21
Sydney Road Assets Performance Contracts
Transcript
Page 1: Sydney Road Assets Performance Contracts€¦ · - M4 Smart Motorways Asset List - As-built drawings for sample bridges 9: 29/06/2020 - Third Party Works summary: #SRAPC. Website

Sydney Road AssetsPerformance Contracts

Page 2: Sydney Road Assets Performance Contracts€¦ · - M4 Smart Motorways Asset List - As-built drawings for sample bridges 9: 29/06/2020 - Third Party Works summary: #SRAPC. Website

Acknowledgement of Country Tim Hahn

Page 3: Sydney Road Assets Performance Contracts€¦ · - M4 Smart Motorways Asset List - As-built drawings for sample bridges 9: 29/06/2020 - Third Party Works summary: #SRAPC. Website

Welcome and AgendaTim Hahn

Page 4: Sydney Road Assets Performance Contracts€¦ · - M4 Smart Motorways Asset List - As-built drawings for sample bridges 9: 29/06/2020 - Third Party Works summary: #SRAPC. Website

• Introduction to the session – Tim Hahn

• Slido instruction – Tim Hahn

• Probity – Tim Hahn

• Returning the Pricing Schedules– Andrew Doherty

• Question and Answers – Rebecca Dean

SRAP ContractsAgenda

Page 5: Sydney Road Assets Performance Contracts€¦ · - M4 Smart Motorways Asset List - As-built drawings for sample bridges 9: 29/06/2020 - Third Party Works summary: #SRAPC. Website

• Interactives 1st week of June

SRAP ContractsFuture Addendums and Sessions

Addendum no.

Week beginning

Proposed Information to be released

6 9/06/2020 - TfNSW Insurance documents- Sample ARL2 Slope Inspection Reports- General Conditions Contract Clause 41.4 update- ITS Structures Condition Data

7 15/06/2020 - Pavement 3 years historical condition data- Level 2 bridge inspections reports including bridges in TAMP Project List

8 22/06/2020 - M4 Smart Motorways Asset List- As-built drawings for sample bridges

9 29/06/2020 - Third Party Works summary

Page 6: Sydney Road Assets Performance Contracts€¦ · - M4 Smart Motorways Asset List - As-built drawings for sample bridges 9: 29/06/2020 - Third Party Works summary: #SRAPC. Website

#SRAPC

Website for questions;

sli.doEnter Code

Page 7: Sydney Road Assets Performance Contracts€¦ · - M4 Smart Motorways Asset List - As-built drawings for sample bridges 9: 29/06/2020 - Third Party Works summary: #SRAPC. Website

SRAP ContractsProbity

– Transport for New South Wales (TfNSW) will endeavour to follow up with answers to any Slido questions you have today through the Tender e-data room

Probity Contact Details Gordon EastwoodEmail: [email protected]: 0435 472 352

Page 8: Sydney Road Assets Performance Contracts€¦ · - M4 Smart Motorways Asset List - As-built drawings for sample bridges 9: 29/06/2020 - Third Party Works summary: #SRAPC. Website

Request for TenderReturning the Pricing SchedulesAndrew Doherty

Page 9: Sydney Road Assets Performance Contracts€¦ · - M4 Smart Motorways Asset List - As-built drawings for sample bridges 9: 29/06/2020 - Third Party Works summary: #SRAPC. Website

Pricing Schedules BriefingObjectives of the Briefing

• Present the Pricing Schedules with a narrative on how the schedules should be completed

• Present answers to common themes regarding questions submitted on Ansarada to date.

• Not an exhaustive briefing an all commercial / legal facets of the tender.

Page 10: Sydney Road Assets Performance Contracts€¦ · - M4 Smart Motorways Asset List - As-built drawings for sample bridges 9: 29/06/2020 - Third Party Works summary: #SRAPC. Website

SRAP ContractsPricing Schedules Briefing

Overview

10.01 Instructions to Tenderers10.02 Pricing Summary10.03 Margin Rates10.04 The Services10.05 Schedules of Unit Rates10.06 Reference Pricing for Special Projects 10.08 Indicative Cost Changes Regarding Motorway Projects10.08 Key Assumptions10.09 Forecast Cash flow

Page 11: Sydney Road Assets Performance Contracts€¦ · - M4 Smart Motorways Asset List - As-built drawings for sample bridges 9: 29/06/2020 - Third Party Works summary: #SRAPC. Website

SRAP ContractsSchedule 10.01 – Instructions to Tenderers

– Do not use “included” in the pricing

– Pricing must be inclusive of all things necessary and incidental to performing the Services described in the Service Plans.

