SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner: Geological Survey of Slovenia Slavko Šolar
Transcript
Page 1: SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:

SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT

SARMa

STATUS OF THE PROJECT

& IT’S IMPACT

Quality Management Board meetingBudapest, June 28, 2010

Lead partner: Geological Survey of SloveniaSlavko Šolar

Page 2: SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:

Main objective of the project

• Shifting to sustainable aggregate resource management (SARM) and encouraging sustainable supply mix (SSM) policies. – to develop common approach to sustainable aggregate

resource management (SARM) and – to ensure sustainable supply mix (SSM) planning, at

three scales, to ensure efficient and secure supply in SEE.

Page 3: SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:

Local level

a) Optimize the efficiency of primary aggregates production, and prevent or minimize environmental impacts of quarrying and improve reclamation,

b) minimize illegal quarrying by improving knowledge,

c) promote recycling (construction, demolition & quarry waste)

Page 4: SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:

Regional/national level

• Develop strategies for sustainably managing aggregate resources, including in protected areas, considering aggregate resources in land management and use planning, and harmonizing policies across regions,

• Develop guidelines and procedures for SSM planning.

Page 5: SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:

Transnational level

• Recommend methods for harmonizing SARM & SMM transregionally and transnationally,

• Design a multi-purpose and multi-scale Aggregates Intelligence System (AIS) as a long-term tool for know-how transfer.

• Follow-up: prepare plan for a Regional Centre on SARM & SSM, to increase capacity of all interested and affected groups through workshops training and educational materials.

Page 6: SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:

Done so far – June 2010 • WP 1 – project management

Project structure, reporting,

• WP 2 – communication – Promotion

• WP 3 – questionnaires analysis• WP 4 - questionnaires• WP 5 – work plan

Page 7: SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:

WP 2 work done – June 2010 • Developed project website• Implemented management plan• Held two Consortium project meetings• Submitted communication strategy and

plan submitted• Press conferences held• Organized regional and national capacity

building workshops (Split, Patras)

Page 8: SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:

Challenges – June 2010 • Reporting – national financial

control• Financing • Change of partnership• Project structure – communication• Consultant assistance

Page 9: SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:

Challenges – June 2010

• Developing Glossary• IT Group

Page 10: SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:

Project partners (15, 14)1. ERDF: GeoZS - Geological survey of Slovenia, SI2. ERDF: MUL - University of Leoben, AT 3. ERDF: PELLA – Prefectural Authority of Pella, GR4. ERDF: IGME - Institute of Geology and Mineral Exploration, GR5. ERDF: TUC – Technical University of Crete, GR6. ERDF: MBFH – Hungarian Office for Mining and Geology, HU7. ERDF: ER – Emilia-Romagna Region - Environment, Soil and Coast

Defense Department, IT8. ERDF: ANPAR – National Association Producers of Recycled Aggregates,

IT9. ERDF: PARMA – Parma Province - Territorial Planning Service, IT10. ERDF: IGR – National Institute for Research-Development in domain of

Geology, Geophysics, Geochemistry and Remote Sensing, RO11. ERDF: FGG – University of Bucharest, Faculty of Geology and Geophysics,

RO12. IPA: MGK10 – Herzeg – Bosnia Canton Government – Ministry of

Economy, BiH13. IPA: RGF – University of Belgrade, Faculty of Mining and Geology, SRB14. 10 % partner: METE – Ministry of Economy, Trade and Energy, AL

(Albanian Geological Survey)15. 10% Partner: MINGORP – Ministry of Economy, Labor and

Entrepreneurship, Energy and Mining Directorate, HR (Croatian Geological Survey

Page 11: SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:

Project Inner Circle:

• Project partnership (14) • Project observers (8)• Pool of stakeholders (5) o Croatia (2) – industry, o Italy (2) – associations, o Bulgaria (1) – association.

Page 12: SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:

SARMa interviews, posters

Page 13: SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:

MAY 26th and 27th, 2010Aachen, Germany

INTEGRATION OF THE THREE INTER-DEPENDENT LIFE CYCLES IN THE MINING/QUARRYING INDUSTRY:

PROPOSED LCA METHODOLOGY WITHIN THE EU SARMA PROJECT

POLITECNICO DI TORINO Gian Andrea Blengini

PROVINCIA DI TORINO Elena Garbarino

SARMa at mineral conferences

Page 14: SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:

SARMa papers

AcknowledgementsThe research presented in this paper was developed within theSARMa Project, an European Commission funded project: ContractNo. SEE AF/A/151/2.4/X (www.sarmaproject.eu).The authors would like to thank Cavit SpA and Unical SpA for thedata and information supplied, the staff of Provincia di Torino andProfessor Vanni Badino of Politecnico di Torino for the valuable cooperation.

Page 15: SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:

SARMa workshops

and others to follow …Croatia Greece

Page 16: SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:

RAW MATERIALS INITIATIVERecent development

• Communication in 2008• Working groups:

– Critical minerals– Exchange of best practices

• Reports in June 2010• Communication is next …

Page 17: SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:

Improving framework conditions for extracting minerals for the EU

Exchanging Best Practice on Land Use Planning, Permitting and

Geological Knowledge Sharing• GEOLOGICAL KNOWLEDGE BASE ….

Page 18: SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:

SUMMARY OF CHAPTER AND RECOMMENDATIONS

• Developing an information platform to assess the conflicts of deposits with other land uses: The long term access to deposits should be taken into account in land use planning. Cross-border geological projects as eWater, eEarth, One Geology, FODD and SARMa might be combined with other relevant information services to visualise deposits and their potential conflicts at the European and regional level.

Page 19: SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:

SARMa at EU level

European Technology Platform on Sustainable Mineral Resources

European Aggregates Association

Page 20: SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:

Summarizing and Outlook• SARMa project was successfully launched in May

2009

• June 2010 is turning point with regard to outputs (mostly after 4th and 6th period)

• SARMa made impact within SEE and also within European Union (Commission and industry)

• Project progress can be observed on www.sarmaproject.eu