SWIFTNet Migration DE/AT. Claudia König Regional Account Manager. DIDUG, 12. - 14. May 2003. Filename_Vx.ppt. SWIFTNet FIN Migration. Overview Planning Ordering Summary. Modem. SNL. VPN box. FIN and SWIFTNet FIN: main components. FIN CBT. M-CPE. FIN CBT. X.25. FW. FW. POP. - PowerPoint PPT Presentation
34
Slide 1 Filename_Vx.ppt SWIFTNet Migration DE/AT DIDUG, 12. - 14. May 2003 Claudia König Regional Account Manager
Transcript
Page 1: SWIFTNet Migration DE/AT

Slide 1

Filename_Vx.ppt

SWIFTNet Migration DE/AT

DIDUG, 12. - 14. May 2003

Claudia KönigRegional Account Manager

Page 2: SWIFTNet Migration DE/AT

Slide 2 SWIFTNet Migration - DIDUG 2003

SWIFTNet FIN Migration

Overview

Planning

Ordering

Summary

Page 3: SWIFTNet Migration DE/AT

Slide 3 SWIFTNet Migration - DIDUG 2003

FIN and SWIFTNet FIN: main components

FIN CBT

X.25

SAP

X.25SWIFT

Operating Centre

Modem

IP FINSWIFTNet FINBridge

FIN CBT M-CPE

SNL

FW FW

NetworkPartner

POP

VPNbox

Page 4: SWIFTNet Migration DE/AT

Slide 4 SWIFTNet Migration - DIDUG 2003

SWIFTNet Migration Approach

Country Window Approach+/- 5000 BICs

Hand-holding Approach~ 200 locations

Road shows Configurator for planning and

budgeting Ordering via SWIFT.com Support national market infrastructure

plans

SWIFTNet MigrationAll 7200+ BICs

“Facilitated”~ 150 locations

“Complex”~ 50 locations

Criteria: Largest accounts Target more than

100,000 Messages/day All qualifying BICs for

single institution grouped

Criteria: Large accounts Target 40K-99K

Messages/day All qualifying BICs for

single connection grouped

Page 5: SWIFTNet Migration DE/AT

Slide 5 SWIFTNet Migration - DIDUG 2003

SWIFTNet FIN migration overview

Q4 2002: Early adopters December 2002 New FIN customers

Cut-over: on SWIFTNet FIN 2003 - 2004: Main migration period 2Q 2003: Start MVIP Early Adopter

Phase 4Q 2004: Penalty period End 2004: End of X.25 support

2002 2003 2004

Page 6: SWIFTNet Migration DE/AT

Slide 6 SWIFTNet Migration - DIDUG 2003

Worldwide Status until end of March 2003 worldwide 159 BICs migrated during the 1st Quarter

2003 peak day 119,312 messages a total of 911,046 messages were transferred over

SWIFTNet FIN vs. 165,685,791 total FIN messages

DE/AT Status until end of April 2003 6 out of 20 DE1 BICs switched live traffic 5 out of 9 AT1 BICs switched live traffic

SWIFTNet FIN migration status

Page 7: SWIFTNet Migration DE/AT

Slide 7 SWIFTNet Migration - DIDUG 2003

Access networksLocal loops

SIPN Access Multi-Vendor network connectivity

Customer premises Backbone

CustomerA

CustomerB

BackboneAccessPoints

OPCs

SIPN

SIPN BackboneNetwork

NetworkPartner n

NetworkPartner 2

NetworkPartner 1

VPNbox

One logical network at the VPN level

VPNbox

VPNbox

M-CPE

Modem/TA

Page 8: SWIFTNet Migration DE/AT

Slide 8 SWIFTNet Migration - DIDUG 2003

Network PartnerSWIFT

SIPN Access Management responsibilities

Customer SWIFT

CustomerA

CustomerB

M-CPE

BackboneAccessPoints

OPCs

SIPN

SIPN BackboneNetwork

NetworkPartner 2

NetworkPartner 1VPN

box

VPNbox

NetworkPartner nVPN

box

IPSec tunnels provide end-to-end protection

through the ‘untrusted’ Network Partner

IP networksModem/TA

Page 9: SWIFTNet Migration DE/AT

Slide 9 SWIFTNet Migration - DIDUG 2003

SWIFTNet FIN Migration

Overview

Planning

Ordering

Summary

Page 10: SWIFTNet Migration DE/AT

Slide 10 SWIFTNet Migration - DIDUG 2003

Setting the Scene7 stage SWIFTNet migration process for CMW Customers

Project initiation

Design, planning and approval

Ordering

Provisioning and installationTest (including stress test)Live and staged ramp upX. 25 decommissioning