– All supporting estimates to the pricing schedule are to be made available to TfNSW

Schedule 10 - Pricing Schedules

Pricing Schedule 10.01 Instructions to Tenderers

Generally1Pricing Instructions to Tenderers

Page 12: Sydney Road Assets Performance Contracts€¦ · - M4 Smart Motorways Asset List - As-built drawings for sample bridges 9: 29/06/2020 - Third Party Works summary: #SRAPC. Website

Pricing Schedules BriefingSchedule 10.02 Pricing Summary

– Not all schedules are carried forward to the pricing summary

– Tactical works total should exclude “Maintenance” phase

– Tenderers are bidding the first 3 years of the contract with margins fixed over the term of the contract

Schedule Scope Item Contract Year 1

Contract Year 2

Contract Year 3

$Total / yr $ Rate / yr $Total / yr10.04.01 Program Management

Program Management Team -$ -$ -$ Offices, Facilities & Other -$ -$ -$ Depots -$ -$ -$ Total -$ -$ -$

10.04.02 Asset ManagementAsset Management Team -$ -$ -$ Asset Management Planning Other -$ -$ -$ Total -$ -$ -$

10.04.03 Fault Management ServicesTotal Fault Management Services -$ -$ -$

10.04.04 Routine MaintenanceTotal Routine Maintenance -$ -$ -$

10.04.05 Tactical WorksExcluding Routine Maintenance Refer Separate Workbook

10.04.07 Sample Tactical Corridor Works ProjectsRefer Separate Workbook

10.04.10 Event Management ServicesHarbour Zone Signage Store -$ -$ -$

10.04.11 Mobilisation ServicesMobilisation Services -$

10.04.12 Demobilisation Year 2030Demobilisation -$

TAMP 1Pricing Summary

Page 13: Sydney Road Assets Performance Contracts€¦ · - M4 Smart Motorways Asset List - As-built drawings for sample bridges 9: 29/06/2020 - Third Party Works summary: #SRAPC. Website

Pricing Schedules BriefingProgram and Asset Management 10.04.01 & 10.04.02

– Tenderers to nominate roles in addition to the mandatory roles

– “$Total / yr” will indicate whether a role is full time or Part time

– Do not add new lines to Program and asset management pricing schedules tables other than personnel

1 Program Management Team $ Rate / yr $Total / yr $ Rate / yr $Total / yr $ Rate / yr $Total / yr1.01 $ - $ - $ - $ - $ - $ - 1.02 $ - $ - $ - $ - $ - $ -

1.03 $ - $ - $ - $ - $ - $ - 1.04 $ - $ - $ - $ - $ - $ - 1.05 $ - $ - $ - $ - $ - $ - 1.06 $ - $ - $ - $ - $ - $ - 1.07 $ - $ - $ - $ - $ - $ -

Contract Year 1 Contract Year 3Contract Year 2TAMP 1

Program Management

Contract Manager

Safety ManagerCustomer and Engagement LeadEnvironmental LeadPersonnel 6Personnel 7Personnel 8

Page 14: Sydney Road Assets Performance Contracts€¦ · - M4 Smart Motorways Asset List - As-built drawings for sample bridges 9: 29/06/2020 - Third Party Works summary: #SRAPC. Website

Pricing Schedules BriefingFault Management & Routine Maintenance10.04.03 & 10.04.04

– Tenderers to price Routine outcomes per annum / per ConOps score range– If an activity such as road sweeping is required to achieve an outcome such as

pavement health, the activity should be costed in the corresponding outcome row of schedule 10.04.04.

– To clarify any demarcations between routine and tactical maintenance pricing, Tenderers are to complete the key assumptions schedule 10.08

– All routine maintenance costs priced in 10.04.04 will carry forward to the 10.04.05 TAMP project list to be the sum total of the "Maintenance" stage.

Page 15: Sydney Road Assets Performance Contracts€¦ · - M4 Smart Motorways Asset List - As-built drawings for sample bridges 9: 29/06/2020 - Third Party Works summary: #SRAPC. Website

Pricing Schedules BriefingTactical Works – Schedule 10.04.05

TfNSW road assets are estimated at $26 billion

– Examples of the range of assets

• five asset categories – pavement, bridges, tunnels, roadside and traffic

Project Phase Task Description / Scope of work Calculation details Source of data Fixed Price /

Target Cost Rate/Line item Cost

(Base currency)

BN 68 Bridge at Huntleys Point Strengthe Concept Concept Options, design

BN 68 Bridge at Huntleys Point Strengthe Delivery Readiness

Detailed desgn, REF, Tender, TC3 etc

BN 68 Bridge at Huntleys Point Strengthe DeliveryGirder StrengtheningPier Repairs/StrengtheningBearing Repair/Replacement

REMEMBRANCE DRIVE, CAMDEN - R0620015000.000BU_34.610

Delivery

Construction

REMEMBRANCE DRIVE, CAMDEN - R0620015000.000BU_34.610

Finalisation

Handover

Cable Pit Renewals Harbour Zone Delivery Readiness

Cable Pit Renewals Harbour Zone Delivery

approximately 25 Cable replacements per Annum due to: electrical issues, vermin damage, ageing and degradation

Cable Pit Renewals Harbour Zone Finalisation

Taren Point Rd south bound near Woodlands Rd Initiation

Issue brief

Taren Point Rd south bound near Woodlands Rd Concept

Design, REF

Taren Point Rd south bound near Woodlands Rd Delivery

Construction of approx. 350m long/5m high noise wall along Taren Point Rd South bound near Woodlands Rd .

