1
Table of Contents
I. KOVIS E&C Profile
II. KOVIS E&C Organization & Company Resource
III. Engineering & Fabrication Strategy
IV. Experience List
V. Execution Capability by Each Division
VI. Quality and Environmental Control System
2
1. NAME : KOVIS Engineering & Construction Co., Ltd.
2. ADDRESS(Office) : 5th~6th Floor, VIPD Building, No. 4 Nguyen Thi Minh Khai
Street, Da Kao Ward, District 1, HCM City, Vietnam.
Tel: 84-28-3911-7211 / 7212, Fax: 84-28-3911-7213.
3. CEO & PRESIDENT : Mr. Young Sup (David) Kim / P.E.
4. FACTORY :
Binh Duong - 10 St., Sacombank Warehouse, Song Than 1
(750m²) Industrial Park, Di An, Binh Duong Province, Vietnam.
Nhon Trach - Workshop 4A, Road N4, Vinatex – Tan Tao Industrial
(5300m²) Zone, Phuoc An Commune, Nhon Trach, Dong Nai.
Hai Phong - Bac Son Commune, An Duong District, Hai Phong City
(80.000m²)
5. ESTABLISHED DATE : 2009, September
(as a Global Venture Company No. 11 by SK Engineering & Construction in Korea)
6. CERTIFICATE : Company Certificate (KOVIS E&C), ISO 9001 & ISO 14001
7. WEBSITE: https://kovis.com.vn/
I. KOVIS E&C Profile
3 3
4
I. KOVIS E&C Profile
Company Investment Certificate
5
I. KOVIS E&C Profile
ISO 9001:2015 Certificate of
Quality Management System ISO 14001:2015 Certificate of
Environmental Management System
II.1) KOVIS E&C Organization
II.2) Employees
II.3) Man Power Mobilization Capability for Construction Works
II.4) Equipment Capability for Construction Works
6
II. KOVIS E&C Organization & Company Resource
President
Mr. Y. S. Kim Email : [email protected]
HP : +84-(0)90-925-0080
+82-(0)10-3763-6749
Project Dep’t
Mrs. Nguyen Thi Minh Tho Email : [email protected]
HP : +84-(0)978-751-531
Marketing Dep’t
Mr. S.H. (Joshua) Kim
(Korea) Email : [email protected]
HP : +84-(0)-93 875 0080
Mrs. Vo Thi Kim Dung Email : [email protected]
HP : +84-(0)938-932-588
Mrs. Vo Thi Nguyen Ha Email : [email protected]
HP : +84-(0)35-278-6785
Admin / Account Dep’t
Mrs. Tran T. Uyen Phuong Email : [email protected]
HP : +84-(0)904-909-070
Design & Engineering Dep’t
Mr. Le Ngoc Khoa Email : [email protected]
HP : +84-(0)98-340-8056
Mr. Nguyen Tien Dat
Email : [email protected]
HP : +84-(0)36-863-8625
7
Procurement Dep’t
Mrs. Duong Thi Ngoc Van Email : [email protected]
HP : +84-(0)937-994-686
Engineering & Construction
Dep’t
Mr. S. Y. Cho/ Director Email : [email protected]
HP : +84-(0)938-521-000
Fabrication & Construction Dep’t
Mr. Duong Van Giap Email : [email protected]
HP : +84-(0)983-742-667
Mr Ha Van Vien Email : [email protected]
HP : +84-(0)936-923-679
Office : 5th- 6th Floor, VIPD Building, No.4 Nguyen
Thi Minh Khai Street, DaKao Ward, Dist. 1,
HCMC, Vietnam
Tel. : +84 – (0)28 – 3911 - 7211 / 7212
Fax. : +84 – (0)28 – 3911 – 7213
Plant 1 : Workshop 4A, Road N4, Vinatex – Tan Tao
Industrial Zone, Phuoc An Commune, Nhon Trach,
Vietnam.
Plant 2 : Bac Son Commune, An Duong District, Hai Phong City,
Vietnam.
II.1) KOVIS E&C Organization
II. KOVIS E&C Organization & Company Resource
8
II.2) Employees
II. KOVIS E&C Organization & Company Resource
Division
Korean Vietnamese
Total
In Vietnam
In Korea
Staff
Worker
Permanent Temporary
General Director 1 1
Project Management 3 5 8
Production & Management
- Production 1 5 55 40 101
- Construction 4 5 9
Engineering Division 1 20 21
QA/QC 1 3 5 9
Administration 2 3 5
Sales & Marketing 1 1 2 4
Total 12 1 42 63 40 158
9
FIELDS
Mech. Pkg & Structure Fab.
