TEST SCHEDULE
TEST SCHEDULE FOR BROAD BAND MULTIPLAY (BNG & RPR Switch)
Document No TD/ENG/NIB-Broadband/Multiplay/TS No of Pages. 18
Issue No. 01
Issued By: T&D Circle, Jabalpur
Approved By: CGM T&D Circle
Date of Issue: 09-08-2007
Amendment No (If Any)
No of Pages:
Issued by:
D f I
T & D CIRCLE, JABALPUR
“FIX IT RIGHT AT THE FIRST INSTANCE”
TECHNICAL & DEVELOPMENT CIRCLE
JABALPUR
ACCEPTANCE TESTING SCHEDUL (BROADBAND MULTIPLAY)
Page - 1 -
INDEX Multiplay Network Diagram Page 2 PART A- GENERIC TEST SCHEDULE Page 3 - 9 1. PRE-SWITCH ON TESTS
Page 3-4
2. POST-SWITCH ON TESTS Page 5 to 7
2.1 CHECK OF BROADBAND NETWORK GATEWAY
Page 5
2.3 CHECK OF RPR LAN SWITCH (T-I & T-II)
Page 6
PART B – TEST PROCEDURE
Page 8-18
ANNEXURE-I: TEST PROCEDURE FOR POST SWITCH ON TEST OF BNG
Page 8-13
ANNEXURE-III: TEST PROCEDURE FOR RPR T-I & T-II LAN SWITCH
Page 14-18
TECHNICAL & DEVELOPMENT CIRCLE
JABALPUR
ACCEPTANCE TESTING SCHEDUL (BROADBAND MULTIPLAY)
Page - 2 -
Multiplay Network Diagram
Abbreviations • Core Components
– BNG (Broadband Network Gateway) – RPR (Resilient Packet Ring) – OC LAN (Other City LAN)
• Access Components
– DSLAM – CPE
TECHNICAL & DEVELOPMENT CIRCLE
JABALPUR
ACCEPTANCE TESTING SCHEDUL (BROADBAND MULTIPLAY)
Page - 3 -
PART A: GENERIC TEST SCHEDULE
1. PRE-SWITCH ON TESTS (Applicable to all network elements) SL. NO. NAME OF TEST REFERENCE GUIDELINES
1 Check of Earthing System and its Distribution
As per T&D EI and Installation document (EI Ref No.: I-001)
If earth is existing, then earth measurement is to be done, if not feasible, a certificate from planning along with last reading (within six months) to be taken
2. Check of Air Conditioning As per T&D Test Schedule
If existing, required temp. and humidity conditions are to ensured as per node requirement.
3. Check of Fire Alarm System - DO - If existing, it should be operational
4. Check of False Flooring / Antistatic Flooring / False Ceiling
- DO -
In case of Core Router locations only. Optional for others.
5. Check of Engine Alternator - DO - If existing, sufficient capacity and redundancy is to be ensured.
6. Check of Power Plant / Battery including inverter
- DO -
If existing Power plant / battery, sufficient capacity is to be ensured
7. Check of Lighting and Power Outlets
- DO - Should be adequate
8. Check of Cable Laying and Termination
As per Installation Document Should be neatly laced and clean
9. Voltage Drop Test. It should be < 1 Volt 10. Approved Lay out/LAR/BOM,
Approved IP allotment & General Inspection items
As per switching schedule. Approval from planning branch is required.
11. Hardware Conformity Test including racks, Laptop Computers, Spares & Protocol/performance analyzer etc.
As per approved Bill of Material (BOM) for site (Certified from concerned consignee)
12. Check of Optical Fiber patch cord
Penta scanner report/Certificate for GE Cables should be obtained.
13. QA Certificate for the indigenous/imported equipments
QA report is to be insisted Upon (QM333 for indigenous or Factory Test Report for imported items)
14. Check of Documentation Documentation to be provided as per BOM
15. Check of Licensed copy of As per Bill of Material (BOM) As per approved BOM
TECHNICAL & DEVELOPMENT CIRCLE
JABALPUR
ACCEPTANCE TESTING SCHEDUL (BROADBAND MULTIPLAY)
Page - 4 -
Software CDs 16. Check for A/T of Transmission
media to be used Refer relevant EI Ensure that the media is
A/Ted. Obtain certificate from the Installer.
