Sustainable Urban Mobility in Lisbon
Sandra Somsen
“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
• 100 km2
• 500k inhabitants
• + approx. 600k daily commuters
• + 5 milliontourist/year
“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat 2
• 17-38 cm sea level rise by 2050
• 29% decrease in rainfall by 2100
• 1-4°C increase in annual average temperature by 2100
“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat 3
4
Lisbon Commitment :reduce GHG emissions by
2016: Lisbon – first European capital city to sign the new
Lisbon’s Commitment:reduce GHG emissions by
20% until 2020
2009: Lisbon signs the
“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
5
-26% CO2
Transport sector’s emissions by 2030PNAC-2030
“Portugal aims for
Zero Carbonby 2050”
António Costa, Prime Minister
“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
6
Countries,Cities &Industry
for the acceleration of decarbonisation in
transport
“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
Quick Diagnosis
7“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
550
+430
+930-50
+200 +200
0
100
200
300
400
500
600
700
800
900
1.000
1.100
1.200
1.300
1.400
1.500
Tho
usa
nd
s o
f p
eo
ple
Base Estimation interval
Daily Population flow
Total increase of70% to 105%
8“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
Metropolitan area
population (m)
2,8 1,1 1,5 4,3 5,3 10,4 10,9
LIS AMS STH BOS BAR LON PAR
CityMetropolitan area
82% 18% 73%27% 53%82% 18% 47% 84% 16% 70% 30% 85%15% 80% 20%
Nota: Aglomeração urbana para AMS, STH, BOS, LON, PAR; Área metropolitana para LIS e BAR
Fonte: Relatório da ONU "World Cities", 2016
Pendulum challenge
9“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
+ 370.000 vehicles per day
“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat 10
Major corridors
Dados de tráfego: 2017Q2Valores em milhares de veículos / dia, um sentidoFonte: IMT
15,000 entradas a partir de Loures (IC22 e A8)
Os restantes são do IC17
5 major entrance routes… 370.000 vehicles/day
Highways
Main roads
Traffic flow
11“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
12
Number of visitors to AML
+53%
2017, comparing to 2013
~470k visitors/month (2017)
Road traffic
+11%
2017, comparing to 2013
Increasing pressure
“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat 12
Fonte: INE
“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat 13
14
54%Private
Car
Other Modes
34%Private
car
66%Other Modes
Boston 45%
Estocolmo 45%
Paris 38%
Londres 36%
Amesterdão 32%
Barcelona 26%
today 2030
Private Car
+ Public Transport+ Active Mobility
+ Shared Services
150k
“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
Modal Split - Key indicator
14
E1 -
Co
ntr
ol a
nd
man
agem
ent
E2 -
Info
rmat
ion
, pro
mo
tio
n, p
ub
licp
arti
cip
atio
n
E3 -
Fin
anci
ng
E4 -
Reg
ula
tio
n a
nd
ince
nti
ves
E5 -
Mo
nit
ori
ng
and
eva
luat
ion
R1 - PedestrianR2 - PT
R4 - CyclingR3 - Roads/ traffic
R5 - Interfaces
S1 - ParkingS2 - SharingS3 - LogisticsS4 - ScholarS5 - Touristic
15
Lisbon Mobility Ecosystem
“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
Vision Strategy
PR
EPA
RA
ÇÃ
O
IMP
LEM
ENTA
ÇÃ
O
SUMP
MONITORIZAÇÃO
2017 2018 2019
ELA
BO
RA
ÇÃ
O
Lisbon SUMP
16“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
Public Transport Network
17“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
Public Transport Investment
More reliability: | 92% -> 97%
More offer| 4% increase in traversed km
250 new buses| 30 new electric vehicles
New routes| E24 | Neighbourhood routes
>150 new drivers and brakemen
.New solutions| on board Wi-Fi | app Carris
18“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
19
SPRING 2019
30€
40€
Family Pass Cost(2x)
Public Transport’s Tariff
Urban pass cost
Willingness to pay
3 Zones interurbanpass cost
Willingness to pay
“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat 19
Public Space regeneration
20“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
Proposto 2017Public Space regeneration
before
21“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat 21
Proposto 2017Public Space regeneration
after
22“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat 22
Proposto 2017Public Space regeneration
before
23“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat 23
Proposto 2017Public Space regeneration
after
24“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat 24
MOVE LISBOA | Visão Estratégica de Mobilidade
Inclusive Mobility
• 2500 accessible zebra crossings
• 9400 elevated zebra crossings
• 2000 accessible BUS stops
• Vertical Mobility
25“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat 25
2008-2018
90km existingnetwork
200km plannednetwork
2018-2021
26“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat 26
A new transport mode:
the smartphone
27“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
Shared Mobility, connected and sustainable
28“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
74 stations 1290 docks+700 bikes
> 19 000 active subscriptions
over 1,000,000 trips taken
*November 2018
29“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
30 30“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
31“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
32“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
33“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
34“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
35“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
36“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
37“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
38“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
Come and move in Lisbon!
39“Greening for change”, February 7th-8th 2019 - Cornellà de Llobregat
OBRIGADA