Tank Const.
PIPING
Plant Construction Works
Electric / Instrument
Civil/Architecture
TOTAL
MAX MOB
CAPABILITY
600
200
100
200
100
100
1300
CURRENT MAN
POWER
100
20
10
10
20
15
175
Remarks
Chemical Inj Pkg
S. Structure
Parts- Sub-con
Sub-con
Sub-con
Sub-con
II.3) Man Power Mobilization Capability for Construction Works
II. KOVIS E&C Organization & Company Resource
Discipline Item Specification KOVIS Unit Remarks
Common Over head Cranes 5 ton 2 sets
Common Hiap Truck 5 ton 1 sets
Common Folk Lift 3 ton 1 sets
Common Truck 5 ton 1 set
Common Pick up 2 ton 1 set
Common Auto level 1 sets
Mechanic Hydraulic Punching Machine 25 thick 1 sets
Mechanic Saw Cutting M/C 1 sets
Mechanic Jackbouch 5 sets
Mechanic Electric Winch 5 ton 1 set
Mechanic Tank Auto Welding M/C 500 Amp 2 sets
Mechanic TIG Welding Machine Model: ATW-350DT 8 sets Autowel
Mechanic TIG Welding Machine Model: TIG 303 41 sets Jasic
Mechanic TIG Welding Machine Model: TIG 301 7 sets
Mechanic ARC Welding Machine Model: ATW-350D 4 Sets Autowel
Mechanic ARC Welding Machine Model: ARC 350 29 Sets Jasic
Mechanic Chain Block 1 ton 12 sets Kawasaki
Mechanic Chain Block 2 ton 12 sets Kawasaki
Mechanic Chain Block 5 ton 6 sets Kawasaki
Mechanic Chain Block 10 ton 1 sets
Mechanic Chain Block 15 ton 1 sets
10
II.4) Equipment Capability for Construction Works
II. KOVIS E&C Organization & Company Resource
Discipline Item Specification KOVIS Unit Remarks
Mechanic Welding Tool Sets Arc, Jig 10 sets
Mechanic Blower Electric 5 sets
Painting Electric Compressor 400 CFM 1 sets
Painting Blasting Tool Sets 1 sets
Painting Painting Spray Tool Sets 1 sets
Surface roughness tester
(SJ210 / Mitutoyo) 1 set
Painting tool Coating Thickness gauge
(456 Elcometer) 1 set
Hardness gauge
(Elcometer) 1 set
Equipment Grinding machine 180 Brand: Bosch 30 set Equipment Grinding machine 100 Brand: Bosch 49 set Machine Pipe Cutting & Beveling machine Model: S-100LT 1 set
Machine Beveling machine Model: S-CM4_M 1 set
Machine Wood-Sewing machine Model: 810172988146 1 set
Machine Air compressor Model: Puma, 31045M 108M
E1 1 set
Machine Air compressor Model: 31045M108M3E1 1 set
Machine Bench drilling machine 1,2M, 2HP-3P-1450
Model: HK-KC12 1 set
Machine Table vise Model: L0058-06 3 set
Machine Turning Roller Model: SKTR-5 1 set 5 Tons
Machine Turn Table for Welding 40W, table dia.: 300mm 2 set
11
II.4) Equipment Capability for Construction Works
II. KOVIS E&C Organization & Company Resource
III.1) Work Activity for Chemical Injection Package (CIP)
III.2) Work Activity for Platform Ladders & Steel Structure
III.3) Work Activity for Sampling Systems
III.4) Distribution for Equipments & Materials
12
III. Engineering & Fabrication Strategy
Work Activity KOVIS Sub Contractor Remark
Mechanical Packaged Equipment
(Chemical Injection Package)
Engineering ○
Pumps ○ Pulsafeeder pumps,
OBL Pumps or equiv.
Tanks and Accessories ○
Piping Spools ○
Electrical / Instrument ○ ○
Skids, Handrails & Ladders ○ ○ Hot Dip Galv.
