+ All Categories
Home > Documents > Survey Compendium

Survey Compendium

Date post: 05-Apr-2018
Category:
Upload: sam
View: 222 times
Download: 0 times
Share this document with a friend

of 17

Transcript
  • 7/31/2019 Survey Compendium

    1/17

    NTPC HR SurveyNTPC HR SurveyCompendiumCompendium

  • 7/31/2019 Survey Compendium

    2/17

    AboutAbout

    A ready to use booklet ofA ready to use booklet of

    standardized survey instruments forstandardized survey instruments for

    NTPCNTPCTo contain questionnaires along withTo contain questionnaires along with

    guidelines for their analysisguidelines for their analysis

    Will provide trends within NTPCWill provide trends within NTPC Will provide benchmarks within NTPCWill provide benchmarks within NTPC

  • 7/31/2019 Survey Compendium

    3/17

    Methodology forMethodology for

    Instrument DesignInstrument Design1.1. Framing theoretical or conceptualFraming theoretical or conceptual

    backgroundbackground

    2.2. Developing the questionnaireDeveloping the questionnaire

    3.3. Pilot TestsPilot Tests

    4.4. Reviews by third party leadingReviews by third party leadingfaculties in the areafaculties in the area

    5.5. Standardizing the instrumentsStandardizing the instruments

  • 7/31/2019 Survey Compendium

    4/17

    List of SurveyList of Survey

    InstrumentsInstruments1.1. Employee Relations Climate (ERC)Employee Relations Climate (ERC)

    2.2. Core Values (CV)Core Values (CV)

    3.3. Empowerment (E)Empowerment (E)

    4.4. Reward & Recognition (R&R)Reward & Recognition (R&R)

    5.5. Services Effectiveness (SE)Services Effectiveness (SE)

    6.6. Training & Development (T&D)Training & Development (T&D)

    7.7. Township & Welfare Facilities (TWF)Township & Welfare Facilities (TWF)

    8.8. Performance Management System (PMS)Performance Management System (PMS)

    9.9. Climate Surveys (Bodh & e-Darpan)Climate Surveys (Bodh & e-Darpan)

  • 7/31/2019 Survey Compendium

    5/17

    Employee RelationsEmployee Relations

    ClimateClimateDeveloped on basis of four dimensionalDeveloped on basis of four dimensionalframework of NTPCs employee relationsframework of NTPCs employee relations

    strategystrategy

    Employee Participative

    Systems

    Objective: To ensure

    employee participation in

    decision making process

    Employee

    Relations

    Strategy

    Top Down Communication

    Employee Feedback Systems

    Objective: To disseminate the vision and strategy

    throughout the organisation

    Employee Welfare

    Activities

    Objective: Hygiene factor to

    ensure a motivated and

    efficient workforce

    Objective: Listening system for top management for

    awareness about grass root issues; System to receive

    feedback from employee regarding effectiveness of

    organisational policies and decision

  • 7/31/2019 Survey Compendium

    6/17

    Instrument contains 30 statementsInstrument contains 30 statements 6 statements on Top Down6 statements on Top Down

    CommunicationCommunication

    8 on Employee Feedback8 on Employee Feedback

    8 on participative Decision Making8 on participative Decision Making

    8 on Employee Welfare8 on Employee Welfare

    5 point scale5 point scale

    To be conducted once in 2 yearsTo be conducted once in 2 years

  • 7/31/2019 Survey Compendium

    7/17

    Core ValuesCore Values

    Designed around our 6 core values Designed around our 6 core values

    BCOMIT.BCOMIT.

