234
CITY OF ROCHESTER FY 13 PROPOSED CIP BUDGET TABLE OF CONTENTS TABLE OF CONTENTS Budget Message to the City Council by the City Manager............................................................................ i Vehicle Lists ............................................................................................................................................... iii Debt Limit Analysis ...................................................................................................................................... 1 20-Year Bond Schedule ................................................................................................................................ 3 CIP Plan Summary ....................................................................................................................................... 5 CIP Program Schedule .................................................................................................................................. 7 Economic Development.............................................................................................................................. 11 MIS (Municipal Information Systems) ....................................................................................................... 15 Public Buildings ......................................................................................................................................... 31 Planning Department ................................................................................................................................. 43 Police Department ....................................................................................................................................... 47 Fire Department ......................................................................................................................................... 57 Public Works Department ......................................................................................................................... 67 Host Community ...................................................................................................................................... 109 School ...................................................................................................................................................... 115 Water Works ........................................................................................................................................... 143 Sewer Works ........................................................................................................................................... 183 Arena ....................................................................................................................................................... 215 Community Center ................................................................................................................................... 219
Transcript

CITY OF ROCHESTER FY 13 PROPOSED CIP BUDGET

TABLE OF CONTENTS

TABLE OF CONTENTS

Budget Message to the City Council by the City Manager............................................................................ i

Vehicle Lists ............................................................................................................................................... iii

Debt Limit Analysis...................................................................................................................................... 1

20-Year Bond Schedule ................................................................................................................................ 3

CIP Plan Summary ....................................................................................................................................... 5

CIP Program Schedule.................................................................................................................................. 7

Economic Development.............................................................................................................................. 11

MIS (Municipal Information Systems) ....................................................................................................... 15

Public Buildings ......................................................................................................................................... 31

Planning Department ................................................................................................................................. 43

Police Department....................................................................................................................................... 47

Fire Department ......................................................................................................................................... 57

Public Works Department ......................................................................................................................... 67

Host Community ...................................................................................................................................... 109

School ...................................................................................................................................................... 115

Water Works ........................................................................................................................................... 143

Sewer Works ........................................................................................................................................... 183

Arena ....................................................................................................................................................... 215

Community Center................................................................................................................................... 219

CITY OF ROCHESTER FY 13 PROPOSED CIP BUDGET

TABLE OF CONTENTS

THIS PAGE INTENTIONALLY LEFT BLANK

i

Date: April 17, 2012 To: Mayor and City Council From: Dan Fitzpatrick - City Manager Re: Fiscal Year 2013 Proposed Capital Budget I am pleased to submit for your consideration the Capital Improvements Program that covers the period from July 1, 2012 to June 30, 2018. The document is our long-range plan of the major projects and equipment purchase needs of the City and School over a six-year period and shows all projects totaling $77.9M.

All other projects are prioritized, and our approach at appropriately reducing the scope and costs of projects continues to work. Once again, along with City Staff, I have refined and prioritized the most urgent projects.

The following are the five largest projects that are included in this proposed plan;

• FY13-15 Wastewater Treatment Plant Upgrade $21,200,000

• FY13-18 Salmon Falls Road Reconstruction $8,919,100

• FY13-18 Pavement Rehabilitation $11,000,000

• FY13-14 Phase III of I/I Franklin Street $6,840,000

• FY13 Brock Street Reconstruction $4,800,000

Cash CIP –FY13 CIP proposal includes $1,304,200 in total General Fund cash funded capital projects as follows;

• Vehicle & Equipment Replacement $571,200 • Pavement Rehabilitation & Maintenance $150,000 • Replaster Pools $60,000 • Sidewalk Snow Blower $60,000 • City Hall Parking Lot & Congress Rain Garden $58,000 • Stillwater Circle Bridge $45,000 • Community Center Tennis Court Rehab $45,000 • Sidewalk Replacements $40,000 • New Wood Chipper $40,000 • Hancock St Reconstruction $15,000 • Forensic Evidence Drying Cabinet $12,000 • School Various Projects $188,000

Moreover, in order to further reduce cash outlays the use of dedicated revenues in FY13 is $510,000

ROCHESTER FIRE DEPARTMENT

APPARATUS REPLACEMENT PROGRAM

CAPITAL PROJECTS FOR FY13-18

FY 13 Replace Engine 5 $ 400,000.00 Replace Fire Hose $ 29,000.00 Hose & Nozzles $ 6,000.00 FY 14 Replace Fire Hose $ 46,400.00 Replace 19 sets of Permanent Firefighters Gear $ 47,500.00 Hose & Nozzles $ 6,000.00 FY 15 Replace 18 sets of Permanent Firefighters Gear $ 45,000.00 Replace 41 Breathing Apparatus $ 275,000.00 Hose & Nozzles $ 6,000.00 FY 16 Replace Engine 7 $ 300,000.00 Hose & Nozzles $ 6,000.00 FY 17 Replace Command Vehicle $ 45,000.00 Hose & Nozzles $ 6,000.00 FY 18 Replace Engine 4 $ 500,000.00 Hose & Nozzles $ 6,000.00 Total Cost $1,723,900.00

iii

ROCHESTER FIRE DEPARTMENT APPARATUS REPLACEMENT PROGRAM

ANNUALLY DUE PURCHASES 2013 BOND ENGINE 5

400,000

2014

0 0

2015

0 0

2016 BOND ENGINE 7 TANKER 300,000

2017 DEDICATED REVENUE

COMMAND CAR 45,000

2018 BOND ENGINE 4 500,000

2019 0 0

2020 0 0

2021 BOND RESCUE 1 250,000

FY REPLACE

LIGHT REPLACE MEDIUM

REPLACE HEAVY

NEXT HEAVY DUE

13

75 ENGINE 5 (37)

2026

14

15

16 85 ENGINE 7 (30)

2031

17 COMMAND CAR

18 94 ENGINE 4 (25)

19

20 RESCUE 1

2040

21

iv

ROCHESTER FIRE APPARATUS INVENTORY

APPARATUS YEAR MAKE MILES HOURS Engine 5 1975 Mack 70,889 4,021 Engine 4 1994 E-one 79,930 7,161 Engine 3 2006 Smeal 44,601 3,466 Ladder 1 1992 E-one 44,603 2,613 Engine 2 1997 E-one 41,165 1,965 Rescue 1 2000 E-one 43,864 3,512 Engine 1 2002 Smeal 76,104* 7,397 Engine 7 1985 Mack 13,336 2,355 Truck 1 2009 E-one 10,985 921 Miles 2010 Miles 2009 Car 3 2007 Chevy 24,978 20,803 Car 2 1998 Ford Expedition 90,247 83,123 Forestry 1 1997 F-350 Ford 22,872 22,499 Car 1 2004 Ford Expedition 24,017 21,945 Utility 1 2005 F-350 Ford 22,527 20,157 Revised 12/12/11 Rochesterfireapparatusinventory *This is an estimate since odometer replaced in 07, last original odometer reading of 36,439.

v

Roc

hest

er P

olic

e D

epar

tmen

tV

ehic

le In

vent

ory

12/1

9/11

CA

RYE

AR

MA

KE

MO

DEL

ASS

IGN

MEN

TVE

HIC

LE ID

#R

EGIS

TRA

TIO

N

MIL

EAG

E1F

2009

FOR

DC

row

n V

icto

riaP

ATR

OL

2FA

HP

71V

99X

1358

41M

P 9

20 3

86,9

123F

2011

FOR

DC

row

n V

icto

riaP

ATR

OL

2FA

BP

7BV

0BX

1041

64M

P 9

20 1

42,

176

5F20

08FO

RD

SU

V

SU

PE

RV

ISO

R1F

MFK

1658

8LA

6472

6M

P 9

20 4

92,7

046F

2011

FOR

DC

row

n V

icto

riaP

ATR

OL

2FA

BP

7BV

6BX

1207

87M

P 9

20 5

32,2

388F

2011

FOR

DC

row

n V

icto

riaP

ATR

OL

2FA

BP

7BV

9BX

1041

63M

P 9

20 6

479

9F20

09FO

RD

Cro

wn

Vic

toria

PA

TRO

L2F

AH

P71

V09

X13

5842

MP

920

792

,657

10F

2010

FOR

DC

row

n V

icto

riaP

ATR

OL

2FA

BP

7BV

7AX

1144

77M

P 9

20 8

64,3

6813

F20

09FO

RD

Cro

wn

Vic

toria

PA

TRO

L2F

AH

P71

V29

X13

5843

MP

920

975

,397

20F

2010

FOR

DC

row

n V

icto

riaP

ATR

OL

2FA

BP

7BV

9AX

1144

78 M

P

920

1159

,218

21F

2011

FOR

DC

row

n V

icto

riaP

ATR

OL/

CIT

2FA

BP

7BV

1BX

1280

36 M

P 9

20 1

224

,566

CA

RYE

AR

MA

KE

MO

DEL

ASS

IGN

MEN

TVE

HIC

LE ID

#R

EGIS

TRA

TIO

N

MIL

EAG

E2

2006

FOR

DC

row

n V

icto

riaS

UP

PO

RT

2FA

FP71

W26

X13

6325

MP

920

13

93,1

134

2011

FOR

DFo

cus

SU

PP

OR

T1F

AH

P3F

N7B

W20

4402

MP

920

15

9,36

012

2011

FOR

DFo

cus

SU

PP

OR

T1F

AH

P3F

N5B

W20

4401

MP

920

16

7,91

514

1997

FOR

DR

AN

GE

RA

NIM

AL

CO

NTR

L1F

TCR

10A

XV

TA12

292

MP

920

19

80,7

5615

2004

FOR

DTA

UR

US

SU

PP

OR

T1F

AFP

42U

14G

1201

22N

H 5

3022

172

,762

1620

11FO

RD

Cro

wn

Vic

toria

K-9

2FA

BP

7BV

5BX

1041

61M

P 9

20 1

04,

102

1720

09FO

RD

FOC

US

SU

PP

OR

T1F

AH

P35

N99

W18

2138

MP

920

17

30,0

79

CA

RYE

AR

MA

KE

MO

DEL

ASS

IGN

MEN

TVE

HIC

LE ID

#R

EGIS

TRA

TIO

N

MIL

EAG

E18

2006

FOR

DTA

UR

US

CH

IEFS

1FA

FP53

U26

A17

6509

MP

920

161

,529

720

04FO

RD

TAU

RU

SD

EP

UTY

CH

IEF

1FA

FP52

254G

1630

22 M

P 9

20 7

80

,635

DET

ECTI

VES/

SUPP

OR

T B

AC

K L

INE

FLEE

T

OTH

ER

vi

DP

W E

QU

IPM

EN

T R

EP

LAC

EM

EN

T S

CH

ED

ULE

FY12

CIP

Veh

#Pl

ate

#YE

AR

MA

KE

MO

DEL

/DES

CR

IPTI

ON

Vin

#M

ILES

/HR

S as

of

12/

07/1

0M

ILES

/HR

S as

of

12/

23/1

1D

EPT

LOC

Life

Sche

dule

d Ye

ar o

f R

epla

cem

ent

base

d up

on

Life

Act

ual/

Prop

osed

1st R

epla

ce2n

d R

epla

ce

Rep

lace

C

ost 2

010

$22

G15

100

1988

Che

vrol

et

Buc

ket T

ruck

K 3

0 1

ton

1GB

HV

34K

7KJ1

0469

686

,219

92,2

09H

WY

DP

W10

1998

2013

2023

2033

$84,

000

102

G09

927

1994

Ford

F250

4x4

Pic

kup

5.8

gas

2FTH

26H

8SC

A23

984

89,1

0294

,608

B&

GC

C8

2002

2012

2020

2028

$25,

000

10G

0230

119

90M

ack

RD

690P

Dum

p1M

2P26

0C7M

M00

9150

70,1

1571

,567

HW

YD

PW

1520

0520

1220

2720

42$1

10,0

0051

G13

813

1995

Ford

Util

ity b

ody

F350

4x2

2FD

KF3

7H7S

CA

4555

917

3,63

618

3,73

9W

/SD

PW

820

0320

1320

2120

29$7

0,00

035

G15

785

1990

Che

vrol

et

Kod

iak

K70

Dum

p 1G

BP

7D1Y

7LV

1032

5548

339

50,6

60W

/SD

PW

1520

0520

1320

2820

43$8

5,00

010

3G

1350

219

97Fo

rdF3

50 4

x4 d

iese

l1F

THF3

6F8V

EC

7332

567

,225

75,8

49B

&G

CC

820

0520

1320

2120

29$6

0,00

020

G12

970

1991

Mac

kR

D69

0P D

ump

1M2P

260G

9MM

0091

5163

,889

65,1

96H

WY

DP

W15

2006

2013

2028

2043

$110

,000

33G

0642

919

98C

hevr

olet

K

20 P

icku

p1G

BG

K24

R0W

Z276

549

134,

321

142,

062

WTR

WTP

820

0620

1320

2120

29$2

5,00

081

G02

268

1995

Hud

son

Trai

ler (

hot t

op) H

D 1

4 10

,000

lbs

10H

HD

1402

S10

0005

7N

/AN

/AH

WY

DP

W12

2007

2013

2025

2037

$20,

000

26G

0229

219

94B

obca

t07

53 s

kid

stee

r51

2716

358

H26

13H

2707

HW

YD

PW

1220

0620

1420

2620

38$5

0,00

031

G03

468

1998

Che

vrol

et

K20

Pic

kup

1GC

GK

24R

2WE

2547

3785

,909

93,2

15S

PLI

TD

PW

820

0620

1420

2220

30$2

5,00

02

G02

300

2000

Dod

ge25

00 4

x4 P

icku

p3B

7KF2

6Z9Y

M21

7225

96,0

2310

0,64

4S

PLI

TD

PW

820

0820

1420

2220

30$4

0,00

056

G03

180

2000

Che

vrol

et

TC20

903

2500

Pic

kup

serv

ice

body

1GTG

C24

F9Y

F470

634

95,2

6910

1,18

8W

/SD

PW

820

0820

1420

2220

30$6

0,00

030

G07

647

1997

Bom

bard

ier

SW

48

1197

0307

H85

8/M

2579

H89

9/27

74H

WY

DP

W12

2009

2014

2026

2038

$50,

000

48G

1585

320

00G

MC

TC31

003

Ser

vice

Bod

y1G

DJC

34FX

YF4

4162

168

,220

74,5

58S

WR

DP

W10

2010

2014

2024

2034

$50,

000

18G

0230

819

99G

MC

TC7H

042

Dum

p1G

DP

7H1C

1YJ5

0476

848

,424

51,4

81H

WY

DP

W15

2014

2014

2029

2044

$110

,000

64G

0227

619

81Jo

yC

ompr

esso

r D15

00P

1689

88H

1508

H15

08W

/SD

PW

2020

0120

1520

3520

55$3

5,00

086

G02

271

1997

Che

vrol

et

Pic

kup

CK

2090

31G

CG

K24

R9V

E16

3480

70,7

17H

WY

AR

EN

A10

2007

2015

2025

2035

$25,

000

14G

1453

419

96Jo

hnst

on

Sw

eepe

r 23R

JH1J

9VM

3H49

TC17

2022

H39

38H

4122

HW

YD

PW

1220

0820

1520

2720

39$1

60,0

0052

G03

778

2000

Dod

geR

am P

icku

p 25

00 4

x43B

7KF2

6Z0Y

M21

7226

59,2

8169

,339

SW

RW

WTF

820

0820

1520

2320

31$5

0,00

058

G21

730

2000

Kub

ota

Trac

tor B

7500

HS

D53

741

H53

6H

606

WTR

WTP

1020

1020

1520

2520

35$3

8,00

010

6G

0243

020

00C

hevr

olet

1Ton

35

00

6.5

Die

sel

1GB

JK34

FOY

F448

864

44,1

0147

,779

B&

GC

C10

2010

2015

2025

2035

$68,

000

5920

01P

ucke

ttP

aver

540

200

112

1901

07H

319

H36

5H

WY

DP

W10

2011

2015

2025

2035

$30,

000

13G

0164

520

00Jo

hnst

on

Sw

eepe

r 300

01J

9VM

3H69

YC

1720

59H

4195

H47

18H

WY

DP

W12

2012

2015

2027

2039

$170

,000

25G

0157

320

00S

ulliv

anC

ompr

esso

r D18

5Q8J

DB

2063

9H

468

H49

8W

/SD

PW

1220

1220

1520

2720

39$3

0,00

07

G17

319

2004

Trac

kles

s M

T5T

side

wal

k tra

ctor

MT5

T 22

76H

1966

H22

01/M

1456

3H

WY

DP

W10

2014

2015

2025

2035

$110

,000

54G

0630

119

99G

MC

TCH

402

C85

00 D

ump

1GD

P7H

1CO

XJ5

0595

749

,820

52,4

29H

WY

DP

W15

2014

2015

2030

2045

$110

,000

15G

0227

320

00G

MC

TC7H

042

Dum

p1G

DP

7H1C

21J5

0185

322

,151

24,0

38H

WY

DP

W15

2015

2015

2030

2045

$110

,000

55G

0385

020

00G

MC

CC

7H04

2 D

ump

1GB

P7H

1C1Y

J505

668

41,6

4144

,038

HW

YD

PW

1520

1520

1520

3020

45$1

10,0

0061

G14

690

2005

Gor

man

-Rup

ppu

mp

T4-A

3-F2

L-H

T13

1753

0H

395

H39

6W

/SD

PW

1020

1520

1520

2520

35$2

5,00

090

G01

035

2000

Big

Tex

Trai

ler 4

0SP

-14

blac

k4K

BN

X14

21Y

1B65

321

N/A

N/A

WTR

WTP

1520

1520

1520

3020

45$1

5,00

043

G06

565

1998

Dod

ge35

00 4

x43B

6MF3

659W

M28

2900

36,5

4840

,353

SW

RW

WTF

1020

0820

1620

2620

36$4

0,00

010

7G

0246

920

00C

hevr

olet

1Ton

35

00

6.5

Die

sel

1GB

JK34

F2Y

F449

076

57,5

8764

,057

B&

GC

C10

2010

2016

2026

2036

$68,

000

4G

1732

020

04Tr

ackl

ess

MT5

T si

dew

alk

tract

orM

T5T

2275

H19

00/M

7134

H21

73/M

7707

HW

YD

PW

1020

1420

1620

2620

36$1

15,0

0080

G00

744

2001

Eag

er B

eave

rTr

aile

r 20

XP

T11

2HB

V32

21L0

5888

0N

/AN

/AH

WY

DP

W15

2016

2016

2031

2046

$20,

000

104

G18

773

2006

Che

vrol

etK

3500

Silv

erad

o ex

t cab

1GB

HK

39D

06E

1641

8823

,196

28,0

41B

&G

CC

1020

1620

1620

2620

36$2

5,00

011

1993

Sto

ne

Rol

ler A

VR

4000

2551

093

H14

60H

1510

HW

YD

PW

1220

0520

1720

2920

41$2

5,00

032

G17

924

2004

Che

vrol

et

K15

00 e

xt c

ab2G

CE

K19

V84

1337

224

59,4

0568

,537

HW

YD

PW

820

1220

1720

2520

33$2

5,00

01

G17

961

2005

Che

vrol

et

Trai

lbla

zer

1GN

DT1

3S45

2224

063

33,7

6138

,000

SP

LIT

DP

W8

2013

2017

2025

2033

$30,

000

46G

0229

619

98Fe

rmec

TLK

860

Bac

khoe

SM

FB44

EC

OW

8603

721

H71

18H

7410

W/S

DP

W15

2013

2017

2032

2047

$150

,000

108

G18

771

2006

Che

vrol

etC

olor

ado

pick

up1G

CC

S14

8768

2046

0828

,470

34,5

16B

&G

CC

820

1420

1720

2520

33$2

2,00

021

G17

973

2005

Che

vrol

et

K35

00 1

-ton

1GB

HK

3928

5E18

9708

60,4

6470

,419

HW

YD

PW

1020

1520

1720

2720

37$3

0,00

073

G19

690

2007

Che

vrol

etC

olor

ado

4x4

pick

up1G

CD

T199

0781

8124

240

,075

51,3

09W

TRW

TP8

2015

2017

2025

2033

$24,

000

5G

1323

520

06G

MC

3500

4x4

w/ S

ervi

ce B

ody

1GB

JK34

M9G

S11

7401

4275

5901

SP

LIT

DP

W10

2016

2017

2027

2037

$65,

000

112

GO

0641

2001

Vol

voL3

0 Lo

ader

L3

0BZS

D18

1228

2H

2633

H30

25B

&G

CC

1520

1620

1720

3220

47$8

0,00

028

G16

447

2002

Dae

woo

M30

0-V

300

-5A

Loa

der

1018

H39

52H

4271

HW

YD

PW

1520

1720

1720

3220

47$1

25,0

0068

2005

Sto

ne

Rol

ler -

WP

2500

5320

0516

9N

/AN

/AH

WY

DP

W12

2017

2017

$30,

000

105

G12

231

2007

Che

vrol

et1

ton

w/ r

ack

body

1GB

JC34

D87

E11

9247

22,1

2528

,421

B&

GC

C10

2017

2017

2027

2037

$30,

000

41G

1687

220

03C

hevr

olet

S

ilver

ado

1500

Pic

kup

1GC

EK

14V

73E

3182

7652

,169

60,4

74S

WR

WW

TF8

2011

2018

2026

2034

$25,

000

47G

0226

619

98In

tern

atio

nal

Vac

-Tru

ck 2

554

1HTG

BA

DR

XW

H56

1309

36,9

2540

,374

SW

RD

PW

1520

1320

1820

3320

48$2

00,0

0053

G18

029

2005

Che

vrol

etK

2500

HD

Silv

erad

o1G

BH

KZ4

UX

5319

5190

58,2

2370

,588

WTR

WTP

820

1320

1820

2620

34$2

5,00

0

DPW

Veh

icle

Info

rmat

ion

Log

12/2

3/11

12/2

8/20

11

vii

DP

W E

QU

IPM

EN

T R

EP

LAC

EM

EN

T S

CH

ED

ULE

FY12

CIP

3G

1499

620

06G

MC

3/4

Ton

2-w

heel

driv

e pi

ckup

1GC

EG

25H

7711

1201

47,4

4059

,700

SP

LIT

DP

W8

2014

2018

2026

2034

$25,

000

110

G10

413

1994

Pen

n C

ampe

rTr

aile

r util

ity la

wn

big

1P9U

616D

5RL0

1695

5N

/AN

/AB

&G

DP

W20

2014

2018

2038

2058

40G

0166

020

00Tr

iton

Por

tabl

e ge

nera

tor

4TC

SU

1078

YH

7100

05H

267

H30

3S

WR

HU

T15

2015

2018

2033

2048

$40,

000

87G

2039

820

07C

hevr

olet

Col

orad

o 4x

4 pi

ckup

1GC

DT1

9999

9171

374

31,0

4135

,328

SP

LIT

DP

W8

2015

2018

2026

2034

$24,

000

37G

0764

420

06Tr

ackl

ess

MT5

sid

ewal

k tra

ctor

MT5

T 92

4H

1197

/M42

03H

1482

/M53

48H

WY

DP

W10

2016

2018

2028

2038

$100

,000

42G

1877

220

06C

hevr

olet

Silv

erad

o K

3500

1GB

HK

3904

6E16

7076

92,5

3711

0,98

0S

WR

DP

W10

2016

2018

2028

2038

$45,

000

44G

1443

020

07K

ubot

aL4

240H

STC

3088

6H

522

H64

0S

WR

WW

TF10

2017

2018

2028

2038

$38,

000

57G

0347

420

10C

hevr

olet

C

olor

ado

Ext

ende

d ca

p 4X

4 pi

ckup

1GC

JTB

96A

8105

984

11,4

9323

,109

W/S

DP

W8

2018

2018

2026

2034

$24,

000

27G

0226

520

00C

ham

pion

Gra

der 7

26 A

VH

PX

0309

78X

H46

79H

5012

HW

YD

PW

1520

1520

1920

3420

49$2

80,0

0019

G17

385

2004

GM

CC

8500

Top

Kic

k1G

DP

8C1C

44F5

1317

132

,911

36,1

26H

WY

DP

W15

2019

2019

2034

2049

$110

,000

67G

1877

520

04S

ulliv

anC

ompr

esso

rD

185Q

11JD

H29

7H

330

WTR

DP

W15

2019

2019

$35,

000

7520

09Fe

rris

La

wn

Mow

er/IS

3100

Z20

1359

1662

72S

WR

WW

TF10

2019

2019

$9,0

0049

G18

843

2006

Che

vrol

et

C35

00 R

ack

Bod

y1G

BJC

34D

06E

2011

9532

,226

37,2

18S

WR

DP

W10

2016

2020

2030

2040

$30,

000

109

G12

520

1998

Har

very

Trai

ler u

tility

sm

all

5A2G

5081

1WB

0000

53N

/AN

/AB

&G

CC

2020

1820

2020

4020

6011

1G

0382

219

98To

wgo

Trai

ler u

tility

40X

K10

85X

WA

9832

92N

/AN

/AB

&G

CC

2020

1820

2020

4020

6024

G21

110

2009

Che

vrol

et35

00H

D 1

-ton

- dum

p bo

dy1G

BJK

3461

8E18

6620

27,9

7243

,500

HW

YD

PW

1020

1920

2020

3020

40$6

0,00

083

G04

482

1999

Inte

rnat

iona

lTr

aile

r fla

t1Z

FU08

19X

B00

1383

N/A

N/A

SW

RD

PW

2020

1920

2020

4020

60$2

0,00

016

G18

102

2005

GM

CC

8500

Top

Kic

k1G

DP

8C1C

X5F

2192

1830

,318

35,1

52H

WY

DP

W15

2020

2020

2035

2050

$110

,000

17G

1889

220

06G

MC

C85

00 T

opK

ick

1GD

P8C

1C26

F413

167

27,8

9533

,176

HW

YD

PW

1520

2120

2120

3620

51$1

15,0

0029

G02

283

2006

Dae

woo

080W

V E

xcav

ator

3GC

0001

7H

2370

H27

45H

WY

DP

W15

2021

2021

2036

2051

$150

,000

45G

1912

620

06In

tern

atio

nal

6-w

heel

sew

er je

t tru

ck w

/cam

era

1HTM

MA

AN

66H

2458

9095

7510

,950

SW

RD

PW

1520

2120

2120

3620

51$1

90,0

0034

G01

846

2010

Ford

F250

4X

4 pi

ckup

1FTS

X2B

51A

EA

3285

612

790

22,1

79W

TRD

PW

820

1820

2220

3020

38$2

6,00

06

G20

396

2007

Inte

rnat

iona

l6-

whe

el D

ump

1M2P

121C

XH

A00

2422

12,8

1016

,195

HW

YD

PW

1520

2220

2220

3720

52$1

10,0

0012

G19

946

2007

Inte

rnat

iona

l10

-whe

el d

ump

truck

1HTW

XA

HT1

8J56

3268

25,0

1731

,479

HW

YD

PW

1520

2220

2320

3820

53$1

45,0

008

G19

947

2008

Inte

rnat

iona

l6-

whe

el D

ump

1HTW

AB

AR

48JS

6325

016

,806

19,9

46H

WY

DP

W15

2023

2023

2038

2053

$130

,000

36G

1372

120

08C

ater

pilla

r42

0E b

ackh

oeC

AT0

420E

EK

MW

0307

7H

1526

H21

28W

TRD

PW

1520

2320

2320

3820

53$1

50,0

0039

G14

514

2008

Cat

erpi

llar

938H

Loa

der

CA

T093

8HJM

JC00

172

H13

39H

2008

HW

YD

PW

1520

2320

2320

3820

53$1

50,0

0065

G20

937

2008

Inte

rnat

iona

l6-

whe

el D

ump

1HTW

AA

AR

38J6

7762

78,

828

12,0

39H

WY

DP

W15

2023

2023

$110

,000

92G

1388

120

08A

mer

ican

Mes

sage

Boa

rd1A

9AS

4324

8222

8103

N/A

N/A

HW

YD

PW

1520

2320

2320

3820

5393

G02

307

2008

Am

eric

anM

essa

ge B

oard

1A9A

S43

2682

2281

07N

/AN

/AH

WY

DP

W15

2023

2023

2038

2053

9G

2110

520

09In

tern

atio

nal

10-w

heel

dum

p tru

ck1H

TWX

AH

T19J

1589

9611

586

1827

7H

WY

DP

W15

2024

2023

2038

2053

$145

,000

74G

2203

320

09C

ater

pilla

rG

ener

ator

(tra

iler m

ount

ed)

16M

PF0

9AD

0558

79H

1028

H10

78S

WR

WW

TF15

2024

2024

$15,

000

38G

0764

519

84C

ater

pilla

r92

6 Lo

ader

94Z0

0888

H45

14H

4514

HW

YD

PW

1519

99??

