ii
TABLE OF CONTENT
Page number PREFACE .................................................................................................................... i
TABLE OF CONTENT ............................................................................................... ii
CHAPTER I INTRODUCTION
1.1. Background. ....................................................................................... I-1
1.2. Purpose and Objective ....................................................................... I-2
1.2.1. Purpose of Environmental Management ................................ I-2
1.2.2. Objective of Environmental Management. ............................ 1-2
CHAPTER II ENVIRONMENTAL MANAGEMENT APPROACH
2.1. Technological Approach. ................................................................... II-1
2.2. Socio-Economic Approach ................................................................ II-1
2.3. Institutional Approach. ...................................................................... II-2
CHAPTER III ENVIRONMENTAL MANAGEMENT PLAN
3.1. Pre-Construction Phase ...................................................................... III-1
3.1.1. Survey and Land Measurement .............................................. III-1
3.2. Construction Phase ............................................................................ III-6
3.3. Post Construction Phase (Operation) ................................................ III-30
Appendix :
Environmental Management Plan (Figure)
iii
LIST OF TABLES
Page number Table 3.1. Type of Vegetation for Greenery along Toll Road ................................. III-20
Table 3.2. Environmental Management Plan Matrix ............................................... III-38
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
I - 1
CHAPTER I
INTRODUCTION
1.1. Background
Background of the implementation plan for Cikampek - Palimanan toll road
development activities throughout ± 116.4 km, in West Java Province, among others, is to
provide the highway transportation system that efficiently with a high level of service to
support the national economy.
Cikampek - Palimanan Toll Road Development Plan is one of the toll road network
improvement program in Indonesia, initiated by the Government of the Republic of
Indonesia through the Toll Road Regulatory Body (BPJT), while supporting the
establishment of road networks connecting Sumatra, Java and Bali.
Location of Toll Road Development plan covers five regencies: Purwakarta, Subang,
Majalengka, Indramayu and Cirebon with an area of land needed is ± 765.6 ha. With the
construction of Cikampek - Palimanan toll roads connecting Jakarta to Cikampek from
Cikopo to Kanci toll road, with lane width 2 x (2x 3.6) m, is expected to support the
national highway development program and speed up the distance between regions on
the island of Java.
In order to preserve natural resources and increase the carrying capacity, and considering
that Cikampek-Palimanan toll road construction activities are expected to have impacts,
both effects are positive or negative for each stage of the project activity. It is necessary to
study the environment in accordance with the Decree of the Minister of Environment
Number Kep-17/MENLH/2001.
In an effort to reduce negative impacts, the proponent acting as a license holder in its
implementation would complement its activities with the Environmental Management Plan
and Environmental Monitoring Plans (RKL and RPL). Through this study, some
environmental problems can be identified early, so it can be anticipated by arranging step
handling. Thus is created a model of sustainable development and environmentally
sound. Preparation of RKL-RPL of Palimanan Cikampek toll road refers to the Regulation
of the Minister of Environment No.08 Year 2006 on Guidelines for Preparing
Environmental Management Plan and Environmental Monitoring Plan (RKL-RPL) and the
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
I - 2
Decree of the Minister of Environment No. 17 of 2001 on Types of Business Plan And / Or
Activity That Must Complete The Environmental Impact Analysis.
1.2. Purpose and Objective of Environmental Management
1.2.1. Purpose of Environmental Management
• Ensuring that activities Cikampek-Palimanan Manager Toll will comply with the
provisions of environmentally sustainable development with natural resource
management so that they can be utilized as well as possible for economic and
social development.
• Manage the environmental changes brought about by the construction and
development of Cikampek - Palimanan toll roads, so that environmental quality is
really protected.
• Increase the positive impact (benefit) and control or mitigate the negative impacts
(risks).
• Comply with all applicable laws relating to pollution control, waste management
and environmental quality control.
1.2.2. Environmental Management Objectives
• Ensuring that environmental changes caused by Cikampek-Palimanan Toll Road
development activities which is located in five regencies (Purwakarta-Subang-
Majalengka-Indramayu-Cirebon) West Java Province still maintain the quality of
the environment.
• Maintain and preserve the environmental quality around the Palimanan Cikampek
toll road development site and development along the corridor of ± 116.4 km.
• Improve or develop positive impact and control the negative impacts due to
construction activities of Cikampek-Palimanan Toll Road and the development
along these corridors.
• Applying the proposed mechanism for coordination of environmental impact
management activities with related agencies in the implementation of
environmental management.
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
II - 1
CHAPTER II
ENVIRONMENTAL MANAGEMENT APPROACH
Environmental Management Approach
To address the significant impacts that have been evaluated in EIA study, it can use one
or several environmental management approaches namely, technological, social and
economic, and institutional.
2.1. Technology Approach
Environmental management through technology approach is the application of science
and engineering in finding practical solutions to overcome the effects arising from the
construction of Peudada-Suplesi-Nalan line and development of Cikampek-Palimanan toll
roads throughout ± 116.4 km, in five districts (Purwakarta-Subang-Majalengka -
Indramayu-Cirebon), West Java Province.
2.2. Socio-Economic Approach
This approach includes the steps to be taken by the proponent as an effort to overcome
the significant environmental impacts, through measures based on social interaction,
economics and culture and supports the role of government. The activities include:
1) Enter into management based on social interaction, by way of involving
communities around the location of activities. How this is done in order to get a
sense of community participation in environmental management around the
location of activities.
2) Perform community restitution of all property affected by construction activities,
with the compensation given to the principle of mutual benefit.
3) Trying to establish harmonious social relationships with people that are around the
location of activities, intended so to avoid any jealousy towards activities undertaken on
site activities.
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
II - 2
2.3. Institutional Approach
This approach is the institutional mechanism that will be the proponent’s efforts in order to
overcome the large and important impact of the environment, the activities include:
(1) Cooperation with agencies concerned and related to environmental management,
in areas in five regencies (Purwakarta-Subang-Majalengka-Indramayu-Cirebon)
and West Java Province.
(2) The monitoring of the performance of environmental management by the relevant
authorities.
(3) Reporting the results of environmental management on a regular basis to the
parties concerned.
(4) Establish the organizational unit (division) is responsible in the field of
environmental management.
(5) Delivery of the members / staff of the environmental division for training (training)
in the environmental field.
(6) Reporting the results of environmental management that have been made to the
appropriate authorities and interested parties.
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 1
CHAPTER III
ENVIRONMENTAL MANAGEMENT PLAN
In the environmental management plan prepared in a structured way the various aspects
that need to be managed as the following:
a. Significant impacts and sources of significant impacts
• Environmental Components
• Source impact
b. Measurement of impact
c. The purpose of the environmental management plan
d. Environmental management
e. Location of environmental management
f. Periods of environmental management
g. Financing of environmental management
h. Institutions for environmental management
• Implementing environmental management
• Supervision of environmental management
• Reporting the results of environmental management
3.1. Pre-Construction Stage
In the pre-construction components that need to be managed is the restlessness of
society as a result of activity measurement and installation of stakes and land preparation.
3.1.1. Land Survey and Measurement
1. The emergence of community unrest
(1) Source of Significant Impacts
Components of the Environment : Socio-Cultural.
Impact Source : Survey of land measurement
(2) Measurement of Impact
Community unrest can be observed in society with the emergence of public opinion about
the likelihood and extent of public land that will be affected by development.
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 2
(3) Environmental Management Objectives
Management was conducted in order to suppress the emergence of unrest community as
small as possible, so that people can accept with a good plan to build Cikampek-
Palimanan toll roads and development in five regencies; Purwakarta, Subang,
Majalengka, Indramayu and Cirebon.
(4) Environmental Management
Management Efforts are made to anticipate the impact by:
- Perform persuasive approach and give an explanation to the public about the
purposes and objectives of Cikampek-Palimanan toll road development along the
corridor ± 116.4 km, which is to meet transportation needs in West Java in
particular and National general.
- Provide clear information about the activities of measuring and installation of
stakes and area limit of Cikampek-Palimanan toll road development activities.
- Explaining to the public about the need for the required land for the construction of
Cikampek-Palimanan toll road, and development areas along the corridor of ±
116.4 km, and other complementary buildings to be constructed such as flood
control drainage channels, bridges, (JPO), rest area (resting place) Interchange
(IC) and others.
Hence, the development activities will not cause unrest to the emergence of a negative
impact if these buildings were built.
(5) Location of Environmental Management
Location management at field sites used for the physical buildings of Cikampek-
Palimanan toll road and other auxiliary buildings and the residential population in the sub-
district to village level in five regions of the district.
(6) Period of Environmental Management
It begins since toll road development plans and corridors ± 116.4 km and each week
delivered at the time of measurement activities and the installation of stakes in the
location.
(7) Implementing Institution of Environmental Management
Executor: Proponent of Cikampek-Palimanan toll road construction
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 3
Village and Sub-district Head of 5 Regencies
Land Agency in 5 Regencies
Supervisor: Office of Public Works and Social Service in 5 regencies
Reporting: Environmental Protection Agency West Java Province
BPLHD, Regent of Purwakarta, Subang, Majalengka,
Indramayu and Cirebon
BPJT-Department of Public Works
2. The emergence of Social Conflict
(1) Source of Significant Impacts
Components of the Environment: Social economic and cultural
Source of Impact: The procurement of land for construction of toll roads
(2) Benchmark Impact
Public unrest, especially in Babakan village Ciwaringin, with the emergence of public
opinion who disagrees toll road route through the nearby Islamic boarding House of
Babakan Ciwaringin so there are pros and cons of land acquisition carried out by the TPT.
(3) Environmental Management Objectives
Environmental management was conducted in order to suppress small as possible
occurrence of horizontal violence in rural communities Babakan due to land acquisition
activities for the construction of Cikampek toll road.
(4) Environmental Management
Management Efforts are made to anticipate these impacts by:
- Perform persuasive approach and give an explanation to the public about the
mechanism of land acquisition by the government.
- Provide clear information about the activities of the determination of compensation
value of the land as government policy areas and the central government.
(5) Location of Environmental Management
Location management is in Babakan village, particularly around Islamic boarding schools
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 4
of Ciwaringin.