Fabrication & Assembly ○ X KOVIS’ Factory (Nhon
Trach in Dong Nai)
Final Inspection ○
Delivery to Port ○
Inspection ○ ○
Pre-Commissioning ○ If required (Option)
III. Engineering & Fabrication Strategy
13
III.1) Work Activity for Chemical Injection Package (CIP)
Work Activity KOVIS Sub Contractor Remark
Platform Ladders & Steel Structure
Engineering: Erection & Cutting Plan ○
Fabrication: Bending, Cutting,
Welding, 1st Assembly, Inspection ○ ○
Shot Blasting ○ ○
Painting ○ ○
Hot Dip Galvanizing
(Handrails, Ladders, Safety gate) ○
2nd Assembly ○
Final Inspection ○
Packing ○
Delivery to Port ○
III. Engineering & Fabrication Strategy
14
III.2) Work Activity for Platform Ladders & Steel Structure
Work Activity KOVIS Sub Contractor Remark
Mechanical Packaged Equipment
(Sampling Systems)
Engineering ○
Equipment ○ ○ Emerson, Yokogawa
Endress+Hauser
Piping Spools & Tube Systems ○
Electrical / Instrument ○ ○ Rose, Hach
Steel Structures ○
Fabrication & Assembly ○ KOVIS’s Factory at
Nhon Trach-Dong Nai
Testing & Inspection ○
Delivery to Port ○
Pre-Commissioning ○ If required (Option)
III. Engineering & Fabrication Strategy
15
III.3) Work Activity for Sampling Systems
III. Engineering & Fabrication Strategy
16
III.4) Distribution for Equipments & Materials
Products Brands Logo Scope of business
Metering Pumps
Pulsafeeder
(USA)
PULSAPRO Series: PP680, PP880, PP7120,
PP900
Pulsa Series: 8480X, 7660,7440,...
Pulsa Series: 8480X, 7660,7440,...
Eclipse Metallic / Mon-metallic: E02, E05, E12
OBL
(Italy)
Hydraulic Diaphragm Metering Pumps:
XRN Series – BlackPlus
XL/XLB Series
XLC Series
X9 Series: LY, LK, LP, LN
Hy-Lok Tube Fittings Hy-Lok
(Korea)
Fittings:
Hy-Lok Tube Fittings, High Pressure Fittings, Pipe
Fittings (ASME 16.11)
Valves:
Needle Valves, Ball Valves, Double Block & Bleed
Valves, Manual Ball Valves, Cryogenic Valves
Tubing:
Acutherm,
Therma-Fuser Systems
Acutherm
(USA)
Variable Air Volume Systems,
VAV Diffusers and Building Automation System
Roof Drainage Systems
(GEBERIT Pluvia)
Geberit
(Swiss/Korea)
GEBERIT Pluvia Siphonic Roof Drainage System,
Superior roof drainage system
III. Engineering & Fabrication Strategy
17
III.4) Distribution for Equipments & Materials
Products Brands Logo Scope of business
Young Poong Pumps
Young
Poong
Precision
Corporation
(Korea)
– ASME Pump
– API Pump
– Magnetic Pump
– Industrial Pump
– Munsch Pump
– Trico
McSYS Valve McSYS
(Korea)
- Butterfly Valve: High Performance, Triple Offset,
Concentric
- Globe Control Valve: Globe Control Valve – C &
Globe Control Valve – S
- Actuated Valve: 2-way Ball Valve, 3-way Ball Valve,
V-notch Ball Valve, H.P Butterfly Valve, Plastic Valves
(Technical) Angle Valve, Mega Valve, Positoner
- Teflon Valve:
AirSweep® Solution
Control
Concepts
(USA)
- AirSweep
- Dazic
- Acousticlean
Sodimate - Powder
chemical expert
Sodimate
(French)
- Powder Chemicals: lime, activated carbon, sodium
bicarbonate...
- Mixing Tanks: lime milk preparation, activated carbon
slurry preparation
- Sludge Mixers and Conveyors for sludge stabilization
units
IV.1) Experience List for Chemical Injection Package
IV.2) Experience List for PULSAFEEDER PUMPS
IV.3) Experience List for Platform & Ladder
IV.4) Experience List for Construction Works
IV.5) Experience List for Construction for Piping Works
IV.6) Experience List for GEBERIT Syphonic Drain System
18
IV. Experience List
Project Name Location Client Item
Description Q’ty
Year
Order Remark
Ruwais Refinery
Expansion Project
ABU Dhabi
(UAE)
ABU Dhabi Oil Refinery
(RRE Pjt)
Chemical
Injection
Package
16
Sets
2011-
2012
(Metering Pumps-
Pulsafeeder Pump)
Esmeraldas
Refinery
Rehabilitation
Project-Phase II
Ecuador SKEC/ Petro Industrial
Chemical
Dosing
System
11
Sets
2010-
2011
(Metering pumps-
Pulsafeeder Pump)
NGHI SON Refinery
Complex Project Vietnam
SK Engineering &
Construction
Chemical
Injection
Package
16
Sets
2015-
2016
NGHI SON Refinery
Complex Project
Vietnam
SK Engineering &
Construction
Chemical
Injection
Package
8
Sets
2015-
2016
RPLC Deep
Conversion Project Venezuela
KOLON e ENGINEERING/
Hyundai Eng.
