Synth:Core and Synth:Amped Installation Guidelines 10.12.18 The purpose of this manual is to provide general maintenance recommendations based on certain installation environments. If there are other questions about a specific issue not covered in this manual, please contact © Swiff-Train Company, 10850 Train Ct. Houston, Texas 77041 or call 800.275.7943 (opt 2) Material Receiving & Storage Upon receipt of material, immediately remove any wrapping and inspect for damage and verify that the correct product and color was received. Do not drop cartons as this may cause damage. No labor claim will be honored on material installed with visual defects. Verify the material delivered is the correct style, color and free of any defects. Commencement of the installation of visually defective material by the flooring contractor will constitute the flooring contractor’s acceptance of the materials and job site conditions. Any discrepancies must be reported immediately to Ground Control Surfaces technical department before beginning installation. Jobsite Conditions Prior to beginning installing, the flooring contractor should visit the jobsite to confirm that permanent heating, ventilating and air conditioning (HVAC) system will be in continuous operation and capable of maintaining area temperature of 70°-80°F continuously from 48 hours before installation, during and through 48 hours after installing. It should be determined that work by other trades will be completed prior to installation, or arrangements made for adequate and continuous protection of installed flooring if other trades will be working at same time or after. While Ground Control Surfaces Synth:Core and Amped flooring is waterproof, it’s not designed to be used as a moisture barrier. Concrete slabs must be cured and tested for moisture and that a moisture barrier is installed in the crawl space or even under a Ground Control Surfaces Synth:Core and Amped floor over a concrete subfloor. Moisture won’t damage Ground Control Surfaces Synth:Core and Amped but it can get in the walls and structure of any building. Acclimation Although it is not required, it is recommended that you always acclimate any hard surface flooring material. Ground Control Surfaces Synth:Core and Amped flooring requires no acclimation period when the installation site conditions are climate controlled prior, during and after the installation. This means that Ground Control Surfaces Synth:Core and Amped flooring can be installed faster and more efficiently than conventional alternatives. Since most buildings, as well as other connecting flooring products may expand and contract, Ground Control Surfaces recommends to leave a 1⁄4” expansion gap between the perimeter walls and any adjacent hard surface flooring material bridging these products with standard transitions. Do not install Ground Control Surfaces Synth:Core and Amped floors where it will be constantly exposed to temperatures below 32° or greater than 130° Fahrenheit. During the installation period, temperatures should be maintained between 65° F to 85° F and relative humidity should be maintained at 35% to 65% relative humidity. Do not store cartons near heating/cooling ducts or in direct sunlight. Subfloor Preparation The flooring contractor should evaluate the suitability of existing surface to receive new flooring. Fill any low spots in the subfloor greater than 1/8" in 6 feet with a Portland cement leveling compound. Check this by using a 6' straight edge. Remove any high spots by sanding or grinding. Remove any existing floor molding or base material where needed.
Transcript
Page 1: Synth:Core and Synth:Amped Installation Guidelinesgroundcontrolsurfaces.com/wp-content/uploads/GRCO_SynthCoreA… · or on top of the underlayment if used. This will be your guide

Synth:Core and Synth:Amped Installation Guidelines 10.12.18 The purpose of this manual is to provide general maintenance recommendations based on certain installation environments. If there are other questions about a specific issue not covered in this manual, please contact © Swiff-Train Company, 10850 Train Ct. Houston, Texas 77041 or call 800.275.7943 (opt 2) Material Receiving & Storage Upon receipt of material, immediately remove any wrapping and inspect for damage and verify that the correct product and color was received. Do not drop cartons as this may cause damage. No labor claim will be honored on material installed with visual defects. Verify the material delivered is the correct style, color and free of any defects. Commencement of the installation of visually defective material by the flooring contractor will constitute the flooring contractor’s acceptance of the materials and job site conditions. Any discrepancies must be reported immediately to Ground Control Surfaces technical department before beginning installation. Jobsite Conditions Prior to beginning installing, the flooring contractor should visit the jobsite to confirm that permanent heating, ventilating and air conditioning (HVAC) system will be in continuous operation and capable of maintaining area temperature of 70°-80°F continuously from 48 hours before installation, during and through 48 hours after installing. It should be determined that work by other trades will be completed prior to installation, or arrangements made for adequate and continuous protection of installed flooring if other trades will be working at same time or after.

