RIVE
R ST
REET
SINA
TRA
DRIV
E
EASEMENT
PROPERTY LINE
EASE
MENT
PROP
ERTY
LINE
PROPERTY LINE
DN
OVERHANG
PORT
E CO
CHER
E OVE
RHAN
G
NEWARK STREET
SHARED REAR ACCESS
USPS LOADING
HOTELLOADING
HOTEL LOBBY
HOTELENTRY
WILEY BUILDING
95 RIVER STREET
POST OFFICE
BIKEPATH
765421 3
(PROPOSED,EXISTING 2 WAY)
1
2
ELEV: 7'-0"
ELEV: 10'-0"
WILEY LOADINGPARKING ENTRANCE
EXISTING PARALLEL PARKING
1 2 3 4 5 6 7 8 9 10 11 12 13
1ST STREET
(PROPOSED,EXISTING 1 WAY)
PRO
POSE
D PA
RALL
EL P
ARKIN
G
3
4
5
8
14
ELEV: 17' - 0"
ELEV: 7' - 0"
APPROX. 9%RAMP DN TOP.O. PARKING
4.5% RAMPTRANSITION
P.O. LLV FOOTPRINT
RETAIL
PROPOSED ANGLED PARKING
TOWER EDGE
ELEV: 10'-0"
ELEV: 14'-0"
LAUNDRY
FIREPROTECTION
PANTRY
CIRCULATION
1
2
3
4
5
6
7
8
ELEV: 10'-10"
USPSPARKING
1
2
3
PROPOSEDCURB CUT &RAMP TO USPSPARKINGGARAGE
EASEMENT
EASEMENT
ATLANTA WASHINGTON NEW YORK
©
75 Broad StreetSuite 2210New York, NY 10004(212) 691-0271www.coopercarry.com
SCOPE DOCUMENTS
The Construction Documents have not been completed therefore this drawing may beincomplete or not coordinated. The documents issued indicate the general scope ofthe Project. The Contractor is responsible for complete and coordinated pricing andWork, and shall include all items necessary for the proper execution and completionof the Project, whether indicated or not. All components of the Project shall complywith any and all requirements of national, state, and local codes. The Contractor shallinform the Owner and Architect of any omissions, inconsistencies or errors in theinformation provided. If no notice is given and any omissions, inconsistencies orerrors are discovered, the Architect's decisions on items of Work included in thescope shall be binding on the Contractor, when consistent with the general scope andquality of the Project.
Principal-in-Charge
Project Manager
Project Architect
Staff Architect
Project No.
Date
Drawing No.
NOT ISSUED FOR CONSTRUCTION
1
A
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
BC
DE
FG
HJ
KL
MN
P
AB
CD
EF
GH
JK
LM
NP
Copyright Cooper Carry 2016
Q:\2
012\
2012
0240
\d-7
dra
win
gs\d
-7-1
revi
t\use
rs\2
0120
240_
2015
_sch
eme_
25_g
oeth
e020
41.rv
t4/
2 6/2
016
10:4
8 :58
AM
A1.01
2016.03.17
20120240.01JBW
JA
JA
WG
SITE PLAN
RIVERFRONT HOTEL ANDPOST OFFICE RENOVATION
SCHEME 25
Hoboken, New Jersey
KMS Development
PROJ
ECT N
UMBE
R: 20
1202
40.01
PR O
JECT
NAM
E: R
IVER
FRON
T HO T
EL A
N D P
OST O
FFIC
E RE
NOV A
TION
S CHE
ME 25
SHE E
T NUM
BER:
A1 .0
1 - S
I TE P
LAN
ISSUANCESNo. Drawing Issue Description Date
SCALE: 1/16" = 1'-0"A1.011 SITE PLAN
PROJECT N°
75 Broad Street, Suite 2210, New York, New York Tel.212-691-0271© 2016 , Inc.,C COOPER ARRY
20120240.01 05/06/16 AERIAL VIEWS
RIVERFRONT HOTEL AND POST OFFICE RENOVATION Hoboken, New Jersey
Looking Northeast
Looking East Looking Southwest
PROJECT N°
75 Broad Street, Suite 2210, New York, New York Tel.212-691-0271© 2016 , Inc.,C COOPER ARRY
20120240.01 05/06/16 AERIAL VIEWS
RIVERFRONT HOTEL AND POST OFFICE RENOVATION Hoboken, New Jersey