Chemical
Injection
Package
15
Sets
2015-
2016
IV. Experience List
19
IV.1) Experience List for Chemical Injection Package
Project Name Location Client Item
Description Q’ty
Year
Order Remark
HSVC1 PP4
Project Vietnam
eTec E&C
Limited/
Hyosung Vina
Chemicals
Co., Ltd
Chemical
Injection
Package
6
Sets
2018-
2019
HSVC OL1
Project Vietnam
eTec E&C
Limited/
Hyosung Vina
Chemicals
Co., Ltd
Chemical
Injection
Package
12
Sets 2020 On Going
IV. Experience List
20
IV.1) Experience List for Chemical Injection Package
IV. Experience List
21
IV.2) Experience List for Chemical Injection Package
No. Project
Name
Project
Location Item Tag No. Service
1
Esmeraldas
Refinery
Rehabilitation Project –
Phase II
Ecuador
2010014-MH51O-VD-YME4007-CB-004 Daf Alum Feed System
2010014-MH51O-VD-YME4009-CB-004 Daf Polymer Feed System
2010014-MH51O-VD-YME4011-PA3-CB-004 Salty Daf Polymer Feed System
201004-MH51O-VD-YME4011-PA4-CB-004 Salty Daf Caustic Feed System
201004-MH51O-VD-YME4024-PA2-CB-004 Phosphoric Acid Feed System
2010014-MH51O-VD-YME4030-PA4-CB-004 Storm Daf Caustic Feed System
2010014-MH511O-VD-YME4110-CB-004 Daf Caustic Feed System
2010014-MH51O-VD-YME4111-CB-004 Salty Daf Alum Feed System
2
Ruwais
Refinery
Expansion
Project
UAE
5578-E1-VP-1100-ME-002-009 Demulsifier Injection Package
5578-E1-VP-1100-ME-003-009 Antifoulant Injection Package
5578-E1-VP-1100-ME-004-009 Caustic Injection Package
5578-E1-VP-1100-ME-005-009 Neutralizing Amine Injection Package
5578-E1-VP-1100-ME-006-009 Corrosion Inhibitor Injection Package
5578-E1-VP-1100-ME-003-009 Antifoam Injection Package
5578-E1-VP-1300-ME-002-009 Amine Dosing Package
5578-E1-VP-1300-ME-003-009 Phosphate Dosing Package
5578-E1-VP-1520-ME-020-009 Antifoam Injection Package
5578-E1-VP-1530-ME-002-009 Antifoam Injection Package
5578-E1-VP-1800-ME-001-009 Mdea Antifoam Injection Package
5578-E1-VP-1810-ME-001-009 Mdea Antifoam Injection Package
5578-E1-VP-1900-ME-700-009 Phosphate Dosing Package
3 HSVC PP4
Cai Mep
Site,
Vung Tau, Vi
etnam
PK-1201 Chemical Dosing Package For Ct-1201
PK-2601 Chemical Dosing Package For Ct-2601
IV. Experience List
22
IV.2) Experience List for Chemical Injection Package
No. Project
Name
Project
Location Item Tag No. Service
4 NSRP
Project
Thanh Hoa,
Vietnam
VS215A-207-A-011 Chlorination Package
VS215A-207-A-012 Cooling Water Chemical Dosing Package
VS215A-207-A-013 Amine Dosing Package
VS215A-207-A-014 Oxygen Scavenger Dosing Package
VS215A-207-A-015 Phosphate Dosing Package
VS215A-207-A-016 Phosphate Dosing Package
VS215A-207-A-017 Chemical Dosing Package For 110-a-017
VS215A-207-A-018 Chemical Dosing Package For 121-a-004
VS215A-206-A-021 Demulsifier Injection Package
VS215A-206-A-022 Anti Foulant Injection Package
VS215A-206-A-023 Corrosion Inhibitor Injection Package
VS215A-206-A-024 Neutraliser Injection Package
VS215A-206-A-025 Antifoam Injection Package
VS215A-206-A-026 Bisulphite Injection Package
VS215A-206-A-027 Caustic Injection Package