#VA

LUE

!#V

ALU

E!

$125

,000

63G

0231

019

87Li

ndsa

yC

ompr

esso

r 175

OD

3143

8H

2053

H20

53W

/SD

PW

1520

02??

#VA

LUE

!#V

ALU

E!

$30,

000

7719

87R

oot S

prin

gS

now

Blo

wer

RB

8.89

2588

0H

327

H32

7H

WY

DP

W12

2010

??#V

ALU

E!

#VA

LUE

!$9

0,00

0

12/2

8/20

11

viii

CO

DE

ENFO

RC

EMEN

T V

EHIC

LE L

IST

TYP

EY

EA

RV

IND

ATE

PU

RC

HA

SE

DM

ILE

AG

E

Ford

Exp

lore

r19

981F

MZU

34E

3WZA

4491

79/

13/2

002

116,

921

#61

Che

vy M

alib

u20

051G

1ND

52F4

5M23

4790

7/7/

2006

7,58

2#6

0

Toyo

ta P

rius

2007

JTD

KB

2OU

0732

9395

710

/1/2

007

33,0

26#6

2

Toyo

ta P

rius

2007

JTD

KB

2OU

2776

9096

610

/1/2

007

27,5

51#6

3

ix

THIS PAGE INTENTIONALLY LEFT BLANK

CITY OF ROCHESTER FY13 PROPOSED CIP BUDGET

CAPITAL IMPROVEMENTS x

Ass

esse

d V

alua

tion

22,

085,

675,

502

2,08

5,67

5,50

22,

085,

675,

502

N/A

% o

f Sta

te A

sses

smen

t3.

00%

7.00

%10

.00%

Unl

imite

d

Stat

utor

y Li

mit

62,5

70,2

65.0

614

5,99

7,28

5.14

208,

567,

550.

20U

nlim

ited

Bon

ds32

,409

,593

.27

12,6

69,8

71.4

39,

302,

526.

944,

043,

754.

36N

otes

0.00

0.00

300,

000.

000.

00St

ate

Rev

olvi

ng L

oans

0.00

0.00

1,12

5,30

1.59

12,1

77,0

23.3

6

Ava

iliab

le D

ebt M

argi

n30

,160

,671

.79

133,

327,

413.

7119

7,83

9,72

1.67

Unl

imite

d

FY99

Aut

horiz

ed b

ut U

niss

ued

00

00

FY03

Aut

horiz

ed a

nd U

niss

ued

0.00

0.00

146,

000.

350.

00FY

04 A

utho

rized

and

Uni

ssue

d 41

,840

.10

0.00

150,

000.

0030

3,96

4.93

FY05

Aut

horiz

ed a

nd U

niss

ued

301,

496.

000.

002,

000,

000.

0093

3,56

6.74

FY06

Aut

horiz

ed a

nd U

niss

ued

241,

794.

940.

0025

8,15

9.90

0.00

FY07

Aut

horiz

ed a

nd U

niss

ued

1,26

6,30

0.00

0.00

498,

052.

2769

0,00

0.00

FY08

Aut

horiz

ed a

nd U

niss

ued

200,

000.

0027

5,00

0.00

193,

214.

0090

,000

.00

FY09

Aut

horiz

ed a

nd U

niss

ued

1,95

0,00

0.00

50,0

00.0

04,

321,

047.

003,

280,

000.

00FY

10 A

utho

rized

and

Uni

ssue

d1,

460,

018.

780.

0010

0,00

0.00

575,

000.

00FY

11 A

utho

rized

and

Uni

ssue

d75

8,61

5.84

435,

000.

001,

333,

761.

9772

5,00

0.00

FY12

Aut

horiz

ed a

nd U

niss

ued

2,54

6,25

0.00

368,

155.

002,

366,

000.

0068

6,00

0.00

Tot

al A

utho

rize

d an

d U

niss

ued

8,76

6,31

5.66

1,12

8,15

5.00

11,3

66,2

35.4

97,

283,

531.

67

Net

Deb

t Mar

gin

21,3

94,3

56.1

313

2,19

9,25

8.71

186,

473,

486.

18N

/A

1 C

ity B

onds

Out

stan

ding

31,4

89,3

94.1

5 A

rena

Bon

ds O

utst

andi

ng92

0,19

9.12

32,4

09,5

93.2

7

Deb

t Lim

it A

naly

sis -

as o

f Mar

ch 3

0, 2

012

CIT

Y O

F R

OC

HE

STE

R

Des

crip

tion

City

& A

rena

1Sc

hool

Wat

erSe

wer

CITY OF ROCHESTER FY13 PROPOSED CIP BUDGET

DEBT LIMIT ANALYSIS 1

THIS PAGE INTENTIONALLY LEFT BLANK

CITY OF ROCHESTER FY13 PROPOSED CIP BUDGET

CAPITAL IMPROVEMENTS 2

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

CIT

Y P

RIN

CIP

AL

-

2,

795,

837

2,

903,

665

2,

899,

546

2,

519,

821

2,

208,

887

2,

178,

640

1,

945,

970

1,

871,

777

1,

711,

627

1,

477,

806

I

NT

ER

EST

-

1,

167,

072

1,

061,

920

94

7,14

4

84

7,15

6

75

5,42

1

66

5,57

4

58

4,92

0

51

2,94

8

44

2,91

5

38

2,20

8

SC

HO

OL

PR

INC

IPA

L-

1,80

6,80

6

1,80

1,59

3

1,80

2,76

4

1,77

6,44

7

795,

285

764,

305

637,

270

641,

107

608,

698

415,

811

IN

TE

RE

ST-

470,

155

402,

645

331,

669

262,

905

194,

093

164,

996

138,

883

117,

465

95,9

77

77

,207

SUB

TOTA

LS C

ITY

& S

CH

OO

L

PRIN

CIP

AL

& IN

TER

EST

-

6,

239,

869

6,16

9,82

3

5,

981,

122

5,40

6,32

9

3,

953,

686

3,77

3,51

5

3,30

7,04

3

3,

143,

297

2,85

9,21

7

2,

353,

032

WA

TE

R F

UN

D P

RIN

CIP

AL

-

86

8,46

3

86

0,19

1

86

4,11

6

79

1,51

3

79

1,96

6

78

9,06

6

63

8,57

3

63

1,14

6

57

6,17

3

54

4,52

6

I

NT

ER

EST

-

39

0,27

0

36

4,10

6

33

3,10

0

30

5,31

4

27

7,64

7

24

6,04

0

21

7,59

0

19

6,01

2

17

4,41

2

15

3,53

4

SE

WE

R F

UN

D P

RIN

CIP

AL

-

1,

554,

765

1,

539,

770

1,

540,

190

1,

518,

766

1,

516,

791

1,

502,

279

1,

448,

801

1,

430,

618

1,

431,

685

43

7,28

1

I

NT

ER

EST

-

65

2,17

2

59

0,05

7

52

6,84

1

46

4,94

6

40

3,23

8

34

0,32

7

27

9,08

1

22

0,27

9

16

1,92

7

10

4,04

3

A

RE

NA

FU

ND

PR

INC

IPA

L-

77,4

54

79

,499

79,4

99

79

,360

84,3

60

84

,360

84,3

60

51

,595

51,7

46

51

,746

I

NT

ER

EST

-

35

,310

31,9

88

28

,585

25,1

57

21

,721

18,1

65

14

,589

11,8

20

9,

858

7,

887

G

RA

ND

TO

TA

LS

PR

INC

IPA

L-

7,10

3,32

4

7,18

4,71

8

7,18

6,11

5

6,68

5,90

7

5,39

7,28

8

5,31

8,64

9

4,75

4,97

4

4,62

6,24

2

4,37

9,92

9

2,92

7,17

1

IN

TE

RE

ST-

2,71

4,97

8

2,45

0,71

6

2,16

7,33

8

1,90

5,47

8

1,65

2,12

1

1,43

5,10

3

1,23

5,06

3

1,05

8,52

5

885,

089

724,

879

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

TO

TA

LS

CIT

Y P

RIN

CIP

AL

1,48

3,80

6

1,34

2,80

6

1,35

7,80

6

1,06

7,80

6

912,

806

927,

806

533,

950

504,

030

415,

000

430,

000

31,4

89,3

94

I

NT

ER

EST

324,

463

269,

537

216,

784

169,

433

128,

935

94,6

76

59

,307

42,3

74

26

,263

13,8

13

8,

712,

862

SC

HO

OL

PR

INC

IPA

L39

2,81

1

24

5,81

1

24

0,81

1

17

5,81

1

16

0,81

1

16

0,81

1

80

,920

72,0

00

45

,000

45,0

00

12

,669

,871

IN

TE

RE

ST59

,932

46,5

38

36

,308

27,7

23

20

,681

14,2

99

7,

917

5,

130

2,

700

1,

350

2,

478,

571

SUB

TOTA

LS C

ITY

& S

CH

OO

L

PRIN

CIP

AL

& IN

TER

EST

2,26

1,01

2

1,90

4,69

2

1,

851,

710

1,44

0,77

3

1,

223,

233

1,19

7,59

2

68

2,09

4

623,

534

48

8,96

3

490,

163

55

,350

,699

WA

TE

R F

UN

D P

RIN

CIP

AL

544,

778

499,

726

499,

185

472,

737

455,

132

435,

595

221,

973

182,

970

30,0

00

30

,000

10,7

27,8

29

I

NT

ER

EST

132,

665

112,

568

92,4

21

72

,619

53,4

58

34

,989

17,1

68

8,

819

1,

800

90

0

3,

185,

428

SE

WE

R F

UN

D P

RIN

CIP

AL

432,

912

413,

564

414,

237

329,

934

286,

669

287,

413

100,

103

25,0

00

5,

000

5,

000

16

,220

,778

IN

TE

RE

ST86

,950

70,3

20

53

,907

39,4

00

26

,889

15,8

88

4,

862

1,

250

30

0

15

0

4,

042,

829

A

RE

NA

FU

ND

PR

INC

IPA

L49

,746

16,7

46

16

,746

16,7

46

16

,746

16,7

46

16

,746

16,0

00

15

,000

15,0

00

92

0,19

9

I

NT

ER

EST

5,79

6

4,50

9

3,98

9

3,46

9

2,95

0

2,43

0

1,91

0

1,39

0

900

450

232,

873

GR

AN

D T

OT

AL

S P

RIN

CIP

AL

2,90

4,05

3

2,51

8,65

3

2,52

8,78

6

2,06

3,03

4

1,83

2,16

5

1,82

8,37

1

953,

692

800,

000

510,

000

525,

000

72,0

28,0

71

I

NT

ER

EST

609,

805

503,

472

403,

409

312,

644

232,

912

162,

281

91,1

64

58

,963

31,9

63

16

,663

18,6

52,5

63

City

of R

oche

ster

Lon

g T

erm

Deb

t Req

's. P

rinc

ipal

& In

tere

st P

aym

ents

20 Y

EA

R S

CH

ED

UL

E -

AS

OF

MA

RC

H 1

6, 2

012

CITY OF ROCHESTER FY13 PROPOSED CIP BUDGET

CAPITAL IMPROVEMENTS 3

THIS PAGE INTENTIONALLY LEFT BLANK

CITY OF ROCHESTER FY13 PROPOSED CIP BUDGET

CAPITAL IMPROVEMENTS 4

Ent

erpr

ise

& S

peci

al R

even

ue F

unds

City

Dep

artm

ents

2013

2014

2015

2016

201

720

18Si

x Y

ear

Tot

alPR

OJE

CT

S

CIT

Y O

F R

OC

HE

STE

R

FY

13 P

RO

POSE

D C

IP B

UD

GE

T

CA

PIT

AL

IMPR

OV

EM

EN

TS

PLA

N S

UM

MA

RY

FUN

DIN

G S

OU

RC

E T

OT

AL

S

14,9

82,6

0016

,060

,000

28,7

78,5

007,

884,

500

4,02

6,00

06,

104,

000

77,8

35,6

00G

rand

Tot

al

3,02

7,50

03,

585,

000

550,

000

400,

000

15,0

000

7,57

7,50

0W

ater

Wor

ks4,

154,

000

3,67

2,60

020

,592

,500

1,03

0,00

015

,000

45,0

0029

,509

,100

Sew

er W

orks

300,

000

00

00

030

0,00

0A

rena

45,0

000

00

00

45,0

00C

omm

unity

Cen

ter

7,52

6,50

07,

257,

600

21,1

42,5

001,

430,

000

30,0

0045

,000

37,4

31,6

00To

tal E

nter

pris

e &

Spe

cial

Rev

enue

Fun

ds

Bon

d: C

ity/S

choo

l5,

136,

000

7,83

4,50

06,

522,

000

5,89

5,50

03,

417,

000

5,62

5,00

034

,430

,000

Bon

d: W

ater

/Sew

er/A

rena

2,36

5,00

03,

490,

000

1,10

0,00

075

0,00

015

,000

07,

720,

000

Cas

h: C

ity/S

choo

l1,

304,

200

758,

000

938,

000

443,

000

378,

000

378,

000

4,19

9,20

0C

ash:

Wat

er/S

ewer

/Are

na76

6,50

019

5,00

010

,000

00

097

1,50

0D

edic

ated

Rev

enue

510,

000

209,

900

161,

000

116,

000

201,

000

101,

000

1,29

8,90

0G

rant

550,

900

015

,000

00

056

5,90

0St

ate

Rev

olvi

ng F

und

4,35

0,00

03,

572,

600

20,0

32,5

0068

0,00

015

,000

028

,650

,100

14,9

82,6

0016

,060

,000

28,7

78,5

007,

884,

500

4,02

6,00

06,

104,

000

77,8

35,6

00G

rand

Tot

al

63,9

000

00

00

63,9

00Ec

onom

ic D

evel

opm

ent

85,0

0011

0,00

013

0,00

011

0,00

014

5,00

010

5,00

068

5,00

0M

IS25

7,00

01,

489,

500

502,

000

1,11

3,50

00

03,

362,

000

Publ

ic B

uild

ings

10,0

0010

,000

5,00

010

,000

15,0

000

50,0

00Pl

anni

ng13

9,00

014

0,00

011

0,00

00

00

389,

000

Polic

e43

5,00

099

,900

326,

000

306,

000

51,0

0050

6,00

01,

723,

900

Fire

5,16

2,20

06,

800,

000

6,41

0,00

04,

762,

000

3,63

2,00

05,

295,

000

32,0

61,2

00Pu

blic

Wor

ks38

0,00

00

00

00

380,

000

Hos

t Com

mun

ity92

4,00

015

3,00

015

3,00

015

3,00

015

3,00

015

3,00

01,

689,

000

Scho

ol7,

456,

100

Tota

l City

CIP

8,80

2,40

07,

636,

000

6,45

4,50

03,

996,

000

6,05

9,00

040

,404

,000

5

THIS PAGE INTENTIONALLY LEFT BLANK

CITY OF ROCHESTER FY13 PROPOSED CIP BUDGET

CAPITAL IMPROVEMENTS 6

BO

ND

PRO

CE

ED

SC

/OA

MO

UN

TO

&M

CA

SHD

ED

RE

VST

AT

EH

WY

FU

ND

SSR

F

CIT

Y O

F R

OC

HE

STE

R

FY13

PR

OPO

SED

CIP

BU

DG

ET

CA

PIT

AL

IMPR

OV

EM

EN

TS

PRO

GR

AM

SC

HE

DU

LE

DE

PAR

TM

EN

T/D

ESC

RIP

TIO

NG

RA

NT

LIF

EA

MO

UN

TFU

ND

BA

LR

ET

EA

RN

Eco

nom

ic D

evel

opm

ent

Indu

stria

l Par

k Si

gns

50,0

000

00

013

,900

010

063

,900

50,0

000

00

0E

cono

mic

Dev

elop

men

tSu

btot

al:

00

13,9

0063

,900

MIS

Ann

ual H

ardw

are

Rep

lace

men

t0

025

,000

00

00

532

,983

25,0

00A

nnua

l Sof

twar

e U

pgra

des

00

10,0

000

00

05

15,0

0010

,000

Libr

ary

Serv

er R

epla

cem

ent

00

30,0

000

00

05

030

,000

Net

wor

k U

pgra

de /

Expa

nsio

n0

020

,000

00

00

734

,567

20,0

000

085

,000

00

MIS

Subt

otal

:82

,550

00

85,0

00Pu

blic

Bui

ldin

gsR

epla

ster

Poo

ls0

60,0

000

00

00

100

60,0

00U

nion

St P

arki

ng L

ot a

nd D

umps

ter E

nclo

sure

s15

0,00

00

00

00

020

015

0,00

0V

ehic

le &

Equ

ipm

ent R

epla

cem

ent P

rogr

am0

47,0

000

00

00

101,

601

47,0

0015

0,00

010

7,00

00

00

Publ

ic B

uild

ings

Subt

otal

:1,

601

00

257,

000

Plan

ning

Mas

ter P

lan

Cha

pter

upd

ates

/cre

atio

n0

010

,000

00

00

100

10,0

000

010

,000

00

Plan

ning

Subt

otal

:0

00

10,0

00Po

lice

Fore

nsic

Evi

denc

e D

ryin

g C

abin

et0

12,0

000

00

00

100

12,0

00V

ehic

le &

Equ

ipm

ent R

epla

cem

ent P

rogr

am0

127,

000

00

00

05

1,46

712

7,00

00

139,

000

00

0Po

lice

Subt

otal

:1,

467

00

139,

000

Fire

App

arat

us R

epla

cem

ent P

rogr

am40

0,00

00

00

00

015

040

0,00

0Fi

re G

ear R

epla

cem

ent

00

6,00

00

00

010

826,

000

Hos

e R

epla

cem

ent

00

29,0

000

00

010

029

,000

400,

000

035

,000

00

Fir

eSu

btot

al:

820

043

5,00

0Pu

blic

Wor

ksB

rock

Stre

et R

econ

stru

ctio

n2,

000,

000

00

00

00

351,

000

2,00

0,00

0C

ity H

all P

arki

ng L

ot a

nd C

ongr

ess S

t. R

ain

G0

58,0

000

00

87,0

000

200

145,

000

Han

cock

Stre

et R

econ

stru

ctio

n0

15,0

000

00

00

300

15,0

00N

ew C

hipp

er0

40,0

000

00

00

150

40,0

00Pa

vem

ent M

aint

enan

ce0

50,0

000

00

00

1050

,750

50,0

00Pa

vem

ent R

ehab

ilita

tion

Prog

ram

1,40

0,00

010

0,00

00

00

00

1030

0,58

81,

500,

000

Phas

e III

of I

/I Pr

ojec

t - F

rank

lin S

t. A

rea

100,

000

00

00

00

350

100,

000

Reb

uild

Upp

er C

ity D

am R

aise

Rig

ht A

butm

en0

20,0

000

00

00

500

20,0

00R

epla

ce S

idew

alk

Snow

Blo

wer

Uni

ts0

60,0

000

00

00

100

60,0

00

CA

PITA

L IM

PRO

VEM

ENTS

7

BO

ND

PRO

CE

ED

SC

/OA

MO

UN

TO

&M

CA

SHD

ED

RE

VST

AT

EH

WY

FU

ND

SSR

F

CIT

Y O

F R

OC

HE

STE

R

FY

13 P

RO

POSE

D C

IP B

UD

GE

T

CA

PIT

AL

IMPR

OV

EM

EN

TS

PRO

GR

AM

SC

HE

DU

LE

DE

PAR

TM

EN

T/D

ESC

RIP

TIO

NG

RA

NT

LIF

EA

MO

UN

TFU

ND

BA

LR

ET

EA

RN

Salm

on F

alls

Roa

d R

econ

stru

ctio

n50

,000

00

00

450,

000

030

050

0,00

0Si

dew

alk

Rep

lace

men

t Pro

gram

040

,000

00

00

025

41,4

4740

,000

Still

wat

er C

ircle

Brid

ge -

Brid

ge R

ail M

aint

ena

045

,000

00

00

020

045

,000

Stre

et D

rain

age

Impr

ovem

ent P

rogr

am25

0,00

00

00

00

030

80,5

3825

0,00

0V

ehic

le &

Equ

ipm

ent R

epla

cem

ent P

rogr

am0

397,

200

00

00

010

039

7,20

03,

800,

000

825,

200

00

0Pu

blic

Wor

ksSu

btot

al:

474,

323

053

7,00

05,

162,

200

Hos

t Com

mun

ityTr

ansf

er to

Eco

nom

ic D

evel

opm

ent F

und

00

100,

000

00

00

50

100,

000

Tran

sfer

to G

ener

al F

und

00

280,

000

00

00

50

280,

000

00

380,

000

00

Hos

t Com

mun

itySu

btot

al:

00

038

0,00

0Sc

hool

Equi

pmen

t - F

urni

ture

020

,000

00

00

010

020

,000

Faci

litie

s - D

oor H

ardw

are

Upg

rade

035

,000

00

00

010

035

,000

Faci

litie

s - P

aint

ing

Cyc

le-E

xter

ior

020

,000

00

00

010

020

,000

Faci

litie

s - P

aint

ing

Cyc

le-In

terio

r0

28,0

000

00

00

100

28,0

00Fl

oor m

achi

nes

08,

000

00

00

010

08,

000

Fuel

Tan

k R

epai

rs0

12,0

000

00

00

100

12,0

00H

ealth

& S

afet

y - E

lect

rical

Upg

rade

030

,000

00

00

025

030

,000

Inte

rior R

enov

atio

ns a

t NLS

,G,M

PL,R

MS

282,

000

00

00

00

250

282,

000

Play

grou

nd U

pgra

des

020

,000

00

00

015

020

,000

Rep

lace

HV

AC

Uni

ts a

t RM

S11

4,00

00

00

00

020

011

4,00

0R

oof O

ver H

.S. G

ym25

0,00

00

00

00

025

025

0,00

0Si

tew

ork-

Gon

ic T

raff

ic &

Par

king

Issu

es90

,000

00

00

00

250

90,0

00Sp

rinkl

er S

yste

m R

epai

rs0

15,0

000

00

00

200

15,0

0073

6,00

018

8,00

00

00

Scho

olSu

btot

al:

00

092

4,00

05,

136,

000

Gen

eral

Fun

d T

otal

:1,

259,

200

510,

000

00

560,

023

055

0,90

07,

456,

100 C

API

TAL

IMPR

OV

EMEN

TS

8

BO

ND

PRO

CE

ED

SC

/OA

MO

UN

TO

&M

CA

SHD

ED

RE

VST

AT

EH

WY

FU

ND

SSR

F

CIT

Y O

F R

OC

HE

STE

R

F

Y13

PR

OPO

SED

CIP

BU

DG

ET

CA

PIT

AL

IMPR

OV

EM

EN

TS

PRO

GR

AM

SC

HE

DU

LE

DE

PAR

TM

EN

T/D

ESC

RIP

TIO

NG

RA

NT

LIF

EA

MO

UN

TFU

ND

BA

LR

ET

EA

RN

Wat

er W

orks

Ber

ry R

iver

Dam

Con

stru

ctio

n50

0,00

00

00

00

050

050

0,00

0B

rock

Stre

et R

econ

stru

ctio

n0

00

060

0,00

00

035

66,9

0460

0,00

0C

ham

berla

in S

t Wat

er10

0,00

00

00

00

050

010

0,00

0Ev

alua

te W

ater

Pip

elin

e fr

om R

ound

Pon

d to

Re

20,0

000

00

00

050

020

,000

Gro

undw

ater

Res

ourc

e D

evel

opm

ent

020

0,00

00

00

00

5021

9,53

820

0,00

0I/I

Pro

gram

Pha

se II

I - F

rank

lin S

t, W

este

rn a

rea

00

00

50,0

000

035

050

,000

Met

er R

epla

cem

ent

795,

000

00

00

00

200

795,

000

Mod

ify F

luor

idat

ion

Syst

em20

,000

00

00

00

500

20,0

00O

btai

n So

urce

Wat

er P

rote

ctio

n La

nd45

,000

00

00

00

500

45,0

00R

oche

ster

Res

ervo

ir W

este

rn E

nd S

pillw

ay0

75,0

000

00

00

200

75,0

00Sa

lmon

Fal

ls R

oad

Rec

onst

ruct

ion

100,

000

00

00

00

3044

0,66

710

0,00

0V

ehic

le &

Equ

ipm

ent R

epla

cem

ent P

rogr

am0

112,

500

00

00

010

011

2,50

0W

ater

Tan

k M

aint

enan

ce P

rogr

am38

0,00

00

00

00

020

038

0,00

0H

anco

ck S

treet

Rec

onst

ruct

ion

030

,000

00

00

030

030

,000

1,96

0,00

041

7,50

00

065

0,00

0W

ater

Wor

ksSu

btot

al:

00

727,

109

3,02

7,50

0Se

wer

Wor

ksA

dapt

ive

Man

agem

ent P

lan-

Gre

at B

ay E

stua

ry55

,000

00

00

00

100

55,0

00B

rock

Stre

et R

econ

stru

ctio

n0

00

02,

200,

000

00

300

2,20

0,00

0H

VA

C C

ontro

ller R

epla

cem

ent

50,0

000

00

00

020

050

,000

Inflo

w &

Infil

tratio

n El

imin

atio

n Ph

ase

III0

140,

000

00

00

030

50,0

0014

0,00

0Pu

mp

Stat

ion

Rep

lace

men

t Pro

gram

018

,000

00

00

025

871,

275

18,0

00So

da A

sh S

ilo0

13,5

000

00

00

200

13,5

00V

ehic

le &

Equ

ipm

ent R

epla

cem

ent P

rogr

am0

77,5

000

00

00

1021

,000

77,5

00W

aste

wat

er C

olle

ctio

n Sy

stem

CM

OM

Pro

gram

0

100,

000

00

00

030

010

0,00

0W

aste

wat

er T

reat

men

t Pla

nt U

pgra

de to

mee

t Per

00

00

1,50

0,00

00

025

319,

836

1,50

0,00

010

5,00

034

9,00

00

03,

700,

000

Sew

er W

orks

Subt

otal

:0

01,

262,

111

4,15

4,00

0A

rena

Bui

ldin

g Im

prov

emen

ts30

0,00

00

00

00

025

50,0

0030

0,00

030

0,00

00

00

0A

rena

Subt

otal

:0

050

,000

300,

000

Com

mun

ity C

ente

rR

ehab

ilita

te T

enni

s Cou

rts *

In G

en F

und

Cas

h

45,0

000

00

00

150

45,0

000

45,0

000

00

Com

mun

ity C

ente

rSu

btot

al:

00

045

,000

2,36

5,00

0E

nter

pris

e Fu

nd T

otal

:81

1,50

00

04,

350,

000

00

All

Fund

s Tot

al:

2,03

9,22

07,

526,

500

2,59

9,24

37,

501,

000

2,07

0,70

00

510,

000

4,35

0,00

00

550,

900

14,9

82,6

00 CA

PITA

L IM

PRO

VEM

ENTS

9

THIS PAGE INTENTIONALLY LEFT BLANK

CITY OF ROCHESTER FY13 PROPOSED CIP BUDGET

CAPITAL IMPROVEMENTS 10

BO

ND

PRO

CE

ED

SC

/OA

MO

UN

TO

&M

CA

SHD

ED

RE

VST

AT

EH

WY

FU

ND

SSR

F

CIT

Y O

F R

OC

HE

STE

R

FY

13 P

RO

POSE

D C

IP B

UD

GE

T

CA

PIT

AL

IMPR

OV

EM

EN

TS

PRO

GR

AM

SC

HE

DU

LE

DE

PAR

TM

EN

T/D

ESC

RIP

TIO

NG

RA

NT

LIF

EA

MO

UN

TFU

ND

BA

LR

ET

EA

RN

Eco

nom

ic D

evel

opm

ent

Indu

stria

l Par

k Si

gns

50,0

000

00

013

,900

010

063

,900

50,0

000

00

0E

cono

mic

Dev

elop

men

tSu

btot

al:

00

13,9

0063

,900

CA

PITA

L IM

PRO

VEM

ENTS

11

THIS PAGE INTENTIONALLY LEFT BLANK

CITY OF ROCHESTER FY13 PROPOSED CIP BUDGET

CAPITAL IMPROVEMENTS 12

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Industrial Park Signs

Replace all existing industrial park signs

GSBP is required under development agreement. Ten Rod Road is required as a result of the Spaulding Turnpike Expansion. NHDOT is contributing $13,900 towards the Ten Rod Road sign.

