+ All Categories
Home > Documents > Switch Point

Switch Point

Date post: 21-Mar-2016
Category:
Upload: christophe-girot
View: 215 times
Download: 0 times
Share this document with a friend
Description:
River strategy: The main approach was to redefine a new edge removing the vulnerable settlements along the river, widening the riverbank and implementing new greenery. The river should also be activated as a transport line where goods and people can be transferred within the whole kampung. Land strategy: The site was divided into three layers – a new hard edge on the southern Part of Bukit Buri, a transportation backbone in the centre and e quiet green belt along the northern river side. Existent qualities in Bukit Duri were strengthened. The activities of workshops, shops, carpentries and traffic were enhanced. The old railway depot has been reactivated as a train station, the workshops densified and a new flexible building structure is planned.
12
Transcript
Page 1: Switch Point
Page 2: Switch Point
Page 3: Switch Point
Page 4: Switch Point
Page 5: Switch Point
Page 6: Switch Point
Page 7: Switch Point
Page 8: Switch Point
Page 9: Switch Point
Page 10: Switch Point
Page 11: Switch Point
Page 12: Switch Point

Recommended