Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section 82 (1) of the Electricity Act, 2003) (Central Act 36 of 2003) PRESENT : Thiru S.Akshayakumar …. Chairman Thiru G.Rajagopal …. Member and Dr.T.Prabhakara Rao …. Member M.P.No.28 of 2016 In the matter of: Approval of Capital Investment Plan for FY 2016-17 to FY 2018-19 for generation and distribution function of Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO) Tamil Nadu Generation and Distribution Corporation Ltd. (Represented by Chief Financial Controller/General 144, Anna Salai Chennai 600 002. … Petitioner (Thiru M.Gopinathan Standing Counsel for TANGEDCO) Vs. NIL …Respondent . Dates of hearing : 09.12.2016 and 29.12.2016 Date of Order : 31.07.2017 The Tamil Nadu Generation and Distribution Corporation Limited (hereinafter referred to as “TANGEDCO” or “the Petitioner”) has filed the Capital Investment Plan (hereinafter referred as “CIP”) for the MYT Control Period from FY 2016-17 to FY 2018-19 for the Generation and Distribution functions in M.P. No. 28 of 2016. The Petition came up for hearing on 09.12.2016 and 29.12.2016. The Commission upon
Transcript
Page 1: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 1 of 52

TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section 82 (1) of the Electricity Act, 2003)

(Central Act 36 of 2003) PRESENT:

Thiru S.Akshayakumar …. Chairman Thiru G.Rajagopal …. Member

and Dr.T.Prabhakara Rao …. Member

M.P.No.28 of 2016

In the matter of: Approval of Capital Investment Plan for FY 2016-17 to FY 2018-19 for

generation and distribution function of Tamil Nadu Generation and Distribution

Corporation Limited (TANGEDCO)

Tamil Nadu Generation and Distribution Corporation Ltd.

(Represented by Chief Financial Controller/General

144, Anna Salai

Chennai – 600 002.

… Petitioner (Thiru M.Gopinathan Standing Counsel for TANGEDCO)

Vs. NIL …Respondent

.

Dates of hearing : 09.12.2016 and 29.12.2016 Date of Order : 31.07.2017

The Tamil Nadu Generation and Distribution Corporation Limited (hereinafter

referred to as “TANGEDCO” or “the Petitioner”) has filed the Capital Investment Plan

(hereinafter referred as “CIP”) for the MYT Control Period from FY 2016-17 to FY

2018-19 for the Generation and Distribution functions in M.P. No. 28 of 2016. The

Petition came up for hearing on 09.12.2016 and 29.12.2016. The Commission upon

Page 2: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 2 of 52

perusing the above petition and after hearing the submissions of the Petitioner and

stakeholders hereby makes the following:-

ORDER

1. Prayer of the Petitioner:-

TANGEDCO has prayed to consider projections for the CIP for each year

of the MYT Control Period from FY 2016-17 to FY 2018-19 in respect of

generation projects and distribution and to approve the same as deemed fit by

the Commission.

2. Facts of the case:-

2.1. The Petitioner has submitted that the installed capacity of conventional energy

sources is 17,976.48 MW as on April 1, 2016, which includes Hydro (2307.90 MW),

Thermal (4660 MW), Gas Stations (516.08 MW), share from Central Generating

Stations (5464MW), Captive Power Plants (986.50 MW), Power purchase

(852.50MW), LTOA (2830 MW) and MTOA (359.50 MW). The installed capacity of

Renewable Energy sources as on April 1, 2016 (infirm power) is 9629.52 MW, which

includes generation from wind (7597.71MW), Solar (1142.41 MW), Biomass (230 MW)

and Co-generation plants (659.40 MW).

2.2. The distribution network of TANGEDCO comprises 33 kV, 22 kV and 11 kV

sub-transmission system. TANGEDCO owns and operates an extensive distribution

network consisting of HT line network and LT line network. It also owns 2,67,421

distribution transformers with a total capacity of 30,920 MVA as on June 30, 2016.

TANGEDCO served a total of 272.19 Lakh consumers as on September 30, 2016.

Page 3: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 3 of 52

2.3. The Petitioner has submitted that Tamil Nadu met an all-time peak demand of

15,343 MW, making it the second ranked State in the country next to Maharashtra, in

terms of highest peak demand and energy consumption. The present demand of

power in the State is around 14,500 - 15,000 MW. The Petitioner has submitted the

Demand- Availability projections for the period FY 2015-16 to FY 2021-22 as under:

Table 1: Demand and Availability as submitted by TANGEDCO

Sl.

No. Particulars

FY

2015-16

FY

2016-17

FY

2017-18

FY

2018-19

FY

2019-20

FY

2020-21

FY

2021-22

1

Installed Capacity at the

beginning of the year

(MW)

13,231 14,786 15,613 16,308 17,295 21,655 26,095

2 Expected addition during

the year (MW) 741 827 695 987 4,360 4,440 7,640

3 Reduction of capacity

during the year (MW) 814 - - - - - -

4 Installed capacity at the

end of the year (MW) 14,786 15,613 16,308 17,295 21,655 26,095 33,735

5

Availability at the

beginning of the year

(MW)

10,023 11,318 11,548 12,059 12,898 16,452 19,622

6 Additional availability

during the year (MW) 619 703 591 839 3,706 3,349 4,794

7

Addition/(Reduction) of

availability during the

year (MW)

703 (446) - - - - -

8

Reduction due to ageing

of Thermal Stations as per

LGBR (MW)

27 27 80 - 152 179 27

9 Availability at the end of

the year (MW) 11,318 11,548 12,059 12,898 16,452 19,622 24,389

10 Power Purchase (MW) 3,190 3,830 3,730 3,330 3,330 3,330 3,330

11 Total Availability at the

end of the year (MW) 14,508 15,378 15,789 16,228 19,782 22,952 27,719

12 Projected Demand (MW) 14,538 15,566 16,577 17,679 18,841 20,065 21,348

13 Surplus/(deficit) (MW) (30) (188) (788) (1,451) 941 2,887 6,371

This demand will be met by generation from existing power stations, power

from projects planned to be commissioned in the coming years and also through

power purchase.

2.4. The Petitioner has submitted that though most of the existing generating

Page 4: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 4 of 52

stations (Thermal and Hydro) have completed their life period and are performing well,

capital expenditure has been proposed to maintain the plant availability factor to meet

the projected demand. Based on the demand and availability projections for FY 2016-

17 to FY 2020-21 as per 19th Electric Power Survey (EPS) Projections, for meeting the

additional demand, it has proposed commissioning of new projects and strengthening

of distribution network as well, for which the capital expenditure has been proposed in

the CIP.

2.5. The Petitioner has further submitted that the CIP for the Generation and

Distribution function for the Control Period from FY 2016-17 to FY 2018-19 as shown

in the following Table:

Table 2: Proposed Capital Expenditure and Capitalisation submitted by TANGEDCO for the

Control Period from FY 2016-17 to FY 2018-19 (Rs. Crore)

Sl.

No. Particulars

Estimated

Cost FY 2016-17 FY 2017-18 FY 2018-19

Capital Expenditure

1 Generation 1,24,188.61 4,755.46 16,094.31 18,379.05

2 Distribution 10,694.79 5,577.12 3,016.39 2,101.28

Capitalisation

1 Generation 1,24,188.61 1,435.49 1,839.23 7,217.16

2 Distribution 10,694.79 5,298.47 3,073.03 2,173.32

2.6. The CIP proposal covers year-wise capital expenditure and capitalization for

the following existing generating stations and ongoing/new projects:

I Existing Generating stations:

a. Thermal Power Generating stations - ETPS, TTPS, MTPS, North Chennai Stage I, Mettur Stage III, North Chennai Stage II; b. Hydro power Generating Stations in Kundah, Tirunelveli, Kadamparai and Erode Circles; c. Gas Turbine Power stations at Valuthur, Thirumakottai, Kuttalam and Basin Bridge.

Page 5: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 5 of 52

II Ongoing/New Generation projects a. Thermal Projects – Completed schemes – Mettur Stage III, NCTPS Stage II. b. Thermal Projects – On going schemes - ETPS Expansion (1x660 MW), Ennore SEZ (2x660 MW), NCTPS Stage III (1x800 MW), Uppur TPS (2x800 MW). c. Thermal Projects – New schemes – Ennore Replacement (660 MW), Udangudi

Stage I (2x660 MW), Cheyur UMPP (5x800 MW), Udangudi Stage II & III (2x660 MW each) and Kadaladi Super critical (5x800 MW)

d. Hydro Projects – Completed schemes - Periyar Vaigai IV (2x1.25 MW), Bhavani Kattalai Barrage I, II, III (2x15 MW each), Bhavani Barrage I & II

(2x 5 MW). e. Hydro Projects - New- Dam Rehabilitation and Improvement Project (DRIP) under World Bank funding, Kundah Pumped Storage (4x125MW), Sillahalla

Pumped Storage (4x500 MW), Mettur Pumped Storage (500 MW), Modified Moyar Ultimate Stage HEP Phase I (25 MW) and Kolli Hill Hydro Project (2x15 MW)

2.7. The Petitioner has submitted the details of existing generating Stations

including the year of commissioning and stated that even though most of the

thermal/hydro/gas generating stations are more than 25 years old, they are performing

well. The expenditure proposed for the existing generating stations are as follows:

Table 3: Capital Expenditure and Capitalisation for existing Generating

stations as submitted by TANGEDCO (Rs. Crore)

Sl.

No. Particulars

Estimated

Cost FY 2016-17 FY 2017-18 FY 2018-19

Capital Expenditure

1 Thermal Generating Stations 3264.62 1543.30 1102.36 618.96

2 Hydro Power Stations 442.06 227.60 73.81 140.65

3 Gas Turbine Power Stations 517.86 146.27 299.59 72.00

4 Total 4224.54 1917.17 1475.76 831.61

Capitalisation

1 Thermal Generating Stations 3264.62 1120.16 727.65 1416.81

2 Hydro Power Stations 442.06 188.97 29.29 223.80

3 Gas Turbine Power Stations 517.86 60.97 358.89 98.00

4 Total 4224.54 1370.1 1115.83 1738.61

2.8. The proposed Capital Expenditure in respect of the existing Thermal

Page 6: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 6 of 52

Generating stations is towards schemes to replace the equipment that have served

their useful life during capital overhauling works, to reduce the Auxiliary Consumption,

to reduce the steam loss and to improve the Station Heat Rate (SHR) and thereby the

Station efficiency, Boiler maintenance, electrical modernisation, to meet the norms

prescribed by the Pollution Control Board and to reduce the downtime of the Units in

case of failures. Also, works related to Ash Handling system and Coal Handling

system have been proposed to be carried out to ensure trouble free coal unloading

work and to meet out the Coal Feeding requirement of the generating stations.

2.9. In respect of the existing Hydro stations, Comprehensive Renovation,

Modernisation and Uprating (RMU) works at Moyar power house, Periyar power

house, Kodayar power house and Sholayar power house, and modernisation works in

certain other power houses have been proposed by the Petitioner. In addition, works

related to governor upgradation, provision for turbine runner, protection system

upgradation, replacement of station transformer, etc., have been proposed by the

Petitioner.

2.10. As regards the existing Gas stations, the Capital works include mandatory

inspection of Hot Gas Path, mandatory inspection of Gas Turbine and Generator,

major overhauling works, mandatory combustion inspection and replacement of items

during mandatory inspections, construction of quarters, replacement of damaged

parts, etc.

2.11 The detailed justification for each of the proposed capital works along with

details of approval of the competent authority for the works and cost benefit analysis

Page 7: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 7 of 52

have been furnished by the Petitioner.

2.12. The Capital Expenditure and Capitalisation for new generating stations as

submitted by TANGEDCO is shown in the Table below:

Table 4: Capital Expenditure for New Generation Projects as submitted by TANGEDCO

(Rs. Crore)

Sl.

No. Name of the Stations

Estimated

Cost

FY

2016-17

FY 2017-

18

FY 2018-

19

Thermal Power Projects

1 Mettur Thermal Power Project -

Stage-III (600MW) 4695.43 8.54 166.16 0.00

2 North Chennai Thermal Power

Project - Stage-II (1200MW) 8352.32 18.51 192.89 0.00

3 Ennore SEZ STPP (1320MW) 9800.00 573.90 1140.48 380.16

4 ETPS Expansion (660MW) 5421.00 750.00 1500.00 1979.33

5 ETPS Replacement Project

(660MW) 3600.00 2.00 500.00 1000.00

6 Uppur Thermal Power Project

(1600MW) 12778.00 250.00 5000.00 4000.00

7 North Chennai Thermal Power

Project - Stage-III (800MW) 6357.00 550.00 1500.00 1500.00

8

Udangudi Thermal Power

Project - Stage-I, II & III (3960

MW)

27300.00 257.50 3400.00 5100.00

9

Kadaladi Super Critical

Thermal Power Project

(5x800MW)

30000.00 54.00 500.00 3000.00

Total 108303.75 2464.45 13899.53 16959.49

Hydro Power Projects

1 Mettur Pumped Storage HEP

(500MW) 2200.00 1.00 2.00 3.00

2 Modified Moyar Ultimate

Stage HEP Phase-I (25MW) 156.91 0.25 1.75 2.00

3 Survey and Investigation of

works for new Hydro Schemes 7.00 1.00 2.00 4.00

4 Kundah Pumped HEP

(4x125MW) 1831.29 208.00 500.00 400.00

5 Sillahalla HEP (4x500MW) 7000.00 2.23 5.65 155.00

6 Periyar Vaigai - IV SHEP

(2x1.25MW) 66.26 1.26 0.00 0.00

7 DRIP works under World Bank

Funded 272.00 104.00 160.82 0.00

8 Bhavani Kattalai Barrage -I

(2x15MW) 4.15 2.10 2.05 0.00

9 Bhavani Kattalai Barrage -II

(2x15MW) 4.79 2.50 2.29 0.00

10 Bhavani Kattalai Barrage-III 23.03 15.03 5.05 2.95

Page 8: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 8 of 52

Sl.

No. Name of the Stations

Estimated

Cost

FY

2016-17

FY 2017-

18

FY 2018-

19

(2x15MW)

11 Bhavani Barrage -I (2x15MW) 11.88 3.88 7.00 1.00

12 Bhavani Barrage -II (2x15MW) 17.43 5.88 11.55 0.00

13 Kolli Hill Hydro Project

(2x15MW) 65.58 26.71 18.87 20.00

Total 11660.32 373.84 719.02 587.95

Further, TANGEDCO submitted that it has taken up establishment of twelve

(12) Co-generation Plants with the capacity of 183 MW in the Co-operative and Public

Sector Sugar mills along with Sugar mill Modernization in Tamil Nadu at a total cost of

Rs.1,241.15 Crore. These projects are likely to be commissioned by the end of 2017.

2.13. The Petitioner has submitted that it has erected 33 Nos. of 33 kV Substations

during FY 2015-16 at a cost of Rs. 75.51 Crore, energizing 11,121 km of LT lines and

3,458 km of HT lines. The Petitioner has proposed the capital works for establishment

of 33 kV sub-stations, enhancement of power transformers in sub-stations, erection of

HT and LT feeders (overhead and underground), erection of distribution transformers

and erection of pillar boxes, conversion of Overhead line to underground cable and

Deposit Contribution Works (DCW), etc. The works are proposed to be carried out to

meet the load growth, reduce outages, enhance operational flexibility, improve the

quality of supply, increase the revenue and reduce the Aggregate Technical &

Commercial (AT&C) loss. The works are also proposed to be carried out under various

schemes of the Government of India, viz., Restructured Accelerated Power

Development & Reforms Programme (R-APDRP) [Part A and Part B], Integrated

Power Development Scheme (IPDS), and Deendayal Upadhyaya Gram Jyoti Yojana

(DDUGJY) besides own funded schemes and DCW schemes.

Page 9: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 9 of 52

2.14. The Petitioner has submitted the region-wise allocation of capital expenditure

and capitalisation for the Distribution function for FY 2016-17 to FY 2018-19 as shown

in the Table below:

Table 5: Capital Expenditure for Distribution as submitted by TANGEDCO (Rs. Crore)

Sl. No. Name of the Region Estimated

Cost FY 2016-17 FY 2017-18 FY 2018-19

1 Chennai North 765.98 425.55 193.56 146.87

2 Chennai South 1783.72 1178.53 324.95 280.24

3 Coimbatore 1291.44 698.14 309.73 283.57

4 Erode 1392.95 625.88 487.87 279.20

5 Madurai 1146.82 712.52 215.33 218.97

6 Tirunelveli 747.98 422.79 203.42 121.77

7 Trichy 1332.86 670.04 452.61 210.21

8 Vellore 947.66 366.13 340.71 240.82

9 Villupuram 1285.38 477.54 488.21 319.63

10 Grand total 10694.79 5577.12 3016.39 2101.28

Table 6: Capitalisation for Distribution as submitted by TANGEDCO (Rs. Crore)

Sl. No. Name of the Region Estimated

Cost FY 2016-17 FY 2017-18 FY 2018-19

1 Chennai North 765.98 415.03 192.20 144.30

2 Chennai South 1783.72 1144.66 327.46 286.03

3 Coimbatore 1291.44 677.86 300.63 298.55

4 Erode 1392.95 568.34 506.70 297.53

5 Madurai 1146.82 693.84 222.19 215.64

6 Tirunelveli 747.98 402.30 212.08 127.79

7 Trichy 1332.86 621.96 469.15 228.91

8 Vellore 947.66 336.32 347.94 241.79

9 Villupuram 1285.38 438.16 494.68 332.78

10 Grand total 10694.79 5298.47 3073.03 2173.32

2.15. The Petitioner has submitted that a higher capitalisation amount for the FY

2016-17 are due to completion of works under RAPDRP schemes for an amount of

Page 10: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 10 of 52

Rs.2275 crs., DDUGJY schemes for about Rs.165.51 crs. and other completed works

in distribution side for Rs.1800 crs.

3. AT&C Losses

The Petitioner has submitted that T&D losses are due to energy dissipated in

the conductors and equipment used for transmission, transformation, sub-transmission

and distribution of power. These technical losses are inherent in the system and can

be reduced to an optimum level. However, the Commercial losses are due to illegal

consumption of electrical energy, which is not correctly metered and billed, and

causes losses to the utility. The Petitioner further submitted that it has taken various

efforts for reduction of Aggregate Technical & Commercial (AT&C) losses. AT&C

losses have been reduced from 18.40% in FY 2012-13 to 17.96% in FY 2015-16. The

collection efficiency of 98.79% has been achieved in FY 2015-16. The Petitioner has

proposed the works under R-APDRP, IPDS and DDUGJY for reduction of AT&C

losses.

4. Relevant Policy/Regulations

The CIP submitted by TANGEDCO has to be approved as per the relevant

provision of Tariff Policy, Tariff Regulations and MYT Regulations.

4.1. The relevant provisions of the Tariff Policy notified by Government of India on

January 6, 2016 with respect to the CIP are reproduced below:

“5.11 Tariff policy lays down … …

a) Return on Investment

… … …

While allowing the total capital cost of the project, the Appropriate Commission would

ensure that these are reasonable and to achieve this objective, requisite benchmarks

Page 11: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 11 of 52

on capital costs should be evolved by the Regulatory Commissions.

b) to (h)… … … …

g) Renovation and Modernization

… … …

A multi-year tariff (MYT) framework may be prescribed which should also cover

capital investments necessary for renovation and modernization and an incentive

framework to share the benefits of efficiency improvement between the utilities and the

beneficiaries with reference to revised and specific performance norms to be fixed by

the Appropriate Commission. Appropriate capital costs required for pre-determined

efficiency gains and/or for sustenance of high level performance would need to be

assessed by the Appropriate Commission. ……” (emphasis added)

4.2. Regulation 17 of the TNERC (Terms and Conditions for determination of Tariff)

Regulations, 2005 (hereinafter called Tariff Regulations, 2005) specifies as under:

“17. Capital Investment Plan

(1) The licensee shall file a detailed Capital Investment Plan every year showing

separately, ongoing projects that will spill into the year under review and new project

(along with justification) that will commence but may be completed within or beyond

the tariff period.

(2) The Commission may consider the licensee’s investment plan for approval and for

this purpose, may require the licensees to provide relevant technical and commercial

details. The costs corresponding to the approved investment plan of a licensee for a

given year shall normally be considered for its revenue requirement.

(3) In presenting the justification for new projects, the licensee shall detail the specific

nature of the works and the results to be achieved. The details must be shown in

physical parameter (e.g.) new capacity to be added, length of lines to be energised,

number of sub-stations / Bays to be added, meters to be added, replaced, etc. so that it

is amenable for physical verification. In case of significant shortfall in achieving

physical targets, the Commission may require the licensee to explain the reasons, and

may proportionately reduce the provision, including interest and return component

made towards revenue requirement, in the next tariff proposal.

(4) The licensee may, at any time, during the tariff year, seek provision for additional

capital expenditure to meet natural calamities involving substantial investment and the

Commission shall examine and review these provisions in the manner as given in this

regulation and approve their inclusion in the revenue requirement in the next period.

(5) The licensee shall get the Capital Investment Plan approved by the Commission

before filing ARR and Application for determination of tariff.”

4.3. Regulation 3 (v) of TNERC (Terms and conditions for determination of Tariff for

Intra-State Transmission/Distribution of Electricity under MYT framework) Regulations

2009 specifies as under:

Page 12: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 12 of 52

“3. Multiyear Tariff Frame Work

x x x x

(.v). Capital Investment Plan: The licensee shall get the approval of the Capital Investment Plan for each

year of the initial control period in accordance with the Regulation 17 of TNERC Tariff

Regulations. It may be ensured that the approval of the Commission is obtained before

tariff filing under MYT framework. The capital investment plan shall have

capitalization schedules for each year of the control period.

The source of finance to meet the capital expenditure in each year of the

control period shall also be furnished along with Capital Investment Plan.”

4.4. Further, the Hon’ble APTEL in its Judgment dated October 18, 2014 in Appeal

No. 196 of 2013 filed by M/s. OPG Renewable Energy against the Tariff Order 1 of

2013 had given certain directions regarding the approval of CIP of TANGEDCO for FY

2014-15 and FY 2015-16. After taking cognizance of such directions, the Commission

in the Suo-motu Tariff Order dated December 11, 2014 directed TANGEDCO as

under:

“7: SUMMARY OF DIRECTIVES

7.1 The Commission directs TANGEDCO

a) … … …

b) … … …

c) The Commission likes to reiterate that TANGEDCO shall submit a well-structured

cohesive business plan and detailed individual schemes for the planned capacity

additions as well as system strengthening plans. All such plans and schemes shall be

submitted to the Commission in accordance with the Terms and Conditions of Tariff

Regulations 2005 and its amendment dated 09.04.2014, MYT Tariff Regulations 2009,

as well as Licensing Regulations 2005. The submission for approval in this regard so

far has been highly unsatisfactory. The Commission has been addressing the utilities by

way of letters as well as by way of directions. The compliance to such letters and

directions will have to be serious and without fail.”

4.5. TANGEDCO filed its CIP for FY 2014-15 and FY 2015-16 for approval of the

Commission through additional affidavits dated April 4, 2014, June 2, 2016 and

August 23, 2016 in M. P. No. 39 of 2012. After due verification and scrutiny of the

Petition, the Commission vide Order dated January 31, 2017 approved the CIP for

TANGEDCO for FY 2014-15 and FY 2015-16.

Page 13: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 13 of 52

5. Procedure adopted:-

5.1. TANGEDCO has submitted its Petition for approval of CIP for Third Control

Period from FY 2016-17 to FY 2018-19 on November 21, 2016, which was admitted

by the Commission and registered as M.P. No. 28 of 2016. The Commission held a

preliminary hearing in the matter on December 9, 2016. During the hearing,

TANGEDCO was directed to re-submit the CIP Petition with details such as projected

demand, generation capacity addition, distribution load centres, energy loss trajectory,

etc., and schemes for the same.

5.2. The Commission vide Order dated December 29, 2016, directed TANGEDCO

to upload the Petition on its website for obtaining comments and suggestions from the

stake holders and file their reply thereafter along with the compilation of comments

and suggestions. TANGEDCO submitted its revised Capital Investment Plan on

January 5, 2017 with details such as projected demand, generation capacity addition,

distribution load centres, energy loss trajectory, etc., and the respective schemes for

the same. The revised CIP was also uploaded by TANGEDCO on its website on

January 5, 2017. The comments and suggestions provided by the stakeholders in

writing have been summarised issue-wise, along with TANGEDCO’s replies as

elaborated in Appendix of this Order.

5.3. Since, FY 2016-17 is already over, the Commission asked TANGEDCO to

submit the updated status of capital expenditure incurred and capitalisation achieved,

to facilitate a realistic estimate of capital expenditure and capitalisation for FY 2016-17

to FY 2018-19. The Commission has analysed the final proposals for the generation

and distribution functions for the Control Period from FY 2016-17 to FY 2018-19.

Page 14: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 14 of 52

6. Findings of the Commission:-

6.1. The Demand and Energy projections made by TANGEDCO depicts deficit

scenario till the end of FY 2018-19. There would be surplus scenario after FY 2019-20

after taking into account the planned capacity addition from FY 2016-17 onwards. The

Commission is of the view that any slippage in the timelines for capacity addition may

lead to continued deficit scenario beyond the Control Period, if the demand increases

as per the projections which may have to be bridged through short term power

procurement.

6.2. While analysing the CIP, the Commission has taken into account the demand

and energy availability projections submitted by TANGEDCO. The Commission has

also taken into account the Stakeholders’ comments and TANGEDCO’s reply while

proceeding with CIP approval.

6.3. The Commission observes that many of the existing thermal stations viz. TTPS

Unit 1, II, III and MTPS Stage I have exceeded their life period and hence,

TANGEDCO has taken up Upgradation of the existing system, Renovation and

Modernisation, capital overhaul works, etc., to ensure availability of these low-cost

power plants. The Hydro stations are very old stations and some of them are in

service since as early as 1940s and the allocation of capital expenditure is largely

towards Renovation, Modernisation and Upgradation (RMU) works, other

modernization works, etc. The proposed capital expenditure for Gas stations is largely

towards statutory inspection that are to be carried out as per the recommendations of

Original Equipment Manufacturer (OEM).

Page 15: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 15 of 52

6.4. The Commission has taken into account this aspect while approving the capital

expenditure for these schemes. The Commission has considered the capital

expenditure scheme towards Generation Stations/Units, which have surpassed their

useful life or are going to surpass their useful life during the Control Period from FY

2016-17 to FY 2018-19. As regards the existing Generating Stations, the Commission

notes that North Chennai Thermal Power Station-Stage I & II, Mettur Thermal Power

Station Stage -II will not surpass its useful life by the end of the Control Period. Hence,

for such Thermal Generating Stations, the Commission has considered only those

schemes, which are essential for their operation and which qualify under Regulation

19 of the Tariff Regulations.

6.5. Further, the Petitioner has proposed some schemes in FY 2016-17. Since FY

2016-17 is already over, the Commission sought the status of the schemes proposed

in FY 2016-17 from TANGEDCO and has accordingly considered the revised phasing

of capital expenditure for such schemes.

6.6. The Commission has not considered any capital expenditure and capitalisation

towards Ennore Thermal Power Station as the station is de-commissioned. As regards

the existing Thermal Power Station, the Commission has considered the schemes

towards Capital overhauling, replacement of economiser coil, commissioning of

Pressure Reducing De-superheating system, retrofitting of condenser, installation of

fire protection system, replacement of HP module assembly, replacement of IP/LP/HP

rotor, replacement of water wall tubes, revamping of internal coal handling,

replacement of electrical equipments, provision of wireless CCTV and surveillance

Page 16: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 16 of 52

system, PAT schemes, civil works for ash dyke area, revamping of PDFAC system,

schemes for fulfilment of norms of Pollution Control Board, etc.

The petitioner shall also consider to phase out the old units which have

completed their life period by new high efficiency machines meeting new

environmental norms/policy of GoI.

6.7. As regards Hydro projects, the Commission has considered major capital

expenditure schemes towards Static excitation provision for Kundah Power house-2,

230/22 kV substation at Kundah Power House, RMU of Moyar Power house, Periyar

Power house, Kodayar Power house and Sholayar Power house, replacement of auto

sequencer panel at Kadamparai pumped storage Power house, supplying of barrage

gates at BPH-2, etc.

6.8. As regards Gas Stations, the Commission has considered the major capital

expenditure schemes towards installation of Gas booster, upgradation of equipment

as per OEM recommendations, commissioning of air cooled condenser, construction

of quarters, compressor discharge and turbine casing, etc.

Further, in respect to the capital expenditure proposed for Thirumakottai Gas

Thermal Station, which has completed its life period, the expenditure has been

admitted by the Commission under renovation and modernisation and life extension

programme as per Regulation 19 of Tariff Regulations, 2005. The petitioner is also

directed to submit a comprehensive Plan for Renovation & Modernisation and life

extension for its each of the gas stations as and when they complete their life period

for admitting the expenditure.

6.9. While admitting and approving the capital expenditure for existing Generating

Page 17: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 17 of 52

Stations, the Commission has been guided by the provisions of the TNERC’s Tariff

Regulations 2005 and MYT Regulations, 2009 reproduced above.

6.10. Accordingly, the schemes proposed by the Petitioner for each of the above

existing Thermal, Hydro and Gas stations and the Commission’s approval of capital

expenditure and capitalisation considering the life period served by the asset

observations have been duly deliberated upon in Annexures 1 to 13.

6.11. For the investment proposals in the existing generating stations

commencing during the Control Period, i.e., April 1, 2016 onwards, the

Commission directs TANGEDCO to submit the year-wise actual capital

expenditure incurred along with detailed justification for delay, if any, at time of

approval of actual capital expenditure and capitalisation. Further, the

Commission directs the Petitioner to maintain the record for the scheme-wise

actual capital expenditure incurred and actual capitalisation done after April

2016 for each Generating Station separately and submit the same to the

Commission at the time of next Tariff Petition. The Commission will approve the

actual Capital expenditure and actual capitalisation based on such scheme-wise

information, subject to prudence check.

6.12. TANGEDCO has submitted that it has prepared the CIP for FY 2016-17 to FY

2018-19 based on the demand and energy availability projections for FY 2016-17 to

FY 2020-21 as per 19th Electric Power Survey (EPS) Projections. Accordingly, for

meeting the additional demand, it has proposed commissioning of new projects, for

which the capital expenditure has been proposed in the CIP.

Page 18: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 18 of 52

6.13. The new Thermal and Hydro projects are as follows:

Thermal Projects – Ennore SEZ, ETPS Expansion, ETPS Replacement, Uppur

Thermal Project, North Chennai Thermal Power Project Stage III, Udangudi Stage I, II

& III, Kadaladi Super critical Project

Hydro Projects – Mettur Pumped Storage, Modified Moyar Ultimate Stage Phase I,

Kundah Pumped HEP, Sillahalla HEP, Kolli Hydro Project.

6.14. For admitting and approving the capital expenditure for the new Generation

Thermal and Hydro Projects, the Commission is guided by the provisions of

Regulation 6 (7) (i) (a) of the TNERC (Terms and Conditions for the determination of

the Tariff) Regulations,2005 which specifies as under:

“… … …

(7) In case of Generating Station or the Transmission system declared under

commercial operation on or after the date of notification of these Regulations, an

application for fixation of tariff shall be made in two stages as below:

(i) (a) A generation company or a licensee may make an application as per Appendix –

I to these regulations, for determination of provisional tariff in advance of the

anticipated date of completion of the project, based on the capital expenditure

actually incurred upto the date of making of the application or a date prior to making

of the application, duly audited and certified by the statutory auditors, and the

provisional tariff shall be charged from the date of commercial operation of the

respective units of the generation station or the line or sub-station of the transmission

system.

(b) Provisional tariff or provisional billing of charge, wherever allowed by the

Commission based on the application made by the generating company or the

transmission licensee or by the Commission on its own or otherwise, shall be adjusted

against the final tariff approved by the Commission:

Provided that where the provisional tariff charged exceeds the final tariff approved by

the Commission under these regulations, the generating company or the transmission

licensee, as the case may be, shall pay simple interest @ 6% per annum computed on

monthly basis, on the excess amount so charged from the date of payment of such

excess amount and upto the date of adjustment:

Page 19: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 19 of 52

Provided further that where the provisional tariff charged is less than the final tariff

approved by the Commission, the beneficiaries shall pay simple interest at 6% per

annum, computed on monthly basis on the deficit amount from the date on which final

tariff will be applicable upto the date of billing of such deficit amount.

Provided also that excess/deficit amount along with simple interest at 6% shall be

adjusted within three months from the date of order failing which the defaulting

licensee / beneficiary shall be liable to pay penal interest on excess / deficit amount at

the rate as may be decided by the Commission].

(ii) A licensee shall make a fresh application in the same format as above, for the

determination of final tariff based on actual capital expenditure incurred upto the

date of commercial operation of the Generating Station or Transmission system duly

audited and certified by the Statutory Auditors.

(8). In case the licensee does not initiate tariff filings in time, the Commission shall

initiate tariff determination and regulatory scrutiny on suo motu basis.”

6.15. The above-said Regulations clearly specify that the Petitioner shall approach

the Commission for provisional tariff for new generating stations before the anticipated

date of COD based on capital expenditure actually incurred, duly audited and certified

by the Statutory Auditor. Also, after the achievement of COD of the project, the

Petitioner is required to approach the Commission for approval of capital cost and final

tariff based on actual capital expenditure incurred till COD, duly audited and certified

by the Statutory Auditor.

6.16. In view of the above Regulations, the Commission is of the opinion that it would

not be appropriate to allow the recovery of capital expenditure incurred by the

Petitioner towards new Generating Stations through tariff, without verifying prudency

of the actual capital expenditure incurred before COD of the project. At the same time,

it does not mean that the Commission has rejected the proposed capital expenditure

against these Projects. TANGEDCO is required to ensure that the new generation

projects are taken up on time, based on the projected demand-supply gap/surplus for

Page 20: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 20 of 52

the future years and to ensure that the cost is optimised.

6.17. In light of the foregoing, the Commission in-principle approves the Capital

expenditure and funding of the new Generation projects as proposed by the

Petitioner. However, the Commission has not considered any capital

expenditure for these projects for recovery through tariff. The Petitioner shall

adhere to the original time lines for the completion of the projects as mentioned

in Detailed Project Report and duly approved by Board of Directors.

6.18. The Commission further directs the Petitioner to file the Petitions for

approval of provisional tariff and final tariff for new Generation projects in line

with the provisions of the Tariff Regulations. The Commission will take a final

view on the time overrun and related cost overrun and IDC component for

individual projects, after the new generation projects are commissioned, and the

actual audited capital cost including IDC are submitted to the Commission with

due justification for the increase in capital cost, if any.