VS215A-206-A-028 Nitrite Injection Package
VS215A-206-A-029 Corrosion Inhibitor Injection Package
VS215A-206-A-030 Antifoam Injection Package
VS215A-206-A-031 Corrosion Inhibitor Injection Package
VS215A-206-A-032 Anti Fouling Agent Injection Package
VS215A-206-A-033 Anti Oxydant Injection Package
VS215A-206-A-034 Sulfiding Agent Injection Package
VS215A-206-A-035 Corrosion Inhibitor Injection Package
VS215A-206-A-036 Ming Agent Injection Package
IV. Experience List
23
IV.2) Experience List for Chemical Injection Package
No. Project
Name
Project
Location Item Tag No. Service
5 RPLC
Project Venezuela
M-9511-M27 Nutrient-2 Injection Unit
M-9511-M22 Naoh INJECTION UNIT
M-9511-G87A/B/C Naoh DOSING PUMP FOR BACKWASH WASTEWATER PIT & RECYCLE WATER TANK
M-9511-M25 H2so4 Injection Unit
M-9511-M23 Emulsion Breaker Injection Unit
M-9511-M24 Coagulant Injection Unit
M-9511-M26 Nutrient-1 Unit
M-9511-M28A Polymer-1 Injection Unit
M-9511-M30 Antiscalant Injection Unit
M-9511-M32 Naocl INJECTION UNIT
M-9511-M33 Re-mineralization Injection Unit
M-9511-M60 De-chlorination Injection Unit
M-9511-M34 Citric Acid Injection Unit
M-9511-M35 Biocide Injection Unit
M-9511-M28B Polymer-1 Injection Unit
M-9511-M37B Ro Cip Unit
6
HSVC
OL1
Project
Cai Mep Site,
Vung Tau,
Vietnam
PK-6010 Chemical Dosing Package For Fired Heater
PK-6701 Corrosion Inhibitor Dosing Unit For Cracking Furnace
PK-6801 Corrosion Inhibitor Dosing Unit For Cracking Furnace
PK-6802 Anti-faulant Dosing Unit For Cracking Furnace
PK-6804 Emulsion Breaker Dosing Unit For Cracking Furnace
PK-6806 Anti-faulant Dosing Unit Ii For Cracking Furnace
PK-1147 O2 Scavenger Dosing Unit For Steam Boiler
PK-1148 Amine Dosing Unit For Steam Boiler
PK-1149 Phosphate Dosing Unit For Steam Boiler
Z-1261 Scale And Corrosion Inhibitor Dosing Unit For Cooling Tower
Z-1262 Biocide Dosing Unit For Cooling Tower
Z-1263 Ph Adjuster Dosing Unit For Cooling Tower
Major Work
Platform & Ladder Fabrication Work
Pipe rack, Equipment Structure &
Shelter Structure Work
Furnace & Heater Fabrication Work
Flare Stack Fabrication Work
Project Name Location Client Item
Description Q'ty Year Order Remarks
RUWAIS Refinery Expansion Project
(RRE Project)
Abu. Dhabi,
U.A.E
SK
(Abu Dhabi Oil Refining
Company) (TAKEREER)
Platform &
Ladders 1,760 tons 2010
Painted With
Hot dip Galv.
Jurong Aromatic Complex Project Singapore Jurong Aromatic (SKEC) S/Structure &
Platforms 800 tons 2012-2013
Painted &
Hot Dip Galv.
Grating
Lixil Global Viet Nam Factory Vietnam Nippon Express Co., Ltd S/Structure &
Platforms 60.2 tons 2013-2014 Painted
O Mon Thermal Power Plant Vietnam HanKook Tower Crane
Co.,Ltd Steel Structure 200 tons 2013-2014
Painted &
Hot Dip Galv.
Grating
Nghi Son Refinery Complex Project Vietnam SK Engineering &
Construction
Platform &
Ladders 1300 tons 2015-2016
Painted &
Hot Dip Galv.
Grating
Nghi Son Refinery Complex Project Vietnam SK Engineering &
Construction Steel Structure 550 tons 2016-2017
Painted &
Hot Dip Galv.