(6) Period of Environmental Management
Made since the initial plan of land acquisition for highway purposes and periodically
carried out every single month.
7) Environmental management institutions
Executor: Proponent of Cikampek-Palimanan toll road development, Sub-destrict head of
Ciwaringin, and BPN Cirebon
Supervisor: Office of Public Works and Highways Office of Cirebon, Environmental
Protection Agency of Cirebon
Reporting: BPLHD West Java Province, regent of Cirebon, BPJT-Department of Public
Works
3. Reduced Income
(1) Source of Significant Impacts
Components of the Environment: Social economic and cultural
Impact Source: Land Acquisition for Toll Road Development
(2) Benchmark Impact
Unrest that emerged in communities occurs due acquisitions of farmer-owned land such
as rice fields and gardens and others.
(3) Environmental Management Objectives
Environmental management is intended to make rice fields which is a source of income
for residents receive appropriate compensation value, and irrigation networks that passed
the motorway network can be maintained smoothness.
(4) Environmental Management
Management Efforts are made to anticipate the impact by:
- To socialize continuously since the preparation of land acquisition through the
implementation process of land acquisition, about the toll road development plans
and the value of wetland compensation to be received by a resident of lowland rice
fields affected by the project.
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 5
- Create technical designs that accommodate the interests of the smooth process of
the drainage of irrigation water in paddy field population.
- Together with relevant agencies both at the central provincial and district levels, to
disseminate the results of the utilization of land compensation money, in the form
of counseling.
(5) Location of Environmental Management
Location Management of the village across the fields affected by land acquisition for the
project needs.
(6) Period of Environmental Management
Period Management conducted periodically every month during the land acquisition
activities is conducted.
(7) Institution of Environmental management
Executor: Proponent Palimanan Cikampek toll road construction, Sub-district heads and
village heads in the 5 regencies, Land Agency in 5 regencies and West Java Province.
Supervisors: Public Works Department of Highways, Department of Environment in 5
regencies
Reporting: BPLHD West Java Province, Regent of Purwakarta, Subang, Majalengka,
Indramayu and Cirebon, BPJT-Department of Public Works.
3.2. Construction Phase
At the construction stage there are significant negative impacts and positive impacts that
need to be managed for significant negative impacts can be minimized or eliminated and
the positive impact of improved. The negative impact that emerges is a negative
perception of society, and the decline in public health, while positive impacts include
increased revenue, opening up employment and try and increase the livelihoods of local
communities.
A. Components of Physical - Chemical
1. Reduced Air Quality
(1) Source of Impact
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 6
Components of the Environment: Air Quality
Source Impact: Operational project vehicles
(2) Benchmark Impact
Air dust levels were observed visually (observation) and the complaints from the public
due to the many dust or air dust concentration measurements of air quality monitoring
results.
(3) Environmental Management Objectives
To prevent or reduce the occurrence of elevated levels of dust in the air because the
roads are not paved over, particularly those close to residential areas, reducing the
negative perception of society towards the project and further prevent the situation was
not an aesthetic as well as decline in public health.
(4) Environmental Management
Efforts are made to handle the impact of increased dust is as follows:
• Air trucks must have a cover with plastic or tarps;
• The volume of cargo tonnage or height does not exceed the truck;
• Clean the tires first project vehicles before entering a public road.
• Reduce vehicle speed to 20 km / h, especially in the vicinity of human settlement;
• Watering the road vehicle through which the road project with water especially
near and through the settlement in the dry season;
• In the rainy season, road damage easily occurs, for example, road potholes,
muddy, so the project should fix it immediately.
(5) Location of Environmental Management
Performed along the road passed by the project vehicles, especially those that pass
through residential villages in 5 regencies; Purwakarta, Subang, Majalengka, Indramayu
and Cirebon.
(6) Period of Environmental Management
Made at any time or as needed, followed by related activities during the construction
phase.
(7) Institute of Environmental management
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 7
Executing: Executing Contractor Toll Road Development.
Supervisor: Environmental Office in 5 regencies, Department of Health in 5 regencies.
Reporting: BPLHD West Java Province, Regent of Purwakarta, Subang, Majalengka,
Indramayu and Cirebon, BPJT-Department of Public Works
2. Increased Noise
(1) Source Impact
Components of the Environment: Noise Quality
Source of Impact: Cleaning and Preparation of the subgrade and Operations project
vehicles.
(2) Benchmark Impact
The increased noise at the location of settlements and access roads.
(3) Environmental Management Objectives
Minimize the noise level that occurred in residential areas.
(4) Environmental Management
Efforts are made to handle the impact of increased noise is as follows:
- Setting the implementation of good construction and adequate.
- Locations of batching plants are far from settlements.
- Setting heavy vehicle operations and vehicle projects for the noise that comes
from these vehicles do not disturb residents in the nearest settlement, where
operating hours are socialized with the local community.
(5) Location of Environmental Management
Conducted along the path traversed by the vehicle projects, particularly those in rural
residential areas through five regencies; Purwakarta, Subang, Majalengka, Indramayu
and Cirebon.
(6) Period of Environmental Management
Made at any time or as needed, follow-related activities during the construction phase of
every 1-month.
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 8
(7) Institution of Environmental management
Executing: Executing activities Contractor
Supervisor: Office of Public Works Highways, Proponent of Toll road
Reporting: EPA of West Java Province, Regent of Purwakarta, Subang, Majalengka,
Indramayu and Cirebon, Governor of West Java Province
3. Reduced Surface Water Quality
(1) Source Impact
Components of the Environment: The quality of river water and river water quality.
Source of Impact: Cleaning of land, construction of toll roads and buildings complement.
(2) Benchmark Impact
Decreasing water quality that is on the highway alignment.
(3) Environmental Management Objectives
Prevent / reduce the change of surface water and groundwater.
(4) Environmental Management
Efforts are made to mitigate water quality degradation of the river are as follows:
- Setting a good implementation
- Making channels gatherer
- Making temporary dike
(5) Location of Environmental Management
Carried out along the highway alignment, in the village, subdistrict in 5 regencies;
Purwakarta, Subang, Majalengka, Indramayu and Cirebon.
(6) Period of Environmental Management
Made at any time or as needed, following the course of construction activities.
(7) Institution of Environmental management:
Executing: Executing activities Contractor
Supervisor: Office of Public Works, Proponent Toll road operator
Reporting: BPLHD West Java Province, Regent of Purwakarta, Subang, Majalengka,
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 9
Indramayu and Cirebon, Governor of West Java Province
4. Impaired Surface Water Flow
(1) Source Impact
Components of the Environment: The quality of river water and river water quality.
Source of Impact: Cleaning of land, construction of toll roads and buildings complement.
(2) Benchmark Impact
Disturbance of vegetation has resulted in changes in surface water flow patterns, and
disruption of farming communities cropping pattern in the study area. The occurrence of
local inundation has resulted from disruption of the flow of surface water by extractive
materials.
(3) Environmental Management Objectives
Reduce / minimize disruption to plant rice field drainage into the population, also made in
order that the drainage remain smooth and well directed in accorandce with its original
state.
(4) Environmental Management
Efforts are made to mitigate water quality degradation of the river are as follows:
- Setting of construction activity, adjusted for planting and harvesting schedules.
- To coordinate with related agencies for the management of technical irrigation
channel in the alignment of the highway.
- Make surface water drainage in accorandce with the direction of pre-existing
natural flow with the appropriate dimensions.
(5) Location of Environmental Management
Carried out along the highway alignment, in the villages, sub-districts, in 5 regencies;
Purwakarta, Subang, Majalengka, Indramayu and Cirebon.
(6) Period of Environmental Management
Made at any time or as needed during the construction progress, and follow the activities
of the construction phase, at least 3 months.
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 10
(7) Institution of Environmental management:
Executing: Executing activities Contractor
Supervisors: Public Works Department of Highways, Proponent of Toll road
Reporting: BPLHD West Java Province, Regent of Purwakarta, Subang, Majalengka,
Indramayu and Cirebon. Governor of West Java Province, BPJT-Department of Public
Works
5. Occurrence of Soil Erosion
(1) Source Impact
Components of the Environment: The quality of river water and river water quality
Source of Impact: Cleaning of land, excavation and embankment.
(2) Benchmark Impact
Disturbance of slope stability and increased sediment in surface runoff and rivers are
crossed by the highway plan.
(3) Environmental Management Objectives
In an effort to prevent soil erosion caused by excavation and embankment work on the
cliff. Prevent the run-off of sediment in surface water and river channel crossed by the
highway plan.
(4) Environmental Management
Efforts are made to mitigate soil erosion are as follows:
- Do not cut too steep cliff
- Create a cap on the cliff excavation results by planting trees or by sloop protection
(retaining wall) of masonry or reinforced concrete.
(5) Location of Environmental Management
Location management in a location which made cutting the cliff and at locations that are
too upright embankment along the highway.
(6) Period of Environmental Management
Management during the construction period lasts and is permanent, at least 3 months.
(7) Institution of Environmental management:
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 11
Executing: Executing activities Contractor
Supervisors: Public Works Department of Highways, District Environmental Office,
Proponent of Toll road operator.
Reporting: BPLHD West Java Province, Regent of Purwakarta, Subang, Majalengka,
Indramayu and Cirebon. Governor of West Java Province, BPJT-Department of Public
Works
6. Groundwater Flow Disturbance
(1) Source Impact
Environmental Components: The quantity of shallow groundwater
Source of impact: Activities soil excavation and embankment for the road
(2) Benchmark Impact
Inhibition of ground water flow resulting in disruption of water sources such as springs,
wells population and construction of the road damage due to ground water flow is
obstructed.
(3) Environmental Management Objectives
Prevent disruption of water sources such as springs, wells resident of the damage, as well
as prevent damage to the road resulting from the destructive force of ground water which
clogged the road building.
(4) Environmental Management
Efforts are made to handle the impact is as follows:
- Creating an underground drainage channel that is placed in accorandce with the original
flow pattern.
- Construction is built considering the direction of the drainage so it does not block the
drainage of groundwater, such as creating a permanent filter (drain belt) to menggindari
avalanches.
