Taking EDM to the Enterprise
07-06-2006 Plant Engineering Life Cycle conference (PELC) – The Hague
Practical experiences
with implementing an efficient and controlled
Engineering Drawing Improvement Environment
for NAM Offshore
Guus van Jarwaarde, DINTEC
© DINTEC and Cyco Software B.V. – 07-06-2006 Taking EDM to the Enterprise 2
The Fire Triangle
Lessons learnt: There are 3 elements required for combustion awareness If any side is missing the fire can not start prevention If any side is removed the fire will go out control There is a 4th dimension, called chain reaction
Simplification of a complex topic
© DINTEC and Cyco Software B.V. – 07-06-2006 Taking EDM to the Enterprise 3
Overview
Archiving versus document quality
Assets versus document quality
Organizational issues versus document quality
Justifications used
The critical success factors
Sub-optimal solutions
Summary
1
2
3
4
5
6
7
EDM
Triangle
© DINTEC and Cyco Software B.V. – 07-06-2006 Taking EDM to the Enterprise 4
Archiving requirements
(Inter)national Legal and Industrial regulations-) ISO, CE marking, . . .
Safety and Integrity-) Company internal
Engineering, Operational, Maintenance, . . .-) Information value
Other-) Economical / Efficiency / Historical reasons, . . .
Organization
Arch
ivin
g Asset
© DINTEC and Cyco Software B.V. – 07-06-2006 Taking EDM to the Enterprise 5
Archiving issues
General archiving requirements-) find, read, update, in-time, accurate and complete
Digital archiving issues-) Advantages (faster finding & updating,
sharing, integration, . . . )
-) Complex, various file formats, various versions, limited durability: limited
storage life, media type, hardware, application software, . . .
Digital Requires more attention!
Organization
Arch
ivin
g Asset
© DINTEC and Cyco Software B.V. – 07-06-2006 Taking EDM to the Enterprise 6
What file format is this digital file? Organization
Arch
ivin
g Asset
© DINTEC and Cyco Software B.V. – 07-06-2006 Taking EDM to the Enterprise 7
Answer: Microsoft Excel
This can be acceptable or not acceptable – decide what templates to be used Remark: is this the most efficient way to mark-up (red-lining) information ?
Organization
Arch
ivin
g Asset
© DINTEC and Cyco Software B.V. – 07-06-2006 Taking EDM to the Enterprise 8
AutoCAD issues
Various fonts used in this drawing were not delivered affects readability Example of hidden costs
Organization
Arch
ivin
g Asset
© DINTEC and Cyco Software B.V. – 07-06-2006 Taking EDM to the Enterprise 9
More complex file formats (hybrid files)
A scanned drawing (tif format) has been digitally modified. The result is 2 physical files representing 1 drawing.
Organization
Arch
ivin
g Asset
© DINTEC and Cyco Software B.V. – 07-06-2006 Taking EDM to the Enterprise 10
A few Archive recommendations
Manage digital files, based on accepted file types and supported versions (incoming and stored)
Remember the more exceptions the more difficult to manage
Set-up and maintain company document standards - accepted file types and versions- drafting and delivery standard- engineering drawing standard showing what to
maintain (keep As Built)
Doing all this helps to obtain better ARCHIVE control !!!
Organization
Arch
ivin
g Asset
© DINTEC and Cyco Software B.V. – 07-06-2006 Taking EDM to the Enterprise 11
Assets and document quality
Business controls: range of standards, procedures, regular reviews / audits Graph shows a reactive approach. Pro-active is more efficient and gives more control
Organization
Arch
iving Asset
pro-active approachInitialdocumentation status
BusinessControls
Uncontrolledprogression
Audit / Review Audit / Review
Influences: - Asset modifications - Changes to operation conditions - Introduction of new staff - . . .
Time
TechnicalIntegrity
© DINTEC and Cyco Software B.V. – 07-06-2006 Taking EDM to the Enterprise 12
Assets and document quality – As Built activities
PlannedMaintenance
LocalMaintenance
&Modifications
Engineered jobs(in-house projects)
Engineered jobs( external projects)
Engineered Modifications
Operational Locations
As Builtactivities
As Builtactivities
As Builtactivities
As Builtactivities
Contractor As Built scope
Organisation – Asset As Built scope
DrawingManagement
Archive
Various processes, which may result in As Built activities
Determine also per discipline what types of drawings need to be kept up-to-date (As Built), e.g. P&ID, Isometric, Single Line, Cause & Effect
Organization
Arch
iving Asset
© DINTEC and Cyco Software B.V. – 07-06-2006 Taking EDM to the Enterprise 13
Assets and document quality – Control As Built activitiesEngineering Process
ProjectSpecificatie
Detailed Design
Materials &Procurement
Construction
Commissioning / Start-up
Handover /Close-out
Operations / Maint
ModificationsNew Assets
DRAWING
MGMT
SYSTEEM
DMS
Organization Archive
DrawingControl
As BuiltTeam
contentcontrol
administrativecontrol
Organization
Arch
iving Asset
© DINTEC and Cyco Software B.V. – 07-06-2006 Taking EDM to the Enterprise 14
Additional costs
Costs
Time
Not following documentation standards during the engineering process will result in much higher (and most of the time hidden) additional costs.
Organization
Arch
iving Asset
© DINTEC and Cyco Software B.V. – 07-06-2006 Taking EDM to the Enterprise 15
Organizational issues versus document quality
Mgmt
Engineering . . .Operations &Maintenance
. . . . . . . . . EDM . . . . . .
Efficient Engineering Document Management is the integration of data, standards and systems amongst all parties involved!
Span of control Span of control Span of control
Organization
Arch
iving Asset
© DINTEC and Cyco Software B.V. – 07-06-2006 Taking EDM to the Enterprise 16
Justifications used
Look at Treats & Opportunities: - treats: legal, safety, integrity, technical reliability- opportunities: integrate with other developments
Look at inefficienties and savings: - make a financial analisys (ROI)
Use supporting figures - e.g. for 100.000 drawings:- opening each file & extract info cost > 1 manyear- say that the development of 1 drawing cost € 500,=.
The investment is in total € 50.000.000.
This is an asset by it self and requires regular maintenance and from time to time a rejuvenation.
© DINTEC and Cyco Software B.V. – 07-06-2006 Taking EDM to the Enterprise 17
The critical success factors
Get active support from highest management as well as a broad basis for support in the organization
Step by step (fased approach) - takes longer (is not critical)- justification is easier- costs can be spread - every next improvement step
should be in line with the previous one(s)
Get external expertise
t
© DINTEC and Cyco Software B.V. – 07-06-2006 Taking EDM to the Enterprise 18
Sub-optimal solutions
If the EDM system does not provide the required functionality
The present information might be not correct or fit for purpose and need updating before migrating to a new environment (garbage in garbage out).Advice: do not postpone updating!
© DINTEC and Cyco Software B.V. – 07-06-2006 Taking EDM to the Enterprise 19
Summary
Engineering Document Management has become a more and more complex asset to manage.Focus on all 3 areas of the EDM triangle. Focus also on the 4th dimension: the Engineering Drawing Management System (EDMS)
Taking EDM to the Enterprise
07-06-2006 Plant Engineering Life Cycle conference (PELC) – The Hague
Practical experiences with implementing an efficient and controlled Engineering Drawing Improvement Environment for NAM Offshore
Guus van Jarwaarde, DINTEC