Grating
PMB Ferroalloys SND. BHD. Malaysia PRC INC./
PMB Silicon Sdn Bhd Dust Collector 70 tons 2018-2019
IV. Experience List
IV.3) Experience List for Steel Structure, Platform & Ladder
Project Name Location Client Item Description Year
Order Remark
NGHI SON
REFINERY
COMPLEX PROJECT
Vietnam
SK E&C/
JGCS
Consortium
Temporary Camp
Facilities
Dec.
2013
AREA:
3,494 m2
NGHI SON
REFINERY
COMPLEX PROJECT
Vietnam
SK E&C/
JGCS
Consortium
Korean Canteens Sep.
2014
AREA:
750 m2
NGHI SON
REFINERY
COMPLEX PROJECT
Vietnam
SK E&C/
JGCS
Consortium
Equipment and Utensil
List for Korean
Canteens in JGCS
Camp
Sep.
2014
NGHI SON
REFINERY
COMPLEX PROJECT
Vietnam
SK E&C/
JGCS
Consortium
Sports Center
Oct.
2014
AREA:
940 m2
IV. Experience List
25
IV.4) Experience List for Construction Works
Project Name Location Client Item Description Year
Order Remark
HSVC1 PP4 Project Vietnam eTec E&C
Limited
Site Temporary
Facility Work
July.
2018
AREA:
4,320 m2
HSVC1 PP4 Project Vietnam eTec E&C
Limited
Elevator For
Admin Building
Dec.
2018
HSVC1 PP4 Project Vietnam eTec E&C
Limited
Elevator
For Additive
Dec.
2018
Petrochemical
Complex In South Of
Vietnam
(Long Son
Petrochemical LSP)
Vietnam
TPSK
Consortium./
Long Son
Petrochemicals
Co., Ltd
Site Temporary
Facility (Office and
Warehouse & Others)
Works
Oct.
2019
Area:
7,368 m2
On Going
Samil Pham
Ophthalmic Facility Vietnam
eTec E&C
Limited
Site Preparation &
Temporary Facility
Work
Nov.
2019
Area:
4,000 m2
On Going
HSVC PP5 Project Vietnam eTec E&C
Limited
Elevator
For Additive
May
2020 On Going
IV. Experience List
26
IV.4) Experience List for Construction Works
IV. Experience List
27
IV.5) Experience List for Construction for Piping Works
Project Name Location Client Description Q'ty Year
Order Remarks
NGHI SON REFINERY
COMPLEX PROJECT Vietnam
JGCS
Consortium Plant Piping Works
534
Man powers
2016-
2017
NPK FERTILIZER PLANT Vietnam SC Engineering
Co., Ltd
Steel Structure &
Piping Works
104
Man Powers
2017-
2018
HSVC1 PP4 PROJECT Vietnam
eTec E&C
Limited Piping Works
40
Man Powers
2019-
2020
IV. Experience List
28
IV.6) Experience List for GEBERIT Syphonic Drain System
Project Name Location Main Con Year Remarks
KYUNGNAM HANOI LANDMARK TOWER Ha Noi Kyungnam Enterprises 2010
HABICO TOWER Ha Noi Doosan Heavy Industry 2010
LG ELECTRONICS DISPLAY PHASE1, 2 Hai Phong GS C & E 2016
LG INNOTEK Hai Phong GS C & E 2017
V. Execution Capability by Each Division
V.1) Engineering Division
V.2) Mechanical Packaged Equipment Division
V.3) S. Structure / Mechanic Fabrication Division
V.4) Construction for Piping Works
V.5) Tank / Piping Work Division
V.6) Civil / Architecture Division
29
V.1) Engineering Division
30
AUTOCAD Design
ANSYS Analysis
Pressure Vessel Design
Tank Design Programs
3-D Modeling
VI. Execution Capability by Each Division
V.1) Engineering Division
31
V. Execution Capability by Each Division
V.1.1) AUTOCAD Design
V.1) Engineering Division
V.1.2) 3-D Modeling
32
V. Execution Capability by Each Division
V.1) Engineering Division
V.1.3) ANSYS Analysis
33
V. Execution Capability by Each Division
V.1) Engineering Division
V.1.4) Pressure Vessel Design
34
V. Execution Capability by Each Division
V.2) Mechanical Packaged Equipment Division
35
Mechanical Packaged Equipment
(Chemical Injection Packages)
V. Execution Capability by Each Division
SYSTEM CAPABILITY
CHEMICAL DOSING
ANTI-FOAM &
ANTI-FOULANT INJECTION
DE-MULSIFIER
CAUSTIC
CORROSION INHIBITOR & ANTI-
SCALE AGENT AND BIOCIDE
INJECTION
POLYMER DOSING
POLYMER DOSING
AFU / DAF ALUM FEED
POWER GEN. BOILER FEED WATER CONT.