GSBP expansion

10

Mandatory

Other Industrial Parks

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Economic Development 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$63,900

$63,900

4) Type of Project:Buildings Improvements

-

20132) FY:

1

9) Anticipated Funding Source(s):

Bond, Grant

13

Econ

omic

Dev

elop

men

t10

1In

dust

rial P

ark

Sign

s

Non

e

Dep

artm

ent:

Proj

ect T

itle:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

Proj

ect #

:20

13FY

:1

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$63,

900

$0$0

$0$0

$0Bu

ildin

gs Im

prov

emen

ts$6

3,90

0

Sum

mar

y fo

r 'pr

ojec

tID' =

543

1 (1

det

ail r

ecor

d)TO

TAL:

$63,

900

$0$0

$0$0

$0$6

3,90

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$50,

000

$0$0

$0$0

$0Bo

nd: C

ity/S

choo

l$5

0,00

0

$13,

900

$0$0

$0$0

$0G

rant

$13,

900

TOTA

L:$6

3,90

0$0

$0$0

$0$0

$63,

900

14

BO

ND

PRO

CE

ED

SC

/OA

MO

UN

TO

&M

CA

SHD

ED

RE

VST

AT

EH

WY

FU

ND

SSR

F

CIT

Y O

F R

OC

HE

STE

R

F

Y13

PR

OPO

SED

CIP

BU

DG

ET

CA

PIT

AL

IMPR

OV

EM

EN

TS

PRO

GR

AM

SC

HE

DU

LE

DE

PAR

TM

EN

T/D

ESC

RIP

TIO

NG

RA

NT

LIF

EA

MO

UN

TFU

ND

BA

LR

ET

EA

RN

MIS

Ann

ual H

ardw

are

Rep

lace

men

t0

025

,000

00

00

532

,983

25,0

00A

nnua

l Sof

twar

e U

pgra

des

00

10,0

000

00

05

15,0

0010

,000

Libr

ary

Serv

er R

epla

cem

ent

00

30,0

000

00

05

030

,000

Net

wor

k U

pgra

de /

Expa

nsio

n0

020

,000

00

00

734

,567

20,0

000

085

,000

00

MIS

Subt

otal

:82

,550

00

85,0

00

CA

PITA

L IM

PRO

VEM

ENTS

15

THIS PAGE INTENTIONALLY LEFT BLANK

CITY OF ROCHESTER FY13 PROPOSED CIP BUDGET

CAPITAL IMPROVEMENTS 16

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Annual Hardware Replacement

The rotating in of personal computer related hardware so obsolete and troublesome systems are replaced with working systems prior to serious impacts on City operations. Included for FY13 will be replacment of 2 servers that are over 6 years old.

To better utilize existing systems and to minimize delays and down time of City services because of personal computer hardware issues.

This relates to the costs and efficiency of departmental operations and services. It directly relates to CIP projects - "Business Computer Systems Upgrade", "Computer Network Upgrades and Expansion" and "City Wide Software Applications".

5

Essential

Other Multiple City Locations

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:MIS 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$25,000

$280,000

4) Type of Project:Machinery and Equipment

-

20132) FY:

2

9) Anticipated Funding Source(s):

Ded Rev

17

MIS

Ann

ual H

ardw

are

Rep

lace

men

t

Ther

e w

ill s

till b

e co

sts

whe

n so

me

devi

ces

have

to b

e re

plac

ed a

s th

ey ra

ndom

ly fa

il. A

lso,

the

rela

tions

hip

of h

ardw

are

and

softw

are

will

caus

e m

anda

tory

upg

rade

s to

har

dwar

e as

vita

l sof

twar

e sy

stem

s up

grad

es o

ccur

.

Addi

tiona

l fun

ds c

an b

e in

serte

d in

to o

pera

ting

budg

ets,

coo

rdin

ated

by

MIS

and

use

d fo

r equ

ipm

ent f

ailu

res

as th

ey o

ccur

. R

educ

ed o

r dis

able

d C

ity s

ervi

ces

will

hav

e to

be

endu

red

durin

g ha

rdw

are

failu

res

and

whi

le w

aitin

g fo

r rep

lace

men

t co

mpo

nent

s.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

2

Fisc

a l Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$25,

000

$45,

000

$60,

000

$45,

000

$60,

000

$45,

000

Mac

hine

ry a

nd E

quip

men

t$2

80,0

00

Sum

mar

y fo

r 'pr

ojec

tID' =

506

4 (1

det

ail r

ecor

d)TO

TAL:

$25,

000

$45,

000

$60,

000

$45,

000

$60,

000

$45,

000

$280

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$25,

000

$45,

000

$60,

000

$45,

000

$60,

000

$45,

000

Ded

icat

ed R

even

ue$2

80,0

00

TOTA

L:$2

5,00

0$4

5,00

0$6

0,00

0$4

5,00

0$6

0,00

0$4

5,00

0$2

80,0

00

18

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Annual Software Upgrades

Upgrade of software programs and systems to more current, efficient and flexible levels of service.

This will be in keeping with other associated computer programs and systems allowing better communication, record keeping, data analysis and access to information.

This relates to existing and future programs and systems used by the City, vendors, other government agencies and the general public.

5

Essential

Other Various City Departments

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:MIS 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$10,000

$100,000

4) Type of Project:Other Software

-

20132) FY:

3

9) Anticipated Funding Source(s):

Ded Rev

19

MIS

Ann

ual S

oftw

are

Upg

rade

s

Com

patib

ility

pro

blem

s w

ill re

sult

in m

ore

man

hou

rs n

eede

d fo

r con

vers

ions

, im

ports

and

exp

orts

of d

ata.

Con

tinue

d ad

ditio

nal m

an h

ours

spe

nt d

oing

dat

a co

nver

sion

bet

wee

n in

com

patib

le fo

rmat

s.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

3

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

Sof

twar

e$1

0,00

0$2

0,00

0$1

5,00

0$2

0,00

0$1

5,00

0$2

0,00

0O

ther

-$1

00,0

00

Sum

mar

y fo

r 'pr

ojec

tID' =

506

8 (1

det

ail r

ecor

d)TO

TAL:

$10,

000

$20,

000

$15,

000

$20,

000

$15,

000

$20,

000

$100

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$10,

000

$20,

000

$15,

000

$20,

000

$15,

000

$20,

000

Ded

icat

ed R

even

ue$1

00,0

00

TOTA

L:$1

0,00

0$2

0,00

0$1

5,00

0$2

0,00

0$1

5,00

0$2

0,00

0$1

00,0

00

20

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Library Server Replacement

Replacement of the Library server that runs the Integrated Library System (ILS). This system is central to all Library functions: circulation, acquistions, cataloging, financials, and all online public access.

The Library's contracted ILS provider’s software upgrades will cause needed server replacement periodically.

5

Essential

Library

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:MIS 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$30,000

$60,000

4) Type of Project:Machinery and Equipment

20132) FY:

4

9) Anticipated Funding Source(s):

Ded Rev

21

MIS

Libr

ary

Ser

ver R

epla

cem

ent

The

Libr

ary

wou

ld n

ot b

e ab

le to

con

tinue

with

ILS

upg

rade

s. F

allin

g be

hind

in u

pgra

de re

leas

es w

ould

incr

ease

the

likel

ihoo

d of

futu

re in

tero

pera

bilit

y fa

ilure

, pre

vent

ing

the

Libr

ary

from

taki

ng a

dvan

tage

of n

ew, e

volv

ing

met

hods

of d

ata

exch

ange

.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

4

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$30,

000

$0$0

$0$3

0,00

0$0

Mac

hine

ry a

nd E

quip

men

t$6

0,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

522

8 (1

det

ail r

ecor

d)TO

TAL:

$30,

000

$0$0

$0$3

0,00

0$0

$60,

000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$30,

000

$0$0

$0$3

0,00

0$0

Ded

icat

ed R

even

ue$6

0,00

0

TOTA

L:$3

0,00

0$0

$0$0

$30,

000

$0$6

0,00

0

22

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Network Upgrade / Expansion

Continued upgrading, replacement and addition of computer networking associated equipment that will expand the availability of City resources to all departments and will also improve access to external resources. Included in FY13 is the replacement of th e main server running City backups.

To increase both internal and external communication and to increase the quality and availability of municipal information.

This relates to the costs and efficiency of all projects and services provided by the City.

7

Essential

Other Multiple City Locations

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:MIS 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$20,000

$120,000

4) Type of Project:Machinery and Equipment

-

20132) FY:

5

9) Anticipated Funding Source(s):

Ded Rev

23

MIS

Net

wor

k U

pgra

de /

Exp

ansi

on

Inef

ficie

nt le

vels

of c

omm

unic

atio

n an

d ac

cess

to re

sour

ces

and

info

rmat

ion,

incr

easi

ng th

e co

sts

asso

ciat

ed w

ith d

aily

m

unic

ipal

ope

ratio

ns.

Con

tinui

ng to

lack

info

rmat

ion

due

to a

cces

s at

crit

ical

tim

es a

nd lo

catio

ns.

Inef

fect

ive

com

mun

icat

ion

both

inte

rnal

and

ex

tern

al.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

5

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

Mac

hine

ry a

nd E

quip

men

t$1

20,0

00

Sum

mar

y fo

r 'pr

ojec

tID' =

512

6 (1

det

ail r

ecor

d)TO

TAL:

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

$120

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

Ded

icat

ed R

even

ue$1

20,0

00

TOTA

L:$2

0,00

0$2

0,00

0$2

0,00

0$2

0,00

0$2

0,00

0$2

0,00

0$1

20,0

00

24

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Government Channel

Continued upgrades, replacement and enhancements to systems related to the operation and production of the Government Channel.

To maintain compatibility with the current media technology and to provide an appropriate level of service for the viewers and participants.

City Hardware Replacement Program.

5

Essential

City Hall

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:MIS 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$50,000

4) Type of Project:Machinery and Equipment

20142) FY:

6

9) Anticipated Funding Source(s):

Bond

25

MIS

Gov

ernm

ent C

hann

el

Som

e eq

uipm

ent w

ill fa

il an

d ne

ed to

be

repl

aced

for t

he c

ontin

ued

broa

dcas

ting

of th

e G

over

nmen

t Cha

nnel

. To

kee

p th

e ch

anne

l on

the

air,

thes

e co

sts

will

stil

l hav

e to

be

paid

.

A s

imila

r am

ount

of f

unds

cou

ld b

e in

serte

d in

to o

pera

ting

budg

ets.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2014

FY:

6

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$1

0,00

0$1

0,00

0$1

0,00

0$1

0,00

0$1

0,00

0M

achi

nery

and

Equ

ipm

ent

$50,

000

Sum

mar

y fo

r 'pr

ojec

tID' =

524

5 (1

det

ail r

ecor

d)TO

TAL:

$0$1

0,00

0$1

0,00

0$1

0,00

0$1

0,00

0$1

0,00

0$5

0,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$1

0,00

0$1

0,00

0$1

0,00

0$1

0,00

0$1

0,00

0B

ond:

City

/Sch

ool

$50,

000

TOTA

L:$0

$10,

000

$10,

000

$10,

000

$10,

000

$10,

000

$50,

000

26

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Government Systems Software Upgrade

Comprehensive government systems software package.

Better financial reporting tools and more thorough data sharing and project management by all departments. Will improve efficiency and minimize potential for mistakes.

This project will improve communication and enhance the efficiency of all essential City and School business and community related services.

6

Essential

City Hall

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:MIS 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$60,000

4) Type of Project:Other Software & Hardware

20142) FY:

7

9) Anticipated Funding Source(s):

Ded Rev

27

MIS

Gov

ernm

ent S

yste

ms

Sof

twar

e U

pgra

de

Del

ayin

g w

ill c

ontin

ue to

lim

it th

e ef

fect

iven

ess

of m

any

City

and

Sch

ool f

unct

ions

, lim

its G

over

ning

Bod

y ac

cess

to u

sefu

l re

ports

, and

lim

its e

ffici

ency

of a

var

iety

of c

omm

unity

ser

vice

s an

d ot

her d

aily

bus

ines

s op

erat

ions

.

Mai

ntai

n th

e st

atus

quo

. E

xam

ine

stan

d-al

one

non-

inte

grat

ed s

oftw

are

solu

tions

that

wou

ld im

prov

e R

oche

ster

's c

omm

unity

se

rvic

es re

late

d pr

oces

ses.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2014

FY:

7

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

Sof

twar

e &

Har

dwar

e$0

$15,

000

$10,

000

$15,

000

$10,

000

$10,

000

Oth

er-

$60,

000

Sum

mar

y fo

r 'pr

ojec

tID' =

512

4 (1

det

ail r

ecor

d)TO

TAL:

$0$1

5,00

0$1

0,00

0$1

5,00

0$1

0,00

0$1

0,00

0$6

0,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$1

5,00

0$1

0,00

0$1

5,00

0$1

0,00

0$1

0,00

0D

edic

ated

Rev

enue

$60,

000

TOTA

L:$0

$15,

000

$10,

000

$15,

000

$10,

000

$10,

000

$60,

000

28

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

MetroCast-PEG Grant

As part of the franchise agreement, MetroCast will provide capital grants for equipment related to PEG programming - $30,000 on Jan 1, 2012 (FY12), and $15,000 on Jan 1, 2015 (FY15)

Franchise Agreement

6

Essential

City Hall

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:MIS

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost

7a) Current FY Cost

10) General Description

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$0.00

$15,000.00

4) Type of Project:Other

2a) Project #:

20152) FY:

8

9) Anticipated Funding Source(s):

Grant

29

MIS

102

Met

roC

ast-P

EG

Gra

ntD

epta

rtm

ent:

Proj

ect T

itle:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

Proj

ect #

:20

15FY

:8

Fisc

a l Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$0

$15,

000

$0$0

$0O

ther

-$1

5,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

536

7 (1

det

ail r

ecor

d)TO

TAL:

$0$0

$15,

000

$0$0

$0$1

5,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$0

$15,

000

$0$0

$0G

rant

$15,

000

TOTA

L:$0

$0$1

5,00

0$0

$0$0

$15,

000

30

BO

ND

PRO

CE

ED

SC

/OA

MO

UN

TO

&M

CA

SHD

ED

RE

VST

AT

EH

WY

FU

ND

SSR

F

CIT

Y O

F R

OC

HE

STE

R

FY

13 P

RO

POSE

D C

IP B

UD

GE

T

CA

PIT

AL

IMPR

OV

EM

EN

TS

PRO

GR

AM

SC

HE

DU

LE

DE

PAR

TM

EN

T/D

ESC

RIP

TIO

NG

RA

NT

LIF

EA

MO

UN

TFU

ND

BA

LR

ET

EA

RN

Publ

ic B

uild

ings

Rep

last

er P

ools

060

,000

00

00

010

060

,000

Uni

on S

t Par

king

Lot

and

Dum

pste

r Enc

losu

res

150,

000

00

00

00

200

150,

000

Veh

icle

& E

quip

men

t Rep

lace

men

t Pro

gram

047

,000

00

00

010

1,60

147

,000

150,

000

107,

000

00

0Pu

blic

Bui

ldin

gsSu

btot

al:

1,60

10

025

7,00

0 CA

PITA

L IM

PRO

VEM

ENTS

31

THIS PAGE INTENTIONALLY LEFT BLANK

CITY OF ROCHESTER FY13 PROPOSED CIP BUDGET

CAPITAL IMPROVEMENTS 32

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Replaster Pools

The city pools are aging and need to be replastered. The oldest & most used pools are at Hanson Pines. Therefore, these pools should be done first followed by Gonic and East Rochester in following years.

The existing lining is aging and failing. If not replastered prior to failure, pools will be out of service. These are an integral part of Recreation's summer camps as well as an important resource for Rochester residents.

none

10

Maintenance

Other Pools

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Buildings 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$60,000

$150,000

4) Type of Project:Building Construction

-

20132) FY:

9

9) Anticipated Funding Source(s):

Cash

33

Pub

lic B

uild

ings

Rep

last

er P

ools

Poo

ls w

ill b

e cl

osed

whe

n th

e lin

ings

fail.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

9

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$60,

000

$45,

000

$45,

000

$0$0

$0B

uild

ing

Con

stru

ctio

n$1

50,0

00

Sum

mar

y fo

r 'pr

ojec

tID' =

540

8 (1

det

ail r

ecor

d)TO

TAL:

$60,

000

$45,

000

$45,

000

$0$0

$0$1

50,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$60,

000

$45,

000

$45,

000

$0$0

$0C

ash:

City

/Sch

ool

$150

,000

TOTA

L:$6

0,00

0$4

5,00

0$4

5,00

0$0

$0$0

$150

,000

34

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Union St Parking Lot and Dumpster Enclosures

Paving is needed in this area and dumpster enclosures

New pavement and dumpster enclosures will promote a more aesthetically pleasing area in the downtown business district. Pavement in need of repair. Improvement will help coordinate business refuse disposal.

None

20

Essential

Other

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Buildings 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$150,000

$150,000

4) Type of Project:Building Construction

-

20132) FY:

10

9) Anticipated Funding Source(s):

Bond

35

Pub

lic B

uild

ings

Uni

on S

t Par

king

Lot

and

Dum

pste

r Enc

losu

res

Sta

tus

Quo

N/A

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

10

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$150

,000

$0$0

$0$0

$0B

uild

ing

Con

stru

ctio

n$1

50,0

00

Sum

mar

y fo

r 'pr

ojec

tID' =

543

4 (1

det

ail r

ecor

d)TO

TAL:

$150

,000

$0$0

$0$0

$0$1

50,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$150

,000

$0$0

$0$0

$0B

ond:

City

/Sch

ool

$150

,000

TOTA

L:$1

50,0

00$0

$0$0

$0$0

$150

,000

36

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Vehicle & Equipment Replacement Program

FY-13 :Replacement of 102 with small 4X4 Pickup - $20K - replace zero-turn lawn mower - $10K. Replace #22 bucket truck (20% of cost shared with HWY)

Equipment is past useful life - vehicle 102 is 15 years old and maintenance frequency has increased. Maintenance frequency of zero-turn mower has increased to the point that it is becoming unreliable.

10

Essential

Community Center

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Buildings 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$47,000

$177,000

4) Type of Project:Auto/Light Truck

20132) FY:

11

9) Anticipated Funding Source(s):

Cash

37

Pub

lic B

uild

ings

Veh

icle

& E

quip

men

t Rep

lace

men

t Pro

gram

Con

tinue

d w

orki

ng a

t les

s th

an p

eak

effic

ienc

y w

ith m

ore

frequ

ent e

quip

men

t fai

lure

.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

11

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$37,

000

$0$6

5,00

0$6

5,00

0$0

$0A

uto/

Ligh

t Tru

ck$1

67,0

00

$10,

000

$0$0

$0$0

$0M

achi

nery

and

Equ

ipm

ent

$10,

000

Sum

mar

y fo

r 'pr

ojec

tID' =

515

2 (2

det

ail r

ecor

ds)

TOTA

L:$4

7,00

0$0

$65,

000

$65,

000

$0$0

$177

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$47,

000

$0$6

5,00

0$6

5,00

0$0

$0C

ash:

City

/Sch

ool

$177

,000

TOTA

L:$4

7,00

0$0

$65,

000

$65,

000

$0$0

$177

,000

38

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

City Hall & Annex Master Plan

This is to fund engineering/architectural services to develop a master plan to develop the City Hall Campus. Also included is the Annex-(Old PD Building)

50

Desirable

City Hall

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Buildings 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$2,075,000

4) Type of Project:Buildings Improvements

20142) FY:

12

9) Anticipated Funding Source(s):

Bond

39

Pub

lic B

uild

ings

City

Hal

l &

Ann

ex M

aste

r Pla

nD

epar

tmen

t:Pr

ojec

t #:

Proj

ect T

itle:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2014

FY:

12

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$1

,444

,500

$332

,000

$298

,500

$0$0

Bui

ldin

gs Im

prov

emen

ts$2

,075

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

543

3 (1

det

ail r

ecor

d)TO

TAL:

$0$1

,444

,500

$332

,000

$298

,500

$0$0

$2,0

75,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$1

,444

,500

$332

,000

$298

,500

$0$0

Bon

d: C

ity/S

choo

l$2

,075

,000

TOTA

L:$0

$1,4

44,5

00$3

32,0

00$2

98,5

00$0

$0$2

,075

,000

40

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Reconstruct Vehicle Maintenance Bay at DPW Garage

Renovate DPW garage such that an updated vehicle maintenance facility be constructed at the current DPW facility. Current facility has been inadequate to maintain the largest truck and equipment during all weather conditions. FY-15 is for architectural services to identify the most efficient means of constructing w/o displacing current activity. FY-16 construction.

Current facility no longer meets city's needs. Equipment maintenance facilities are too small. Unable to adequately service larger vehicles. Cramped conditions in maintenance garage create workplace safety issue.

35

Desirable

DPW Garage

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Buildings 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$810,000

4) Type of Project:Building Construction

20152) FY:

13

9) Anticipated Funding Source(s):

Bond, Cash

41

Pub

lic B

uild

ings

Rec

onst

ruct

Veh

icle

Mai

nten

ance

Bay

at D

PW

Sta

tus

quo.

Ine

ffici

enci

es o

f con

stan

t jug

glin

g of

veh

icle

s to

mak

e ro

om fo

r oth

er v

ehic

les

will

con

tinue

. La

ck o

f sto

rage

spa

ce

for p

arts

and

equ

ipm

ent c

ause

mat

eria

l to

be s

catte

red

all o

ver,

whi

ch c

reat

es s

afet

y ha

zard

s.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2015

FY:

13

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$0

$0$7

50,0

00$0

$0B

uild

ing

Con

stru

ctio

n$7

50,0

00

$0$0

$60,

000

$0$0

$0D

esig

n E

ngin

eerin

g$6

0,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

515

7 (2

det

ail r

ecor

ds)

TOTA

L:$0

$0$6

0,00

0$7

50,0

00$0

$0$8

10,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$0

$0$7

50,0

00$0

$0B

ond:

City

/Sch

ool

$750

,000

$0$0

$60,

000

$0$0

$0C

ash:

City

/Sch

ool

$60,

000

TOTA

L:$0

$0$6

0,00

0$7

50,0

00$0

$0$8

10,0

00

42

BO

ND

PRO

CE

ED

SC

/OA

MO

UN

TO

&M

CA

SHD

ED

RE

VST

AT

EH

WY

FU

ND

SSR

F

CIT

Y O

F R

OC

HE

STE

R

FY

13 P

RO

POSE

D C

IP B

UD

GE

T

CA

PIT

AL

IMPR

OV

EM

EN

TS

PRO

GR

AM

SC

HE

DU

LE

DE

PAR

TM

EN

T/D

ESC

RIP

TIO

NG

RA

NT

LIF

EA

MO

UN

TFU

ND

BA

LR

ET

EA

RN

Plan

ning

Mas

ter P

lan

Cha

pter

upd

ates

/cre

atio

n0

010

,000

00

00

100

10,0

000

010

,000

00

Plan

ning

Subt

otal

:0

00

10,0

00

CA

PITA

L IM

PRO

VEM

ENTS

43

THIS PAGE INTENTIONALLY LEFT BLANK

CITY OF ROCHESTER FY13 PROPOSED CIP BUDGET

CAPITAL IMPROVEMENTS 44

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Master Plan Chapter updates/creation

Anticipating the need for periodic updates to selected Master Plan (MP) Chapters. Anticipate need to update Land Use Chap in FY14 after Zone Ordinance replacement, Transportation Chap upon completion of Turnpike & Strafford Corner improvements, then DT C hap because of progress in meeting goals.

Our program created our MP one chap at a time so it requires that we review the currency of each chap each year. This keeps the document current & provides context & guidance when the Council/Boards/Committees/ Commissions consider specific proposals.

We now have 7 completed chaps. Will work with PB & Council to expore interest in a "Public Facilities" chap.

10

Essential

Other City Wide

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Planning 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$10,000

$50,000

4) Type of Project:Other Chapter updates

-

20132) FY:

14

9) Anticipated Funding Source(s):

Ded Rev

45

Pla

nnin

gM

aste

r Pla

n C

hapt

er u

pdat

es/c

reat

ion

Ris

k le

gal c

halle

nges

to v

alid

ity o

f Zon

ing

Ord

inan

ce w

/o c

urre

nt L

and

Use

cha

pter

. Pot

entia

l for

inap

prop

riate

sho

rt-te

rm

deci

sion

-mak

ing

by p

ublic

bod

ies

w/o

gui

danc

e of

long

-term

pla

n an

d vi

sion

.

Non

e.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

14

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

Cha

pter

upd

ates

$10,

000

$10,

000

$5,0

00$1

0,00

0$1

5,00

0$0

Oth

er-

$50,

000

Sum

mar

y fo

r 'pr

ojec

tID' =

542

8 (1

det

ail r

ecor

d)TO

TAL:

$10,

000

$10,

000

$5,0

00$1

0,00

0$1

5,00

0$0

$50,

000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$10,

000

$10,

000

$5,0

00$1

0,00

0$1

5,00

0$0

Ded

icat

ed R

even

ue$5

0,00

0

TOTA

L:$1

0,00

0$1

0,00

0$5

,000

$10,

000

$15,

000

$0$5

0,00

0

46

BO

ND

PRO

CE

ED

SC

/OA

MO

UN

TO

&M

CA

SHD

ED

RE

VST

AT

EH

WY

FU

ND

SSR

F

CIT

Y O

F R

OC

HE

STE

R

F

Y13

PR

OPO

SED

CIP

BU

DG

ET

CA

PIT

AL

IMPR

OV

EM

EN

TS

PRO

GR

AM

SC

HE

DU

LE

DE

PAR

TM

EN

T/D

ESC

RIP

TIO

NG

RA

NT

LIF

EA

MO

UN

TFU

ND

BA

LR

ET

EA

RN

Polic

eFo

rens

ic E

vide

nce

Dry

ing

Cab

inet

012

,000

00

00

010

012

,000

Veh

icle

& E

quip

men

t Rep

lace

men

t Pro

gram

012

7,00

00

00

00

51,

467

127,

000

013

9,00

00

00

Polic

eSu

btot

al:

1,46

70

013

9,00

0 CA

PITA

L IM

PRO

VEM

ENTS

47

THIS PAGE INTENTIONALLY LEFT BLANK

CITY OF ROCHESTER FY13 PROPOSED CIP BUDGET

CAPITAL IMPROVEMENTS 48

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Forensic Evidence Drying Cabinet

Forensic evidence drying cabinet

We currently don't have the cabapbility to safely store and dry critical evidence associated with major crime scenes. This system is designed to protect the evidence officer and environment from harmful bacteria, viruses and putrid odors.

10

Essential

New Police Station

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Police 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$12,000

$12,000

4) Type of Project:Machinery and Equipment

20132) FY:

15

9) Anticipated Funding Source(s):

Cash

49

Pol

ice

Fore

nsic

Evi

denc

e D

ryin

g C

abin

et

impa

cts

the

safe

ty o

f evi

denc

e ha

ndlin

g an

d sa

fe s

tora

ge o

f con

tam

inat

ed e

vide

nce.

Fund

thro

ugh

oper

atio

nal b

udge

t

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

15

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$12,

000

$0$0

$0$0

$0M

achi

nery

and

Equ

ipm

ent

$12,

000

Sum

mar

y fo

r 'pr

ojec

tID' =

540

7 (1

det

ail r

ecor

d)TO

TAL:

$12,

000

$0$0

$0$0

$0$1

2,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$12,

000

$0$0

$0$0

$0C

ash:

City

/Sch

ool

$12,

000

TOTA

L:$1

2,00

0$0

$0$0

$0$0

$12,

000

50

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Vehicle & Equipment Replacement Program

FY13 purchase of 4 Patrol frontline vehicles at $28,000, purchase 1 backline vehicle at $15,000. This request is to stay in line with 5 year vehicle replacement plan. Motorcycle Lease program, $4,000

5

Essential

Other

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Police 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$127,000

$327,000

4) Type of Project:Auto/Light Truck

-

20132) FY:

16

9) Anticipated Funding Source(s):

Cash

51

Pol

ice

Veh

icle

& E

quip

men

t Rep

lace

men

t Pro

gram

Exc

essi

ve v

ehic

le re

pair

cost

s to

kee

p fle

et o

pera

tiona

l and

saf

e.

Leas

e/pu

rcha

se o

f veh

icle

s to

redu

ce c

osts

in fi

scal

yea

r.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

16

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$127

,000

$100

,000

$100

,000

$0$0

$0A

uto/

Ligh

t Tru

ck$3

27,0

00

Sum

mar

y fo

r 'pr

ojec

tID' =

534

7 (1

det

ail r

ecor

d)TO

TAL:

$127

,000

$100

,000

$100

,000

$0$0

$0$3

27,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$127

,000

$100

,000

$100

,000

$0$0

$0C

ash:

City

/Sch

ool

$327

,000

TOTA

L:$1

27,0

00$1

00,0

00$1

00,0

00$0

$0$0

$327

,000

52

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

IP Security Camera System Upgrade

Replacement of several exterior security cameras on the police station are needed for monitoring of exterior parking lots and security doors. Newer camera technology will provide enhanced ability to view these areas during darkness. Additional cameras will be added to cover more areas in the City Hall parking lot that are currently not covered. A newer video recording system will allow for expansion of camera system to add other City offices where cameras are desired that will tie into our Communications

Project will enhance building and parking area security and allow for expansion of additional cameras to be added for monitoring in our Communications Center.

