Network planning and optimization Mci network fulfillment project Tehran T3109 Timer trial 24 th august 2013
Transcript

Network planning and optimizationMci network fulfillment projectTehran

T3109 Timer trial24th august 2013

MCCI Iran Presentation | Commercial in confidence | © Ericsson AB 2012 | 2012-03-13

SUMMARY

• Timer T3109 (Supervision of the channel release procedure ) was changed for b063N from 12 to 15 s

• The timer T3109 supervises the channel release procedure. • Timer start condition: The timer T3109 starts when the BSC

sends a CHANNEL_REL message to the MS (via a BTS). • Timer stop condition: The timer T3109 stops when the BTS

sends a RELEASE_INDICATION message. This is done after the BTS has received a DISC-frame from the MS.

• Action performed on timer expiry: When the timer T3109 expires, the BSC sends an RF_CHANNEL_REL message to the BTS.

• Appropriate value: Min. = 8 s.Max. = 15 s.Def. = 12 s

• It is expected to improve drops during channel release procedure due to t3109 timer expiry

MCCI Iran Presentation | Commercial in confidence | © Ericsson AB 2012 | 2012-03-13

Signaling diagram

MCCI Iran Presentation | Commercial in confidence | © Ericsson AB 2012 | 2012-03-13

TCH Traffic vs cdr

TIMER WAS CHANGED

STABLE

MCCI Iran Presentation | Commercial in confidence | © Ericsson AB 2012 | 2012-03-13

TCH Traffic vs ccc

TIMER was changed

STABLE

MCCI Iran Presentation | Commercial in confidence | © Ericsson AB 2012 | 2012-03-13

B063n – TCH Traffic vs Cssr

Timer changed

STABLE

MCCI Iran Presentation | Commercial in confidence | © Ericsson AB 2012 | 2012-03-13

B063n – SD Traffic vs SDR

Timer changed

MCCI Iran Presentation | Commercial in confidence | © Ericsson AB 2012 | 2012-03-13

• Timer Change was implemented on 21st August

• No Major Change observed in KPIs up till now.

• KPIs are still under observation after weekend and further update will be done in case of any impact

results

MCCI Iran Presentation | Commercial in confidence | © Ericsson AB 2012 | 2012-03-13

SDCCH establishment & TASR

• SDCCH establishment rate & TASR are satisfactory, Improvement in SDCCH establishment rate is expected with the improvement in SDCCH drop rate


Recommended