6.19. The Petitioner has proposed capital expenditure for the following thermal and

hydro projects under New Generation projects for which COD has been achieved

earlier:

Thermal Projects (a) Mettur Stage III – COD achieved on 12.10.2013 (b) NCTPS Stage II - COD achieved for Unit 1 – 20.03.2014 and Unit II- 08.05.2014 Hydro Projects (a) Periyar Vaigai IV – COD achieved during Feb’2016 (b) Bhavani Kattalai Barrage I – COD achieved during 2006-07

Page 21: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 21 of 52

(c) Bhavani Kattalai Barrage II – COD achieved for Unit 1-10.10.2011 & Unit 2 –14.10.2011

(d) Bhavani Kattalai Barrage III – COD achieved for Unit 1- 28.11.2012 & Unit 2 – 28.12.2012 (e) Bhavani Barrage I – COD achieved for Unit 1 – 29.05.2015 &

Unit 2 – 02.07.2015 (f) Bhavani Barrage II – COD achieved for Unit 1 & 2 -15.08.2013

6.20. The directions of the Commission in respect of new generating stations in the

Tariff Order dated June 20, 2013 on Determination of tariff for generation and

distribution is relevant here, and the same is reproduced below:

“3.124 The Commission observed that there are number of new generating stations for which

TANGEDCO had neither sought prior approval of their capital investment plan nor applied for

determination of tariff in advance for the new generating stations.

3.125 TANGEDCO is required to file separate Petitions for approval of the tariff for the new

generating stations along with accounts for these generating stations duly certified by statutory

auditor. On Commission’s directive, TANGEDCO has submitted partial information for new

thermal stations as per the formats prescribed by TNERC Tariff Regulations. However, the

information is not certified by statutory auditor. With respect to new hydro stations

TANGEDCO has not provided any information.

3.126 Regulation 6 (7) (i) (a) of the TNERC Tariff Regulations, 2005 specifies the following:

“A generation company or a licensee may make an application as per Appendix – I to these

Regulations, for determination of provisional tariff in advance of the anticipated date of

completion of the project, based on the capital expenditure actually incurred upto the date of

making of the application or a date prior to making of the application, duly audited and

certified by the statutory auditors, and the provisional tariff shall be charged from the date of

commercial operation of the respective units of the generation station or the line or sub-station

of the transmission system.”

3.127 Hence, the Commission directs TANGEDCO to file the separate petitions based on

TNERC Regulations, within 90 days of issuance of this Order. In failure of this compliance,

Commission may approve the capital cost based on industry norms and may disallow all

expenses allowed due to provisionally approved capital cost in its next tariff order.”

Page 22: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 22 of 52

6.21. As per the above directions, the Petitioner has filed separate Petitions for

approval of the Capital Cost of NCTPS Stage II Unit I & II and MTPS Stage III in

M.A.P. Nos. 1, 2 and 3 of 2015 and for Periyar Vaigai I, Periyar Vaigai II, Bhavani

Barrage II and Bhavani Kattalai Barrage II in M.A.P. Nos. 1, 2, 3 and 4 of 2014. For

rest of the hydro projects, though COD has been achieved, separate Petitions are yet

to be filed.

6.22. For allowing the capital expenditure of such thermal and hydro projects for

which COD have been achieved and separate Petitions have also been filed for

capital cost approval, the orders of the Commission in the respective Petitions wherein

capital cost for such project were approved by the Commission need to be taken into

account. The observations of the Commission in this regard are detailed below:

I Thermal Projects

The thermal projects, viz., North Chennai Stage II Unit I & Unit II and Mettur

Stage III have been completed with time over-run and cost over-run thereby leading to

increase in the project cost by way of Interest During Construction, Fuel cost, etc. The

quantum of delay and the consequent closure of contract is yet to be taken up. The

Commission, therefore, in its order dated 29.12.2016 in M.A.P No. 1 of 2015,

M.A.P.No.2 of 2015 and in its Order dated 31.01.2017 in M.A.P. No 3 of 2015 of the

respective projects, after prudence check of the actual expenditure incurred by the

Petitioner, disallowed certain portion of the interest expenses and fuel expenses due

to delayed completion of the project and accordingly allowed the cost as on COD

provisionally. The Commission has also directed the Petitioner to file the Petition for

approval of final capital cost based on completed actual capital cost duly certified by

Page 23: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 23 of 52

Auditors based on Audited Accounts of the project on finalization of the quantum of

Liquidated Damages and other penalties and closure of contract for admitting the

expenditure incurred beyond the COD of the project. Therefore, the capex allocation

for the said projects of NCTPS Stage Unit I & II and MTPS Stage III for the MYT

Control Period from FY 2016-17 to FY 2018-19 are not considered for the present.

II Hydro Projects

(a) With regard to Hydro projects, viz., Bhavani Kattalai Barrage II and Bhavani

Barrage II, which have achieved COD during FY 2011-12 and FY 2013-14,

respectively, and separate Petitions filed for approval of the capital cost under

M.A.P.Nos. 3 and 4 of 2014, the Commission has already restricted the capital

expenditure incurred by the Petitioner upto COD towards project work and IDC in line

with the norms stipulated by CERC in the CERC RE Tariff Regulations in view of the

cost overrun of the project and disallowed the expenditure incurred by the petitioner

beyond COD. However, the Capex allocation for the MYT Control Period from FY

2016-17 to FY 2018-19 are towards compensation value towards land acquired,

construction of protection wall, construction of boundary wall, river draining works, etc.

The Commission admits the expenditure as per Regulation 19 of Tariff Regulations,

2005 as it is towards land compensation and also on account of new works not in the

original scope of work.

(b) In respect of the other small hydro projects, viz., Periyar Vaigai IV, Bhavani

Barrage I, Bhavani Kattalai Barrage I & III, separate Petitions seeking approval of

capital cost have not been filed by the Utility. Further, as per the estimated cost

indicated in the present petition, the cost per MW of these projects are also in the

range of Rs.16 Crore/MW to Rs. 26.50 Crore/MW, which is extremely high when

Page 24: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 24 of 52

compared with the norms specified in CERC RE Tariff Regulations. As separate

Petitions seeking approval of the capital cost of these Small Hydro projects have not

been filed by the Utility as already directed by this Commission in its order dated

31-01-2017 in M.P No.39 of 2012, the Commission has not considered the capital

allocation for these small hydro projects for the MYT Control Period from FY 2016-17

to FY 2018-19. The Petitioner is directed to file separate Petitions for approval of

the capital cost for the remaining Small Hydro projects for prudence check of

the Commission.

6.23. Dam Rehabilitation and Improvement Project (DRIP) works under World Bank

funded scheme for 38 dams have been taken up at an estimated cost of Rs. 272

Crore including IDC. Considering the progress of work, the capex allocation for this

project under progress is allowed.

6.24. The details of capital expenditure and capitalisation admitted by the

Commission for the DRIP works, Bhavani Kattalai Barrage II and Bhavani Barrage II

are furnished in Annexures 14-16.

6.25. The abstract of the overall capital expenditure and capitalisation proposed by

the Petitioner and approved by the Commission for Generation function for the

purpose of recovery through tariff, are shown in the Tables below:

Page 25: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 25 of 52

Table 7: Approved Capital Expenditure for Generation function of TANGEDCO (Rs. Crore)

Capital Expenditure

Sl. No. Name of Stations/Projects Estimated

Cost

TANGEDCO Approved by the Commission

FY 2016-17 FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19

1 Ennore Thermal Power Station - - - - - - -

2 Tuticorin Thermal Power Station 904.64 443.27 264.97 196.40 84.20 265.60 466.10

3 Mettur Thermal Power Station – I 454.48 233.83 136.90 83.75 17.74 101.27 65.59

4 North Chennai Thermal Power Station - Stage - I 1,661.88 807.92 610.14 243.82 194.85 276.39 451.40

5 Mettur Thermal Power Station – II 145.33 44.80 75.03 25.50 34.20 31.03 20.00

6 North Chennai Thermal Power Station - Stage - II 98.29 13.48 15.32 69.49 5.67 1.00 65.00

A Thermal Power Stations 3,264.62 1,543.30 1,102.36 618.96 336.66 675.29 1,068.09

1 Kundah Generation Circle (843.65MW) 86.06 15.11 25.00 45.95 15.11 5.00 20.50

2 Tirunelveli Generation Circle (372.80MW) 174.08 174.08 - - 30.49 5.00 45.00

3 Kadamparai Generation Circle (595.45MW) 160.50 35.88 44.00 80.62 30.86 33.78 68.81

4 Erode Generation Circle (483.50MW) 21.42 2.53 4.81 14.08 0.50 2.78 14.08

B Hydro Electric Power Stations 442.06 227.60 73.81 140.65 76.96 46.56 148.39

1 Valuthur Gas Turbine Power Station 264.26 93.46 155.80 15.00 4.16 15.30 47.00

2 Thirumakkottai Gas Turbine Power Station 168.52 32.52 119.00 17.00 6.53 125.99 22.00

3 Kuttalam Gas Turbine Power Station 72.29 20.29 12.00 40.00 2.97 4.45 -

4 Basin Bridge Gas Turbine Power Station 12.79 - 12.79 - 3.50 8.29 1.00

C Gas Turbine Power Stations 517.86 146.27 299.59 72.00 17.16 154.03 70.00

D Thermal Power Projects 1,08,303.75 2,464.45 13,899.53 16,959.49 - - -

E Hydro Electric Power Projects 11,660.32 373.84 719.02 587.95 112.38 174.66 -

1 Drum Rehabilitation and Improvement Project works 272.00 104.00 160.82 - 104.00 160.82 -

2 Bhavani Kattalai Barrage-II 4.79 2.50 2.29 - 2.50 2.29 -

3 Bhavani Barrage-II 17.43 5.88 11.55 - 5.88 11.55 -

4 Other Hydro projects 11,366.10 261.46 544.36 587.95 - - -

F Grand Total 1,24,188.61 4,755.46 16,094.31 18,379.05 543.16 1,050.53 1,286.48

Page 26: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 26 of 52

Table 8: Approved Capitalisation for Generation Function of TANGEDCO (Rs. Crore)

Capitalisation (Rs. Crore)

Sl.

No. Name of Stations/Projects

Estimated

Cost

TANGEDCO Approved by the Commission

FY 2016-17 FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19

1 Ennore Thermal Power Station - - - - - - -

2 Tuticorin Thermal Power Station 904.64 393.22 245.02 266.40 8.38 331.42 476.10

3 Mettur Thermal Power Station – I 454.48 217.61 127.67 109.20 3.08 113.77 57.75

4 North Chennai Thermal Power Station - Stage - I 1,661.88 483.24 260.82 917.82 128.07 191.17 323.40

5 Mettur Thermal Power Station – II 145.33 18.42 74.83 52.08 7.82 30.83 46.58

6 North Chennai Thermal Power Station - Stage - II 98.29 7.67 19.31 71.31 5.67 1.00 65.00

A Thermal Power Stations 3,264.62 1,120.16 727.65 1,416.81 153.02 668.19 968.83

1 Kundah Generation Circle (843.65MW) 86.06 11.21 7.50 67.35 11.21 7.50 1.90

2 Tirunelveli Generation Circle (372.80MW) 174.08 174.08 - - 30.49 - -

3 Kadamparai Generation Circle (595.45MW) 160.50 3.68 14.45 142.37 - 5.10 128.35

4 Erode Generation Circle (483.50MW) 21.42 - 7.34 14.08 - 3.28 14.08

B Hydro Electric Power Stations 442.06 188.97 29.29 223.80 41.70 15.88 144.33

1 Valuthur Gas Turbine Power Station 264.26 23.16 226.10 15.00 4.16 15.30 47.00

2 Thirumakkottai Gas Turbine Power Station 168.52 17.52 108.00 43.00 - 112.52 42.00

3 Kuttalam Gas Turbine Power Station 72.29 20.29 12.00 40.00 - - 7.42

4 Basin Bridge Gas Turbine Power Station 12.79 - 12.79 - - 11.79 1.00

C Gas Turbine Power Stations 517.86 60.97 358.89 98.00 4.16 139.61 97.42

D Thermal Power Projects 1,08,303.75 34.23 411.99 5,421.00 - - -

E Hydro Electric Power Projects 11,660.32 31.15 311.41 57.55 9.38 15.84 4.00

1 Drum Rehabilitation and Improvement Project works 272.00 - 272.00 - - 272.00 -

2 Bhavani Kattalai Barrage-II 4.79 2.50 2.29 - 2.50 2.29 -

3 Bhavani Barrage-II 17.43 5.88 11.55 - 5.88 11.55 -

4 Other Hydro Projects 11,366.10 22.77 25.57 57.55 - - -

F Grand Total 1,24,188.61 1,435.49 1,839.23 7,217.16 207.26 1,109.51 1,210.58

Page 27: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 27 of 52

6.26. The Commission has scrutinised the details of various works submitted by the

Petitioner.

6.27. Provision has been made by the Petitioner for extension of LT, LT-CT and HT

supply to various service categories and establishment of new 33 kV sub stations and

improvement works in sub-stations.

6.28. The objectives of the R-APDRP Scheme are to provide quality and reliable

power supply to the consumers and to bring down the AT&C losses below 15%. The

Petitioner has taken up the project in two parts, viz., Part-A and Part-B.

6.29. For R-APDRP Part A, an amount of Rs.417 Crore for Information Technology

implementation in 100 towns and Rs.182.17 Crore for SCADA/DMS (Supervisory

Control and Data Acquisition System/Distribution Management System) implementation

in 7 towns have been sanctioned. The objective of Part A implementation is to achieve

reliable and verifiable baseline data system in all towns with population greater than

30,000 as per 2001 census (10,000 for Special Category States). The installation of

SCADA/DMS for towns with population greater than 4 lakhs and annual input energy

greater than 350 MU is also envisaged under Part-A.

6.30. TANGEDCO has submitted that 100% loan is provided under R-APDRP for

Part-A projects, which shall be converted to grant on completion and verification of the

same by Third Party Independent Evaluating agencies (TPIEA) appointed by

MoP/Nodal Agency.

Page 28: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 28 of 52

6.31. Detail Project Reports (DPRs) for Part A-Information Technology implementation

have been sanctioned on February 27, 2009 for 27 towns amounting to Rs. 70.04 Crore

and on June 30, 2009 for 83 towns amounting to Rs. 346.96 Crore. DPRs for Part A-

SCADA implementation have been sanctioned on December 8, 2010 amounting to Rs.

182.17 Crore.

6.32. The Commission notes that as per sanction, Part A projects are to be completed

within 3 years from the date of sanction for getting the loan converted into grant.

Further, the extension had been given up to June 30, 2016 in the 6th meeting of the

Monitoring Committee for implementation of IPDS held on December 10, 2015.

Subsequently, the completion date has been further extended up to March 31, 2017 in

the 8th meeting of Monitoring Committee of IPDS implementation held on July 26, 2016.

6.33. As regards the present status of Part A-Information Technology implementation,

the Petitioner submitted that out of 110 towns, 102 towns have been made “Go Live”

and the balance 8 towns are proposed to be made “Go Live” in phases.

6.34. As regards the present status of implementation of Part A-SCADA

implementation, the Petitioner submitted that SCADA/DMS Control Centre equipments

have been commissioned in all the 7 towns, viz., Chennai, Madurai, Salem, Trippur,

Tirunelveli, Trichy and Coimbatore. SCADA/DMS including field equipments, viz., Sub-

station RTU (Remote Terminal Unit) and FRTU (Feeder Remote Terminal Unit) in

RMU’s (Ring Main Units) has been completed in Trichy and Tirunelveli. Installation and

Page 29: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 29 of 52

commissioning of SCADA equipments and DMS will be completed in the balance

towns.

6.35. Part B schemes include regular distribution strengthening works aimed at actual

and demonstrable performance in terms of reduction of AT&C losses in the project area

to less than 15% on a sustained basis for five years commencing one year after the

completion of Part A works besides reduction of AT&C losses for entire utility at 1.5%

per year. Successful completion within the schedule time for Part B schemes subject to

above condition will entitle TANGEDCO for conversion of 50% of the loan amount into

grant.

6.36. TANGEDCO submitted that Part A towns with baseline AT&C losses of above

15%, which is to be verified by a TPIEA, have been considered for implementation of

Part B schemes. Also, SCADA/DMS is implemented in seven towns and SCADA

enabling components like Ring Main Units and Sectionalisers required for this

implementation are proposed in Part B schemes.

6.37. Because of delay in establishment of baseline AT&C Losses, DPRs for 87 towns

were submitted and got sanctioned, based on computed AT&C losses of the respective

towns. However, after the establishment of baseline AT&C losses, Ministry of Power

(MoP), Government of India (GoI) cancelled the sanction for 24 towns. Further, 12 more

towns became eligible and DPRs for those towns were sanctioned by MoP, GoI.

MoP/GOI issued fresh guidelines for SCADA towns with baseline AT&C losses of less

than 15%, as eligible under Part B schemes for provision of only SCADA enabling

Page 30: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 30 of 52

components. Accordingly, DPRs for SCADA enablers only were got sanctioned in 5

towns, viz. Coimbatore, Madurai, Tiruchirapalli, Salem and Tiruppur. However, Board of

TANGEDCO accorded approval for execution of schemes covered in 24 towns

cancelled (Distribution Strengthening Works only). Subsequently, Monitoring Committee

of IPDS (R-APDRP subsumed) in its 8th Meeting held on July 26, 2016 has decided to

revoke cancellation of Part-B schemes for 9 out of 24 towns based on revalidated

baseline data, amounting to Rs. 363.61 Crore sanctioned value. Also, Part-B scheme

for SCADA enablers only in Salem for Rs. 28.12 Crore has been cancelled by

Monitoring Committee to avoid duplication, since Part-B schemes in full has been

reinstated for Salem for Rs. 296.29 Crore. Therefore, Part-B schemes are being

implemented in TANGEDCO in total 88 towns having a total sanction value of Rs.

2841.21 Crore. The cancellation of Part-B schemes in remaining 15 out of 24 towns has

been upheld by Monitoring Committee and GoI and upfront amount (15% of sanctioned

cost) received towards these towns of Rs. 109.42 Crore along with accrued interest

shall be refunded or adjusted from future releases from GoI / Counterpart funding of

PFC.

6.38. The Commission observes that the implementation of R-APDRP has been

delayed. This delay has in turn led to delay in improvement of distribution

network and services. Hence, the Commission is of view that TANGEDCO should

take proactive measures to ensure the timely implementation of R-APDRP Part A

and Part B projects. The Commission, for the purpose of approval of Capital

Investment Plan, has considered the Capital expenditure as proposed by the

Petitioner, subject to the condition that the Petitioner shall adhere to time lines

Page 31: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 31 of 52

proposed for implementation. Any variation in case of actual capital expenditure

shall be taken into account at time of True-up for respective year.

6.39. The Petitioner has taken up certain works under IPDS, funded by MoP, GoI,

which is implemented with the objectives of 24x7 Power supply for all, reduction of

AT&C Losses, and electrification of all urban households. The scope of IPDS includes

strengthening of sub-transmission and distribution network, metering of feeders,

boundary points, Distribution Transformers and to all consumers, completion of missing

links under the establishment of National Optical Fiber Network (NOFN), and provision

of Solar panels in Government building and Net Metering. The funding for such works

has been considered as upfront grant of 60% by MoP, GoI, lending from Financial

Institutions of 30% and utility own funds of 10%.

6.40. TANGEDCO submitted that Detailed Project Reports (DPRs) of 37 Nos. of

distribution strengthening works including metering and roof top solar panels covering

522 towns across 37 Nos. EDC for a total value of Rs.1561.31 Crore were submitted to

M/s. Power Finance Corporation Ltd. (PFC). Formal sanction letter has been issued by

PFC on March 7, 2016 and accordingly the schemes have to be completed within 30

months, i.e., by September 6, 2018. Accordingly, the Tripartite Agreement was

executed between PFC, MoP, GoI and TANGEDCO in respect of implementation of

IPDS on July 19, 2016.

6.41. As per guidelines, a Project Management Agency (PMA) is to be appointed to

assist TANGEDCO in project management. The Grant component of about Rs.7.80

Page 32: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 32 of 52

Crore (0.5% of Rs.1561.31 Crore) is also sanctioned by MoP, GoI. The Price bid was

opened on December 15, 2016 and negotiation is under process. The Petitioner

submitted the summary of Project cost for IPDS as shown in the following Table:

Table 9: Summary of Project Cost for IPDS

Sr.

No. Particulars Unit

Quantity

(Nos.)

Project Cost

(Rs. Crore)

1 New 33/11 kV Sub-stations Nos. 55 120.36

2 Additional Transformer at 33/11 kV Sub-stations Nos. 18 22.76

3 Transformer capacity enhancement at 33/11 kV SS Nos. 18 14.33

4 Renovation & Modernisation of 33/11 kV Sub-

stations Nos. 1 0.30

5 New 33 kV new feeders/Bifurcation of feeders Kms 461.28 36.90

6 33 kV feeders Reconductoring/Augmentation Kms 0.50 0.26

7 33 kV Line Bay Extension at EHV Sub-stations Nos 6 1.81

8 22/11 kV Line: New Feeder/ Feeder Bifurcation Kms 3839.85 273.29

9 11 kV Line: Augmentation/Reconductoring Kms 25.96 4.07

10 Arial Bunched Cable Kms 249.48 22.96

11 Underground Cable Kms 518.27 136.20

12 11 kV Bay Extension Kms 59 8.91

13 Installation of Distribution Transformers Nos. 392 12.10

14 LT Line: New Feeder/ Feeder Bifurcation Kms 2149.17 104.80

15 LT Line: Augmentation/ Reconductoring Kms 2701.80 89.35

16 Capacitor Bank Nos. 78 19.88

17 High Voltage Distribution System (HVDS) Nos. 14833 327.57

18 Metering Nos. 2315114 345.16

19 Provisioning of Solar panel Nos. 1972 13.80

20 Others (Provision for new street light switch point,

DPs, Railway Crossing etc.,) Lot 6.51

21 Grand Total

1,561.31

6.42. The Commission has scrutinised the circle-wise Capital expenditure

proposed by the Petitioner for IPDS schemes and finds it appropriate considering

the scope and time lines of work proposed by the Petitioner. Considering the

past experience of the Petitioner regarding the implementation of R-APDRP

works, the Commission is of view that TANGEDCO should take proactive

measures to ensure the timely implementation of IPDS schemes. The

Commission, for the purpose of approval of Capital Investment Plan, has

considered the Capital expenditure as proposed by the Petitioner, subject to the

Page 33: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 33 of 52

condition that the Petitioner shall adhere to time lines proposed for

implementation. Any variation in actual capital expenditure shall be taken into

account at time of True-up for respective year.

6.43. GoI has launched (Deendayal Upadhyaya Gram Jyoti Yojana) DDUGJY for the

rural areas with separation of agriculture and non-agriculture feeders and strengthening

and augmentation of sub-transmission and distribution.

6.44. For rural electrification, the approval for scheme cost of Rs. 43,033 Crore has

been accorded, including budgetary support of Rs. 33, 453 Crore from GoI during the

entire implementation period for all States. DDUGJY scheme is proposed in 27 Districts

covering 29 Nos. of EDC. District Electricity Committee (DEC) has been formed for all

the 27 Districts. The Government of Tamil Nadu (GoTN) has been addressed to

constitute the State Level Standing Committee for the DDUGJY scheme.

6.45. As regards the progress of implementation, the Petitioner submitted that 108

nos. of new 33/11 kV Sub-stations had been proposed under DDUGJY. The

administrative approval has been accorded for 39 nos., and work has been handed

over to General Construction Circle (GCC) for execution. CEs/Distn. and SEs/EDC

have been asked to acquire land and submit proposal for sanction for the 69 nos.

proposed under DDUGJY.

Further, enhancement of 123 nos. of Power Transformers is proposed under

DDUGJY, out of which, 4 nos. have not been taken into account because of inadequate

Power Transformer Capacity. Out of remaining 119 nos., Sanction had been accorded

Page 34: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 34 of 52

for 86 nos. and work handed over to GCC for execution. CEs/Distn. and SEs/EDC have

been asked to submit proposal for sanction for the 33 nos. proposed under DDUGJY.

6.46. Further, the replacement of Electro-mechanical (EM) meters, Rural electrification

and feeder segregation works are under progress. A consolidated administrative

approval has been accorded by the Board for the components covered under DDUGJY.

6.47. The Commission has scrutinised the circle-wise Capital Expenditure

proposed by the Petitioner for DDUGJY schemes and finds it appropriate

considering the scope and timelines of work proposed by the Petitioner. The

Commission, for the purpose of approval of CIP, has considered the Capital

expenditure as proposed by the Petitioner, subject to the condition that the

Petitioner shall adhere to time lines proposed for implementation. Any variation

in case of actual capital expenditure shall be taken into account at time of True-

up for respective year.

6.48. Further as regards the other capital works proposed by the Petitioner, the

Commission has duly scrutinised the scheme-wise details and approved the Capital

expenditure and capitalisation for the Control Period. In line with the approach adopted

in past Order, the Commission has not considered the capital expenditure towards

DCW.

6.49. The Commission took note of the submissions made by the petitioner for higher

capitalisation for distribution function for the FY 2016-17 and has taken into

Page 35: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 35 of 52

consideration the provision made by the Petitioner.

6.50. The complete distribution circle-wise abstract of the capital expenditure and

capitalisation proposed by the Petitioner and approved by the Commission is shown in

the Tables below:

Table 10: Approved Capital Expenditure for Distribution Function for FY 2016-17 to FY 2018-19

(Rs. Crore)

Sl.

No. Name of the Circles

Estimated

Cost

Petition Approved by the Commission

FY 2016-

17

FY

2017-18

FY

2018-19

FY

2016-17

FY

2017-18

FY 2018-

19

I Region: Chennai

North

1 Chennai Central 406.02 204.10 108.22 93.70 198.40 108.22 93.70

2 Chennai West 145.02 99.34 27.18 18.50 99.34 27.18 18.50

3 Chennai North 214.94 122.11 58.16 34.67 122.11 58.16 34.67

Sub total 765.98 425.55 193.56 146.87 419.85 193.56 146.87

II Region: Chennai South

4 Chennai South 981.30 916.39 39.51 25.40 866.39 39.51 25.40

5 Kancheepuram 378.31 114.86 147.90 115.55 113.90 146.40 113.95

6 Chengalpattu 424.11 147.28 137.54 139.29 147.28 137.54 139.29

Sub total 1,783.72 1,178.53 324.95 280.24 1,127.57 323.45 278.64

III Region: Coimbatore

7 Coimbatore Metro 295.36 213.11 39.50 42.75 181.54 32.00 34.25

8 Coimbatore North 189.35 109.60 39.88 39.87 100.42 34.88 33.87

9 Coimbatore South 198.41 94.19 58.50 45.72 81.46 53.50 39.72

10 Tiruppur 319.52 132.50 96.00 91.02 113.91 86.00 79.02

11 Udumalpet 200.16 110.37 45.00 44.79 98.80 38.00 36.79

12 Nilgiris 88.64 38.37 30.85 19.42 37.73 30.35 18.42

Sub total 1,291.44 698.14 309.73 283.57 613.86 274.73 242.07

IV Region: Erode

13 Erode 388.85 214.74 143.77 30.34 201.28 131.61 19.24

14 Gobi 210.94 99.52 70.59 40.83 97.08 68.09 37.98

15 Mettur 224.62 97.45 69.62 57.55 90.25 63.97 54.55

16 Salem 303.37 126.39 102.41 74.57 119.96 95.83 67.33

17 Namakkal 265.17 87.78 101.48 75.91 71.79 93.75 71.00

Sub total 1,392.95 625.88 487.87 279.20 580.36 453.25 250.10

V Region: Madurai

18 Sivaganga 275.59 111.49 106.58 57.52 99.49 94.58 45.52

19 Theni 103.54 52.35 30.95 20.24 51.81 30.95 20.24

20 Madurai Metro 374.19 238.46 35.17 100.56 238.46 35.17 100.56

21 Ramnad 41.85 21.35 10.25 10.25 21.35 10.25 10.25

22 Dindigul 210.23 175.47 29.96 4.80 174.33 29.96 4.80

Page 36: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 36 of 52

Sl.

No. Name of the Circles

Estimated

Cost

Petition Approved by the Commission

FY 2016-

17

FY

2017-18

FY

2018-19

FY

2016-17

FY

2017-18

FY 2018-

19

23 Madurai 141.42 113.40 2.42 25.60 113.40 2.42 25.60

Sub total 1,146.82 712.52 215.33 218.97 698.84 203.33 206.97

VI Region: Tirunelveli

24 Virudhunagar 100.99 42.82 39.99 18.18 42.82 39.99 18.18

25 Tirunelveli 316.15 207.45 70.84 37.86 196.95 70.84 37.86

26 Kanyakumari 223.23 113.73 71.16 38.34 98.73 55.16 21.34

27 Tuticorin 107.61 58.79 21.43 27.39 58.79 21.43 27.39

Sub total 747.98 422.79 203.42 121.77 397.29 187.42 104.77

VII Region: Trichy

28 Trichy Metro 240.21 121.00 76.31 42.90 121.00 76.31 42.90

29 Thiruvarur 123.73 53.69 39.17 30.87 50.75 36.23 27.93

30 Karur 110.39 64.13 36.48 9.78 63.62 36.48 9.78

31 Pudukkottai 305.74 134.55 99.83 71.36 104.55 90.33 63.86

32 Perambalur 95.16 57.97 27.79 9.40 57.97 27.79 9.40

33 Thanjavur 132.73 77.72 40.61 14.40 77.72 40.61 14.40

34 Nagapattinam 324.90 160.98 132.42 31.50 159.69 131.45 30.56

Sub total 1,332.86 670.04 452.61 210.21 635.30 439.20 198.83

VIII Region: Vellore

35 Vellore 242.55 89.21 98.04 55.30 81.21 89.04 45.30

36 Tirupattur 173.24 75.72 61.72 35.80 73.22 58.52 32.50

37 Dharmapuri 235.94 102.17 76.15 57.62 98.42 72.15 52.87

38 Krishnagiri 295.93 99.03 104.80 92.10 99.03 104.80 92.10

Sub total 947.66 366.13 340.71 240.82 351.88 324.51 222.77

IX Region: Villupuram

39 Cuddalore 589.26 202.80 206.86 179.60 200.55 204.36 176.85

40 Thiruvannamalai 281.57 91.77 138.18 51.62 91.77 138.18 51.62

41 Villupuram 252.73 95.22 93.51 64.00 94.61 93.51 64.00

42 Kallakurichi 161.82 87.75 49.66 24.41 86.48 48.27 22.87

Sub total 1,285.38 477.54 488.21 319.63 473.41 484.32 315.34

Grand total 10,694.79 5,577.12 3,016.39 2,101.28 5,298.36 2,883.77 1,966.36

Table 11 Approved Capitalisation for Distribution Function for FY 2016-17 to FY 2018-19 (Rs.

Crore)

Sl.

No. Name of the Circles

Petition Approved by the Commission

FY

2016-17

FY

2017-18

FY

2018-19

FY

2016-17

FY

2017-18

FY

2018-19

I Region: Chennai North

1 Chennai Central 199.32 106.82 90.51 193.62 106.82 90.51

2 Chennai West 97.00 27.67 18.50 97.00 27.67 18.50

3 Chennai North 118.71 57.71 35.29 118.71 57.71 35.29

Sub total 415.03 192.20 144.30 409.33 192.20 144.30

II Region: Chennai South

4 Chennai South 906.61 45.34 26.81 856.61 45.34 26.81

5 Kancheepuram 103.38 144.59 120.53 102.52 143.14 118.78

6 Chengalpattu 134.67 137.53 138.69 134.67 137.53 138.69

Page 37: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 37 of 52

Sl.

No. Name of the Circles

Petition Approved by the Commission

FY

2016-17

FY

2017-18

FY

2018-19

FY

2016-17

FY

2017-18

FY

2018-19

Sub total 1,144.66 327.46 286.03 1,093.80 326.01 284.28

III Region: Coimbatore

7 Coimbatore Metro 209.93 38.73 43.40 178.96 31.38 34.15

8 Coimbatore North 106.41 39.48 41.66 97.73 34.48 35.16

9 Coimbatore South 91.31 55.53 49.54 79.08 50.53 43.04

10 Tiruppur 125.72 93.18 95.92 107.93 83.38 82.92

11 Udumalpet 108.09 42.78 46.99 97.02 35.98 38.29

12 Nilgiris 36.40 30.93 21.04 35.81 30.43 19.99

Sub total 677.86 300.63 298.55 596.53 266.18 253.55

IV Region: Erode

13 Erode 193.76 157.04 36.66 181.55 144.85 24.34

14 Gobi 90.60 72.75 44.73 88.38 70.28 41.63

15 Mettur 88.22 71.87 60.72 81.73 66.08 57.15

16 Salem 116.08 105.60 76.16 110.25 99.08 68.26

17 Namakkal 79.68 99.44 79.26 65.09 91.08 73.58

Sub total 568.34 506.70 297.53 527.00 471.37 264.96

V Region: Madurai

18 Sivaganga 102.86 109.34 59.78 92.06 97.34 46.58

19 Theni 49.24 30.96 23.34 48.70 30.96 23.34

20 Madurai Metro 236.24 37.39 90.50 236.24 37.39 90.50

21 Ramnad 20.32 10.25 10.28 20.32 10.25 10.28

22 Dindigul 172.02 31.59 6.14 170.88 31.59 6.14

23 Madurai 113.16 2.66 25.60 113.16 2.66 25.60

Sub total 693.84 222.19 215.64 681.36 210.19 202.44

VI Region: Tirunelveli

24 Virudhunagar 40.97 40.18 18.85 40.97 40.18 18.85

25 Tirunelveli 200.66 72.78 40.98 190.16 72.78 40.98

26 Kanyakumari 106.36 74.90 39.84 92.86 59.00 21.24

27 Tuticorin 54.31 24.22 28.12 54.31 24.22 28.12

Sub total 402.30 212.08 127.79 378.30 196.18 109.19

VII Region: Trichy

28 Trichy Metro 116.15 76.03 45.86 116.15 76.03 45.86

29 Thiruvarur 49.96 39.55 31.96 47.31 36.61 28.73

30 Karur 59.87 38.78 11.74 59.36 38.78 11.74

31 Pudukkottai 123.15 104.24 72.35 96.15 92.69 63.90

32 Perambalur 56.42 28.10 9.89 56.42 28.10 9.89

33 Thanjavur 71.53 43.53 16.87 71.53 43.53 16.87

34 Nagapattinam 144.88 138.92 40.24 143.72 137.92 39.20

Sub total 621.96 469.15 228.91 590.64 453.66 216.19

VIII Region: Vellore

35 Vellore 81.74 100.59 55.82 74.54 91.69 44.92

36 Tirupattur 69.64 64.49 36.07 67.39 61.36 32.45

37 Dharmapuri 93.74 78.22 59.02 90.37 74.24 53.87

38 Krishnagiri 91.20 104.64 90.88 91.20 104.64 90.88

Sub total 336.32 347.94 241.79 323.50 331.93 222.12

IX Region: Villupuram

Page 38: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 38 of 52

Sl.

No. Name of the Circles

Petition Approved by the Commission

FY

2016-17

FY

2017-18

FY

2018-19

FY

2016-17

FY

2017-18

FY

2018-19

39 Cuddalore 182.51 207.92 192.46 180.49 205.44 189.46

40 Thiruvannamalai 87.51 137.28 52.08 87.51 137.28 52.08

41 Villupuram 87.51 94.92 63.90 86.90 94.92 63.90

42 Kallakurichi 80.63 54.56 24.34 79.49 53.18 22.66

Sub total 438.16 494.68 332.78 434.39 490.82 328.10

Grand total 5,298.47 3,073.03 2,173.32 5,034.85 2,938.54 2,025.13

6.51. The Commission notes that the investment proposals submitted by the

petitioner for the distribution function for FY 2017-18 and FY 2018-19 is

comparatively lesser than that stated for the FY 2016-17 and the Commission has

taken into consideration the provision made by petitioner. However, it is the

responsibility of the Petitioner to ensure that an efficient distribution system is

developed and maintained and that non-provision of capital expenditure shall not

be cited as a reason for not achieving the targeted distribution loss levels and

other key performance indicators.