10

Maintenance

New Police Station

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Police 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$40,000

4) Type of Project:Other IP Video System Upgrade

20142) FY:

17

9) Anticipated Funding Source(s):

Cash

53

Pol

ice

IP S

ecur

ity C

amer

a S

yste

m U

pgra

de

inab

ility

to e

nhan

ce m

onito

ring

capa

bilit

ies

and

addi

ng o

f add

ition

al c

amer

as to

cur

rent

sys

tem

.

cont

inue

with

cur

rent

sys

tem

.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2014

FY:

17

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

IP V

ideo

Sys

tem

Upg

rade

$0$4

0,00

0$0

$0$0

$0O

ther

-$4

0,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

542

9 (1

det

ail r

ecor

d)TO

TAL:

$0$4

0,00

0$0

$0$0

$0$4

0,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$4

0,00

0$0

$0$0

$0C

ash:

City

/Sch

ool

$40,

000

TOTA

L:$0

$40,

000

$0$0

$0$0

$40,

000

54

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Cruiser Lightbars

Current frontline fleet has 5 lightbars that need replacement due to age and repair issues. Replacement of the lightbars will provide for improved visibility during emergency responses and less repair costs to maintain older light bars.

Needed to increase cruiser visibility during emergency responses and reduce repair costs.

n/a

10

Essential

New Police Station

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Police 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$10,000

4) Type of Project:Other New Lightbars

20152) FY:

18

9) Anticipated Funding Source(s):

Cash

55

Pol

ice

Cru

iser

Lig

htba

rs

Con

tinue

d re

pair

cost

s.

Con

tinue

use

of e

xist

ing

light

bars

.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2015

FY:

18

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

New

Lig

htba

rs$0

$0$1

0,00

0$0

$0$0

Oth

er-

$10,

000

Sum

mar

y fo

r 'pr

ojec

tID' =

543

0 (1

det

ail r

ecor

d)TO

TAL:

$0$0

$10,

000

$0$0

$0$1

0,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$0

$10,

000

$0$0

$0C

ash:

City

/Sch

ool

$10,

000

TOTA

L:$0

$0$1

0,00

0$0

$0$0

$10,

000

56

BO

ND

PRO

CE

ED

SC

/OA

MO

UN

TO

&M

CA

SHD

ED

RE

VST

AT

EH

WY

FU

ND

SSR

F

CIT

Y O

F R

OC

HE

STE

R

FY13

PR

OPO

SED

CIP

BU

DG

ET

CA

PIT

AL

IMPR

OV

EM

EN

TS

PRO

GR

AM

SC

HE

DU

LE

DE

PAR

TM

EN

T/D

ESC

RIP

TIO

NG

RA

NT

LIF

EA

MO

UN

TFU

ND

BA

LR

ET

EA

RN

Fire

App

arat

us R

epla

cem

ent P

rogr

am40

0,00

00

00

00

015

040

0,00

0Fi

re G

ear R

epla

cem

ent

00

6,00

00

00

010

826,

000

Hos

e R

epla

cem

ent

00

29,0

000

00

010

029

,000

400,

000

035

,000

00

Fir

eSu

btot

al:

820

043

5,00

0 CA

PITA

L IM

PRO

VEM

ENTS

57

THIS PAGE INTENTIONALLY LEFT BLANK

CITY OF ROCHESTER FY13 PROPOSED CIP BUDGET

CAPITAL IMPROVEMENTS 58

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Apparatus Replacement Program

Request is for the fire apparatus replacement program. The annual amounts assume a 5% annual inflation rate for major fire apparatus. FY13 replace E5 $400,000; FY 16 replace E7 Tanker $300,000, FY17 replace a Command Car $45,000, FY18 replace E4,$500,000.

Fire Apparatus are major capital investments for a community. Pumpers should be replaced every 15 yrs, aerial ladders every 20 yrs.

This project is a major component of our overall Master Plan recommendations to improve our state of readiness.

15

Essential

Central Fire Station

$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Fire 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: Total Revenues: $0.00

Non-Recurring

$400,000

$1,245,000

4) Type of Project:Machinery and Equipment

20132) FY:

19

9) Anticipated Funding Source(s):

Bond, Ded Rev

59

Fire

App

arat

us R

epla

cem

ent P

rogr

am

1. T

he fi

re a

ppar

atus

indu

stry

has

his

toric

ally

ave

rage

d 5%

per

yea

r inc

reas

es. 2

. Pum

pers

nee

ding

repl

acem

ent a

re o

ver 3

0 yr

s ol

d &

we

will

nee

d m

ore

mon

ey fo

r veh

icle

mai

nten

ance

to e

nsur

e its

relia

bilit

y.

1. L

ease

/pur

chas

e of

app

arat

us. T

his

is b

eing

util

ized

by

man

y co

mm

uniti

es &

the

inte

rest

rate

s ar

e fa

vora

ble.

2. B

uy m

ajor

ap

para

tus

only

whe

n ne

eded

. Pro

ject

ions

for n

ew p

umpe

rs b

y th

e ye

ar 2

013

are

over

$42

5,00

0 ea

ch.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

19

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$400

,000

$0$0

$300

,000

$45,

000

$500

,000

Mac

hine

ry a

nd E

quip

men

t$1

,245

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

507

2 (1

det

ail r

ecor

d)TO

TAL:

$400

,000

$0$0

$300

,000

$45,

000

$500

,000

$1,2

45,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$400

,000

$0$0

$300

,000

$0$5

00,0

00B

ond:

City

/Sch

ool

$1,2

00,0

00

$0$0

$0$0

$45,

000

$0D

edic

ated

Rev

enue

$45,

000

TOTA

L:$4

00,0

00$0

$0$3

00,0

00$4

5,00

0$5

00,0

00$1

,245

,000

60

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Fire Gear Replacement

Request includes helmets, gloves, boots, fire hose and nozzles. FY14 request for19 sets of Permanent gear, FY15 request for 18 sets of permanent gear. This request also includes the cost for yearly maintenance of hose, nozzles and gear.

The permanent firefighters currently have 2 sets of gear a primary set and a backup set. The backup gear will be over 10 years old and needs to be replaced. The current primary set will become their backup set and the new gear will be their primary set.

The new firefighting gear is a major component of our overall plan to give our firefighters the best protection available.

10

Essential

Central Fire Station

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Fire 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$6,000

$128,500

4) Type of Project:Machinery and Equipment

20132) FY:

20

9) Anticipated Funding Source(s):

Ded Rev

61

Fire

Fire

Gea

r Rep

lace

men

t

Whe

n th

e ge

ar is

insp

ecte

d an

d if

the

gear

is fo

und

to b

e w

orn

out,

we

will

hav

e to

elim

inat

e th

e ca

ll fir

efig

htin

g ca

pabi

litie

s.

We

will

con

tinue

to w

ork

on a

pla

n to

repl

ace

the

gear

in th

e fu

ture

.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

20

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$6,0

00$5

3,50

0$5

1,00

0$6

,000

$6,0

00$6

,000

Mac

hine

ry a

nd E

quip

men

t$1

28,5

00

Sum

mar

y fo

r 'pr

ojec

tID' =

534

5 (1

det

ail r

ecor

d)TO

TAL:

$6,0

00$5

3,50

0$5

1,00

0$6

,000

$6,0

00$6

,000

$128

,500

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$6,0

00$5

3,50

0$5

1,00

0$6

,000

$6,0

00$6

,000

Ded

icat

ed R

even

ue$1

28,5

00

TOTA

L:$6

,000

$53,

500

$51,

000

$6,0

00$6

,000

$6,0

00$1

28,5

00

62

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Hose Replacement

The request is to fund a hose replacement program. The program purchases replacement fire hose over a two year period rather than an outright single purchase. All 4 inch hose in FY13 and all 2 1/2 inch and 1 3/4 inch hose in FY14.

All fire hose is currently over ten years old and is approaching the end of its safe and useful life. As a general rule all fire hose should be replaced about every ten to twelve years.Fire hose is one of our most important firefighting tools.

None

10

Essential

Central Fire Station

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Fire 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$29,000

$75,400

4) Type of Project:Machinery and Equipment

20132) FY:

21

9) Anticipated Funding Source(s):

Ded Rev

63

Fire

Hos

e R

epla

cem

ent

We

will

con

tinue

to g

et th

e jo

b do

ne a

nd re

plac

e ho

se a

s ne

eded

. Pur

chas

ing

new

fire

hos

e w

ill m

ake

the

firef

ight

ers

job

safe

r by

mak

ing

sure

they

hav

e fir

e ho

se w

hich

is n

ot w

orn

out a

nd h

ave

less

cha

nce

of fa

ilure

dur

ing

a fir

e.

Non

e

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

21

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$29,

000

$46,

400

$0$0

$0$0

Mac

hine

ry a

nd E

quip

men

t$7

5,40

0

Sum

mar

y fo

r 'pr

ojec

tID' =

539

1 (1

det

ail r

ecor

d)TO

TAL:

$29,

000

$46,

400

$0$0

$0$0

$75,

400

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$29,

000

$46,

400

$0$0

$0$0

Ded

icat

ed R

even

ue$7

5,40

0

TOTA

L:$2

9,00

0$4

6,40

0$0

$0$0

$0$7

5,40

0

64

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Breathing Apparatus

The request is to fund 41 new self-contained breathing apparatus, inculding 37 additional facepiece, 41 spare air bottles, 12 voice amps, 78 voice amp brackets, 7 one hour bottles, and a Rit-Pak. Price reflects trade in of old paks and 5% added for expected price increase next year.

The current self-contained breathing apparatus will be over ten years old and will not meet the new NFPA 2012 Standard. Once the SCBA is two standards old, they should be replaced. This is the most important piece of equipment the firefighters use

The new self-contained breathing apparatus are a major safety component, and will greatly improve firefighter safety. This project is a major component of our overall Master Plan recommendations to improve our state of readiness

12

Essential

Central Fire Station

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Fire 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$275,000

4) Type of Project:Machinery and Equipment

20152) FY:

22

9) Anticipated Funding Source(s):

Bond

65

Fire

Bre

athi

ng A

ppar

atus

We

will

con

tinue

to u

se o

ur c

urre

nt s

elf-c

onta

ined

bre

athi

ng a

ppar

atus

eve

n th

ough

they

do

not m

eet t

he n

ew n

atio

nal

stan

dard

s an

d ar

e pa

st th

eir u

sefu

l life

.

Non

e

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2015

FY:

22

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$0

$275

,000

$0$0

$0M

achi

nery

and

Equ

ipm

ent

$275

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

539

3 (1

det

ail r

ecor

d)TO

TAL:

$0$0

$275

,000

$0$0

$0$2

75,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$0

$275

,000

$0$0

$0B

ond:

City

/Sch

ool

$275

,000

TOTA

L:$0

$0$2

75,0

00$0

$0$0

$275

,000

66

BO

ND

PRO

CE

ED

SC

/OA

MO

UN

TO

&M

CA

SHD

ED

RE

VST

AT

EH

WY

FU

ND

SSR

F

CIT

Y O

F R

OC

HE

STE

R

F

Y13

PR

OPO

SED

CIP

BU

DG

ET

CA

PIT

AL

IMPR

OV

EM

EN

TS

PRO

GR

AM

SC

HE

DU

LE

DE

PAR

TM

EN

T/D

ESC

RIP

TIO

NG

RA

NT

LIF

EA

MO

UN

TFU

ND

BA

LR

ET

EA

RN

Publ

ic W

orks

Bro

ck S

treet

Rec

onst

ruct

ion

2,00

0,00

00

00

00

035

1,00

02,

000,

000

City

Hal

l Par

king

Lot

and

Con

gres

s St.

Rai

n G

058

,000

00

087

,000

020

014

5,00

0H

anco

ck S

treet

Rec

onst

ruct

ion

015

,000

00

00

030

015

,000

New

Chi

pper

040

,000

00

00

015

040

,000

Pave

men

t Mai

nten

ance

050

,000

00

00

010

50,7

5050

,000

Pave

men

t Reh

abili

tatio

n Pr

ogra

m1,

400,

000

100,

000

00

00

010

300,

588

1,50

0,00

0Ph

ase

III o

f I/I

Proj

ect -

Fra

nklin

St.

Are

a10

0,00

00

00

00

035

010

0,00

0R

ebui

ld U

pper

City

Dam

Rai

se R

ight

Abu

tmen

020

,000

00

00

050

020

,000

Rep

lace

Sid

ewal

k Sn

ow B

low

er U

nits

060

,000

00

00

010

060

,000

Salm

on F

alls

Roa

d R

econ

stru

ctio

n50

,000

00

00

450,

000

030

050

0,00

0Si

dew

alk

Rep

lace

men

t Pro

gram

040

,000

00

00

025

41,4

4740

,000

Still

wat

er C

ircle

Brid

ge -

Brid

ge R

ail M

aint

ena

045

,000

00

00

020

045

,000

Stre

et D

rain

age

Impr

ovem

ent P

rogr

am25

0,00

00

00

00

030

80,5

3825

0,00

0V

ehic

le &

Equ

ipm

ent R

epla

cem

ent P

rogr

am0

397,

200

00

00

010

039

7,20

03,

800,

000

825,

200

00

0Pu

blic

Wor

ksSu

btot

al:

474,

323

053

7,00

05,

162,

200 C

API

TAL

IMPR

OV

EMEN

TS

67

THIS PAGE INTENTIONALLY LEFT BLANK

CITY OF ROCHESTER FY13 PROPOSED CIP BUDGET

CAPITAL IMPROVEMENTS 68

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Brock Street Reconstruction

Total reconstruction of street, rehabilitation of sidewalks and installation of granite curbing. The street is a principal walking route for school children, propose sidewalks on both sides of street. Water and sewer improvements are necessary. Prelimin ary design funded in FY 2007. FY 2008 - Final Design. This funds construction in FY-2013. Deferred from FY 2010

Street carries a significant amount of traffic and is degrading rapidly. Significant drainage issues. Sidewalks need to be rehabilitated to continue to be safe for school children to walk to school. Water main needs re- routing & sewer pipe too small.

Water and sewer upgrades funded from respective enterprise funds. - Deferred from FY 2010.

35

Maintenance

Other Brock Street

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$2,000,000

$2,000,000

4) Type of Project:Building Construction

-

20132) FY:

23

9) Anticipated Funding Source(s):

Bond

69

Pub

lic W

orks

Bro

ck S

treet

Rec

onst

ruct

ion

Stre

et is

sev

erel

y de

grad

ed.

Wat

er m

ain

need

s to

be

re-r

oute

d. S

ewer

mai

n to

o sm

all t

o ac

com

mod

ate

futu

re g

row

th o

n W

ashi

ngto

n S

treet

are

a. S

idew

alks

will

con

tinue

to d

egra

de to

a p

oint

that

sch

ool c

hild

ren

wal

king

to s

choo

l will

be

at

incr

ease

d ris

k.

Pav

emen

t reh

abili

tatio

n on

ly.

Doe

s no

t cor

rect

sid

ewal

k or

dra

inag

e de

ficie

ncie

s.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

23

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$1,8

75,0

00$0

$0$0

$0$0

Bui

ldin

g C

onst

ruct

ion

$1,8

75,0

00

$125

,000

$0$0

$0$0

$0C

onst

ruct

ion

Eng

inee

ring

$125

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

509

0 (2

det

ail r

ecor

ds)

TOTA

L:$2

,000

,000

$0$0

$0$0

$0$2

,000

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$2,0

00,0

00$0

$0$0

$0$0

Bon

d: C

ity/S

choo

l$2

,000

,000

TOTA

L:$2

,000

,000

$0$0

$0$0

$0$2

,000

,000

70

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

City Hall Parking Lot and Congress St. Rain Garden

Low impact development initiative to reduce effects of impervious cover. Balance if cost by grant from Cocheco River Watershed Alliance. Permeable pavement for City Hall parking lot. Install rain garden drainage system in Congress St. Parking lot.

This is a grant process whereby the City bears 40% of the cost. The Cocheco River is aquatically impaired due to non-point sources and storm water runoff. Cocheco water quality is directly linked to City potable water supply.

20

Desirable

City Hall

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$145,000

$145,000

4) Type of Project:Construction Engineering

20132) FY:

24

9) Anticipated Funding Source(s):

Cash, Grant

71

Pub

lic W

orks

City

Hal

l Par

king

Lot

and

Con

gres

s S

t. R

ain

Ga

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

24

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$145

,000

$0$0

$0$0

$0C

onst

ruct

ion

Eng

inee

ring

$145

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

545

2 (1

det

ail r

ecor

d)TO

TAL:

$145

,000

$0$0

$0$0

$0$1

45,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$58,

000

$0$0

$0$0

$0C

ash:

City

/Sch

ool

$58,

000

$87,

000

$0$0

$0$0

$0G

rant

$87,

000

TOTA

L:$1

45,0

00$0

$0$0

$0$0

$145

,000

72

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Hancock Street Reconstruction

Project will upgrade the portion of Hancock Street between Rochester Commons and Lowell Street intersection. Installation of curbing and rehabilitation of sidewalk. Current sewer main needs to be replaced as it is slowly becoming undersized.

In recent years, there have been improvements made on either side of this corridor which includes the installation of sidewalks and granite curbing. This section of street has drainage problems that need to be corrected. Pavement deteriorating steadily.

Water and sewer improvements funded from water and sewer enterprise funds.

30

Maintenance

Other Hancock Street

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$15,000

$285,000

4) Type of Project:Building Construction

-

20132) FY:

25

9) Anticipated Funding Source(s):

Bond, Cash

73

Pub

lic W

orks

Han

cock

Stre

et R

econ

stru

ctio

n

This

pro

ject

is p

roje

cted

for F

Y 2

014

afte

r Sou

th M

ain

Stre

et h

as b

een

com

plet

ed.

If w

e de

fer i

t too

long

, sew

er b

acku

ps a

re

poss

ible

par

ticul

arly

as

land

on

Roc

hest

er H

ill R

oad

beco

mes

furth

er d

evel

oped

and

add

'l w

aste

wat

er is

con

veye

d th

roug

h th

e se

wer

Sta

tus

quo.

- how

ever

wai

ting

too

long

may

cau

se s

ewer

pro

blem

s. P

ut d

own

pave

men

t shi

ms

as n

eces

sary

.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

25

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$2

50,0

00$0

$0$0

$0B

uild

ing

Con

stru

ctio

n$2

50,0

00

$0$2

0,00

0$0

$0$0

$0C

onst

ruct

ion

Eng

inee

ring

$20,

000

$15,

000

$0$0

$0$0

$0D

esig

n E

ngin

eerin

g$1

5,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

509

4 (3

det

ail r

ecor

ds)

TOTA

L:$1

5,00

0$2

70,0

00$0

$0$0

$0$2

85,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$2

70,0

00$0

$0$0

$0B

ond:

City

/Sch

ool

$270

,000

$15,

000

$0$0

$0$0

$0C

ash:

City

/Sch

ool

$15,

000

TOTA

L:$1

5,00

0$2

70,0

00$0

$0$0

$0$2

85,0

00

74

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

New Chipper

Purchase new wood chipper

Due to concerns of Safety Committee DPW got rid of the old wood chipper. Replacement was not provided. Chipper would save 50% of man power associated with debris management following severe storms.

None.

15

Maintenance

DPW Garage

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$40,000

$40,000

4) Type of Project:Machinery and Equipment

20132) FY:

26

9) Anticipated Funding Source(s):

Cash

75

Pub

lic W

orks

New

Chi

pper

Sta

tus

Quo

Cur

rent

ly d

ebris

are

bro

ught

to C

ity la

ndfil

l. A

chi

pper

wou

ld a

llow

deb

ris to

be

disp

erse

d lo

cally

in m

any

area

s.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

26

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$40,

000

$0$0

$0$0

$0M

achi

nery

and

Equ

ipm

ent

$40,

000

Sum

mar

y fo

r 'pr

ojec

tID' =

544

8 (1

det

ail r

ecor

d)TO

TAL:

$40,

000

$0$0

$0$0

$0$4

0,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$40,

000

$0$0

$0$0

$0C

ash:

City

/Sch

ool

$40,

000

TOTA

L:$4

0,00

0$0

$0$0

$0$0

$40,

000

76

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Pavement Maintenance

This is to cover the cost of maintaining the pavement on streets that are beginning to show signs of deterioration and can be rehabilitated cost-effectively through crack sealing & shimming. Funding for this project is from transportation tax fee

It is most cost-effective to maintain streets that are in the early stages of pavement degradation through cracksealing, shimming, and overlay programs. These are for relatively inexpensive maintenance items that will extend the life of pavements.

None.

10

Maintenance

Other Various Streets

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$50,000

$300,000

4) Type of Project:Building Construction

-

20132) FY:

27

9) Anticipated Funding Source(s):

Cash

77

Pub

lic W

orks

Pav

emen

t Mai

nten

ance

City

has

spe

nt m

ore

than

$10

M in

rece

nt y

ears

to re

habi

litat

e an

d pa

ve s

treet

s. S

ome

of th

ese

stre

ets

are

in th

e ea

rly s

tage

of

degr

adat

ion

(e.g

. cra

cks

are

show

ing)

. N

ot s

pend

ing

the

mon

ey to

sea

l the

se c

rack

s w

hile

they

are

sm

all w

ill c

ost m

ore

mon

ey.

To c

ombi

ne th

is p

rogr

am w

ith p

avem

ent r

econ

stru

ctio

n pr

ogra

m.

Kee

ping

them

sep

arat

e ho

wev

er a

llow

s th

e ci

ty to

act

ivel

y im

plem

ent t

he R

oad

Sur

face

Man

agem

ent S

yste

m w

ithou

t bei

ng d

ilute

d by

oth

er p

rogr

ams.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

27

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$50,

000

$50,

000

$50,

000

$50,

000

$50,

000

$50,

000

Bui

ldin

g C

onst

ruct

ion

$300

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

508

2 (1

det

ail r

ecor

d)TO

TAL:

$50,

000

$50,

000

$50,

000

$50,

000

$50,

000

$50,

000

$300

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$50,

000

$50,

000

$50,

000

$50,

000

$50,

000

$50,

000

Cas

h: C

ity/S

choo

l$3

00,0

00

TOTA

L:$5

0,00

0$5

0,00

0$5

0,00

0$5

0,00

0$5

0,00

0$5

0,00

0$3

00,0

00

78

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Pavement Rehabilitation Program

This is to fund those road projects that do not require extensive engineering but need significantly more work than an overlay or crackseal. Note: $100,000 Cash is funded by the Transportation Tax fee.

City has over 160 miles of roads that it maintains. Funding at this level in the out years will enable the city to keep up with the paving from 6 to 8 miles of streets per year depending on what needs to be completed

Street Drainage improvement program

10

Maintenance

Other City wide

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$1,500,000

$11,000,000

4) Type of Project:Building Construction

-

20132) FY:

28

9) Anticipated Funding Source(s):

Bond, Cash

79

Pub

lic W

orks

Pav

emen

t Reh

abili

tatio

n P

rogr

am

Def

errin

g pr

ogra

m a

fter t

he re

cent

fund

ing

expi

res

will

cau

se th

e ci

ty to

con

tinue

to b

acks

lide

on th

e co

nditi

on o

f the

stre

ets.

C

heap

er to

do

over

lay

than

reco

nstru

ctio

n.

Def

er p

avin

g. T

his

will

cau

se th

e ci

ty to

con

tinue

to b

acks

lide

on th

e co

nditi

on o

f its

stre

ets.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

28

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$1,5

00,0

00$1

,750

,000

$1,7

50,0

00$2

,000

,000

$2,0

00,0

00$2

,000

,000

Bui

ldin

g C

onst

ruct

ion

$11,

000,

000

Sum

mar

y fo

r 'pr

ojec

tID' =

508

9 (1

det

ail r

ecor

d)TO

TAL:

$1,5

00,0

00$1

,750

,000

$1,7

50,0

00$2

,000

,000

$2,0

00,0

00$2

,000

,000

$11,

000,

000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$1,4

00,0

00$1

,750

,000

$1,7

50,0

00$2

,000

,000

$2,0

00,0

00$2

,000

,000

Bon

d: C

ity/S

choo

l$1

0,90

0,00

0

$100

,000

$0$0

$0$0

$0C

ash:

City

/Sch

ool

$100

,000

TOTA

L:$1

,500

,000

$1,7

50,0

00$1

,750

,000

$2,0

00,0

00$2

,000

,000

$2,0

00,0

00$1

1,00

0,00

0

80

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Phase III of I/I Project - Franklin St. Area

Reconstruction of Franklin Street between Chamberlain and South Main Street and street improvements in the neighborhood bounded by Western and Adams. This serves as Phase III of city's I/I program. On Franklin, work will involve complete removal of all pavement and subgrade material. Installation of curbing and drainage improvements, reconstruction of sidewalk.

This section of road is in very poor condition. It is a vital link between the East side, downtown and the Tri-City area. Additionally, the adjacent area of Western Avenue neighborhood is a candidate for I/I work. This combines the work of both.

Water and sewer I/I improvements will be planned as part of this project. Need to fill in gap in water system in Franklin Street between Adams and Prospect Streets and work to rehabilitate sewers. This project will also replace Western Av. Pump station.

35

Maintenance

Other Franklin St. (S. Main to Cham)

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$100,000

$3,100,000

4) Type of Project:Building Construction

-

20132) FY:

29

9) Anticipated Funding Source(s):

Bond

81

Pub

lic W

orks

Pha

se II

I of I

/I P

roje

ct -

Fran

klin

St.

Are

a

Con

ditio

n of

this

col

lect

or s

treet

will

get

wor

se a

nd w

orse

.

Mak

e th

is s

treet

par

t of t

he p

avem

ent p

rogr

am a

nd d

o pa

vem

ent r

ehab

ilita

tion

only

. D

efer

stre

etsc

ape

impr

ovem

ents

. P

avem

ent s

him

was

pla

ced

in 2

004

and

2009

to

"sm

ooth

the

ride"

or a

yea

r or t

wo.

Con

tinue

with

this

tact

ic. D

efer

I/I

impr

ovem

ents

.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

29

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$2

,800

,000

$0$0

$0$0

Bui

ldin

g C

onst

ruct

ion

$2,8

00,0

00

$0$2

00,0

00$0

$0$0

$0C

onst

ruct

ion

Eng

inee

ring

$200

,000

$100

,000

$0$0

$0$0

$0D

esig

n E

ngin

eerin

g$1

00,0

00

Sum

mar

y fo

r 'pr

ojec

tID' =

509

1 (3

det

ail r

ecor

ds)

TOTA

L:$1

00,0

00$3

,000

,000

$0$0

$0$0

$3,1

00,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$100

,000

$3,0

00,0

00$0

$0$0

$0B

ond:

City

/Sch

ool

$3,1

00,0

00

TOTA

L:$1

00,0

00$3

,000

,000

$0$0

$0$0

$3,1

00,0

00

82

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Rebuild Upper City Dam Raise Right Abutment

Raise right concrete abutment of dam so that dam is able to pass the 50 year flood with 1 ft freeboard per NHDES requirements

NHDES issues a letter of deficiency in 2010. Identified was inadequate hydraulic capacity of the spillway and vulnerability to overtopping and associated damages

50

Mandatory

Other

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$20,000

$65,000

4) Type of Project:Construction Engineering

-

20132) FY:

30

9) Anticipated Funding Source(s):

Cash

83

Pub

lic W

orks

Reb

uild

Upp

er C

ity D

am R

aise

Rig

ht A

butm

ent

Non

-com

plia

nce

and

inab

ility

to p

ass

50 y

ear f

lood

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

30

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$4

5,00

0$0

$0$0

$0C

onst

ruct

ion

Eng

inee

ring

$45,

000

$20,

000

$0$0

$0$0

$0D

esig

n E

ngin

eerin

g$2

0,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

544

6 (2

det

ail r

ecor

ds)

TOTA

L:$2

0,00

0$4

5,00

0$0

$0$0

$0$6

5,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$20,

000

$45,

000

$0$0

$0$0

Cas

h: C

ity/S

choo

l$6

5,00

0

TOTA

L:$2

0,00

0$4

5,00

0$0

$0$0

$0$6

5,00

0

84

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Replace Sidewalk Snow Blower Units

Replace Snow Blower units #4, #7, #37. Each units is $20,000

Existing blower units are old and becoming weak and less effective.

