Date post: | 06-Jul-2018 |
Category: |
Documents |
Upload: | bhanu-vadlamani |
View: | 217 times |
Download: | 0 times |
of 18
8/17/2019 Survey on construction delay
1/18
This survey aims to gather data about the most relevant causes for constructiondelays. It is being distributed to various parties involved in construction includingbut not limited to owners, consultants, contractors and sub-contractors.Thesecauses will then be analyzed to provide relevant solutions to minimize constructiondelay. Thank you for taking time to participate in the survey.
For the purpose of this study, please consider the following definitions.
1. Owner: An owner/client is the party responsible for the inception of a project. Their role
includes conveying the design idea to the architect, making major aesthetic decisions and funding
the project.
2. Consultant: A consultant is the Architect/Engineer. They have the calling shots on thematerials used, design, inspections and/or Quality Assurance/Quality Control.
3. Contractor: A contractor is the party who manages the construction of the project. They are
responsible for providing the workforce and materials and overseeing the completion of a projecton schedule and in budget.
4. Subcontractor: A subcontractor is the party that works for the project in agreement with thecontractor. Each subcontractor is specialized in his/her own field of work.
Additional definitions:
Contract: A binding legal document that lays out the terms and conditions for the project.
Construction Delay Analysis
Construction Delay Analysis
1
8/17/2019 Survey on construction delay
2/18
Basic Information
Construction Delay Analysis
1. Please select your role in construction.*
Owner
Consultant
Contractor
Subcontractor
Other (please specify)
2. Please provide you name. (All responses are kept anonymous. This information is only for the purposeof analysis and data sorting)
*
3. Please mention the name of your firm. (All responses are kept anonymous. This information is only for the purpose of analysis and data sorting)
4. Please mention your experience in the construction industry in years.
5. Please select the country where most of your projects are located.
2
8/17/2019 Survey on construction delay
3/18
Project Size
Construction Delay Analysis
Please describe the average project cost and area for the project size you selected.
6. Please select the most relevant project size you would like to answer about.*
Small Projects
Medium Projects
Large Projects
3
8/17/2019 Survey on construction delay
4/18
Project Type
Construction Delay Analysis
7. Please select the most relevant project type you deal with*
Single Owner Residential Projects
Multiple Owner Residential Projects
Commercial Projects (like office buildings, etc.)
Industrial Projects (like factories, manufacturing units, etc.)
Public Projects (like roads, government projects, etc.)
Other (please specify)
4
8/17/2019 Survey on construction delay
5/18
Software Use
Construction Delay Analysis
8. Do you/your firm use software for design/project management and coordination?*
Yes
No
5
8/17/2019 Survey on construction delay
6/18
Software Use
Construction Delay Analysis
9. Which of the following software tools do you use on a regular basis (e.g., at least once a month) for design and/or project management?
AutoCAD
ArchiCAD
Solidworks
Revit
Primevera
Microsoft Project
Cloud Based Services (E.g., Procore, BuilderTrend, Prologis etc)
N/A - Do not use software
Other software solutions for any other operations (please specify)
Extremely Useful Very Useful Useful Not very useful Not at all useful Not Applicable
10. From your experience in using construction software, how useful do you think software is in reducingconstruction delays? (Please answer this question only if you have used construction management
software)
*
6
8/17/2019 Survey on construction delay
7/18
Construction Delay Analysis
Not at all important Slightly importantSomewhatimportant Very important Extremely important
Contract
Owner/Client
Design Consultant(Engineering and
Architecture)
Contractor
Materials
Coordination
Labor/Equipment
City/Government Approvals
External
Safety
Please mention any other factors you think would be a cause of construction delay
11. One a scale of 1 to 5 , please rate each factor on its contribution in construction delay. Further
subcategories are mentioned ahead in the survey.
*
7
8/17/2019 Survey on construction delay
8/18
Contract
Construction Delay Analysis
Not at allimportant
Slightlyimportant
Somewhatimportant Very important
Extremelyimportant
N/A - Do not usecontracts
Original contract durationis too short/unrealistic.
Mistakes anddiscrepancies in contractdocument
Legal disputes betweenvarious parties
Type of contract
Ineffectiveincentives/disincentives
300 character limit. Please specify a few changes that you think would be most effective to reduce delays related to this particular cause - this is optional. Separate different suggestions using a semicolon.
12. On a scale of 1 to 5, how would you rate the following factors related to delays caused by contract?*
8
8/17/2019 Survey on construction delay
9/18
Client/Owner
Construction Delay Analysis
Not at all important Slightly importantSomewhatimportant Very important Extremely important
Finance and payment of completed work
Owner Interference
Slow decision making
Conflicts between joint-ownership of project
Suspension of work byowner
300 character limit. Please specify a few changes that you think would be most effective to reduce delays related to this particular cause - this is optional. Separate different suggestions using a semicolon.
