+ All Categories
Home > Documents > SuperOffice CRM 5 and ProjectHelp ProjectHelp ILink.

SuperOffice CRM 5 and ProjectHelp ProjectHelp ILink.

Date post: 02-Jan-2016
Category:
Upload: vernon-fowler
View: 218 times
Download: 0 times
Share this document with a friend
Popular Tags:
13
SuperOffice CRM 5 and ProjectHelp ProjectHelp ILink
Transcript
Page 1: SuperOffice CRM 5 and ProjectHelp ProjectHelp ILink.

SuperOffice CRM 5 and ProjectHelp

ProjectHelp ILink

Page 2: SuperOffice CRM 5 and ProjectHelp ProjectHelp ILink.

SuperOfficeProjectHelp

• Common database• SQL platform• Configuration done in ProjectHelp• Document management• Projects created in ProjectHelp and transferred to SuperOffice• Diary in SuperOffice can be exported to timesheets in ProjectHelp

Integration - Principle

ProjectHelp ILink

Page 3: SuperOffice CRM 5 and ProjectHelp ProjectHelp ILink.

Customer Information

• Customers and contacts administered in CRM 5.• Customers and contacts set as “read only” in ProjectHelp.• Updates performed in real time or at specified intervales

Page 4: SuperOffice CRM 5 and ProjectHelp ProjectHelp ILink.

Common document management

• Documents in CRM 5 can be made available in ProjectHelp

Page 5: SuperOffice CRM 5 and ProjectHelp ProjectHelp ILink.

Project Information

• Projects created in ProjectHelp with help of wizard• Corresponding projects created automatically in CRM5• Updates performed in real time or at specified intervals

Page 6: SuperOffice CRM 5 and ProjectHelp ProjectHelp ILink.

Timesheets and Calendar

• Diary in CRM5 can be exported to timesheets ProjectHelp• Activity types set-up as the same in both systems• A follow-up in CRM 5 that is connected to a project, shows in ProjectHelp as corresponding Activity Type

Page 7: SuperOffice CRM 5 and ProjectHelp ProjectHelp ILink.

ProjectHelp data shown in CRM5

Page 8: SuperOffice CRM 5 and ProjectHelp ProjectHelp ILink.

ProjectHelp timesheet shown in CRM5

Page 9: SuperOffice CRM 5 and ProjectHelp ProjectHelp ILink.

Configuration of the ProjectHelp ILink

Page 10: SuperOffice CRM 5 and ProjectHelp ProjectHelp ILink.

Configuration of the Superoffice database

Page 11: SuperOffice CRM 5 and ProjectHelp ProjectHelp ILink.

Configuration of the Projecthelp database

Page 12: SuperOffice CRM 5 and ProjectHelp ProjectHelp ILink.

Configuring data types to be transfered

Page 13: SuperOffice CRM 5 and ProjectHelp ProjectHelp ILink.

Configuring the Scheduler


Recommended