    Consists 30 statements, 5 on eachConsists 30 statements, 5 on eachcore valuecore value

    5 point scale5 point scaleTo be conducted once in 3 yearsTo be conducted once in 3 years

  • 7/31/2019 Survey Compendium

    8/17

    EmpowermentEmpowerment

    Measures three empowermentMeasures three empowerment

    related aspects related aspects

    Amount - 11 statementsAmount - 11 statements Process 10 statementsProcess 10 statements

    Facilitating Factors 9 statementsFacilitating Factors 9 statements

    Only for executivesOnly for executives 5 point scale5 point scale

    To be conducted once every 2 yearsTo be conducted once every 2 years

  • 7/31/2019 Survey Compendium

    9/17

  • 7/31/2019 Survey Compendium

    10/17

    Services EffectivenessServices Effectiveness Comparative study of customer satisfactionComparative study of customer satisfaction

    with various services function. Aspectswith various services function. Aspectscovered are covered are Quality of ServiceQuality of Service

    PromptnessPromptness Friendliness and accessibilityFriendliness and accessibility UniformityUniformity Customer feedbackCustomer feedback

    Instrument contains 21 statements to beInstrument contains 21 statements to berated on 5 point scale w.r.t to each servicerated on 5 point scale w.r.t to each servicefunctionfunction

    The instrument contains HR, IT and F&A. ItThe instrument contains HR, IT and F&A. Itcan be easily expanded to include functionscan be easily expanded to include functionslike C&M or township maintenancelike C&M or township maintenance

  • 7/31/2019 Survey Compendium

    11/17

    Training & DevelopmentTraining & Development

    To study T&D environment within theTo study T&D environment within the

    unitunit

    Contains 21 statements onContains 21 statements on Nomination processNomination process

    Training infrastructure EDC, FacultyTraining infrastructure EDC, Faculty

    Subordinate DevelopmentSubordinate Development Need and usefulnessNeed and usefulness

    5 point scale5 point scale

    To be conducted once every twoTo be conducted once every two

  • 7/31/2019 Survey Compendium

    12/17

  • 7/31/2019 Survey Compendium

    13/17

    Performance ManagementPerformance Management

    SystemSystem Designed around following aspects ofDesigned around following aspects of

    performance management in theperformance management in thecompanycompany

    Goal Setting Standard of Goals,Goal Setting Standard of Goals,CascadingCascading

    Evaluation Procedure Objectivity,Evaluation Procedure Objectivity,Personal BiasPersonal Bias

    Performance feedbackPerformance feedback Linkages Rewards, Training, CareerLinkages Rewards, Training, Career

    progressionprogression

    Role of HRRole of HR

  • 7/31/2019 Survey Compendium

    14/17

    Sample ScheduleSample Schedule

    Frequency

    2 1 2 2 2 3 1 2

    Year T&D SE ERC E PMS CV TWF R&R

    n

    n+1

    n+2

    n+3

    n+4

    n+5

  • 7/31/2019 Survey Compendium

    15/17

    Sample SizeSample SizeSurvey Employee

    Population

    ~500 ~1000 ~1500

    Employee Relations Climate (ERC) 225 275 310

    Climate Surveys (Bodh & e-Darpan)

    40% 40% 40%

    Core Values (CV) 40% 40% 40%

    Empowerment (E) 125 200 250

    Reward & Recognition (R&R) 225 275 310

    Services Effectiveness (SE) 225 275 310

    Training & Development (T&D) 225 275 310

  • 7/31/2019 Survey Compendium

    16/17

    Pilot StudyPilot Study

    In order to standardize eachIn order to standardize eachinstrument we need to -instrument we need to - Measure reliability and validityMeasure reliability and validity

    Weed out ambiguous statements, if anyWeed out ambiguous statements, if any Each HRD executive to select oneEach HRD executive to select one

    instrument for pilot surveyinstrument for pilot survey

    Each one of the 8 instruments to beEach one of the 8 instruments to bepicked up by 2 locations at least,picked up by 2 locations at least,

    preferably 1 Coal and 1 Gas basedpreferably 1 Coal and 1 Gas based

    stationstation

  • 7/31/2019 Survey Compendium

    17/17

    Data sheet in MS Excel being providedData sheet in MS Excel being providedin CDin CD

    Sheets contain sample size andSheets contain sample size and

    sample compositionsample composition

    Raw data to be entered in sheets andRaw data to be entered in sheets and

    emailed to CC-HRD (emailed to CC-HRD ([email protected]@ntpc.co.in,,

    [email protected][email protected],,

    [email protected]@ntpc.co.in ))

    Data to be sent latest by 10Data to be sent latest by 10thth Oct 2008Oct 2008

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]

Recommended