GAS PLANT ODORANT INJECTION SYSTEM
V.2) Mechanical Packaged Equipment Division
36
V.2.1) Esmeraldas Project (Ecuador)
V. Execution Capability by Each Division
V.2) Mechanical Packaged Equipment Division
37
V.2.2) RRE Project (Ruwais Refinery Expansion Project, UAE)
V. Execution Capability by Each Division
V.2) Mechanical Packaged Equipment Division
38
V.2.3) NSRP COMPLEX PROJECT (Nghi Son Refinery and Petrochemical)
V. Execution Capability by Each Division
V.2) Mechanical Packaged Equipment Division
39
V.2.4) RPLC DEEP CONVERSION PROJECT (Petroleos De Venezuela)
V. Execution Capability by Each Division
V.2) Mechanical Packaged Equipment Division
40
V. Execution Capability by Each Division
V.2.5) HSVC1 PP4 PROJECT
V.2) Mechanical Packaged Equipment Division
41
V. Execution Capability by Each Division
V.2.5) HSVC1 PP4 PROJECT
42
V.3) S. Structure / Mechanic Fabrication Division
V. Execution Capability by Each Division
43
V.3.1) RRE Project (SKEC / U.A.E)
V. Execution Capability by Each Division
V.3) S. Structure / Mechanic Fabrication Division
44
V.3.2, Jurong Aromatic Project (SKEC / Singapore)
V. Execution Capability by Each Division
V.3) S. Structure / Mechanic Fabrication Division
45
V.3.3, O MON Thermal Power Plant
V. Execution Capability by Each Division
V.3) S. Structure / Mechanic Fabrication Division
46
V.3.4) NSRP Complex Project
V. Execution Capability by Each Division
V.3) S. Structure / Mechanic Fabrication Division
47
V.3.4) NSRP Complex Project
V. Execution Capability by Each Division
V.3) S. Structure / Mechanic Fabrication Division
48
V.3.5) PMB Ferroalloys SND. BHD. Project
V. Execution Capability by Each Division
V.3) S. Structure / Mechanic Fabrication Division
49
V.3.5) PMB Ferroalloys SND. BHD. Project
V. Execution Capability by Each Division
V.3) S. Structure / Mechanic Fabrication Division
50
V.3.6) Structure Erection Work
V.3) S. Structure / Mechanic Fabrication Division
V. Execution Capability by Each Division
51
V.4.1) NSRP Complex Project
V.4) Construction for Piping Works
V. Execution Capability by Each Division
V.4.2) NPK FERTILIZER PLANT
V.5) Tank & Piping Work Division
52
V. Execution Capability by Each Division
ㅊ Project Manager
Fabrication Welding/ Field QA/ QC Paint Engineering
Project Engineer
V.5) Tank & Piping Work Division
53
Tool & Equipments
Automatic Welding M/C
Plate Bending Roller
Angle Bending Roller
Others
Organization for Tank Work
V.5.1) Tank Fabrication Works at Factory
Project Engineer
V. Execution Capability by Each Division
54
V.5) Tank & Piping Work Division
V.5.1) Field Tank Works
V. Execution Capability by Each Division
V.5) Tank & Piping Work Division
55
Special Welding
Carbon Steel Pipe
KHR32C ( Kubota Steel )
35Cr-45Ni
25Cr-35Ni
20Cr-32Ni
Dissimilar Welding
A351-CF8C + SA 312 TP321H
SA 312 TP321H + A335 Gr.P22
KHR32C + Alloy 800H
35Cr-45Ni + 25Cr-35Ni
SA 312 TP321H + 25Cr-35Ni
35Cr-45Ni + 20Cr-32Ni
GX10NiCrNb3220 + 20Cr-32Ni
20Cr-10NiCb + SA 312 TP321H,347H
PTFE Lined Piping for Sulfuric Acid Handling
V.5.2) Piping Works
V. Execution Capability by Each Division
56
BUILDING LIST No. ITEM AREA(m2) Remark
1 OFFICE BUILDING 1026.0
2 CANTEEN 350.0
3 EDUCATION BUILDING 240.0
4 AMENITY BUILDING 40.5
5 SPORT BUILDING 216.0
6.1 DORM 1, BUILDING 1 180.0
6.2 DORM 1, BUILDING 2 120.0
7.1 DORM 2, BUILDING 1 200.0
7.2 DORM 2, BUILDING 2 220.0
7.3 DORM 2, BUILDING 3 100.0
8 DORM 3 150.0
9 DORM 4 210.0
10 LAUNDRY BUILDING 51.0