(5) Location of Environmental Management
Location management is along the highway alignment plan where there is a deep
excavation.
(6) Period of Environmental Management
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 12
Period management is during the construction phase lasts, at least 3 months.
(7) Institution of Environmental management:
Executing: Executing activities Contractor
Supervisors: Public Works Department of Highways District, District Environmental Office,
Proponent Toll road operator, BPLHD West Java Province
Reporting: BPLHD West Java Province, Regent of Purwakarta, Subang, Majalengka,
Indramayu and Cirebon. Governor of West Java Province, BPJT-Department of Public
Works
7. Slope Stability Disorders
(1) Source Impact
Components of the Environment: The stability of slopes
Source Impact: Excavation and stockpiling of land base.
(2) Benchmark Impact
Disturbance of slope stability in areas that require cutting. Also on sloping areas that
require landfill.
(3) Environmental Management Objectives
Prevent the occurrence of landslides / soil erosion
(4) Environmental Management
Efforts are made to handle the impact of slope stability problems are as follows:
- Making / excavation is not steep cliff
- The surface of the lid is open
(5) Location of Environmental Management
Carried out along the highway alignment, in the village, subdistrict in 5 regencies;
Purwakarta, Subang, Majalengka, Indramayu and Cirebon.
(6) Period of Environmental Management
Made at any time or as needed, following the course of construction activities.
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 13
(7) Institution of Environmental management:
Executing: Executing activities Contractor
Supervisors: Public Works Department of Highways District, District Environmental Office,
Proponent Toll road operator, BPLHD West Java Province
Reporting: BPLHD West Java Province, Regent of Purwakarta, Subang, Majalengka,
Indramayu and Cirebon. Governor of West Java Province, BPJT-Department of Public
Works
B. Biological Components
1. Reduced Cultivation Vegetation
(1) Source Impact
Type of impact that will be managed is the reduction of flora / vegetation, the transfer
function of the area of productive land into roads. Sources of impact are earthwork
activities include land clearing and preparation of subgrade, subgrade preparation and
excavation and embankment. Types of flora which would shrink the area includes the area
of productive land in the form of rice, mixed farms and their fields, such as teak, rubber,
coconut plantations, mango with an area of approximately 168.79 ha, whereas the area of
rice fields around 279.8.
(2) Benchmark Impact
Measure of impact is the reduced area region covering paddy fields and mixed garden
crops (rubber, teak and other plants)
(3) Environmental Management Objectives
The purposes of environmental management are:
- Preventing shrinkage or reduction in land area and rice fields plantation crops
- Preventing unwanted plant damage found in the street outside ROW Maintaining
the sustainability of productivity of paddy fields
- Maintain or prevent secondary impacts resulting from the decline of vegetation /
flora that there is climate change micro / local and reduced function of the plant as
a runoff for water / flood.
- Similarly green belt that will be made to function other than for aesthetic purposes
as well as a filter for vehicle exhaust gases, dust and noise, can be muted so as
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 14
not to disturb the people who stay in the surrounding streets.
- Development of green belt also aims to contribute to the need of oxygen and
absorption of CO released by the fumes. By planting the kinds of plants in
accorandce with the physical and chemical conditions of the local environment,
local plant species diversity, and plant maintenance capabilities to the green belt
will be able to provide a positive impact on the operation of green belt along the toll
roads.
- Provides services and provide improved aesthetic environment of safety from
traffic accidents, and to reduce public health problems due to vehicle exhaust
gases, dust and noise.
(4) Environmental Management
Environmental management is the following:
- Cleaning and stripping done on the local plants are needed for the job.
- Restricting logging vegetation during construction.
- Avoiding logging manner that could damage other plants that are not desired
(outside ROW) by considering logging techniques by observing changes in plant
- Avoid the use of wetland area, the garden as a site entrance, and / or road access
- Avoiding the use of wetland area as a base camp location, footprint quarry location
- Minimize footprint area of work in the area of rice fields, gardens in accorandce
with the requirements for construction, and provide compensation to landowners
relating to the site needs work area.
- Ensuring the separation of top soil layer to facilitate replanting.
- Conduct replanting / re-vegetation in areas that are prepared or above the median
of the road after work or in conjunction with construction work done.
In addition to the above management is also necessary that the reforestation program is
implemented after the construction activity or at the final stage of construction for the
purpose of rehabilitation or re-vegetation along the highway and surrounding locations.
The effort needs to be done in this greening program include:
- Placement of greenery on the edge of the road or in the median area of the road
with a safe distance from the edge of the road, spacing between trees on the same
line about 5 m.
- Selecting the type of plants suitable for green belt along the Toll Road Cikampek -
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 15
Palimanan.
- Select plant species that are categorized as not to abort a lot of leaves, is more
advisable than the autochthonous species than exotic plants.
- Conduct watering of plants along the green line.
- Perform pruning
- Shuffling dead plants with new plants.
Some types of green belt plants that are suggested to be planted along the highway can
be seen in Table 3.1.
Tabel 3.1 Type of Vegetation for Greenery along Toll Road
No. Indonesian Name Scientific Name
Big tree (Water and soil conservation)
1 Turi Sesbania granifloria
2 Rambutan Nephelium lappaceum
3 Sawo kecik Manilkara kaukii
4 Damar Agathis sp
5 Mahoni Swietenia mahagoni
6 Dadap merah Erithrina crystagali
7 Tusam Pinus merkusii
13 Glodokan Polyalthia longifolia
14 Asam laudi Phthecellobium juice
15 Ketapang Terminalia catappa
16 Kembang merak Caesalpinea pulcherrima
17 Bougenville Bougenvillea spectabilis
18 Angsana Pterocarpus indicus
19 Johar Cassia siamea
20 Pinus Pinus mercusii
22 Flamboyan Delomix regia
23 Sonokeling Dalbergia spp
Shrubs (Land Covering)
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 16
1 Rumput gajah Axonopus copmresus
2 Pangkas kuning Duranta variegate
3 Bayam merah Iresine herbstii
4 Taiwan Beauty Cuphea hyssopfolia
5 Kembang sepatu Hibiscus rosa sinensis
6 Soka Ixora sp.
7 Krokot Alternanthera sp
(5) Location of Environmental Management
Location of environmental management is on the sides of the street / road ROW and the
road segment that is being done primarily at a location nearby neighborhood. While the
area of environmental management for greening performed on green belt that is placed
along Cikampek – Palimanan Toll road.
(6) Period of Environmental Management
Periods of environmental management is in the construction stage, namely when the land
clearing and execution time / together with minor works or construction work performed
and a final pitch. Landscape. Also performed during the operation of roads, including for
the green line.
(7) Institute of Environmental management
Executing: Contractor, the Office of Parks in related regencies,
Supervisor: Office of Public Works Highways, Agricultural Office in related regencies,
Proponent Toll road operator
Reporting: BPLHD West Java Province
Regent of Purwakarta, Subang, Majalengka, Indramayu and Cirebon, Governor of West
Java Province
C. Components of Social, Economic and Cultural Rights.
1. Improved Emploement Opportunities
(1) Source Impact
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 17
Components of the Environment: Social economic and cultural
Source of Impact: The involvement of local communities in employment.
(2) Benchmark Impact
Is the ratio of labor income and business actors before and during the construction of
Cikampek- Palimanan toll road e and construction of infrastructure networks.
(3) Environmental Management Objectives
Maintain and provide value-added income residents around the location of activity, so be
on incomes that meet the needs of residents in the village environment.
(4) Environmental Management
- Giving priority to local residents to work on construction activities in advance,
before bringing in labor from outside the region;
- Provide opportunities for local people to make transport services and provision of
daily necessities of life;
(5) Location of Environmental Management
In the villages around the location of activities, especially in a nearby village in the five
regencies; Purwakarta, Subang, Majalengka, Indramayu and Cirebon.
(6) Period of Environmental Management
Made at any time in accorandce with the needs of recruitment during construction.
(7) Institutions for Environmental Management
Executor: Proponent Activity Toll Road
Supervisor: Regency Labor Office, Department of Labor in 5 districts
Reporting: BPLHD West Java Province
Regent of Purwakarta, Subang, Majalengka, Indramayu and Cirebon, Governor of West
Java Province
2. The emergence of Social Jealousy
(1) Source Impact
Components of the Environment: Social economic and cultural
Source Impact: Mobilization of labor and business opportunity.
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 18
(2) Benchmark Impact
Work and business opportunities for residents around the location of highway construction
activities, the administrative area that exceeded alignment.
(3) Environmental Management Objectives
Pressing the smallest possible negative social impacts arising from highway construction
activities and supporting facilities.
(4) Environmental Management
Efforts are made to handle the impact of social envy and tried are as follows:
- Focusing on recruitment to the people affected by the project and its surroundings, in
accorandce with the expertise and work opportunities.
- Provide opportunities for local entrepreneurs trying to society to participate in
construction activities.
(5) Location of Environmental Management
Carried out along the highway alignment, in the village, subdistrict in 5 districts; District
Purwakarta, Subang, Majalengka, Indramayu and Cirebon regency.
(6) Period of Environmental Management
Made at any time or as needed, follow-related activities during the construction phase.
(7) Institute of Environmental management
Executing: Executing Contractor activities, management-related activities and village
officials.
Supervisor: Regencies office of Labor, toll road proponent manager.
Reporting: BPLHD West Java Province
Regent of Purwakarta, Subang, Majalengka, Indramayu and Cirebon, Governor of West
Java Province
3. Increased Business Opportunities
(1) Source Impact
Components of the Environment: Social economic and cultural
Source Impact: Mobilization of labor, use of local building materials (quarry).
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 19
(2) Benchmark Impact
Work and business opportunities for residents around the location of highway construction
activities.
(3) Environmental Management Objectives
Increased positive impact on the openness of employment and business opportunities for
the community around the study location.
(4) Environmental Management
Efforts are made to mitigate the negative impacts of increased employment opportunities
as follows:
- Utilization of local materials and labor
- Outreach to take advantage of business opportunity
(5) Location of Environmental Management
Carried out along the highway alignment, in the village, subdistrict in 5 regencies;
Purwakarta, Subang, Majalengka, Indramayu and Cirebon.