1

2

3

4

5

6

7

• Project team and plan in place : 2 weeks

• Solution fully planned and approved : 8-12 weeks

• Clean order, accepted by COS : 2-3 weeks

• Products and services provisioned and installed : 14 weeks

• Customer ready to migrate live FIN traffic : 4 weeks

• All FIN traffic migrated to SWIFTNet : upto 12 weeks

• Dismantling of X.25 infrastructure

Deliverable / Typical duration

Page 11: SWIFTNet Migration DE/AT

Slide 11 SWIFTNet Migration - DIDUG 2003

0 5 10 # Weeks

3-4 wPreparation and installation of SW

12 wLine & CPE delivery, CPE installation

SWIFT systems provisioning2 w

(Installation of service specific SW)

1 w

12 w

Customer preparationh/w, s/w, Firewall, NAT and staff training

Order creation (Telecom partner)

1 w SWIFT validates forms

Order forms sent to SWIFT

4 w

Managed

Dial-up3-4 w

SWIFT systems provisioning

Preparation and installation of SW2 w

Customer preparation

customer activation

The SWIFTNet implementation timelinesDecide on your configuration

Page 12: SWIFTNet Migration DE/AT

Slide 12 SWIFTNet Migration - DIDUG 2003

SWIFTNet FIN Migration

Overview

Planning

Ordering

Summary

Page 13: SWIFTNet Migration DE/AT

Slide 13 SWIFTNet Migration - DIDUG 2003

How to Order

1. The Order Flow for: - Dial-up Connection- Managed Connection

2. Ordering Tools: - e-Ordering: SWIFTNet FIN Migration- Paper forms: Other Services (+ special

cases) - Ordering VPN Box (only for dial-up) 3. Service Bureaux & Shared Connections

Page 14: SWIFTNet Migration DE/AT

Slide 14 SWIFTNet Migration - DIDUG 2003

CustomerSWIFT

Local telecom

(1) Order SWIFTNet

(2) Order ISDNor PSTN line fromlocal provider

(3) Order VPN box directly from VPN

box reseller

VPN boxes

VPN Boxreseller Network partner

(5) Activate port

for dial-up

(6) Provision & activate VPN device

(4) Provide VPN provisioning information

SWIFT’s Customer Order Flow Dial-up Connection

Page 15: SWIFTNet Migration DE/AT

Slide 15 SWIFTNet Migration - DIDUG 2003

Customer SWIFT

Network Partner

(2) Order service to network partner

Local telecom

(3) Order ISDN line and TA (if necessary)

(1) Order SWIFTNet

(4) Order local loop

(5a) Install router, VPN and local loop

(5b) Provide VPN provisioning information

(6) Provision & activate VPN device

SWIFT’s Customer Order Flow Managed Connection

Page 16: SWIFTNet Migration DE/AT

Slide 16 SWIFTNet Migration - DIDUG 2003

E-OrderingMigration Toolbox Overview

SWIFTNet Migration Toolbox

Configuration Ordering SupportStatus

Knowledge base& Case manager

SWIFTNet MigrationOrdering Tool

Key ActivityManager

SWIFTNet MigrationConfiguration Tool

Page 17: SWIFTNet Migration DE/AT

Slide 17 SWIFTNet Migration - DIDUG 2003

E-Ordering How do I get access ?

Toolbox - Valid BIC - anybody within your institution

Ordering - Limited to one user per institution

clip

Page 18: SWIFTNet Migration DE/AT

Slide 18 SWIFTNet Migration - DIDUG 2003

E-Ordering SWIFTNet Migration Configuration Tool

Page 19: SWIFTNet Migration DE/AT

Slide 19 SWIFTNet Migration - DIDUG 2003

E-Ordering SWIFTNet Migration Ordering Tool

Page 20: SWIFTNet Migration DE/AT

Slide 20 SWIFTNet Migration - DIDUG 2003

Ordering portal

Paper FormsHow do I get access to paper forms?