13. On a scale of 1 to 5, how would you rate the following factors related to delays caused by client/owner?*
9
8/17/2019 Survey on construction delay
10/18
Design Consultant
Construction Delay Analysis
Not at all important Slightly importantSomewhatimportant Very important Extremely important
Mistakes/discrepanciesin design documents
Preparation andapproval of documents
Insufficient level of detailin drawings
Complexity of projectdesign
Qualityassurance/control
Green BuildingDesign/Certification
300 character limit. Please specify a few changes that you think would be most effective to reduce delays related to this particular cause - this is optional. Separate different suggestions using a semicolon.
14. On a scale of 1 to 5, how would you rate the following factors related to delays caused by the designconsultant/engineer?
*
10
8/17/2019 Survey on construction delay
11/18
Contractor
Construction Delay Analysis
Not at all important Slightly importantSomewhatimportant Very important Extremely important
Inadequatefinances/funds by thecontractor
Subcontractors
Poor site management
Improper constructionmethods
Inadequate supervisionexperience/training
300 character limit. Please specify a few changes that you think would be most effective to reduce delays related to this particular cause - this is optional. Separate different suggestions using a semicolon.
15. On a scale of 1 to 5, how would rate the following factors related to delays caused by contractor?*
11
8/17/2019 Survey on construction delay
12/18
Materials
Construction Delay Analysis
Not at all important Slightly importantSomewhatimportant Very important Extremely important
Shortage of constructionmaterials in market
Changes in materialtypes and specificationsduring construction
Delay in materialdelivery/procurement
Damage of storedmaterial
Late selection of finishmaterials
300 character limit. Please specify a few changes that you think would be most effective to reduce delays related to this particular cause - this is optional. Separate different suggestions using a semicolon.
16. On a scale of 1 to 5 , how would rate the following factors related to delays caused by materials?*
12
8/17/2019 Survey on construction delay
13/18
Coordination
Construction Delay Analysis
Not at all important Slightly importantSomewhatimportant Very important Extremely important
Delay in approvingmajor changes in thescope of work
Delay in performinginspection and testing
Lack of communicationbetween parties
Lack of regular meetings
Inability to handle toomany projects at once
Use of different softwareby different parties
300 character limit. Please specify a few changes that you think would be most effective to reduce delays related to this particular cause - this is optional. Separate different suggestions using a semicolon.
17. On a scale of 1 to 5, how would rate the following factors related to delays caused due to coordination?*
13
8/17/2019 Survey on construction delay
14/18
Labor/Equipment
Construction Delay Analysis
Not at all important Slightly importantSomewhatimportant Very important Extremely important
Shortage of workforce
Unqualified/unproductivelabor
Personal conflictsamong labor
Equipment availabilityand failure
Improper use of available equipment
300 character limit. Please specify a few changes that you think would be most effective to reduce delays related to this particular cause - this is optional. Separate different suggestions using a semicolon.
18. On a scale of 1 to 5, how would rate the following factors related to delays caused because of labor/equipment?
*
14
8/17/2019 Survey on construction delay
15/18
City/Government Approvals
Construction Delay Analysis
Not at all important Slightly importantSomewhatimportant Very important Extremely important
Delays in submittingdesign documents/shopdrawings
Delays in reviewing andapproving designdocuments by the city
Revising the existingrules/codes
Green Building Approvals
300 character limit. Please specify a few changes that you think would be most effective to reduce delays related to this particular cause - this is optional. Separate different suggestions using a semicolon.
19. On a scale of 1 to 5, how would rate the following factors related to delays caused because of city/government/other approvals?
*
15
8/17/2019 Survey on construction delay
16/18
External Factors
Construction Delay Analysis
Not at all important Slightly importantSomewhatimportant Very important Extremely important
Surface/subsurfaceconditions
Weather conditions
Accidents duringconstruction
Effect of social, culturaland political factors
Delay in providingservices from the utilitiesdepartments (such aswater, electricity,telephone, etc.)
300 character limit. Please specify a few changes that you think would be most effective to reduce delays related to this particular cause - this is optional. Separate different suggestions using a semicolon.
20. On a scale of 1 to 5, how would rate the following factors relating to delays caused because of externalreasons?
*
16
8/17/2019 Survey on construction delay
17/18
Construction Delay Analysis
Not at all important Slightly importantSomewhatimportant Very important Extremely important
Lack of proper safetytraining/education
Lack of proper PersonalProtective Equipment(PPE) , Material SafetyData Sheet (MSDS),etc,.
Employer negligence inproviding proper safetygear
Employee negligence inusing provided safetygear
MalfunctioningEquipment
300 character limit. Please specify a few changes that you think would be most effective to reduce delays related to this particular cause - this is optional. Separate different suggestions using a semicolon.
21. On a scale of 1 to 5, how would rate the following factors relating to delays caused because of
safety reasons?
*
17
8/17/2019 Survey on construction delay
18/18
Thank you!
Construction Delay Analysis
If yes, please enter any relevant data in the comment box below.
22. Thank you for taking time to answer the survey. Would you like to provide additional data for theresearch?
Yes
No