None

10

Maintenance

DPW Garage

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$60,000

$60,000

4) Type of Project:Machinery and Equipment

20132) FY:

31

9) Anticipated Funding Source(s):

Cash

85

Pub

lic W

orks

Rep

lace

Sid

ewal

k S

now

Blo

wer

Uni

ts

Rep

lace

men

t of b

low

er u

nits

is fa

r les

s ex

pens

ive

than

pur

chas

ing

new

sid

ewal

k bl

ower

veh

icle

s

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

31

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$60,

000

$0$0

$0$0

$0M

achi

nery

and

Equ

ipm

ent

$60,

000

Sum

mar

y fo

r 'pr

ojec

tID' =

544

5 (1

det

ail r

ecor

d)TO

TAL:

$60,

000

$0$0

$0$0

$0$6

0,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$60,

000

$0$0

$0$0

$0C

ash:

City

/Sch

ool

$60,

000

TOTA

L:$6

0,00

0$0

$0$0

$0$0

$60,

000

86

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Salmon Falls Road Reconstruction

This involves the reconstruction of Salmon Falls Road between Route 125 and Autumn St. and from Whitehall to Haven Hill Road. Replace road base in some areas where it is not to standard. Drainage improvements in both sectors and install water to loop be tween Autumn and Flat Rock Bridge Road. Initial design engineering funded last year. Tangible improvements for FY-12; significant design for FY-14 and major reconstruction FY-15.

Longest road in the city and traffic has increased markedly as area has developed. Pavement is deteriorating steadily. Applied for federal funds for complete reconstruction of Road. Near term funding will maintain the road so it is servicable.

Water and sewer projects associated with this are funded from appropriate enterprise funds. - Other phases to be done in out years; Full reconstruction will occur if city receives federal funds, otherwise only pavement maintenance will occur.

30

Maintenance

Other Salmon Falls Road

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$500,000

$7,219,000

4) Type of Project:Building Construction

-

20132) FY:

32

9) Anticipated Funding Source(s):

Bond, Cash, Grant

87

Pub

lic W

orks

Sal

mon

Fal

ls R

oad

Rec

onst

ruct

ion

Stre

et w

ill c

ontin

ue to

deg

rade

to th

e po

int t

hat i

t will

bec

ome

a sa

fety

con

cern

for m

otor

ists

. City

resu

rface

d ab

out 1

.5 m

iles

of

road

in 2

009,

how

ever

, oth

er s

ectio

ns o

f the

road

stil

l nee

d it

Div

ide

the

proj

ect i

nto

piec

es ra

ther

than

dea

ling

with

the

road

as

a w

hole

. S

eek

deve

lope

r par

ticip

atio

n. A

ctiv

ely

soug

ht

fede

ral a

nd/o

r sta

te fu

ndin

g fo

r thi

s pr

ojec

t. A

ttem

pted

to s

ubm

it pr

ojec

t for

sta

te "1

0-ye

ar"

high

way

pla

n, w

/o s

ucce

ss to

dat

e.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

32

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$420

,000

$0$1

,300

,000

$1,2

00,0

00$7

20,0

00$2

,200

,000

Bui

ldin

g C

onst

ruct

ion

$5,8

40,0

00

$40,

000

$0$1

20,0

00$1

15,0

00$7

2,00

0$2

20,0

00C

onst

ruct

ion

Eng

inee

ring

$567

,000

$40,

000

$120

,000

$115

,000

$72,

000

$215

,000

$250

,000

Des

ign

Eng

inee

ring

$812

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

510

2 (3

det

ail r

ecor

ds)

TOTA

L:$5

00,0

00$1

20,0

00$1

,535

,000

$1,3

87,0

00$1

,007

,000

$2,6

70,0

00$7

,219

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$50,

000

$120

,000

$1,5

35,0

00$1

,387

,000

$1,0

07,0

00$2

,670

,000

Bon

d: C

ity/S

choo

l$6

,769

,000

$0$0

$0$0

$0$0

Cas

h: C

ity/S

choo

l$0

$450

,000

$0$0

$0$0

$0G

rant

$450

,000

TOTA

L:$5

00,0

00$1

20,0

00$1

,535

,000

$1,3

87,0

00$1

,007

,000

$2,6

70,0

00$7

,219

,000

88

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Sidewalk Replacement Program

Program to prioritize and replace sidewalks throughout the city. Work was begun in 2006 to replace areas where sidewalks are crumbling through out the city. Future efforts will target larger areas where the sidewalks are difficult to navigate due to degradation.

Some of the sidewalks are degrading to the point that they are dangerous for people who are mobility challenged to navigate them safely

This is for areas where there are degraded sidewalks where there is no other project planned for the near future.

25

Maintenance

Other

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$40,000

$240,000

4) Type of Project:Building Construction

-

20132) FY:

33

9) Anticipated Funding Source(s):

Cash

89

Pub

lic W

orks

Sid

ewal

k R

epla

cem

ent P

rogr

am

Sid

ewal

ks w

ill c

ontin

ue to

deg

rade

incr

easi

ng th

e ci

ty's

liabi

lity

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

33

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$40,

000

$40,

000

$40,

000

$40,

000

$40,

000

$40,

000

Bui

ldin

g C

onst

ruct

ion

$240

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

516

2 (1

det

ail r

ecor

d)TO

TAL:

$40,

000

$40,

000

$40,

000

$40,

000

$40,

000

$40,

000

$240

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$40,

000

$40,

000

$40,

000

$40,

000

$40,

000

$40,

000

Cas

h: C

ity/S

choo

l$2

40,0

00

TOTA

L:$4

0,00

0$4

0,00

0$4

0,00

0$4

0,00

0$4

0,00

0$4

0,00

0$2

40,0

00

90

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Stillwater Circle Bridge - Bridge Rail Maintenance

To repair the spalling concrete that is anchoring the bridge rail system to the bridge deck. Will need to remove bridge rail and remove and recast the spalling concrete that is anchoring the bridge rail. This does not include replacement of bridge rail. May need to include replacement in order to meet current safety standards.

The concrete that anchors the bridge rail had become weakened due to spalling and degradation from the application of road salt on the bridge.

None

20

Maintenance

Other Stillwater Circle

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$45,000

$45,000

4) Type of Project:Building Construction

-

20132) FY:

34

9) Anticipated Funding Source(s):

Cash

91

Pub

lic W

orks

Stil

lwat

er C

ircle

Brid

ge -

Brid

ge R

ail M

aint

enan

The

conc

rete

will

con

tinue

to e

rode

and

spa

ll an

d fu

rther

wea

ken

the

anch

orin

g ca

paci

ty o

f the

brid

ge ra

il. U

ltim

atel

y th

e ra

il w

ill fa

il to

hol

d an

err

ant v

ehic

le fr

om fa

lling

off

the

brid

ge in

the

even

t the

driv

er lo

ses

cont

rol o

f the

ir ve

hicl

e.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

34

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$45,

000

$0$0

$0$0

$0B

uild

ing

Con

stru

ctio

n$4

5,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

534

9 (1

det

ail r

ecor

d)TO

TAL:

$45,

000

$0$0

$0$0

$0$4

5,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$45,

000

$0$0

$0$0

$0C

ash:

City

/Sch

ool

$45,

000

TOTA

L:$4

5,00

0$0

$0$0

$0$0

$45,

000

92

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Street Drainage Improvement Program

For designing and building drainage structures & making neighborhood drainage improvements throughout the city. Also for installation of catch basins and closed drainage systems prior to repaving some streets.

City has spent $10M to repave streets in recent years. Past expenditures have been focused toward streets where drainage problems are not an issue. Past expenditures have focused on places like Crockett neighborhood and Chestnut Hill Rd.

Pavement rehabilitation program

30

Maintenance

Other Various Locations

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$250,000

$2,050,000

4) Type of Project:Building Construction

-

20132) FY:

35

9) Anticipated Funding Source(s):

Bond

93

Pub

lic W

orks

Stre

et D

rain

age

Impr

ovem

ent P

rogr

am

Will

cau

se c

ity to

eve

ntua

lly e

xpen

d va

luab

le p

avem

ent m

oney

s w

ithou

t act

ually

cor

rect

ing

the

reas

on w

hy th

e pa

vem

ent i

s de

grad

ing

prem

atur

ely.

Thi

s is

ess

entia

l to

corr

ect t

he p

avem

ent d

egra

datio

n pr

oble

ms

in s

ome

neig

hbor

hood

s.

Rea

lloca

te s

ome

of th

e pa

ving

mon

ey fo

r dra

inag

e co

rrect

ion

elem

ents

. D

oing

so

will

redu

ce th

e nu

mbe

r of s

treet

s th

at w

ill b

e re

pave

d un

der t

he c

urre

nt p

rogr

am.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

35

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$200

,000

$160

,000

$320

,000

$320

,000

$320

,000

$320

,000

Bui

ldin

g C

onst

ruct

ion

$1,6

40,0

00

$50,

000

$40,

000

$80,

000

$80,

000

$80,

000

$80,

000

Des

ign

Eng

inee

ring

$410

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

508

3 (2

det

ail r

ecor

ds)

TOTA

L:$2

50,0

00$2

00,0

00$4

00,0

00$4

00,0

00$4

00,0

00$4

00,0

00$2

,050

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$250

,000

$200

,000

$400

,000

$400

,000

$400

,000

$400

,000

Bon

d: C

ity/S

choo

l$2

,050

,000

TOTA

L:$2

50,0

00$2

00,0

00$4

00,0

00$4

00,0

00$4

00,0

00$4

00,0

00$2

,050

,000

94

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Vehicle & Equipment Replacement Program

Replacement of bucket truck (#22 - 80% highway, 20% buildings & grounds) and replacement of 2 6-wheel dump trucks (#10, 1990 Mack & #20 1991 Mack)

Many vehicles are approaching their useful lives or past useful life.

Replacement of existing equipment.

10

Essential

DPW Garage

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$397,200

$1,322,200

4) Type of Project:Auto/Light Truck

20132) FY:

36

9) Anticipated Funding Source(s):

Cash

95

Pub

lic W

orks

Veh

icle

& E

quip

men

t Rep

lace

men

t Pro

gram

Con

tinue

to re

pair

vehi

cles

and

equ

ipm

ent i

f pos

sibl

e.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

36

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$117

,200

$115

,000

$25,

000

$25,

000

$25,

000

$25,

000

Aut

o/Li

ght T

ruck

$332

,200

$220

,000

$110

,000

$270

,000

$110

,000

$110

,000

$110

,000

Hea

vy E

quip

men

t$9

30,0

00

$60,

000

$0$0

$0$0

$0M

achi

nery

and

Equ

ipm

ent

$60,

000

Sum

mar

y fo

r 'pr

ojec

tID' =

508

1 (3

det

ail r

ecor

ds)

TOTA

L:$3

97,2

00$2

25,0

00$2

95,0

00$1

35,0

00$1

35,0

00$1

35,0

00$1

,322

,200

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$397

,200

$225

,000

$295

,000

$135

,000

$135

,000

$135

,000

Cas

h: C

ity/S

choo

l$1

,322

,200

TOTA

L:$3

97,2

00$2

25,0

00$2

95,0

00$1

35,0

00$1

35,0

00$1

35,0

00$1

,322

,200

96

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Chesley Hill Road Drainage Improvements

Involves the engineering evaluation aimed at the rehabilitation of the closed drainage system on street in addition to pavement rehabilitation. Engineering evaluation will determine whether curbing and perhaps sidewalk are warranted on street. This funds engineering only. Construction funds can either be provided from Street Drainage Improvement Program or as a stand alone project.

Street is on a steep grade and existing drainage system is inadequate to handle the stormwater runoff that flows down the street without causing street degradation. The pavement on the north side of the street was rehabed in 2008.

This project complements the paving work that was on the north side of Chesley Hill Road in 2008. Drainage work needs to be done and the pipe work will be funded by Street Drainage Improvement Program

25

Maintenance

Other Chesley Hill - Gonic Side.

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$60,000

4) Type of Project:Design Engineering

-

20142) FY:

37

9) Anticipated Funding Source(s):

Cash

97

Pub

lic W

orks

Che

sley

Hill

Roa

d D

rain

age

Impr

ovem

ents

Roa

d w

ill c

ontin

ue to

det

erio

rate

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2014

FY:

37

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$6

0,00

0$0

$0$0

$0D

esig

n E

ngin

eerin

g$6

0,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

528

4 (1

det

ail r

ecor

d)TO

TAL:

$0$6

0,00

0$0

$0$0

$0$6

0,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$6

0,00

0$0

$0$0

$0C

ash:

City

/Sch

ool

$60,

000

TOTA

L:$0

$60,

000

$0$0

$0$0

$60,

000

98

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Columbus/Summer Intersection

Add left turn lanes on Columbus Avenue at Summer Street. Project will add a travel lane on the west side of Columbus Avenue and construct sidewalks on Columbus Avenue from City Hall to Profile Bank. Reconfigure traffic signals for new lanes. Will conti nue to pursue alternative funding (CMAQ).

Intersection is a bottleneck for motorists traveling on Columbus Avnue. There is no left turn lane causing stacking on this heavily travelled road. Not enough room for motorists to bypass those turning left, severely degrading level of service.

Design engineering for this project was funded in FY05, however source of funds was from State CMAQ funding. This project was not selected during the last round of CMAQ funding and low on the priority list for the current round of funding - Shifted to 14

25

Desirable

Other Columbus/Summer Intersection

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$860,000

4) Type of Project:Building Construction

-

20142) FY:

38

9) Anticipated Funding Source(s):

Bond

99

Pub

lic W

orks

Col

umbu

s/S

umm

er In

ters

ectio

n

Lack

of a

left-

hand

turn

lane

in e

ach

dire

ctio

n at

this

sig

naliz

ed in

ters

ectio

n se

vere

ly d

egra

des

the

leve

l of s

ervi

ce o

f thi

s in

ters

ectio

n. C

ars

som

etim

es h

ave

to s

it th

roug

h se

vera

l lig

ht c

ycle

s w

hen

mot

oris

ts a

re tu

rnin

g le

ft on

to S

umm

er S

treet

.

Con

tinue

with

fund

ing

proj

ect n

ow ra

ther

than

wai

t for

sta

te fi

nanc

ing

or fi

nanc

e pr

ojec

t up

front

then

see

k re

imbu

rsem

ent a

fter

stat

e fu

ndin

g be

com

es a

vaila

ble.

Req

uire

con

tribu

tion

fund

ing

from

priv

ate

deve

lopm

ent s

ourc

es.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2014

FY:

38

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$0

$650

,000

$0$0

$0B

uild

ing

Con

stru

ctio

n$6

50,0

00

$0$0

$70,

000

$0$0

$0C

onst

ruct

ion

Eng

inee

ring

$70,

000

$0$6

0,00

0$0

$0$0

$0D

esig

n E

ngin

eerin

g$6

0,00

0

$0$8

0,00

0$0

$0$0

$0La

nd A

cqui

sitio

n$8

0,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

509

2 (4

det

ail r

ecor

ds)

TOTA

L:$0

$140

,000

$720

,000

$0$0

$0$8

60,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$1

40,0

00$7

20,0

00$0

$0$0

Bon

d: C

ity/S

choo

l$8

60,0

00

TOTA

L:$0

$140

,000

$720

,000

$0$0

$0$8

60,0

00

100

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Sheridan, Glen, Granite Streets Rehabilitation

Reconstruction of Catherine, Sheridan, Glen, and Granite Streets. Roadway, curbing, sidewalk, rehabs. All within walking distance and on bus route of Allen School. Street and sidewalks degrading. Drainage and sewer issues. Expansion of Catherine Street outfall project to include entire city block. Design funded in '08; This funds construction, which has been deferred until 2013

These streets have been neglected for very long time. These are in a prime walk and bus routes for elementary schoolers to Allen School. Received complaints from residents about uneven sidewalks, poor drainage. Expansion of Catherine Street outfall.

Funding for water and sewer portions of project in these enterprise funds. FY08 was for investigation and design. Construction has been deferred to 2013 due to funding limitations. There is also a water and sewer component.

30

Maintenance

Other Sheridan St. neighborhood

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$900,000

4) Type of Project:Building Construction

-

20142) FY:

39

9) Anticipated Funding Source(s):

Bond

101

Pub

lic W

orks

She

ridan

, Gle

n, G

rani

te S

treet

s R

ehab

ilita

tion

Sta

tus

Quo

. Th

e co

nditi

on o

f the

infra

stru

ctur

e is

dec

ayin

g. C

ontin

ued

deca

ying

will

resu

lt in

an

even

gre

ater

num

ber o

f co

mpl

aint

s fro

m re

side

nts

and

pare

nts

trans

porti

ng th

eir c

hild

ren

to s

choo

l.

Pav

emen

t ove

rlay

- whi

ch o

nly

serv

es to

"dre

ss it

up"

for t

he s

hort

term

and

doe

s no

t fix

und

erly

ing

prob

lem

s to

dra

inag

e, w

ater

an

d se

wer

.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2014

FY:

39

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$8

25,0

00$0

$0$0

$0B

uild

ing

Con

stru

ctio

n$8

25,0

00

$0$7

5,00

0$0

$0$0

$0C

onst

ruct

ion

Eng

inee

ring

$75,

000

Sum

mar

y fo

r 'pr

ojec

tID' =

508

8 (2

det

ail r

ecor

ds)

TOTA

L:$0

$900

,000

$0$0

$0$0

$900

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$9

00,0

00$0

$0$0

$0B

ond:

City

/Sch

ool

$900

,000

TOTA

L:$0

$900

,000

$0$0

$0$0

$900

,000

102

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Lighting for Congress St. Parking Lot

Installation of decorative lighting that originally slated for the Congress Street Parking Lot, but was never installed with parking lot was constructed in 2008 because of a lack of funds. This will install the same lighting that was installed on Hanson Street, but w/ LED bulbs for energy efficiency.

The parking lot was designed for lighting and to complement the downtown area. There were insufficient funds budgeted to install the lights at the time, however all of the electrical conduit and light bases have been installed. Makes it safer for users.

Congress Street Parking lot, which was completed in 2009

25

Desirable

Other Congress St. Parking Lot

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$60,000

4) Type of Project:Building Construction

-

20152) FY:

40

9) Anticipated Funding Source(s):

Cash

103

Pub

lic W

orks

Ligh

ting

for C

ongr

ess

St.

Par

king

Lot

Sub

stan

dard

ligh

ting

in th

e pa

rkin

g lo

t wou

ld c

ontin

ue.

Full

pote

ntia

l of p

arki

ng lo

t to

dow

ntow

n ar

ea w

ould

not

be

real

ized

.

Opt

for a

diff

eren

t lig

htin

g ty

pe.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2015

FY:

40

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$0

$60,

000

$0$0

$0B

uild

ing

Con

stru

ctio

n$6

0,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

539

6 (1

det

ail r

ecor

d)TO

TAL:

$0$0

$60,

000

$0$0

$0$6

0,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$0

$60,

000

$0$0

$0C

ash:

City

/Sch

ool

$60,

000

TOTA

L:$0

$0$6

0,00

0$0

$0$0

$60,

000

104

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Strafford Sq. Reconstruction

This project involves the reconstruction of Strafford Square using state funds. This funds the acquisition of property and reconstruction intersection to a roundabout. Preliminary design work is completed and includes work south on North Main Street to just south of Jackson St. This will enhance the gateway to the downtown from the north.

This is the final phase of the Washington St. reconstruction project. This project is on NHDOT's transportation improvement program and the city is eligible for funding at 80 percent level.

This is the final phase of the Washington St. reconstruction program. Underground utility work in this area is being done in Phase IV, which is due to be completed by Oct. '10.

30

Maintenance

Other North Main St. :Pine - Jackson

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$1,500,000

4) Type of Project:Building Construction

-

20152) FY:

41

9) Anticipated Funding Source(s):

Bond

105

Pub

lic W

orks

Stra

fford

Sq.

Rec

onst

ruct

ion

Sta

te fu

ndin

g du

e to

be

avai

labl

e in

201

5 fo

r con

stru

ctio

n an

d pr

oper

ty a

cqui

sitio

n in

201

2. I

f def

erre

d to

o lo

ng p

ast 2

015,

then

st

ate

fund

ing

coul

d be

com

e in

jeop

ardy

.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2015

FY:

41

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$0

$1,2

00,0

00$0

$0$0

Bui

ldin

g C

onst

ruct

ion

$1,2

00,0

00

$0$0

$300

,000

$0$0

$0C

onst

ruct

ion

Eng

inee

ring

$300

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

522

0 (2

det

ail r

ecor

ds)

TOTA

L:$0

$0$1

,500

,000

$0$0

$0$1

,500

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$0

$1,5

00,0

00$0

$0$0

Bon

d: C

ity/S

choo

l$1

,500

,000

TOTA

L:$0

$0$1

,500

,000

$0$0

$0$1

,500

,000

106

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Woodman, Myrtle Street Rehabilitation

This is for Phase II of the Allen School Neighborhood that was first funded in 2008. This covers the area north of the school including Myrtle, Woodman, and a portion of Congress Street. FY15 is for investigation and design of phase II '16 is for construction.

These streets have been neglected for a very long time. These are in a prime walk and bus routes for elementary schoolers to Allen School. Received complaints from residents about uneven sidewalks and poor drainage.

Continuation of the Catherine, and Sheridan Street rehabilitation.

30

Maintenance

Other Myrtle St. Neighborhood

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Public Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$810,000

4) Type of Project:Building Construction

-

20152) FY:

42

9) Anticipated Funding Source(s):

Bond, Cash

107

Pub

lic W

orks

Woo

dman

, Myr

tle S

treet

Reh

abili

tatio

n

Fund

ing

for w

ater

and

sew

er p

ortio

n of

pro

ject

in th

ese

ente

rpris

e fu

nds.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2015

FY:

42

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$0

$0$6

75,0

00$0

$0B

uild

ing

Con

stru

ctio

n$6

75,0

00

$0$0

$0$7

5,00

0$0

$0C

onst

ruct

ion

Eng

inee

ring

$75,

000

$0$0

$60,

000

$0$0

$0D

esig

n E

ngin

eerin

g$6

0,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

531

9 (3

det

ail r

ecor

ds)

TOTA

L:$0

$0$6

0,00

0$7

50,0

00$0

$0$8

10,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$0

$0$7

50,0

00$0

$0B

ond:

City

/Sch

ool

$750

,000

$0$0

$60,

000

$0$0

$0C

ash:

City

/Sch

ool

$60,

000

TOTA

L:$0

$0$6

0,00

0$7

50,0

00$0

$0$8

10,0

00

108

BO

ND

PRO

CE

ED

SC

/OA

MO

UN

TO

&M

CA

SHD

ED

RE

VST

AT

EH

WY

FU

ND

SSR

F

CIT

Y O

F R

OC

HE

STE

R

FY13

PR

OPO

SED

CIP

BU

DG

ET

CA

PIT

AL

IMPR

OV

EM

EN

TS

PRO

GR

AM

SC

HE

DU

LE

DE

PAR

TM

EN

T/D

ESC

RIP

TIO

NG

RA

NT

LIF

EA

MO

UN

TFU

ND

BA

LR

ET

EA

RN

Hos

t Com

mun

ityTr

ansf

er to

Eco

nom

ic D

evel

opm

ent F

und

00

100,

000

00

00

50

100,

000

Tran

sfer

to G

ener

al F

und

00

280,

000

00

00

50

280,

000

00

380,

000

00

Hos

t Com

mun

itySu

btot

al:

00

038

0,00

0 CA

PITA

L IM

PRO

VEM

ENTS

109

THIS PAGE INTENTIONALLY LEFT BLANK

CITY OF ROCHESTER FY13 PROPOSED CIP BUDGET

CAPITAL IMPROVEMENTS 110

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Transfer to Economic Development Fund

Host Community Fees transferred to Economic Development Fund.

5

Mandatory

Other

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Host Community 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$100,000

$100,000

4) Type of Project:Other

-

20132) FY:

43

9) Anticipated Funding Source(s):

Ded Rev

111

Hos

t Com

mun

ityTr

ansf

er to

Eco

nom

ic D

evel

opm

ent F

und

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

43

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$100

,000

$0$0

$0$0

$0O

ther

-$1

00,0

00

Sum

mar

y fo

r 'pr

ojec

tID' =

541

4 (1

det

ail r

ecor

d)TO

TAL:

$100

,000

$0$0

$0$0

$0$1

00,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$100

,000

$0$0

$0$0

$0D

edic

ated

Rev

enue

$100

,000

TOTA

L:$1

00,0

00$0

$0$0

$0$0

$100

,000

112

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Transfer to General Fund

Host Community Fees to transfer to general fund to offset tax rate.

5

Mandatory

City Hall

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Host Community 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$280,000

$280,000

4) Type of Project:Other

20132) FY:

44

9) Anticipated Funding Source(s):

Ded Rev

113

Hos

t Com

mun

ityTr

ansf

er to

Gen

eral

Fun

dD

epar

tmen

t:Pr

ojec

t #:

Proj

ect T

itle:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

44

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$280

,000

$0$0

$0$0

$0O

ther

-$2

80,0

00

Sum

mar

y fo

r 'pr

ojec

tID' =

527

2 (1

det

ail r

ecor

d)TO

TAL:

$280

,000

$0$0

$0$0

$0$2

80,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$280

,000

$0$0

$0$0

$0D

edic

ated

Rev

enue

$280

,000

TOTA

L:$2

80,0

00$0

$0$0

$0$0

$280

,000

114

BO

ND

PRO

CE

ED

SC

/OA

MO

UN

TO

&M

CA

SHD

ED

RE

VST

AT

EH

WY

FU

ND

SSR

F

CIT

Y O

F R

OC

HE

STE

R

FY13

PR

OPO

SED

CIP

BU

DG

ET

CA

PIT

AL

IMPR

OV

EM

EN

TS

PRO

GR

AM

SC

HE

DU

LE

DE

PAR

TM

EN

T/D

ESC

RIP

TIO

NG

RA

NT

LIF

EA

MO

UN

TFU

ND

BA

LR

ET

EA

RN

Scho

olEq

uipm

ent -

Fur

nitu

re0

20,0

000

00

00

100

20,0

00Fa

cilit

ies -

Doo

r Har

dwar

e U

pgra

de0

35,0

000

00

00

100

35,0

00Fa

cilit

ies -

Pai

ntin

g C

ycle

-Ext

erio

r0

20,0

000

00

00

100

20,0

00Fa

cilit

ies -

Pai

ntin

g C

ycle

-Inte

rior

028

,000

00

00

010

028

,000

Floo

r mac

hine

s0

8,00

00

00

00

100

8,00

0Fu

el T

ank

Rep

airs

012

,000

00

00

010

012

,000

Hea

lth &

Saf

ety

- Ele

ctric

al U

pgra

de0

30,0

000

00

00

250

30,0

00In

terio

r Ren

ovat

ions

at N

LS,G

,MPL

,RM

S28

2,00

00

00

00

025

028

2,00

0Pl

aygr

ound

Upg

rade

s0

20,0

000

00

00

150

20,0

00R

epla

ce H

VA

C U

nits

at R

MS

114,

000

00

00

00

200

114,

000

Roo

f Ove

r H.S

. Gym

250,

000

00

00

00

250

250,

000

Site

wor

k-G

onic

Tra

ffic

& P

arki

ng Is

sues

90,0

000

00

00

025

090

,000

Sprin

kler

Sys

tem

Rep

airs

015

,000

00

00

020

015

,000

736,

000

188,

000

00

0Sc

hool

Subt

otal

:0

00

924,

000 C

API

TAL

IMPR

OV

EMEN

TS

115

THIS PAGE INTENTIONALLY LEFT BLANK

CITY OF ROCHESTER FY13 PROPOSED CIP BUDGET

CAPITAL IMPROVEMENTS 116

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Equipment - Furniture

Furniture Replacement throughout the district.

Within the current inventory of furniture, there are many pieces that have been there for over 20 years.

None.

10

Essential

Other District Wide

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:School 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$20,000

$120,000

4) Type of Project:Other Furniture

-

20132) FY:

45

9) Anticipated Funding Source(s):

Cash

117

Sch

ool

Equ

ipm

ent -

Fur

nitu

re

The

curr

ent f

urni

ture

is v

ery

old.

If w

e de

fer t

he p

urch

ase

of re

plac

emen

t fur

nitu

re, t

he c

urre

nt fu

rnitu

re, d

ue to

saf

ety

reas

ons,

w

ill h

ave

to b

e di

scar

ded

and

then

we

wou

ld b

e le

ft w

ith n

o fu

rnitu

re.