Page 21: SWIFTNet Migration DE/AT

Slide 21 SWIFTNet Migration - DIDUG 2003

Ordering the VPN Box from TELINDUSwww.telindus.com/swift

Page 22: SWIFTNet Migration DE/AT

Slide 22 SWIFTNet Migration - DIDUG 2003

Service Bureaux & shared connections

Page 23: SWIFTNet Migration DE/AT

Slide 23 SWIFTNet Migration - DIDUG 2003

DE2

01.04.-29.04.03: ordering

19.08.-08.09.03: migration window

09.09.-08.12.03: move live traffic to SWIFTNet

08.12.03: switch off x.25 connection

Next steps:

customer to monitor delivery and installation

SWIFTNet FIN MigrationNext steps

Page 24: SWIFTNet Migration DE/AT

Slide 24 SWIFTNet Migration - DIDUG 2003

DE3

01.10.-27.10.03: ordering

16.02.-05.03.04: migration window

06.03.-05.06.04: move live traffic to SWIFTNet

04.06.04: switch off x.25 connection

Next steps:

attend SWIFTNet training sessions

plan the migration

SWIFTNet FIN MigrationNext steps

Page 25: SWIFTNet Migration DE/AT

Slide 25 SWIFTNet Migration - DIDUG 2003

DE4

12.02.-11.03.04: ordering

01.07.-21.07.04: migration window

22.07.-19.10.04: move live traffic to SWIFTNet

20.10.04: switch off x.25 connection

Next steps:

stay informed and consider additional SWIFTNet Services

SWIFTNet FIN MigrationNext steps

Page 26: SWIFTNet Migration DE/AT

Slide 26 SWIFTNet Migration - DIDUG 2003

AT2

05.01.-04.02.04: ordering

26.05.-30.06.04: migration window

01.07.-28.09.04: move live traffic to SWIFTNet

29.09.04: switch off x.25 connection

Next steps:

stay informed and consider additional SWIFTNet services

SWIFTNet FIN MigrationNext steps

Page 27: SWIFTNet Migration DE/AT

Slide 27 SWIFTNet Migration - DIDUG 2003

Monthly surcharges and penalties for remaining X.25 connections

Monthly surcharge for remaining X.25 connections:

Location Dial-up line Permanent lineWestern Europe EUR 300 EUR 600

on 1 October 2004: EUR 5,000 per connection on 1 November 2004: EUR 10,000 per connection on 1 December 2004: EUR 20,000 per connection

Penalty for remaining X.25 connections

Page 28: SWIFTNet Migration DE/AT

Slide 28 SWIFTNet Migration - DIDUG 2003

SWIFTNet FIN Migration

Overview

Planning

Ordering

Summary

Page 29: SWIFTNet Migration DE/AT

Slide 29 SWIFTNet Migration - DIDUG 2003

What to do?

• If you are not already in the process start your preparations • Create a project team• Assign a project manager• Clarify roles, responsibility and communication channels within your

organisation• Train key staff on SWIFTNet• Decide on your configuration (SN Services, Throughput, Connectivity

Packs, Security…)

• Check out for you migration dates

• If you are already in the migration process respect your deadlines

Page 30: SWIFTNet Migration DE/AT

Slide 30 SWIFTNet Migration - DIDUG 2003

Customer Tasks Get in Contact with Network Partners

AT&T - email: [email protected]

Colt- email: [email protected]

- Website: www.colt.net/swift Equant

- email: [email protected] - Website: www.equant.com/swift

Infonet- email: [email protected]

- Website: www.infonet.com/swift_ip_solutions

Local ContactsAT&T:Michael N. Weigel+49 [email protected]

Colt:Gerhard Lange +49 69 56606 - [email protected]

Equant:Christoph Doerr+49 69 92901 [email protected]

Infonet/TelekomDr. Heinrich Rudolph+49 69 [email protected]

Page 31: SWIFTNet Migration DE/AT

Slide 31 SWIFTNet Migration - DIDUG 2003

Customer TasksGet in Contact with SWIFT Service Partners

Provide the following services locally:• SWIFTAlliance implementations• SWIFTNet migration assistance• Connectivity implementations• Regular upgrades of SWIFT interfaces and other

SWIFT software products Addresses, Infos about their Service, Pricing Overview are

available on swift.com

Page 32: SWIFTNet Migration DE/AT

Slide 32 SWIFTNet Migration - DIDUG 2003

Customer ViewWhere to find helpwww.swift.com On line customer services (OLCS): your first stop to find help SWIFTNet ordering portal Migration toolbox

– Network partner information– Online support - Frequently Asked Questions (FAQs)– Configurator tool for connectivity and budgeting information– e-ordering tool including the KAM (key activity management

tool) Order preparation checklist

For any other questions: Customer Services Centre

Page 33: SWIFTNet Migration DE/AT

Slide 33 SWIFTNet Migration - DIDUG 2003

Contacts in Germany

Simone Weyhenmeyer069 - 7541 - [email protected]

Claudia König069 - 7541 - [email protected]