6.52. Further, the Commission directs the Petitioner shall maintain the record for

the scheme-wise actual capital expenditure incurred and actual capitalisation

done for each Distribution Circle/Zone separately and submit the same to the

Commission at the time of the next Tariff Petition. The Commission will approve

the actual Capital expenditure and actual capitalisation based on these

information, subject to prudence check.

6.53. The Petitioner has submitted the scheme-wise cost benefit analysis for existing

Generating Stations. The schemes proposed for existing Generating Stations are

intended to improve and retain the performance of Thermal Generating Stations. It is

Page 39: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 39 of 52

noted that Hydro stations have also served out their useful life and Petitioner has

proposed to take up Renovation, Modernisation and Upgradation works at Moyar power

house, Periyar power house, Kodayar power house and Sholayar power house. These

works are generally to avoid loss of generation/improved generation. For Gas stations,

the materials released during Combustion Inspection and Hot gas path inspection have

been refurbished for future use, cost of which is less than the original cost of the item.

Repair cost is not only economical but also ensures spares are available.

The new capacity addition has been taken up by the Petitioner considering the

increasing demand and projected increase in the demand-supply gap.

6.54. The Petitioner has submitted the scheme-wise cost benefit analysis for the

Distribution function. The Petitioner has submitted the intangible benefits towards the

proposed Capital works such as reduction of AT&C losses, to ensure reliability of

supply, towards system strengthening, to meet the load growth, to reduce HT:LT ratio,

to relieve higher loading of distribution transformer, to reduce the outage time and

enhance operation flexibility, to improve the metering and accurate recording of

consumption and to avoid the human errors, augmentation of current carrying capacity

of conductor, easy identification of fault and avoid electrical accidents, easy isolation of

11 kV faults and avoiding loss in consumption, improvement in power factor, to improve

voltage regulation, voltage stability and VAR compensation, etc. In view of the above,

though the Commission appreciates that the Petitioner’s primary duty is to ensure

reliable power supply to all categories of consumers, the Utility shall also ensure that it

is done in the most economical way.

Page 40: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 40 of 52

6.55. The Petitioner in its CIP Petition has not proposed any funding for the capital

works proposed for the existing Generating Stations. The Commission directs the

Petitioner to ensure that the financial assistance is tied up for proposed schemes.

6.56. The Commission has not considered the Capital Expenditure for New Generating

projects for recovery through tariff. Hence, the funding of the same shall be considered

at time of approval of capital cost and tariff for the respective Generating Stations in line

with the provisions of the Tariff Regulations.

6.57. Most of the schemes are being executed as funded schemes of MoP, GoI.

Balance schemes are being executed through loan from Financial Institutions or the

Petitioner’s own funds. In the foregoing circumstances, the Petitioner needs to ensure

that the financial assistance is tied up for proposed schemes.

6.58. Summary of CIP for FY 2016-17 to FY 2018-19

TANGEDCO has submitted Capital Expenditure of Rs. 4,755.46 Crore, Rs. 16,094.31

Crore and Rs. 18,379.05 Crore for its Generation function for FY 2016-17, FY 2017-18

and FY 2018-19, respectively. Similarly, for Distribution function, it has submitted

Capital Expenditure of Rs. 5,577.12 Crore, Rs. 3,016.39 Crore and Rs. 2,101.38 Crore

for FY 2016-17, FY 2017-18 and FY 2018-19, respectively.

Based on the approval of Capital Expenditure and Capitalisation as discussed in

foregoing paras of this Order, the summary of approval of CIP is given in the following

Tables:

Page 41: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 41 of 52

Table 12: Approved Capital Expenditure for the Control Period from FY 2016-17 to FY 2018-19

(Rs. Crore)

Table 13: Approved Capitalisation for the Control Period from FY 2016-17 to FY 2018-19 (Rs.

Crore)

6.59. Commission’s Directives

(a) The Commission directs the Petitioner to maintain the record of the scheme-wise

actual capital expenditure incurred and actual capitalisation done for each Generating

Station separately and submit the same to the Commission at the time of next Tariff

Petition. The Commission will approve the actual Capital expenditure and actual

capitalisation based on these information, subject to prudence check.

(b) The Commission directs the Petitioner for file the Petitions for approval of

Sl.

No. Particulars

FY 2016-17 FY 2017-18 FY 2018-19

Petition

Approved

by the

Commission

Petition Approved by

the Commission Petition

Approved

by the

Commission

1 Generation 4,755.46 543.16 16,094.31 1,050.53 18,379.05 1,286.48

2 Distribution 5,577.12 5,298.36 3,016.39 2,883.77 2,101.28 1,966.36

3 Total 10,332.58 5,841.52 19,110.70 3,934.30 20,480.33 3,252.84

Sl.

No. Particulars

FY 2016-17 FY 2017-18 FY 2018-19

Petition

Approved

by the

Commission

Petition

Approved

by the

Commission

Petition

Approved

by the

Commission

1 Generation 1,435.49 207.26 1,839.23 1,109.51 7,217.16 1,210.58

2 Distribution 5,298.47 5,034.85 3,073.03 2,938.54 2,173.32 2,025.13

3 Total 6,733.96 5,242.11 4,912.26 4,048.05 9,390.48 3,235.71

Page 42: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 42 of 52

provisional tariff for new Generation projects in line with the provisions of the Tariff

Regulations. The Commission will take a final view on the time overrun and related cost

overrun and IDC component for individual projects, after the new generation projects

are commissioned, and the actual audited capital cost including IDC are submitted to

the Commission with due justification for the increase in capital cost.

(c) The Commission directs the Petitioner to maintain the record of the scheme-wise

actual capital expenditure incurred and actual capitalisation done for each Distribution

Circle/Zone separately and submit the same to the Commission at the time of next

Tariff Petition. The Commission will approve the actual Capital expenditure and actual

capitalisation based on these information, subject to prudence check.

7. Appeal

An appeal against this Order shall lie before the Appellate Tribunal for Electricity

under section 111 of the Electricity Act, 2003 within a period of 45 days from the date of

receipt of a copy of this Order by the aggrieved person.

(Sd…..)

(Dr. T. Prabhakara Rao) Member

(Sd….) (G. Rajagopal)

Member

(Sd….) (S. Akshayakumar)

Chairman

/ True Copy / Secretary Tamil Nadu Electricity Regulatory Commission

Page 43: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 43 of 52

APPENDIX – I

STAKEHOLDERS’ COMMENTS, TANGEDCO’S REPLY

The following Section summarizes the key views/ objections/ suggestions and requests made by

stakeholders on the Capital Investment Plan (CIP) of TANGEDCO on the basis of the Hearing

held by the Commission on January 5, 2017. These include submissions received in writing as

well as submissions received and observations made at the Public Hearing. The Commission, in

order to accommodate maximum responses to the Public Notice had allowed the time for

submission of written comments till January 20, 2017.

In this Section, the Commission has addressed the views expressed by the stakeholders at a

single place. All comments received from the stakeholders by the Commission have been

provided to TANGEDCO, soliciting their responses. The responses so received have been

included under the relevant heads. Therefore, each view has been considered by the Commission

and appropriately addressed in this Order.

Regulatory Process

Stakeholder Comments

It is stated in the affidavit that the Chief Financial Controller (CFC) is well acquainted with the

facts of the case from records and is authorized to file the Petition. The Petition deals with

projects on the technical side of TANGEDCO whereas the CFC may be familiar with finance

and accounts. Hence, the CFC’s affidavit may not reflect the true situation.

The Petition for approval of the Capital Investment Plan (CIP) for FY 2014-15 and FY 2015-16

is still pending with the Commission. Hence, the filing of the present Petition may not be

appropriate as the previous CIP has not been approved by the Commission.

TANGEDCO’s Reply

TANGEDCO submitted that the projections for the CIP for FY 2016-17, FY 2017-18 and FY

2018-19 for Generation, Distribution and Projects is received in the office of (O/o) of

Page 44: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 44 of 52

CFC/Regulatory Cell from the concerned circles. Then, the projections are scrutinised by both

Technical and Accounts wings functioning in the O/o of CFC/Regulatory Cell. After detailed

clarifications and discussions with the concerned circles, the CIP has been filed along with

relevant particulars in line with Regulation 17 of the TNERC Tariff Regulations, 2005 and

Regulation 3(v) of the TNERC MYT Regulations, 2009, for its approval.

As regards the comment on the pending CIP for FY 2014-15 and FY 2015-16, the Commission

has approved the CIP for FY 2014-15 and FY 2015-16 filed in M.P.No.39 of 2012.

Capital Investment Plan

Stakeholder Comments

The Petition has no mention about the huge outstanding loan of Rs. 82,444.24 Crore till FY

2015-16.

The Petition envisages abnormal capital expenditure amounting to Rs. 1,34,883.40 Crore, which

is not commensurate with the year-wise investment from FY 2016-17 to FY 2017-18 (FY 2018-

19). The proposed capital expenditure project cost in the Petition does not tally with the year-

wise expenditure, i.e., the year-wise thermal and hydro power projects expenditure works out to

Rs. 3,35,004.28 Crore, whereas the estimated cost is shown as Rs. 1,19,964.07 Crore. Further,

there is no mention about the source of funding for this huge investment in the Petition.

The project completion period being followed at present is 40 months, whereas the Petition

states the same as 84 months upto FY 2021-22.

The entire CIP now proposed by TANGEDCO is aimed solely at getting relief from the financial

crisis. For this reason, it is presumed that TANGEDCO is in a critical financial condition and has

proposed an exaggerated plan outlay exceeding the existing loan of more than Rs. 82,000 Crore.

TANGEDCO has a bad and illegal habit of obtaining huge loans even without getting proper

approval from the Commission. The Commission also remains a silent spectator to the offenses

committed by TANGEDCO for years together, which has caused a great damage not only to the

financial status of TANGEDCO but has also caused the collapse of the economy of Tamil Nadu.

The above aspects of abuse of managerial functions by TANGEDCO has been proved by the

performance of TANGEDCO during FY 2015-16 in which period, TANGEDCO was capable

enough to bring down the annual loss to around Rs. 5,000 Crore from the previous period losses

of more than Rs. 13,000 Crore per annum.

Page 45: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 45 of 52

TANGEDCO’s Reply

TANGEDCO submitted that the projections for the CIP for FY 2016-17, FY 2017-18 and FY

2018-19 for Generation, Distribution and Projects, is received in the O/o of CFC/Regulatory Cell

from the concerned circles. Then, the projections are scrutinised by both Technical and Accounts

wing functioning in the O/o of CFC/Regulatory Cell. After detailed clarifications and discussion

with the concerned circles, the CIP has been filed along with relevant particulars in line with

Regulation 17 of the TNERC Tariff Regulations, 2005 and Regulation 3(v) of TNERC MYT

Regulations, 2009 for the Commission’s approval.

TANGEDCO submitted that while indicating the year-wise projections for FY 2016-17, FY

2017-18 and FY 2018-19 for all the capital works for Generation, Distribution and Projects, the

total estimated cost of the capital works and the source of funding is also required to be

indicated, as per the format prescribed by the Commission. Accordingly, the total estimated cost

of the works/project is distributed in the years under review in proportion to the probable

progress and capitalisation of capital works to be achieved, by duly mentioning the source of

funding in the Remarks column. Some of the projects started in the preceding years will spill-

over into the years under review and some of the new projects that will commence in the year

under review will be completed within or beyond FY 2018-19. Hence, the total estimated cost

and the year-wise projections will be commensurate only when the new projects discussed in the

Petition are started and completed within FY 2016-17, FY 2017-18 and FY 2018-19 under

review without any addition or deletion in the scope of capital works during the execution

period.

TANGEDCO submitted that it has sought the Commission’s approval only for the projected

year-wise capital expenditure and capitalisation for FY 2016-17, FY 2017-18 and FY 2018-19

for Generation, Distribution and Projects out of total estimated cost of the capital works.

TANGEDCO submitted that under normal conditions, the stipulated completion period for the

thermal power projects (i.e., 500 MW and above) is between 39 to 42 months from the date of

award of the EPC contract. This has been clearly indicated in Booklet-I of the Petition for some

of the EPC contracts already awarded. Some of the projects to be awarded in the years under

review will be awarded and completed within or beyond FY 2018-19. Hence, it may not be

construed that the project completion period for those projects will be 84 months upto

FY 2021-22.

Page 46: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 46 of 52

Generation Projects

Stakeholder Comments

At present, Basin Bridge Gas Turbine Power Station (BBGTPS) is operated in open cycle mode,

resulting in wastage of heat. Instead of cheap natural gas, expensive naphtha is used as fuel. Due

to these reasons, the power generated from this power station is costly and finds a place in the

bottom of the merit order dispatch, and hence, this Power Station is seldom put into service. If

this Power Plant is upgraded as a combined cycle power plant, the exhaust gas from the turbine

can be further used to generate steam and additional power at the same cost of fuel. A proposal

to upgrade BBGTPS as combined cycle power plant should be included in the CIP. The existing

old dilapidated power house building may be demolished, if additional space for the upgradation

is required.

Naphtha is costly. A Gas Company like HPCL, who supplied fuel to erstwhile GMR IPP in the

same area, may be able to supply gas to BBGTPS. If the Power Station is upgraded to a

combined cycle power plant and gas is made available, the power from this station will become

cheaper and it will advance in the merit order list. The power from this power plant will be very

useful to supply power to Chennai City, as 230 kV transmission lines to the city substations got

damaged during the recent 'Vardha’ cyclone.

At present, TANGEDCO has the capability to generate thermal energy at the rate of

approximately Rs. 3 per unit. At the same time, the private generators are not capable enough

and experienced to generate thermal energy at less than Rs. 5.50 per unit. Because of the

incapability, huge quantity of coal is being wasted leading to loss of national wealth.

TANGEDCO may consider acquiring such high cost private thermal stations, thereby it can

enjoy a great relief in the expenditure towards purchase of high cost power from the private

thermal power generators.

The staggering of power supply by load shedding in the substations of TANGEDCO is being

continued (maintaining three-phase supply for 14 hours and two-phase supply for 10 hours) as

addition of generation capacity during the 1980’s and 1990’s was meagre as compared to the

growth and therefore generating capacity is not sufficient to meet the increasing demand. The

peak load of 15,343 MW on April 29, 2016 is only a restricted demand. Supplying three-phase

power supply on 24x7 could be possible only if the on-going projects are expedited on war-

footing, if everything goes as projected in the CIP.

Page 47: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 47 of 52

Completion Reports should be closed for power generation plants. Penalties are not levied for

incomplete projects. This violation looms large in the case of EPC contracts, for e.g., the same

EPC contractor was awarded the 600 MW Mettur Thermal Power Station despite the debacle of

Valuthur Phase II (92 MW) power plant.

For Thermal Power Projects, avoidance of cost and time overruns, capacity addition, and growth

in net profit should be benchmarked. The practice of putting a CE/Civil in charge of projects

should be dispensed with.

Spinning Reserves, Equivalent Strategic Petroleum Reserve, Liquidity and Solvency are to be

maintained according to norms. Incursion of renewables (mainly wind energy) into the grid with

must-run status has led to backing down of thermal power stations, which hinders the merit order

(economic) dispatch operations. The base load power plants are not designed for operational

flexibility as they cannot be scaled back quickly and are inefficient at lower loads. This technical

specification is not indicated to the generating Units by designers and manufacturers for the

upcoming thermal projects.

TANGEDCO’s Reply

As regards BBGTPS, TANGEDCO submitted that the existing 4x30 MW Units utilize naphtha

as fuel and normally, two Units are put in synchronous condenser mode. The Units are seldom

used in Generation mode as per the requirements of State Load Despatch Centre (SLDC). Unit

III is under repair for the replacement of Compressor and Turbine casing at M/s. BHEL,

Hyderabad and is expected to be brought into service by the end of February 2017. All the three

Units are now in standby mode for generation mode / condenser mode of operation.

TANGEDCO clarified that as there is no natural gas connectivity available at Chennai presently,

the Units are running on naphtha with a variable cost of Rs. 15.79 per kWh. As regards the

comment on utilisation of natural gas, TANGEDCO submitted that M/s IOCL, Chennai has

proposed to install a new R-LNG terminal at Ennore by the end of 2018 and has agreed to supply

natural gas after regasification to BBGTPS by laying pipelines and sought the requirement for

generation. Accordingly, the required quantity of natural gas required for peak hour/base load

generation is furnished to M/s IOCL. Considering the present rate of 7.5 Dollars per MMBTU of

R-LNG, the approximate variable cost of generation for combined cycle would be Rs.4.61 per

kWh and for open cycle mode would be Rs.7.65 per kWh.

TANGEDCO also submitted that after getting confirmed allocation of R-LNG from M/s. IOCL

and analysing the cost of generation during that period of supply, proposal would be put up for

Page 48: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 48 of 52

the conversion of open cycle to combined cycle mode at BBGTPS with the cost of conversion of

120 MW open cycle plant into combined cycle plant of 180 MW at Rs. 360 Crore.

TANGEDCO submitted that the CIP for FY 2016-17, FY 2017-18 and FY 2018-19 for

Generation, Distribution and Projects has been filed in accordance with Regulation 17 of the

TNERC Tariff Regulations, 2005 and Regulation 3(v) of TNERC MYT Regulations, 2009 for

the Commission’s approval.

AT&C Losses

Stakeholder Comments

The line loss reported by the Ministry of Power based on the State Distribution Utilities annual

integrated rating was 21.7 % during FY 2013-14 and 24.4% in FY 2014-15, whereas,

TANGEDCO’s Petition states AT&C loss during FY 2012-13 as 18.4 % and same is claimed to

have been brought down to 17.96 % during FY 2015-16. Hence, the loss indicated in the Petition

is totally untrue and false.

The line loss assessed by TANGEDCO does not reflect the actual loss as considerable quantum

of energy consumed and losses are not metered for years together.

TANGEDCO has caused a huge loss of investment by the installation of metering arrangements

and Automatic Power Factor Correction (APFC) equipment in all the distribution transformers,

which remain a total waste as the same are not in use from the date of installation.

The measures to prevent theft of energy are not implemented properly to reduce the commercial

losses. Meter readings are not taken properly and the existing meters ought to be replaced with

static meters to quickly reduce loss of energy.

TANGEDCO’s Reply

TANGEDCO submitted that the CIP for FY 2016-17, FY 2017-18 and FY 2018-19 for

Generation, Distribution and Projects has been filed in accordance with Regulation 17 of the

TNERC Tariff Regulations, 2005 and Regulation 3(v) of TNERC MYT Regulations, 2009 for

the Commission’s approval.

As regards the line losses, TANGEDCO submitted that the line losses reported by the Ministry

of Power based on the State Distribution Utilities annual integrated rating during the year 2014

Page 49: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 49 of 52

and 2015 is inclusive of the transmission losses, while the AT&C losses in the distribution side

as indicated in the Petition by TANGEDCO excludes the transmission losses. TANGEDCO has

clearly submitted in the Petition that by implementing various schemes sponsored by the

MoP/GoI such as Restructured Accelerated Power Development and Reform Programme

(RAPDRP), Integrated Power Development Scheme (IPDS), Deendayal Upadhyaya Gram Jyoti

Yojana (DDUGJY), etc., the AT&C losses will be reduced to 15% by FY 2019-20.

As regards the utilisation of metering arrangements, TANGEDCO replied that the installation of

metering arrangements and APFC equipment in the distribution transformers under RAPDRP-

PART-B scheme in 88 towns is in progress and is expected to be completed by March 2017.

Demand Side Management and Distributed Generation

Stakeholder Comments

There is no mention in the Petition about Demand Side Management (DSM). TANGEDCO is

duty bound to educate the consumers about DSM. Though there is separate DSM Wing

functioning in TANGEDCO, the Wing remains a liability with its very poor performance.

TANGEDCO should provide solar panels at the consumer point, especially for independent

residential consumers with a reasonable capacity of about 0.5 KVA. By this process, the low

consuming services can store the electricity during day time in the battery of the inverter and the

stored energy can be utilized by the consumer during evening peak hours to curtail the evening

peak demand. This scheme may be implemented for a minimum of 20 lakh services at the rate of

about Rs. 40,000 per service. The entire cost of installation should be borne by TANGEDCO.

TANGEDCO’s Reply

TANGEDCO submitted that being one of the best Utilities in the country, it is a front-runner in

implementing cutting-edge concepts and has never lacked in educating the consumers about

DSM. TANGEDCO is very well aware of the fact that the Ministry of Power set up Bureau of

Energy Efficiency (BEE) at the Central level for implementing the provisions of the Energy

Conservation Act, 2001, which came into force with effect from March 1, 2002, and

TANGEDCO is spearheading the movement of energy conservation across the State by

implementing various measures listed below:

Page 50: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 50 of 52

i. The DSM Wing is already creating awareness through “EC Day and Week” programme

to the general public across the State during the month of December every year in all distribution

circles.

ii. The Energy Conservation Day/Week is usually arranged to be celebrated from December

14th

to 20th

across the State every year in a grand manner by organizing various events.

However, during 2015, the “National Energy Conservation Day and Week” could not be

celebrated in a grand manner due to torrential rains and flood, which wrecked the entire State

during the first week of December 2015 and it was a low-key affair and during 2016 due to State

mourning, the National Energy Conservation day/week celebrations were cancelled.

iii. As a permanent measure, the slogan on Energy Conservation, i.e., “Save Electricity” is

being sent as SMS to about 2.6 Crore consumers along with the SMS alerts for payment of CC

charges thereby instilling awareness from grass root level to higher echelons of society.

iv. Energy conservation tips along with other suggestions have been displayed on the web-

site of TANGEDCO. Energy conservation slogans have been printed in EB cards and Calendars.

v. The training wing of TANGEDCO emphasizes the need for Energy Conservation and

also propagates the usage of energy efficient lights and star rated equipments in all training

programmes/ workshops/ seminars conducted for school children and public throughout the year.

vi. Among the general public, targeting the student community who form the future

generation will yield long-lasting results to the Utility as well as to the nation. As known by the

common adage “Catch Them Young”, the concept of energy conservation if sown in the young

minds, will be carried forward throughout their life and to all places wherever they go. They will

also help to spread this message to all those with whom they interact without hesitation unlike

adults. Hence, the programme of Energy Conservation awareness to school students has been

initiated across the State through the officers of the distribution network from October 2014

onwards. About 10 lakh students have been addressed so far.

vii. Flex boards with the message of energy conservation have been erected at TANGEDCO

headquarters and EDC offices at Chennai.

viii. Seminar/talk/lecture on Energy Conservation for disseminating the knowledge and the

latest technical knowhow is being taken up for Central Government sectors, micro / small /

medium enterprises, private / public sector, MNCs and higher educational institutions.

ix. TANGEDCO widely propagates and monitors the directives issued vide GO.126 dated

November 10, 2008 and GO.95 dated August 2, 2012 to adopt energy conservation measures in

Page 51: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 51 of 52

all Government offices and buildings including Local Bodies, Public Sector Undertakings, etc.,

by using energy efficient lights and appliances stipulating the usage of LED lamps in locations

such as pathways, entrances, corridors, rest rooms, etc., of the buildings considering its

efficiency and life cycle cost.

x. TANGEDCO through Hello FM and Rainbow FM (radio programmes) has created

awareness among Chennai residents on issues related to general grievances, LT billing and

Energy Conservation during 2012.

xi. During 41st India Tourist and Industrial Fair 2014-15 at Island Grounds, Chennai,

TANGEDCO conducted a stage show (drama) named ‘Minsara Thiruvilayadal’ with the theme

of energy conservation awareness and theft of energy. The theme and script of the above show

was developed and performed by TANGEDCO’s officers/staff. The programme was performed

in four places successfully and reached more than 10,000 students and general public.

xii. TANGEDCO celebrated “Electricity Awareness Week” in all districts across the State

between 21st and 27

th of August 2012 with an aim to create awareness on electrical safety,

electricity theft and prevention and energy conservation by distributing a Handbook on the same.

Ujwal DISCOM Assurance Yojana (UDAY)

The decision of the Government of Tamil Nadu (GoTN) to join the Government of India’s

(GoI’s) UDAY on the condition that there would be no revision of tariff by TANGEDCO for

another two years and that the GoI would help TANGEDCO under UDAY to reduce the losses

incurred, is welcome.

CIP for each year of the MYT Control Period from FY 2016-17 to FY 2018-19 ought to be

modified incorporating the features of UDAY.

The UDAY scheme is not consistent with the CIP approved by the Commission. Further, under

the UDAY scheme, it has been stated that the tariff shall not be revised, which is inconsistent

with the Commission’s mandate to undertake suo-motu Tariff revision in case the Utility does

not file the Petition.

TANGEDCO’s Reply

TANGEDCO submitted that it is thankful for the suggestions to incorporate the features of

UDAY in the CIP and also the general comments on theft of energy, meter reading and

replacement of existing meters with static meters.

Page 52: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 52 of 52

TANGEDCO also submitted that the features of UDAY scheme in Tamil version is readily

available on TANGEDCO’s website, viz., www.tangedco.gov.in.

Page 53: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

FY 2016-17 FY 2017-18 FY 2018-19

Ennore Thermal Power Station - - - -

Tuticorin Thermal Power Station 904.64 84.20 265.60 466.10

Mettur Thermal Power Station - I 454.48 17.74 101.27 65.59

North Chennai Thermal Power Station - Stage - I 1,661.88 194.85 276.39 451.40

Mettur Thermal Power Station - II 145.33 34.20 31.03 20.00

North Chennai Thermal Power Station - Stage - II 98.29 5.67 1.00 65.00

A Thermal Power Stations 3,264.62 1,543.30 1,102.36 618.96 336.66 675.29 1,068.09

Kundah Generation Circle (843.65MW) 86.06 15.11 5.00 20.50

Tirunelveli Generation Circle (372.80MW) 174.08 30.49 5.00 45.00

Kadamparai Generation Circle (595.45MW) 160.50 30.86 33.78 68.81

Erode Generation Circle (483.50MW) 21.42 0.50 2.78 14.08

B Hydro Electric Power Stations 442.06 227.60 73.81 140.65 76.96 46.56 148.39

Valuthur Gas Turbine Power Station (187MW) 264.26 4.16 15.30 47.00

Thirumakkottai Gas Turbine Power Station (107.88MW) 168.52 6.53 125.99 22.00

Kuttalam Gas Turbine Power Station (101MW) 72.29 2.97 4.45 -

Basin Bridge Gas Turbine Power Station (120MW) 12.79 3.50 8.29 1.00

C Gas Turbine Power Stations 517.86 146.27 299.59 72.00 17.16 154.03 70.00

D Thermal Power Projects 108,303.75 - - -

E Hydro Electric Power Projects 11,660.32 112.38 174.66 -

DRIP Works under World Bank Funded 272.00 104.00 160.82 - 104.00 160.82 -

Bhavani Kattalai Barrage -II (2x15MW) 4.79 2.50 2.29 - 2.50 2.29 -

Bhavani Barrage -II (2x5MW) 17.43 5.88 11.55 - 5.88 11.55 -

Other Hydro projects 11,366.10 261.46 544.36 587.95 - - -

F Grand Total 124,188.61 4,755.46 16,094.31 18,379.05 543.16 1,050.53 1,286.48

FY 2016-17 FY 2017-18 FY 2018-19

Ennore Thermal Power Station - - - - - - -

Tuticorin Thermal Power Station 904.64 393.22 245.02 266.40 8.38 331.42 476.10

Mettur Thermal Power Station - I 454.48 217.61 127.67 109.20 3.08 113.77 57.75

North Chennai Thermal Power Station - Stage - I 1,661.88 483.24 260.82 917.82 128.07 191.17 323.40

2.53 4.81 14.08

44.80

155.80

75.03 25.50

13.48 15.32 69.49

15.11 25.00 45.95

174.08 - -

35.88 44.00 80.62

233.83 136.90 83.75

807.92 610.14 243.82

- - -

443.27 264.97 196.40

ABSTRACT- GENERATION FUNCTION

S.No. Name of Stations/ProjectsEstimated Cost

(Rs. Crore)

Capital Expenditure (Rs. Crore)

FY 2016-17 FY 2017-18 FY 2018-19

CAPITAL EXPENDITURE

COMMISSION'S APPROVAL

15.00

32.52 119.00 17.00

20.29 12.00 40.00

93.46

- 12.79

2,464.45 13,899.53 16,959.49

-

373.84 719.02 587.95

S.No. Name of Stations/ProjectsEstimated Cost

(Rs. Crore) FY 2016-17 FY 2017-18 FY 2018-19

CAPITALISATION

COMMISSION'S APPROVALCapitalisation (Rs. Crore)

Page 1

Page 54: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Mettur Thermal Power Station - II 145.33 18.42 74.83 52.08 7.82 30.83 46.58

North Chennai Thermal Power Station - Stage - II 98.29 7.67 19.31 71.31 5.67 1.00 65.00

A Thermal Power Stations 3,264.62 1,120.16 727.65 1,416.81 153.02 668.19 968.83

Kundah Generation Circle (843.65 MW) 86.06 11.21 7.50 67.35 11.21 7.50 1.90

Tirunelveli Generation Circle (372.80 MW) 174.08 174.08 - - 30.49 - -

Kadamparai Generation Circle (595.45 MW) 160.50 3.68 14.45 142.37 - 5.10 128.35

Erode Generation Circle (483.50 MW) 21.42 - 7.34 14.08 - 3.28 14.08

B Hydro Electric Power Stations 442.06 188.97 29.29 223.80 41.70 15.88 144.33

Valuthur Gas Turbine Power Station (187 MW) 264.26 23.16 226.10 15.00 4.16 15.30 47.00

Thirumakkottai Gas Turbine Power Station (107.88 MW) 168.52 17.52 108.00 43.00 - 112.52 42.00

Kuttalam Gas Turbine Power Station (101 MW) 72.29 20.29 12.00 40.00 - - 7.42

Basin Bridge Gas Turbine Power Station (120 MW) 12.79 - 12.79 - - 11.79 1.00

C Gas Turbine Power Stations 517.86 60.97 358.89 98.00 4.16 139.61 97.42

D Thermal Power Projects 108,303.75 34.23 411.99 5,421.00 - - -

E Hydro Electric Power Projects 11,660.32 31.15 311.41 57.55 8.38 285.84 -

DRIP Works under World Bank Funded 272.00 - 272.00 - - 272.00 -

Bhavani Kattalai Barrage -II (2x15MW) 4.79 2.50 2.29 - 2.50 2.29 -

Bhavani Barrage -II (2x5MW) 17.43 5.88 11.55 - 5.88 11.55 -

Other Hydro projects 11,366.10 22.77 25.57 57.55 - - -

F Grand Total 124,188.61 1,435.49 1,839.23 7,217.16 207.26 1,109.51 1,210.58

]

Page 2

Page 55: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation

(Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditure (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisa

tion (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

I Division : Renovation and Modernisation ( Mechanical )

1 Eco Coil - Unit V Boiler Complete replacement of Economizer Coil Assembly, LTSH

supply Tubes and Straight tube panels for Super Heater Rear wall

near Economiser in Unit V Boiler.

The eco-coil failure rate is very high and it is essential to replace the

eco-coil assembly by new one to avoid frequent failure. By

replacement of economizer coil assembly in Unit-V, the loss of

generation due to eco coil failure will be reduced.

5.76

B.P.CMD

No. 65

dt.19.02.14

5.76 5.76 0.00 0.00 0.00 0.00 - 5.68 5.76 0.08 - -

2 Eco Coil - Unit-II Boiler Complete replacement of Economizer Coil Assembly, LTSH

supply Tubes and Straight tube panels for Super Heater Rear wall

near Economiser in Unit II Boiler

The eco-coil failure rate is very high and it is essential to replace the

eco-coil assembly by new one to avoid frequent failure. By

replacement of economizer coil assembly in Unit-II, the loss of

generation due to eco coil failure will be reduced.

4.39B.P.CMD No.155

dt.10.04.15 4.39 4.39 0.00 0.00 0.00 0.00 - 3.54 4.39 0.85 - -

3 Coutant bottom slope tubes & acute bends

in Unit II Boiler

Design, Manufacture, Supply, Erection, testing and

Commissioning of Coutant bottom slope tubes & acute bends for

Unit II Boiler of 210MW

Due to the usage of low calorific value of Vizag coal, the quantity of

coal used is 145 to 165 T/hr as against the designed quantity of 90 T /

hr which results in more ash content and mass flow leading to

increase in velocity and finally end up with high erosion. Due to the

usage of more quantity of high ash content Vizag coal and hot

clinkers falling over the slopped tubes, it got eroded and more prone

to puncture in this area and subsequent unit outages and generation

loss.

2.20B.P.CMD No.317

dt.29.07.15 2.20 2.20 0.00 0.00 0.00 0.00 - - 2.20 2.20 - -

4 Ammonia injection system in Unit- I Installation of Ammonia injection system in Unit- I The Pollution Control Board while issuing the renewal of consent

order is insisting to provide ammonia injection system especially in

the inlet of ESPs attached to Unit-I, so as to bring down the emission

level of 150 mg/NM³.

3.68B.P.CMD No.109

dt.25.03.14 3.68 3.68 0.00 0.00 0.00 0.00 - - 3.68 3.68 - -

5 Renewal of Flue gas duct from APH outlet

to ESP inlet in Unit 5

Dismantling the entire eroded FG ducts from APH outlet to ESP

inlet. Erection and commissioning of New Ducts from APH outlet

to ESP inlet with New insulation materials.

High air ingress takes place through the eroded opening of the FG

ducts in Unit 5, leading to overloading of ID current , loss of Power

generation and higher auxilary Power Consumption. Hence eroded

flue gas ducts are to be renewed to rectify the above problem.

3.75

B.P.CMD

No.500,dt

02.12.2013

3.75 3.75 0.00 0.00 0.00 0.00 - 3.50 3.75 0.25 - -

6 Replacement of ESP field internals and

controllers in Unit 5

Replacement of first 3 rows (ie), 12 Nos. ESP field internals and

overhauling of remaining 12 Nos. ESP fields Internals and

replacement of 24 Nos. High Voltage Transformer Rectifier & 24

Nos. Electronic Control panels alongwith latest technology

controllers.

Due to high ash content Coal, the internals are in eroded condition

which leads to failure of ESP fields and thereby increase in SPM level.

Hence, it is essentially required to be replaced to meet out the norms

prescribed by the Pollution Control Board. 7.32

B.P.CMD

No.192,dt

15.05.2014

3.11 3.11 0.00 0.00 0.00 0.00 - 6.15 7.32 1.17 - -

7 Double sealing modification in Unit 5

Airpreheater

Dismantling the existing 12 modules with hot intermediate and

cold and baskets. Supply, erection and commissioning of New

Modules with 24 sectors.