Non

e

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

45

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

Furn

iture

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

Oth

er-

$120

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

527

1 (1

det

ail r

ecor

d)TO

TAL:

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

$120

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

Cas

h: C

ity/S

choo

l$1

20,0

00

TOTA

L:$2

0,00

0$2

0,00

0$2

0,00

0$2

0,00

0$2

0,00

0$2

0,00

0$1

20,0

00

118

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Facilities - Door Hardware Upgrade

Door Hardware Upgrade

With the age of the facilities considered and the lack of replacement parts, it is essential that the district continues to replace tired and worn equipment.

none

10

Essential

Other Districtwide

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:School 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$35,000

$210,000

4) Type of Project:Buildings Improvements

-

20132) FY:

46

9) Anticipated Funding Source(s):

Cash

119

Sch

ool

Faci

litie

s - D

oor H

ardw

are

Upg

rade

It be

com

es a

life

saf

ety

and

secu

rity

issu

e to

def

er th

e im

plem

enta

tion

of th

is p

lan.

none

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

46

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$35,

000

$35,

000

$35,

000

$35,

000

$35,

000

$35,

000

Bui

ldin

gs Im

prov

emen

ts$2

10,0

00

Sum

mar

y fo

r 'pr

ojec

tID' =

525

3 (1

det

ail r

ecor

d)TO

TAL:

$35,

000

$35,

000

$35,

000

$35,

000

$35,

000

$35,

000

$210

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$35,

000

$35,

000

$35,

000

$35,

000

$35,

000

$35,

000

Cas

h: C

ity/S

choo

l$2

10,0

00

TOTA

L:$3

5,00

0$3

5,00

0$3

5,00

0$3

5,00

0$3

5,00

0$3

5,00

0$2

10,0

00

120

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Facilities - Painting Cycle-Exterior

Painting Cycle-Exterior

This is an ongoing project to keep the exterior of the districts buildings in a clean and healthful atmosphere.

Independent

10

Maintenance

Other Districtwide

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:School 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$20,000

$120,000

4) Type of Project:Buildings Improvements

-

20132) FY:

47

9) Anticipated Funding Source(s):

Cash

121

Sch

ool

Faci

litie

s - P

aint

ing

Cyc

le-E

xter

ior

Con

tinue

d m

aint

enan

ce is

ess

entia

l to

keep

the

faci

litie

s in

goo

d co

nditi

on fr

om a

phy

sica

l and

aes

thet

ic p

ersp

ectiv

e.

Non

e

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

47

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

Bui

ldin

gs Im

prov

emen

ts$1

20,0

00

Sum

mar

y fo

r 'pr

ojec

tID' =

536

6 (1

det

ail r

ecor

d)TO

TAL:

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

$120

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

Cas

h: C

ity/S

choo

l$1

20,0

00

TOTA

L:$2

0,00

0$2

0,00

0$2

0,00

0$2

0,00

0$2

0,00

0$2

0,00

0$1

20,0

00

122

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Facilities - Painting Cycle-Interior

Districtwide Interior Painting Cycle.

This is an ongoing project to keep the interior of the districts buildings in a clean and healthful atmosphere.

Independent

10

Maintenance

Other Districtwide

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:School 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$28,000

$168,000

4) Type of Project:Buildings Improvements

-

20132) FY:

48

9) Anticipated Funding Source(s):

Cash

123

Sch

ool

Faci

litie

s - P

aint

ing

Cyc

le-In

terio

r

The

faci

litie

s w

ill o

nly

cont

inue

to d

eter

iora

te a

nd w

ill m

ake

it ne

cess

ary

to in

vest

mor

e m

oney

in th

e fu

ture

.

none

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

48

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$28,

000

$28,

000

$28,

000

$28,

000

$28,

000

$28,

000

Bui

ldin

gs Im

prov

emen

ts$1

68,0

00

Sum

mar

y fo

r 'pr

ojec

tID' =

524

8 (1

det

ail r

ecor

d)TO

TAL:

$28,

000

$28,

000

$28,

000

$28,

000

$28,

000

$28,

000

$168

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$28,

000

$28,

000

$28,

000

$28,

000

$28,

000

$28,

000

Cas

h: C

ity/S

choo

l$1

68,0

00

TOTA

L:$2

8,00

0$2

8,00

0$2

8,00

0$2

8,00

0$2

8,00

0$2

8,00

0$1

68,0

00

124

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Floor machines

2 - 20" walk-behind floor machines, battery operated.

Needed to clean the hallways, gyms & classrooms.

none

10

Essential

Other Districtwide

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:School 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$8,000

$8,000

4) Type of Project:Machinery and Equipment

-

20132) FY:

49

9) Anticipated Funding Source(s):

Cash

125

Sch

ool

Floo

r mac

hine

s

It w

ill b

e ve

ry d

iffic

ult t

o m

aint

ain

stan

dard

s of

cle

anlin

ess

in th

e sc

hool

s w

ithou

t the

se m

achi

nes.

none

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

49

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$8,0

00$0

$0$0

$0$0

Mac

hine

ry a

nd E

quip

men

t$8

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

546

4 (1

det

ail r

ecor

d)TO

TAL:

$8,0

00$0

$0$0

$0$0

$8,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$8,0

00$0

$0$0

$0$0

Cas

h: C

ity/S

choo

l$8

,000

TOTA

L:$8

,000

$0$0

$0$0

$0$8

,000

126

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Fuel Tank Repairs

For tank sumps, alarms, and piping.

Oil tanks need upgrades to meet state and local rule changes.

none

10

Essential

Other Districtwide

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:School 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$12,000

$12,000

4) Type of Project:Other Oil Tank Repairs

-

20132) FY:

50

9) Anticipated Funding Source(s):

Cash

127

Sch

ool

Fuel

Tan

k R

epai

rs

Oil

tank

pip

ing

may

hav

e le

aks,

ala

rm s

yste

ms

coul

d fa

il.

none

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

50

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

Oil

Tank

Rep

airs

$12,

000

$0$0

$0$0

$0O

ther

-$1

2,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

546

5 (1

det

ail r

ecor

d)TO

TAL:

$12,

000

$0$0

$0$0

$0$1

2,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$12,

000

$0$0

$0$0

$0C

ash:

City

/Sch

ool

$12,

000

TOTA

L:$1

2,00

0$0

$0$0

$0$0

$12,

000

128

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Health & Safety - Electrical Upgrade

Electrical upgrade cycle.

The continued upgrade in electrical services is needed to keep pace with added technology throughout the district.

Essential in the continued upgrade of the districts facilities.

25

Essential

Other Districtwide

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:School 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$30,000

$180,000

4) Type of Project:Buildings Improvements

-

20132) FY:

51

9) Anticipated Funding Source(s):

Cash

129

Sch

ool

Hea

lth &

Saf

ety

- Ele

ctric

al U

pgra

de

If th

is p

roje

ct w

as d

efer

red

the

dist

rict c

ould

not

kee

p pa

ce w

ith th

e se

rvic

es n

eces

sary

to s

uppo

rt th

e te

chno

logi

cal

impr

ovem

ents

thro

ugho

ut th

e di

stric

t.

none

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

51

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$30,

000

$30,

000

$30,

000

$30,

000

$30,

000

$30,

000

Bui

ldin

gs Im

prov

emen

ts$1

80,0

00

Sum

mar

y fo

r 'pr

ojec

tID' =

521

4 (1

det

ail r

ecor

d)TO

TAL:

$30,

000

$30,

000

$30,

000

$30,

000

$30,

000

$30,

000

$180

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$30,

000

$30,

000

$30,

000

$30,

000

$30,

000

$30,

000

Cas

h: C

ity/S

choo

l$1

80,0

00

TOTA

L:$3

0,00

0$3

0,00

0$3

0,00

0$3

0,00

0$3

0,00

0$3

0,00

0$1

80,0

00

130

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Interior Renovations at NLS,G,MPL,RMS

Alter and create space to enhance educational environments and to address life safety issues.

As teaching and educational needs change, building spaces need to adapt to those changes.

To address ongoing space study recommendations.

25

Essential

Other NLS, GONIC, MAPLE, RMS

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:School 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$282,000

$282,000

4) Type of Project:Buildings Improvements

-

20132) FY:

52

9) Anticipated Funding Source(s):

Bond

131

Sch

ool

Inte

rior R

enov

atio

ns a

t NLS

,G,M

PL,

RM

S

Teac

hing

and

lear

ning

env

ironm

ents

will

bec

ome

inad

equa

te.

none

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

52

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$282

,000

$0$0

$0$0

$0B

uild

ings

Impr

ovem

ents

$282

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

545

6 (1

det

ail r

ecor

d)TO

TAL:

$282

,000

$0$0

$0$0

$0$2

82,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$282

,000

$0$0

$0$0

$0B

ond:

City

/Sch

ool

$282

,000

TOTA

L:$2

82,0

00$0

$0$0

$0$0

$282

,000

132

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Playground Upgrades

Replace equipment that has been determined to be a safety issue.

A continuing upgrade of playground equipment is essential for safety reasons.

none

15

Essential

Other Districtwide

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:School 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$20,000

$120,000

4) Type of Project:Machinery and Equipment

-

20132) FY:

53

9) Anticipated Funding Source(s):

Cash

133

Sch

ool

Pla

ygro

und

Upg

rade

s

Dam

aged

and

dan

gero

us e

quip

men

t is

a sa

fety

issu

e. R

emov

ing

dang

erou

s ite

ms

and

not r

epla

cing

them

will

leav

e ou

r D

istri

ct w

ith in

adeq

uate

pla

ygro

unds

.

none

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

53

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

Mac

hine

ry a

nd E

quip

men

t$1

20,0

00

Sum

mar

y fo

r 'pr

ojec

tID' =

546

6 (1

det

ail r

ecor

d)TO

TAL:

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

$120

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

$20,

000

Cas

h: C

ity/S

choo

l$1

20,0

00

TOTA

L:$2

0,00

0$2

0,00

0$2

0,00

0$2

0,00

0$2

0,00

0$2

0,00

0$1

20,0

00

134

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Replace HVAC Units at RMS

Replace 4 - HVAC units that are located on the roof of the Middle School.

Essential

none

20

Essential

Other RMS

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:School 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$114,000

$114,000

4) Type of Project:Machinery and Equipment

-

20132) FY:

54

9) Anticipated Funding Source(s):

Bond

135

Sch

ool

Rep

lace

HV

AC

Uni

ts a

t RM

S

Equ

ipm

ent f

ailu

re m

ay o

ccur

bec

ause

repl

acem

ent p

arts

are

bec

omin

g ha

rd to

find

.

none

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

54

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$114

,000

$0$0

$0$0

$0M

achi

nery

and

Equ

ipm

ent

$114

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

545

8 (1

det

ail r

ecor

d)TO

TAL:

$114

,000

$0$0

$0$0

$0$1

14,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$114

,000

$0$0

$0$0

$0B

ond:

City

/Sch

ool

$114

,000

TOTA

L:$1

14,0

00$0

$0$0

$0$0

$114

,000

136

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Roof Over H.S. Gym

Replace failing roof system over the gym area of the High School.

As the roof fails, building components will be damaged.

none

25

Essential

Other High School

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:School 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$250,000

$250,000

4) Type of Project:Buildings Improvements

-

20132) FY:

55

9) Anticipated Funding Source(s):

Bond

137

Sch

ool

Roo

f Ove

r H.S

. Gym

Inte

rior b

uild

ing

com

pone

nts

will

be

dam

aged

.

none

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

55

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$250

,000

$0$0

$0$0

$0B

uild

ings

Impr

ovem

ents

$250

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

545

9 (1

det

ail r

ecor

d)TO

TAL:

$250

,000

$0$0

$0$0

$0$2

50,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$250

,000

$0$0

$0$0

$0B

ond:

City

/Sch

ool

$250

,000

TOTA

L:$2

50,0

00$0

$0$0

$0$0

$250

,000

138

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Sitework-Gonic Traffic & Parking Issues

Add parking and reconfigure traffic flow patterns.

Essential

none

25

Essential

Other Gonic School

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:School 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$90,000

$90,000

4) Type of Project:Other Parking

-

20132) FY:

56

9) Anticipated Funding Source(s):

Bond

139

Sch

ool

Site

wor

k-G

onic

Tra

ffic

& P

arki

ng Is

sues

Traf

fic fl

ow h

as b

ecom

e a

safe

ty is

sue

and

park

ing

has

beco

me

cong

este

d an

d af

fect

s tra

ffic

flow

.

none

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

56

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

Par

king

$90,

000

$0$0

$0$0

$0O

ther

-$9

0,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

545

7 (1

det

ail r

ecor

d)TO

TAL:

$90,

000

$0$0

$0$0

$0$9

0,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$90,

000

$0$0

$0$0

$0B

ond:

City

/Sch

ool

$90,

000

TOTA

L:$9

0,00

0$0

$0$0

$0$0

$90,

000

140

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Sprinkler System Repairs

Repairs to pipe leaks, valves and compressor replacements.

Leaks and breakdowns in the sprinkler systems become a life safety issue.

none

20

Essential

Other Districtwide

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:School 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$15,000

$15,000

4) Type of Project:Buildings Improvements

-

20132) FY:

57

9) Anticipated Funding Source(s):

Cash

141

Sch

ool

Spr

inkl

er S

yste

m R

epai

rs

Spr

inkl

er s

yste

ms

coul

d fa

il an

d be

com

e a

life

safe

ty is

sue.

none

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

57

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$15,

000

$0$0

$0$0

$0B

uild

ings

Impr

ovem

ents

$15,

000

Sum

mar

y fo

r 'pr

ojec

tID' =

546

8 (1

det

ail r

ecor

d)TO

TAL:

$15,

000

$0$0

$0$0

$0$1

5,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$15,

000

$0$0

$0$0

$0C

ash:

City

/Sch

ool

$15,

000

TOTA

L:$1

5,00

0$0

$0$0

$0$0

$15,

000

142

BO

ND

PRO

CE

ED

SC

/OA

MO

UN

TO

&M

CA

SHD

ED

RE

VST

AT

EH

WY

FU

ND

SSR

F

CIT

Y O

F R

OC

HE

STE

R

FY13

PR

OPO

SED

CIP

BU

DG

ET

CA

PIT

AL

IMPR

OV

EM

EN

TS

PRO

GR

AM

SC

HE

DU

LE

DE

PAR

TM

EN

T/D

ESC

RIP

TIO

NG

RA

NT

LIF

EA

MO

UN

TFU

ND

BA

LR

ET

EA

RN

Wat

er W

orks

Ber

ry R

iver

Dam

Con

stru

ctio

n50

0,00

00

00

00

050

050

0,00

0B

rock

Stre

et R

econ

stru

ctio

n0

00

060

0,00

00

035

66,9

0460

0,00

0C

ham

berla

in S

t Wat

er10

0,00

00

00

00

050

010

0,00

0Ev

alua

te W

ater

Pip

elin

e fr

om R

ound

Pon

d to

Re

20,0

000

00

00

050

020

,000

Gro

undw

ater

Res

ourc

e D

evel

opm

ent

020

0,00

00

00

00

5021

9,53

820

0,00

0I/I

Pro

gram

Pha

se II

I - F

rank

lin S

t, W

este

rn a

rea

00

00

50,0

000

035

050

,000

Met

er R

epla

cem

ent

795,

000

00

00

00

200

795,

000

Mod

ify F

luor

idat

ion

Syst

em20

,000

00

00

00

500

20,0

00O

btai

n So

urce

Wat

er P

rote

ctio

n La

nd45

,000

00

00

00

500

45,0

00R

oche

ster

Res

ervo

ir W

este

rn E

nd S

pillw

ay0

75,0

000

00

00

200

75,0

00Sa

lmon

Fal

ls R

oad

Rec

onst

ruct

ion

100,

000

00

00

00

3044

0,66

710

0,00

0V

ehic

le &

Equ

ipm

ent R

epla

cem

ent P

rogr

am0

112,

500

00

00

010

011

2,50

0W

ater

Tan

k M

aint

enan

ce P

rogr

am38

0,00

00

00

00

020

038

0,00

0H

anco

ck S

treet

Rec

onst

ruct

ion

030

,000

00

00

030

030

,000

1,96

0,00

041

7,50

00

065

0,00

0W

ater

Wor

ksSu

btot

al:

00

727,

109

3,02

7,50

0 CA

PITA

L IM

PRO

VEM

ENTS

143

THIS PAGE INTENTIONALLY LEFT BLANK

CITY OF ROCHESTER FY13 PROPOSED CIP BUDGET

CAPITAL IMPROVEMENTS 144

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Berry River Dam Construction

This is a continuation of funding for the eventual reconstruction of the Berry River Dam. This provides a place holder for additional funds to cover the anticipated cost of reconstructing the dam after all the permitting is complete. Permitting is being complicated by the dynamic requirements from DES for maintaining minimum stream flows and wetlands impact. Required to upgrade dam; provided DES with replacement time table of end of 2012, subject to permitting.

Originally appropriate funds in 2003 and 2006 for study, permitting, and construction. Dam is severely degraded. Short term shoring and temporary leak plugging was completed in 2007, however these measures were temporary (5-10 year life expectancy).

50

Maintenance

Other Berry River Dam

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Water Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$500,000

$500,000

4) Type of Project:Building Construction

-

20132) FY:

58

9) Anticipated Funding Source(s):

Bond

145

Wat

er W

orks

Ber

ry R

iver

Dam

Con

stru

ctio

n

Less

relia

ble

abili

ty to

div

ert f

low

s fro

m th

e B

erry

Riv

er to

the

Roc

hest

er R

eser

voir

inta

ke re

sulti

ng in

less

relia

bilit

y in

kee

ping

th

e R

oche

ster

Res

ervo

ir an

d R

ound

Pon

d fil

led

with

wat

er d

urin

g th

e dr

yer m

onth

s of

the

year

. D

am w

ill fa

il ul

timat

ely.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

58

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$500

,000

$0$0

$0$0

$0B

uild

ing

Con

stru

ctio

n$5

00,0

00

Sum

mar

y fo

r 'pr

ojec

tID' =

539

4 (1

det

ail r

ecor

d)TO

TAL:

$500

,000

$0$0

$0$0

$0$5

00,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$500

,000

$0$0

$0$0

$0B

ond:

Wat

er/S

ewer

/Are

na$5

00,0

00

TOTA

L:$5

00,0

00$0

$0$0

$0$0

$500

,000

146

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Brock Street Reconstruction

Water portion of Brock St. project. Project primarily involves extending 16" diameter water main from Washington Street to the existing 18-inch that feeds the city near Armory. Distribution system on Brock Street will be updated as engineering assessment dictates. Final design funded for FY 2008 and this funds construction in FY-2013.

This will enable us to eliminate the need for the old cross-country feeder main from the water treatment plant. This main is located in an area that is difficult to access between Hussey Hill Road and Holy Rosary Cemetery particulary in winter.

This is the water portion of the Brock Street reconstruction project. Sewer and highway portions are funded from their appropriate funds.

35

Maintenance

Other Brock Street

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Water Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$600,000

$600,000

4) Type of Project:Building Construction

-

20132) FY:

59

9) Anticipated Funding Source(s):

SRF

147

Wat

er W

orks

Bro

ck S

treet

Rec

onst

ruct

ion

Stre

et is

sev

erel

y de

grad

ed.

Wat

er m

ain

need

s to

be

rero

uted

. S

ewer

mai

n to

o sm

all t

o ac

com

mod

ate

futu

re g

row

th in

W

ashi

ngto

n S

treet

are

a. E

vent

ually

stre

et w

ill b

ecom

e pr

oble

mat

ic to

all

resi

dent

s if

allo

w to

deg

rade

too

muc

h fu

rther

.

Do

only

the

sepa

rate

com

pone

nts.

E.g

wat

er w

ithou

t doi

ng s

ewer

or h

ighw

ay/s

idew

alk

upgr

ades

. D

o pa

vem

ent r

ehab

ilita

tion

only

.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

59

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$525

,000

$0$0

$0$0

$0B

uild

ing

Con

stru

ctio

n$5

25,0

00

$75,

000

$0$0

$0$0

$0C

onst

ruct

ion

Eng

inee

ring

$75,

000

Sum

mar

y fo

r 'pr

ojec

tID' =

512

0 (2

det

ail r

ecor

ds)

TOTA

L:$6

00,0

00$0

$0$0

$0$0

$600

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$600

,000

$0$0

$0$0

$0S

tate

Rev

olvi

ng F

und

$600

,000

TOTA

L:$6

00,0

00$0

$0$0

$0$0

$600

,000

148

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Chamberlain St Water

To loop system from end beyond Chamberlain St. School to Whitehall Rd. enhancing system flow to eliminate water quality issues.

Water in this area resides too long in service mains due to poor circulation. The aged water can present trihalomethanes.

None

50

Essential

Other

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Water Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$100,000

$100,000

4) Type of Project:Design Engineering

-

20132) FY:

60

9) Anticipated Funding Source(s):

Bond

149

Wat

er W

orks

Cha

mbe

rlain

St W

ater

City

has

bee

n en

gage

d w

ith p

lan

to im

prov

e ov

eral

l City

wat

er c

ircul

atio

n to

com

ply

with

Dis

infe

ctio

n-B

y-P

rodu

ct S

tage

2 ru

le

whi

ch C

ity is

requ

ired

to c

ompl

y w

ith 1

0/20

13

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

60

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$100

,000

$0$0

$0$0

$0D

esig

n E

ngin

eerin

g$1

00,0

00

Sum

mar

y fo

r 'pr

ojec

tID' =

544

7 (1

det

ail r

ecor

d)TO

TAL:

$100

,000

$0$0

$0$0

$0$1

00,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$100

,000

$0$0

$0$0

$0B

ond:

Wat

er/S

ewer

/Are

na$1

00,0

00

TOTA

L:$1

00,0

00$0

$0$0

$0$0

$100

,000

150

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Evaluate Water Pipeline from Round Pond to Reservior

Existing 1000 foot pipe feeds source drinking water from Round Pond to Rochester Reservoir. Nearly 60 years old. At least 1 known leak. This is a critical part of the water supply system. Major failure would adversely affect supply quanity. Project to examine inside of pipe to determine condition and potential looming failures

This is key legacy infrastructure. It is necessary to deliver quantity to the City through this conveyance and it is near the end of its life.

50

Maintenance

Water Treatment Plant

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Water Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$20,000

$220,000

4) Type of Project:Construction Engineering

20132) FY:

61

9) Anticipated Funding Source(s):

Bond

151

Wat

er W

orks

Eva

luat

e W

ater

Pip

elin

e fro

m R

ound

Pon

d to

R

Pip

elin

e re

achi

ng e

nd o

f use

ful l

ife. T

his

is a

key

par

t of t

he w

ater

sup

ply

syst

em o

f the

City

. It i

s le

gacy

infra

stru

ctur

e. W

ithou

t ex

amin

ing

will

not

kno

w if

maj

or p

ortio

ns a

re h

eade

d fo

r fai

lure

. Fai

lure

s w

ill b

e un

pred

icta

ble

and

may

be

cata

stro

phic

.

No

alte

rnat

ives

. Mus

t be

exam

ined

to d

eter

min

e co

nditi

on to

avo

id o

ther

wis

e fa

ilure

s

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

61

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$2

00,0

00$0

$0$0

$0C

onst

ruct

ion

Eng

inee

ring

$200

,000

$20,

000

$0$0

$0$0

$0D

esig

n E

ngin

eerin

g$2

0,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

542

7 (2

det

ail r

ecor

ds)

TOTA

L:$2

0,00

0$2

00,0

00$0

$0$0

$0$2

20,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$20,

000

$200

,000

$0$0

$0$0

Bon

d: W

ater

/Sew

er/A

rena

$220

,000

TOTA

L:$2

0,00

0$2

00,0

00$0

$0$0

$0$2

20,0

00

152

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Groundwater Resource Development

This is a continuation to explore the City and its service area for additional supplies of groundwater to plan for future growth and development. Recent efforts centered on the potential for exploring and encumbering water resources in East Rochester and Lebanon. This is to fund the drilling and lay the groundwork for obtaining the property rights to productive sources of water.

Drought conditions in 1999 and 2001 has shown how vulnerable the city's surface water supply is to dry periods. As the city grows this could limit the city's opportunity for growth and future prosperity. Locking in future resources is important.

Continuation of 03-601-04, 04-601-02, and 05-601-11, 06-601-05, 07-601-04, 08-601-05, 09-601-03

50

Essential

Other East Rochester - Lebanon, ME

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Water Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$200,000

$200,000

4) Type of Project:Design Engineering

-

20132) FY:

62

9) Anticipated Funding Source(s):

Cash

153

Wat

er W

orks

Gro

undw

ater

Res

ourc

e D

evel

opm

ent

Whi

le th

e ci

ty is

in th

e pr

oces

s of

div

ersi

fyin

g its

wat

er s

ourc

es, h

avin

g m

ultip

le s

ourc

es a

vaila

ble

will

giv

e th

e ci

ty a

bac

kup

plan

in th

e ev

ent o

ne o

f the

cur

rent

sou

rces

bec

omes

una

vaila

ble.

If d

efer

red

thes

e so

urce

s w

ill n

ot b

e av

aila

ble.

City

Cou

ncil

Pus

hed

out t

o 20

12 -4

-27-

10

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

62

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$200

,000

$0$0

$0$0

$0D

esig

n E

ngin

eerin

g$2

00,0

00

Sum

mar

y fo

r 'pr

ojec

tID' =

510

7 (1

det

ail r

ecor

d)TO

TAL:

$200

,000

$0$0

$0$0

$0$2

00,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$200

,000

$0$0

$0$0

$0C

ash:

Wat

er/S

ewer

/Are

na$2

00,0

00

TOTA

L:$2

00,0

00$0

$0$0

$0$0

$200

,000

154

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

I/I Program Phase III - Franklin St, Western area

This is for water main improvements in the area that will be reconstructed as part of the Phase III of the city's I/I program. Work will focus on the area bounded by Western Ave, Franklin St. and Adams Av. Will also involve the rehabilitation of Frankli n St. between limits of South Main and Chamberlain St.

It is most cost-effective to consider all aspects of a street before engaging in a major reconstruction project. The water mains under the streets in this neighborhood will be evaluated for suitability for replacement or cleaning and lining.

This project will be mostly a sewer and drainage improvement project that is funded from the sewer and general funds.

35

Maintenance

Other Franklin St. Area

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Water Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$50,000

$1,050,000

4) Type of Project:Building Construction

-

20132) FY:

63

9) Anticipated Funding Source(s):

SRF

155

Wat

er W

orks

I/I P

rogr

am P

hase

III -

Fra

nklin

St,

Wes

tern

are

The

cond

ition

of t

his

neig

hbor

hood

will

con

tinue

to d

eter

iora

te a

nd g

roun

dwat

er a

nd s

torm

wat

er fr

om th

is a

rea

of th

e ci

ty w

ill

cont

inue

to in

filtra

te in

to th

e se

wer

sys

tem

.

Take

a p

iece

mea

l app

roac

h by

repa

ving

the

stre

ets

in th

e ne

ighb

orho

od a

nd ig

nore

the

issu

e of

inflo

w a

nd in

filtra

tion

into

the

sew

er s

yste

m.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

63

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$1

,000

,000

$0$0

$0$0

Bui

ldin

g C

onst

ruct

ion

$1,0

00,0

00

$50,

000

$0$0

$0$0

$0D

esig

n E

ngin

eerin

g$5

0,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

529

2 (2

det

ail r

ecor

ds)

TOTA

L:$5

0,00

0$1

,000

,000

$0$0

$0$0

$1,0

50,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$50,

000

$1,0

00,0

00$0

$0$0

$0S

tate

Rev

olvi

ng F

und

$1,0

50,0

00

TOTA

L:$5

0,00

0$1

,000

,000

$0$0

$0$0

$1,0

50,0

00

156

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Meter Replacement

This project is to replace the remaining Neptune meters (approximately 1500 meters) with new meters Sensus meters ($187,500). Add radio read capability to all existing meters (approximately 4800) not currently capable ($576,000). Radio read software and transceiver ($32,000). City staff would install meters.

Only have one meter gun capable of reading the Neptune meters and replacement guns are no longer available. Radio read capability will signficantly reduce the amount of time needed to read meters.

Prior meter replacement program and meters installed by staff replaced 2970 meters. Per the audit recently completed by W-P, $328,875 in lost revenues was recouped annually by those meter replacements. This resulted in just over a 3 year payback.

20

Essential

Other City Wide

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Water Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$795,000

$795,000

4) Type of Project:Machinery and Equipment

-

20132) FY:

64

9) Anticipated Funding Source(s):

Bond

157

Wat

er W

orks

Met

er R

epla

cem

ent

If th

e N

eptu

ne m

eter

s ar

e no

t rep

lace

d an

d th

e m

eter

gun

fails

, tho

se m

eter

s w

ill b

e ne

ed to

be

man

ually

read

insi

de th

e cu

stom

ers

hom

e.

Use

radi

o to

wer

s ra

ther

than

veh

icle

tran

scie

ver -

app

rox

$120

,000

. Ben

efit

is th

at a

ll m

eter

s co

uld

be re

ad fr

om th

e U

tility

Bill

ing

offic

e .