While Ground Control Surfaces Synth:Core and Amped flooring is waterproof, it’s not designed to be used as a moisture barrier. Concrete slabs must be cured and tested for moisture and that a moisture barrier is installed in the crawl space or even under a Ground Control Surfaces Synth:Core and Amped floor over a concrete subfloor. Moisture won’t damage Ground Control Surfaces Synth:Core and Amped but it can get in the walls and structure of any building.

Acclimation Although it is not required, it is recommended that you always acclimate any hard surface flooring material. Ground Control Surfaces Synth:Core and Amped flooring requires no acclimation period when the installation site conditions are climate controlled prior, during and after the installation. This means that Ground Control Surfaces Synth:Core and Amped flooring can be installed faster and more efficiently than conventional alternatives. Since most buildings, as well as other connecting flooring products may expand and contract, Ground Control Surfaces recommends to leave a 1⁄4” expansion gap between the perimeter walls and any adjacent hard surface flooring material bridging these products with standard transitions. Do not install Ground Control Surfaces Synth:Core and Amped floors where it will be constantly exposed to temperatures below 32° or greater than 130° Fahrenheit. During the installation period, temperatures should be maintained between 65° F to 85° F and relative humidity should be maintained at 35% to 65% relative humidity. Do not store cartons near heating/cooling ducts or in direct sunlight. Subfloor Preparation The flooring contractor should evaluate the suitability of existing surface to receive new flooring. Fill any low spots in the subfloor greater than 1/8" in 6 feet with a Portland cement leveling compound. Check this by using a 6' straight edge. Remove any high spots by sanding or grinding. Remove any existing floor molding or base material where needed.

Page 2: Synth:Core and Synth:Amped Installation Guidelinesgroundcontrolsurfaces.com/wp-content/uploads/GRCO_SynthCoreA… · or on top of the underlayment if used. This will be your guide

Ground Control Surfaces accepts no responsibility for underlayment or sub-floor failures. Timely and thorough inspection and preparation of subfloors are first required actions to assure a satisfactory installation. No site work should commence until the flooring contractor is completely familiar with existing subfloor and related site conditions. Note: Where necessary, undercut door frames, lay a loose plank upside down against the frame or on top of the underlayment if used. This will be your guide for proper height to allow installed planks to float under the door frame. Saw the bottom of the doorjamb case molding back to the wall studs so that 1/4" expansion gap is maintained when Ground Control Surfaces Synth:Core and Amped is fitted under doorjamb case molding. Dust, Dirt and Debris Removal

Broom sweep, vacuum and / or damp mop to make completely clean. Assure that the surface is completely clean prior to installation.

• CDX Underlayment Grade Plywood (at least 1⁄2” thick)

• OSB (at least 3⁄4” thick) • Concrete Slab • Resilient Tile • Underlayment Partical Board

Acceptable Subfloor Type

Although you may install Ground Control Surfaces Synth:Core and Amped over many different subfloor types, the following are the most widely accepted surfaces found:\

• CDX Underlayment Grade Plywood (at least 1⁄2” thick)

• OSB (at least 3⁄4” thick) • Concrete Slab • Resilient Tile • Underlayment Particle Board • Wood Floor • Laminate Floor • Sheet vinyl • Ceramic • Marble

If you have a question regarding any other subfloors not listed above, please contact Ground Control Surfaces, technical support @ 800.275.7943 (opt 2).