(6) Period of Environmental Management
Made at any time or as needed, follow-related activities during the construction phase
(7) Institute of Environmental management
Executing: Executing Contractor activities, management-related activities and village
officials.
Supervisor: Regencies office of Labor, toll road proponent manager.
Reporting: BPLHD West Java Province
Regent of Purwakarta, Subang, Majalengka, Indramayu and Cirebon, Governor of West
Java Province
4. Traffic disruption
(1) Source Impact
Components of the Environment: Traffic Flows
Source of Impact: Cleaning and Preparation of the subgrade and the environment
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 20
(2) Benchmark Impact
Interference with traffic congestion on public roads direction to the project site.
(3) Environmental Management Objectives
Minimize disruption of traffic jams that disrupt economic activity
(4) Environmental Management
Efforts are made to mitigate traffic congestion is as follows:
- Setting appropriate activities
- Setting time transporting building materials
- Installation of signs and traffic diversion
- On location Babakan Ciwaringin Islamic boarding school area, it will construct over pass
and access roads in the form of rural road upgrading and new road construction, and
made a box culvert under the highway to, in order to connect the two boarding area.
(5) Location of Environmental Management
Conducted along the path traversed by the vehicle projects, particularly those in rural
areas through five residential areas; regency of Purwakarta, Subang, Majalengka,
Indramayu and Cirebon.
At the Babakan Ciwaringin Islamic boarding school area namely in STA 200 +700 s / d
STA 201 +055.
(6) Period of Environmental Management
Made at any time or as needed, follow-related activities during the construction phase.
(7) Institution of Environmental management
Executing: Executing activities Contractor, Managers and community of Babakan
Ciwaringin Islamic boarding school.
Supervisor: Office of Public Works (Highways), Environmental Office, Proponent of Toll
road, Social services offices in 5 regencies.
Reporting: BPLHD West Java Province, Regent of Purwakarta, Subang, Majalengka,
Indramayu and Cirebon. Governor of West Java Province, BPJT-Department of Public
Works
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 21
5. Damage to Public Road (local road or village roads, district roads)
(1) Source Impact
Environmental components: public road facilities
Source Impact: Transportation of construction materials
(2) Benchmark Impact
Is the integrity of the road on the quality of 80%. Further reviews of the functions for
society, then the other benchmarks were not disruption of the smooth transportation and
security for road users.
(3) Environmental Management Objectives
Maintaining the condition of roads and transportation as well as avoiding obstacles
prevent the negative attitude of society because of the disruption of transport in rural
areas.
(4) Environmental Management
The management is carried out include:
- Set the tonnage of vehicles tailored to the ability of roads to be traversed,
especially on roads that are not paved;
- Adjust the vehicle speed, especially on rural roads and through the settlement;
- If there is damage to the road to be fixed;
- Prioritizing the other road users if traffic;
- Create traffic signs specifically related to the execution of construction to prevent
the risk of accidents;
- Not allowing people hitchhiked transportation projects persuasive manner.
(5) Location of Environmental Management
Performed on the vehicle traveled along the road that crosses the project primarily or near
settlements.
(6) Period of Environmental Management
On a regular basis any time during the development period of Palimanan Cikampek toll
road and toll road network development (during construction) and adjusted for the
occurrence of damage to roads.
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 22
(7) Institution of Environmental management
Executing: Executing activities Contractor,
Supervisor: Office of Public Works (Highways)
Reporting: BPLHD West Java Province, Regent of Purwakarta, Subang, Majalengka,
Indramayu and Cirebon. Governor of West Java Province, BPJT-Department of Public
Works
6. Damage to Public Utilities (Water Pipe)
(1) Source Impact
Components of the Environment: Traffic congestion
Source of Impact: Cleaning of land for highway construction.
(2) Benchmark Impact
Degrading condition of public utilities such as electricity networks, telephone, water
networks, irrigation and others.
(3) Environmental Management Objectives
Reducing the smallest possible disturbance to public utilities.
(4) Environmental Management
Efforts are made to the handling of traffic impacts are as follows:
Create technical handling, such as the transfer of electrical substations, making the box
culvert to avoid disruption of clean water and irrigation channels that meet their individual
needs.
(5) Location of Environmental Management
Location management is in place along the intended utility of the highway.
(6) Period of Environmental Management
Management during the construction period lasted, at least 3 months.
(7) Institution of Environmental management
Executing: Executing activities Contractor,
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 23
Supervisor: Office of Public Works (Highways)
Reporting: BPLHD West Java Province, Regent of Purwakarta, Subang, Majalengka,
Indramayu and Cirebon. Governor of West Java Province, BPJT-Department of Public
Works
7. Public-destruction of social facilities (Facilities Social and Public Facilities)
(1) Source of Impact
Components of the Environment: Traffic congestion
Source of Impact: Excavation and site preparation.
(2) Benchmark Impact
Reduced social facilities and public facilities, such as the Mosque, Village Office, Health
Center, School and others.
(3) Environmental Management Objectives
Reducing the negative social impact as small as possible due to the disruption of the
facilities in question.
(4) Environmental Management
Efforts are made to handle the impact is as follows:
- To coordinate with local governments in order to obtain replacement land to
rebuild the facilities in question.
- Pay compensation according to the price according to the policy agreed by both
parties, between community and government.
(5) Location of Environmental Management
Location management is a toll road along which there are special facilities intended.
(6) Period of Environmental Management
Period management is during the construction period lasts.
(7) Institution of Environmental management
Executing: Executing activities Contractor,
Supervisor: Office of Public Works (Highways)
Reporting: BPLHD West Java Province, Regent of Purwakarta, Subang, Majalengka,
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 24
Indramayu and Cirebon. Governor of West Java Province, BPJT-Department of
Public Works
3.3. Post-Construction Phase (Operations)
A. Chemical Physical Components
1. Reduced Air Quality
(1) Source Impact
Components of the Environment: Air Quality
Source Impact: Operational project vehicles
(2) Benchmark Impact
Dust levels were observed visually (observation) and the complaints from the public due
to the many dust or air dust concentration measurements of air quality monitoring results.
(3) Environmental Management Objectives
To prevent or reduce the occurrence of elevated levels of dust in the air because the
roads are not paved over, particularly those close to residential areas, reducing the
negative perception of society towards the project and further prevent the situation was
not an aesthetic as well as decline in public health.
(4) Environmental Management
Efforts are made to handle the impact of increased dust is as follows:
- Air trucks must have a cover with plastic or tarps;
- The volume of cargo tonnage or height does not exceed the truck;
- Reduce vehicle speed to 20 km / h, especially in the vicinity of human settlement;
- Watering the road vehicle through which the road project with water especially
near and through the settlement in the dry season;
- In the rainy season, road damage easily occur, for example, if the road is muddy,
so the project should fix it immediately.
(5) Location of Environmental Management
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 25
Conducted along the path traversed by vehicles, especially those in rural areas through
five regencies; Purwakarta, Subang, Majalengka, Indramayu and Cirebon.
(6) Period of Environmental Management
Made at any time or as needed, followed by related activities during the operational stage
6 months.
(7) Institution of Environmental management
Executing: Executing activities Contractor,
Supervisor: Office of Public Works (Highways), Office of Environmental DIvision
Reporting: BPLHD West Java Province, Regent of Purwakarta, Subang, Majalengka,
Indramayu and Cirebon. Governor of West Java Province, BPJT-Department of
Public Works
2. Increased Noise
(1) Source Impact
Components of the Environment: Noise Quality
Source Impact: Operating vehicle on the highway.
(2) Benchmark Impact
The increased noise at the location of settlements and access roads.
(3) Environmental Management Objectives
Minimize the noise level in a neighborhood adjacent to settlements.
(4) Environmental Management
Efforts are made to handle the impact of increased noise is as follows:
- Planting trees on the left side of the road toll, especially on the location of settlements.
(5) Location of Environmental Management
Conducted along the path traversed by vehicles, especially those in rural areas through
five regencies; Purwakarta, Subang, Majalengka, Indramayu and Cirebon.
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 26
(6) Period of Environmental Management
Made at any time or as needed, followed by related activities during the operational stage
6 months.
(7) Institution of Environmental management
Executing: Executing activities Contractor,
Supervisor: Office of Public Works (Highways), Office of Environmental DIvision
Reporting: BPLHD West Java Province, Regent of Purwakarta, Subang, Majalengka,
Indramayu and Cirebon. Governor of West Java Province, BPJT-Department of Public
Works
3. Changing Land Use
(1) Source Impact
Components of the Environment: Land use
Source Impact: Changes in land use resulting from the operation of toll roads.
(2) Benchmark Impact
Changing land use and government population along the alignment along the 116.4 km
highway, which was originally paddy fields into residential areas, which was originally the
garden of mixture and other trade areas.
(3) Environmental Management Objectives
Directing the use of land so as not to overlap and synergize each other.
Avoid land use change so as not to disturb the economic culture of local communities.
(4) Environmental Management
- Conduct monitoring and controlling land use to refer to the local spatial plan.
- Create a land use policy in synergy with the use of toll roads for better highway
performance, for example by not making too many entrance toll due to demand
from the region woke up along the highway alignment.
(5) Location Management
Location management is the alignment along the highways, as well kuliaras access toll
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 27
road (interchange).
(6) Period of Environmental Management
Made at any time or as needed, followed by related activities during the operational stage
6 months.
(7) Institution of Environmental management
Executing: Executing activities Contractor,
Supervisor: Office of Planning
Reporting: BPLHD West Java Province, Regent of Purwakarta, Subang, Majalengka,
Indramayu and Cirebon. Governor of West Java Province, BPJT-Department of Public
Works
B. Components of Social, Economic and Cultural Rights
1. Increasing employment opportunities and business opportunity
It includes the existence of employment opportunities for people around the location of
highways, including the acceptance of employment as a clerk for the management of toll
roads. In addition, business opportunities, especially in the service sector during the
operation of Cikampek - Palimanan toll roads will result in positive changes in the
environment. resident outside the Toll Road area also will get follow-up impact of the
increasing activities and agricultural production in this region, among other trading
activities and output of farm inputs and transportation services. In turn, this impact will
increase the dynamics of the region's economy and society in general to increase
revenue, earned from business conducted in other fields.