Page 16: Sydney Road Assets Performance Contracts€¦ · - M4 Smart Motorways Asset List - As-built drawings for sample bridges 9: 29/06/2020 - Third Party Works summary: #SRAPC. Website

SRAP ContractsTactical Works – Schedule 10.04.05

– Only the service providers TAMP projects for their shortlisted zone(s) should be priced in a conforming tender.

– Tenderers are to develop a detailed price submission for the 3 year works program developed for the TAMP. Tenderers are also to provide indicative pricing for the remaining years 4-10.

– The tactical projects being put forward in schedule 10.04.05 should have supporting cost build-ups priced in the same format as schedules 10.06. The rates used in these cost build-ups should be consistent with the unit rates bid in pricing schedules 10.05 &10.06.

Page 17: Sydney Road Assets Performance Contracts€¦ · - M4 Smart Motorways Asset List - As-built drawings for sample bridges 9: 29/06/2020 - Third Party Works summary: #SRAPC. Website

SRAP ContractsTactical Works – Schedule 10.04.05

TfNSW desire for Tactical projects to progress towards 100% fixed cost

Tactical Asset Management Plan for SRAP Conctracts Commencing July 2021

Services 1 2 3 4 5 6 7 8 9Management Asset planning & program management costsTactical Asset Management Plan All routine maintenance Tactical ITS works Tactical Signs and Delineation works Tactical Road Pavement works Tactical bridge and tunnel works Tactical Corridor works Event management Asset RecoverySpecial ProjectsSimple Minor Improvement worksComplex Minor Improvement works

Commercial Reset Points

1 2 3

NB: this is a simplified split for illustration purposes. In reality there may be some elements which comprise a mix of arrangements (e.g. a tactical upgrade performed as a fixed price, or asset management work under a

Page 18: Sydney Road Assets Performance Contracts€¦ · - M4 Smart Motorways Asset List - As-built drawings for sample bridges 9: 29/06/2020 - Third Party Works summary: #SRAPC. Website

Pricing Schedules BriefingSchedule of Unit Rates – Schedule 10.05

– The schedule of rates is to be used to build up prices for the tactical works in schedule 10.04.05

– This schedule will be used to assess any changes during the operation of the contract.

– This schedule of rates does not need to be referenced in the fixed pricing required for Routine Maintenance Schedule 10.04.04.

Pay Item Description of Work Quantity Unit Unit Rate Amount

R44P1 Topsoil 1.00 2 to 5 6 to 50 51 to 100 >100R44P1.1 Removal and Stockpiling of Non-contaminated Topsoil (Stockpile Volumes) 1 m3 - $0.00 $0.00 $0.00 $0.00 $0.00 $0.00R44P6 Disposal Off Site of Non-contaminated Spoil (other than Topsoil)R44P6.1 Haulage of Spoil 1 m3 km - $0.00 1.00 2 to 5 6 to 50 51 to 100 >100R44P6.2 Disposal Off Site of Non-contaminated Spoil (CT1) (Rate Only) 1 t - $0.00 $0.00 $0.00 $0.00 $0.00 $0.00R44P6.3 Disposal Off Site of Non-contaminated Spoil (ENM) (Rate Only) 1 m3 - $0.00 $0.00 $0.00 $0.00 $0.00 $0.00R44P6.4 Disposal Off Site of Non-contaminated Spoil (VENM) (Rate Only) 1 m3 - $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Unit Quantity BandingR44 – EARTHWORKS Ed 5/Rev 0

Page 19: Sydney Road Assets Performance Contracts€¦ · - M4 Smart Motorways Asset List - As-built drawings for sample bridges 9: 29/06/2020 - Third Party Works summary: #SRAPC. Website

Pricing Schedules BriefingSpecial Projects– Schedule 10.06

– Tenderers are permitted to change the formulas in the green cells. In accordance with schedule 10.01, tenderers are responsible for the integrity of all formulas.

– The price submissions for reference projects will be assessed based on the assumption that the Projects will have a hypothetical commencement date of 30/06/2021 with pricing based on the tender documents provided.

Pay Item Description of Work Quantity Unit Rate Amount

G1P1 Provision of Traffic Signal Loop Reinstatement - provisional sum $5,100.00 $.00

G1P2 Road Safety Audit 1 no. - $.00G1P3 Provision of NDD (Non-Destructive Digging) Unit (Night Rate) - "Potholing" 4 hour - $.00

G1 Sub-total: $.00

G1 – JOB SPECIFIC REQUIREMENTS Ed 2/Rev 0

Page 20: Sydney Road Assets Performance Contracts€¦ · - M4 Smart Motorways Asset List - As-built drawings for sample bridges 9: 29/06/2020 - Third Party Works summary: #SRAPC. Website

Questions and Answers

Questions submitted in Slido will beresponded to in the Tender E-Data room