Installation Tools

• Pencil Chalk Line • Crosscut Power Saw or Guillotine Cutter • 3M Scotch BlueTM 2080 Tape • 1⁄4” Spacers • Hammer • Tapping Block and Pull Bar • Tape Measure

Starting Your Installation

Since most buildings, as well as other connecting flooring products may expand and contract, Ground Control Surfaces recommends to leave a 1⁄4” expansion gap between the perimeter walls and any adjacent hard surface flooring material bridging these products with standard transitions.

Work from several open boxes of flooring and stack the floor before permanently installing the floor. This will allow you to select varying textures, colors, and sheens, and to arrange them in a harmonious pattern.

In many cases Ground Control Surfaces Synth:Core and Amped is designed to replicate a natural material. It is the installers’ responsibility to determine the expectations of what the finished floor will look like. Use the variable pieces that do not meet those visual expectations to use as cuts in other areas of the installation.

This will allow you to select varying textures, colors, and sheens, and to arrange them in a harmonious pattern. Remember, it is the installers’ responsibility to determine the expectations of what the finished floor will look like and then to cull out pieces that do not meet those expectations.

Begin installation next to an outside wall. This is usually the straightest and best reference for establishing a straight working line. Establish this line by measuring an equal distance from the wall at both ends and snapping a chalk line. The

Page 3: Synth:Core and Synth:Amped Installation Guidelinesgroundcontrolsurfaces.com/wp-content/uploads/GRCO_SynthCoreA… · or on top of the underlayment if used. This will be your guide

distance you measure from the wall should be the width of a plank or tile.

You may need to scribe cut the first row of planks or tiles to match the wall in order to make a straight working line if the wall is out of line.

You may also want to position a few rows before starting installation to confirm your layout decision and working line. When installing the flooring, stagger end joints from row to row by at least 8” for planks, and equal to 12” for tile.

For plank installations, you can use the cut-off end to begin the next row when cutting the last plank in a row to fit. If cut-off end is less than 8”, discard it and instead cut a new plank at a random length (at least 8” in length) and use it to start the next row. For tile installations, always begin a row with either a full tile or a half tile so that the joints are consistently staggered in a “brick work” type pattern. Always begin each row from the same side of the room.

Installation Instructions

Prior to installation, inspect material in daylight for visible faults/damage. Check if sub floor/site conditions comply with the specifications described in these instructions.

If you are not satisfied, do not install, and contact your Ground Control Surfaces technical support at 800.275.7943 (opt 2).

Measure the room at right angle to the direction of the flooring. For the best visual effect, planks or tiles in the final row should be at least 1/3 the width of the plank or tile. For this purpose, planks or tiles in the first row can be cut to smaller size to accommodate.

Arrange the boards in order to obtain a pleasant blend of shades. Lay boards, preferably following the direction of the main source of light. We recommend installing on wooden floors across the existing floorboards.

Step 1: Begin installation working from left to right. Insert spacers at ends and edges where planks meet wall.

Step 2: Lock short end of plank by inserting tongue into groove at an angle and drop in place. Continue to end of first row.

Step 3: Use leftover plank from first row as starter for second row. There must be at least 8” between plank end joints on adjacent rows.

For tile installations: The distance between end joints should be equal to 12” for proper appearance.

Page 4: Synth:Core and Synth:Amped Installation Guidelinesgroundcontrolsurfaces.com/wp-content/uploads/GRCO_SynthCoreA… · or on top of the underlayment if used. This will be your guide

Step 7: Tap end of plank with hammer and tapping block to lock ends of planks together. Remove bridge and continue towards wall until installing the final plank in the row.

Step 8: Use hammer and pull bar to lock final piece in row. Insert spacer at end of row.

Step 9: Use hammer and pull bar to lock long edges of planks on final row.

Step 4: Lock long edge of plank by inserting tongue into groove at an angle and drop in place. Slide plank toward end of previously installed plank until the tongue just touches the groove.

