm

Page 4: Suomi NPP CrIS SDR Status · Jan. 25: First light image, 900 cm-1. BT 20-Jan-2012 12:54 to 23:57 UTC from CCAST SDR processing system, UW/UMBC . 5 . CrIS SDR Highlights ... • The

NPP CrIS Sensor Data Record Calibration Uncertainty Specifications

Band Spectral range (cm-1)

N. of chan.

Resolution (cm-1)

FORs per

Scan

FOVs per FOR

NEdN @287K BB

mW/m2/sr/ cm-1

Radiometric Uncertainty @287K BB

(%)

Spectral (chan center) uncertainty

ppm

Geolocation uncertainty

km

LW 650-1095 713 0.625 30 9 0.14 0.45 10 1.5

MW 1210-1750 433 1.25 30 9 0.06 0.58 10 1.5

SW 2155-2550 159 2.5 30 9 0.007 0.77 10 1.5

4

SDR Calibration Uncertainty

Radiometric uncertainty specification converted to that expressed in brightness temperature

Page 5: Suomi NPP CrIS SDR Status · Jan. 25: First light image, 900 cm-1. BT 20-Jan-2012 12:54 to 23:57 UTC from CCAST SDR processing system, UW/UMBC . 5 . CrIS SDR Highlights ... • The

CalVal Milestones and Events

• January 18th 2012: CrIS was powered up; team started instrument checkout and optimization.

• February 8th : Engineering packet v32 was uploaded (PGA setting and bit trim mask updates).

• February 22nd : Full spectral resolution RDRs (0.8 cm maxOPD for all bands) were collected.

• April 11th : Engineering packet v33 was upload (spectral calibration parameters, nonlinearity coefficients and ICT emissivity table updates).

• April 18th: A new FIR digital filter was uploaded to replace the corrupted one.

• May 15th : CrIS SDR product reached Beta maturity level .

• June 27th: Engineering packet v34 was uploaded (temperature drift limit updates)

• Product provisional review: October 23, 2012 • Validated product: 2013

Jan. 25: First light image, 900 cm-1 BT 20-Jan-2012 12:54 to 23:57 UTC from CCAST SDR processing system, UW/UMBC

5

Page 6: Suomi NPP CrIS SDR Status · Jan. 25: First light image, 900 cm-1. BT 20-Jan-2012 12:54 to 23:57 UTC from CCAST SDR processing system, UW/UMBC . 5 . CrIS SDR Highlights ... • The

CrIS SDR Highlights

• Instrument noise (NEdN) • Spectral calibration and uncertainty • Radiometric calibration and uncertainty • Accuracy assessment with RTM and inter-sensor

comparisons • Geolocation calibration and uncertainty • SDR quality flag improvement

Page 7: Suomi NPP CrIS SDR Status · Jan. 25: First light image, 900 cm-1. BT 20-Jan-2012 12:54 to 23:57 UTC from CCAST SDR processing system, UW/UMBC . 5 . CrIS SDR Highlights ... • The

NEdN

7 Feb

1

Mar

2

May

2

Jun

4

Jul 4

Aug

6

NEdN

The noise levels are much better than the specification

The large NEdN at MW FOV 7 is a known issue before NPP launch

NEdN at selected wavenumber ranges

Stable NEdN over 8 months

Page 8: Suomi NPP CrIS SDR Status · Jan. 25: First light image, 900 cm-1. BT 20-Jan-2012 12:54 to 23:57 UTC from CCAST SDR processing system, UW/UMBC . 5 . CrIS SDR Highlights ... • The

Spectral Uncertainty

8

Longwave band, 730-740 cm-1

Midwave band, 1350-1380 cm-1

Shortwave band, 2200-2250 cm-1

Inter-FOV spectral shifts relative to FOV5 derived from correlation analysis

Longwave band

Midwave band

ppm

pp

m

Spectral shifts assessed with RTM

LW & MW band frequency uncertainty < 3 ppm (specification 10 ppm) SW band frequency uncertainty relative to FOV5 < 3 ppm

Page 9: Suomi NPP CrIS SDR Status · Jan. 25: First light image, 900 cm-1. BT 20-Jan-2012 12:54 to 23:57 UTC from CCAST SDR processing system, UW/UMBC . 5 . CrIS SDR Highlights ... • The

Radiometric Uncertainty Assessment Inter-FOV difference

9

LW, 672-682 cm-1, wrt FOV5

LW, 830-840 cm-1, wrt FOV5

MW, 1382-1408 cm-1, wrt FOV9

MW, 1585-1600 cm-1, wrt FOV9

SW, 2360-2390 cm-1, wrt FOV5

SW, 2500-2520 cm-1, wrt FOV5

BT D

iff (K

) BT

Diff

(K)