Note: The BOM verification of all the network elements including Servers, UPS, Battery in the nonvalidation sites viz Noida, Chennai also needs to be carried out as part of the AT schedule.
TECHNICAL & DEVELOPMENT CIRCLE
JABALPUR
ACCEPTANCE TESTING SCHEDUL (BROADBAND MULTIPLAY)
Page - 5 -
2. POST SWITCH ON TESTS
2.1 CHECK OF BROADBAND NETWORK GATEWAY(BNG)
SL NO
NAME OF TEST REFERENCE GUIDELINES
1 Power Supply Module redundancy As per Annexure I Test No. 1
2 Main switch controller card Redundancy Test
As per Annexure I Test No. 2
3 Boot Process As per Annexure I Test No. 3
Printout of Boot process in hard copy or soft copy
4 Login as User and Logout (Using Console)
As per Annexure I Test No. 4
5 Login as User and Logout (Using Telnet)
As per Annexure I Test No. 5
6. Check date and time setting As per Annexure I Test No. 6
7. Check log details As per Annexure I Test No. 7
8. Check of Software Version As per Annexure I Test No. 8
9. Backup and Restoration of configuration/Data
As per Annexure I Test No. 9
10. Check of Alarms (Hardware & Software display)
As per Annexure I Test No. 10
11. System User management functions for different levels
As per Annexure I Test No. 11
12. Check IP Pools As per Annexure I Test No. 12
13. Test of GE ports As per Annexure I Test No. 13
14. Check of connectivity for L3PE & available RPR T-1
Use the existing connectivity for L3PE & BNG and T1 & BNG
Verify for the GE interface through ping
15. Checking of power levels of optics Refer respective vendor’s manual
TECHNICAL & DEVELOPMENT CIRCLE
JABALPUR
ACCEPTANCE TESTING SCHEDUL (BROADBAND MULTIPLAY)
Page - 6 -
2.2 CHECK OF RPR LAN SWITCH (T-I & T-II)
SL NO. NAME OF TEST REFERENCE GUIDELINES/Expected
Results
1. Check for Redundancy for Power Supply
As per Annexure III Test No. 1
2. Check for Redundancy for Processor
As per Annexure III Test No. 2
3. Power ON As per Annexure III Test No. 3
Printout of Boot process in hard copy or soft copy
4. Log In and Log Out As per Annexure III Test No. 4
5. Check date and time setting As per Annexure III Test No. 5
6. Check log details As per Annexure III Test No. 6
7. Backup and Restoration As per Annexure III Test No. 7
8. Check of restoration by system reboot
As per Annexure III
Test No. 8
9. Check of Alarms As per Annexure III Test No. 9
10. Check of Software Version As per Annexure III
Test No. 10
11. System User management functions for different levels
As per Annexure III Test No.11
12. Check of proper working for GE & FE ports
As per Annexure III Test No. 12
FE is Applicable only for T-I
13. Check of working & automatic changeover of RPR RING
As per Annexure III Test No. 13
Ensure that there is no interruption of service/traffic.
14 Test on VLAN As per Annexure III Test No. 14
Numbers of VLAN configuration for various services to be verify.
15 Check for MAC addresses As per Annexure III Test No. 15
16. Checking of power levels of optics
Refer respective vendor’s manual
TECHNICAL & DEVELOPMENT CIRCLE
JABALPUR
ACCEPTANCE TESTING SCHEDUL (BROADBAND MULTIPLAY)
Page - 7 -
PART B TEST PROCEDURES
ANNEXURE 1 BROAD BAND NETWORK GATEWAY
Test No:1 Power Supply Module Redundancy
Diagram
Procedure 1. Connect the BNG with the power supply units. Switch ON both power inputs to the BNG using MCB’s.
2. Attach a PC to the management port of the BNG.
3. Ping the Management IP of the BNG from the PC.
4. Switch off one power supply of BNG, by switching off one MCB in PDP or using the switch, on the power supply unit. Ping will not be disturbed.