(1) Source Impact
Components of the Environment: Social economic and cultural.
Source of Impact: The existence of employment opportunities for surrounding
communities and business opportunities in the service sector.
(2) Benchmark Impact
- Increasing the number of local workers who absorbed
- Number of business opportunities that are available for the local economy
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 28
(3) Environmental Management Objectives
Further improve the economic condition of society again.
Optimize employment opportunities and business opportunity for local people in order to
foster economic activity by region.
(4) Environmental Management
Manager Toll roads could provide employment opportunities to the people who meet
the qualifications (in accorandce with the qualifications and requirements).
Informing the public about employment opportunities following the qualification of labor
needed to install an information sheet about the vacancy on the board's
announcement at the Village Office or the District in each project area.
Counseling and information about business opportunities in the population
Provide appropriate MSEs wage (Minimum Wage of City), education level and skills of
workers.
Involve the employees in the employees' social security
(5) Location Management
Management is done by targeting the population of toll roads in the villages that had
access toll road, which is located in the sub-district in 5 regencies.
(6) Period of Environmental Management
Done periodically between three to six months and intensively during the operation.
(7) Institution of Environmental management
Executing Agency: Office of Economic Affairs and related District Highway Manager.
Supervisor: Regional Revenue Office, Environmental Office.
Reporting: BPLHD West Java Province, Reggent of Purwakarta, Subang, Majalengka,
Indramayu and Cirebon
2. Public Perception
Operation of Cikampek - Palimanan toll roads and building facilities and infrastructure to
support the toll road will lead to a positive perception on the surrounding environment.
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 29
(1) Source Impact
Components of the Environment: Social economic and cultural
Source Impact: Increased accessibility of the local economy with the presence of toll
roads. Increased regional economy
(2) Benchmark Impact
The number of people who support the existence of the highway
(3) Environmental Management Objectives
Community support for the operation of toll roads in order to foster economic activity by
region.
(4) Environmental Management
Fulfill the commitment in providing employment opportunities to the community around
that qualified for increased economic activities.
Maintenance of highway infrastructure and facilities in order to keep functioning optimally.
Conduct a brief interview on the condition of the community about the existence of the
highway on kinship or access attempt.
(5) Location Management
Management by objectives on land around highways in villages who gets access toll road,
which is located in the sub district in 5 regencies
(6) Period of Environmental Management
Done periodically between three to six months during the post-construction road
(7) Institution of Environmental management
Executing Agency: Office of Economic Affairs and related District Highway Manager.
Supervisor: Regional Revenue Office, Environmental Office.
Reporting: BPLHD West Java Province, Regent of Purwakarta, Subang, Majalengka,
Indramayu and Cirebon
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 38
Table 3.2. MATRIX OF ENVIRONMENTAL MANAGEMENT PLAN (RKL)
CIKAMPEK – PALIMANAN TOLL ROAD 116,4 KM
IN W
EST JAVA PROVINCE
Type of Im
pacts
Source of Im
pact
Benchmark of
Impact
Env.
Managem
ent
Objective
Env. M
anagem
ent
Effort
Location and
Period
Institution of Environm
ental M
anagem
ent
Executing
Supervisor
Reporting
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
I. Pre-Construction Stage
Section- I, STA 91+500 s/d 1 18+550
Purwakarta and Subang
Section II
STA 118+550 s/d STA 129+750
Subang
Section III
STA 129+750 s/d STA 158+450
Subang and Indramayu)
Section IV
STA 158+450 s/d STA 177+350
(Indramayu and Majalengka)
Section V
STA 177+350 s/d STA 193+450
Majalengka)
Section VI
STA 193+450 s/d STA 207+900
. Majalengka and Cirebon)
1. The emergence
of com
munity
unrest
Survey and land
measurement
Com
munity unrest
can be observed in
society with the
emergence of
public opinion
about the likelihood
and extent of public
land that will be
affected by
developm
ent.
Managem
ent was
conducted in order
to suppress the
emergence of
unrest com
munity
as small as
possible, so that
people can accept
with a good plan to
build Cikam
pek-
Palimanan toll
roads and
developm
ent in five
regencies.
Perform persuasive
approach and give an
explanation to the public
about the purposes and
objectives of Cikam
pek-
Palimanan toll road
developm
ent along the
corridor ± 116.4 km,
which is to meet
transportation needs in
West Java in particular
and National general.
Provide clear
information about the
activities of m
easuring
and installation of stakes
and area limit of
Cikam
pek-Palimanan
toll road development
activities.
Explaining to the public
about the need for the
required land for the
construction of
Cikam
pek-Palimanan
toll road, and
Location
managem
ent at
field sites used for
the physical
buildings of
Cikam
pek-
Palimanan toll road
and other auxiliary
buildings and the
residential
population in the
sub-district to
village level in five
regions of the
district.
STA
193+450 s/d STA
207+900
(Kab. M
ajalengka
and Cirebon)
It begins since toll
road development
plans and corridors
± 116.4 km and
each week
delivered at the
Proponent of
Cikam
pek-Palimanan
toll road construction
Village and Sub-
district Head of 5
Regencies
Land Agency in 5
Regencies
Office of Public
Works and Social
Service in 5
regencies
Environm
ental
Protection Agency
West Java
Province BPLHD,
Regent of
Purwakarta,
Subang,
Majalengka,
Indram
ayu and
Cirebon
BPJT-Department
of Public Works
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 39
Type of Im
pacts
Source of Im
pact
Benchmark of
Impact
Env.
Managem
ent
Objective
Env. M
anagem
ent
Effort
Location and
Period
Institution of Environm
ental M
anagem
ent
Executing
Supervisor
Reporting
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
developm
ent areas
along the corridor of ±
116.4 km, and other
complem
entary
buildings to be
constructed such as
flood control drainage
channels, bridges,
(JPO), rest area (resting
place) Interchange (IC)
and others.
time of
measurement
activities and the
installation of
stakes in the
location.
2. The em
ergence
of Social Conflict
The procurement of
land for construction
of toll roads
Public unrest,
especially in
Babakan village
Ciwaringin, with the
emergence of
public opinion who
disagrees toll road
route through the
nearby Islamic
boarding House of
Babakan
Ciwaringin so there
are pros and cons
of land acquisition
carried out by the
TPT.
Environm
ental
managem
ent was
conducted in order
to suppress small
as possible
occurrence of
horizontal violence
in rural
communities
Babakan due to
land acquisition
activities for the
construction of
Cikam
pek toll road.
Perform persuasive
approach and give an
explanation to the public
about the mechanism of
land acquisition by the
government.
Provide clear
information about the
activities of the
determination of
compensation value of
the land as government
policy areas and the
central governm
ent.
Location
managem
ent is in
Babakan village,
particularly around
Islamic boarding
schools of
Ciwaringin.
Made since the
initial plan of land
acquisition for
highway purposes
and periodically
carried out every
single month.
Proponent of
Cikam
pek-Palimanan
toll road
developm
ent, Sub-
destrict head of
Ciwaringin, and BPN
Cirebon
Office of Public
Works and
Highways Office of
Cirebon,
Environm
ental
Protection Agency
of Cirebon
BPLHD West Java
Province, regent of
Cirebon, BPJT-
Department of
Public Works
3. Reduced
Income
Land Acquisition
for Toll Road
Development
Unrest that
emerged in
communities
occurs due
acquisitions of
farmer-owned
land such as
rice fields and
gardens and
others.
Environm
ental
managem
ent
is intended to
make rice
fields which is
a source of
income for
residents
receive
appropriate
compensation
To socialize
continuously since
the preparation of
land acquisition
through the
implem
entation
process of land
acquisition, about
the toll road
developm
ent plans
and the value of
Location
Managem
ent of
the village
across the
fields affected
by land
acquisition for
the project
needs.
Period
Managem
ent
Proponent
Palimanan
Cikam
pek toll
road
construction,
Sub-district
heads and
village heads in
the 5 regencies,
Land Agency in
5 regencies and
Public Works
Department of
Highways,
Department of
Environm
ent in
5 regencies
BPLHD West
Java Province,
Regent of
Purwakarta,
Subang,
Majalengka,
Indram
ayu and
Cirebon,
BPJT-
Department of
Public Works
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 40
Type of Im
pacts
Source of Im
pact
Benchmark of
Impact
Env.
Managem
ent
Objective
Env. M
anagem
ent
Effort
Location and
Period
Institution of Environm
ental M
anagem
ent
Executing
Supervisor
Reporting
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
value, and
irrigation
networks that
passed the
motorway
network can
be maintained
smoothness.
wetland
compensation to be
received by a
resident of lowland
rice fields affected
by the project.
Create technical
designs that
accommodate the
interests of the
smooth process of
the drainage of
irrigation water in
paddy field
population.
Together with
relevant agencies
both at the central
provincial and
district levels, to
dissem
inate the
results of the
utilization of land
compensation
money, in the form
of counseling.
conducted
periodically
every month
during the land
acquisition
activities is
conducted.
West Java
Province.
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 41
Type of Im
pacts
Source of Im
pact
Benchmark of
Impact
Env.
Managem
ent
Objective
Env. M
anagem
ent
Effort
Location and Period
Institution of Environm
ental M
anagem
ent
Executing
Pengawas
Penerima Laporan
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
II. Construction Stage
Section- I, STA 91+500 s/d 1 18+550
Purwakarta and Subang
Section II
STA 118+550 s/d STA 129+750
Subang
Section III
STA 129+750 s/d STA 158+450
Subang and Indramayu)
Section IV
STA 158+450 s/d STA 177+350
(Indramayu and Majalengka)
Section V
STA 177+350 s/d STA 193+450
Majalengka)
Section VI
STA 193+450 s/d STA 207+900
. Majalengka and Cirebon)
A. C
omponents of
Physical - Chem
ical
1. Reduced Air
Quality
Mobilization of
weight equipment
And transportation
of construction
materials.
Operating base
camp,
Preparation of soil
foundation,
excavation and
heap,
baand jobs
roads and layers
pavement, and
bridge work
Air dust levels were
observed visually
(observation) and the
complaints from
the
public due to the
many dust or air dust
concentration
measurements of air
quality monitoring
results.
