Taiwan Power Company1
Taipower Coal Demandand
Procurement Plan
Presented by Edward K. M. ChenDirector of Fuel Department
Taiwan Power Company
At The 8TH Meeting of R.O.C. / AustraliaJoint Energy and Minerals Trades
Taipei, August 2000
Taiwan Power Company2
Contents1. Introduction2. Coal Demand
• Coal-fired Units• Consumption Forecast• Power Plant Characteristics & Environmental Restrictions • Coal Quality Comparison
3. Procurement Plan• Taipower Policy• Procurement Methods• Procurement Plan for Year 2002
4. Taipower and Australian Coal Industry• Status of Current Contracts• Bengalla JV
Taiwan Power Company3
Year
Type Million KLOE Million KLOE Million KLOE
Electricity 10.06 34% 44.20 49% 53.50 46% Petroleum 15.38 52% 33.90 37% 45.20 39% Coal 2.37 8% 10.00 11% 9.40 8% Natural Gas 1.77 6% 2.80 3% 5.70 5% Renewable Energy - - 2.10 2%
Total 29.58 90.90 115.90
Remark: KLOE – Kiloliters of Oil Equivalent
1980 2000 2010
Energy Consumption in Taiwan
1980
34%
8%
6%52%
Electricity Petroleum Coal Natural Gas Renewable Energy
2000
11% 3%
49%
37%
2010
5% 2%8%
39%
46%
Taiwan Power Company4
Make-up of Generating Capacity in Taiwan
2000
Hydro14.9%
Coal33.4%
Oil18.2%
NG16.1%
Nuclear17.4%
2010
Hydro10.1%
Coal32.8%
Oil7.8%
NG32.6% Nuclear
16.7%
Total : 29,634MW Total : 46,891MW
Taiwan Power Company5
Make-up of Electricity Generation in Taiwan
2000
Hydro5.7%
Coal39.5%
Oil15.5%
NG10.5%
Co-gen5.2%
Nuclear23.6%
2010
Hydro3.2%
Coal43.5%
Oil3.2%
NG22.7%
Co-gen4.5%
Nuclear23.0%
Total : 156,511Gwh Total : 236,880Gwh
Taiwan Power Company6
Existing Coal-fired Units in Taiwan
Station UnitDate of
CommercialOperation
InstalledCapacity
(MW)Owner Station Unit
Date ofCommercialOperation
InstalledCapacity
(MW)Owner
#1 Jan. 1960 75 TPC #7 May 1996 550 TPC
#2 Nov. 1961 125 〞Taichung
#8 Jun. 1997 550 〞Shenao
#3 May 1966 200 〞 #1 May 1982 500 TPC
#1 Jul. 1968 300 TPC #2 May 1983 500 〞Linko
#2 Mar. 1972 300 〞 #3 Mar. 1985 550 〞
#1 May 1991 550 TPC
Hsinta
#4 Feb. 1986 550 〞
#2 Sep. 1991 550 〞 #1 Jul. 1969 300 TPC
#3 Jul. 1992 550 〞Talin
#2 May 1970 300 〞
#4 Oct. 1992 550 〞 #1 Jun. 1999 600 FPG
#5 Mar. 1996 550 〞 #2 Sep. 1999 600 FPG
Taichung
#6 May 1996 550 〞
Mailiao
#3 Sep. 2000 600 FPG
Total (22 Units) 9,900MW
Remarks: 1. Shenao #1- #3 are planned to be retired in 2006.
2. Linko #1 is planned to be retired in 2008.
Taiwan Power Company7
650 650550 550
0
100
200
300
400
500
600
700
MW
2001 2002 2003 2004 2005
Planned Coal-fired Units in Taiwan
Hoping #1(IPP)
Hoping #2(IPP) Taichung #9
(TPC)Taichung #10
(TPC)
2001-2005 Planed: 2,400MW
2008-2009 Additional Capacity:2,300MW
2001-2009 Total : 4,700MW
Taiwan Power Company8
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
Million MT
Year
Taipower Coal Consumption Forcast
Coal 21.99 22.52 22.33 21.98 23.82 24.41 24.09 24.17 24.30 23.72 22.53
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
Taiwan Power Company9
Plant Emission Limit Equip't Status Coal Usage
Shenao#1-#375MWe*1
125MWe*1200MWe*1
SOx:500PPmNOx: 300PPm
w/o FGD、no ash pond low ash Indonesian
Linkou#1-#2300MWe*2
SOx:200PPmNOx: 300→ 240PPm
w/ FGD high V.M. Australian
Taichung#1-#4550MWe*4
SOx:100PPmNOx:250→ 100PPm
w/ FGD 、 w/o SCR Indonesian + Australian or SA
Taichung#5-#8550MWe*4
SOx:100PPmNOx:100PPm
w/ FGD & w/ SCR Indonesian + Australian or SA
Hsinta#1-#2500MWe*2
SOx: 80PPmNOx: 200PPm
w/ FGD 、 w/o SCR E-type coal *2 + KPC*1 + Australian*2
Hsinta#3-#4550MWe*2
SOx:170→ 80PPmNOx:220P→ 80PPm
FGD 、 SCR underconstruction
E-type coal + low sulfur bituminous coal
Talin#1-#2300MWe*2
SOx:200PPmNOx:300→ 220PPm
w/o FGD 、 w/o SCR E-type coal + low sulfur bituminous coal
Environmental Restrictions and Coal Usage For Taipower Coal-fired Power Plants
Taiwan Power Company10
Import Term Contract Coal Quality Comparison
Quality Item