The APH leakage in Unit 5 is always more than 10% (Designed for

8%) which results in Overloading of ID, FD & PA Fan. Hence, it is

necessary to provide double sealing arrangement by modifying the 12

sectors into 24 sectors in the Air preheater, so as to reduce the air

leakage

6.33

B.P.CMD

No.436,dt

03.10.2013

6.33 6.33 0.00 0.00 0.00 0.00 - 0.09 6.33 6.24 - -

8 Hot Reheat coil assembly in Unit- V Boiler Complete replacement of Hot Reheat coil assembly in Unit-V Most of the tubes in Hot Reheat Coil Assembly are in overheated

condition which needs replacement of Hot Reheat Coil Assembly in

Unit V to reduce the failure of Hot Reheat Coil 7.00 Nil 7.00 7.00 0.00 0.00 0.00 0.00 - - 7.00 7.00 - -

9 Eco. coil - Unit I Boiler Replacement of Eco coil assembly, LTSH supply Tubes and

Straight tube panels for SH rear wall near Economier in Unit- I

Boiler

The eco-coil failure rate is very higher and it is essential to replace the

eco-coil assembly by new one to avoid frequent failure. By

replacement of economizer coil assembly in Unit-I, the loss of

generation due to eco coil failure will be reduced. 5.14 Nil 0.00 5.14 5.14 0.00 0.00 - - 5.14 5.14 - -

10 Design, Engineering, Manufacturing,

Supply, Erection and Commissioning of

Modified PRDS system in Unit 4 & 5

Design, Engineering, Manufacturing, Supply, Erection and

Commissioning of Modified PRDS system in Unit 4 & 5

Pressure Reducing De-superheating Steam is required at thermal

power station as a process requirement. Existing PRDS system gets

steam from main steam line and spray from Boiler feed pump

discharge during startup and normal running conditions.

Modification is proposed to take a tapping from CRH – Cold Reheat

line and this will be economical and energy saving solution.

2.00 Nil 0.00 2.00 2.00 0.00 0.00 - - - - 2.00 2.00

11 Water wall panel (Front and rear) in Unit

III Boiler.

Replacement of water wall panel (Front and rear) from ring header

7.48m to 16mtr elevation in unit-III. 362 Nos of tubes have to be

replaced along with acute bends

The Water wall tube thichkness got reduced to 3.5 mm and panels

have got bent at many location due to erosion and thermal stress. 5.00 Nil 0.00 0.00 0.00 5.00 5.00 - - - - 5.00 5.00

FY 2016-17

ANNEXURE 1

TUTICORIN THERMAL POWER STATION(5X210MW)

Approved by the Commission

FY 2017-18 FY 2018-19

Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost

(Rs.in Crs.)

Details of Board

approval

TANGEDCO's Submission

FY 2016-17 FY 2017-18 FY 2018-19

Page 12

Page 56: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation

(Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditure (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisa

tion (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17

Approved by the Commission

FY 2017-18 FY 2018-19

Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost

(Rs.in Crs.)

Details of Board

approval

TANGEDCO's Submission

FY 2016-17 FY 2017-18 FY 2018-19

12 Electrostatic Precipitators in Unit -III Modification of Electrostatic Precipitators in Unit -III To reduce the SPM (Suspended Particulate Matter) level below

150mg/Nm3 as per the statutory norms of Tamilnadu Pollution

Control Board.

10.00 Nil 0.00 0.00 0.00 10.00 10.00 - - - - 10.00 10.00

13 Super heater side walls in boiler II nd pass

in Unit III

Complete replacement of Super heater side walls in boiler II nd

pass in Unit III

The coil failure rate is very higher and it is essential to replace the coil

assembly by new one to avoid frequent failure. The loss of generation

due to coil failure will be reduced.

8.00 Nil 0.00 0.00 0.00 8.00 8.00 - - - - 8.00 8.00

14 Hot Reheat coil assembly Unit- IV Complete replacement of Hot Reheat coil assembly Unit- IV Most of the tubes in Hot Reheat Coil Assembly are in overheated

condition which needs replacement of Hot Reheat Coil Assembly in

Unit IV to reduce the failure of Hot Reheat Coil

7.00 Nil 0.00 0.00 0.00 7.00 7.00 - - 7.00 7.00 - -

15 Cast basalt pipe in Unit I, II & III of Ash

Dyke Area.

Replacement of 300 m straight portion of the M.S. pipe with cast

basalt pipe in Unit I, II & III of Ash Dyke Area.

MS pipes are serving for about 12000 hours only (1.5- 2 years ) due to

the highly abreassive and corrosive ash slurry. Replacing it with cast

basalt pipes which has a life span of about 15 years will be beneficial

for the Tamil Nadu Generation and Distribution Corporation Limited

6.20B.P.CMD No.191

dt.15.05.14 6.20 6.20 0.00 0.00 0.00 0.00 - - - - 6.20 6.20

16 Cast Basalt lined Pipes in Unit IV&V ash

dyke area

Renewal of 350NB Cast Basalt lined Pipes in Unit IV&V ash dyke

area

Cast basalt pipes for Ash slurry disposal lines in the ash dyke area

were erected during commissioning and are in service for more than

23 years. Delay in replacement may lead to frequent pipe failures,

leading to leakage of slurry into sea / cooling water outflow channel

and cause loss of generation.

4.00 Nil 4.00 4.00 0.00 0.00 0.00 0.00 - - - - 4.00 4.00

17 Bottom Ash System in Unit I Replacement of complete Bottom Ash System in Unit I The complete Bottom ash system in Unit I is in continuous service for

more than 33 years from the date of commissioning. Due to ageing

and use of sea water mixed with slurry application, the Bottom Ash

Hopper skin plates, support structures, refractory linings, platforms,

seal trough, drive systems, etc., got worn out to the maximum.

Hence, it is proposed to Refurbish Complete Bottom Ash system in

Unit I.

5.00

Proposal is being

processed for

obtaining

administrative

approval

0.00 5.00 5.00 0.00 0.00 - - - - 5.00 5.00

18 Ash slurry disposal system for Unit 1,2,&3 Modification of ash slurry disposal system for Unit 1,2,&3 The design capacity of the present pumps are based on the coal with

19% ash content, whereas the coal now being used contains ash

content of 40 to 45%. Due to more than 33 years of ash deposit, the

height of the ash dyke and length of the discharge pipe line has been

increased from 20m to 2000m respectively in main dyke. Existing

arrangement is not advisable in long term due to its proximity to the

cooling water outlet channel. Further, the VOC Port Trust has

requested to stop discharging of ash slurry in the periphery dyke, for

their proposed stack yard of North Cargo Berth – 3&4.

6.00

Proposal is being

processed for

obtaining

administrat ive

approval

0.00 6.00 6.00 0.00 0.00 - - - - 6.00 6.00

19 Condenser in Unit II Retrofitting of Condenser in Unit II Due to sea water applications and long service i.e more than 30 years'

the tube plates of condenser have corroded severely . Hence,

retrofitting of condensers by renewal of tube sheets and tubes is

necessarily required to avoid unforeseen forced shutdown of the units

leading to long outages. This work will enhance the residual life of the

condensers by 10 to 15 years.

27.00 Nil 27.00 27.00 0.00 0.00 0.00 0.00 - - - - 27.00 27.00

20 Condenser in Unit I Retrofitting of Condenser in Unit I Due to sea water applications and also it has served its life period i.e

more than 37 years, the tube plates of condenser have corroded

severely . Hence the retrofitting of condensers by renewal of tube

sheets and tubes is necessarily required to avoid unforeseen forced

outages of unit.

27.00 Nil 0.00 27.00 27.00 0.00 0.00 - - 27.00 27.00 - -

21 Condenser in Unit III Retrofitting of Condenser in Unit III Due to sea water applications and also it has served its life period i.e

more than 37 years the tube plates of condenser have corroded

severely . Hence the retrofitting of condensers by renewal of tube

sheets and tubes is necessarily required to avoid unforeseen forced

outages of unit.

27.00 Nil 0.00 0.00 0.00 27.00 27.00 - - - - 27.00 27.00

Page 13

Page 57: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation

(Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditure (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisa

tion (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17

Approved by the Commission

FY 2017-18 FY 2018-19

Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost

(Rs.in Crs.)

Details of Board

approval

TANGEDCO's Submission

FY 2016-17 FY 2017-18 FY 2018-19

22 Condenser system in Unit IV. Renewal of condenser inlet and outlet pipes & Provision of debris

filter in condenser cooling water inlet line in Unit IV.

The condenser performance is dependent on cooling water

temperature and cooling water flow rate. The cooling water flow rate

is getting affected due to accumulation of considerable amount of

marine growths over the tubes of the condenser. In consequence,

temp. gets raised and vacuum lowered. This results in increasing of

Turbine heat rate and losses to Board. In order to clear the marine

growths and sea grass from the cooling water admitted into the

condenser and to maintain the rated cooling water flow, debris filter is

essential.

2.00 Nil 0.00 2.00 2.00 0.00 0.00 - - - - 2.00 2.00

23 ACW System Providing additional plate type heat exchanger unit for improving

efficiency of ACW system in Unit 4 & 5

During summer seasons the problem aggravates and the ACW

temperature could not be maintained within permissible limits

leading to reduction in power generation. As all the three available

heat exchangers are in service to keep the temperature under control

we can’t clean a particular heat exchanger when the unit is generating

to its full capacity.This will solves the problem of reducing the power

generation in case of raise in ACW temperature during summer

season while the grid warrants maximum power generation.

3.00 Nil 3.00 3.00 0.00 0.00 0.00 0.00 - - - - 3.00 3.00

24 Fire Fighting Installation of Fire Protection System including Erection &

Commissioning of Fire Hydrant System and Fire Annunciation

system exclusively for Coal Jetty area

In case of fire, to safeguard the board properties the fire protection is

necessarily required. 15.00 Nil 15.00 15.00 0.00 0.00 0.00 0.00 - - - - 15.00 15.00

25 Common Effluent treatment plant Common Effluent treatment plant To fulfil the norms of pollution control Board.

35.00 Nil 0.00 5.00 35.00 30.00 0.00 0.00 - - - 5.00 35.00 30.00

26 Ground Level Reservoir Strengthening works in GLR I & III & Improvement works

in unit I&III

All the outer side slopes of GLR IV are grown with unwanted bushes,

shrubs and small trees which affect the side bunds. The side drains

got filled up with earth and bushes. More leaks found throughout the

bund and pump room. To protect the bund, rectification work is

essentially required.

2.00 Nil 2.00 2.00 0.00 0.00 0.00 0.00 - - - - 2.00 2.00

27 10 ML per Day Desalination plant Installation of 10 MLD Desalination plant TTPS is now getting raw water from M/s. TWAD @ Rs. 15 per KL.

During summer months, getting water from M/s. TWAD is becoming

very difficult due to poor monsoon, shortage of water and farmers

agitation, etc., However TWAD pipe line have also become old and

are to be renewed involving huge expenditure

150.00B.P.CMD No.86

dt.06.03.14 35.00 35.00 150.00 80.00 - - - 5.00 150.00 145.00

28 Modification of Shuttle Feeder-2A/2B at

Secondary Crusher House-II

Dismantling of existing 1400mm Belt Shuttle Feeder along with all

accessories and design, engineering and supply of 1800mm belt

width shuttle feeder

The existing belt width of shuttle feeder-2A/2B are 1400mm and can

carry the load upto 800T/Hr. Much difficulties are being experienced

while handling higher discharge resulting in frequent stoppage of

shuttle feeders and ultimately cause higher ship demurrage charges.

In order to overcome the above, it is proposed to modify with belt

width of 1800mm

6.00

Will be

submitted for

Approval

3.00 3.00 3.00 3.00 0.00 0.00 - - - - - -

29 New conveyor to deliver its full capacity

after dismantling the existing structure of

conveyor 29B and bring back conveyor 55 to

running condition after changing necessary

spares

Design, Engineering, Fabrication, Supply, Erection and

Commissioning of new conveyor to deliver its full capacity after

dismantling the existing structure of conveyor 29B and bring back

conveyor 55 to running condition after changing necessary spares

Conveyors 49 &54 are the main conveyors for receiving coal from

Coal Jetty.1 & Coal Jetty.2. In case of any problem in these conveyors,

discharge from ship will get affected. Alternate for conveyor 49 &

conveyor 54 can be ensured by bringing back conveyor 29B into

service. Discharge from two coal jetties simultaneously will not get

affected in case of any problem in conveyor 49 & conveyor 54.

Existing structure is in damaged condition and conveyor 29B could

not discharge its full designed capacity and not in service since 2006.

Existing structure is to be strengthened , new conveyor to be erected

to ensure the capacity of 1100 T/Hr and bring back the conveyor 55 to

running condition after changing the necessary spares.

10.00

Will be

submitted for

Approval

5.00 5.00 5.00 5.00 0.00 0.00 - - - - 10.00 10.00

30 Static classifier with dynamic system in coal

mills of Units I,II & III

Replacement of the existing static classifier with dynamic system

in coal mills of Units I,II & III

Existing classifier system of the mills is not capable of grinding the

coal to its full capacity and required fineness. To improve the mill

performance and boiler efficiency dynamic system is essential. The

amount invested can be got back within 42 months.

24.00 To be obtained 24.00 24.00 0.00 0.00 0.00 0.00 - - - - 24.00 24.00

Page 14

Page 58: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation

(Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditure (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisa

tion (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17

Approved by the Commission

FY 2017-18 FY 2018-19

Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost

(Rs.in Crs.)

Details of Board

approval

TANGEDCO's Submission

FY 2016-17 FY 2017-18 FY 2018-19

II - - - - - -

31 Ash Silo Erection of 1000 MT Silo for 5 nos of unit I to V. As per the requirement of TNPCB; TNPCB is extending conditional

clearance under the Section 31-A of Air (Prevention and control of

Pollution) Act (1981) for the operation of the plant

based on the assurance from TTPS for the early installation of the

silos. ( Provision is essential for the year 2015-16 for

the processing of the proposal though cash out flow will be only in

2016-17 i.e. after HQ apprval and tendering.)

65.00

Proposal is being

processed for

obtaining

administrat ive

approval.

75.00 75.00 60.00 60.00 0.00 0.00 - - 65.00 65.00 - -

III - - - - - -

32 Boiler Feed Pump Procurement of 200KHI.S model Boiler Feed Pump cartridge

assembly.

The Boiler Feed Pumps in Units I & III were upgraded to 200KHI.S

model in 2004 and 2007 respectively. Upgradation is going to be taken

up in unit II also during this year 2015-16 for which the BFP cartridge

assembly is required as spare.

2.75

Included in Bulk

spares

requiremnt of

M/s. BHEL.

2.75 2.75 0.00 0.00 0.00 0.00 - - - - - -

33 Main Turbine Capital overhauling of Unit II TG and Re-RLA study. As per OEM, TG set of 210MW LMW Turbine have to be capital

overhauled and undergone Re-RLA study once in 5 years. Already 7

years have passed since last capital overhaul of Unit II in the year

2008.2.00

per(TANGEDCO

)CMD

proceeding

No.109, dt

07.03.15

2.00 2.00 0.00 0.00 0.00 0.00 - 0.78 2.00 1.22 - -

34 HP Module complete assembly HP Module complete assembly To replace the aged HP module and to avoid outage of turbine and to

maintain generation 35.00Po No: 04/

14.05.14 35.00 35.00 0.00 0.00 0.00 0.00 - - 35.00 35.00 - -

35 IP Rotor IP Rotor To replace the aged IP Rotor and to avoid outage of turbine and to

maintain generation 22.00Po No: 04/

14.05.14 22.00 22.00 0.00 0.00 0.00 0.00 - - 22.00 22.00 - -

36 LP Rotor LP Rotor To replace the aged LP Rotor and to avoid outage of turbine and to

maintain generation 20.47Po No: 04/

14.05.14 20.00 20.00 0.00 0.00 0.00 0.00 - 20.47 20.47 - - -

37 Supply, Erection and commissioning of

LP/HP by pass upgratation system

Supply , Erection and commissioning of LP/HP by pass

upgradation system

The operation of control valve failed frequently due to the ageing and

difficulty in the out dated design of the equipment. Besides the

system became obsolete since the OEM have stopped the supply of

the existing equipment. So it is found difficult for maintain the

existing system and decided to go in for upgrading with new version

2.58

Per(TANGEDCO

) CMD

proceeding

No.470 dt

26.10.10

2.31 2.31 0.00 0.00 0.00 0.00 - 2.58 2.58 - - -

38 Vacuum pump in Unit II Replacement of Existing steam Main ejectors by vacuum pump for

augmenting the capacity of air evacuation system of condensers of

Unit II in TTPS.

Since the vacuum pump is a volumetric device, Hogging capacity is

much more than that of ejectors and reduces the evacuation time and

in turn reduces the total outage time of unit.

Considerable revenue gain towards saving of fuel by cutting out the

motive steam used for main and starting ejectors.4.05

Per(TANGEDCO

) CMD

proceeding

No.381 dt

28.08.10

0.15 0.15 0.00 0.00 0.00 0.00 - 4.03 4.05 0.02 - -

39 Vacuum pump in Unit I & III Replacement of existing steam Main ejectors and starting ejector by

vacuum pump for augmenting the capacity of air evacuation

system of condenser of Units I & III

Since the vacuum pump is a volumetric device, Hogging capacity is

much more than that of ejectors and reduces the evacuation time and

in turn reduces the total outage time of unit.

Considerable revenue gain towards saving of fuel by cutting out the

motive steam used for main and starting ejectors.

8.10

(Per)

TANGEDCO

Proceedings

(CMD) No.108

0.00 8.10 8.10 0.00 0.00 - - - - 8.10 8.10

40 Main Turbine capital overhauling of Unit I TG and Re-RLA study. As per OEM,TG set of 210MW LMW Turbine have to be capital

overhauled and undergone Re-RLA study once in 5 years.2.00

Administrative

approval has

been sought

from HQs.

0.00 2.00 2.00 0.00 0.00 - - 2.00 2.00 - -

41 Main Turbine Capital overhauling of Unit III TG and Re-RLA study. As per OEM, TG set of 210MW LMW Turbine have to be capital

overhauled and undergone Re-RLA study once in 5 years.2.00

Administrative

approval has

been sought

from HQs.

0.00 0.00 0.00 2.00 2.00 - - - - 2.00 2.00

IV - - - - - -

42 Air preheater in Unit II Conversion of existing conventional Airpreheaters Model 27VIT

72” (74”) in Unit II to Modular Airpreheater with 24 sectors Model

27VITM 2000 having double sealing arrangement in Unit II.

To absorb the extra amount of heat produced by burning excess coal

than the designed value, to reduce the air leakage across the

airpreheater there by reducing the auxiliary consumption of ID, FD &

PA fan current and also to comply the norms of BEE, this modification

have to be essentially carried out.

6.56

TANGEDCO

(CMD)

proceedings

No.93,

dt.02.03.2015

6.56 6.56 0.00 0.00 0.00 0.00 - 0.09 6.56 6.47 - -

Division : Boiler Maintenance

Division : Ash Handling Plant

Division : Turbine Maintenance I

Page 15

Page 59: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation

(Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditure (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisa

tion (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17

Approved by the Commission

FY 2017-18 FY 2018-19

Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost

(Rs.in Crs.)

Details of Board

approval

TANGEDCO's Submission

FY 2016-17 FY 2017-18 FY 2018-19

43 ESP Unit II Revamping of Unit II ESP by replacing the internals in the first two

rows (8 fields) and overhauling of the remaining 12 fields in Unit

II.

The ESP internals (Except collecting electrodes) in the first two rows

(A1, A2, B1, B2, C1, C2, D1 &D2) are in service right from the date of

commissioning. Due to high ash content in the coal, the internals got

eroded, leading to tripping of ESP fields. This affects the collection

efficiency of the ESP leading to higher SPM level in the flue gas.

Hence, in order to solve the above problems, it has been proposed to

replace the ESP internals during the forthcoming capital overhaul for

the year 2016-17.

4.00 ––– 4.00 4.00 0.00 0.00 0.00 0.00 - 0.29 4.00 3.71 - -

44 ESP Unit I Improvement works in Unit I ESP Improvement works to be carried out to comply with the norms of

Ministry of Environment and Forest notification dated 07.12.2015 to

reduce the SPM level below 100 mg/Nm3

10.00 ––– 0.00 10.00 10.00 0.00 0.00 - - - - 10.00 10.00

45 Coutant bottom slope tubes & acute bends

for Unit I Boiler of 210MW

Design, Manufacture, Supply, Erection, testing and

Commissioning of Coutant bottom slope tubes & acute bends for

Unit I Boiler of 210MW

Due to the usage of low calorific value Vizag coal, the quantity of coal

used is 145 to 165 T/hr as against the designed quantity of 90 T / hr

which results in more ash content and mass flow leading to increase

in velocity and finally end up with high erosion. Due to the usage of

more quantity of high ash content Vizag coal and hot clinkers falling

over the slopped tubes, it got eroded and more prone to puncture in

this area and subsequent unit outages and generation loss.

1.40 ---- 0.00 1.40 1.40 0.00 0.00 - - - - 1.40 1.40

46 ESP Unit III Replacement of the ESP internals in the last three rows of B&D

path ( B3, B4, B5, D3, D4 & D5) in Unit III

The ESP internals in the last three rows of B&D path ( B3, B4, B5, D3,

D4 & D5) are in service right from the date of commissioning. Due to

high ash content in the coal, the internals got eroded, leading to

tripping of ESP fields. This affects the collection efficiency of the ESP

leading to higher SPM level in the flue gas. Hence, in order to solve

the above problems, it has been proposed to replace the ESP internals

during the forthcoming capital overhaul for the year 2018-19.

4.50 ––– 0.00 0.00 0.00 4.50 4.50 - - - - 4.50 4.50

47 Coutant bottom acute bend, 90º bend, &

Rear arch bends. Unit IV

Complete replacement of Coutant bottom acute bend, 90º bend, &

Rear arch bends. Unit IV

Thickness of the bends gradually reducing which warrants

replacement5.00 0.00 0.00 0.00 5.00 5.00 - - - - 5.00 5.00

48 Water wall tubes in high heat zone area.

Unit IV

Replacement of Water wall tubes in high heat zone area. Unit IV Erosion and internal deposits will be more in the high heat zone area

and needs replacement12.00 0.00 0.00 0.00 12.00 12.00 - - - - 12.00 12.00

V - - - - - -

49 Improvement works in drainage system at

Camp II

Improvement works in drainage system To avoid flooding of rain water in camp II quarters area and to

improve drainage system in camp II as it is nearer to sea area.1.49 Nil 0.00 0.49 1.49 1.00 0.00 0.00 - - - - - -

VI - - - - - -

50 Ground Level Reservoir Providing and Arresting the ground water leakage and

strengthening the impervious bottom layer of GLR IV bottom &

side embarkment, providing layers in the GLR IV including

rectification works

To prevent the percelation of Raw water into the ground and to avoid

wastage of Raw water.

3.00 Nil 3.00 3.00 0.00 0.00 0.00 0.00 - - 3.00 3.00 - -

51 RCC/PSC structures of coal jetty I conveyor

system of TTPS in Red gate area/ North

break water of VOC port at ECHS areas

conveyor-16

Remedial measures to RCC/PSC structures of coal jetty I conveyor

system of TTPS in Red gate area/ North break water of VOC port

at ECHS areas conveyor-16

To safeguard the converyor structures

1.77 Nil 1.50 1.50 0.00 0.00 0.00 0.00 - 1.77 1.77 - - -

52 RCC retaining wall with drain in the

peripheral zone area of ash dyke for

diverting ash slurry water to spillway.

Construction of RCC retaining wall with drain in the peripheral

zone area of ash dyke for diverting ash slurry water to spillway.

To retain ash and to drain the decanted water from bund.

2.00 Nil 2.00 2.00 0.00 0.00 0.00 0.00 - - 2.00 2.00 - -

VII - - - - - -

53 Coal bunker inclined walls East,West and

South direction in Unit I

Renewal of coal bunker inclined walls East, West and South

direction in Unit I during the period 2016-17

Existing bunker trapezoidal portions have served more than 37 years

and are found to be damaged. To avoid generation loss and to ensure

free flow of coal to mills the work is essential.

3.00 To be obtained 3.00 3.00 0.00 0.00 0.00 0.00 - - - - 3.00 3.00

54 Coal bunker inclined walls East,West and

South direction in Unit II

Renewal of coal bunker inclined walls East,West and South

direction in Unit II during the period 2016-17

Existing bunker trapezoidal portions have served more than 36 years

and are found damaged. To avoid generation loss and to ensure free

flow of coal to mills the work is essential.

3.00 To be obtained 3.00 3.00 0.00 0.00 0.00 0.00 - - 3.00 3.00 - -

55 Coal bunker inclined walls East,West and

South direction in Unit III

Renewal of coal bunker inclined walls East,West and South

direction in Unit III during the period 2016-17

Existing bunker trapezoidal portions have served more than 35 years

and are found damaged. To avoid generation loss and to ensure free

flow of coal to mills the work is essential.

3.00 To be obtained 3.00 3.00 0.00 0.00 0.00 0.00 - - - - 3.00 3.00

Division : Civil Maintenance I

Division : Civil Maintenance II

Division : Mill Plant Maintenance I

Page 16

Page 60: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation

(Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditure (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisa

tion (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17

Approved by the Commission

FY 2017-18 FY 2018-19

Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost

(Rs.in Crs.)

Details of Board

approval

TANGEDCO's Submission

FY 2016-17 FY 2017-18 FY 2018-19

VIII - - - - - -

56 Secondary Crusher House-I Modification of Secondary Crusher House-I The wet coal discharge takes 5-6 days due to chocking problem in

Crusher. This will be eliminated after modification and the discharge

period is 4 days approximately. 7.33

Per.TANGEDCO

PROCEEDINGS

(CMD) No.5 /

06.01.11

0.00 5.56 6.89 1.33 0.00 0.00 - 7.33 7.33 - - -

57 ILMS along with structural at Head end

conveyor 56 & 63 Quantity 2 sets.

Supply , Erection & commissioning of ILMS along with structural

at Head end conveyor 56 & 63 Quantity 2 sets.

Whenever the sharp edged iron pieces/ferrous materials are coming

along with the coal it may tear the conveyor belts. Moreover, if it

enters into the coal mills, it will damage the mill internals, costly

bearings etc also leads to mill outage. To ensure boiler stability at

such times ,heavy oil is being introduced which inturn additional

revenue loss to TANGEDCO and also partial generation loss . Hence

this proposal is essential.

4.50Will be

submitted0.00 4.00 4.50 0.50 0.00 0.00 - - - - 4.50 4.50

58 PLC for CHS V control room PLC for CHS V control room The control desk at CHS.V is very vital one as it is the main operating

center for all main conveyors that is receving the coal from coal jetty.2,

stacking and feeding coal to the bunkers of Units IV & V. The existing

control desk has served for more than 25 years. Of recent days

frequent problems have been encountered. As the conveyors have to

be in service for 24 hrs, 365 days without any interruption, the system

down time should be decreased

3.00Will be

submitted2.50 2.50 0.50 0.50 0.00 0.00 - - 3.00 3.00 - -

59 Providing additional drive system in

stacker II machine

Providing additional drive system in stacker II machine Stacker-II machines are being used for receiving coal from jetty’s and

feeding to unit bunkers uninterruptly. There are only 2 drive systems

available. If anyone of the drive gets failed may lead to stoppage of

the machine affecting coal receiving from jetty’s. Hence by providing

additional drive system in the middle of stacker boom structure the

problem can be minimized.

1.60Will be

submitted1.60 1.60 0.00 0.00 0.00 0.00 - - 1.60 1.60 - -

60 Suspension Magnet for conveyor-47. Supply, Erection, Commission ing of Suspension Magnet for

conveyor-47.

The existing magnet served 21 years and also got burnt completely

during the fire incident on 03.07.2012. This magnet is very essential to

segregate the ferrous material coming along with coal for safe guard

the crushers. 1.50

Revised proposal

for seeking

administrative

approval subd

on 14.8.15

1.50 1.50 0.00 0.00 0.00 0.00 - - - - 1.50 1.50

61 LT switch gear 3A & 3B (3 ph, 415 V) at

CHS-III

Design, Supply, Erection, Commissioning LT switch gear 3A & 3B

(3 ph, 415 V) at CHS-III

The existing switch gear served more than 33 years and becomes

more weak condition. As per Ministry of Power, New Delhi

notification dt :29th march 1994 vide S.O 266(E) the life time assessed

in the schedule C(f) switch gear including cable connection has been

25 years only. Hence updated technology Switch Gear is proposed

3.00

Clarification

submitted for

obtain ing

administrative

approval on

24.11.15 &

Tender notice for

Press Publication

requested from

SE/MI/ TTPS to

CE/Civil

Design/ Chennai

on 21.1.16

3.00 3.00 0.00 0.00 0.00 0.00 - - 3.00 3.00 - -

62 New Freight cum passenger lift at PCH-II. Design, Engineering, Supply, Erection, Commissioning of New

Freight cum passenger lift at PCH-II.

The PCH I location are elevated upto 30 mtr height for safety

handling of the men & materils and economical completion of the

work in time. 3.00Will be submitt

ed for approval3.00 3.00 0.00 0.00 0.00 0.00 - - 3.00 3.00 - -

IX - - - - - -

63 Freight cum passanger lift at PCH II Supply of freight cum passanger lift at PCH II Height of PCH II is 30 mtrs.For safe handling of men and material lift

is necessary.And also for starting the breakdown / preventive work

lift is very necessary.3.00

Administrative

Approval

Awaited from

Head Quarters

3.00 3.00 0.00 0.00 0.00 0.00 - - 3.00 3.00 - -

Division : External Coal Handling -I

Division : External Coal Handling -II

Page 17

Page 61: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation

(Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditure (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisa

tion (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17

Approved by the Commission

FY 2017-18 FY 2018-19

Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost

(Rs.in Crs.)

Details of Board

approval

TANGEDCO's Submission

FY 2016-17 FY 2017-18 FY 2018-19

64 15 Ton electric wire rope hoist with trolley

in conveyor 69,70,71 & 73

Supply, Erection, commissioning & Testing of 15 Ton electric wire

rope hoist with trolley in conveyor 69,70,71 & 73

For safe handling of men and material 15 Ton electric wire rope hoist

is necessary.And also for starting the breakdown / preventive work

15 Ton electric wire rope hoist is very necessary.

3.18

Will be

submitted for

approval

3.18 3.18 0.00 0.00 0.00 0.00 - - - - 3.18 3.18

65 ILMS at Conveyor 48A1/B1 at SCH II Supply, Erection, commissioning of ILMS at Conveyor 48A1/B1 at

SCH II

For picking-up iron and foreign materials coming along the coal

which will avoid cutting/damage the belt, chocking of chute. 2.02

Will be

submitted for

approval

2.02 2.02 0.00 0.00 0.00 0.00 - - - - 2.02 2.02

66 Passanger cum freight lift 1000 KG (IT) at JT

- 20

Passanger cum freight lift 1000 KG (IT) at JT - 20 Height of JT-20 is 30 mtrs. For safe handling of men and material, lift

is necessary. And also for starting the breakdown / preventive work

lift is very necessary.

3.20

Will be

submitted for

aproval

3.20 3.20 0.00 0.00 0.00 0.00 - - 3.20 3.20 - -

X - - - - - -

67 Yard conv.49 & 54 Revamping of yard conv.49 & 54 The conveyors 49 & 54 are vital trunk yard conveyors in the coal yard

for receiving the coal discharged from two coal jetties and feeding coal

to bunkers of all the five units of TTPS. These conveyors are in

continuous service for more than 19 years. Break down on these

conveyors affects the coal stacking process on receipt of coal from the

ships and coal feeding process in the units bunkers through

reclaimers in the yard. Monetory loss will occur if the coal handling

process is affected. Hence revamping of conv. 49 & 54 is essential

15.48

(per)

TANGEDCO

Proceeding

(CMD) No.135

dt. 07.04.14

6.88 6.88 0.00 0.00 - 14.01 15.48 1.47 - -

68 Additional bogie wheel drive assembly in

Stacker-I

Additional bogie wheel drive assembly in Stacker-I Stacker-I machine is being used for receiving coal from jetty’s and

feeding to unit bunkers uninterruptly. There are 4Nos. drive system

available in Reclaimer I machine provided at the front and middle

portion of the machine and hence travel problem does not occur even

in full load condition. But in Stacker I and II machines there are only 2

drive systems available. If anyone of the drive gets failed may lead to

stoppage of the machine affecting coal receiving from jetty’s. Hence

by providing additional drive system in the middle of stacker boom

structure the problem can be minimized.

2.10

(per)

TANGEDCO

Proceeding

(CMD) No.62, dt.

04.02.16

2.10 2.10 0.00 0.00 0.00 0.00 - - - - 2.10 2.10

XI - - - - - -

69 R&M of Man machine interface system in

Unit-IV

Supply of Latest windows based MMI system,Dismantling of old

system, Erection,Testing & commissioning of new system.

As the old Man Machine Interface system is in service for the past 15

years, the Man Machine Interface system has become obsolete, it has

been renovated. 3.74B.P.No.172, dt

30.04.2013.3.74 3.74 0.00 0.00 0.00 0.00 - - - - - -

70 6.6KV PILC Cable for HT Motors and HT

Transformers in Unit-I ( EM- I )

Replacement of various sizes of 6.6KV PILC Cable for HT Motors

and HT Transformers in Unit-I

The existing PILC Cables have served 34 years, much more than its

life period of 25 years. The insulation properties of the existing PILC

Cable are in deteriorated condition. Sudden failure of these cables will

lead to disturbance in the Electrical System thereby causing loss of

generations. Hence to maintain uninterrupted power supply to HT

Motors and HT Transformers in Unit-I, the essential existing PILC

Cables are proposed to be replaced by XLPE FRLS Aluminium

armored HT power Cables.

1.00Proposal sent for

approval.1.00 1.00 0.00 0.00 0.00 0.00 - - 1.00 1.00 - -

71 Replacement of various sizes of 6.6KV PILC

Cable by XLPE Cable for HT Motors and

HT Transformers in Unit-II.(EM- I )

Replacement of various sizes of 6.6KV PILC Cable by XLPE Cable

for HT Motors and HT Transformers in Unit-II.

The existing PILC Cables have served 34 years, much more than its

life period of 25 years. The insulation properties of the existing PILC

Cable are in deteriorated condition. Sudden failure of these cables will

lead to disturbance in the Electrical System thereby causing loss of

generations. Hence to maintain uninterrupted power supply to HT

Motors and HT Transformers in Unit-I, the essential existing PILC

Cables are proposed to be replaced by XLPE FRLS Aluminium

armored HT power Cables.

1.00Proposal to be

evolved.0.00 1.00 1.00 0.00 0.00 - - - - 1.00 1.00

Division : Internal Coal Handling -I

Division : Renovation and Modernisation (Electrical )

Page 18

Page 62: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation

(Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditure (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisa

tion (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17

Approved by the Commission

FY 2017-18 FY 2018-19

Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost

(Rs.in Crs.)

Details of Board

approval

TANGEDCO's Submission

FY 2016-17 FY 2017-18 FY 2018-19

72 6.6KV PILC Cable by XLPE Cable for HT

Motors and HT Transformers in Unit-III

.(EM-I )

Replacement of various sizes of 6.6KV PILC Cable by XLPE Cable

for HT Motors and HT Transformers in Unit-iII . (R&M works)

The existing PILC Cables have served 34 years, much more than its

life period of 25 years. The insulation properties of the existing PILC

Cable are in deteriorated condition. Sudden failure of these cables will

lead to disturbance in the Electrical System thereby causing loss of

generations. Hence to maintain uninterrupted power supply to HT

Motors and HT Transformers in Unit-I, the essential existing PILC

Cables are proposed to be replaced by XLPE FRLS Aluminium

armored HT power Cables.