To prevent or
reduce the
occurrence of
elevated levels of
dust in the air
because the roads
are not paved over,
particularly those
close to residential
areas, reducing the
negative perception
of society towards
the project and
further prevent the
situation was not
an aesthetic as well
as decline in public
health.
Air trucks must have a
cover with plastic or
tarps;
The volum
e of cargo
tonnage or height does
not exceed the truck;
Clean the tires first
project vehicles before
entering a public road.
Reduce vehicle speed
to 20 km / h, especially
in the vicinity of hum
an
settlem
ent;
Watering the road
vehicle through which
the road project with
water especially near
and through the
settlem
ent in the dry
season;
In the rainy season,
road dam
age easily
occurs, for example,
road potholes, muddy,
so the project should fix
it immediately.
Performed along the road
passed by the project
vehicles, especially those
that pass through
residential villages in 5
regencies
Sta. 92+600-
92+850,
Sta 98+700-98+800,
Sta 104+550-104+900,
Sta 11 3+700- 11 3+800,
Sta 116+800-116+900
Purwakarta & Subang Sta
122+450-122+600
Sta 123+550-123+700
Sta 126+300-126+650,
Indram
ayu Sta 129+950-
30+000
Sta 13 1+400-3 1+500
Sta 132+050-32+ 150
Sta 132+300-32+450
Sta 132+600-32-t 700
Sta 136+700-36+900
Stal 49+800- 149+950,
Majalengka
Executing
Contractor Toll
Road
Development.
Environm
ental
Office
in
5 regencies,
Department
of
Health
in
5 regencies.
BPLHD West Java
Province, Regent
of Purwakarta,
Subang,
Majalengka,
Indram
ayu and
Cirebon, BPJT-
Department of
Public Works
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 42
Sta 158+450-
177+350.
Sta 180-1-300-1 80+600
Sta 187+000-187+400
Sta 188+200-188+550
Sta 188+700- 189+000
189+800-190+200.
Sta 194+700-194+800 Sta
200+200-200+400
Sta 200+600-201+200
Sta 201+400-201+500
Sta 202+400-202+550
Sta 205+800-205+850
Sta 206+850-207+000
Cirebon.
Made at any tim
e or as
needed, followed by related
activities
during
the
construction phase.
2. Increased Noise
Mobilization of
weight equipment
And transportation
of construction
materials.
Operating base
camp,
Preparation of soil
foundation,
excavation and
heap,
baand jobs
roads and layers
pavement, and
bridge work
The increased noise
at the location of
settlem
ents and
access roads.
Minimize the noise
level that occurred
in residential areas.
Setting the
implem
entation of
good construction
and adequate.
Locations of
batching plants are
far from
settlem
ents.
Setting heavy
vehicle operations
and vehicle
projects for the
noise that com
es
from
these vehicles
do not disturb
residents in the
nearest settlement,
where operating
hours are
socialized with the
local com
munity.
Conducted along the path
traversed by the vehicle
projects, particularly those
in rural residential areas
through five regencies Sta.
92+600-
92+850,
Sta 98+700-98+800,
Sta 104+550-1 04+900,
Sta 11 3+700- 11 3+800,
Sta 11 6+800- 11 6+900,
Subang
Sta 122+450-122+600
Sta 123+550-1 23+700
Sta 126+300- 126+650 and
Indram
ayu
Sta
129+950-130+000
Sta 13 1+400-3 1+500
Sta 132+050-32+150
Sta 132+300-32+450
Sta 132+600-32+700
Sta 136+700-36+900
Executing
activities
Contractor
Office of Public
Works
Highways,
Proponent of
Toll road
EPA of W
est Java
Province, Regent
of Purwakarta,
Subang,
Majalengka,
Indram
ayu and
Cirebon, Governor
of West Java
Province
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 43
Sta 149+800-4 9+950
Section V
Majalengka
Sta
180+300-180+600
Sta 187+000- 187+400
Sta 188+200- 188+550
Sta 188+700- 189+000
189+800-190+200. Di
Majalengka &
Cirebon
Sta
194+700-194+800
Sta 198+000- 198+050
Sta 199+000-199+250
Sta 201+400-201+500 Sta
202+400-202+550
Sta 205+800-205+850
Sta 206+850-207+000,
during the construction
phase.
3. Reduced Surface
Water Quality
Mobilization of
weight equipment
And transportation
of construction
materials.
Operating base
camp,
Preparation of soil
foundation,
excavation and
heap,
baand jobs
roads and layers
pavement, and
bridge work and
drainage work
Decreasing water
quality that is on the
highway alignm
ent.
Prevent / reduce
the change of
surface water and
groundwater.
- Setting a good
implem
entation
- Making channels
gatherer
- Making temporary
dike
Carried out along the
highway alignm
ent j STA
94+800,
STA 10 1+900, STA
106+500, STA 110+500,
STA. Section II Kab.
Subang pada Sta.
92+600-92+850,
Sta 98+700-98+800,
Sta 104+550- 104+900,
Sta 11 3+700- 11 3+800,
Sta 11 6+800- 11 6+900,
Pada Section 111 Kab.
Indram
ayu pada River
Cilamatan STA 138+500,
River Cipunegara STA
142+000. Section W
Kab. M
ajalengka Pada
lokasi antara Sta
158+450-1 77+350 tidak
terdapat permukiman.
Section V River Cimanuk
Executing
activities
Contractor
Office of Public
Works,
Proponent Toll
road operator
BPLHD West Java
Province, Regent
of Purwakarta,
Subang,
Majalengka,
Indram
ayu and
Cirebon, Governor
of West Java
Province
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 44
STA 180+000. and Section
VI pada River
Ciwaringin STA 201+000,
Kanal Ciliwung STA
205+500.
Made at any time or as
needed, following the
course of construction
activities.
4. Im
paired Surface
Water Flow
Cleaning of land,
construction of toll
roads and buildings
complem
ent
Disturbance of
vegetation has
resulted in changes in
surface water flow
patterns, and
disruption of farming
communities cropping
pattern in the study
area. The occurrence
of local inundation
has resulted from
disruption of the flow
of surface water by
extractive materials.
Reduce / m
inimize
disruption to plant
rice field drainage
into the population,
also made in order
that the drainage
remain smooth and
well directed in
accorandce with its
original state.
Setting of construction
activity, adjusted for
planting and harvesting
schedules.
To coordinate with
related agencies for the
managem
ent of
technical irrigation
channel in the
alignm
ent of the
highway.
Make surface water
drainage in accorandce
with the direction of
pre-existing natural flow
with the appropriate
dimensions.
Carried out along the
highway alignm
ent River
Ciherang STA 95+000,
River Cilamaya,
pada Section II River
Ciherang STA 95+000,
River Cilamaya
STA. 102+500. Section III
River Cilamatan STA
138+500, River
Cipunegara STA
142+000, Section IV River
CipanasSTA 1^1+500.
Section V
River
CimanukSTA 180+000.
Section VI pada Pada
River
Ciwaringin STA 201+000,
Kanal Ciliwung STA
205+500.
Made at any time or as
needed during the
construction progress, and
follow the activities of the
construction phase, at least
3 months.
Executing
activities
Contractor
Public Works
Department of
Highways,
Proponent of
Toll road
BPLHD West Java
Province, Regent
of Purwakarta,
Subang,
Majalengka,
Indram
ayu and
Cirebon. Governor
of West Java
Province, BPJT-
Department of
Public Works
5. Occurrence of Soil
Erosion
Cleaning of land,
excavation and
embankment
Disturbance of slope
stability and
increased sediment in
surface runoff and
rivers are crossed by
In an effort to
prevent soil erosion
caused by
excavation and
embankment work
- Do not cut too
steep cliff
- Create a cap
on the cliff excavation
results by planting trees
Location managem
ent in a
location which made cutting
the cliff and at locations
that are too upright
embankment along the
Executing
activities
Contractor
Public Works
Department of
Highways,
District
Environm
ental
BPLHD West Java
Province, Regent
of Purwakarta,
Subang,
Majalengka,
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 45
the highway plan.
on the cliff. Prevent
the run-off of
sediment in surface
water and river
channel crossed by
the highway plan.
or by sloop protection
(retaining wall) of
masonry or reinforced
concrete.
highway.
Managem
ent during the
construction period lasts
and is permanent, at least
3 months.
Office,
Proponent of
Toll road
operator.
Indram
ayu and
Cirebon. Governor
of West Java
Province, BPJT-
Department of
Public Works
6. Groundwater Flow
Disturbance
Activities soil
excavation and
embankment for the
road
Inhibition of ground
water flow resulting in
disruption of water
sources such as
springs, wells
population and
construction of the
road dam
age due to
ground water flow is
obstructed.
Prevent disruption of
water sources such
as springs, wells
resident of the
damage, as well as
prevent dam
age to
the road resulting
from
the destructive
force of ground water
which clogged the
road building.
- Creating an
underground
drainage channel that
is placed in
accorandce with the
original flow pattern.
- Construction is built
considering the
direction of the
drainage so it does
not block the
drainage of
groundwater, such as
creating a permanent
filter (drain belt) to
menggindari
avalanches.
Location
managem
ent is
along
the
highway
alignm
ent plan where there
is a deep excavation.
Period
managem
ent
is
during
the
construction
phase
lasts, at least 3
months.
Executing
activities
Contractor
Public
Works
Department
of
Highways
District,
District
Environm
ental
Office,
Proponent Toll
road
operator,
BPLHD
West
Java Province
BPLHD West Java
Province, Regent
of Purwakarta,
Subang,
Majalengka,
Indram
ayu and
Cirebon. Governor
of West Java
Province, BPJT-
Department of
Public Works
7. Slope Stability
Disorders
Activities soil
excavation and
embankment for the
road
Disturbance of slope
stability in areas that
require cutting. Also
on sloping areas that
require landfill.
Sta. 91+500 sampai
Sta.207+750.