5. Switch on the power supply and repeat this process with the other power supply as well.
Results Passed Failed
Remarks
Redundancy of the Power supply Modules Tested
Test No: 2 Main switch controller card Redundancy Test
Diagram
CARD / XCRP
CARD / XCRP
CARD / GE
PC
L3PE / PC
Console Cable
Ethernet Cable
BNG
BNG with Redundant
Power Supply Module
PC Console Cable
TECHNICAL & DEVELOPMENT CIRCLE
JABALPUR
ACCEPTANCE TESTING SCHEDUL (BROADBAND MULTIPLAY)
Page - 8 -
Procedure 1) Connect a laptop/PC to the BNG using console 2) Login using Username and Password 3) Check the status of the Controller Cards 4) Connect the GE port of the card to the L3PE (or to PC
through Converter if Network not available) 5) Configure the BNG port with an IP Address and the L3PE /
PC with another IP of the same subnet. 6) Start a ping L3PE / PC to the BNG. 7) Using the console login issue the command “reload switch-
over” in BNG 8) The ping will continue after switch-over
Note: Primarily XCRP in slot no 7 is master and that in slot number 8 is slave. To test the failover mechanism use the following command: reload switch-over Now XCRP in slot 8 is the master and that in slot 7 is the slave.
Results Passed Failed
Remarks Switchover between the master and slave supported
Test No: 3 Boot Process
Ref Figure
Procedure 1. Connect to the console port located on the controller card and labeled “Craft 2” using the console cable. The other end being connected to the PC
2. Launch the Hyper terminal application from the PC with the following parameters (9600,N,8,1,no flow control)
3. Reboot the BNG and check for the boot process being displayed on the hyper terminal
Results Passed Failed
Remarks
Boot Process successfully tested
BNG PC
Console Cable
TECHNICAL & DEVELOPMENT CIRCLE
JABALPUR
ACCEPTANCE TESTING SCHEDUL (BROADBAND MULTIPLAY)
Page - 9 -
Test No:4 Login as User and Logout (From console)
Diagram
Procedure 1. Power should be connected and the system should be working
2. Connect to the console port—Located on the controller card and labeled “Craft 2” using the console cable. The other end being connected to the PC
3. Launch the Hyper terminal application from the PC with the following parameters
4. (9600,N,8,1,no flow control)
5. Enter the configured username and password
6. To quit , type the command “ EXIT ”
7. Relogin again
Results Passed Failed
Remarks
Console Login tested
Test No : 5 Login as User and Logout (From Telnet Session)
Diagram
Procedure 1. Power should be connected and the system should be working
2. The BNG should have been configured with a Management IP , user along with a password.
3. Connect to the Ethernet management port—Located on the
BNG PC
Console Cable
BNG PC
Cross Cable
TECHNICAL & DEVELOPMENT CIRCLE
JABALPUR
ACCEPTANCE TESTING SCHEDUL (BROADBAND MULTIPLAY)
Page - 10 -
controller card and labeled “ENET”; We can connect a terminal to the system over a LAN using this port
4. Launch the telnet application into the BNG using the management IP
5. Enter the configured username and password
6. To quit , type the command “ EXIT”
7. Relogin again
Results Passed Failed
Remarks Telnet Login tested
Test No:6 Check date and time setting
Diagram
Procedure 1. Connect to the BNG either by using console or Telnet
2. Enter the user name and password when prompted
3. To check the system date and time , type the following command:
[local]Redback>show clock The output should be as follows: Wed Apr 12 17:03:49 2006 GMT NOTE : The time displayed is based on configuration information provided using the clock set command (in exec mode) and the system clock timezone command (in global configuration mode). If no time zone is configured as the local time zone, the system uses GMT as the default time zone.
Results Passed Failed
Remarks
Date and Time parameters can be set as per requirement
BNG PC
Console Cable
TECHNICAL & DEVELOPMENT CIRCLE
JABALPUR
ACCEPTANCE TESTING SCHEDUL (BROADBAND MULTIPLAY)
Page - 11 -
Test No:7 Check log details
Diagram
Procedure 1) Connect to the BNG 2) Type the following command:
show log [active | file filename] [all | fac log-fac-name | tdm-console ] [level level] [since start-time] [until end-time] Displays information about system event logs or a previously saved log file. Moreover , when we enter the reload command from the command-line interface (CLI), or a reboot command from the bootrom, the system copies its log and debug buffers into these two special files: /md/loggd_dlog.bin and /md/loggd_ddbg.bin. As an aid to debugging, we can display these files using the show log command: show log file /md/loggd_dlog.bin show log file /md/loggd_ddbg.bin
Results Passed Failed
Remarks Logging feature enabled in the BNG
Test No :8 Check of software version
Procedure 1) Log into the system 2) To check the software version execute the command at CLI Mode to check the software version.