0.1

-0.1

0.1

-0.1

FOV-2-FOV differences are less than 0.04 K for LW and MW and less than 0.1 K for SW

Page 10: Suomi NPP CrIS SDR Status · Jan. 25: First light image, 900 cm-1. BT 20-Jan-2012 12:54 to 23:57 UTC from CCAST SDR processing system, UW/UMBC . 5 . CrIS SDR Highlights ... • The

Radiometric Uncertainty Assessment Daily Mean CrIS-AIRS Differences

10 Stable difference ~0.1 K

v33 upload

Mar

Mar Mar Mar

Mar Mar

Oct

Oct

Oct

Oct

Oct

Page 11: Suomi NPP CrIS SDR Status · Jan. 25: First light image, 900 cm-1. BT 20-Jan-2012 12:54 to 23:57 UTC from CCAST SDR processing system, UW/UMBC . 5 . CrIS SDR Highlights ... • The

Radiometric Uncertainty Assessment CrIS-IASI SNO (North Pole)

11

Sample size = 411 CrIS

- IA

SI

CrIS IASI

The CrIS IASI difference is ~ 0.2 K

Page 12: Suomi NPP CrIS SDR Status · Jan. 25: First light image, 900 cm-1. BT 20-Jan-2012 12:54 to 23:57 UTC from CCAST SDR processing system, UW/UMBC . 5 . CrIS SDR Highlights ... • The

12

Radiometric Uncertainty Assessment CrIS/VIIRS (M13 4um) comparisons

Difference is less than 0.2 K

Page 13: Suomi NPP CrIS SDR Status · Jan. 25: First light image, 900 cm-1. BT 20-Jan-2012 12:54 to 23:57 UTC from CCAST SDR processing system, UW/UMBC . 5 . CrIS SDR Highlights ... • The

Standard deviations of Biases vs Radiative Transfer Model (RTM) simulated radiances

Radiometric Uncertainty Assessment Radiance Bias Estimated with RTM

Overall bias < 0.2 K FOV-2-FOV differences < 0.1 K

13

Standard deviation (over 9-FOVs) of Bias vs RTM simulated radiances

Bias

(K)

Page 14: Suomi NPP CrIS SDR Status · Jan. 25: First light image, 900 cm-1. BT 20-Jan-2012 12:54 to 23:57 UTC from CCAST SDR processing system, UW/UMBC . 5 . CrIS SDR Highlights ... • The

• Co-located VIIRS IR data are used to estimate the CrIS geolocation uncertainty A coding error was found that caused the geolocation error

14

Geolocation Uncertainty Assessed with VIIRS

Geolocation uncertainty within 30o scan angles < 1 km (specification 1.5 km)

IDPS MX6.2 4.5 km geolocation error

error CrIS - VIIRS

IDPS MX6.3 CrIS image

Bias (m)

RMSE (m)

Track -21 80

Scan -8 64

VIIRS geolocation uncertainty

Image differences (CrIS – VIIRS) before and after a coding error fix

Page 15: Suomi NPP CrIS SDR Status · Jan. 25: First light image, 900 cm-1. BT 20-Jan-2012 12:54 to 23:57 UTC from CCAST SDR processing system, UW/UMBC . 5 . CrIS SDR Highlights ... • The

Overall Quality Flag Improvement

15

Quality flag: Blue color – GOOD Green color - DEGRADED

Beta product

Current product

Engineering packet v34 uploaded

Perc

enta

ge (%

)

A false alarm (data labeled as Degraded) was fixed with code changes and parameter updates

Page 16: Suomi NPP CrIS SDR Status · Jan. 25: First light image, 900 cm-1. BT 20-Jan-2012 12:54 to 23:57 UTC from CCAST SDR processing system, UW/UMBC . 5 . CrIS SDR Highlights ... • The

Issues

• Software issues and IDPS SDR anomaly are still occurring

• Significant SW cold scene FOV differences

• Spectral ringing

16

Page 17: Suomi NPP CrIS SDR Status · Jan. 25: First light image, 900 cm-1. BT 20-Jan-2012 12:54 to 23:57 UTC from CCAST SDR processing system, UW/UMBC . 5 . CrIS SDR Highlights ... • The

Summary

• CrIS SDR has reached the Provisional maturity level

• All critical DRs and document issues have been addressed

• A number of CalVal and software issues have been identified and will be addressed for the Validated product

• The team has a clear path moving forward for both NPP and J1 missions

17

Calibration type Meet Specification

LW band MW band SW band

NEdN

Radiometric calibration

Spectral calibration *

Geolocation ** ** **

* Relative to FOV5 ** Within 30o scan angles


Recommended