Step 5: IMPORTANT! Use hammer and tapping block to tap long edge of plank to ensure a tight fit. ANY GAPPING CAN COMPROMISE THE LOCKING SYSTEM!

Step 6: Attach a scrap piece of floor to bridge gap between ends of planks.

Page 5: Synth:Core and Synth:Amped Installation Guidelinesgroundcontrolsurfaces.com/wp-content/uploads/GRCO_SynthCoreA… · or on top of the underlayment if used. This will be your guide

Installing Under Door Jamb

Step 1: Undercut space under the door jamb to allow plank to slide freely. Tap long edge with hammer and tapping block to lock long edge.

Step 2: Use hammer and pull bar to lock short end of plank.

Installer Advisory Radiant Heat Ground Control Surfaces Synth:Core and Amped products can be installed over radiant heat using a floating or glue down method. Follow the following requirements when installing Ground Control Surfaces Synth:Core and Amped product in this environment

• Turn the heat off for 24 hours before, during and 48 hours after installation when installing over radiant heated panels.

• Floor temperature must never exceed 85°F (30°C).

• Failure to strictly follow our adhesive guidelines, failure may result in and void the warranty.

Warning: Electric heating mats that are not embedded into the subfloor are not recommended for use underneath Ground Control Surfaces Synth:Core and Amped flooring products. Using electric heating mats that are not embedded and applied directly underneath the Ground Control Surfaces Synth:Core and Amped flooring could void the warranty for your floor. It is best to install Ground Control Surfaces Synth:Core and Amped over embedded radiant floor heating systems and adhere to the guidelines listed above.

After Installation Flooring should be one of the last items installed in a project. In order to protect the floors while other trades are finishing their work prior to final cleanup and turnover to the owner, use rosin paper and only use 3M Scotch- BlueTM 2080. Tape to hold the rosin paper to the floor (other blue tapes may damage the finish). Clean the floor thoroughly before laying the rosin paper to ensure that no debris is trapped underneath. DO NOT USE plastic film or other non-breathing coverings as this can cause the floor to become damaged from humidity buildups. Dust mop or vacuum your floor to remove any loose dirt or debris. It is suggested that you clean the floor using a recommended ph neutral cleaner and if desired, an acrylic floor finish to accomplish the desired appearance. Please see the Ground Control Surfaces Synth:Core and Amped flooring LVT maintenance manual for further details.

Page 6: Synth:Core and Synth:Amped Installation Guidelinesgroundcontrolsurfaces.com/wp-content/uploads/GRCO_SynthCoreA… · or on top of the underlayment if used. This will be your guide

General Maintenance • Do not expose Ground Control Surfaces

Synth:Core and Amped flooring to temperature exceeding 140° F.

• Oil or petroleum-based products can result in surface staining. Do not track asphalt-driveway sealer or automobile-oil drips onto the vinyl floor covering.

• Caster wheeled chairs should have wide, rubber casters.

• Use non-staining mats. Rubber may discolor the floor.

• Frequently moved furniture should be equipped with felt pads to avoid scratching the flooring surface. Heavy furniture and appliances should be equipped with non-staining large surface floor protectors. Furniture with castors or wheels must be easy swiveling, large surface non-staining and suitable for resilient floors.

• Do not use ball type castors as they can damage the floor.

• Use floor protectors under furniture.

• Use walk off mats at entrances to prevent dirt and grit from being tracked on to the floor.

• Sweep or vacuum the floor regularly to remove loose dirt. Do NOT use vacuums that use a beater bar or turn beater bar off.

• Clean up spills immediately.

• Damp mop as needed using clean water and a diluted neutral floor cleaner.

• Do not use harsh cleaners or chemicals on the floor as it can adversely effect the clear floor surface.

• Do not use abrasive scrubbing tools. Do not use detergents, abrasive cleaners or “mop and shine” products.