+ All Categories
Home > Documents > SWM_Rohri

SWM_Rohri

Date post: 04-Apr-2018
Category:
Upload: engrafsoomro3147
View: 220 times
Download: 0 times
Share this document with a friend

of 8

Transcript
  • 7/29/2019 SWM_Rohri

    1/8

    1

    Martin Steiner SWM inventory meeting Rohri 13/12/2010

    Definition of numbers & types of skip platforms

    Rohri, 13 December 2010

    Martin Steiner (Posch & Partners / ECPAK)

    2

    Agenda Introduction

    Aims of the present meeting

    Participants, and their roles

    Upgrading solid waste collection in Rohri

    Status

    Intended next steps

    What has to be achieved today?

    Martin Steiner SWM inventory meeting Rohri 13/12/2010

    collection containers (to be delivered in early spring)

    What can be achieved today?

    Change of certain locations of waste collection points

    Mutual understanding: Needs of community & NSUSC

  • 7/29/2019 SWM_Rohri

    2/8

    3

    Why do we need skip platforms?

    Wheelbarrows, donkey carts etc. cannot unload

    over edges higher than 1 ft

    Two basic alternatives to fill a container

    For achieving a reasonable volume containers

    (skips) must have a certain height

    Martin Steiner SWM inventory meeting Rohri 13/12/2010

    4

    Martin Steiner SWM inventory meeting Rohri 13/12/2010

  • 7/29/2019 SWM_Rohri

    3/8

    5

    Designing platforms for filling 4 ft high skips

    Martin Steiner SWM inventory meeting Rohri 13/12/2010

    Test platform for defining designrequirements of primary collectors

    6

    About safety, mobility, theft protection

    Martin Steiner SWM inventory meeting Rohri 13/12/2010

  • 7/29/2019 SWM_Rohri

    4/8

    7

    Martin Steiner SWM inventory meeting Rohri 13/12/2010

    8

    Two types of containers (skips),

    and four types of platforms

    1 unit per

    vehicle

    @ 7 m3

    2 units

    @ 3.5 m3

    each

    Standard, w = 3.4 m Slim, w = 2.4 m

    Martin Steiner SWM inventory meeting Rohri 13/12/2010

    Wheelbarrow, w = 1.4 m

    NONE

  • 7/29/2019 SWM_Rohri

    5/8

    9

    Data collection performed

    between June and October

    Documentation of all (> 500)

    Solid waste inventories for all six cities

    formal present solid waste

    collection and disposal points

    Registration by means of GPS

    First aim of these inventories

    was to define the number and

    type of skip platforms for a

    Martin Steiner SWM inventory meeting Rohri 13/12/2010

    Electronic database (Google

    Earth maps) of said inventorieswill be made available as

    planning and documentation

    tool for our SW managers

    10

    What can be improved? Eg. a better distribution of waste collection points

    Martin Steiner SWM inventory meeting Rohri 13/12/2010

  • 7/29/2019 SWM_Rohri

    6/8

    11

    How many decisions have to be made?

    Sukkur New Sukkur Rohri Khairpur Shikarpur Larkana Total

    Population: 286,400 103,800 63,200 167,300 184,800 370,400 1,180,000

    24% 9% 5% 14% 16% 31%

    Existing collection points: 29 48 268 345

    Future collection points: 95 35 26 55 62 123 396

    Balance: -3 7 -145

    Martin Steiner SWM inventory meeting Rohri 13/12/2010

    STANDARD SLIM WHEELBARROW NONE

    12

    Martin Steiner SWM inventory meeting Rohri 13/12/2010

  • 7/29/2019 SWM_Rohri

    7/8

    13

    Martin Steiner SWM inventory meeting Rohri 13/12/2010

    14

    Martin Steiner SWM inventory meeting Rohri 13/12/2010

  • 7/29/2019 SWM_Rohri

    8/8

    15

    Solid collection & disposal Rohri:

    Overview data

    S/o

    FotoNr.