1.00Approval

Awaited 0.00 0.00 0.00 1.00 1.00 - - - - 1.00 1.00

73 Replacement of 20 Nos. High Voltage

Rectifier Transformers by new in ESP-1

(UNIT-I) .(EM-II)

Replacement of 20 Nos. High Voltage Rectifier Transformers by

new in ESP-1 (UNIT-I) (R&M works)

The Existing HVR transformers have served more than 35 years.

winding insulation are in deteriorated condition due to ageing and

continuous sparks emanated in the field, which results insufficient

Corona power supply to the ESP fields. Frequent winding failures

have occurred and rewinded repeatedly. Further if any trouble

occures, it will affects the performance of ESP. Besides the above, the

ID Fan impeller blades, shafts and outlet ducts are also subjected to

more erosion and also increase in the ID fan motor current.

1.00Awaited

Approval1.00 1.00 0.00 0.00 0.00 0.00 - - 1.00 1.00 - -

74 Replacement of existing NGEF make LT

switchgear panel by new switchgear panel

with necessary protection arrangements at

FOPH-I .(EM-II )

Replacement of existing NGEF make LT switchgear panel by new

switchgear panel with necessary protection arrangements at FOPH-

I

The existing 33 years old LT switchgear at FOPH-I requires suitable

modernization as the OEM M/S NGEF have withdrawn their service

support very long back. Further switchgear unit of M/S.NGEF

ceased function from 2002. More number of failure of modules /

breakers observed in the recent past. Multi repaired module / breaker

are not reliable for continuous operation.

1.20

TANGEDCO

proceedings

(CMD) No. 394,

Dt. 9.9.2015

1.20 1.20 0.00 0.00 0.00 0.00 - - 1.20 1.20 - -

75 Replacement of existing standard LT Ash

Slurry Pump Motor by energy saving LT

Motors at Ash Handling Pump House Stage

I&II. (EM-II )

Replacement of existing standard LT Ash Slurry Pump Motor by

energy saving LT Motors at Ash Handling Pump House Stage

I&II.

The existing motors have served more than 35 years. There is no

spares available due to absolescence. Frequent winding failure

occured due to long service. Ash slurry Pump Motor is essentially

required for effective disposal of Ash slurry.

1.00Proposal to be

evolved.1.00 1.00 0.00 0.00 0.00 0.00 - - - - - -

76 Replacing of 3nos 900KW, 6.6KV journal

bearing type PA fan motors by anti friction

bearing type motors in unit-I, II & III

(EM-II )

Replacing of 3nos 900KW, 6.6KV journal bearing type PA fan

motors by anti friction bearing type motors in unit-I, II & III

The motors have served more than 35 years. There is no spare

support from OEM M/s. BHEL. The design of existing old type

motors differ from readily available motors design. Failure of motor

due to ageing may cause loss of generation. 2.00Proposal to be

evolved.2.00 2.00 0.00 0.00 0.00 0.00 - - 2.00 2.00 - -

77 Retrofitting of 6.6 KV MOCB by Vaccum

Circuit breaker at AHP Stage -I .(EM-II )

Retrofitting of 6.6 KV MOCB by Vaccum Circuit breaker at AHP

Stage -I

The existing MOCB's are in continuous service for the past 35 years.

The OEM M/s. ALIND Ltd., have with drawn spare supports very

long back. Due to obsolescence, no spare is available. Hence any

problem in the breaker operation could not be rectified. The life

served breakers posses a threat to safety of men and material . Hence

replacement is essentially required.

2.25 Approval

Awaited2.25 2.25 0.00 0.00 0.00 0.00 - - 2.25 2.25 - -

78 Replacement of existing journal bearing of

ID fan motors (3Nos) into anti friction

bearing fan motors in unit- I. (EM-II)

Replacement of existing journal bearing of ID fan motors (3Nos)

into anti friction bearing fan motors in unit- I.

The motors have served more than 35 years. There is no spare

support from OEM M/s. BHEL. The design of existing motors differ

from readily available motors design. Failure of motor due to ageing

may cause loss of generation.

4.50Proposal to be

evolved.0.00 0.00 0.00 4.50 4.50 - - 4.50 4.50 - -

79 Replacement of existing 60KV/800m Amps

Rectifier Transformer in unit-II . (EM-II)

Replacement of existing 60KV/800m Amps Rectifier Transformer

in unit-II .

The Existing HVR transformers in ESP have served more than 35

years. winding insulation are in deteriorated condition due to ageing

and continuous sparks emanated in the field , which results

insufficient Corona power supply to the ESP fields. Frequent winding

failures have occurred and rewinded repeatedly . Any further trouble

will affect the performance of ESP. Besides the above, the ID Fan

impeller blades, shafts and outlet ducts are also subjected to more

erosion and also increase in ID fan motor current.

2.80Approval

Awaited 0.00 0.00 0.00 2.80 2.80 - - 2.80 2.80 - -

80 Replacement of existing HT Mill motors by

Energy efficient motors (7Nos) in unit-II

(EM-II)

Replacement of existing HT Mill motors by Energy efficient motors

(7Nos) in unit-II

The mill motor have served more than 35 years. The OEM M/s. BHEL

have stopped the spare support from the year 2000. Failure of

windings , rotor bars and rotor shaft occured frequently. Due to

obsolescence, replacement is required.

2.10Awaited

Approval0.00 0.00 0.00 2.10 2.10 - - - - 2.10 2.10

Page 19

Page 63: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation

(Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditure (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisa

tion (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17

Approved by the Commission

FY 2017-18 FY 2018-19

Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost

(Rs.in Crs.)

Details of Board

approval

TANGEDCO's Submission

FY 2016-17 FY 2017-18 FY 2018-19

81 Replacement of existing journal bearing FD

fan 3Nos. motors into anti friction bearing

fan motors in Boiler area in unit-II. (EM-II)

Replacement of existing journal bearing FD fan 3Nos. motors into

anti friction bearing fan motors in Boiler area in unit-II.

The motors have served morethan 35years. There is no spare support

from OEM M/s. BHEL. The design of existing motors differ from

readily available motors design. Failure of motor due to ageing may

cause loss of generation.

3.00Proposal to be

evolved.0.00 0.00 0.00 3.00 3.00 - - - - 3.00 3.00

82 Replacement of existing old control system

in ESP by micro processor based control

panels in unit-II (EM-II)

Replacement of existing old control system in ESP by micro

processor based control panels in unit-II

The existing control system have served more than 15 years. There is

no spare support from OEM M/s.BHEL. To optimize the ESP

performane new version control panel is required. 1.00Awaited

Approval0.00 0.00 0.00 1.00 1.00 - - 1.00 1.00 - -

83 Procurement of One no.1500 KW ID Fan

Motor, One no.1250 KW FD Fan Motor and

One no.350 KW Mill Motor as spare motors

for Units IV & V. (EM-III)

Procurement of One no.1500 KW ID Fan Motor, One no.1250 KW

FD Fan Motor and One no.350 KW Mill Motor as spare motors for

Units IV & V.

The existing ID/FD/MILL Motors in units IV & V have served more

than 24 years. Any major defect in the Motor may lead to partial or

total outage of Generation from the unit. At present, the cooling tube

punctures are observed due to aging and wear / tear. In recent days,

the failure of cooling tubes are found increasing trend. 1.30

TANGEDCO

proceedings

(CMD) No. 562

Dt.31.12.2014

1.30 1.30 0.00 0.00 0.00 0.00 - - 1.30 1.30 - -

84 Modification of 15.75KV bus duct to suit for

3phase GT in unit-IV&V. (EM-III)

Modification of 15.75KV bus duct to suit for 3phase GT in unit-

IV&V.

For replacing the existing single phase Generator Transformers by 3

phase Generator Transformer, the existing delta connection formed

with the isolated bus ducts externally at LV winding side needs to be

dismantled and suitable modifications have to be carried out in the

bus duct arrangement to suit 3 phase transformer. Hence the proposal

is ssentially required.

2.00Proposal to be

evolved.2.00 2.00 0.00 0.00 0.00 - - - - - -

85 Procurement of one no. spare Three phase

Generator Transformer. (EM-III)

Procurement of one no. spare Three phase Generator Transformer. Since the Generator Transformers of Unit- III & Unit -IV are having

high furan value due to ageing and continuous service at full load, the

repairing / rewinding of the above transformers alone will not match

perfectly with the existing GTs.   As some perennial problems

experienced with single phase transformers it is proposed to procure

three phase transformer.

10.00

TANGEDCO

proceedings

(CMD) No. 87,

Dt. 23.02.2015

10.00 10.00 0.00 0.00 0.00 - - - - - -

86 Microprocessor based Annunciation System

in Unit-V. (Instn.II)

Microprocessor based Annunciation System in Unit-V. The existing system is out dated and failure of the system observed

frequently which misguide the unit operations. Newly proposed

system is user friendly,compact, latest and facilitate easy fault

findings. It provides less energy consumption than the existing

obsolete system which has served around twenty five years. 1.50

Proposal to be

evolved.1.50 1.50 0.00 0.00 0.00 0.00 - - - - - -

87 Provision of Integrated Energy

Management System by means of

Intelligent Energy meters and OFC net

working components enriched with the

state- of- the art technology,

Provision of Integrated Energy Management System by means of

Intelligent Energy meters and OFC net working components

enriched with the state- of- the art technology,

Fulfilling CEA’s regulation on Energy metering norms. Real time

energy accounting & APC. Accuracy based payback is around 2

months 2.25CMD No.188 Dt.

02.05.20152.40 2.40 0.00 0.00 0.00 0.00 2.25 2.25 - - - -

88 R&M of the existing DOS based POSE 9010

MMI system to the latest windows based

MMI plant information system in Unit IV

R&M of the existing DOS based POSE 9010 MMI system to the

latest windows based MMI plant information system in Unit IV

Functional Block Diagram of Processor and Drive Control Module

with Real Time Values can be viewed, which will help fault finding

very easy.3.60

CMD No.172 Dt.

30.04.21033.60 3.60 0.00 0.00 0.00 0.00 - - - - - -

89 Up Gradation of Hitachi DCS in Unit-IV Supply of Latest windows based DCS with FDDI network system,

Dismantling of old system, Erection,Testing & commissioning of

new system.

Most of the vital components in the above system have become

obsolete that are in service for more than 20 years in Unit IV of TTPS

and no spares are available from the original supplier, M/s Keltron

Limited, who had also withdrawn their service support for these

systems. Frequent failures, interruptions occured in process data

display to the operators, making them an unreliable source of process

display for taking critical operation decisions,it has been renovated.

6.13B.P.No.45, dt

04.02.2013.7.06 7.06 0.00 0.00 0.00 0.00 6.13 6.13 - - - -

Page 20

Page 64: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation

(Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditure (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisa

tion (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17

Approved by the Commission

FY 2017-18 FY 2018-19

Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost

(Rs.in Crs.)

Details of Board

approval

TANGEDCO's Submission

FY 2016-17 FY 2017-18 FY 2018-19

90 Up gradation of Turbine Control system

from Iskamatic based modules to newer

system in Unit-V.(Instn.II)

Up gradation of Turbine Control system from Iskamatic based

modules to newer system in Unit-V.

The existing Siemens based ISKAMATIC systems were supplied &

commissioned by M/s. BHEL, during 1991 in Unit 5 and are in service

till date. Due to obsolescence of the Iskamatic modules, no spares are

available from the original supplier (M/s. BHEL), who have also

withdrawn service support for the system long back.The failure of the

existing Iskamatic based controllers leads to loss of control of critical

equipments which results in damage to the main equipment and

hence results in loss of generation. Hence, to stave off the

obsolescence and derive benefits of advancement in technology, it is

essential to upgrade the existing EAST Iskamatic control system to a

newer version of Digital system.

5.66

TANGEDCO

proceedings

(CMD) No. 408

Dated .

16.09.2014.

5.20 5.20 0.00 0.00 0.00 0.00 - 5.51 5.66 0.15 - -

91 Up gradation of Pro-control system (STC,

SADC, PRDS & EAST ) & Iskamatic

(Turbine Control System) in Unit- V.

(Instn.II)

Up gradation of Pro-control system (STC, SADC, PRDS & EAST )

& Iskamatic (Turbine Control System) in Unit- V.

The exisiting sytem is in service since unit commissioning (1991). The

exisiting sytem is out dated, spare management is difficult. Failure of

the system occurs frequently which misguide the unit operations.

Newly proposed system is user frendly, compact, latest system,

faclitate easy fault findings better spares management. Hence it is

proposed to upgrade the outdated system.

10.00 _ 0.00 10.00 10.00 0.00 0.00 - - 10.00 10.00 - -

92 Up gradation of Pro-control system (STC,

SADC, PRDS & EAST ) & Iskamatic

(Turbine Control System) in unit-

IV.(Instn.II)

Up gradation of Pro-control system (STC, SADC, PRDS & EAST )

& Iskamatic (Turbine Control System) in unit-IV.

The exisiting sytem is in service since unit commissioning (1992).

Since the exisiting sytem is out dated, spare management is difficult.

Failure of the system occurs frequently which misguide the unit

operations. Newly proposed system is user frendly, compact, latest

system, faclitate easy fault findings better spares management. Hence

it is proposed to upgrade the outdated system.

16.00Awaited

Approval0.00 0.00 0.00 16.00 16.00 - - - - 16.00 16.00

93 Supply,erection, testing and commissioning

of Disturbance fault recorder including

sequential Event Recorder with GPS based

synchronization system for 230KV Indoor

switchyard-I. (MRT-I)

Supply,erection, testing and commissioning of Disturbance fault

recorder including sequential Event Recorder with GPS based

synchronization system for 230KV Indoor switchyard-I.

TTPS 230 KV Indoor Switchyard has 10 outgoing feeders, 5 Units

incoming feeders and 3 station Transformer feeder. The sequence of

feeder trips and study of fault analyzing (distrubance recorder)

essentially required. The existing SER and distrubance recorder are

defective. Hence it is proposed to procure the latest version of

Disturbance fault recorder including sequential Event Recorder with

GPS based synchronization system.

1.55Proposal to be

evolved.1.55 1.55 0.00 0.00 0.00 0.00 - - - - - -

94 Provision of new DCS in Unit-III.

(MRT-I & INST-I)

Replacement of existing open loop and lclosed loop control system

into a new DCS system in Unit- III

In Unit-III, the existing 34 years old CLCS, OLCS and FSSS control

system are of electromechanical based contactors and relays. There is

no SER feature. No facility to indicate permissive of equipments.

FSSS has only one MFT which is based on electromechanical relays.

These electromechanical relays have no watch dogs. For Boiler and

Turbine safty, the existing control systems should be renovated.22.00

Proposal to be

evolved.0.00 22.00 22.00 0.00 0.00 - - - - 22.00 22.00

95 Replacement of existing open loop and left

out closed loop control system into a new

DCS system in Unit- I. (MRT-I & INST-I)

Replacement of existing open loop and left out closed loop control

system into a new DCS system in Unit- I.

Furnace Safeguard Supervisory System (FSSS), Open Loop Control

System (OLCS) Turbine control system of unit-I are having old

version control systems & Protections which consists of

electromechanical type contactors and relays with no redundancy,

watch dog, disturbance recording feature etc and installed and

commissioned during 1979. Any sluggishness in the

electromechanical based protection system will lead to severe damage

to Boiler and turbine.

22.00

TANGEDCO

proceedings

(CMD) No. 553,

Dt 29.12.2015

0.00 22.00 22.00 0.00 0.00 - - - - 22.00 22.00

Page 21

Page 65: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation

(Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditure (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisa

tion (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17

Approved by the Commission

FY 2017-18 FY 2018-19

Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost

(Rs.in Crs.)

Details of Board

approval

TANGEDCO's Submission

FY 2016-17 FY 2017-18 FY 2018-19

96 Replacement of existing outdated static

type FSSS and SBC (Soot Blower Controls)

system and its allied components into latest

vesion system in unit - V. (MRT-II)

Replacement of existing outdated static type FSSS and SBC (Soot

Blower Controls) system and its allied components into latest

vesion system in unit - V.

Due to Spares obsolescence, stoppage of service support, aging and

out dated technology, the system needs for upgration of the existing

procontrol system.

5.00Proposal to be

evolved.0.00 5.00 5.00 0.00 0.00 - - 5.00 5.00 - -

97 Replacement of existing outdated static

type FSSS and SBC (Soot Blower Controls)

system and its allied components into latest

version system in unit-IV. (MRT-II)

Replacement of existing outdated static type FSSS and SBC (Soot

Blower Controls) system and its allied components into latest

version system in unit-IV.

Due to Spares obsolescence, stoppage of service support, aging and

out dated technology, the system needs for upgration of the existing

procontrol system

5.50 Approval

Awaited0.00 0.00 0.00 5.50 5.50 - - - - 5.50 5.50

98 Coal handling switchgear room I & II

(ICHP)

Revamping the existing Coal handling switchgear room I & II These two control rooms had been constructed 35 years ago and the

equipments have completed their full life period of 25 years. The

building of both control rooms are situated below the ground level

and hence the cable trench is filled with water resulting in frequent

failures.

2.65Will be

submitted2.65 2.65 0.00 0.00 0.00 0.00 - - - - - -

XII - - - - - -

99 Replacement of Existing UAT 3A by a new

Transformer of Unit III

Replacement of Existing UAT 3A by a new Transformer of Unit III Poor IR value and Tan delta value the reliaability of Transformer can

be ensured 1.10CMD No.247 Dt.

24.06.21031.10 1.10 0.00 0.00 0.00 0.00 - - 1.10 1.10 - -

904.64 393.22 443.27 245.02 264.97 266.40 196.40 8.38 84.20 331.42 265.60 476.10 466.10

Division : Electrical Maintenance -I

Total amount..............

Page 22

Page 66: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

I SE OPERATION CIRCLE

1 Capital Provision of Wireless CCTV

and Surveillance system in

MTPS-I

MTPS-I is a vital installation. As per IB

recommendations, CCTV Surveillance &

Monitoring system has to be installed.

1.00 To be Sought To be utilised for

security purpose.

0.00 0.50 1.00 0.50 0.00 0.00

- 1.00 - - 1.00 -

II - - - - - -

Division I - - - - - -

- - - - - -

2 MTPS-I- BM-Unit II- Renewal

of damaged / eroded ID fan 2A

& 2B casing. (Model: NDZV 31

SIDOR)

The flue gas leaking through the damaged

portion is hazardous in nature, it damages the

insulation material and due to acidic in nature

after condensation, resulting outside corrosion

and thin out of casing and damage to the duct.

It should be replaced before it reaches

catastrophic damage and subsequent huge

generation loss.

3.73 TANGEDCO

proceedings

(CMD) No:- 218

dated 16.05.2015

Replacement of Id

fan spiral casing is to

enhance its life

further period of 10

to 15 years.

3.73 3.73 0 0 0

- - 3.73 - - 3.73

Division II - - - - - -

I.Regular - - - - - -

3 Reconditioning of HP Rotor& IP

Rotor

To Replace the existing life served Rotors of

Unit-II during COH.

5.00 Proposal

submitted for

Administrative

approval.

To improve the

efficiency of the

turbine

5.00 5.00

- 5.00 - - 5.00 -

4 Procurement of New LP

Diaphragms.- 2Nos (27th & 31st

stage)

To Replace the existing life served Diaphragms

of Unit-I to IV during COH.

7.50 Indent given in

BHEL Bulk

spares for the

year 2015-16

To improve the

efficiency of the

turbine

7.50 7.50

- 7.50 - - 7.50 -

5 Procurement of New HP

Diaphragms 2nd to 12th stage.

To Replace the existing life served Diaphragms

of Unit-I to IV during COH.

5.00 Proposal

submitted for

Administrative

approval.

Reduction of steam

loss between stages

and hence the heat

rate and efficiency

will be improved.

5.00 5.00

- 5.00 - - 5.00 -

6 Reconditioning of LP Rotor To Replace the existing life served Rotors of

Unit-II during COH.

5.15 Proposal

submitted for

Administrative

approval.

To improve the

efficiency of the

turbine

5.15 5.15

- 5.15 - - 5.15 -

7 Procurement of 3 Nos. Boiler

feed pump Cartridge

assemblies

To Replace the existing life served for full life

period of nearly 25 years Boiler feed pump

Cartridge assemblies of Unit-II during COH

8.00 Proposal under

preparation

To improve

efficiency and

reduce the

downtime of Unit, in

case of failure

occurs.

8.00 8.00

- - - - - -

8 Procurement of New HP Rotor To Replace the existing HP rotor which has

served nearly 25 years.

10.45 proposal sent to

Head Quarters

to obtain

Administrative

approval.

Spare rotor is

essential for

immediated

replacement of failed

one and to bring the

unit without waiting

for the rotor to be

repaired.

10.45 10.45

- 10.45 - - 10.45 -

FY 2018-19FY 2016-17 FY 2017-18

TURBINE MAINTENANCE

SE/MECHANICAL CIRCLE I

BOILER MAINTENANCE

Renovation & Modernisation

Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

ANNEXURE 2

METTUR THERMAL POWER STATION-I(4X210MW)

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

Page 44

Page 67: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

9 Reconditioning of HP, LP & IP

Rotors

Reconditioning the existing HP, LP & IP rotor

which has served nearly 25 years.

12.00 Proposal to be

evolved.

To improve

efficiency and

reduce the

downtime of Unit, in

case of failure

occurs.

12.00 12.00

- - 12.00 - - 12.00

- - - - - -

10 Replacement of existing 2 set of

steam ejector by vacuum pumps

for energy savings in Unit I &

II.

Since the Vacuum Pump is a Volumetric

device, hogging capacity is much larger than

that of Ejector, the evacuation time will get

reduced and in turn it will reduce the total

time required to bring back the system after

tripping.

8.10 (Per )

TANGEDCO

PROCEEDINGS(

CMD)No 125dt

01.04.14

Considerable

Revenue gains

towards saving of

fuel will be obtained

by cutting

motivation steam

used for the Ejectors

and the pay back

period will be two

years (max).

8.10 8.10

- - - - - -

11 Replacement of existing 3Nos.

BFP Voith couplings by

optimized voith couplings for

energy savings in Unit-I /

MTPS-I

Required for old / life served BFP Voith

couplings in Unit – I.

2.67 Revised

Proposal to be

sent with

recommendation

of R&M wing.

Optimisation of the

Voith Coupling in

BFP has been

proposed for Energy

savings by adopting

the optimized gear

system, so as to

reduce the slip with

actual scoop margin

of 85% at voith end.

Hence it is ensured

that the life period of

the voith Hydraulic

coupling will be

extended for another

20 Years.

2.67 2.67

- - - - - -

12 Replacement of existing 3Nos.

BFP Voith couplings by

optimized voith couplings for

energy savings in Unit-II

/MTPS-I

Required for old / life served BFP Voith

couplings in Unit – II.

3.00 Proposal under

preparation

Considerable

Revenue gains

towards saving of

fuel will be obtained

by cutting

motivation steam

used for the Ejectors

and the pay back

period will be two

years (max).

3.00 3.00

- - - - - -

II. Renovation & Modernisation

Page 45

Page 68: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

13 Replacement of existing 2 set of

steam ejector by vacuum pumps

for energy savings in Unit III.

Since the Vacuum Pump is a Volumetric

device, hogging capacity is much larger than

that of Ejector, the evacuation time will get

reduced and in turn it will reduce the total

time required to bring back the system after

tripping.

4.50 Proposal under

preparation

Also it will facilitate

easy operation of the

system with a state

of art technology for

evacuation of air and

non-condensable

gases from the

system operation

under vacuum, since

the existing main

ejectors are not

efficient to expel the

increased quantity of

air ingress in the

system.

4.50 4.50

- - - - - -

14 Replacement of existing 2 set of

steam ejector by vacuum pumps

for energy savings in Unit IV

Since the Vacuum Pump is a Volumetric

device, hogging capacity is much larger than

that of Ejector, the evacuation time will get

reduced and in turn it will reduce the total

time required to bring back the system after

tripping.

5.00 Proposal under

preparation

Also it will facilitate

easy operation of the

system with a state

of art technology for

evacuation of Air

and non-

condensable gases

from the system

operation under

vacuum, since the

existing main

ejectors are not

efficient to expel the

increased quantity of

air ingress in the

system.

5.00 5.00

- - - - - -

15 Replacement of existing BFP

Voith couplings by optimized

voith couplings for energy

savings in Unit-III& IV/

MTPS-I.

Required for old / life served BFP Voith

couplings in Unit – III & IV.

9.00 Proposal under

preparation

Considerable

Revenue gains

towards saving of

fuel will be obtained

by cutting

motivation steam

used for the Ejectors

and the pay back

period will be two

years (max).

9.00 9.00

- - - - - -

- - - - - -

16 Capital Overhauling of Unit-II –

TG set & its auxiliaries.

The worn out Turbine Rotors will be replaced

with new items. The worn out tip seals of

diaphragms will be replaced with new one to

reduce steam loss between stages. Steam flow

path correction will be carried out.

1.90 Administrative

Approval

obtained.

T.P.No:161 dt

17.04.15

Reduction of steam

loss in between

stages quantity and

improving

Mechanical work

done and hence the

Turbine Efficiency

will be improved.

2.50 2.50

1.90 - 1.90 -

III. PAT Scheme

Page 46

Page 69: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

17 Capital Overhauling of Unit-IV

– TG set & its auxiliaries.

The worn out Turbine Rotors will be replaced

with new items. The worn out tip seals of

diaphragms will be replaced with new one to

reduce steam loss between stages. Steam flow

path correction will be carried out.

3.00 Proposal under

preparation

Reduction of steam

loss in between

stages quantity and

improving

Mechanical work

done and hence the

Turbine Efficiency

will be improved.

3.00 3.00

- 3.00 - - 3.00 -

18 Capital Overhauling of Unit-III

– TG set & its auxiliaries.

The worn out Turbine Rotors will be replaced

with new items. The worn out tip seals of

diaphragms will be replaced with new one to

reduce steam loss between stages. Steam flow

path correction will be carried out.

3.50 Proposal under

preparation

Reduction of steam

loss in between

stages quantity and

improving

Mechanical work

done and hence the

Turbine Efficiency

will be improved.

3.50 3.50

- - 3.50 - - 3.50

Division III - - - - - -

19 a. Strengthening of Raw coal

Bunkers fabrication, supply

and erection in Unit –I to

IV-14Nos. x 100 L (IC, 2F, 3D &

4B )

The corners of trapezoidal portions bunkers

of all units of MTPS-1 is getting cracked and

coal spilled out often and rectification are

being done then and there. Hence the

trapezoidal portion strengthening work is

essentially required in ( IC, 2F, 3F & 4E )

bunkers to avoid trouble free operation and

loss of generation in the year 2015-16.

4.00 To be sub

mitted

Life Extension 4.00 4.00

- - - - - -

20 b. Modification of Raw coal

Bunkers Engg. Fabrication

supply and erection Unit –I to

IV 4 Nos. x 450 L ( 2E, 3E,4A &

4E )

The corners of trapezoidal portions bunkers of

all units of MTPS-1 is getting cracked and coal

spilled out often and rectification are being

done then and there. Hence the trapezoidal

portion strengthening work is essentially

required in ( IC, 2F, 3F & 4E ) bunkers to

avoid trouble free operation and loss of

generation in the year 2015-16.

18.00 Sanctioned

Tangedco

Proceedings.

CMD No. 75 /

dt. 11.02.15

Life Extension 18.00 18.00

14.66 2.58 - - 17.24 -

21 a) Supply and erection of coal

pipes in Unit - II b) Coal

pipes 200 mtrs - IV c)

Coal pipes 200 mtrs - III

Most of the coal pipes in service are in

wornout condition with reduced pipe

thickness. The original pipes in service are

Seamless Carbon Steel pipes with ø 508 X 12.7

mm thick which are all erected during erection

stage, but there after to attend leak by patch

welding / providing spool pieces mild steel

ERW pipe are being used and that too

thickness of 12mm only and could not

withstand even for a year. Hence this quantity

of seamless steel tubes pipes are required for

replacing the wornout coal pipes

13.59 Sanctioned

Tangedco

Proceedings.

CMD No. 555 /

dt. 30.12.2015

Life Extension 4.09 4.09 4.50 4.50 5.00 5.00

- - 4.09 - 4.09

22 a) Supply and erection of Mill

Separator body in any 2 unit

b) Supply and erection of Mill

Separator body in any one unit

c) Supply and erection of Mill

Separator body

Mill separator bodies and mill tops are in

service from the date of commissioning and

are in worn out condition. Patch up works

were carried out then and there. Hence, they

have to be renewed 2 Nos in the year 2016-17

and the remaining will be replaced in phased

manner for trouble free operation of Mills

(Requirements is given)

6.30 Proposal under

preparation

Life Extension 3.00 3.00 1.60 1.60 1.70 1.70

- - 1.60 - 1.60

MILL PLANT

Page 47

Page 70: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

23 Supply of Mill Gear box only

without internals

The Mill Gear boxes were installed during

commissioning. The material for the box is

used to withstand temperature, heavy

operational loading, impact loading etc. It

should withstand to explosion if any fire

inside. The gear boxes losses its material

capacity. The flanges threaded holes are in

worn out condition and could not able to

withstand its internals hence it should be

replaced in a phased manner and 1 No will be

replaced .

1.50 Proposal under

preparation

Life Extension 1.50 1.50

- 1.50 - - 1.50 -

24 Fabrication, supply and

dismantling and erection of Hot

air ducts- 6Nos

The Hot air ducts for coal mills were erected

during commissioning of the unit III and

served more than 26 years( its life period ).

Due to handling of air duct , plate thickness

got reduced (to 2 mm / 3 mm) and makes

cracks and numerous pin hole puncture in the

duct plates which affects the performance of

Boiler in turn loss of Generation .

1.50 Proposal under

preparation

Life Extension 1.50 1.50

- 1.50 - - 1.50 -

25 Fabrication, supply and

erection of Guillotine Gate

assembly (Hot Air Gates) &

Hot Air Damper assy

The Hot air ducts and its accessories such as

Hot Air Gate & Hot air damper for coal mills

were erected during commissioning of the unit

III and served more than 27 years ( its

life period Due to handling of air duct plate

thickness got reduced (to 2 mm / 3 mm) and

makes cracks and numerous pin hole puncture

in the duct plates getting over loaded which

affects the performance of Boiler in turn loss of

Generation . Quantity of pipe line to be used in

Unit- II and the Quantity to be procured will

be used in Unit-III.

1.50 Proposal under

preparation

Life Extension 1.5 1.5

- 1.50 - - 1.50 -

26 a) Providing of dynamic

classifier in

Unit -I &II.

To improve the mill performance 25.20 Proposal under

preparation

Life Extension 12.40 12.40 12.80 12.80

- - - - - -

Division IV - - - - - - COMMON AUXILIARIES

Page 48

Page 71: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

27 Supply of

Bowl

assembly for

64” VMF -

Mather &

Platt make

Unit-I

Cooling

Water Pumps

-3 Nos.

Supply of Bowl assembly for

64” VMF - Mather & Platt make

Unit-I Cooling Water Pumps -3

Nos.

The performance of the Unit-I Cooling water

pumps are getting deteriorated due to ageing

and also due to very old design. To improve

the performance of the Cooling water pumps,

it is essential to retro fit the pumps with

improved design to sustain the design

parameters.

3.92 Administrative

approval

accorded vide

(per)

TANGEDCO

Proceedings

(CMD) No:540

dt:17.12.2015

Cost benefit analysis

based on expected

improvement on

heat rate:

Expected heat rate

improvement

( by using Ebsilon

software ) =

10.10 Kcal/ Kwhr

Coal Saved for 1 day

= 15 tons

Cost of Mixed coal

( Indian + Foreign )

= 4433 / MT

Cost savings per day

= Rs 15.00 * 4433 =

Rs 66,495/-

Payback period =

4,11,41,100 / 66495

= 618.70 days

= 20.62 Months Or

say 1 year 9 Months

1.30 3.92 2.62

- 3.92 - - 3.92 -

28 Supply of

new 3

Nos. of

16,000 m3 /

Hr capacity

vertical

cooling water

pump

without

motor for

Unit - III

Dismantling of existing pumps

and supply and erection of new

pumps- 3 Nos.

The Cooling water flow of the Existing pumps

are in lesser value compared with the designed

one. The O/H of the pumps is due for long

period due to non-availability of spares

because the model is obsolete one.

8.60 Administrative

Approval

Accorded vide

(per)

TANGEDCO

Proceedings

(CMD) No:403

dt:15.09.2015

Cost benefit analysis

based on expected

improvement on

heat rate:

Expected heat rate

improvement( by

using Ebsilon

software ) = 10.10

Kcal/ Kwhr

Coal Saved for 1 day

= 15 tons

Cost of Mixed coal

( Indian + Foreign )

= 4794 / MT

Cost savings per day

= Rs 15.00 * 4794 =

Rs 71,910/-

Payback period =

86033000 / 71910 =

1196 Days

= 39 Months Or

say 3 years 3 Months

2.80 8.60 5.80

- - - - - -

Page 49

Page 72: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

29 Supply of

PVC fill bars,

S.S. Grid,

drift

eliminator,

S.T. Nozzles

along with

accessories

for Cooling

Tower-I

Supply and erection of PVC fill

bars, S.S. Grid, drift eliminator,

S.T. Nozzles along with

accessories including

reconstruction of all fill support

RCC beam in Seven cells in

Cooling Tower-I

The existing cooling tower in Unit –I have

served more than 27 years. The performance of

the Cooling tower is getting deteriorated due

to ageing and warrants replacement. To

improve the condenser vacuum in stage –I, it

is proposed to retrofit the Cooling Tower

components like Splash fill bars, S.S. Grid

(improved version of GRP grid), Grid holder,

Saddles and HDPE Target Nozzles (Improved

version of conventional PVC nozzles) in Seven

cells ( Cell No. 4,5, 7,8, 9,10 & 11 of C.T.1)

5.24 i)Sent for

Administrative

approval on

26.09.2014

ii)Administrativ

e Approval

deferred and

resubmitted on

29.10.15.

Retrofitting of all the

spares / components

in the cells of cooling

tower is beneficial. 1

mm vacuum

improvement the

cost saving per year

is Rs 33,58,048/-

Anticipated

improvement in

Condenser Vacuum

is 3.7 mm

Cost saved per year

is =3.7 X 3358048 =

Rs. 1,24,24,777

Cost of the work =

Rs. 5,23,57,606

Payback period

= 5,23,57,606/

1,24,24,777

= 4.21 Years

2.62 5.24 2.62

- - - - - -

30 Supply of

Bowl

assembly for

64” VMF -

Mather &

Platt make

Cooling

Water Pumps

Unit-II -3

Nos.

Supply of Bowl assembly for

64” VMF - Mather & Platt make

Cooling Water Pumps Unit-II -

3 Nos.

The performance of the Cooling water pumps

of Unit-II / Stage I is getting deteriorated due

to ageing and also due to very old design. To

improve the performance of the cooling water

pumps, it is essential to retro fit the pumps

with improved design to sustain the design

parameters

5.0 Proposal to be

submitted

Cost benefit analysis

based on expected

improvement on

heat rate.