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

64

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$795

,000

$0$0

$0$0

$0M

achi

nery

and

Equ

ipm

ent

$795

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

543

2 (1

det

ail r

ecor

d)TO

TAL:

$795

,000

$0$0

$0$0

$0$7

95,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$795

,000

$0$0

$0$0

$0B

ond:

Wat

er/S

ewer

/Are

na$7

95,0

00

TOTA

L:$7

95,0

00$0

$0$0

$0$0

$795

,000

158

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Modify Fluoridation System

Replace existing fluoridation system with a more effective and safer system. Cost includes engineering services and construction.

Plant currently uses Hexafluorosilicic Acid for fluoridation. This substance is extremely hazardous for personnel to manage. Sodium Fluoride is the proposed alternative. It is not harmful to personnel to manage and is more effective and less costly.

None

50

Maintenance

Water Treatment Plant

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Water Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$20,000

$80,000

4) Type of Project:Construction Engineering

20132) FY:

65

9) Anticipated Funding Source(s):

Bond

159

Wat

er W

orks

Mod

ify F

luor

idat

ion

Sys

tem

Con

tinue

use

with

exi

stin

g su

bsta

nce.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

65

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$6

0,00

0$0

$0$0

$0C

onst

ruct

ion

Eng

inee

ring

$60,

000

$20,

000

$0$0

$0$0

$0D

esig

n E

ngin

eerin

g$2

0,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

544

9 (2

det

ail r

ecor

ds)

TOTA

L:$2

0,00

0$6

0,00

0$0

$0$0

$0$8

0,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$20,

000

$60,

000

$0$0

$0$0

Bon

d: W

ater

/Sew

er/A

rena

$80,

000

TOTA

L:$2

0,00

0$6

0,00

0$0

$0$0

$0$8

0,00

0

160

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Obtain Source Water Protection Land

Continue obtaining source water protection property. This project to obtain 10 acres of forested land in Barrington situated bewteen Rochester Reservoir and Round Pond water supplies. Obtaining this property will allow a contiguous area of undeveloped land shared by both sources to help maintain water quality.

Studies show that water treatment costs decrease 20% for every 10% increase in forested cover. Property is at the crest of a ridge between Reservoir and Round Pond and bridges a contiguous forested area between the two sources.

None

50

Desirable

Water Treatment Plant

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Water Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$45,000

$45,000

4) Type of Project:Land Acquisition

20132) FY:

66

9) Anticipated Funding Source(s):

Bond

161

Wat

er W

orks

Obt

ain

Sour

ce W

ater

Pro

tect

ion

Land

Pos

sibl

e fu

ture

dev

elop

men

t of t

he p

arce

l. D

ue to

its

high

er e

leva

tion

high

er th

an th

e so

urce

wat

er b

odie

s, c

onta

min

ants

from

de

velo

pmen

t cou

ld e

nter

sou

rce

wat

ers.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

66

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$45,

000

$0$0

$0$0

$0La

nd A

cqui

sitio

n$4

5,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

545

4 (1

det

ail r

ecor

d)TO

TAL:

$45,

000

$0$0

$0$0

$0$4

5,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$45,

000

$0$0

$0$0

$0B

ond:

Wat

er/S

ewer

/Are

na$4

5,00

0

TOTA

L:$4

5,00

0$0

$0$0

$0$0

$45,

000

162

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Rochester Reservoir Western End Spillway

This involves the repair and rehabilitation of the overflow spillway from the Rochester Reservior to wetlands located adjacent to the reservoir. This spillway is severely worn and is becoming undermined. This spillway directs excess water from the reservoir in a controlled manner.

This spillway likely has not seen any significant maintenance in 50 or more years. The concrete is degrading to the point that water may not be directed in its intended direction. This can cause erosion and unintended destruction to the downstream land.

Reservoir metering efforts required by NHDES.

20

Maintenance

Water Treatment Plant

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Water Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$75,000

$75,000

4) Type of Project:Building Construction

20132) FY:

67

9) Anticipated Funding Source(s):

Cash

163

Wat

er W

orks

Roc

hest

er R

eser

voir

Wes

tern

End

Spi

llway

Con

tinue

d de

grad

atio

n of

the

spill

way

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

67

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$50,

000

$0$0

$0$0

$0B

uild

ing

Con

stru

ctio

n$5

0,00

0

$7,5

00$0

$0$0

$0$0

Con

stru

ctio

n E

ngin

eerin

g$7

,500

$17,

500

$0$0

$0$0

$0D

esig

n E

ngin

eerin

g$1

7,50

0

Sum

mar

y fo

r 'pr

ojec

tID' =

529

5 (3

det

ail r

ecor

ds)

TOTA

L:$7

5,00

0$0

$0$0

$0$0

$75,

000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$75,

000

$0$0

$0$0

$0C

ash:

Wat

er/S

ewer

/Are

na$7

5,00

0

TOTA

L:$7

5,00

0$0

$0$0

$0$0

$75,

000

164

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Salmon Falls Road Reconstruction

Involves the water portion of the reconstruction of Salmon Falls Road. Phase 1 is reconstruction from Highland to Stonewall. This is for any repairs or upgrades determined during the final design.

Planned reconstruction of Salmon Falls Road as developed in the Corridor Study. Prudent to plan for upgrades to infrastructure as road is being repaired. Future years include closing gaps in the water distribution system along Salmon Falls Rd.

Highway and sewer portions of the project will be funded from their respective funds. Because of the magnitude of this project. State and Federal funding assistance (10 year plan and SRF) have been sought.

30

Maintenance

Other Salmon Falls Road

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Water Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$100,000

$1,430,000

4) Type of Project:Building Construction

-

20132) FY:

68

9) Anticipated Funding Source(s):

Bond

165

Wat

er W

orks

Sal

mon

Fal

ls R

oad

Rec

onst

ruct

ion

Pla

nnin

g fo

r pav

ing

impr

ovem

ents

. If

not d

one,

stre

et w

ill c

ontin

ue to

deg

rade

to th

e po

int t

hat i

t will

bec

ome

a sa

fety

con

cern

fo

r mot

oris

ts.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

68

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$9

65,0

00$2

00,0

00$0

$0$0

Bui

ldin

g C

onst

ruct

ion

$1,1

65,0

00

$0$1

00,0

00$2

5,00

0$0

$0$0

Con

stru

ctio

n E

ngin

eerin

g$1

25,0

00

$100

,000

$25,

000

$0$0

$15,

000

$0D

esig

n E

ngin

eerin

g$1

40,0

00

Sum

mar

y fo

r 'pr

ojec

tID' =

513

2 (3

det

ail r

ecor

ds)

TOTA

L:$1

00,0

00$1

,090

,000

$225

,000

$0$1

5,00

0$0

$1,4

30,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$100

,000

$1,0

90,0

00$2

25,0

00$0

$15,

000

$0B

ond:

Wat

er/S

ewer

/Are

na$1

,430

,000

TOTA

L:$1

00,0

00$1

,090

,000

$225

,000

$0$1

5,00

0$0

$1,4

30,0

00

166

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Vehicle & Equipment Replacement Program

None in FY-2011 or FY-2012; FY-2013 - replace 33 - 3/4 ton 4X4 pickup at WTP ($26K) - and water portion of no.35 - flat rack dump body; no. 48 - 3/4 ton pick up; no. 51- 3/4 ton service truck w/ utility body for meter installations; No. 25 - mobile compre ssors.

The vehicles listed for FY-2013 are within their normal vehicle replacement schedule.

None.

10

Essential

DPW Garage

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Water Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$112,500

$137,500

4) Type of Project:Auto/Light Truck

20132) FY:

69

9) Anticipated Funding Source(s):

Cash

167

Wat

er W

orks

Veh

icle

& E

quip

men

t Rep

lace

men

t Pro

gram

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

69

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$25,

000

$25,

000

$0$0

$0$0

Aut

o/Li

ght T

ruck

$50,

000

$77,

500

$0$0

$0$0

$0H

eavy

Equ

ipm

ent

$77,

500

$10,

000

$0$0

$0$0

$0M

achi

nery

and

Equ

ipm

ent

$10,

000

Sum

mar

y fo

r 'pr

ojec

tID' =

510

4 (3

det

ail r

ecor

ds)

TOTA

L:$1

12,5

00$2

5,00

0$0

$0$0

$0$1

37,5

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$112

,500

$25,

000

$0$0

$0$0

Cas

h: W

ater

/Sew

er/A

rena

$137

,500

TOTA

L:$1

12,5

00$2

5,00

0$0

$0$0

$0$1

37,5

00

168

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Water Tank Maintenance Program

This is a continuation of the tank maintenance program. This will be for the maintenance of the exterior and interior of the water tanks at Chesley Hill Road. Includes removal and disposal of lead based paint that is on the exterior of the tanks. This dr ives up the cost.

Existing coating is showing its age. Preserving these coatings ensures the paint and coating remains in good condition and extends the life of this investment. Engineering evaluation of tanks completed in 2004 shows that lead paint is on exterior.

Salmon Falls Road Reservior Funded and completed in FY06 and Rochester Hill Tank in FY 09. This will be the final active tank to be 'overhauled' in the City's water tank inventory.

20

Maintenance

Other Chesley Hill

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Water Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$380,000

$380,000

4) Type of Project:Building Construction

-

20132) FY:

70

9) Anticipated Funding Source(s):

Bond

169

Wat

er W

orks

Wat

er T

ank

Mai

nten

ance

Pro

gram

Ext

erio

r coa

tings

are

deg

radi

ng e

xpos

ing

the

stee

l she

lls o

f the

tank

to th

e w

eath

er p

rom

otin

g co

rros

ion.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

70

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$325

,000

$0$0

$0$0

$0B

uild

ing

Con

stru

ctio

n$3

25,0

00

$30,

000

$0$0

$0$0

$0C

onst

ruct

ion

Eng

inee

ring

$30,

000

$25,

000

$0$0

$0$0

$0D

esig

n E

ngin

eerin

g$2

5,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

511

2 (3

det

ail r

ecor

ds)

TOTA

L:$3

80,0

00$0

$0$0

$0$0

$380

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$380

,000

$0$0

$0$0

$0B

ond:

Wat

er/S

ewer

/Are

na$3

80,0

00

TOTA

L:$3

80,0

00$0

$0$0

$0$0

$380

,000

170

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Hancock Street Reconstruction

Upgrade the portion of Hancock Street between Rochester Commons and the Lowell Street. Intersection. Water main in this section of road over 60 years old and will be evaluated for replacement or lining. Condition of nearby water main on Commons was degraded during work there suggesting same conditions exist here.

In recent years, there has been improvements made on either side of this corridor which includes the installation of sidewalks and granite curbing. This section of street has drainage problems that need to be corrected and pavement condition is degraded.

Sewer and Highway portions of this job are funded from their respective accounts. Design in 2018 -$30k and construction in 2019 - $240k w/$30k const eng'g.

30

Maintenance

Other Hancock Street

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Water Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$30,000

$300,000

4) Type of Project:Building Construction

-

20132) FY:

71

9) Anticipated Funding Source(s):

Bond, Cash

171

Wat

er W

orks

Han

cock

Stre

et R

econ

stru

ctio

n

Pro

ject

pro

ject

ed fo

r the

out

yea

rs o

f the

CIP

so

it ca

n be

act

ivel

y co

nsid

ered

. A

s de

velo

pmen

t con

tinue

s in

the

SE

por

tion

of

the

city

, was

te w

ater

gen

erat

ed i

n th

is s

ectio

n m

ay fo

rce

deve

lopm

ent l

imita

tions

ther

e un

til s

ewer

mai

n is

repl

aced

.

Pav

emen

t reh

abili

tatio

n on

ly.

Doe

s no

t cor

rect

sid

ewal

k or

dra

inag

e de

ficie

ncie

s. L

eave

sew

er s

yste

m a

lone

. Sta

tus

Quo

.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

71

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$2

40,0

00$0

$0$0

$0B

uild

ing

Con

stru

ctio

n$2

40,0

00

$0$3

0,00

0$0

$0$0

$0C

onst

ruct

ion

Eng

inee

ring

$30,

000

$30,

000

$0$0

$0$0

$0D

esig

n E

ngin

eerin

g$3

0,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

512

3 (3

det

ail r

ecor

ds)

TOTA

L:$3

0,00

0$2

70,0

00$0

$0$0

$0$3

00,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$2

70,0

00$0

$0$0

$0B

ond:

Wat

er/S

ewer

/Are

na$2

70,0

00

$30,

000

$0$0

$0$0

$0C

ash:

Wat

er/S

ewer

/Are

na$3

0,00

0

TOTA

L:$3

0,00

0$2

70,0

00$0

$0$0

$0$3

00,0

00

172

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Repair of Tufts Pond Dam

This is to repair Tufts Pond Dam. NHDES dam bureau cited the City for deficiencies to the dam. Engineering to be done in FY 2013 and construction in 2014 following permitting.

City's engineering consultant reviewed the condition of the dam in association to the State's Letter of Deficiency and made recommendations for repairs. These repairs need to be designed and then implemented. Seeps observed down stream of dam

None

25

Maintenance

Other Tufts Pond Dam

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Water Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$320,000

4) Type of Project:Buildings Improvements

-

20142) FY:

72

9) Anticipated Funding Source(s):

Bond

173

Wat

er W

orks

Rep

air o

f Tuf

ts P

ond

Dam

Def

erra

l will

resu

lt in

furth

er d

egra

datio

n to

the

dam

and

eve

ntua

l enf

orce

men

t act

ion

by th

e st

ate,

not

to m

entio

n in

crea

sed

repa

ir co

sts.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2014

FY:

72

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$0

$250

,000

$0$0

$0B

uild

ings

Impr

ovem

ents

$250

,000

$0$0

$25,

000

$0$0

$0C

onst

ruct

ion

Eng

inee

ring

$25,

000

$0$4

5,00

0$0

$0$0

$0D

esig

n E

ngin

eerin

g$4

5,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

512

8 (3

det

ail r

ecor

ds)

TOTA

L:$0

$45,

000

$275

,000

$0$0

$0$3

20,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$4

5,00

0$2

75,0

00$0

$0$0

Bon

d: W

ater

/Sew

er/A

rena

$320

,000

TOTA

L:$0

$45,

000

$275

,000

$0$0

$0$3

20,0

00

174

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Replace water mains on May and Upham Sts

Replace old and decaying water mains in May and Upham Streets

There have been several water main breaks on both of these streets in recent years. There has been such tuberlucation in the pipes that their effective diameter is about 2 to 3 inches rather than 6 inches. This reduces availability of firefighting water

Distribution upgrade funds

30

Maintenance

Other May and Upham Streets

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Water Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$145,000

4) Type of Project:Building Construction

-

20142) FY:

73

9) Anticipated Funding Source(s):

Bond

175

Wat

er W

orks

Rep

lace

wat

er m

ains

on

May

and

Uph

am S

ts

Con

tinue

with

sta

tus

quo.

Old

pip

es s

how

ing

sign

fican

t dec

ay a

nd w

ater

dis

tribu

tion

capa

city

. C

ontin

ued

vuln

erab

ility

to w

ater

m

ain

brea

ks, r

educ

ed v

olum

es fo

r fire

figh

ting,

and

redu

ced

pres

sure

to re

side

nts.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2014

FY:

73

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$1

30,0

00$0

$0$0

$0B

uild

ing

Con

stru

ctio

n$1

30,0

00

$0$1

5,00

0$0

$0$0

$0D

esig

n E

ngin

eerin

g$1

5,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

539

2 (2

det

ail r

ecor

ds)

TOTA

L:$0

$145

,000

$0$0

$0$0

$145

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$1

45,0

00$0

$0$0

$0B

ond:

Wat

er/S

ewer

/Are

na$1

45,0

00

TOTA

L:$0

$145

,000

$0$0

$0$0

$145

,000

176

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Sheridan, Glen, Granite Streets Rehabilitation

Water portion of Reconstruction of Catherine, Sheridan, Glen, and Granite Streets. Replace and/or line the water mains on each street after engineering evaluation. Engineering evaluation completed in 2008 and project is on the shelf

These streets have been neglected for very long time. Water mains are old and there have been some dirty water complaints in the area.

Funding for sewer and highway portions of project from other funding sources. Funding in FY 2008 for investigation and design and FY 2014 is for construction.

30

Maintenance

Other Sheridan/Glen/Granite/Catherin

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Water Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$350,000

4) Type of Project:Building Construction

-

20142) FY:

74

9) Anticipated Funding Source(s):

Bond

177

Wat

er W

orks

She

ridan

, Gle

n, G

rani

te S

treet

s R

ehab

ilita

tion

Des

ign

85%

, but

if c

onst

ruct

ion

is d

efer

red.

..Sta

tus

Quo

. Th

e co

nditi

on o

f the

infra

stru

ctur

e is

dec

ayin

g. C

ontin

ued

deca

ying

w

ill re

sult

in a

n ev

en g

reat

er n

umbe

r of c

ompl

aint

s fro

m th

e re

side

nts

and

pare

nts

trans

porti

ng th

eir c

hild

ren

to s

choo

l.

Leav

e w

ater

line

s al

one.

Rou

ting

and

linin

g of

line

s ra

ther

than

repl

acem

ent.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2014

FY:

74

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$3

20,0

00$0

$0$0

$0B

uild

ing

Con

stru

ctio

n$3

20,0

00

$0$3

0,00

0$0

$0$0

$0C

onst

ruct

ion

Eng

inee

ring

$30,

000

Sum

mar

y fo

r 'pr

ojec

tID' =

511

0 (2

det

ail r

ecor

ds)

TOTA

L:$0

$350

,000

$0$0

$0$0

$350

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$3

50,0

00$0

$0$0

$0B

ond:

Wat

er/S

ewer

/Are

na$3

50,0

00

TOTA

L:$0

$350

,000

$0$0

$0$0

$350

,000

178

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Water Distribution System Upgrade

Continuation of an existing city program to upgrade old and undersized water mains throughout the city using city crews and contract forces. Water mains will be replaced or relined as determined by the facilities plan and hydraulic model of the system. - Recent uses were for replacement of decrepid water main discovered in East Rochester during I/I project, also insulation of exposed water main off Tebbetts road that was causing water quality problems.

Provides for replacement or relining of deteriorating water mains; Looping of dead end mains increasing flow characteristics city wide and improved fire protection. Available for use to clean up persistant dirty water issues.

Continuation of projects from previous years. Continuous funding has been suspended for a few budget cycles, however it is prudent to reestablish budget item as it provides flexibility to correct sudden failures in the distribution system.

40

Maintenance

Other Various Locations

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Water Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$550,000

4) Type of Project:Building Construction

-

20142) FY:

75

9) Anticipated Funding Source(s):

Bond

179

Wat

er W

orks

Wat

er D

istri

butio

n S

yste

m U

pgra

de

This

is fu

ndin

g to

repl

ace

or re

line

old

or d

ecay

ing

wat

er p

ipes

in lo

catio

ns w

here

ther

e ar

e do

cum

ente

d w

ater

qua

lity

prob

lem

s in

con

junc

tion

with

pav

ing

and

drai

nage

pro

blem

s. D

efer

ring

them

resu

lts in

incr

ease

d ch

ance

of h

avin

g m

ain

issu

es.

Rep

lace

as

the

syst

em fa

ils.

This

may

requ

ire c

onst

ruct

ion

with

in n

ewly

pav

ed a

reas

.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2014

FY:

75

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$4

00,0

00$0

$150

,000

$0$0

Bui

ldin

g C

onst

ruct

ion

$550

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

510

3 (1

det

ail r

ecor

d)TO

TAL:

$0$4

00,0

00$0

$150

,000

$0$0

$550

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$4

00,0

00$0

$150

,000

$0$0

Bon

d: W

ater

/Sew

er/A

rena

$550

,000

TOTA

L:$0

$400

,000

$0$1

50,0

00$0

$0$5

50,0

00

180

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Woodman and Myrtle Street Rehabilitation

Water portion of the reconstruction of Myrtle and Woodman Streets, Davieanne Locke Lane, and portions of Congress Street. Design originally planned for FY 2009 and construction in FY 2010 as a continuation of the Catherine/Sheridan Street work. Deferred to FY 15 for design and FY 16 for construction. .

These streets have been neglected for a very long time. Water mains are old and there have been some dirty water complaints in the area.

Funding for sewer and highway portions of project are from other funding sources. Funding in FY 2015 for investigation and design and FY 2016 for construction.

30

Maintenance

Other Myrtle and Woodman Street

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Water Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$300,000

4) Type of Project:Building Construction

-

20152) FY:

76

9) Anticipated Funding Source(s):

SRF

181

Wat

er W

orks

Woo

dman

and

Myr

tle S

treet

Reh

abili

tatio

n

This

will

fini

sh o

ut th

e ne

ighb

orho

od a

nd c

reat

e un

ity.

If ph

ase

II is

def

erre

d th

en a

por

tion

of th

e ne

ighb

orho

od w

ill h

ave

been

re

habi

litat

ed a

nd th

e re

mai

ning

are

a w

ill lo

ok n

egle

cted

. C

ontin

ued

deca

y w

ill re

sult

in a

n ev

en g

reat

er n

o. o

f com

plai

nts

Leav

e w

ater

mai

ns a

lone

. R

outin

g an

d lin

ing

of li

nes

rath

er th

an re

plac

emen

t.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2015

FY:

76

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$0

$0$2

20,0

00$0

$0B

uild

ing

Con

stru

ctio

n$2

20,0

00

$0$0

$0$3

0,00

0$0

$0C

onst

ruct

ion

Eng

inee

ring

$30,

000

$0$0

$50,

000

$0$0

$0D

esig

n E

ngin

eerin

g$5

0,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

532

0 (3

det

ail r

ecor

ds)

TOTA

L:$0

$0$5

0,00

0$2

50,0

00$0

$0$3

00,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$0

$50,

000

$250

,000

$0$0

Sta

te R

evol

ving

Fun

d$3

00,0

00

TOTA

L:$0

$0$5

0,00

0$2

50,0

00$0

$0$3

00,0

00

182

BO

ND

PRO

CE

ED

SC

/OA

MO

UN

TO

&M

CA

SHD

ED

RE

VST

AT

EH

WY

FU

ND

SSR

F

CIT

Y O

F R

OC

HE

STE

R

FY

13 P

RO

POSE

D C

IP B

UD

GE

T

CA

PIT

AL

IMPR

OV

EM

EN

TS

PRO

GR

AM

SC

HE

DU

LE

DE

PAR

TM

EN

T/D

ESC

RIP

TIO

NG

RA

NT

LIF

EA

MO

UN

TFU

ND

BA

LR

ET

EA

RN

Sew

er W

orks

Ada

ptiv

e M

anag

emen

t Pla

n-G

reat

Bay

Est

uary

55,0

000

00

00

010

055

,000

Bro

ck S

treet

Rec

onst

ruct

ion

00

00

2,20

0,00

00

030

02,

200,

000

HV

AC

Con

trolle

r Rep

lace

men

t50

,000

00

00

00

200

50,0

00In

flow

& In

filtra

tion

Elim

inat

ion

Phas

e III

014

0,00

00

00

00

3050

,000

140,

000

Pum

p St

atio

n R

epla

cem

ent P

rogr

am0

18,0

000

00

00

2587

1,27

518

,000

Soda

Ash

Silo

013

,500

00

00

020

013

,500

Veh

icle

& E

quip

men

t Rep

lace

men

t Pro

gram

077

,500

00

00

010

21,0

0077

,500

Was

tew

ater

Col

lect

ion

Syst

em C

MO

M P

rogr

am

010

0,00

00

00

00

300

100,

000

Was

tew

ater

Tre

atm

ent P

lant

Upg

rade

to m

eet P

er0

00

01,

500,

000

00

2531

9,83

61,

500,

000

105,

000

349,

000

00

3,70

0,00

0Se

wer

Wor

ksSu

btot

al:

00

1,26

2,11

14,

154,

000 CA

PITA

L IM

PRO

VEM

ENTS

183

THIS PAGE INTENTIONALLY LEFT BLANK

CITY OF ROCHESTER FY13 PROPOSED CIP BUDGET

CAPITAL IMPROVEMENTS 184

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Adaptive Management Plan-Great Bay Estuary

If participation in Great Bay Coalition is approved by City a long-term financial commitment will be required. Included is Rochester's support to invest in water quality habitat monitoring, invest in aquatic restoration, modify WWTP for Nitrogen reduction to achieve 8ppm effluent.

Coalition has 5 community members. If approved by all 5, Coalition would be bound by agreement w/EPA/NHDES to finance this long term work. In exchange, Coalition communities may be granted a lighter nutrient permit level saving millions of dollars.

10

Mandatory

Sewer Treatment Plant

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Sewer Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$55,000

$55,000

4) Type of Project:Design Engineering

20132) FY:

77

9) Anticipated Funding Source(s):

Bond

185

Sew

er W

orks

Ada

ptiv

e M

anag

emen

t Pla

n-G

reat

Bay

Est

uary

Likl

eyho

od o

f a m

ore

strin

gent

nut

rient

lim

it w

hich

wou

ld c

ost c

omm

unity

mem

bers

mill

ions

mor

e to

mod

ify th

eir W

WTP

's.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

77

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$55,

000

$0$0

$0$0

$0D

esig

n E

ngin

eerin

g$5

5,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

545

0 (1

det

ail r

ecor

d)TO

TAL:

$55,

000

$0$0

$0$0

$0$5

5,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$55,

000

$0$0

$0$0

$0B

ond:

Wat

er/S

ewer

/Are

na$5

5,00

0

TOTA

L:$5

5,00

0$0

$0$0

$0$0

$55,

000

186

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Brock Street Reconstruction

Sewer portion of the Brock Street reconstruction program. Project design underway; This funds construction in FY13.

Sewer upgrade during reconstruction is necessary because sewer main is undersized to handle growth planned for Washington Street. Additionally, likely that asbestos-containing transite sewer pipe will have to be dealt with during construction.

Water and highway upgrades funded from their respective funds.

30

Maintenance

Other Brock Street

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Sewer Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$2,200,000

$2,200,000

4) Type of Project:Building Construction

-

20132) FY:

78

9) Anticipated Funding Source(s):

SRF

187

Sew

er W

orks

Bro

ck S

treet

Rec

onst

ruct

ion

Stre

et is

sev

erel

y de

grad

ed.

As

prop

osed

gro

wth

alo

ng W

ashi

ngto

n S

t. co

rrid

or o

ccur

s, th

ere

will

be

sew

er b

acku

ps a

long

B

rock

Stre

et b

ecau

se th

e se

wer

pip

e is

too

smal

l to

hand

le th

e in

crea

sed

load

onc

e th

e W

ashi

ngto

n S

t. pu

mp

stat

ion

is

upgr

aded

.

Pav

emen

t reh

abili

tatio

n on

ly.

Doe

s no

t cor

rect

sew

er o

r oth

er in

frast

rctu

re d

efic

ienc

ies.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

78

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$2,0

00,0

00$0

$0$0

$0$0

Bui

ldin

g C

onst

ruct

ion

$2,0

00,0

00

$200

,000

$0$0

$0$0

$0C

onst

ruct

ion

Eng

inee

ring

$200

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

514

1 (2

det

ail r

ecor

ds)

TOTA

L:$2

,200

,000

$0$0

$0$0

$0$2

,200

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$2,2

00,0

00$0

$0$0

$0$0

Sta

te R

evol

ving

Fun

d$2

,200

,000

TOTA

L:$2

,200

,000

$0$0

$0$0

$0$2

,200

,000

188

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

HVAC Controller Replacement

Upgrade to Honeywell controller system to allow access to and control of HVAC system at WWTP. Needed also to tie into City's monitoring and troubleshooting software. Replace existing Delta controllers with new Honeywell. Existing are over 12 years old.

Controller upgrade will result in energy and fuel savings and will improve habitation of WWTP. Existing controllers have no access for troubleshooting.

20

Desirable

Sewer Treatment Plant

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Sewer Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$50,000

$50,000

4) Type of Project:Buildings Improvements

20132) FY:

79

9) Anticipated Funding Source(s):

Bond

189

Sew

er W

orks

HVA

C C

ontro

ller R

epla

cem

ent

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

79

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$50,

000

$0$0

$0$0

$0B

uild

ings

Impr

ovem

ents

$50,

000

Sum

mar

y fo

r 'pr

ojec

tID' =

545

1 (1

det

ail r

ecor

d)TO

TAL:

$50,

000

$0$0

$0$0

$0$5

0,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$50,

000

$0$0

$0$0

$0B

ond:

Wat

er/S

ewer

/Are

na$5

0,00

0

TOTA

L:$5

0,00

0$0

$0$0

$0$0

$50,

000

190

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Inflow & Infiltration Elimination Phase III

Continuing project to eliminate excess infiltration and inflow (I/I) into the sewer system. Gonic was constructed in 2003 and East Rochester started in September 2005. Phase III will be for a preliminary evaluation and TV viewing of the sewer on Franklin Street with further evaluation in 2013, design and construction to begin in FY13. Completion projected for FY14 - will also involve the replacement of Western Ave. pump station

Excessive I/I into the sewer system uses capacity needed for existing and future sewer customers. The cost of treating clean water increases over time.