Prevent the
occurrence of
landslides / soil
erosion
- Making / excavation
is not steep cliff
- The surface of the
lid is open
Carried out along the
highway alignm
ent, in the
village Section I to
VI. Made at any time or as
needed, following the
course of construction
activities
Executing
activities
Contractor
Public Works
Department of
Highways
District, District
Environm
ental
Office,
Proponent Toll
road operator,
BPLHD West
Java Province
BPLHD West Java
Province, Regent
of Purwakarta,
Subang,
Majalengka,
Indram
ayu and
Cirebon. Governor
of West Java
Province, BPJT-
Department of
Public Works
B. B
iological
Components
1. Reduced
Cultivation
Vegetation
Sources of impact
are earthwork
activities include
land clearing and
preparation of
subgrade, subgrade
Measure of impact is
the reduced area
region covering
paddy fields and
mixed garden crops
(rubber, teak and
Preventing shrinkage
or reduction in land
area and rice fields
plantation crops
Preventing unwanted
plant dam
age found
Cleaning and
stripping done on the
local plants are
needed for the job.
Restricting logging
vegetation during
Location of environm
ental
managem
ent is on the
sides of the street / road
ROW and the road
segm
ent that is being done
primarily at a location
Contractor, the
Office of Parks in
related regencies
Office of Public
Works
Highways,
Agricultural
Office in related
regencies,
BPLHD West Java
Province
Regent of
Purwakarta,
Subang,
Majalengka,
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 46
preparation and
excavation and
embankment.
other plants)
in the street outside
ROW Maintaining the
sustainability of
productivity of paddy
fields
Maintain or prevent
secondary impacts
resulting from
the
decline of vegetation /
flora that there is
climate change micro
/ local and reduced
function of the plant
as a runoff for water /
flood.
Similarly green belt
that will be made to
function other than for
aesthetic purposes as
well as a filter for
vehicle exhaust
gases, dust and
noise, can be muted
so as not to disturb
the people who stay
in the surrounding
streets.
Development of
green belt also aims
to contribute to the
need of oxygen and
absorption of CO
released by the
fumes. By planting
the kinds of plants in
accorandce with the
physical and chemical
conditions of the local
environm
ent, local
plant species
diversity, and plant
maintenance
capabilities to the
green belt will be able
to provide a positive
construction.
Avoiding logging
manner that could
damage other plants
that are not desired
(outside ROW) by
considering logging
techniques by
observing changes in
plant
Avoid the use of
wetland area, the
garden as a site
entrance, and / or
road access
Avoiding the use of
wetland area as a
base cam
p location,
footprint quarry
location
Minimize footprint
area of work in the
area of rice fields,
gardens in
accorandce with the
requirements for
construction, and
provide
compensation to
landowners relating
to the site needs
work area.
Ensuring the
separation of top soil
layer to facilitate
replanting.
Conduct replanting /
re-vegetation in
areas that are
prepared or above
the median of the
road after work or in
conjunction with
construction work
done.
nearby neighborhood.
While the area of
environm
ental
managem
ent for greening
performed on green belt
that is placed along
Cikam
pek – Palimanan Toll
road.
Periods of environm
ental
managem
ent is in the
construction stage, nam
ely
when the land clearing and
execution time / together
with minor works or
construction work
performed and a final pitch.
Landscape. Also performed
during the operation of
roads, including for the
green line.
Proponent Toll
road operator
Indram
ayu and
Cirebon, Governor
of West Java
Province
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 47
impact on the
operation of green
belt along the toll
roads.
Provides services and
provide improved
aesthetic environm
ent
of safety from
traffic
accidents, and to
reduce public health
problems due to
vehicle exhaust
gases, dust and
noise.
C. Com
ponents of
Social, Economic
and Cultural Rights.
1. Im
proved
Emploement
Opportunities
The involvem
ent of
local com
munities in
employment
Is the ratio of labor
income and business
actors before and
during the
construction of
Cikam
pek- Palimanan
toll road e and
construction of
infrastructure
networks.
Efforts to
increase
opportunities
work for the
community
local, with
number of occasions
work reaches ± 1225
people, then the
absorption of local
components pursued
more and more.
Giving priority to
local residents to
work on construction
activities in advance,
before bringing in
labor from
outside
the region;
Provide opportunities
for local people to
make transport
services and
provision of daily
necessities of life;
.
In the villages around the
location of activities Sta.
92+600-92+850,
Sta 98+700-98+800,
Sta 104+550- 104+900,
Sta 11 3+700- 11 3+800,
Sta 116+800-116+900.
Section II Sta
122+450-122+600
Sta 123+550-123+700
Sta 126+300-126+650.
Section III
Sta 129+950-130+000
Sta 13 1+400-1 3 1+500
Sta 132+050-132+150
Sta 132+300-132+450
Sta 132+600-132+700
Sta 136+700-1 36+900
Sta 149+800-149+950.
Section IV
Section V Sta
180+300-180+600
Sta 187+000- 187+400
Sta 188+200-1 88+550
Sta 188+700- 189+000
Proponent Activity
Toll Road
Regency Labor
Office,
Department of
Labor in 5
districts
BPLHD West Java
Province
Regent of
Purwakarta,
Subang,
Majalengka,
Indram
ayu and
Cirebon, Governor
of West Java
Province
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 48
189+800-190+200. Pada
Section VI Sta 194+700-
194+800
Sta 199+900-200+000
Sta 200+200-200+400
Sta 200+600-20 1 +200
Sta 20 1+400-20 1+500
Sta 202+400-202+550
Sta 205+800-205+850
Sta 206+850-207+000,
Made at any time in
accorandce with the needs
of recruitment during
construction.
2. The emergence of
Social Jealousy
Mobilization of labor
and business
opportunity
Work and business
opportunities for
residents around the
location of highway
construction activities,
the administrative
area that exceeded
alignm
ent.
Pressing the smallest
possible negative
social impacts arising
from
highway
construction activities
and supporting
facilities.
- Focusing on
recruitment to the
people affected by
the project and its
surroundings, in
accorandce with the
expertise and work
opportunities.
- Provide
opportunities for local
entrepreneurs trying
to society to
participate in
construction
activities.
Carried out along the
highway alignm
ent, in the
village, subdistrict in 5
districts,
Sta. 92+600-92+850,
Sta 98+700-98+800,
Sta 104+550-104+900,
Sta 113+700-113+800,
Sta 116+800-116+90,
pada Section II Sta
122+450-122+600
Sta 123+550-123+700
Sta 126+300-126+650
Pada Section III
: Sta 129+950- 130+000
Sta 13 1+400-13 1+500
Sta 132+050- 132+ 150
Sta 132+300- 132+450
Sta 132+600-132+700
Sta 136+700-136+900
Sta 149+800-149+950
Pada Section IV tidak ada.
Section V Sta 1 80+300-
180+600, Sta 1 87+000-
187+400, Sta 1 88+200-
188+550, Sta 1,88+700-
189+000, 189+800-
190+200. Pada Section VI
Executing
Contractor
activities,
managem
ent-
related activities
and village
officials.
Regencies
office of Labor,
toll road
proponent
manager.
BPLHD West Java
Province
Regent of
Purwakarta,
Subang,
Majalengka,
Indram
ayu and
Cirebon, Governor
of West Java
Province
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 49
Sta 194+700-194+800
Sta 198+000-198+050
Sta 199+000-199+250
Sta 199+900-200+000
Sta 200+200-200+400
Sta 200+600-20 1+200
Sta 250+800-205+850
Sta206+850-207+000.
Made at any time or as
needed, follow-related
activities during the
construction phase.
3. Increased
Business
Opportunities
Mobilization of
labor, use of local
building materials
(quarry)..
Work and business
opportunities for
residents around the
location of highway
construction activities.
Increased positive
impact on the
openness of
employment and
business
opportunities for the
community around
the study location.
Utilization of local
materials and labor
- Outreach to take
advantage of
business opportunity
Carried out along the
highway alignm
ent, in the
village, subdistrict in 5
regencies Section I s/d
Section VI.
Made at any time or as
needed, follow-related
activities during the
construction phase
Executing
Contractor
activities,
managem
ent-
related activities
and village
officials.
.
Regencies
office of Labor,
toll road
proponent
manager.
BPLHD West Java
Province
Regent of
Purwakarta,
Subang,
Majalengka,
Indram
ayu and
Cirebon, Governor
of West Java
Province
4. Traffic disruption
Cleaning and
Preparation of the
subgrade and the
environm
ent
Interference with
traffic congestion on
public roads direction
to the project site.
Minimize disruption of
traffic jams that
disrupt economic
activity
Setting appropriate
activities
- Setting time
transporting building
materials
- Installation of signs
and traffic diversion
- On location
Babakan Ciwaringin
Islamic boarding
school area, it will
construct over pass
and access roads in
the form of rural road
upgrading and new
road construction,
and made a box
culvert under the
highway to, in order
Conducted along the path
traversed by the vehicle
projects, particularly those
in rural areas Sta :
92+920, 97+689,
104+044,107+325,109+51
8,113+625,116+950.
Pada Section II Terutam
a pada di STA 200+700 s/d
STA 201+055 Pada
Section
111 pada rule/ jalan
kabupaten yang dilalui
yaitu pada Sta :
130+012,136+135
139+806,142+736
149+7 11. Pada Section IV
pada rute/ jalan kabupaten
yang dilalui yaitu pada Sta
Executing
activities
Contractor,
Managers and
community of
Babakan
Ciwaringin Islamic
boarding school.
Office of Public
Works
(Highways),
Environm
ental
Office,
Proponent of
Toll road, Social
services offices
in 5 regencies
BPLHD West Java
Province, Regent
of Purwakarta,
Subang,
Majalengka,
Indram
ayu and
Cirebon. Governor
of West Java
Province, BPJT-
Department of
Public Works
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 50
to connect the two
boarding area
158+888,169+600,
173+612. Pada Section V
Sta:
179+002,182+500
184+802,187+281
189+070,190+673
192+712. Pada Section VI
di STA 200+700 s/d STA
Made at any time or as
needed, follow-related
activities during the
construction phase.
5. Dam
age to Public
Road (local road or
village roads, district
roads)
Transportation of
construction
materials
Is the integrity of the
road on the quality of
80%. Further reviews
of the functions for
society, then the
other benchm
arks
were not disruption of
the smooth
transportation and
security for road
users.