Results Passed Failed
Remarks
Checked the software version
BNG PC
Console Cable
BNG PC
Console Cable
TECHNICAL & DEVELOPMENT CIRCLE
JABALPUR
ACCEPTANCE TESTING SCHEDUL (BROADBAND MULTIPLAY)
Page - 12 -
Test No :9 Backup & Restoration of configuration
Diagram
Procedure 1) Connect to the BNG using the Console or Ethernet port.
2) The following is the commands to take back up: Save config [device | URL ] filename Eg save config /flash/redback.cfg
3) To copy a file to the external drive , use : copy /flash/redback.cfg /md/redback.cfg
4) To copy a file back to flash:
Copy /md/redback.cfg /flash/redback.cfg
5) To Remove a file:
Delete <filename>
Results Passed Failed
Remarks Backup and Restoration of configurations are possible
Test No :10 Check of Alarms
Diagram
Procedure 1) Log into the system 2) To check the alarms type the following command: show system alarm [all | slot[/port[:chan-num[:sub-chan-num]]]] Displays system-level, card-level, port-level, channel-level, or subchannel-level alarms. By Default Displays system-level alarms only. Eg. [local]Redback>show system alarm [local]Redback#show system alarm 4 [local]Redback#show system alarm 13/2
Results Passed Failed
Remarks Use the show system alarm command to display system-level, card-level, port-level, channel-level, or subchannel-level alarms.
BNG PC ( TFTP
Server)
Cross Cable
BNG PC
Console Cable
TECHNICAL & DEVELOPMENT CIRCLE
JABALPUR
ACCEPTANCE TESTING SCHEDUL (BROADBAND MULTIPLAY)
Page - 13 -
Test No: 11 System User management functions for different levels
Diagram
Procedure 1. Create two contexts ie Local and test
2. Create an administrator account in each of the contexts with different privileges
3. First login using administrator@local and type the command :Show config
4. Then login using administrator@test and type the command :Show config
5. Check for the privileges in each of the modes
Results Passed Failed
Remarks
An administrator authenticated to the “local” context, given appropriate administrator privileges, can configure all functions on the Smart Edge router, including functions for each context, and global entities, such as ports, port profiles, SNMP, and so on. Non-local administrators have no configuration mode privileges, and have restricted exec mode privileges.
Test No: 12 Check IP pools
Diagram
Procedure 1) Login to the BNG 2) Configure a context ip-dial with an ip pool 3) Type the following command :
show ip pool [name] [context summary] Displays the status of the IP addresses in the specified IP pool, in all IP pools in the specified interface, or in all IP pools in the current context or range.
BNG PC
Console Cable
BNG PC
Console Cable
TECHNICAL & DEVELOPMENT CIRCLE
JABALPUR
ACCEPTANCE TESTING SCHEDUL (BROADBAND MULTIPLAY)
Page - 14 -
Eg: [local]Redback>context ip-dial [ip-dial]Redback>show ip pool
Results Passed Failed
Remarks Check the IP Pools and also info like available addresses and reserved addresses from the pool.
Test No: 13 Test of GE ports Diagram
Procedure 1. Connect a laptop/PC to the BNG using console 2. Login using Username and Password 3. Connect the GE port of the BNG to the L3PE (or to PC through Converter if Network not available) 1) Configure the BNG port with an IP Address and the L3PE / PC
with another IP of the same subnet. 4. Check the LED status of the GE port. Check the status from Console. Use command : Show Port 5. Start a ping L3PE / PC to the BNG.
Results Passed Failed
Remarks GE ports are active and functional
CARD / XCRP
CARD / XCRP
CARD / GE
PC
L3PE / PC
Console Cable
Ethernet Cable
BNG
TECHNICAL & DEVELOPMENT CIRCLE
JABALPUR
ACCEPTANCE TESTING SCHEDUL (BROADBAND MULTIPLAY)