Expected heat rate

improvement ( by

using Ebsilon

software )

= 10.10 Kcal/ Kwhr

Coal Saved for 1 day

= 15 tons

Cost of Mixed coal(

Indian + Foreign ) =

4433 / MT

Cost savings per day

= Rs 15.00 * 4433 =

Rs 66,495/-

Payback period =

4,11,41,100 / 66495

= 618.70days

= 20.62 months or

say 1 year 9 months

1.60 5.00 3.40

- - - - - -

Page 50

Page 73: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

31 Replacing of

worn out

Auxiliary

cooling water

pumps and

replacing of

Existing

weaken

motors-

2 Nos.

Supply, Erection, Testing and

commissioning of worn out

Auxiliary cooling water pumps

and replacing of Existing

weaken motors- 2 Nos.

To improve the performance of the Auxiliary

cooling water system it is necessary to replace

the above pumps with Motors.

1.50 Proposal to be

submitted

As per PCRA study

report, tests

conducted on the

ACWPs 1A & 1B,

pump efficiency

found very lower

than design

efficiency. Further

the ‘Jothi’ make

motor is design

obsolete and

rewound motors

with lesser efficiency

are running in above

pumps. The payback

period of investment

cost for replacing

pump with motor

will be around

approximately 7

years by increasing

the rated flow and

pressure and

efficiency.

0.75 1.50 0.75

- 0.66 0.84 - - 1.50

32 Additional 2 cells for

cooling tower-1 of MTPS-I

For improvement of condenser vacuum 4.00 Proposal to be

submitted

Expected heat rate

improvement( by

using Ebsilon

software )

= 9.0 Kcal/ Kwhr

Coal Saved for 1

day= 13 tons

Cost of Mixed coal

( Indian + Foreign )=

4794 / MT

Cost savings per day

= Rs 13.00 * 4794

= Rs 62,322/-

Payback period =

4,00,00,000 / 62322 =

642days

= 21months or say 1

year 9 months

2.00 4.00 2.00

- - 4.00 - - 4.00

Page 51

Page 74: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

33 New 3Nos. of

16,000m3/Hr

. Capacity

vertical

cooling water

pump

complete

assembly

without

motor for

UNIT – IV/

MTPS-I

Dismantling of existing pumps

and supply and erection of new

pumps 3 Nos.

To retain the performance of Cooling water

system there by increasing the condenser

vacuum.

9.00 Proposal wiil be

submitted.

Cost benefit analysis

based on expected

improvement on

heat rate:

Expected heat rate

improvement( by

using Ebsilon

software ) = 10.10

Kcal/ Kwhr

Coal Saved for 1 day

= 15 tons

Cost of Mixed coal

( Indian + Foreign )

= 4794 / MT

Cost savings per day

= Rs 15.00 * 4794 =

Rs 71,910/-

Payback period =

86033000 / 71910 =

1196 Days

= 39 Months or

say 3 years 3months

9.00 9.00

- - - - - -

34 Supply,

Erection,

Testing and

commissioni

ng of worn

out Auxiliary

cooling water

pumps and

replacing of

Existing

weaken

motors- 2

Nos.

Supply, Erection, Testing and

commissioning of worn out

Auxiliary cooling water pumps

and replacing of Existing

weaken motors- 2 Nos.

At present the ACWP 2A and 2B have served

more than 25 years and the efficiency of the

pumps are found very low when compared

with design efficiency. Further the ‘Jothi’ make

motor is design obsolete and rewound motors

with lesser efficiency are running in above

pumps. To improve the performance of the

Auxiliary cooling water system, it is

necessary to replace the above pumps with

Motors.

1.70 Proposal to be

submitted

ACWPs 2A & 2B,

pump efficiency

found very lower

than design

efficiency. Further

the ‘Jothi’ make

motor is design

obsolete and

rewound motors

with lesser efficiency

are running in above

pumps. The payback

period of investment

cost for replacing

pump with motor

will be around

approximately 7

years by increasing

the rated flow and

pressure and

efficiency.

0.85 1.70 0.85

- - 1.70 - - 1.70

Page 52

Page 75: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

35 Supply,

Erection,

Testing and

commissioni

ng of worn

out Auxiliary

cooling water

pumps and

replacing of

Existing

weaken

motors- 2

Nos.

Supply, Erection, Testing and

commissioning of worn out

Auxiliary cooling water pumps

and replacing of Existing

weaken motors- 2 Nos.

At present the ACWP 1C and2C have served

more than 25 years and the efficiency of the

pumps are found very low when compared

with design efficiency . Further the ‘Jothi’

make motor is design obsolete and rewound

motors with lesser efficiency are running in

above pumps. To improve the performance of

the Auxiliary cooling water system it is

necessary to replace the above pumps with

Motors.

1.80 Proposal to be

submitted

As per PCRA study

report, tests

conducted on the

ACWP 1C & 2C,

pump efficiency

found very lower

than design

efficiency. Further

the ‘Jothi’ make

motor is design

obsolete and

rewound motors

with lesser efficiency

are running in above

pumps. The payback

period of investment

cost for replacing

pump with motor

will be around

approximately 7

years by increasing

the rated flow and

pressure and

efficiency.

1.80 1.80

- - 1.80 - - 1.80

36 1 No of 3,800

m3/Hr.

Capacity

vertical Raw

water pump

complete

assembly

without

motor for

RWP

No: 1

1 No of 3,800 m3/Hr. Capacity

vertical Raw water pump

complete assembly without

motor for RWP No:1

At present the RWP No: 1 has served more

than 25 years and the efficiency of the pumps

are found very low when compared with

design efficiency as PCRA study report. To

improve the performance of the raw water

system, it is necessary to replace the above

pumps.

1.70 Proposal to be

submitted

As per PCRA study

report, tests

conducted on the

Raw water pumps

efficiency of RWP

No:1 found very

lower than design

efficiency. The

payback period of

investment cost for

replacing pump

without motor will

be around

approximately 8

years by increasing

the rated flow and

pressure and

efficiency.

1.70 1.70

- - 1.70 - - 1.70

37 1 No. of 3,800 m3/Hr. Capacity

vertical Raw water pump

complete assembly without

motor for RWP No:3

At present the RWP No: 3 has served more

than 25 years and the efficiency of the pumps

are found very low when compared with

design efficiency . To improve the performance

of the raw water system, it is necessary to

replace the above pumps.

1.80 Proposal to be

submitted

RWP No:3 found

very lower than

design efficiency.

The payback period

of investment cost

for replacing pump

without motor will

be around

approximately 8

years by increasing

the rated flow and

pressure and

efficiency.

1.80 1.80

- - 1.80 - - 1.80

- - - - - - Civil Division II

Page 53

Page 76: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

38 Providing concrete road from the Ash dyke

view point location to the primary pond

location over the lower ash dyke western bund

for a length of 1800 m at MTPS-I

3.00 Proposal to be

submitted

For easy plying of

Ash laden vehicles

in Ash dyke area.

3.77 3.77 0.00 0.00 0.00

- 3.00 - - 3.00 -

39 Construction of compound wall in Ash dyke

area

11.58 Proposal to be

submitted

For easy plying of

Ash laden vehicles

in Ash dyke area.

0.00 11.58 11.58 0.00 0.00

- 1.50 10.08 - 1.50 10.08

40 Providing concrete road from the existing

Bituminous road at the sounthern end of

Lower Ash Dyke western Bunds to the

Existing Concrete road in front of Dry slo in

Ash Dyke area(800m)

1.18 Per .CMD /

TANGEDCO

Proceedimg

No:525

(Technical

Branch)

DT:06.12.14

For safe guarding

the Boards property.

1.36 1.36 0.00 0.00 0.00

1.18 - - 1.18 - -

- - - - - -

- - - - - -

- - - - - -

41 RAILWAY TRACK WORKS:

Removing of existing wornout

rails, removing coal powder on

the track lines, providing PCC

mix providing of check rails in

Wagon Tippler 1 & 2 inhaul

side track lines upto point and

crossings and removing of

wornout and damaged CST 9

sleepers by new PSC sleepers

from level crossing, Road No:3,

4, 5 and other track lines and

from WT-I, II, III, IV level

crossing. (8 Nos. works)

The existing tracklines 30,000 mtr

(approximately) were erected during the

Commissioning of the plant (i.e. 1985 to1986).

Railway authorities insisted to erect the pre-

stressed concrete sleepers (PSC Sleepers)

instead of CST9 Sleepers. Now it is

programmed to Strengthen about 1000mtrs

trackline with PSC Sleepers during the year

2015-16 in phased manner.

2.62 CE's Power To Strengthen about

1000 mtrs trackline

with PSC Sleepers

during the year 2015-

16 in phased manner

so as to improve the

handling of coal.

2.62 2.62 0.00 0.00 0.00

- - - - - -

42 PSC sleepers for 52Kg. point &

crossings, Check rails for CMS

crossings, Fitting, Cast

Manganese steel crossing

1X81/2” for 52Kg. rails in PSC

sleepers, Tonque rails, Stock

rails, Grooved rubber sole plate,

PSC sleepers Drg No: T 2496,

Combination Metal liner, Elastic

Rail Clip, grooved rubber pad,

40mm ballast, Various sizes of

bolt and nuts, Point box for

broad gauge Railway track,

Fish plate bolt and nuts, Fish

plate for 52 Kg. rails and Check

rails for level crossings

In MTPS-I siding Railway tracklines for a

length of about 30kms are being maintained by

MTPS-I. In that, 67 Nos. point & crossings are

utilized for changing of wagons from one line

to another line. The Railway authorities are

insisting to strengthen the MTPS trackline with

PSC sleepers for the safe operation of

Locomotives and coal wagons. If gauge level

is not maintained, then it will leads to

derailment of wagons and Locomotives to

huge demurrage payable to Railways.

2.87 CE's Power To avoid the

demurrage charges.

2.87 2.87 0.00 0.00 0.00

- - - - - -

Regular

SE/MECHANICAL II

Coal Handling Plant-I

Page 54

Page 77: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

43 a) Spares for Wagon Tippler I to

IV (17 items) b)Primary Crusher

spares and conveyor spares

Frequent outage of coal unloading

equipments is primarily due to worn out

condition of machine part and failure of the

components due to aging and prolonged

usage. Hence, replacement of worn out parts

and overhauling of the existing parts are

essentially required to be carried out to

increase the coal handling capability of the

conveyor system and to reduce the frequent

breakdown of components in conveyor system

and to undertake trouble free coal unloading

work in round the clock for another 10 years

and to meet out the coal feeding requirement

to both existing and new 600 MW unit.

15.04 Board's Power.

B.P. yet to be

issued

To avoid payment of

demurrage charges

to Railways.

8.79 8.79 6.25 6.25 0.00 0.00

- - 6.25 - - 6.25

44 RAILWAY TRACK WORKS:

Removing of existing wornout

rails, removing coal powder on

the track lines, providing PCC

mix providing of check rails in

Wagon Tippler 1 & 2 inhaul

side track lines upto point and

crossings and removing of

wornout and damaged CST 9

sleepers by new PSC sleepers

from level crossing, Road No:3,

4, 5 and other track lines and

from WT-I, II, III, IV level

crossing(21 Nos. works)

The existing tracklines 30,000 mtr

(approximately) are erected during the

Commissioning of the plant (i.e. 1985 to1986).

These rails are mounted on cast steel with tie

bar sleepers (CST9); These sleepers have

served for more than 25 Years and now it is

found worn-out condition, and gauge, level

could not maintained properly. If gauge, level

not maintained properly it leads to derailment

of locomotives and coal wagons. Also CST9

sleepers are outdated nowadays and Railway

authorities insisted to erect the pre-stressed

concrete sleepers (PSC Sleepers) instead of

CST9 Sleepers. Now it is programmed to

Strengthen about 1000 mtrstrackline with PSC

Sleepers during the year 2016-17 in phased

manner.

5.90 Proposal to be

submitted to the

Board

In compliance with

the Railways

instruction and to

avoid demurrage

charges.

5.90 5.90 0.00 0.00 0.00

- - - - - -

45 PSC sleepers for 52Kg. point &

crossings, Check rails for CMS

crossings, Fitting, Cast

Manganese steel crossing

1X81/2” for 52Kg. rails in PSC

sleepers, Tonque rails, Stock

rails, Grooved rubber sole plate,

PSC sleepers Drg No: T 2496,

Combination Metal liner, Elastic

Rail Clip, grooved rubber pad,

40mm ballast, Various sizes of

bolt and nuts, Point box for

broad gauge Railway track,

Fish plate bolt and nuts, Fish

plate for 52 Kg. rails and Check

rails for level crossings

In MTPS-I siding Railway tracklines for a

length of about 30kms are being maintained by

MTPS-I. In that, 67 Nos. point & crossings are

utilized for changing of wagons from one line

to another line. These point & crossings are

mounted on wooden/ steel sleepers layout

and these sleepers are erected during the

commissioning of the plant. Straight tracklines

are mounted on CST 9 sleeper which was

outdated nowadays. The Railway authorities

are insisting to strengthen the MTPS trackline

with PSC sleepers for the safe operation of

Locomotives and coal wagons. The

expenditure incurred by MTPS-I will be

proportionately shared between MTPS-I & II.

5.18 Proposal to be

submitted to the

Board

In compliance with

the Railways

instruction and to

avoid demurrage

charges.

5.18 5.18 0.00 0.00 0.00

- - - - - -

Page 55

Page 78: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

46 Repowering of Locomotive

Sl.No:3 including replacement

of all electrical wiring changing

modified torque arm, all valves

replacement, radiator water line

replacement (changing of flex

master coupling) and rebuild of

cabin hood.

The existing locomotive Sl.No:3 SAN

Locomotive have served for more than 23

years and crossed double the life period (as

per BP NO:26,2058, the life of locomotive is 10

years or 16,00 Hours.). The locomotive is

running with heavy vibration and not utilized

for its full capacity. The SAN Locomotives

company recommended for repowering of

locomotive to improve the capacity of

locomotive. If the locomotive repowering is

carried out thro the original manufacture,

M/s. SAN, Bangalore, the life of locomotive

can be extended for another 10 years. The total

cost of new locomotive is 300 lakhs. The cost of

repowering for one locomotive is only 150

lakhs which is advantages to the board.

0.80 Proposal to be

submitted to the

Board

For speedy

unloading of coal

from the wagon

tippler so as to avoid

the demurrage

charges.

0.80 0.80 0.00 0.00 0.00

- - - - - -

47 Supply and erection of Rail

table assembly Wagon

tippler I & II.

The rail table assembly fitted with Wagon

Tippler should be enough to withstand the

impact load caused during shunting of coal

wagons and unloading of coal wagons. The

rail table assemblies in Wagon tippler I & II

are in bend and wornout condition due to

hitting of loaded coal wagons during tipped

position and prolonged usage since its erection

in 1987. Due to wornout condition of this rail

tale assembly, the pivot locking gear and top

stop locking were failed frequently causing

damages to Wagon Tippler parts and

derailment of railway wagons. Hence the

wornout rail table assembly is required to be

replaced for trouble free and safe round the

clock coal unloading.

1.30 Proposal to be

submitted to the

Board

The rail table

assembly fitted with

Wagon Tippler

should be enough to

with stand the

impact load caused

during shunting of

coal wagons and

unloading of coal

wagons. The rail

table assemblies in

Wagon tippler I & II

are in bend and

wornout condition

due to hitting of

loaded coal wagons

during tipped

position and

prolonged usage

since its erection in

1987. Due to

wornout condition of

this rail tale

assembly the pivot

locking gear and top

stop locking were

failed frequently

causing damages to

Wagon Tippler parts

and derailment of

railway wagons.

1.30 1.30 0.00 0.00 0.00

- - - - - -

Page 56

Page 79: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

48 Primary Crusher spares and

conveyor spares ( 7 Nos.)

These spares are required for emergency

replacement in the event of failure of Primary

Crusher A&B. These spares are not available in

the event of any failure of PCR A&B. hence it

is essentially required for keep as spare for

PCR A&B.

2.39 Proposal to be

submitted to the

Board

These spares are

required for

emergency

replacement in the

event of failure of

Primary Crusher

A&B. These spares

are not available in

the event of any

failure of PCR A&B.

Hence, it is

essentially required

to keep as spare for

PCR A&B.

2.39 2.39 0.00 0.00 0.00

- 2.39 - - 2.39 -

49 Provision of spare IMS & SMS In CHP-I, 2 Nos. Suspension Electro magnetic

separators (SMS) and 4 Nos. Inline Electro

magnetic separators (IMS) are in service in

Conveyor 7A, 7B, 8A1 & 8B1 from the period

of commissioning of CHP-I for continuous

separation of ferrous items, from large volume

of coal carried through conveyor belts. These

SMS & IMS have served more than 25 years

and its effectiveness got reduced. These SMS

are continuously working in dust prone areas.

Due to frequent failure of SMS & IMS, foreign

materials are entering into coal mills causing

damage to mill internals and bearings which

in turn leads to forced mill outages and causes

heavy generation loss. .

1.00 Proposal to be

submitted to the

Board

To avoid damages to

the conveyor belt

and mills due to the

presence of iron rods

and stones in the

coal. This will

improve the life of

the belt and mills.

1.00 1.00 0.00 0.00 0.00

- 1.00 - - 1.00 -

50 Supply and erection of 30 Ton

EOT crane in Loco shed.

In CHP-I loco shed EOT crane capacity 10 ton

have served more than 29 years from the date

of commissioning. The EOT crane is not

effectively in use for carrying out locomotive

maintenance and repair work. It is used for

locomotive under chasing work of wheel

bearings replacement, traction motor, final

drive replacement and repairing work. Each

and every time, loco is to sent to repair bay II

EOT crane of 125 T capacity for separating the

bogie and locomotive top. The locomotive

capacity of BHEL locomotive is 80 tons & SAN

loco 60 Tons capacity. If any overhauling work

in the turbine area, the 125 T TG floor crane

not available to carry out loco work. Hence in

order to repair the loco in the loco shed the

crane capacity has to be raised to 30 tons.

1.00 Proposal to be

submitted to the

Board

For speedy

repairing of

locomotives and put

into service

immediately so as to

avoid demurrage

charges.

1.00 1.00 0.00 0.00 0.00

- - - - - -

Page 57

Page 80: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

51 Design, supply,erection testing

and commissioning of

motorized multi point

lubrication systems for wagon

tippler and apron feeder (8

units).

The multipoint lubrication system of wagon

tippler and apron feeders erected by

M/s.Elecon Engg. Co. Ltd Gujarat got wornout

due to long usages. To product the

components and improve the life of wagon

tippler and apron feeders and to avoid major

breakdown, the new multipoint lubrication

with new improved version has been erected

so as to supply the coal to bunkers for

uninterrupted power generation.

2.00 Proposal to be

submitted to the

Board

To avoid demurrage

charges.

2.00 2.00 0.00 0.00 0.00

- - - - - -

- - - - - -

52 Design, supply, site

modification erection and

commissioning of side arm

charger for Wagon Tippler 4

and 1

The side arm charger is used to shunt the coal

wagons to place the wagons on wagon tippler

table for coal unloading at wagon tippler, and

shunting the wagons from wagon tippler table

to out haul side, without using locomotives.

Shunting the coal wagons accurately in the

above operation, the time required to place the

wagons will be reduced considerably and the

number tipping can be improved. The idle

time of wagon tippler during coal wagon batch

movement from load track lines to wagon

tippler inhaul can be avoided.

30.00 Techno

commercial offer

requested from

firms. Offer yet

to received.

Proposal will be

prepared and

submitted after

field study and

submission of

Techno

commercial

offer.

To reduce the

locomotive operating

expenditure and

avoiding wagon

tippler idle time, and

to ensure

uninterrupted coal

unloading, more

number of coal

wagons with

economical

operation of

locomotives.

0.00 15.00 30.00 15.00

- - - - - -

- - - - - -

- - - - - -

COAL HANDLING PLANT Division II - works

REGULAR

Renovation & Modernization

Page 58

Page 81: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

53 MTPS-I-CHP-II- Supply of 1No.

bucket wheel gear box Make

:DORSTENER, Model : AKVP

75/320, Shaft mounted, Ratio -

1:175.26, Oil capacity – 120

Litrs.

Two Nos. SCR machines are in service at

MTPS-I from 1987. These machines are used

for coal stacking in coal yard and reclaiming

the same for feeding to Unit bunkers these

machines have served more than 26 years due

to prolong usage for more than 26 years

frequent trouble in the gear box have occuring.

SCR machines for reclaiming the stacked coal

for maintaining the bunker levels of all 4 x 210

MW Units. The both gear box in SCR

machines have served for more than 26 years it

is customary to have one no. gear box to keep

as a spare for replacement during emergency.

2.09 (Per.)

CMD/TANGED

CO Proceedings

No.419,

dt.18.09.14

The bucket wheel

gear box is required

for one to one

replacement in SCR

machine-I & II

inorder to reduce the

down time of SCR

machines .

2.09 2.09

- 2.09 - - 2.09 -

54 Replacement of existing relay

logic panel by PLC system in

MCC-I SWGR of CHP-II

division.

The existing Relay Logic Control systems have

became obsolete and are outdated as on date.

This may end up with difficulty to find out

when the problem actually occurred or to trace

the malfunctioning at the particular field

location. In order to overcome these

difficulties, it is proposed to implement the

modernized Programmable Logic Control

systems with SCADA and operation station for

Coal Handling plant. The Programmable Logic

Control system will provide the operator with

the ability to perform all the control functions

from the operating station and control desk.

5.64 (Per.)

CMD/TANGED

CO Proceedings

No.433,

dt.05.10.15

Tender yet to be

floated

The system will

provide the facilities

for log reports,

system self

diagnostics, process

of engineering

analysis, process

modeling, trouble

shooting and include

advance controls in

future. The auxiliary

power consumption

will be reduced, due

to the usage of

minimum number of

contactors.

5.64 5.64

- 5.64 - - 5.64 -

55 Supply, erection testing and

commissioning of IMS complete

set without control and power

panel–2 Nos

In coal handling plant-II, four numbers of

Inline Magnetic Separators (IMS) 3A, 3B, 4A

and 4B are being utilized in the conveyors

10A, 10B, 15A and 15B respectively in Junction

Tower 2 (3A & 3B) and Transfer Tower 1B( 4A

& 4B).

The Inline Magnetic Separators have served

more than 25 years. Due to prolonged usage,

aging and normal wear & tear the performance

of the IMS found very low and in decreasing

trend. Hence it is very much essential to

replace the existing ineffective IMS – 2 Nos.

with new one to ensure the trouble free &

continuous operation

1.00 Proposal under

preparation

The Inline Magnetic

Separators are very

much essential to

remove the ferrous

materials from the

coal if any.

Otherwise, ferrous

materials will be fed

to unit bunkers

along with coal,

causing damage to

the bowl mill

resulting in outage

of the coal mill and

hence loss of unit

generation.

1.00 1.00

- - - - - -

Page 59

Page 82: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

56 Replacement of wornout

slewing ring in SCR machines

and other allied works etc.,

The SCR machines are erected and

commissioned during the year 1988 and had

served more than 26 years. Further it is

evident that if any failure occur in slew

bearing ring of SCR machine, it would affect

normal operation of machine besides the coal

feeding to unit. Therefore it is proposed to

renew the slewing ring available at Central

stores in SCR machine–I / II as and when

required.

2.00 Proposal under

preparation

The slew ring

bearing plays and

important role in

distributing and

with standing

inordinate load

during reclaiming of

coal and therefore

the availability of the

machines through

out the year have to

be constantly

monitored.

2.00 2.00 0.00

- - - - - -

- - - - - -

57 Supply, erection and

commissioning of Hydraulic

brake in Travelling Trippers in

conveyor 11A / 11B - 2 Nos.

The Travelling Tripper in conveyor 11A /11B

are equipped with electro magnetic brake and

hence while operation if any problem occurs, it

will not stop immediately. Due to the weight

of the coal in the discharge chutes it leads to

move forward. To avoid such problem it is

proposed to install hydraulic brake in the

Travelling Tripper 11A/11B in a phased

manner to ensure trouble free operation of

travelling tripper.

1.60 Proposal under

preparation

To ensure trouble

free operation of coal

handling.

1.6 1.6 0.00

- - - - - -

58 Slew gear box for SCR

machines – 1 No.

There are 4 Nos of slew gear box in service at

SCR Machines from the commissioning period,

at present there is no spare available for

gearbox. Hence, 1 No gearbox is

required to meet out emergency replacement

in order to reduce the down time period of

SCR machines.

2.00 Proposal under

preparation

To ensure trouble

free operation of coal

handling.

2.00 2.00

- 2.00 - - 2.00 -

II. - - - - - -

59 Pull chord status mointoring

system with wire less

transmitter and all other

accessories

At present great difficulties are being

experienced to identfy the operated pull chord

switches and lot of time is being consumed to

reset the switches operated, since the location

staff have to go around both sides of conveyor

systems to identify the operated pull chord

switches. Practically much hardships are

being experienced and hence to avoid these

diffculties and reduce the down time of

conveyor systems it is essential to provide

pullchord status indications in MCC-I through

wireless type.

2.00 Proposal to be

submitted for

approval of

Board

Downtime of the

conveyor system is

reduced .

2.00 2.00

- 2.00 - - 2.00 -

Renovation & Modernization

MATERIALS

Page 60

Page 83: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

60 Supply, erection and

commissioning of DXT bag

filter in M-I sub division - 10

Nos.

Due to prolonged usage for more than 25 years

these dust extraction systems became

ineffective and the ambient air quality in CHP-

I&II working area are beyond the norms

stipulated by pollution control board. The

vibration is very high in the dust extraction

blower due to worn out of impeller, and

imbalance in dynamic balancing. Hence the

bearings used in the drive shaft has failed and

the drive shaft became bend. This problems

creating hardship in running the dust

extraction system continuously.Due to this the

entire working area of CHP-I&II has been

polluted and whole area became dusty. Hence

neat working atmosphere could not be

maintained.

4.00 Proposal under

preparation

The dust extraction

system fitted in the

main stream

conveyors are used

to extract coal dust

emanated from the

coal transfer chutes

which are situated in

elevated area,

required to be

operated

continuously

without fail to

minimize the dust

density. In order to

comply with the

norms prescribed by

the TNPCB, it is

proposed to go for

bag filter in the DEs

system.

4.00 4.00

- 4.00 - - 4.00 -

61 Supply, erection and

commissioning of 1 No. BFD in

JT-2

It is proposed to install an interconnection belt

feeder before con 10A&10B at the discharge

chute of con 9A & 9B wherein there will be an

additional flexibility of interchangeability of

conveyor streams if any problem is

experienced in con.10A&10B apart from

minimizing the damage caused to the

discharge chute of con.9A&9B, idlers, skirt

board assembly in con. 10A & 10B due to the

high impact load and hence will improve the

system availability and reduce coal powder

accumulation in con.10A&10B tail end area.

Also the OEM M/s.ELECON ENGG CO LTD

Vide their letter Ref.No: CB: SD: MTPS: 08-09:

1415 dt.10-09-08 had recommended

interconnection of conveyors in Stream A to

Stream B and removal of sampling unit in JT 2.

4.00 Proposal under

preparation

The cost benefit /

pay back period

cannot be evolved as

this is a component

that forms a part of

the coal conveying

system, which does

the regular operation

of conveying coal to

the bunkers.

4.00 4.00

- - - - - -

62 Supply, erection, testing and

commissioning of VVVF Drive

system for all LT motors of coal

handling plant

It is proposed to provide variable voltage

variable frequency drive for all LT motors of

coal handling plant to reduce the consumption

of auxiliary power. (under PAT scheme)

4.00 Proposal under

preparation

Provision of

variable voltage

variable frequency

drive for all LT

motors of coal

handling plant to

reduce the

consumption of

auxiliary power

under PAT scheme.

4.00 4.00 0.00

- - - - - -

Page 61

Page 84: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

63 Supply, erection, testing and

commissioning of VVVF Drive

system for all HT motors of coal

handling plant

It is proposed to provide variable voltage

variable frequency drive for all HT motors of

coal handling plant to reduce the consumption

of auxiliary power. (under PAT scheme)

6.00 Proposal under

preparation

Provision of

variable voltage

variable frequency

drive for all HT

motors of coal

handling plant to

reduce the

consumption of

auxiliary power

under PAT scheme.

6.00 6.00 0.00

- - - - - -

64 Supply, erection and

commissioning of coal sampling

unit in conveyor 9A & 9B

The existing coal sampling unit at JT-2, which

is not in service will be dismantled to carryout

the improvement work of interconnection belt

feeder system. As per IS 436 (Part-I / Section –

I) – 1964 The coal sampling unit for coal

sampling and analysis will be erected in

conveyor 9A & 9B.

2.50 Proposal under

preparation

The existing coal

sampling unit at JT-

2, which is not in

service will be

dismantled to

carryout the

improvement work

of interconnection

belt feeder system.

As per IS 436 (Part-I

/ Section – I) – 1964

The coal sampling

unit for coal

sampling and

analysis will be

erected in conveyor

9A & 9B.

2.50 2.50 0.00

- 2.50 - - 2.50 -

DIVISION -

III- - - - - -

65 Supply, erection, testing &

commissioning of scrapper

feeder assembly complete set

for Bottom Ash Hopper, Stage-I

&II, Qty : 2 nos.

The existing scrapper feeder has served more

than 25 years in corrosive & erosive area at

Bottom Ash Hopper location. The structure

and parts of the scrapper feeders have got

severely damaged and could not be

reconditioned further. Hence, it has been

decided to replace the SFs in a phased manner.

Accordingly for the year 2015-16, 2 nos. SF are

to be replaced in Stage-I & II

2.00 1) (Per.) CMD /

TANGEDCO

Proc. No. 271, dt.

01.07.15 2) (Per.)

CMD /

TANGEDCO

Proc. No. 334, dt.

04.08.15

The cost benefit /

pay back period

cannot be evolved as

this is a equipment

for the safe disposal

of the hot ash as

slurry at the Bottom

Ash Hopper

2.00 2.00

- - - - - -

66 Supply of Cast basalt pipes

from AHPH, Stage-I & II to XY

column inclusive of all

accessories such as flanges,

bends, bolt & nuts, gaskets,

sleeve couplings and other tools

& plants, etc.

Qty - 1100 mtr.

The Ash slurry pipe line streams from AHPH,

Stage-I & II to XY column to a length of 1100

mtr M.S.ERW Pipe lines in service which is

located in hilly terrain area. Now, it is decided

to replace the MS ERW Pipes by Cast basalt

pipes to get better life to reduce the failures in

that area. In this reach the ash slurry pipe lines

are located very nearer to the switch yard area

of 1x600 MW (MTPS-II/ Stage-III). In case of

any puncture or leakage occurs in this area, the

ash slurry water directly affects the above area.

In order to avoid this, it is decided to replace

‘U’ column to ‘XY’ column and AHPH, Stage-I

& II to B1 bend location by Cast basalt pipes

4.00 Proposal under

preparation

The Ash slurry pipe

line streams from

AHPH, Stage-I & II

to XY column to a

length of 1100 mtr

M.S.ERW Pipe lines

in service which is

located in hilly

terrain area. Now, it

is decided to replace

the MS ERW Pipes

by Cast basalt pipes

to get better life to

reduce the failures in

that area

0.00 1.00 0.00 2.00 4.00 1.00

- - - - - -

OIL &AHS

Page 62

Page 85: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

67 Mixing Apparatus with

accessories

(i) Mettalic bellows

(ii) HP nozzles

(iii) Distance pieces with poking

hole & flanges

(iv) Fixing fasteners

(v) Gaskets & Gland ropes

(vi) 40 NB Valves

of capacity 10 ton/ hr. for ESP

hoppers of Units I to IV

Qty – 40 nos.

ESP Hopper - Qty. in service

10 ton/hr = 24 nos./Unit x 4 Units = 96 nos.

5 ton/hr.= 24 nos./Unit x 4 Units = 96 nos.

There are 96 nos. 10 ton / hr. capacity Mixing

Apparatus available in ESP Hoppers in Unit-I

to IV since 1994. As the inner sides of these

Mixing Apparatus are completely immersed in

the hot ash slurry, they have got worn-out and

punctured frequently due to normal wear &

tear and the same being reconditioned and

reused. At present, Mixing Apparatus in the

first & second rows of Unit I to IV ESP

Hoppers (where the ash collection is more) are

in thinned-out and beyond repairable

condition as they are subjected to continuous

highly abrasive ash slurry environment.

Hence, it is decided to replace the existing

damaged / thinned-out Mixing Apparatus by

new one in phased manner.

2.40 Proposal under

preparation

The material of

construction is

changed from MS to

SS 304 to avoid

frequent

reconditioning

works and to reduce

the down time if

any.

2.40 2.40

- 2.40 - - 2.40 -

68 Supply, erection, testing and

commissioning of scrapper

feeder assembly complete set

for Bottom Ash Hopper, Stage-I

& II

Qty - 4 nos.

The existing scrapper feeder has served more

than 25 years in corrosive & erosive area at

Bottom Ash Hopper location. The structure

and parts of the scrapper feeders have got

severely damaged and could not be

reconditioned further. Hence, it has been

decided to replace the SFs in phased manner.

Accordingly for the year 2016-17, 4 nos. SF are

proposed to be replaced in Stage-I & II.

4.50 Proposal under

preparation

The cost benefit /

pay back period

cannot be evolved as

this is a equipment

for the safe disposal

of the hot ash as

slurry at the Bottom

Ash Hopper

0.00 2.25 4.50 2.25

- - - - - -

- - - - - - RENOVATION & MODERNISATION

Page 63

Page 86: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

69 Revamping of existing PDFAC

System consisting of Conveying

Air Compressors, Inst. Air

Compressors, PLC System, Ash

Conveying Vessels, all

associated valves such as Dome

valves, Dome valve seals,

Switch valves, Switch valve

seals, Pipe in pipe arrangement

for Ash conveying pipe lines

and their supporting structures,

flushing water liners and

related valves in ESP in Unit-I

to IV for Rs. 5 CRS. x 4 Units =

Rs. 20CRS.

Silo allotted Cement Companies M/s Ultratech

Cement Ltd, M/s ACCL, M/s MCL & M/s

CCCL have erected / existing PDFAC System

of Unit - I to IV during 2002–03 as per the

MoU. MoU in respect of Unit III & IV has

already been terminated. Similarly MoU of

Unit I & II are likely to be terminated. On

termination of MoU, PDFACS have to be

maintained by TANGEDCO.

These PDFACS have served 12 years already.

These system handle the abrasive nature of dry

fly ash. These system have been in continuous

service since its commissioning. Hence erosion

and corrosion is more in these equipments due

to normal wear and tear. Hence R&M of

PDFACS is essentially required to improve the

ash collection & ambient air quality & revenue

to the TANGEDCO.

20.00 Proposal under

preparation

On expiry of the

MoU between

TANGEDCO &

Cement Companies,

the existing PDFAC

systems have to be

maintained by

TANGEDCO.

In this juncture, it is

proposed to carryout

the revamping of

PDFAC System since

the existing PDFAC

system has served

beyond the life

period. The

equipments are

conveying abrasive

nature dry fly ash

continuously

throughout the year.

