Equipment ManufacturerSuperhero
500-1719
Equipment ManufacturerSuperhero
500-1719
0.5 1.0
05'
Meters2.0 3.0
10'
36"
0,92M
48"
1,22M
60"
1,53M
72"
1,83M
29'-7"
[9.02M]
31'-1"
[9.48M]
TRANSFER
STATION
W/ STEP
TWIST-N-SHOUT
SLIDE
HORIZONTAL
LOOP LADDER
W/ ACCESS
LADDER
POST
MOUNT
WHEEL
HOPSCOTCH
CLIMBER
SILO
CLIMBER
360° NUVO
SPIRAL
SLIDE
LEG
LIFT
6'-1"
[1.85M]
6'-1"
[1.86M]
6'-1"
[1.86M]
6'-1"
[1.86M]
6'-2"
[1.89M]
6'-2"
[1.88M]
ADA
STAIR
ADA
STAIR
ADA
GATE
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 5
3
5
2
2
2
2
2
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
500-
1719
CA
TA
LO
G P
RE
-D
ES
IG
N
500-1719A 1/4"=1'-0"
M. MERTZ
20-DEC-17
17'5'' x 18'11'' x 11'2''5,31M x 5,77M x 3,4M
29'7'' x 31'1''9,02M X 9,48M
755 SqFt.70,14 SqM.
101 Ft.30,78M
8 Ft.2,44M
28 5-12
17
0.5 1.0
05'
Meters2.0 3.0
10'
36"
0,92M
48"
1,22M
60"
1,53M
72"
1,83M
29'-7"
[9.02M]
31'-1"
[9.48M]
6'-1"
[1.85M]
6'-1"
[1.86M]
6'-1"
[1.86M]
6'-1"
[1.86M]
6'-2"
[1.89M]
6'-2"
[1.88M]
8
9
10
11
12
13
14
15
16
17
18
19
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 5
3
5
2
2
2
2
2
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
500-
1719
CA
TA
LO
G P
RE
-D
ES
IG
N
500-1719A 1/4"=1'-0"
M. MERTZ
20-DEC-17
17'5'' x 18'11'' x 11'2''5,31M x 5,77M x 3,4M
29'7'' x 31'1''9,02M X 9,48M
755 SqFt.70,14 SqM.
101 Ft.30,78M
8 Ft.2,44M
28 5-12
17
DATE:
SCALE:
DRAWN BY:
SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)
SUPPORT POST FOOTING (DETAIL 1 or 4) INDICATES POST LENGTH)
CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)
(ZZCH1850 INDICATES PART NUMBER)
GROUND ZERO POST FOOTING (DETAIL 2) INDICATES POST LENGTH)
COMPONENT FOOTING (DETAIL 3)
(112"
(144"
1
6
8
"
1
6
8
"
S
T
A
T
I
O
N
T
R
A
N
S
F
E
R
S
T
A
T
I
O
N
T
R
A
N
S
F
E
R
1
3
2
"
1
3
2
"
1
3
2
"
1
3
2
"
1
3
2
"
1
3
2
"
1
3
2
"
1
3
2
"
1
2
0
"
1
4
4
"
48"
15"
48" 15"64"21"
13"
12"
24"
151"
143"
15"
17"
15"
72"
19"
16"
8"
32"
41"
16"
5"
20"
14"
51"
15"
14"
9"
26"
48"
48"
48"
48"
42"
24"
126"
180"
167"
99"
TRANSFER
STATION
W/ STEP
TWIST-N-SHOUT
SLIDE
HORIZONTAL
LOOP LADDER
W/ ACCESS
LADDER
HOPSCOTCH
CLIMBER
SILO
CLIMBER
360° NUVO
SPIRAL
SLIDE
ADA
STAIR
ADA
STAIR
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
FOOTING LEGEND
1
1
2
"
1
8
5
0
Z
Z
C
H
1
4
4
"
G
Z
SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)
SUPPORT POST FOOTING (DETAIL 1 or 4)(112" INDICATES POST LENGTH)
CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)
(ZZCH1850 INDICATES PART NUMBER)
GROUND ZERO POST FOOTING (DETAIL 2)(144" INDICATES POST LENGTH)
COMPONENT FOOTING (DETAIL 3)
500-
1719
CA
TA
LO
G P
RE
-D
ES
IG
N
500-1719A 1/4"=1'-0"
M. MERTZ
20-DEC-17
Posts
ZZPM0016 11 5in OD X 120in STEEL POST W/ RIVETED CAP
ZZPM0026 82 5in OD X 132in STEEL POST W/ RIVETED CAP
ZZPM0036 13 5in OD X 144in STEEL POST W/ RIVETED CAP
ZZPM0056 24 5in OD X 168in STEEL POST W/ RIVETED CAP
Decks & Kick Plates
ZZPM0616 15 SQUARE COATED DECK ASSEMBLY
ZZPM0617 26 TRIANGULAR COATED DECK ASSEMBLY
ZZPM2530 17 12in DECK TO DECK KICK PLATE
ADA Items
ZZPM2007 18 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)
ZZUN2019 19 APPROACH STEP FOR TRANSFER STATION
Slides
ZZPM2727 110 TWIST AND SHOUT (48in DECK)
ZZPM3537 111 SLIDE- NUVO 360 SPIRAL SLIDE
Activity Panels
ZZPM4290 112 STEERING WHEEL (POST MOUNT)
Barriers
ZZPM4288 113 ACCESS GATE
Climbers
ZZPM7956 114 SILO CLIMBER (60in DECK)
ZZPM8260 115 HOPSCOTCH CLIMBER (48in DECK)
Overhead Events
ZZPM5770 116 LEG LIFT
ZZPM5780 117 6ft HORIZONTAL LOOP LADDER
ZZPM5970 118 OVERHEAD EVENT ACCESS LADDER (36in DECK)
Stairs and Ladders