Page - 15 -
ANNEXURE II TEST PROCEDURE FOR RPR T-I & T-II LAN SWITCH
Test Item:1 Power Supply redundancy
Procedure 1. Set up Switch with two PWIN cards
2. Connect PC to Console Port
3. Ping to Switch’s self IP
3. Pull out one PWIN card, observe the ping is still working.
Results Passed Failed Test Item:2 Check for Redundancy for Processor
Procedure 1. Set up Switch with two OAM cards
2. Connect PC to Console Port
3. Ping to Switch’s self IP
4. Pull out active OAM card and observe the stand-by OAM card takes over the control of the system
5. Observe the ping is still working
Results Passed Failed Test Item:3 Boot Process
Procedure 1. Select a card 2. Select reboot mode with hard reboot or soft reboot 3. Observe cards alarm LED status
Results Passed Failed Test Item:4 Login and Logout (From console)
Procedure 1. Connect Switch through Hyper Terminal from PC/Laptop
2. Login with user name and password
3. Telnet to shelf IP address of switch
4. Exit for logout
Results Passed Failed Test Item:5 Check date and time setting
Procedure 1. Set the Switch Time & Date 2. Change the Switch Time & Date 3. Observe the change
Results Passed Failed
TECHNICAL & DEVELOPMENT CIRCLE
JABALPUR
ACCEPTANCE TESTING SCHEDUL (BROADBAND MULTIPLAY)
Page - 16 -
Test Item:6 Check log details
Procedure 1. Select Log management
2. System Log
3. Operation Log
4. History session
Results Passed Failed Test Item:7 Backup and Restoration of configuration
Procedure 1. Select Backup / Restore from Tools
2. Select Switch and select directory of Server
3. FTP user Name and password
4. Back up or restore
Results Passed Failed Test Item:8 Check of Restoration by system reboot (through Console)
Procedure 1. Connect PC to console port 2. Do reboot through command & observe restoration 3. Do reboot through on/off switch & observe restoration 4. Observe cards & alarm LED status
Results Passed Failed Test Item:9 Check of Alarms
Procedure 1. check all current alarm management in OMC-O GUI
2. check all history alarm management in OMC-O GUI
3. check NE current alarm management in OMC-O GUI
4. check NE history alarm management in OMC-O GUI
Results Passed Failed Test No :10 Check of software version
Procedure 1) Log into the system 2) To check the software version execute the command at CLI Mode to check the software version.
Results Passed Failed
Remarks Checked the software version
TECHNICAL & DEVELOPMENT CIRCLE
JABALPUR
ACCEPTANCE TESTING SCHEDUL (BROADBAND MULTIPLAY)
Page - 17 -
Test Item:11 System User management functions for different levels
Procedure 1. create monitor user in security management menu
2. create admin user in security management menu
3. create operation user in security management menu
Results Passed Failed Test Item:12 Check of proper working for GE & FE module
Procedure 1. Connect the Link to OCLAN switch (or a PC using converter if
Network not available) to the FE port of the switch.
2. Connect a DSLAM to the GE port of the switch (or a PC using
converter if Network not available).
3. Enable the GE / FE ports.
4. Check the GE / FE port’s status.
5. Disconnect the GE/ FE, check the status of GE/ FE port.
Results Passed Failed Test Item:13 Check of working & automatic change over of RPR RING
Procedure
NE1 NE2 NE3R0_a
R1_a
R0_b
R1_b
R1_c
R0_c
pc1 pc2
1. Connect a DSLAM to the GE port (or a PC using converter if
Network not available) of the switch (NE1 in figure)
2. Ping to the BNG or other RPR switch (NE2) ip address from
DSLAM (or from PC if DSLAM not available)
3. Remove the fiber connection between NE1 & NE2
4. Observe the service; it should be normal.
Results Passed Failed Test Item:14 Test on VLAN
Procedure 1. Connect two DSLAM (or two PC using converter if network not
TECHNICAL & DEVELOPMENT CIRCLE
JABALPUR
ACCEPTANCE TESTING SCHEDUL (BROADBAND MULTIPLAY)
Page - 18 -
available) to the switch
2. Create Ethernet service, set up service’s VLAN ID 10 for both
the devices
3. Ping from one DSLAM to other (or between two PCs) and the
operation shall succeed
4. Change the service’s VALN ID into another value for one device
5. Repeat step3 and ping will fail
Results Passed Failed Test Item:15 Check for MAC addresses
Procedure 1. Connect two DSLAM (or two PC using converter if Network not available) to the switch
2. Create Ethernet service, set up service’s VLAN ID 10 for both
the devices
3. Ping from one DSLAM to other (or between two PCs) and the
operation shall succeed
4. Check L2 Unicast Forward state Table and query the port status 5. Observe the MAC addresses
Results Passed Failed