11-1 KEEPER DORM 1 60.0
11-2 KEEPER DORM 2 60.0
12 UTILITY 94.0
13 BIKE SHELTER 64.0
14 CAR PARKING
SHELTER
112.5
15 EXTERNAL WORKS
TOTAL 3,494.0
V.6.1) TEMPORARY FACILITIES
V. Execution Capability by Each Division
V.6) Civil & Architecture Division
57
V.6.1) TEMPORARY CAMP FACILITIES
V. Execution Capability by Each Division
V.6) Civil & Architecture Division
V.6.1.1) Nghi Son Refinery Complex Project
58
V.6.1) TEMPORARY CAMP FACILITIES
V. Execution Capability by Each Division
V.6) Civil & Architecture Division
V.6.1.2) HSVC1 PP4 Project
59
V.6.1) TEMPORARY CAMP FACILITIES
V. Execution Capability by Each Division
V.6) Civil & Architecture Division
V.6.1.3) Petrochemical Complex In South Of Vietnam (Long Son Petrochemical LSP)
- On Going
60
V.6.2) KOREAN CANTEENS
V. Execution Capability by Each Division
V.6) Civil & Architecture Division
61
V.6.3) SPORTS CENTER
V. Execution Capability by Each Division
V.6) Civil & Architecture Division
62
V.6.4) Supply Elevator
V. Execution Capability by Each Division
V.6) Civil & Architecture Division
V.6.4.1. Elevator For Admin Building - HSVC1 PP4 Project
63
V.6.4) Supply Elevator
V. Execution Capability by Each Division
V.6) Civil & Architecture Division
V.6.4.1. Elevator For For Additive - HSVC1 PP4 Project
VI. Quality and Environmental Control System
VI.1) Management Process Flow Chart
VI.2) Product Realization Process Flow Chart
VI.3) Component Procurement& Inspection Flow Chart
VI.4) Manufacture, Test & Inspection Flow Chart
VI.5) Startup, Operation & Service Flow Chart
VI.6) Design Flow Chart
64
VI.1) Management Process Flow Chart
65
VI. Quality and Environmental Control System
Receive Order
from Customer
Is Design
Required?
Design to
Requirements
Buy Material
Receive Material
Is Material
Acceptable?
Return to
SupplierNo
Build to
Requirement
Yes
Inspection
Results
Verify Built to
Requirements
Is Product
Acceptable?
Yes
No
Rework to
Requirement
Inspection
Results
Package and Ship
Finished Product
Yes
Provide Service
Support
No
Receive Parts
From Customers
MANAGEMENT RESPONSIBILITYM
EA
SU
RE
ME
NT
, AN
AL
YS
IS &
IMP
RO
VE
ME
NT
PRODUCT REALIZATION
RE
SO
UR
CE
MA
NA
GE
ME
NT
Contract Review
Design Control
- Purchasing
- Document Control
- Inspection on & Testing
- Inspection on &
Measuring of Equipment
- Inspection & Test Status
- Insp & Test Status
- N/C Product
- Corrective Action
- Document Control
- Product Identification
- Product Realization
Inspection & Testing
- N/C Product
- Corrective Action
Handling, Storage,
Packaging, Preservation &
Delivery
Servicing
Customer Supplied
Product
- Quality Records
- Corrective/
Preventive Action
Inspection &
Measuring
Equipment
- Quality Records
- Corrective/
Preventive Action
VI.2) Product Realization Process Flow Chart
66
Vl. Quality and Environmental Control System
VI.3) Component Procurement & Inspection Flow Chart
67
Vl. Quality and Environmental Control System
VI.4) Manufacture, Test & Inspection Flow Chart
68
Vl. Quality and Environmental Control System
VI.5) Startup, Operation & Service Flow Chart
69
Vl. Quality and Environmental Control System
Test Product
(from)
Startup
User Manual
Operation
User Manual
Service
User Manual
Questionnaire Analyze
Data
Improvement
Startup Support
Warranty Database
Customer Corrective Actions
Customer Feedback,
Analyze
Data
Improvement
All Areas
Calibration
VI.6) Design Flow Chart
70
VI. Quality and Environmental Control System
71