Highway and water projects funded separately from their respective funds. Franklin Street and the area between Western Avenue and Adams Street in this project. Other streets in this neighborhood can be done together.

30

Maintenance

Other Western/Prospect Neighborhood

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Sewer Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$140,000

$2,690,000

4) Type of Project:Building Construction

-

20132) FY:

80

9) Anticipated Funding Source(s):

Cash, SRF

191

Sew

er W

orks

Inflo

w &

Infil

tratio

n E

limin

atio

n P

hase

III

Con

tinue

d in

crea

sed

cost

s to

trea

t effl

uent

at t

he w

aste

wat

er tr

eatm

ent f

acili

ty.

Non

e

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

80

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$2

,300

,000

$0$0

$0$0

Bui

ldin

g C

onst

ruct

ion

$2,3

00,0

00

$0$2

50,0

00$0

$0$0

$0C

onst

ruct

ion

Eng

inee

ring

$250

,000

$140

,000

$0$0

$0$0

$0D

esig

n E

ngin

eerin

g$1

40,0

00

Sum

mar

y fo

r 'pr

ojec

tID' =

514

0 (3

det

ail r

ecor

ds)

TOTA

L:$1

40,0

00$2

,550

,000

$0$0

$0$0

$2,6

90,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$140

,000

$0$0

$0$0

$0C

ash:

Wat

er/S

ewer

/Are

na$1

40,0

00

$0$2

,550

,000

$0$0

$0$0

Sta

te R

evol

ving

Fun

d$2

,550

,000

TOTA

L:$1

40,0

00$2

,550

,000

$0$0

$0$0

$2,6

90,0

00

192

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Pump Station Replacement Program

This program is to replace existing sewer pump stations systematically. Start with replacing the older underground pump stations that are maintenance problems: Updated Schedule: Weeping Willow, Autumn Kirsten and Sawyer (design '13, const. '14); River St. (design '14, const. '15); Route 11. (design '15, const. '16)

The City has 30 sewer pump stations in its inventory. The average life expectancy of a station is between 20 and 35 years. This creates a situation where we must put substantial rehab/replacement effort into one station per year.

"New" Route 125 pump station moved up due to importance in system, condition, and in ability to maintain safely.

25

Maintenance

Other Existing Sewer Pump Station

$0.00$3,000.00

$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Sewer Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $3,000.00 Total Revenues: $0.00

Non-Recurring

$18,000

$1,613,000

4) Type of Project:Building Construction

-

20132) FY:

81

9) Anticipated Funding Source(s):

Bond, Cash

193

Sew

er W

orks

Pum

p St

atio

n R

epla

cem

ent P

rogr

am

If w

e ke

ep d

efer

ring

mai

nten

ance

we

will

be

in a

situ

tatio

n w

here

we

will

hav

e to

repl

ace

seve

ral a

t onc

e, w

hen

they

bre

ak

dow

n. S

tatio

ns s

hut d

own

and

we

have

sew

age

over

flow

s an

d w

e en

d up

dis

char

ging

raw

sew

age

to ri

vers

and

stre

ams

viol

atin

g la

ws

Non

e

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

81

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$3

45,0

00$5

50,0

00$5

50,0

00$0

$0B

uild

ing

Con

stru

ctio

n$1

,445

,000

$18,

000

$50,

000

$50,

000

$50,

000

$0$0

Des

ign

Eng

inee

ring

$168

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

514

5 (2

det

ail r

ecor

ds)

TOTA

L:$1

8,00

0$3

95,0

00$6

00,0

00$6

00,0

00$0

$0$1

,613

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$3

95,0

00$6

00,0

00$6

00,0

00$0

$0B

ond:

Wat

er/S

ewer

/Are

na$1

,595

,000

$18,

000

$0$0

$0$0

$0C

ash:

Wat

er/S

ewer

/Are

na$1

8,00

0

TOTA

L:$1

8,00

0$3

95,0

00$6

00,0

00$6

00,0

00$0

$0$1

,613

,000

194

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Soda Ash Silo

Existing paint peeling off and exposing metal which is rusting.

This silo holds the only chemical used and the silo is critical for WWTP operation

None

20

Maintenance

Sewer Treatment Plant

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Sewer Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$13,500

$13,500

4) Type of Project:Buildings Improvements

20132) FY:

82

9) Anticipated Funding Source(s):

Cash

195

Sew

er W

orks

Sod

a A

sh S

iloD

epar

tmen

t:Pr

ojec

t #:

Proj

ect T

itle:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

82

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$13,

500

$0$0

$0$0

$0B

uild

ings

Impr

ovem

ents

$13,

500

Sum

mar

y fo

r 'pr

ojec

tID' =

545

3 (1

det

ail r

ecor

d)TO

TAL:

$13,

500

$0$0

$0$0

$0$1

3,50

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$13,

500

$0$0

$0$0

$0C

ash:

Wat

er/S

ewer

/Are

na$1

3,50

0

TOTA

L:$1

3,50

0$0

$0$0

$0$0

$13,

500

196

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Vehicle & Equipment Replacement Program

Replaces equipment and vehicles used by the sewer department that are past their useful life. For FY-13 replace portion 35: portion of 48- utility maintenance truck; replace 51- utility service truck ($35K); replace 25 - mobile compressor ($10K);

Vehicles past useful lives.

All vehicles listed will be split between water and sewer funds.

10

Essential

Sewer Treatment Plant

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Sewer Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$77,500

$112,500

4) Type of Project:Machinery and Equipment

20132) FY:

83

9) Anticipated Funding Source(s):

Cash

197

Sew

er W

orks

Veh

icle

& E

quip

men

t Rep

lace

men

t Pro

gram

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

83

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$77,

500

$25,

000

$10,

000

$0$0

$0M

achi

nery

and

Equ

ipm

ent

$112

,500

Sum

mar

y fo

r 'pr

ojec

tID' =

513

3 (1

det

ail r

ecor

d)TO

TAL:

$77,

500

$25,

000

$10,

000

$0$0

$0$1

12,5

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$77,

500

$25,

000

$10,

000

$0$0

$0C

ash:

Wat

er/S

ewer

/Are

na$1

12,5

00

TOTA

L:$7

7,50

0$2

5,00

0$1

0,00

0$0

$0$0

$112

,500

198

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Wastewater Collection System CMOM Program Devel

Development of wastewater collection system Capacity, Monitoring, Operation, and Maintenance (CMOM) program. A systematic approach to managing wastewater collection system functionality. Will involve inspections and mapping as well as maintenance miles tones for wastewater collection effort

EPA will lilely be putting the development of a CMOM requirement into the discharge permit that EPA will be renewing in 2010, making the creation of a program mandatory. The intent of the program is to reduce the likelihood and number of accidental spill

Collection system upgrade program - Wastewater treatment plant upgrade

30

Maintenance

Other Sewer Collection System - City

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Sewer Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$100,000

$200,000

4) Type of Project:Design Engineering

-

20132) FY:

84

9) Anticipated Funding Source(s):

Cash

199

Sew

er W

orks

Was

tew

ater

Col

lect

ion

Sys

tem

CM

OM

Pro

gram

Sin

ce it

is li

kely

to b

e a

requ

irem

ent o

f the

dis

char

ge p

erm

it, fa

ilure

to c

ompl

y m

ay s

et th

e ci

ty u

p fo

r eve

ntua

l enf

orce

men

t ac

tion

from

EPA

and

the

Sta

te o

f New

Ham

pshi

re.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

84

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$100

,000

$100

,000

$0$0

$0$0

Des

ign

Eng

inee

ring

$200

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

539

5 (1

det

ail r

ecor

d)TO

TAL:

$100

,000

$100

,000

$0$0

$0$0

$200

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$100

,000

$100

,000

$0$0

$0$0

Cas

h: W

ater

/Sew

er/A

rena

$200

,000

TOTA

L:$1

00,0

00$1

00,0

00$0

$0$0

$0$2

00,0

00

200

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Wastewater Treatment Plant Upgrade to meet Permit

This involves design work to comply with expected requirements of new permit: tasks incl. Ability to remove nitrogen to 5 mg/L; and remove phosphorus to .2 mg/L.; also evaluate to install new clarifier, anoxic zone mixers, and more SolarBees; each of which was previously proposed to be funded separately to perpetuate current permit conditions.

Comply with permit expected to be issued by EPA. Other communities in the area are being required to treat to levels stated above as part of their permit. Legal services will likely also be needed to negotiate final permit terms.

This effort evaluates need for and consolidates installation of add'l clarifier, anoxic zone mixers, add'l SolarBee units, proposed previously into one effort in consideration of new permit requirements. Continuation of funding in '10.

25

Essential

Sewer Treatment Plant

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Sewer Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$1,500,000

$21,200,000

4) Type of Project:Building Construction

20132) FY:

85

9) Anticipated Funding Source(s):

SRF

201

Sew

er W

orks

Was

tew

ater

Tre

atm

ent P

lant

Upg

rade

to m

eet

City

will

ulti

mat

ely

be s

ubje

cted

to e

nfor

cem

ent a

ctio

n by

EP

A, D

ES

, and

pos

sibl

e la

wsu

its a

nd p

oor p

ublic

rela

tions

by

non-

gove

rnm

enta

l org

aniz

atio

ns li

fe C

onse

rvat

ion

Law

Fou

ndat

ion

and

Cle

an W

ater

Act

ion.

Wor

k w

/ EP

A a

nd o

ther

com

mun

ities

to ju

stify

diff

eren

t, an

d ho

pefu

lly le

ss c

ostly

dis

char

ge li

mits

in th

e pe

rmit.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

85

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$0

$19,

000,

000

$0$0

$0B

uild

ing

Con

stru

ctio

n$1

9,00

0,00

0

$0$0

$700

,000

$0$0

$0C

onst

ruct

ion

Eng

inee

ring

$700

,000

$1,5

00,0

00$0

$0$0

$0$0

Des

ign

Eng

inee

ring

$1,5

00,0

00

Sum

mar

y fo

r 'pr

ojec

tID' =

523

6 (3

det

ail r

ecor

ds)

TOTA

L:$1

,500

,000

$0$1

9,70

0,00

0$0

$0$0

$21,

200,

000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$1,5

00,0

00$0

$19,

700,

000

$0$0

$0S

tate

Rev

olvi

ng F

und

$21,

200,

000

TOTA

L:$1

,500

,000

$0$1

9,70

0,00

0$0

$0$0

$21,

200,

000

202

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Collection System Upgrade

This program replaces old and undersized sewer mains throughout the city using city crews and contract forces. Provides funding for incremental expansions of the sewer system when requested and approved according to the sewer ordinance.

The existing city sewer system is undersized and in poor condition in various locations. Areas are evaluated using a sewer video camera in order to determine if the infrastructure can be rehabilitated or replaced as issues are discovered. .

Continuation of project 01-439-02 and 07-602-02. This project is in conjunction with water distribution upgrade program and pavement rehabilitation programs.

30

Maintenance

Other various

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Sewer Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$300,000

4) Type of Project:Building Construction

-

20142) FY:

86

9) Anticipated Funding Source(s):

Bond

203

Sew

er W

orks

Col

lect

ion

Sys

tem

Upg

rade

As

city

's s

ewer

s co

ntin

ue to

det

erio

rate

ove

r tim

e, th

e co

st to

repa

ir th

e sy

stem

s in

crea

ses.

The

cos

t to

treat

cle

an w

ater

in

crea

ses.

If th

e se

wer

sys

tem

is a

llow

ed to

con

tinua

lly o

verfl

ow in

to w

ater

bod

ies

prio

r to

treat

men

t, th

e ci

ty c

an b

e fin

ed.

No

feas

ible

alte

rnat

ive.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2014

FY:

86

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$2

60,0

00$0

$0$0

$0B

uild

ing

Con

stru

ctio

n$2

60,0

00

$0$4

0,00

0$0

$0$0

$0D

esig

n E

ngin

eerin

g$4

0,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

513

4 (2

det

ail r

ecor

ds)

TOTA

L:$0

$300

,000

$0$0

$0$0

$300

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$3

00,0

00$0

$0$0

$0B

ond:

Wat

er/S

ewer

/Are

na$3

00,0

00

TOTA

L:$0

$300

,000

$0$0

$0$0

$300

,000

204

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Increase Disc Filter Capacity

Procures materials needed to add more disc filters. Increases disc filter capability.

Enables the plant to operate at a higher capacity. This will become essential as the city grows.

None.

15

Desirable

Sewer Treatment Plant

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Sewer Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$45,000

4) Type of Project:Machinery and Equipment

20142) FY:

87

9) Anticipated Funding Source(s):

Cash

205

Sew

er W

orks

Incr

ease

Dis

c Fi

lter C

apac

ity

The

inte

nt is

to m

ake

the

plan

t rea

dy fo

r the

city

's g

row

th, w

hich

has

acc

eler

ated

in re

cent

yea

rs .

Pro

gram

min

g fo

r it n

ow

enab

les

the

plan

t to

be p

roac

tive

rath

er th

an re

activ

e, w

hich

is w

hat w

ill h

appe

n if

it ge

ts d

efer

red

Non

e.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2014

FY:

87

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$4

5,00

0$0

$0$0

$0M

achi

nery

and

Equ

ipm

ent

$45,

000

Sum

mar

y fo

r 'pr

ojec

tID' =

514

6 (1

det

ail r

ecor

d)TO

TAL:

$0$4

5,00

0$0

$0$0

$0$4

5,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$4

5,00

0$0

$0$0

$0C

ash:

Wat

er/S

ewer

/Are

na$4

5,00

0

TOTA

L:$0

$45,

000

$0$0

$0$0

$45,

000

206

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Sheridan, Glen, and Granite Street Rehabilitation

Sewer works portion of reconstruction of Catherine, Sheridan, Glen, and Granite Streets. Sewer system in streets is being evaluated for lining or replacement. Streets are old and little work has been done on them in many years. This is for construction funding in FY14.

These streets have been neglected for very long time. These are in prime walking and bus routes for elementary schoolers to Allen School. Received complaints from residents about uneven sidewalks, poor drainage, etc.

Funding for water and highway portions of projects from other funding sources. FY08 was for investigation and design. FY-14 is for construction.

30

Maintenance

Other Sheridan St. neighborhood

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Sewer Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$235,000

4) Type of Project:Building Construction

-

20142) FY:

88

9) Anticipated Funding Source(s):

Bond

207

Sew

er W

orks

She

ridan

, Gle

n, a

nd G

rani

te S

treet

Reh

abili

tatio

Sta

tus

quo.

The

con

ditio

n of

the

infra

stru

ctur

e is

dec

ayin

g. C

ontin

ued

deca

ying

will

resu

lt in

an

even

gre

ater

num

ber o

f co

mpl

aint

s fro

m re

side

nts

and

pare

nts

trans

porti

ng th

eir c

hild

ren

to s

choo

l.

Pav

emen

t ove

rlay

- onl

y se

rves

to "d

ress

up"

in th

e sh

ort t

erm

and

doe

s no

t fix

und

erly

ing

wat

er,s

ewer

and

dra

inag

e pr

oble

ms.

It

is m

ore

cost

-effe

ctiv

e to

revi

ew a

nd re

habi

litat

e al

l of t

he in

frast

ruct

ure

whe

n a

stre

et is

reco

nstru

cted

.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2014

FY:

88

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$2

00,0

00$0

$0$0

$0B

uild

ing

Con

stru

ctio

n$2

00,0

00

$0$3

5,00

0$0

$0$0

$0C

onst

ruct

ion

Eng

inee

ring

$35,

000

Sum

mar

y fo

r 'pr

ojec

tID' =

513

9 (2

det

ail r

ecor

ds)

TOTA

L:$0

$235

,000

$0$0

$0$0

$235

,000

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$2

35,0

00$0

$0$0

$0B

ond:

Wat

er/S

ewer

/Are

na$2

35,0

00

TOTA

L:$0

$235

,000

$0$0

$0$0

$235

,000

208

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Salmon Falls Road Reconstruction -

Sewer portion of reconstruction of Salmon Falls Road. Project involves reviewing condition of existing sewers in area and then expanding sewers to other densely developed areas of the street. Construction cost grossly estimated and would be adjusted aft er preliminary engineering completed. Design began in 2011 and construction thereafter.

Area has developed significantly over the years resulting in increased traffic and degrading road surface. More cost effective to deal with the entire infrastructure of a street including utilities during a reconstruction. Sewer Pump station work needed

Water, highway, and sidewalk projects associated with this are funded from other accounts.

30

Maintenance

Other Salmon Falls Road

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Sewer Works

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$0.00

$270,100.00

4) Type of Project:Building Construction

-

2a) Project #:

20142) FY:

89

9) Anticipated Funding Source(s):

SRF

209

Sew

er W

orks

602

Sal

mon

Fal

ls R

oad

Rec

onst

ruct

ion

-

Stre

et a

nd it

s as

soci

ated

infra

stru

ctur

e w

ill c

ontin

ue to

deg

rade

.

Div

ide

the

proj

ect i

nto

piec

es ra

ther

than

dea

ling

with

the

road

as

a w

hole

. A

ctiv

ely

cont

inue

to s

eek

fede

ral a

nd/o

r sta

te

fund

ing

for t

his

proj

ect.

Sub

mit

proj

ect f

or s

tate

"10-

year

" hig

hway

pla

n w

hen

allo

wed

. Sew

er w

ill b

e fu

nded

by

SR

F.

Dep

artm

ent:

Proj

ect T

itle:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

Proj

ect #

:20

14FY

:89

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$0

$210

,000

$0$0

$0B

uild

ing

Con

stru

ctio

n$2

10,0

00

$0$0

$22,

500

$0$0

$0C

onst

ruct

ion

Eng

inee

ring

$22,

500

$0$2

2,60

0$0

$0$1

5,00

0$0

Des

ign

Eng

inee

ring

$37,

600

Sum

mar

y fo

r 'pr

ojec

tID' =

515

1 (3

det

ail r

ecor

ds)

TOTA

L:$0

$22,

600

$232

,500

$0$1

5,00

0$0

$270

,100

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$2

2,60

0$2

32,5

00$0

$15,

000

$0S

tate

Rev

olvi

ng F

und

$270

,100

TOTA

L:$0

$22,

600

$232

,500

$0$1

5,00

0$0

$270

,100

210

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Woodman, Myrtle St. Reconstruction - (Phase II)

Sewer works portion of the reconstruction of Woodman, Myrtle, and Davieanne Locke Lane, as well as portions of Congress Street. Funds sewer design in FY 2015 and construction in FY-2016.

This would be a continuation of Phase I which included Catherine/Sheridan Streets. All are around and encompass the walking routes to the Allen St. School. Streets have been neglected for a very long time. Received complaints from residents about area.

Funding for water and highway portions of project from other funding sources. Design and construction of Phase II will occur in FY-15 w/ Construction in FY-16..

30

Maintenance

Other Myrtle and Woodman Sts.

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Sewer Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$480,000

4) Type of Project:Building Construction

-

20152) FY:

90

9) Anticipated Funding Source(s):

SRF

211

Sew

er W

orks

Woo

dman

, Myr

tle S

t. R

econ

stru

ctio

n - (

Pha

se II

Sta

tus

Quo

. Th

e co

nditi

on o

f the

infra

stru

ctur

e is

dec

ayin

g. C

ontin

ued

deca

ying

will

resu

lt in

an

even

gre

ater

num

ber o

f co

mpl

aint

s fro

m re

side

nts

and

pare

nts

trans

porti

ng th

eir c

hild

ren

to s

choo

l.

Pav

emen

t ove

rlay

- onl

y se

rves

to "d

ress

up"

in th

e sh

ort t

erm

and

doe

s no

t fix

und

erly

ing

wat

er, s

ewer

, and

dra

inag

e pr

oble

ms.

It i

s m

ore

cost

-effe

ctiv

e to

revi

ew a

nd re

hab

all o

f the

infra

stru

ctur

e w

ith a

stre

et is

reco

nstru

cted

.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2015

FY:

90

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$0

$0$3

80,0

00$0

$0B

uild

ing

Con

stru

ctio

n$3

80,0

00

$0$0

$0$5

0,00

0$0

$0C

onst

ruct

ion

Eng

inee

ring

$50,

000

$0$0

$50,

000

$0$0

$0D

esig

n E

ngin

eerin

g$5

0,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

532

1 (3

det

ail r

ecor

ds)

TOTA

L:$0

$0$5

0,00

0$4

30,0

00$0

$0$4

80,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$0

$50,

000

$430

,000

$0$0

Sta

te R

evol

ving

Fun

d$4

80,0

00

TOTA

L:$0

$0$5

0,00

0$4

30,0

00$0

$0$4

80,0

00

212

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Hancock Street Reconstruction

This is the sewer portion of the Hancock Street reconstruction program. Project currently programmed for evaluation and design in FY18 and construction in FY19.Eng'g $45k, Const $550k, CE $50k

Preliminary results indicate that the capacity of the sewer mains are limited by the size of the sewer main in Hancock Street. Street is severely degraded relative to the Lowell Street area and Commons, which received upgrade within last several years.

Highway and water projects are funded from their respective accounts.

30

Maintenance

Other Hancock Street

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Sewer Works 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

0

$45,000

4) Type of Project:Design Engineering

-

20182) FY:

91

9) Anticipated Funding Source(s):

Bond

213

Sew

er W

orks

Han

cock

Stre

et R

econ

stru

ctio

n

As

deve

lopm

ent c

ontin

ues

in th

e S

E s

ectio

n of

the

City

, was

tew

ater

gen

erat

ed h

ere

may

forc

e de

velo

pmen

t lim

itatio

ns u

ntil

the

sew

er m

ain

is re

plac

ed to

allo

w g

reat

er p

eak

Pav

emen

t reh

abili

tatio

n on

ly.

Doe

s no

t cor

rect

sew

er d

efic

ienc

ies.

Sta

tus

Quo

.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2018

FY:

91

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$0$0

$0$0

$0$4

5,00

0D

esig

n E

ngin

eerin

g$4

5,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

514

4 (1

det

ail r

ecor

d)TO

TAL:

$0$0

$0$0

$0$4

5,00

0$4

5,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$0$0

$0$0

$0$4

5,00

0B

ond:

City

/Sch

ool

$45,

000

TOTA

L:$0

$0$0

$0$0

$45,

000

$45,

000

214

BO

ND

PRO

CE

ED

SC

/OA

MO

UN

TO

&M

CA

SHD

ED

RE

VST

AT

EH

WY

FU

ND

SSR

F

CIT

Y O

F R

OC

HE

STE

R

FY

13 R

OPO

SED

CIP

BU

DG

ET

CA

PIT

AL

IMPR

OV

EM

EN

TS

PRO

GR

AM

SC

HE

DU

LE

DE

PAR

TM

EN

T/D

ESC

RIP

TIO

NG

RA

NT

LIF

EA

MO

UN

TFU

ND

BA

LR

ET

EA

RN

Are

naB

uild

ing

Impr

ovem

ents

300,

000

00

00

00

2550

,000

300,

000

300,

000

00

00

Are

naSu

btot

al:

00

50,0

0030

0,00

0 CA

PITA

L IM

PRO

VEM

ENTS

215

THIS PAGE INTENTIONALLY LEFT BLANK

CITY OF ROCHESTER FY13 PROPOSED CIP BUDGET

CAPITAL IMPROVEMENTS 216

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Building Improvements

Improvement of the remaining part of the facility that was left untouched when the first phase of improvements were done in 2001.

The space that is currently used for the YMCA will become vacant once the lease expires. This would allow expansion of arena offices, development of revenue generating space, and or possible relocation of Recreation offices.

Ties with Recreation Master Plan

25

Essential

Arena

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Arena 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$300,000

$300,000

4) Type of Project:Buildings Improvements

20132) FY:

92

9) Anticipated Funding Source(s):

Bond

217

Are

naB

uild

ing

Impr

ovem

ents

Nee

ded

build

ing

upgr

ades

and

repa

irs w

ill n

ot b

e do

ne. P

oten

tial o

f los

t rev

enue

.

Non

e

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

92

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$300

,000

$0$0

$0$0

$0B

uild

ings

Impr

ovem

ents

$300

,000

Sum

mar

y fo

r 'pr

ojec

tID' =

545

5 (1

det

ail r

ecor

d)TO

TAL:

$300

,000

$0$0

$0$0

$0$3

00,0

00

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$300

,000

$0$0

$0$0

$0B

ond:

Wat

er/S

ewer

/Are

na$3

00,0

00

TOTA

L:$3

00,0

00$0

$0$0

$0$0

$300

,000

218

BO

ND

PRO

CE

ED

SC

/OA

MO

UN

TO

&M

CA

SHD

ED

RE

VST

AT

EH

WY

FU

ND

SSR

F

CIT

Y O

F R

OC

HE

STE

R

FY13

PR

OPO

SED

CIP

BU

DG

ET

CA

PIT

AL

IMPR

OV

EM

EN

TS

PRO

GR

AM

SC

HE

DU

LE

DE

PAR

TM

EN

T/D

ESC

RIP

TIO

NG

RA

NT

LIF

EA

MO

UN

TFU

ND

BA

LR

ET

EA

RN

Com

mun

ity C

ente

rR

ehab

ilita

te T

enni

s Cou

rts0

45,0

000

00

00

150

45,0

000

45,0

000

00

Com

mun

ity C

ente

rSu

btot

al:

00

045

,000 C

API

TAL

IMPR

OV

EMEN

TS

219

THIS PAGE INTENTIONALLY LEFT BLANK

CITY OF ROCHESTER FY13 PROPOSED CIP BUDGET

CAPITAL IMPROVEMENTS 220

City of Rochester, New HampshireCAPITAL PROJECT REQUEST FORM

Capital Improvements for Fiscal Years 2013 - 2018

Request Type:NewModification

Continuation

Rehabilitate Tennis Courts

This is to rehabilitate the tennis courts at the Community Center with an overlay, new surface coatings & lines, new posts and nets.

Existing tennis courts are showing their age, cracked and some of the posts are bent.

None

15

Maintenance

Community Center

$0.00$0.00$0.00$0.00$0.00$0.00

$0.00$0.00$0.00$0.00$0.00$0.00

1) Department:Community Center 2a) Project #:

3) Project Title:

5) Expected Useful Life: Recurring

6) Location: 7) Total Project Cost:

7a) Current FY Cost

10) General Description:

11) Justification

12) Relationship to Other Projects

Personnel Services:Supplies & Materials:Charges & Services:

Other:Other:Other:

Licenses & Permits:Fines & Forfeits:

Use of Property & Money:Intergovernmental:

Current Service Charges:Other:

8) Project Priority or Need:

Years

13) Net Effect on Operating Costs: 14) Net Effect on Operating Revenues:

Total Expenses: $0.00 Total Revenues: $0.00

Non-Recurring

$45,000

$45,000

4) Type of Project:Building Construction

20132) FY:

93

9) Anticipated Funding Source(s):

Cash`

221

Com

mun

ity C

ente

rR

ehab

ilita

te T

enni

s C

ourts

Eve

ntua

lly s

hort

term

repa

irs w

ill n

o lo

nger

be

viab

le a

nd th

e te

nnis

cou

rts w

ill n

eed

to b

e cl

osed

to p

ublic

use

.

Rep

air s

afet

y de

fect

s on

ly. C

lose

cou

rts w

hen

no lo

nger

abl

e to

effe

ct re

pairs

.

Dep

artm

ent:

Proj

ect #

:Pr

ojec

t Titl

e:

17) I

mpl

icat

ions

of D

efer

ring

Proj

ect:

18) P

roje

ct A

ltern

ativ

es:

2013

FY:

93

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

15) P

roje

ct C

ompo

nent

s:Si

x-Ye

arTo

tal

$45,

000

$0$0

$0$0

$0B

uild

ing

Con

stru

ctio

n$4

5,00

0

Sum

mar

y fo

r 'pr

ojec

tID' =

541

0 (1

det

ail r

ecor

d)TO

TAL:

$45,

000

$0$0

$0$0

$0$4

5,00

0

Fisc

al Y

ear

2013

Fisc

al Y

ear

2014

Fisc

al Y

ear

2015

Fisc

al Y

ear

2016

Fisc

al Y

ear

2017

Fisc

al Y

ear

2018

Six-

Year

Tota

l16

) Pro

ject

Fun

d So

urce

s

$45,

000

$0$0

$0$0

$0C

ash:

City

/Sch

ool

$45,

000

TOTA

L:$4

5,00

0$0

$0$0

$0$0

$45,

000

222


Recommended