Also due to aging,

erosion and

corrosion and hot

ash & ash slurry

atmosphere most of

the equipments are

getting frequently

worn-out and also

getting frequent

failures. Hence

0.00 5.00 20.00 15.00

- - 10.00 - - -

70 Supply, Erection, testing and

commissioning of PDFACS

system (additional compressor,

ash conveying pipe lines,

pneumatic pipe lines, ash

conveying pressure vessels and

its related pneumatic

equipments & modification of

PLC system programme, etc.)

and down-comers like mixing

apparatus, distance pieces,

bellows, pipe lines, etc. for the

additional fields proposed to be

installed in ESP

In order to reduce the emission in the flue gas

as per the Pollution Control norms, the

renovation & modification work is proposed to

be carried out by Boiler Maintenance division

by increasing the additional ESP fields. This

provision is made for providing PDFACS

System for evacuating the ash from the

additional fields.

6.00 Proposal under

preparation

In order to reduce

the emission in the

flue gas as per the

Pollution Control

norms

6.00 6.00

- - - - - -

- - - - - -

- - - - - -

SE/ELECTRICAL SYSTEM

C&I

Page 64

Page 87: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

71 R&M Replacement of existing Eddy

current clutch drive into

Various frequency Drive at

R.C.Feeders in Unit 1 & 2.

There are 12 Nos R.C. Feeders with eddy

current clutch drive to feed the coal to

pulveriser in Unit 1 & 2. Present system is in

service from the date of commissioning of the

units. (Unit-1- 07.01.1987 & Unit 2 -01.12.1987).

Now the feeders are running in volumetric

mode only. If the feeders are changed to

gravimetric mode accurate weighing will be

achieved. At present due to obsolescence of

electronic modules the gravimetric mode could

not be attained. Also the present eddy current

clutch drive involves more components like

eddy current clutch, Tacho generator are

complex in nature. The physical size of the

motor is very high when comparing the VFD

motor. If the eddy current drives are modified

to VFD the energy consumption will be very

less. Due to on line calibration the calibration

time is very less.

9.16 Proposal

submitted.

Cost of running a

7.5HP motor full

speed for 20hours

per day for 300

days.= Rs.1,92,020.40

per year.Cost of

running a VFD Drive

Motor is Rs.

48,389.14 per year.

Savings of Rs.

1,43,631.26 per year

per feeder.

9.16 9.16

- - - - - -

72 R&M Replacement of existing Eddy

current clutch drive into

Various frequency Drive at

R.C.Feeders in Unit 3 & 4.

There are 12 Nos R.C. Feeders with eddy

current clutch drive to feed the coal to

pulveriser in Unit 3 & 4. Present system is in

service from the date of commissioning of the

units. (Unit-3- 22.03.1989 & Unit-4 -27.03.1990)

Now the feeders are running in volumetric

mode only. If the feeders are changed to

gravimetric mode accurate weighing will be

achieved. At present due to obsolescence of

electronic modules the gravimetric mode could

not be attained. Also the present eddy current

clutch drive involves more components like

eddy current clutch, Tacho generator are

complex in nature. The physical size of the

motor is very high when comparing the VFD

motor. If the eddy current drives are modified

to VFD the energy consumption will be very

less. Due to on line calibration the calibration

time is very less.

10.00 Proposal

submitted.

Cost of running a

7.5HP motor full

speed for 20hours

per day for 300

days.= Rs.1,92,020.40

per year.Cost of

running a VFD Drive

Motor is Rs.

48,389.14 per year.

Savings of Rs.

1,43,631.26 per year

per feeder.

10.00 10.00

- - - - - -

Page 65

Page 88: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

73 R&M Upgradation of existing Tata

Honeywell make GUS based

system to Experion based DCS

system and renovation &

integration of Turbovisory

System, Turbine protection,

HP/LP bypass system,

Vibration system and

Annunciation system by add on

controller and I/O cards in the

upgraded system on

proprietary basis in Unit-II of

MTPS-1

In unit-II, the existing TPS DCS system was

supplied by M/s Tata Honeywell Automation

India limited, Pune and commissioned during

2003. In Unit II, Turbovisory system, Turbine

Protection, HP/LP bypass system , Vibration

system and Annunciation system were

supplied by M/s Philips, M/s. BHEL and

M/s CML. These systems are in service since

1987.Now OEM M/s.BHEL and M/s Philips

stopped manufacturing of these types of

electronic cards and more over these cards are

not available in open market. The

manufacturer is not ready to repair any of the

defective electronic cards, due to technology

advancement and non availability of spares.it

is important that the existing deteriorated

system has to be replaced necessarily and

immediately.

7.74 Board's approval

to be obtained.

Cost of investment

for the renovation

can be realized by

avoiding the

tripping of the unit

for one time, due to

mal function of

existing Turbovisory

and Turbine

protection system.

Approximate loss

due to shutdown

for1.5 days

(cost of realization

per unit is Rs.

5.65)=5.04 Million

Units x 1.5 days x Rs.

5.65 = Rs 4.27 Crs..

7.74 7.74

- 7.74 - - 7.74 -

74 R&M Renovation & Modernization of

Unit –II Furnace Safeguard and

Supervisory System into new

distributed control system in

Unit II Mettur thermal Power

station-1.Supply , Installation,

Commissioning of hardware

and software Materials for new

DCS which includes

FSSS,PRDS and SADC System.

2) Supply , Installation,

Commissioning of Flame

scanners system.

In Unit II, the existing FSSS, PRDS, SADC, and

SCANNERS systems were supplied and

commissioned by M/s. BHEL during

1987.These systems have served more than 25

years. It has become aged and obsolete. he

frequency of failure of electronic cards now

has increased & unexpected failure of these

cards may take place in future which may

cause GENERATION loss. Hence it is

important that the existing deteriorated system

has to be replaced necessarily and

immediately. Due to technological

advancement it is economical to have FSSS,

PRDS, SCANNER, SOOTBLOWING

CONTROLS, ERV & SADC system in a single

system.

7.68 Approved.

TANGEDCO

Proceedings No:

432 dt

27.09.2014.

Cost of investment

for the renovation

can be realized by

avoiding the

tripping of the unit

for one time, due to

mal function of

existing FSS

System.Approximate

loss due to

shutdown for1.5

days

(cost of realization

per unit is Rs.

5.65)=5.04 Million

Units x 1.5 days xRs.

5.65 = Rs 4.27Crs..

7.68 7.68

- 7.68 - - 7.68 -

Page 66

Page 89: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

75 R&M Supply, Erection, Testing and

Commissioning of Integration

of Turbine Supervisory

Instrumentation and Vibration

monitoring system into DCS

system by Replacing the

existing Philips make Turbine

Supervisory system & VMS

System for Unit-I.

The existing Philips make Turbine supervisory

Instrument System (Sl.No:1) and Vibration

Monitoring System (Sl.No:2&3) was

commissioned in Unit-I during 1987.These

electronic modules in the above system have

served more than its life period. . The OEM

M/s PHILIPHS (system A& B) & M/s CML

(system C) have stopped manufacturing these

modules and the company M/s PHILIPHS

Electronics itself does not exist now. Hence

spare modules could not be procured and the

failed modules also could not be repaired.

Without this system the Turbine cannot be put

into service. Hence it is important that the

existing detoriated system has to be replaced

necessarily and immediately.

It is proposed to completely revamp the

complete Turbo supervisory instrumentation

system and VMS system

1.54 Approval of

Board is

Awaited

Cost of investment

for the renovation

can be realized by

avoiding the

tripping of unit for

one time, due to

malfunction of

existing Turbovisory

and Turbine

protection system.

(i.e.) If unit trips due

to malfunction, it

may require 1.5 days

to 2 days or more for

investigation, tracing

and rectification of

existing system.

Approximate loss

due to shut down for

1.5 days at

Rs.5.65/per unit =

5.04 MU× 1.5 days ×

Rs.5.65 =Rs.4.27 Crs.

1.54 1.54

- 1.54 - - 1.54 -

76 R&M Unit-III - Proposal for R&M of

C&I FSS system into new DCS

system.

1. FSS System has involved thousands of

different types of electronic cards. This system

has served more than 25 years. It has become

aged and obsolete. Due to ageing of the

system it has developed so many operational

problems 2. Now, M/s. BHEL stopped

manufacturing of these types of electronic

cards and more over these cards are not

available in open market. Even, M/s. BHEL is

not ready to repair any of the defective

electronic cards, due to non availability of

spares and technology advancement. 3. The

frequency of failure of electronic cards now

has increased & unexpected failure of these

cards may take place in future which may

cause generation loss. Hence, it is important

that the existing deteriorated system has to be

replaced necessarily and immediately.

8.00 Approval of

Board is

Awaited

Cost of investment

for the renovation

can be realized by

avoiding the

tripping of the unit

for one time, due to

mal function of

existing FSS

System.Approximate

loss due to

shutdown for1.5

days

(cost of realization

per unit is Rs.

5.65)=5.04 Million

Units x 1.5 days xRs.

5.65 = Rs 4.27Crs..

8.00 8.00

- - - - - -

Page 67

Page 90: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

77 R&M Update/Upgrade of Server, C-

Net to computer

communication interface,

network, Workstation, MIS and

control system software of ABB

DCS system in Unit-1

M/s. ABB make Symphony Harmony DCS

system (Client-Server system of architecture)

was supplied and commissioned during 2007

in 210MW Unit-1 of MTPS-1. Existing Servers

and Engineering Work Stations (EWS) are

connected through SCSI interface and are

working with Windows Server 2003 (32 Bit) as

operating system.

Now, the SCSI interface and Windows Server

2003 Operating System are obsolete and not

available in open market.

Also latest available servers and OS

(Windows server 2008 or above) in open

market could not be interfaced with the

existing ABB DCS system. Hence, updation of

M/s. ABB make Symphony Harmony DCS

system is absolutely necessary.

1.00 Proposal yet to

be submitted.

Any failure occurs in

the existing system,

the restoration could

not be possible due

to the obsolescence

of SCSI interface and

Windows 2003

operating system.

Cost of investment

for the updation can

be realized by

avoiding the

tripping/ delay in

bringing back the

unit for one time.

Approximate loss

due to shutdown for

1.5 days

(cost of realization

per unit is Rs.

5.65)=5.04 Million

Units x 1.5 days xRs.

5.65 = Rs 4.27 Crs..

1.00 1.00

- - 1.00 - - 1.00

78 R&M Stage-II – Turbovisory

Renovation including HP/LP

Bypass system, Vibration &

Turbine Supervisory

Instrumentation.

In Unit III & IV Turbovisory including HP/LP

Bypass system, Vibration & Turbine

Supervisory Instrumentation were

commissioned during the year 1989-90 by

M/s. Philips and the original supplier is M/s.

BHEL. The Bypass system plays a vital role

during unit lightup and shutdown period. The

vibration system gives the healthiness of the

Turbine bearings. The Turbine supervisory

instruments includes the expansion of Turbine,

speed of turbine, Eccentricity, etc. which gives

the performance & protection of the Turbine.

Now, frequent problems occur in the above

system due to ageing. Hence, it is necessary to

renovate the above systems.

5.00 Approval of

Board is

Awaited

Cost of investment

for the renovation

can be realized by

avoiding the

tripping of the unit

for one time, due to

mal function of

existing Turbovisory

and Turbine

protection system.

Approximate loss

due to shutdown for

1.5 days

(cost of realization

per unit is Rs.

5.65)=5.04 Million

Units x 1.5 days xRs.

5.65 = Rs 4.27 Crs..

5.00 5.00

- - - - - -

Page 68

Page 91: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

79 R&M Supply, testing and

commissioning of SOX/NOX

analyzer – 4 sets for unit-I to IV

of MTPS-1.

As per environmental norms, SOX/NOX

needs to be monitored and controlled

continuously. Online SOX/NOX monitors are

used for closely monitoring, giving feed back

and quantifying the contents of SOX and NOX

in the flue gas. Based on the feed back, the

quality of coal and corrective action such as

controlling the combustion and furnace

temperature and feeding better quality of coal

to the boilers from among available stock can

be taken. It is a statutory provisions as

insisted by TNPCB

1.18 Approved vide

CMD

(TANGEDCO)

Proceedings

No.512.

dt.10.12.13.

Indent No.65,

Dt.28.01.2015.

Online SOX/NOX

monitors are used

for closely

monitoring, giving

feed back and

quantifying the

contents of SOX and

NOX in the flue gas.

Only based on the

feed back, the

quality of coal and

corrective action

such as controlling

the combustion and

furnace temperature

and feeding better

quality of coal to the

boilers from among

available stock can

be taken. Hence the

provision of online

SOX/NOX monitors

are essential and is

inevitable and also

to meet the

requirement of

statutory provisions

as insisted by

TNPCB

1.18 1.18

- 1.18 - - 1.18 -

- - - - - - EM-I

Page 69

Page 92: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

80 Regular Procurement of one number

Spare HV/LV Coils for AREVA

make Generator Transformer.

The vital spare coils have to be procured from

the OEM M/s.AREVA which is required

for Unit-4. There is no spare HV/LV Coils

available at MTPS-1 to meet out any

emergencies, which may causes huge

generation loss. Hence, it is proposed to

procure a spare coils to be kept as spare at

MTPS-1, to minimize the down time of

equipment and to avoid generation loss.

1.43 Board If there is a spare

HV /LV Coils for

Generating

transformer

maintained

minimum time

required for rection

and commissioning

will be 25 days only.

But the Original

manufacturers (

OEM) of Generating

ransformer required

minimum 24 months

time from the clear

P.O for design

manufacture &

supply of stator.

Generation loss per

day= 5.04MU x

Rs.5.0 =Rs.252 lakhs

(the above values

only Generation

loss excluding spares

cost). The

replacement cost is

meager while

comparing with

generation loss/Day.

This provision is

made to minimize

1.434 1.434

- - - - - -

Page 70

Page 93: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

81 Regular Procurement of one number

Spare HV/LV Coils for BHEL

make Generator Transformer.

These vital spare coils have to be procured

from the OEM M/s. BHEL which are

required for new spare Generator

Transformer. There is no spare HV/LV Coils

available at MTPS-1 to meet out any

emergencies, which may causes huge

generation loss. Hence, it is proposed to

procure a spare coils to be kept as spare at

MTPS-1, to minimize the down time of

equipment and to avoid generation loss.

1.80 Board If there is a spare

HV /LV Coils for

Generating

Transformer

maintained

minimum time

required for rection

and commissioning

will be 25 days only.

But the Original

manufacturers(OEM

) of Generating

ransformer required

minimum 24 months

time from the clear

P.O for design

manufacture &

supply of stator.

Generation loss per

day= 5.04MU x

Rs.5.0 =Rs.252 lakhs

(the above values

only Generation

loss excluding spares

cost). The

replacement cost is

meager while

comparing with

generation loss/Day.

This provision is

made to minimize

1.796 1.796

- 1.80 - - 1.80 -

82 PAT Replacement of existing ABB

& “ALIND” make VCB panels

in 6.6KV 1A,1B, 2A,2B,C1 & C2

buses and RWPH 6.6KV Switch

Gear system in MTPS-I

The ALIND make breakers have served for

more than 25 years, frequent failures of

operating mechanism, vacuum interrupters

etc. arises due to aging and normal wear and

tear which required adequate quantity of

spares and necessary services from the

company. But it is reliably learnt that the

company M/s. ALIND is either sick or

discontinued manufacturing of this type of

6.6KV VCB panels now existing at MTPS.

Because of this, spares and service for the

breakers are not available from the company,

which results in loss of generation whenever

there is any abnormality in the breakers.

10.76 Board In the event of

failure of 1A, 1B,

2A2B,C1 & C2 buses,

Generation loss per

day= 5.04MU x

Rs.4.51 =Rs.225 lakhs

(the above values

only Generation loss

excluding spares

cost).

The replacement cost

is only 1000 lakhs.

The payback period

is 4 days (approx.) of

Generation / Unit.

10.76 10.76

- - - - - -

- - - - - - EM-II

Page 71

Page 94: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

83 Regular Replacement of 30 Nos.

existing 230 KV SCT make

Current Transformers by new

proven make Current

Transformers at 230 KV switch

yard.

It is essential to replace the existing SCT

make CTs due to steep rising of TAN-DELTA

values within a short period which may cause

failure of CTs. If any mishap happens it will

lead to secondary damages to other electrical

equipments in the 230 KV Switch yard which

will affect the power generation of 4 X 210 MW

MTPS.I and stall the power evacuation & thus

resulting heavy loss to TANGEDCO. .It is

essential to replace the existing CTs having 40

KA / 3 seconds to 50 KA/ 3 seconds due to

increasing of fault level due to commissioning

of New generating station and substations in

the forthcoming years.

1.15 After getting

budget

approval, this

work will be

taken up

The work is essential

due to increase in

fault level.

1.50 1.50

- 1.15 - - 1.15 -

84 Regular Replacement of existing 48 Nos

of 40 KA 230 KV Current

Transformers by 50 KA / 3

seconds short time current

rating CTs in 16 No bays at 230

KV Switch yard.

It is essential to replace the existing CTs

having 40 KA / 3 seconds to

50 KA/ 3 seconds due to increasing of fault

level due to commissioning of New generating

station and substations in the forthcoming

years.

3.00 After getting

budget

approval, this

work will be

taken up

The work is essential

due to increase in

fault level.

1.50 3.00 1.50

- - - - - -

85 Regular Replacement of existing

‘ALIND’ Make 6.6 KV MOCB

Panels in Ash handling pump

house stage-I Switch gear

system by new vacuum circuit

breaker panels.

At AHPH Stage-I there are 17 Nos. ‘ALIND’

make MOCBs in service for more than 25

years. These types of breakers have become

obsolete and the spares are not available.

These breakers are for HT motors which are

used for disposal of Unit I & II Ash slurry

water from the ash slurry sump to ash dyke.

Failure of the existing system will lead to

tripping of two units of Stage-I.Hence, it is

very much essential to replace the existing 6.6

KV MOCB Panel by new version VCB Panels.

Cost of investment for the renovation can be

realized by avoiding the forced outages due to

the breakdown of existing old MOCB HT

Breakers because of non-availability of spares

3.00 After getting

budget

approval, this

work will be

taken up

The 6.6KV ALIND

make MOCB HT

switchgear panels at

AHPH-I, which were

erected &

commissioned in the

year 1987 has served

their life period of 25

years and hence

couldn’t be expected

to perform trouble

free operations for

the further years due

to the non-

availability of the

spares & services

from the company.

Due to the usage of

oils, frequent

occurrences of oil

spillages and leaks

warranted

shutdown/forced

outages of the

breakers which

needs almost

maintenances

attention to avoid

flashovers/loss of

generation.

1.50 3.00 1.50

- 1.50 1.50 - - 3.00

MRT - - - - - -

Page 72

Page 95: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Capitalis

ation (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalis

ation (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

FY

2016-17

FY 2017-

18

FY 2018-

19

FY

2016-17

FY

2017-18

FY 2018-

19

FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation

Details of Board

approval

Cost benefit

analysis

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

86 R&M Replacement of the existing

Static version Generator

Protection Relay panel by latest

version of Numerical Generator

Protection Relay panel in Unit-

II & III.

In Unit-II & III of MTPS-I, the Static version

Generator Relay panels of version GSX5e

supplied by M/s.ABB Ltd, Vadodara during

the years 1987 and 1989 respectively, while

commissioning the units. The panels are in

service for more than 25 years. The Generator

Relay panel protects the 210 MW Generator,

250MVA Generator Transformer, 16MVA Unit

Auxiliary Transformers etc., M/s.ABB has

phased out the GSX5e model and it is not in

their manufacturing scope. The existing system

is functioning with old version of relays and

has become obsolete and requires urgent

refurbishment.

1.40 Administrative

approval

accorded vide

TANGEDCO

proceedings

(CMD) No.394

dated 05.09.14.

Any breakdown in

the existing

Generator Protection

Relay panel of Units-

II & III may lead to

tripping of

Generating units.

The loss of

generation due to

forced outage of one

210 MW for one day

is 5.04 million units.

Loss of revenue is

Rs.2.52 Crs. (5.04

million units @ Rs.5

per unit). The cost of

replacement of

existing Generator

protection Relay

panel is Rs.0.7 crore

for one generating

Unit. Hence the

payback period is

less than one day.

1.4 1.4 0.00 0.00 0.00

- 1.40 - - 1.40 -

87 R&M Provision of Integrated Energy

Management System (IEMS) in

MTPS-I with replacement of

existing 28 Nos 110V, 1Amps,

class 0.5 accuracy energy meters

of various make by new high

accuracy 110V, 1Amps, class 0.2

accuracy with Availability

Based Tariff (ABT) features

meters having necessary

communication ports suitable

for energy management system.

In MTPS-I, Static Trivector meters are there

with 110V, 1Amps class 0.5 Accuracy without

any communication between the meters or to

the existing LAN system. For higher accuracy,

existing meters have to be replaced by new

high accuracy meters of class 0.2 having

necessary communication ports suitable for

energy management system to analyze and to

take remedial action to reduce auxiliary

consumption.

2.80 Administrative

approval to be

obtained from

the competent

authority.

Cost of investment

for the Provision of

Integrated Energy

Management System

can be realized by

the way of analyzing

the auxiliary

consumption of all

the four units and in

turn reducing the

auxiliary power

consumption.

2.80 2.80

- - - - - -

454.48 217.61 233.83 127.67 136.90 109.20 83.75 17.74 101.27 65.59 3.08 113.77 57.75 Grand Total .................

NOTE:- The Capital works are to be done by Board's own fund.

Page 73

Page 96: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17FY 2017-

18FY 2018-19

FY 2016-

17

FY 2017-

18FY 2018-19

1 CAP/ Supply

Design, Engg, supply and erection of

new 1000 MT capacity silos and

compressor room, supply, erection,

testing & Commissioning of fly ash pipe

lines & structures from ESP-I, II & III to

new silos.

The existing silos are in worn out condition . To avoid

pollution and to increase the storage capacity of the silo

and to avoid wet sluicing of fly ash.

28.24Board already

approved

To meet the Pollution Control Board's

Norms.28.240 28.240 28.24 - - 28.24 - -

2 C&I/CAP SupplyProcurement of Microprocessor based

Gravimetric feeder system

Currently, the coal fed to boilers is measured in

volumetric mode. Gravimetric mode provides a more

accurate measurement of coal and better control over

coal feeding. Coal being the biggest input to the

thermal power process, accurate measurement shall

result in exact measurement of heat rate, used to

evaluate the station performance under PAT scheme.

3.00Proposal under

preparation

Gravimetric feeding system on

implementation will result in precise

measurement of the coal input to

boiler. Coal being the major cost

component in unit cost of generation,

accurate measurement will result in

exact calculation of heat rate and

assessment of generation cost.

3.000 3.000 3.00 - - 3.00 - -

3 C&I/CAP Supply

Up gradation of Analog based controls -

Iskamatic panels-EAST & ATRS etc., for

three 210 MW KWU Turbine control

systems

Several modules of existing Analog Based control

system of more than 30 years old technology have been

declared as obsolete by M/s.BHEL, EDN, Bangalore. In

case of failure of non available electronic module, the

unit will be in long shutdown for replacement.

Upgradation of this vital turbine control system to

latest Digital based Turbine Control System has to be

carried out for all the three units of NCTPS.

15.43

Board

App.No.483.

DT.06.11.2014

Unit trippings and turbine control

system disturbances due to failure of

aged and obsolete electronic modules

shall be eliminated. Estimated on the

disturbances that occurred due to

EAST system during the last three

years, the monetary savings in respect

of reduction of forced ouatges shall be

Rs.6 Crs. per annum. Saving on costly

spares procurement will be Rs.1 Crore

per annum

15.430 15.430 15.43 - - 15.43 - -

4 C&I/CAP Supply

Up gradation of Honeywell's TDC 3000

System in one 210 MW unit used for

controlling the 210 MW Unit process

systems & auxiliaries.

Several modules of existing Honeywell's TDC 3000

System have been declared as obsolete. More than 40%

of modules have been declared as obsolete. K2LCN

modules have been decalred as obsolete in the year of

2006 and since then this system is being maintained.

To overcome the obsolete problem declared by OEM,

the system require renovation and also to utilsie the

electronic modules retrieved from renovated unit as

very essential spares in the other two units.

10.00Proposal under

preparation

Savings due to elimination of

procurement of costly Honeywell

spares would be Rs.1.5 Crs. per

annum. Savings due to elimination of

forecasted unit trips due to TDC 3000

system failure would be Rs.2.5 Crs.

per annum

10.000 10.000 10.00 - - 10.00 - -

5MRT/CAP

SUP&WORKS

Design,Engg., supply, installation,

testing and commissioning of Generator

Relay Protection Panel for Unit 1 & 2

Since the existing static generator protection system has

become obsolete, it is proposed to install numerical

protection system. The numerical protection is in

accordance with current protection standards dictated

by the CIGRE and CBIP. This system will ensure

reliable protection for the generator and associated

systems.

2.50Proposal under

preparation

The advanced numerical protection

system will ensure reliability and

safeguard the 210 MW generator and

associated systems. Unit trippings due

to faulty protection system shall be

eliminated, resulting in savings of

Rs.50 Lakhs per each cycle of tripping

and resynchronizing.

2.500 2.500 2.50 - - 2.50 - -

ANNEXURE 3

NORTH CHENNAI THERMAL POWER STATION - STAGE-I(3x210MW)

FY 2016-17 FY 2017-18 FY 2018-19

S.

No.

Name of the

Scheme

Details of work furnishing list of major

itemsTechnical justification

Estimated

Cost (Rs.

Crore)

Details of

Board

approval

Cost benefit analysis

TANGEDCO's Submission Approved by the Commission

Capital Investment Plan for control period from FY 2016-17 to 2018-19

CapitalisationCapital Expenditure

Page 79

Page 97: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17FY 2017-

18FY 2018-19

FY 2016-

17

FY 2017-

18FY 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

S.

No.

Name of the

Scheme

Details of work furnishing list of major

itemsTechnical justification

Estimated

Cost (Rs.

Crore)

Details of

Board

approval

Cost benefit analysis

TANGEDCO's Submission Approved by the Commission

Capital Investment Plan for control period from FY 2016-17 to 2018-19

CapitalisationCapital Expenditure

6MRT/CAP

SUP&WORKS

Design,Engg,Supply,Erection, Testing

and Commissioning of integrated energy

monitoring system

The energy generated, spent as APC and exported are

measured currently using static meters and the daily

energy data are collected manually. The proposal aims

are installing numerical high accuracy smart energy

meters at all critical energy nodes and consolidate the

energy information using software tools for energy

management. This project has already been

implemented in TTPS

2.50Proposal under

preparation

This project shall ensure that the

energy generated, consumed inhouse

and exported to grid are measured

accurately in real time, eliminating

manual errors and providing

analytical tools for assessing energy

consumption in targeted load points

for reduction of auxiliary power

consumption.

2.500 2.500 2.50 - - 2.50 - -

7

Providing of additional fire hydrant

system for conveyors at higher elevation

for effective fire fighting.

At present the fire hydrant system for conveyors at

higher elevations is linked to common plant hydrant

Network and much difficulty is being faced in uplifting

of fire water to conveyors at higher elevation due to

ageing of the existing network in emergency situation.

Hence this work is vital in the fire safety point of view.

3.00Proposal to be

sent

In order to have speedy and effective

fire quenching operation for the

conveyors at higher elevation,

providing additional network is vital

in the fire safety point of view.

3.000 3.000 3.00 - - 3.00 - -

8Cap/ Sup&W/

O&E

Procurement & Installation of Continous

Ambient Air Quality Monitoring Station

complete set (with shelter,Air

conditioners, accessories, furnitures,data

transfer facility from locations of around

5 Km.) - 2 Nos.

TNPCB has directed to provide 4 Nos. CAAQMS with

data uploading facility vide their Lr.dt:31.12.09. 2nos.

Has been already procured and the remaining 2 nos.

need to be procured now.

1.50 To be obtainedStatutoary provision to be made as per

TNPCB norms1.500 1.500 1.50 - - 1.50 - -

9Cap/ Sup&W/

O&E

Surveillance System with HD camera at

various location in NCTPS-I campus on

Security aspects (IP based CCTV

cameras)

For installation and commissioning of HD remote

surveillance with with HD camera at various location

in NCTPS-I campus on Security aspects

2.00 To be obtained

Surveillance System with HD camera

at various location in NCTPS-I is vital

in the security point of view

2.000 2.000 2.00 - - 2.00 - -

10

Capital

modification of

existing Gas

Chlorination

system by new

Electrochlorination

system.

Supply and Erection and commissioning

of new Electrochlorination system

including all the materials required

In order to eliminate unsafe operating hazards in

existing gas chlorination and dependency on

outsourced agency for liquid chlorine, totally safe and

environmentally non hazardous, self contained new

electrochlorination system is essential.

30.00

Proposal

submitted for

obtaining

Administrative

Approval is

Under process.

The operating cost of Gas chlorination

system is double the operating cost of

Electro Chlorination System. Hence,

Electro Chlorination is advantageous

to TANGEDCO , as it is totally safe

and environmentally non hazardous.

As the proposal is a capital

modification of existing system of gas

chlorination, pay back cannot be

envisaged.

20.000 30.000 10.000 - 20.00 10.00 - - 30.00

11

Provision of 1 No.

Spare 25 Ton

Capacity EOT

Crane for CWPH

Supply, Erection Spare 25 Ton Capacity

EOT Crane in the existing Rails for

CWPH

In order to carryout emergency breakdown in CWPs, to

minimise the shut down period of CWPs and to carry

out maintenance activities of any of the CWPs,

simultaneously during OH of other pumps, without

loss of time, to avoid loss generation.

1.30 Under process.

The standby pump availability can be

ensured by avoiding major loss of

generation during emergencies such as

simultaneous failure of more than 1

no. of CWP out of 9 nos. of all the

three Units.

1.000 1.300 0.300 - 1.00 0.30 - - 1.30

12

Provision of 1 No.

Spare 15 Ton

Capacity Gantry

Crane for forebay

of CWPH.

Supply and Erection Spare 15 Ton

Capacity Gantry Crane in the existing

Rails of Forebay for CWPH.

In order to maintain as emergency for carryout

breakdowns in all CWPs, to restore the generation loss.1.10 Under process.

The standby pump, Suction bay and

TWS availability can be ensured by

avoiding major loss of generation

during emergencies such as

simultaneous failure of more than 1

no. out of 9 nos. of CWP and its

equipments in Suction bays of all the

three Units.

1.000 1.100 0.100 - 1.00 0.10 - - 1.10

13

Procurement of 3

Nos of Pull out

Assembly for

Cooling Water

Pumps from the

OEM M/ s. BHEL

Pull out Assembly Complete set for

Cooling Water Pump Model: CW 1Q

In order to improve the performance of the existing

pumps which are now running with worn out

components during the past 20 years, replacement of

total Pull out assembly at the rate of 1 set per Unit per

year for all the three units is essential for quality

maintenance planning.

20.00 Under process. For quality maintenance planning. 6.000 7.000 20.000 7.000 - - - - - -

Page 80

Page 98: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17FY 2017-

18FY 2018-19

FY 2016-

17

FY 2017-

18FY 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

S.

No.

Name of the

Scheme

Details of work furnishing list of major

itemsTechnical justification

Estimated

Cost (Rs.

Crore)

Details of

Board

approval

Cost benefit analysis

TANGEDCO's Submission Approved by the Commission

Capital Investment Plan for control period from FY 2016-17 to 2018-19

CapitalisationCapital Expenditure

14AHP/CAP Sup&

Works

NCTPS- I - MI-AHP- Renewal of

damaged Recovery Water Line 1 from

Recovery water Pump house to Ash

Handling Pump House with fabricated

MS pipes of 12mm thickness including

erection, testing and commissioning

along with all necessary accessories to

transfer ash water to Ash handling pump

house sump

The existing recovery water line which served its life

may not be put into continuous service since at various

locations it is found in weak condition and it is getting

burst out frequently. As per TNPCB norms, the

Recovery water line should be run continuously so as

to avoid stagnation of water in the dyke and the

overflowing of the same to nearby village areas.

2.93

TANGEDCO

Proceeding

(CMD) No.148,

dt.08.04.15.

Effective utilization of decanted water

from the Ash Dyke to Ash handling

Pump House.Minimizing the

consumption of sea water

2.930 2.930 - - - - - -

15 AHP/CAP SuPSS 316L complete assembly of scrapper

feeder including spares

The existing scrapper feeders were completely worn

out since the same were installed during the

commissioning of the Unit.The structural assembly of

the feeders were dislodged and requires

replacement.The bottom plates got corroded leading to

inadequate sealing to the feeder trough which inturn

leads to the air ingress in to the boiler affecting the

performance of the Boiler.

3.16

Scrapper feeder will avoid hindrance

to the normal evacuation of the ash

from boiler and the air ingress into the

system will be avoided. This will

increase the performance of the Boiler

and to maintain uninterrupted ash

evacuation and to sustain maximum

capacity of power generation which

will beneficial to TANGEDCO.

3.160 3.160 - - - - - -

16AHP/Cap Sup&

works Erection of PDFACS for Units I,II & III

The existing PDFAC system is in worn out condition

due to ageing and saline atmosphere. This leads to

unsafe working condition. At present the PDFACS

vessels are beyond the stage of reconditioning and

requires replacement. The replacement of the PDFACS

vessels will be carried out in the phased manner.

Further the PDFACS are not installed in the 4th ,5th

and sixth rows of Unit III, 5th and 6th rows of unit II

and 3rd, 4th, 5th and 6th rows of unit I.

35.00Estimate to be

submitted

To comply with the TNPCB norms of

100% fly ash evacuation.17.500 35.000 17.500 - - - - - -

17 AHPSupply, Erectiion & commissioning of

RWL - 3

The existing recovery water line which served its life

may not be put into continuous service since at various

locations it is found in weak condition and it is getting

burst out frequently. As per TNPCB norms, the

Recovery water line should be run continuously so as

to avoid stagnation of water in the dyke and the

overflowing of the same to nearby village areas.

3.50Estimate to be

submitted

Effective utilization of decanted water

from the Ash Dyke to Ash handling

Pump House.Minimizing the

consumption of sea water

1.200 3.500 2.300 - - - - - -

18 AHP

Supply, Erection & commissioning of

ASDL phase I - AHPH to Stage -2

Compund wall

The existing cast basalt lined pipes which were

commissioned during the project are in worn out,

eroded condition. Ash slurry pipe line leakes are to be

arrested and should be made fit for discharging slurry

to the ash dyke and no ash water shall be let out in the

back waters as per TNPCB norms. Hence it is essential

to renew the damaged / worn out pipes in a phased

manner.

10.00

Approval

awaited from

Head Quarters

for supply and

erection of cast

basalt pipesfor

a value of Rs3.5

Crs..

Other indents

to be submitted

To comply with the TNPCB norms. 4.000 10.000 6.000 - - - - - -

Page 81

Page 99: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17FY 2017-

18FY 2018-19

FY 2016-

17

FY 2017-

18FY 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

S.

No.

Name of the

Scheme

Details of work furnishing list of major

itemsTechnical justification

Estimated

Cost (Rs.