    Date Address UC North EastSewer

    HandPump

    Pipe-line

    Hydrant

    Frequency

    Type

    1 R 1 10 June 2010 T alluka Hos i tal Back Side 22 N 27 41 4 5 E 68 53 30 9 Y N N N Hi h Collection

    2 R 2 10 June 2010 Govt.High School 22 N 27 41 3 5 E 68 53 19 0 N N Y Y -- Collection

    3 R 3 10 June 2010 T & T Colony 22 N 27 40 57 7 E 68 53 15 1 Y N N N High Collection

    4 R 4 10 June 2010 Sanjrani Mohalla Near Railway Track 21 N 27 41 5 7 E 68 53 13 7 N N Y N Low Collection

    5 R 5 10 June 2010 Beri Chowk 21 N 27 41 7 9 E 68 53 11 1 N N N N High Collection

    6 R 6 10 June 2010 Near CNG Filling Station 21 N 27 41 17 0 E 68 53 10 5 Y N N N High Collection

    7 R 7 10 June 2010 Kandara Road (Road) 21 N 27 41 14 6 E 68 53 8 4 Y N N N High Collection

    8 R 8 10 June 2010 Katpar Moula 21 N 27 41 22 4 E 68 53 16 0 Y N N N High Collection

    9 R 9 10 June 2010 Hakim Ki Hotel Bundar Road 21 N 27 41 27 1 E 68 53 25 2 Y N N N Low Collection

    10 R 10 10 June 2010 Mehndi Ka Pirr 21 N 27 41 27 0 E 68 53 25 3 Y N N N Low Collection

    11 R 11 10 June 2010 Bundo Chowk In Front of TMA Office 21 N 27 41 35 6 E 68 53 33 6 Y N Y N -- Collection

    12 R 12 10 June 2010 Mian Ki Road 21 N 27 41 35 1 E 68 33 34 2 Y N Y N -- Collection

    13 R 13 10 June 2010 Som ra house Near Buff alo Yard & Ice Fa 21 N 27 41 24 6 E 68 53 45 6 Y N Y N Low Collection

    14 R 14 10 June 2010 Memon Mohalla 22 N 27 41 20 1 E 68 53 27 8 Y N N N High Collection

    15 R 15 10 June 2010 Govt.High School (Back Side) 22 N 27 41 8 4 E 68 53 18 6 Y N N N Low Collection

    16 R 16 1 0 June 2010 Bedal Colony 22 N 27 41 9 3 E 68 53 26 2 Y N N N Low Collection

    Martin Steiner SWM inventory meeting Rohri 13/12/2010

    17 R 17 10 June 2010 Cement Factory Morr 22 N 27 41 10 5 E 68 53 36 3 Y N N N High Collection

    18 R 18 1 5 June 2010 Sultan Shah 22 N 27 41 11 5 E 68 53 52 8 Y Y N N High Collection

    19 R 19 15 June 2010 Bolan Shah Mohalla 22 N 27 41 17 6 E 68 53 41 0 Y N N N High Collection

    20 R 20 15 June 2010 Shahzado Mohalla 21 N 27 41 30 9 E 68 53 42 1 Y N Y N High Collection

    21 R 21 15 June 2010 Loco Shed & New Yard 22 N 27 40 49 5 E 68 54 45 0 Y N Y N High Collection

    22 R 22 15 June 2010 National Bank of Pakistan 21 N 27 41 34 2 E 68 53 48 7 Y N Y N High Collection

    23 R 23 14 June 2010 Station Road 21 N 27 41 16 3 E 68 53 54 1 Y N Y N -- Collection

    24 R 24 14 June 2010 Pathan Colony 21 N 27 41 16 6 E 68 53 43 9 Y N Y N High Collection

    25 R 25 14 June 2010 GT Road Near Bab-e-Karbala 21 N 27 41 16 6 E 68 53 43 8 Y N Y Y High Collection

    26 R 26 14 June 2010 G angoti Ground 21 N 27 41 27 3 E 68 53 50 9 Y N Y N High Collection

    A R A 14 June 2010 Acchi Qubee 21 N 27 41 5 6 E 68 53 1 4 N N N N High Disposal

    B R B 14 June 2010 Near Total Pump Station Road 21 N 27 41 20 0 E 68 53 59 3 Y N N N High DisposalC R C 14 June 2010 Be-Dil Be Kas Tunnel 21 N 27 41 10 3 E 68 53 37 5 Y N Y N Low Disposal

    16

    Thank you for your attention!

    Martin Steiner SWM inventory meeting Rohri 13/12/2010

    [email protected]