Maintaining the
condition of roads
and transportation as
well as avoiding
obstacles prevent the
negative attitude of
society because of
the disruption of
transport in rural
areas.
Set the tonnage of
vehicles tailored to
the ability of roads to
be traversed,
especially on roads
that are not paved;
Adjust the vehicle
speed, especially on
rural roads and
through the
settlem
ent;
If there is dam
age to
the road to be fixed;
Prioritizing the other
road users if traffic;
Create traffic signs
specifically related to
the execution of
construction to
prevent the risk of
accidents;
Performed on the vehicle
traveled along the road that
crosses the project
primarily or near
settlem
ents.
Sta :
92+920, 94+670;
95+975, 97+689, 98+500,
0+000;
101+100,3+418
104+044,106+205,
107+325 109+518,
113+625,114+80
5,116+116,116+950,
117+ 532,
Pada Section 11
118+425,119+070
121+100,121+825
122+585,123+855
124+831,126+180
127+350,128+286
128+550,129+122
Pada
Section 111 sekitar Sta :
130+012,131+575
133+100,133+566
134+735,136+135
136+870,138+433
139+389,139+806
140+860,142+736
Executing
activities
Contractor,
Office of Public
Works
(Highways)
BPLHD West Java
Province, Regent
of Purwakarta,
Subang,
Majalengka,
Indram
ayu and
Cirebon. Governor
of West Java
Province, BPJT-
Department of
Public Works
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 51
144+800,147+863
149+711,153+453
154+250,155+480
158+888. Pada
Section IV Sta :
160+845,163+536
164+651,165+975
167+675,169+600
171+060,172+021
172+851,173+612
176+655,177+488.
Pada
Section V Sta :
188+230, 189+070
190+673,191+550
92+712. Pada Section VI
Sta :
194+698,195+289
195+938,196+425
197+289,198+191
199+446,200+030
200+030,200+716
201+535,202+123
205+776,206+418.
Periode pengelolaan
adalah selam
a kegiatan
konstruksi berlangsung.
6. Dam
age to Public
Utilities (W
ater Pipe)
Cleaning of land for
highway
construction
Degrading condition
of public utilities such
as electricity
networks, telephone,
water networks,
irrigation and others.
Reducing the
smallest possible
disturbance to public
utilities.
Create technical
handling, such as the
transfer of electrical
substations, m
aking
the box culvert to
avoid disruption of
clean water and
irrigation channels
that meet their
individual needs.
Location managem
ent is in
place along the intended
utility of the highway.
Sta 91+552
(pipa PDAM), Sta
103+421 (Gas), PLN pada
setiap perpotongan,
dengan
jalan kab./ jl desa. Pada
Section 11 di sekitar Sta
126+ 122 (Gas)
127+2 12 (Gas)
Section III
Sta 130+901
Section
Executing
activities
Contractor.
Office of Public
Works
(Highways)
BPLHD West Java
Province, Regent
of Purwakarta,
Subang,
Majalengka,
Indram
ayu and
Cirebon. Governor
of West Java
Province, BPJT-
Department of
Public Works
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 52
IV section V and VI.
Managem
ent during the
construction period lasted,
at least 3 months.
7. Public-destruction
of social facilities
(Facilities Social and
Public Facilities)
Excavation and site
preparation.
Reduced social
facilities and public
facilities, such as the
Mosque, Village
Office, Health Center,
School and others.
Reducing the
negative social
impact as sm
all as
possible due to the
disruption of the
facilities in the area.
coordinate with local
governments in order
to obtain
replacem
ent land to
rebuild the facilities
in question.
Pay com
pensation
according to the
price according to
the policy agreed by
both parties,
between community
and government.
.
Location managem
ent is a
toll road along which there
are special facilities
intended.
Period managem
ent is
during the construction
period lasts.
Executing
activities
Contractor,
Office of Public
Works
(Highways)
BPLHD West Java
Province, Regent
of Purwakarta,
Subang,
Majalengka,
Indram
ayu and
Cirebon. Governor
of West Java
Province, BPJT-
Department of
Public Works
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 53
Type of Im
pacts
Source of Im
pact
Benchmark of Im
pact Env. M
anagem
ent
Objective
Env. M
anagem
ent
Effort
Location and Period
Institution of Environm
ental Managem
ent
Executing
Supervising
Reporting Laporan
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
III. P
ost-Construction Phase
(Operations)
A. Chem
ical
Physical
Components
1. Reduced Air
Quality
Trough traffic
vehicles
Dust levels were
observed visually
(observation) and the
complaints from
the
public due to the
many dust or air dust
concentration
measurements of air
quality monitoring
results.
To prevent or
reduce the
occurrence of
elevated levels of
dust in the air
because the roads
are not paved over,
particularly those
close to residential
areas, reducing the
negative perception
of society towards
the project and
further prevent the
situation was not
a n aesthetic as well
as decline in public
health.
.
Planting trees
a function other than
as a aesthetics but
function as well as
plant capable
absorb pollutants
air.
Make some
rest area on
left and right lane
road toll
and
planting area
surrounding
trees
function shade
and can absorb
pollution.
Location managem
ent is
In all toll roads
starting from
the entrance
until the exit is also
at the entrance to exit in
Interchange Sta.
92+600-92+850,
Sta 98+700-98+800,
Sta 104+550-104+900,
Sta 11 3+700- 11 3+800,
Sta 11 6+800- 11 6+900)
Made at any time or as
needed, followed by related
activities during the
operational stage 6
months.
Executing
activities
Contractor,
Office of Public
Works
(Highways),
Office of
Environm
ental
DIvision
BPLHD West Java
Province, Regent
of Purwakarta,
Subang,
Majalengka,
Indram
ayu and
Cirebon. Governor
of West Java
Province, BPJT-
Department of
Public Works
2. Increased Noise Operating vehicle
on the highway.
The increased noise
at the location of
settlem
ents and
access roads.
Minimize the noise
level in a
neighborhood
adjacent to
settlem
ents.
As above
Conducted along the path
traversed by vehicles,
especially those in rural
areas through five
regencieSta 98-1--700-
9SH-800,
Executing
activities
Contractor,
Office of Public
Works
(Highways),
Office of
Environm
ental
DIvision
BPLHD West Java
Province, Regent
of Purwakarta,
Subang,
Majalengka,
Indram
ayu and
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 54
Sta 104+550-104+900,
Sta 113+700-113+800,
Sta 116+800- 11 6+900.
Made at any time or as
needed, followed by related
activities during the
operational stage 6
months.
Cirebon. Governor
of West Java
Province, BPJT-
Department of
Public Works
3. Changing Land
Use
Changes in land
use resulting from
the operation of toll
roads.
Changing land use
and government
population along the
alignm
ent along the
116.4 km highway,
which was originally
paddy fields into
residential areas,
which was originally
the garden of m
ixture
and other trade
areas.
Directing the use of
land so as not to
overlap and
synergize each
other.
Avoid land use
c hange so as not to
disturb the
econom
ic culture of
local com
munities.
Conduct monitoring and
controlling land use to
refer to the local spatial
plan.
Create a land use
policy in synergy with
the use of toll roads for
better highway
performance, for
exam
ple by not making
too many entrance toll
due to dem
and from
the
region woke up along
the highway alignm
ent
Location managem
ent is
the alignm
ent along the
highways
Made at any time or as
needed, followed by related
activities during the
operational stage 6
months.
Executing
activities
Contractor,
Office of Public
Works
(Highways),
Office of
Environm
ental
DIvision
Office of
Planning
BPLHD West Java
Province, Regent
of Purwakarta,
Subang,
Majalengka,
Indram
ayu and
Cirebon. Governor
of West Java
Province, BPJT-
Department of
Public Works
B. C
omponents of
Social, Economic
and Culture
1. Increasing
employment
opportunities and
business opportunity
The existence of
employment
opportunities for
surrounding
communities and
business
opportunities in the
service sector.
Increasing the
number of local
workers who
absorbed
- Num
ber of business
opportunities that are
available for the local
econom
y
Further improve the
econom
ic condition
of society again.
Optimize
employment
opportunities and
business
opportunity for local
people in order to
foster economic
activity by region.
Manager Toll roads
could provide
employment
opportunities to the
people who meet the
qualifications (in
accorandce with the
qualifications and
requirements).
Informing the public
about employment
opportunities following
the qualification of labor
needed to install an
information sheet about
the vacancy on the
Managem
ent is done by
targeting the population of
toll roads in the villages
that had access toll road,
which is located in the sub-
district in 5 regencies.
Done periodically between
three to six months and
intensively during the
operation.
Office of
Economic Affairs
and related
District Highway
Manager
Regional
Revenue Office,
Environm
ental
Office.
BPLHD West Java
Province, Reggent
of Purwakarta,
Subang,
Majalengka,
Indram
ayu and
Cirebon
Environmental Management Plan of Cikampek-Palimanan Toll Road West Java Province
III - 55
board's announcement
at the Village Office or
the District in each
project area.
Counseling and
information about
business opportunities
in the population
Provide appropriate
MSEs wage (Minimum
Wage of City),
education level and
skills of workers.
Involve the em
ployees
in the em
ployees' social
security
2. Public Perception
Increased
accessibility of the
local economy with
the presence of toll
roads. Increased
regional economy
The num
ber of people
who support the
existence of the
highway
Com
munity support
for the operation of
toll roads in order
to foster economic
activity by region.
Fulfill the com
mitment
in providing
employment
opportunities to the
community around that
qualified for increased
econom
ic activities.
Maintenance of
highway infrastructure
and facilities in order to
keep functioning
optimally.
Conduct a brief
interview on the
condition of the
community about the
existence of the
highway on kinship or
access attempt.
Managem
ent by objectives
on land around highways in
villages who gets access
toll road, which is located in
the sub district in 5
regencies
Done periodically between
three to six months during
the post-construction road
Office of
Economic Affairs
and related
District Highway
Manager.
Regional
Revenue Office,
Environm
ental
Office.
BPLHD West Java
Province, Regent
of Purwakarta,
Subang,
Majalengka,
Indram
ayu and
Cirebon BPJT-
Departemen PU.