Origin
H.V.(Kcal/Kg) S Ash V.M. AFT Others
Western U.S. ~ 6,900 ~ 0.6% ~ 9% ~ 40% ~ 1250OC
Indonesian 5,700 ~ 6,600 0.4%~ 0.9% ~ 6% ~ 41% ~ 1200 OC Black fly ash
Low ash, extra low S coal ~ 5,100 <0.2% <4% ~ 41% ~ 1200 OC
South African ~ 6,300 ~ 0.6% 14% 26% ~ 1400 OC Low Na2O, High N
C-type Australian ~ 6,300 0.6% 14% 28% ~ 1500 OC
D-type Australian ~ 6,400 0.6% 12% 33% ~ 1400 OC
Chinese Mainland ~ 6,200 ~ 0.4% 7% 33% ~ 1200 OC
Taiwan Power Company11
20.13(97.9% )
0.44 (2.1% )
18.43 (90.5% )
1.94 (9.5% )
16.51 (73.2% )
6.06 (26.8% )
16.63 (76.9% )
4.99 (23.1% )
-
5.00
10.00
15.00
20.00
25.00
Million Mt
1997 1998 1999 2000
Share of Low Ash, Extra Low Sulphur Sub-bituminous Coal in Taipower Market
Low Ash, Extra Low Sulfur Sub-bituminous Coal
Ordinary Coal
Taiwan Power Company12
Procurement Plan
Taipower Policy:
Diversification
Direct Contacts for Term Contract Supply
Adequate Level of Participation in the Spot Market
Strict Quality Requirements
Taiwan Power Company13
Procurement Methods Term Contract (1) 70% Min. of Total Requirements
(2) Selective Tendering
(3) Uniform Upper Percentage Limit for All
Regions Except Chinese Mainland Spot Purchase (1) 30% Max. of Total Requirements (2) Open Tendering
Both Term Contract Procurement and Spot Purchases Are Carried Out on An International Bid Basis.
Taiwan Power Company14
Procurement Plan for Year 2002 The uniform upper percentage limit of 35% is proposed subject to final approval by Taipower board of directors. 85% of total requirements are allocated for nominal tonnage to be covered by term contracts.
4-5 term contract tenders are expected to be issued in Q4 2001.
Spot purchase tenders will be issued roughly on a quarterly basis.
Taiwan Power Company15
4.65 (31% )
3.88 (26% )
4.58 (31% )
1.88 (12% )
5.79 (38% )
3.74 (25% )
4.09 (27% )
1.56 (10% )
6.04 (42% )
4.05 (28% )
3.26 (19% )
1.18 (8% )
4.99 (29% )
8.11 (47% )
3.26 (19% )
0.94 (5% )
5.14 (32% )
7.7 (48% )
2.47 (15% )
0.4 (2% )
0.5 (3% )
-
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
Million Mt
1996 1997 1998 1999 2000
Make-up of Taipower Term Contract Coal Tonnages by Country of Origin
Chinese Mainland
America
South Africa
Indonesia
Australia
Taiwan Power Company16
0.47(20% )
1.71 (75% )
0.11(5% )
0.92 (17% )
3.62 (67% )
0.84 (16% )
0.3 (5% )
5.23 (90% )
0.3 (5% )
0.14 (3% )
5.07 (96% )
0.06 (1% )
5.09 (94% )
0.32 (6% )
-
1.00
2.00
3.00
4.00
5.00
6.00
Million Mt
1996 1997 1998 1999 2000
Make-up of Taipower Spot Coal Tonnages by Country of Origin
Others
Indonesia
Australia
Taiwan Power Company17
5.12 (30% )
5.59 (32% )
4.58 (26% )
1.88 (11% )
0.11 (1% )
6.72 (33% )
7.36 (35% )
4.09 (20% )
1.56 (8% )
0.84 (4% )
6.34 (31% )
9.28 (46% )
3.26 (16% )
1.18 (6% )
0.3 (1% )
5.13 (23% )
13.18 (58% )
3.26 (14% )
0.94 (4% )
0.06 (1% )
5.14 (24% )
12.79 (59% )
2.47 (11% )
0.4 (2% )
0.82 (4%)
-
5.00
10.00
15.00
20.00
25.00
Million Mt
1996 1997 1998 1999 2000
Make-up of Taipower Total Import Coal Tonnagesby Country of Origin
Others
America
South Africa
Indonesia
Australia
Taiwan Power Company18
Term Contracts with Australian Coal Suppliers
SupplierNumber ofContracts
Duration
Coalex Pty. Ltd. 1 1982 ~ 2002
CNA Operations Pty. Ltd. 1 1995 ~ 2002
Camberwell Coal Pty. Ltd. 1 1996 ~ 2002
Apollo Resources Pty.Ltd. 1 1996 ~ 2001
Ensham Coal Sales Pty.Ltd. 1 1997 ~ 2003
Macquarie Coal Marketing Pty. Ltd. 21998 ~ 20041998 ~ 2005
Bengalla Coal Sales Company Pty. Ltd. 1 1999 ~ 2005
Dartbrook Coal (Sales) Pty. Ltd. 1 2001 ~ 2005
Total Number of Contracts 9
Taiwan Power Company19
Bengalla Joint Venture Structure
CAN40%
Taipower10%
Wesfarmers40% Mitsui
10%
Taiwan Power Company20
5.87.0 7.0 7.0
7.5
-1.02.03.04.05.06.07.08.0
Million Mt.
2001 2002 2003 2004 2005
Bengalla Mine 2001-2005 Production Plan