ZZPM9168 219 12in ACCESSIBLE STEPPED PLATFORM (DECK TO DECK)
Additional Tool & Maintenance Kits
ZZUN1471 120 INSTALLER HARDWARE KIT
ZZUN9910 121 SURFACING WARNING LABEL KIT
ZZUN9930 122 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
ZZXX0678 123 LABEL KIT- COMPOSITE STRUCTURE - ASTM
ZZXXGNGUID 124 GENERAL INSTALLERS GUIDE
Part No. Description
Design Number: 500-1719A - Bill Of Material
Superhero
Ref.No. Quantity
Monday, May 04, 2020 Page of1 1 Playworld.com
CertifiedZZPM00161 5in OD X 120in STEEL POST W/ RIVETED CAP
1 67.11 99 0 1.00 0.13 0
CertifiedZZPM00262 5in OD X 132in STEEL POST W/ RIVETED CAP
8 593.68 867 0 8.00 0.96 0
CertifiedZZPM00363 5in OD X 144in STEEL POST W/ RIVETED CAP
1 80.91 117 0 1.00 0.13 0
CertifiedZZPM00564 5in OD X 168in STEEL POST W/ RIVETED CAP
2 185.02 271 0 2.00 0.26 0
CertifiedZZPM06165 SQUARE COATED DECK ASSEMBLY 1 90.36 221 4 1.00 0.00 0
CertifiedZZPM06176 TRIANGULAR COATED DECK ASSEMBLY2 92.80 339 4 2.00 0.00 0
CertifiedZZPM25307 12in DECK TO DECK KICK PLATE 1 11.95 20 0 0.25 0.00 0
CertifiedZZPM20078 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)
1 155.24 329 2 2.00 0.09 0
CertifiedZZUN20199 APPROACH STEP FOR TRANSFER STATION1 35.83 72 1 1.00 0.04 0
CertifiedZZPM272710 TWIST AND SHOUT (48in DECK) 1 185.20 662 4 3.00 0.06 1
CertifiedZZPM353711 SLIDE- NUVO 360 SPIRAL SLIDE 1 680.00 1,449 2 6.00 0.15 1
CertifiedZZPM429012 STEERING WHEEL (POST MOUNT) 1 8.67 47 1 0.25 0.00 1
CertifiedZZPM428813 ACCESS GATE 1 34.38 92 0 0.50 0.00 0
CertifiedZZPM795614 SILO CLIMBER (60in DECK) 1 81.77 164 2 1.50 0.07 1
CertifiedZZPM826015 HOPSCOTCH CLIMBER (48in DECK) 1 87.02 168 2 2.00 0.06 1
CertifiedZZPM577016 LEG LIFT 1 7.20 33 1 0.50 0.00 1
CertifiedZZPM578017 6ft HORIZONTAL LOOP LADDER 1 60.60 139 2 1.00 0.00 1
CertifiedZZPM597018 OVERHEAD EVENT ACCESS LADDER (36in DECK)
1 26.16 77 1 1.50 0.06 0
CertifiedZZPM916819 12in ACCESSIBLE STEPPED PLATFORM (DECK TO DECK)
2 188.92 690 2 3.00 0.00 0
N/AZZUN147120 INSTALLER HARDWARE KIT 1 57
CertifiedZZUN991021 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0
N/AZZUN993022 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
1 90
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 500-1719A - Compliance and Technical Data
Superhero
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
Monday, May 04, 2020 Page of1 3 Playworld.com
N/AZZXX067823 LABEL KIT- COMPOSITE STRUCTURE - ASTM1 0.04 TBD 0 0.08 0.00 0
N/AZZXXGNGUID24 GENERAL INSTALLERS GUIDE 1 1
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 500-1719A - Compliance and Technical Data
Superhero
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
364 787 6,004 28 37.83 2.012,672.91 7Totals:
6 Metric Tons354 Kg164 Kg1,202.81 Kg 1.53 m3
Monday, May 04, 2020 Page of2 3 Playworld.com
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 500-1719A - Compliance and Technical Data
Superhero
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
The lay-out for this custom playscape, design number 500-1719A, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.
The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.
The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.
Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]
A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.
A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.
ASTM F1487
2010 ADA Standards for Accessible Design
Installation Times
Carbon Footprint
Pre-Consumer Recycle Content
Post-Consumer Recycle Content
Monday, May 04, 2020 Page of3 3 Playworld.com