Crore)

Details of

Board

approval

Cost benefit analysis

TANGEDCO's Submission Approved by the Commission

Capital Investment Plan for control period from FY 2016-17 to 2018-19

CapitalisationCapital Expenditure

19AHP/ R&M/

SupplySpares for Ash Slurry Disposal Pump

The SAM make model ARN 200/550 Ash consists of

more than 34 part such as impeller, Inner casing, Wear

plates, Gland housing etc. and whenever the

breakdown occurs in ASDP, it will affect the Ash slurry

mixture pumping and the slurry level in the trench will

increase which leads to stoppage of scrapper feeder and

clinker grinder and slag level increases in boiler and

thereby loss of power generation. Some of the spares

which are not readily available have to be procured

from the OEM only. Hence it is essential to procure

the spares for ASDP on proprietary basis only.

1.10Indent to be

submitted

The procurement of spares will sustain

Maximum power generation by

effectively evacuating the ash slurry

mixture to Ash dyke.

1.100 1.100 - - - - - -

20BM/CAP

Sup&WorksRenewal of eroded / damaged RH coil

In unit II RH coil are found to be eroded due to flue

gas. The existing reheater coil served more than 19

years. Nowdays frequent boiler tube puncture is

occuring in Reheater area resulting in loss of generation

and outage of boiler

6.50

Proposal sent

on 05.02.2016

awaiting for

HQ approval

Boiler outage will be reduced, PLF

will be improved by avoiding the cost

of repair Rs.6.00 Crs. and total

amount of Rs.4.7 Crs. towards

generation loss per no of boiler outage

of 01 time.

6.500 6.500 - - - - - -

21BM/CAP

Sup&Works

Renewal of damaged Sky climber for

boiler pressure parts

Existing sky climber is in wornout condition. The same

has to be renewed with new one . At present no sky

climber available at NCTPS - I to attend the breakdown

work in boiler Ist pass.

1.50

Proposal sent

on 05.02.2016

awaiting for

HQ approval

Boiler Down time will be reduced

during water wall puncture and

attending work in boiler first pass by

avoiding the cost of repair Rs. 1.00 Crs.

and total amount of Rs.4.3 Crs.

towards generation loss per no of

boiler outage of 01 time.

1.500 1.500 - - - - - -

22BM/CAP

Sup&Works

Painting of Epoxy/Anti corrosive over

the Boiler structures

To prevent further damage / failure of boiler sturcture

due to corrosion of saline atsomphere. The proposal

submitted approved by CMD / TANGEDCO and

tender in process.

5.25

Tender

specification

sent to HQ.

After approval

of the tender

specification,

tender will be

floated.

To improve the life of boiler structure.

To avoid loss of generation. If boiler

structure is failed it will take atleast 10

days for rectification. The generation

loss works out to Rs.31.00 Crs..

5.250 5.250 - - - - - -

23BM/CAP

Sup&Works

Revamping of Air pre heater for one Unit

including providing double sealing

arrangements in Unit-II

Due to supply of low colorific value of coal, more

quantity of is being consumed to attain the full load

and correspondingly more quantity of primary and

secondary air is fed to the boiler. Hence, the leakage

percentage is always more than 10% in the Air pre

heater which is more than the designed allowable

leakage percentage of 8% which result in overloading

of ID,PA & FD fans. Therefore, it is proposed to

provide double sealing arrangement in Unit II Air pre

heater during the forth coming overhaul.

6.50Approved by

CMD

To reduce air leakage and air

ingression in air preheater and

improve boiler efficieny. Loading of

ID & FD fan will be minimised

including reduced auxiliary power

consumption by avoiding the cost of

repair Rs6.50 Crs. and total amount of

pay back period of Rs1.87 Crs. / year

6.500 6.500 - - - - - -

24BM/Cap Sup &

Works

Renewal of damaged radiant roof in Unit-

I Boiler

During unit I overhaul it was observed that the radiant

roof tubes are found in damaged condition. Hence it is

essential to renewe the damaged radiant roof tubes to

avoid breakdown and loss of generation.

2.00Proposal to be

sent

Boiler outage will be reduced, PLF

will be improved by avoiding the cost

of repair Rs. 2.00 Crs. and total

amount of Rs.4.7 Crs. towards

generation loss per no of boiler outage

of 01 time.

2.000 2.000 - - - - - -

Page 82

Page 100: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17FY 2017-

18FY 2018-19

FY 2016-

17

FY 2017-

18FY 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

S.

No.

Name of the

Scheme

Details of work furnishing list of major

itemsTechnical justification

Estimated

Cost (Rs.

Crore)

Details of

Board

approval

Cost benefit analysis

TANGEDCO's Submission Approved by the Commission

Capital Investment Plan for control period from FY 2016-17 to 2018-19

CapitalisationCapital Expenditure

25BM/Cap Sup &

Works

Renewal of damaged / leaky flue gas

duct APH out let to VGV area in unit-II

The ducting system is provided for flow of exit flue gas

from boiler to chimney through ESP. Due to continuous

flow of abrasive nature of ash, the duct wall, diversion

bends and pipe supports gets eroded, punctured and

damaged.The air ingress through the damaged parts

into the flue gas system causes overloading of ID fan

inturn positive furnace pressure in boiler.

1.50

Proposal sent

on 09.02.2016

awaiting for

HQ approval

To reduce air ingress and to avoid ID

fan overloading in turn avoding cost

of Repair of Rs.1.50 Crs., total amount

of cost benefit is Rs.31.23 lakhs / year

1.500 1.500 - - - - - -

26BM/Cap Sup &

Works

Renewal of damaged insulation from

VGV area to mechanical hopper and

renewal of insulation in Unit-II

Over a period and due to normal wear and tear, most

of the insulated area in Flue gas got damaged. The

damaged insulation areas are to be re-insulated to

avoid heat loss for better efficiency of the equipments

and also for human safety.

2.00Proposal to be

sent

To reduce air ingress and to avoid ID

fan over loading.2.000 2.000 - - - - - -

27BM/Cap Sup &

Works

Renewal of damaged / leaky FG duct at

mechanical hopper to ESP inlet in unit-II

Over a period and due to normal wear and tear, most

of the insulated area in Flue gas got damaged. The

damaged insulation areas are to be re-insulated to

avoid heat loss for better efficiency of the equipments

and also for human safety.

1.50

Proposal sent

on 09.02.2016

awaiting for

HQ approval

To reduce air ingress and to avoid ID

fan over loading in turn avoding cost

of Repair of Rs.1.50 Crs., total amount

of cost benefit is Rs.31.23 lakhs / year

1.500 1.500 - - - - - -

28BM/Cap Sup &

Works

Renewal of damaged part of air noise

attenuate assembly for PA/FD fans for

unit I,II& III.

In Primary air fans the existing attenuate is severely

damaged condition, causing chocking of air flow and

the damages in the wool catridge may fell down and

will damage the impeller during fan in service. Hence,

it is necessary to renew the attenute assembly during

overhaul.

1.50Proposal to be

sentTo avoid overload to PA fan. 1.500 1.500 - - - - - -

29BM/Cap Sup &

Works

Renewal of damaged ESP collecting &

emitting electrodes in unit II.

It was found that the most of the collecting Electrodes

in unit II ESP are in wornout condition and dislocated

from its orginal position due to collection of heavy ash

and fields fail frequently. Hence, it is proposed to

renew the collecting & emitting electrodes during

forthcomig capital overhaul in order to keep the field in

healthy condition to maintian the rated efficiency and

pollution control board norms.

8.00Proposal to be

sent

To improve ESP collection efficiency

inturn reduce the ID fan loading to

mainting the SPM level.

8.000 8.000 - - - - - -

30BM/Cap Sup &

Works

Renewal of damaged PA fan spiral

casing for unit-II

The existing spiral casing in PA fans are in severely

damaged & corroded condition due to normal ageing

and saline atmosphere.This has to be renewed to avoid

breakdown of equipments.

1.50Proposal to be

sent

To avoid air leakage and overloading

of PA fan1.500 1.500 - - - - - -

31BM/Cap Sup &

Works

Renewal of damaged / leaky PA hot air

duct in unit II.

The existing PA hot air ducts are in eroded condition

and needs replacement during capital overhaul of

Unit.

1.50Proposal to be

sent

To avoid PA header air leakage and

overloading of PA fan1.500 1.500 - - - - - -

32BM/Cap Sup &

Works

Renewal of damaged ESP internals at

first three rows for unit II.

The Collection efficiency is higer in first three rows,

due to abrassive nature of ash, the internals are in worn

out condition. Inturn reduce the ID fan load current to

maintain the SPM level of ESP. Hence, it need

replacement during capital overhaul of Unit.

2.00Proposal to be

sent

To improve ESP collection efficiency

and to reduce the ID fan load current.2.000 2.000 - - - - - -

Page 83

Page 101: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17FY 2017-

18FY 2018-19

FY 2016-

17

FY 2017-

18FY 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

S.

No.

Name of the

Scheme

Details of work furnishing list of major

itemsTechnical justification

Estimated

Cost (Rs.

Crore)

Details of

Board

approval

Cost benefit analysis

TANGEDCO's Submission Approved by the Commission

Capital Investment Plan for control period from FY 2016-17 to 2018-19

CapitalisationCapital Expenditure

33BM/Cap Sup &

Works

Renewal of damaged / leaky APH casing

and connecting plates

The APH casing are found in thinout condition. To

avoid air leakage and ingress in flue gas path and to

maintain the negative pressure.

1.70Proposal to be

sent

To improve the APH performance by

reducing air leakages and air

ingression and to maintain the

negative pressure and total amount of

pay back period Rs.1.16 Crs. / year 1.700 1.700 - - - - - -

34 CAP/SP/ BMRenewal of eroded / damaged RH tube

and bends for RH coil for Unit I

The existing RH tube served more than 19 years. Due to

frequent failure occuring in Reheater area, it need

replacement.

6.50

Proposal sent

on 09.02.2016

awaiting for

HQ approval

Boiler outage will be reduced, PLF

will be improved by avoiding the cost

of repair Rs. 6.00 Crs. and total

amount of Rs.4.7 Crs. towards

generation loss per no of boiler outage

of 01 time.

6.500 6.500 - - - - - -

35 CAP/SP/ BMRenewal of eroded / damaged RH tube

and bends for RH coil for Unit III

The existing RH tube served more than 18 years. Due to

frequent failure occuring in Reheater area, it need

replacement.

2.00Proposal to be

sent

Boiler outage will be reduced, PLF

will be improved by avoiding the cost

of repair Rs. 2.00 Crs. and total

amount of Rs.4.7 Crs. towards

generation loss per no of boiler outage

of 01 time.

2.000 2.000 - - - - - -

36 CAP/SP/ BMRenewal of damaged various sizes of

Wear resistant plate for flue gas duct.

To fix the wear resistant plates in the flue gas duct

diversion areas to avoid erosion of ducts.1.50

Proposal to be

sent

To avoid erosion of duct and to

improve the life of duct1.500 1.500 - - - - - -

37 CAP/SP/ BMRenewal of damaged 'FD fan shaft,

housing & impellers

To renewe the fan spares , these critical spares are

esstentially required. 1.50

Proposal to be

sent

Boiler outage will be reduced, PLF

will be improved by avoiding the cost

of repair Rs. 1.00 Crs. and total

amount of Rs.4.7 Crs. towards

generation loss per no of boiler outage

of 01 time.

1.500 1.500 - - - - - -

38BM/CAP

Sup&Works

Rectification/Renewal of damaged ESP

collecting & emitting electrodes for Unit

I, II & III

It was found that most of the collecting Electrodes in

unit I,II & III ESP are in wornout condition and

dislocated from its orginal position due to collection of

heavy ash and fields fail frequently. Hence it is

proposed to renew the collecting & emitting electrodes

in a phased manner during forth coming capital

overhaul in order to keep the field in healthy condition

to maintian the rated efficiency and pollution control

board norms.

2.00Proposal to be

sent

To improve ESP collection efficiency,

inturn reduce the ID fan loading to

mainting the SPM level as instructed

by the Pollution board.

2.000 2.000 - - - - - -

39BM/CAP

Sup&Works

Renewal/Rectification of damaged flue

gas duct Unit I & II

The ducting system is provided for flow of exit flue gas

from boiler to chimney through ESP. Due to continuous

flow of abrassive nature of ash, the duct wall, diversion

bends and pipe supports gets eroded, punctured and

damaged.The air ingresses through the damaged part

into the flue gas system causes overload the ID fan

inturn positive furnace pressure in boiler.These

damages are to be rectified during scheduled overhaul

in every year.

3.00Proposal to be

sent

To reduce air ingress and to avoid ID

fan over loading in turn avoding. cost

of Rs.3.00 Crs. total amount of cost

benefit of Rs.31.23 lakhs / year

3.000 3.000 - - - - - -

Page 84

Page 102: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17FY 2017-

18FY 2018-19

FY 2016-

17

FY 2017-

18FY 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

S.

No.

Name of the

Scheme

Details of work furnishing list of major

itemsTechnical justification

Estimated

Cost (Rs.

Crore)

Details of

Board

approval

Cost benefit analysis

TANGEDCO's Submission Approved by the Commission

Capital Investment Plan for control period from FY 2016-17 to 2018-19

CapitalisationCapital Expenditure

40BM/CAP Sup&

Works

Renovation of APH from flange to flange

by providing double sealing

arrangements and by improving heating

element profile in Unit-I

Due to supply of low colorific value of coal, more

quantity of is being consumed to attain the full load

and correspondingly more quantity of primary and

secondary air is fed to the boiler. Hence, the leakage

percentage is always more than 10% in the Air pre

heater which is more than the designed allowable

leakage percentage of 8% which result in overloading

of ID,PA & FD fans. Therefore, it is proposed to

provide double sealing arrangement in Unit II Air pre

heater during the forth coming overhaul.

20.00

Proposal to be

sent for

Approval

To reduce air leakage and air

ingression in air preheater and

improve boiler efficiency. Loading of

ID & FD fan will be minimised

including reduced auxiliary power

consumption by avoiding the cost of

repair Rs6.50 Crs. and total amount of

pay back period Rs1.87 Crs. / year

20.000 20.000 20.00 - - 20.00 - -

41BM/Cap Sup &

Works

Renewal of eroded / worn out LTSH

coil assembly in Unit I & II

LTSH coils are installed at the second pass of boiler.

They are subjected to erosion caused by high velocity of

flue gas and they have served more than 15 years. The

most eroded areas may lead to failure of LTSH tubes

resulting in tube puncture. To avoid tripping of unit

due to this kind of puncture in LTSH coil, these eroded

coils have to be renewed by new coils is essentially

required

10.00

Proposal sent

on 09.02.2016

awaiting for

HQ approval

Boiler outage will be reduced, PLF

will be improved by avoiding the cost

of repair Rs. 10.00 Crs. for both Units

and total amount of Rs.4.7 Crs.

towards generation loss per no of

boiler outage of 01 time/ unit

10.000 10.000 - - - - - -

42BM/Cap Sup &

Works

Renewal of wornout / damaged ESP

collecting & emitting electrodes in unit

I,II & III.

It was found that the most of the collecting Electrodes

in unit I,II & III ESP are in wornout condition and

dislocated from its orginal position due to collection of

heavy ash and fields fail frequently. Hence it is

proposed to renew the collecting & emitting electrodes

in a phased manner during forth coming capital

overhaul in order to keep the field in healthy condition

to maintian the rated efficiency and pollution control

board norms.

8.00Proposal to be

sent

To improve ESP collection efficiency

inturn reduce the ID fan loading to

mainting the SPM level as instructed

by Pollution board.

8.000 8.000 - - - - - -

43BM/Cap Sup &

Works

Renewal of eroded / worn out

Economizer coil assembly in Unit I & II

Economiser coils are installed at the second pass of

boiler. They are subjected to erosion caused by high

velocity of flue gas and they have served more than 15

years. The most eroded areas may lead to failure of

Economiser tubes resulting in tube puncture. To avoid

tripping of unit due to this kind of puncture in

Economiser coil, these eroded coils have to be renewed

by new coils is essentially required

8.00

Proposal sent

on 09.02.2016

awaiting for

HQ approval

Boiler outage will be reduced, PLF

will be improved by avoiding the cost

of repair Rs. 8.00 Crs. for both Units

and total amount of Rs.4.7 Crs.

towards generation loss per no of

boiler outage of 01 time/ unit

8.000 8.000 - - - - - -

44BM/Cap Sup &

Works

Renewal of ID fan spiral casing for unit-

I,II&III.

Over a period and due to normal wear and tear, the

existing spiral casing got severely in damaged

condition.It has to be renewed during forth coming

overhaul for better efficiency of the fans and also for

human safety.

4.00Proposal to be

sent NA 4.000 4.000 - - - - - -

45BM/Cap Sup &

WorksRenewal of wornout/ damaged FD fans

Supply , Erection of FD fans spares to reduce the power

consumption of fans during capital overhaul of Unit.2.00

Proposal to be

sent

Energy conservation of FD fan by

speed reduction to reduce the auxliary

power consumtion 40.00 lakhs/year

(approx)

2.000 2.000 - - - - - -

Page 85

Page 103: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17FY 2017-

18FY 2018-19

FY 2016-

17

FY 2017-

18FY 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

S.

No.

Name of the

Scheme

Details of work furnishing list of major

itemsTechnical justification

Estimated

Cost (Rs.

Crore)

Details of

Board

approval

Cost benefit analysis

TANGEDCO's Submission Approved by the Commission

Capital Investment Plan for control period from FY 2016-17 to 2018-19

CapitalisationCapital Expenditure

46BM/Cap Sup &

Works

Renewal of wornout / damaged Hot end

centre section and its connecting plates

etc.,in either Unit-I or II

The existing APH Hot End Centre section are found

thinned / weakened condition. Air leaks and

ingression found in centre section and guide bearing

area. It has to be renewed during capital overhaul to

improve the APH performance by reducing air

leakages and air ingression .

1.50Proposal to be

sent

To improve the APH performance by

reducing air leakages and air

ingression and If any punctures/

damages occurs in weak portion of

centre section , it will take 4 days to

rectify.The generation loss works out

to Rs.6.55 Crs..

1.500 1.500 - - - - - -

47BM/Cap Sup &

Works

Renewal of wornout / damaged SADC

damper in Unit II.

The existing secondary air damper are in wornout

condition and its has served more than 19 years.1.50

Proposal to be

sent

Boiler outage will be reduced, PLF

will be improved by avoiding the cost

of repair Rs. 1.5Crs. for both Units

and total amount of Rs.4.7 Crs.

towards generation loss per no of

boiler outage of 01 time/ unit

1.500 1.500 - - - - - -

48BM/Cap Sup &

Works

Complete renewal of damaged /

chocked Heating Elements for Unit III

The existing heating elements are found

chocked/eroded condition.It leads to increase in FG

pressure drop across APH causing poor heat transfer

across APH. Hence it needs replacement.

3.75Proposal to be

sent

To improve the APH performance by

perfect heat transfer and also

improving efficiency of boiler and to

maintain the negative pressure and

total amount of pay back period Rs1.87

Crs. / year

3.750 3.750 - - - - - -

49BM/Cap Sup &

Works

Renewal of wornout / damaged various

sizes of Spring seal assembly.

The existing Spring seal assembly are found in

damaged condition due to erosion and normal wear

and tear .This damages will result in air leakage and air

ingression and leads to over loading of ID and PA fans.

Hence it needs repalcement.

1.19Proposal to be

sent

To reduce air leakage and air

ingression in Gullotine gates and

improve boiler efficiency. Loading of

ID & PA fan wil be minimised and

total amount of pay back period Rs1.16

Crs. / year

1.190 1.190 - - - - - -

50 Cap/S/ MPMComplete gear box assembly for HP803

bowl mill-12 Sets.

Existing Gear Box Assemblies in all the Mills are in

Service above 20 years since from the date of

installation and are running with excessive vibrations

leading to frequent mill breakdowns and loss of

generation. When each mill trips, about 40 MW of load

reduction occurs. This loss of generation cannot be

compensated. Hence replacing complete gear boxes is

essential.

22.80

Proposal for

obtaining

administrative

approval sent

for 6 Sets.

Proposal for

balance 6 Sets

to be sent.

Savings per year is 3.74 crore.

Considering 40MW reduction in load

for one mill trip and a down time of 96

Hrs for gearbox works and 3

occurances per year

11.400 22.800 11.400 - - - - - -

Page 86

Page 104: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17FY 2017-

18FY 2018-19

FY 2016-

17

FY 2017-

18FY 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

S.

No.

Name of the

Scheme

Details of work furnishing list of major

itemsTechnical justification

Estimated

Cost (Rs.

Crore)

Details of

Board

approval

Cost benefit analysis

TANGEDCO's Submission Approved by the Commission

Capital Investment Plan for control period from FY 2016-17 to 2018-19

CapitalisationCapital Expenditure

51 CAP/SW /MPM

Supply, erection testing and

commissioning of dynamic classifier

system for 18 Nos of HP 803 Bowl Mills

for three Units in NCTPS I-18 Sets.

The existing static classifier system served more than 20

years. The designed coal finess can be controlled only

to certain extent by manual operation of deflector

plates.The proposed dynamic classifier will improve

the finess of the coal and thereby the unburnt will be

reduced and the boiler efficiency will be improved.

38.67Proposal sent

for approval

Savings per year is 38.16 Crore

considering the reduction from 5 mill

operation to 4 mill operation.

25.780 38.670 12.890 25.78 12.89 - - 38.67 -

52 CAP/SP/ MPM Mill Separator body-3Nos

Existing Separator body in all the mills are more than

25 years old and in wornout condition due to its

continous usage. Coal powder leakages occurs through

the fastening holes. The mill seperator body and the

journal doors are made of hardened materials and

attending the wornouts and damages will not stand for

long. Hence it is proposed to replace the seperator

body in 3 mills in this year

1.20Proposal to be

sent

Savings per year is 2.5 crore.

Considering 40MW reduction in load

for one mill trip and a down time of

96 Hrs for separator body problem

and 2 occurances per year

1.200 1.200 - - - - - -

53CAP/Works/

MPM

MILLS-Painting of entire column of

structurals for all the units

The entire column and sturctures in the mill floor and

in feeder floor incuding bunker are in saline

atmosphere and is in erroded condition. These

structures have to be painted inorder to protect the

sturctures from getting weakened.

3.25Approval to be

obtained

To improve the life of mill structures

in turn avoid loss of generation. If

structure fails, it will take atleast 10

days to rectify. The generation loss

works out to Rs.31.00 Crs..

3.250 3.250 - - - - - -

54 CAP/SW/MPM

Revamping of Air conditioning system

including chiller pipes CWP's,

compressors and Air Handling Units

The Existing AC Plant system served more than 20

years and working with less efficiency. Frequent

breakdown occurs in the compressors, chill water and

condenser water pumps etc., Due to this required temp.

could not be maintained in the unit controll rooms

where the temp. sense instrumentation panels are in

service. Hence the revamping of existing old air

conditioning system and privision of AC package Units

are essential.

6.30

Approval

obtained for 3

Nos screw

chiller and

chilled water

pipe lines.

Approval for

balance

quantities to be

obtained.

Savings per year is 3.28 crore.

Considering 210MW/ Unit reduction

in generation and a down time of min

24 Hrs attending A/C system B/D ,

and 2 occurances per year

6.300 6.300 - - - - - -

55Cap/Sup&W/MP

M

Supply, Erection & commissioning Hot

air gate assembly with pneumatic power

cylinder- 6 Nos.

To replace the Hot air gate assembly with pneumatic

power cylinder in 2 mills in each unit1.05

Proposal to be

sent

Savings per year is 0.94 crore.

Considering 40MW reduction in load,

and a down time of min 6 Hrs for

HAG problems and 12 occurances per

year

1.050 1.050 - - - - - -

56 Cap/Spare/ MPMWorm gear & Worm shaft assembly -8

Sets

8 Sets of gearboxes have to be assembled for

replacement of damaged gearbox & keeping minimum

essential critical spares.

5.40

Approval

obtained for 4

Sets and for the

balance,

approval to be

obtained.

Savings per year is 5.62 crore.

Considering 40MW reduction in load,

and a down time of min 72 Hrs for

Worm gear & Worm shaft assembly

problems and 6 occurances per year

5.400 5.400 - - - - - -

57 Cap/Spare/MPMRoller Journal Assembly without

grinding roller-21 Nos.

Out of 54 Journal assemblies 27 are running with old

bearing and some of the shafts are reconditioned.

Hence 6 Nos. journal assemblies are to be kept as

critical spares for each unit.

4.30

Approval

obtained for 9

Nos, approval

for the balance

quantities to be

obtained.

Savings per year is 2.5 crore.

Considering 40MW reduction in load

for one mill trip and a down time of 8

Hrs for Roller Journal problems and 24

occurances per year

1.800 4.300 2.500 - - - - - -

58 Cap/Spare/MPMHPMS Rollers, BRS and Air Port

Assemblies -18 Sets.

To be used during renewal of worn out rollers and Bull

Ring Segments after guaranteed hours in the mills for 5

mills.

4.60

Approval

obtained for 12

Sets and for the

balance,

approval to be

obtained.

Savings per year is 2.5 crore.

Considering 40MW reduction in load

on one mill trip and down time of 8

Hrs for HPMS Rollers, BRS and Air

Port Assemblies problem and 24

occurances per year

2.800 4.600 1.800 - - - - - -

Page 87

Page 105: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17FY 2017-

18FY 2018-19

FY 2016-

17

FY 2017-

18FY 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

S.

No.

Name of the

Scheme

Details of work furnishing list of major

itemsTechnical justification

Estimated

Cost (Rs.

Crore)

Details of

Board

approval

Cost benefit analysis

TANGEDCO's Submission Approved by the Commission

Capital Investment Plan for control period from FY 2016-17 to 2018-19

CapitalisationCapital Expenditure

59 Cap/Spare/MPM Various types of Gear box bearings Required for replacement of worn out bearings in gear

box running with High vibration in all three units1.20

Proposal to be

sent

Savings per year is 3.74 crore.

Considering 40MW reduction in load

for one mill trip and a down time of 96

Hrs for gearbox bearing works and 3

occurances per year

0.200 1.200 1.000 - - - - - -

60 CAP/SW/MPMMiscellaneous capital supply & works of

Mill Plant Maintenance Division

To ensure continuous service of all the mills and avoid

loss of generation and oil consumption these spares are

essentially required as and when maintenance

problems arises in the 18 Nos mills in all the three

units.

35.00Approval to be

obtained.

If adequate spares are not avialable in

time , loss of generation of 10 days is

considereded and the loss would be to

Rs.31.00 Crs.

35.000 35.000 - - - - - -

61TM/CAP (carry

over) SupplyBHEL Spares for Turbine & Auxiliaries

Spares for Turbine can be procurred only from the

OEM, M/S BHEL on proprietary basis - to ensure

quality, reliability. Timely procurement of the spares

will ensure execution of Overhauls within the

scheduled period.

3.00PO to be

placed at HQs

1). Can avoid prolonged downtime for

want of spares and COH schedule can

be adhered.

2). PLF will improve.

3). Genuine spares from OEM will

ensure long service life of the spares

and minimum forced outage of the

Turbine.

3.000 3.000 - - - - - -

62TM/CAP (carry

over) SupplyPHE Plates assembly

PHEs are the heat exchangers with the cooling medium

as sea water. Due to salinity, the end plates of MS

material got eroded and corroded and frequent

leakages of DM water noticed. The PHE is cooling the

ACW water which in turn cools the bearings of Main

Turbine, BFP, CEP, Vaccum Pumps, Boiler Fans etc.

The damaged plates of all the 9 nos PHE's are to be

renewed for effective cooling which will ensure

generation and high PLF of the station.

2.00Yet to be

obtained

1). Effective cooling of ACW ensure

optimum loading of the critical / vital

equipments. 2). This will

ensure high PLF. 3). Will

reduce the generation cost by way of

minimum wastage of DM water.

2.000 2.000 - - - - - -

63TM/CAP (carry

over)

Miscellaneous works - Less than 1 Cr.

value - Works - 1.00 Cr.; Supply - 3.77

Cr; Supply & works - 0.35 Cr; Spare -

1.05 Cr.

All the proposed allocation is essentially required for

renewal of equipments / spares that had already

served for more than 20 years and to be replaced in

phased manner for maintaining sustained generation in

forthcoming years.

6.17Yet to be

obtained

Will improve the heat rate, avoid

prolonged forced outage period and

efficiency of the Units.

6.170 6.170 - - - - - -

64TM/CAP works

(new schemes)

COH/AOH of Turbine axial key

correction works, HP module, IP inner

casing replacement work in unit-II.

Unit-II of NCTPS was commissioned on 27.08.1995.

Right from the commissioning of the unit, the axial shift

is increasing in the positive direction. M/s.BHEL

recommended to replace the HP module along with IP

inner casing. The last COH of unit-II was done during

the month of Oct'2007 as per the OEM

recommendations the COH of turbine to be carried out

after 50,000 running hours of turbine. Since unit-II

crossed 50,000 running hours during the year 2013-14.

5.00Yet to be

obtained

Within six months period of axial key

correction work, the unit is being

shutdown for another correction. This

permenant measure suggested by

M/s.BHEL will avoid such forced

outage every six months once and

result in savings of Rs.11.5 Cr. per

outage. Also, this mandatary COH

will result in trouble free operation of

the Turbine for further 50,000 hrs. or 7

yrs.

5.000 5.000 - - - - - -

65TM/CAP works

(new schemes)COH of Turbine in unit-I.

In unit-I of NCTPS-I capital overhauling of turbine was

completed on 21.06.2010. As per the OEM

recommendations the COH of turbine to be carried out

after 50,000 running hours of turbine.

5.00Yet to be

obtained

This mandatary COH will result in

trouble free operation of the Turbine

for further 50,000 hrs or 7 yrs. of

operation.

5.000 5.000 - - - - - -

66TM/CAP Supply

(new schemes)

procurement of condenser outlet bend

pipes 1600 mm dia. – 2 nos. for unit- II of

NCTPS-stage- I

In unit 2, the pipe bends at condenser CW outlet are in

much eroded condition, with patch welding done over

the entire perimeter of the pipe and no more patch

welding is possible. If not replaced in the immediate

next opportunity, it may puncture to an extent that the

unit will have to be shut down for a long period.

1.60Yet to be

obtained

Improvement of efficiency of the Unit

by increase in Vaccum for full load

operation. Improved Net

Heat Rate due to operation of the Unit

with increased vaccum. 0.005 Ksc

improvement of vaccum will result in

savings of Rs. 3.5 Cr/yr.

1.600 1.600 - - - - - -

Page 88

Page 106: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17FY 2017-

18FY 2018-19

FY 2016-

17

FY 2017-

18FY 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

S.

No.

Name of the

Scheme

Details of work furnishing list of major

itemsTechnical justification

Estimated

Cost (Rs.

Crore)

Details of

Board

approval

Cost benefit analysis

TANGEDCO's Submission Approved by the Commission

Capital Investment Plan for control period from FY 2016-17 to 2018-19

CapitalisationCapital Expenditure

67

TM/CAP Supply &

works (new

schemes)

Renewal of complete SCS assembly with

auto electrical drive system – 3 Nos. one

each in the three units of NCTPS 1

The internal mechanical parts along with the screen

basket got deformed beyond repairable condition,

leading to carry over of lot of debris in the sea water

discharged to the PHE. Also, much difficulties

experienced in the fabrication of quality screen basket

to withstand the back pressure that is created due to

severe chocking of debris, without auto cleaning

system. This causes raise in ACW temperature which in

turn result in reduction in Unit generation and

generation loss. Hence, this proposal is evolved for the

replacement of SCS with auto electrical drive system.

1.00Yet to be

obtained

Maintenance of the ACW temperature

within the operating limits will

improve the operation of the HT

equipments at its optimum capacity,

which will increase the generation of

the unit and in turn the Auxiliary

Power consumption will decrease.

1.000 1.000 - - - - - -

68

TM/CAP Supply &

works (new

schemes)

Renovation / refurbishment of complete

PHE assembly 2 sets including erection &

commissioning in Unit 1 & 2

Due to continuous service in saline water, the pressure

& end plates got rusted and the titanium plates got

deformed along with the erosion of gasket seating

portions, beyond repairable condition, leading to

leakage of ACW or mixing of ACW with sea water.

This causes shutdown of the Unit and wastage of entire

ACW water. Hence, it is proposed to renovate /

refurbishment one complete PHE assembly in units 1 &

2 during the COH 2016.

1.35Yet to be

obtained

Partial loss of generation due to raise

in H2 gas temperature and bearing

temperatures of Turbine & Boiler

auxiliaries is considerably reduced

due to proper maintenance of ACW

temperature. Cost of generation is

reduced due to avoidance of wastage

of ACW (DM water).

1.350 1.350 - - - - - -

69TM/CAP Supply

(new schemes)

Condensate Extraction Pump. Model: EN

5J40. Suitable for 210 MW KWU Set.

Spare Pump is required for immediate replacement,

common spare for the six nos. CEP in service in all the

three units. If any major breakdown /failure occurs in

the running pump, spare pump can be replaced with in

the minimum down time period.

2.00Yet to be

obtained

1)Can reduce the forced outage

downtime period to maximum extent

possible. 2). Very vital

equipment. Ensures availability of

standby. 3)Common spare for

the six nos. pumps in service in all

three units.

2.000 2.000 - - - - - -

70TM/CAP Supply

(new schemes)Procurement of LP Heater assembly

Due to prolonged service, puncture developed in the

LP heater shell and managed by patch welding. These

sort of punctures will lead to drop in vaccum and

isolation of the heater from service resulting in increase

in Heat Rate and in higher Generation cost. This spare

heater will require a lead time of min. of 4 years for

procurement from OEM M/S BHEL.

3.00Yet to be

obtained

Timely procurement of this spare will

enable replacement within a short

span of failure of the heater. This will

improve the Heat Rate and reduction

in generation cost.

3.000 3.000 - - - - - -

71TM/CAP Supply

(new schemes)Procurement of HP Heater assembly

Due to prolonged service, partition plate of FW passage

of the HP heaters got damaged and managed by patch

welding. This will lead to drop in FW temperature to

Economiser inlet, resulting in generation loss, increase

in Heat Rate and in higher Generation cost. This spare

heater will require a lead time of min. of 4 years for

procurement from OEM M/S BHEL.

4.00Yet to be

obtained

Timely procurement of this spare will

enable replacement within a short

span of failure of the heater. This will

improve the Heat Rate and reduction

in generation cost and generation loss.

4.000 4.000 - - - - - -

72TM/CAP Supply

(new schemes)BHEL Spares for Turbine & Auxiliaries

During COH of the Turbine, after dismantling of the

internals of HPT, IPT and LPT certain unanticipated

spares need to be replaced that can be procured only

from the OEM, M/S BHEL. Hence, to avoid Generation

loss for want of spares and to get genuine spare from

OEM this provision is given.

50.00Yet to be

obtained

1)Can avoid prolonged downtime for

want of spares and COH schedule can

be adhered. 2)PLF will

improve.

3)Genuine spares from OEM will

ensure long service life of the spares

and minimum forced outage of the

Turbine.

50.000 50.000 - - - - - -

73TM/CAP Spare

(new schemes)

1600 NB Inlet spool pipes for debris

filter with TIE rods, connecting bolts and

nuts for unit-1 &2

Due to saline atmosphere and frequent contact with sea

water the inlet spool pieces of the Condenser CW inlet

pipelines got eroded and corrded and need to be

replaced at the earliest to avoid permanent damage

beyond repairable condition and long shut down of the

Unit

1.20Yet to be

obtained

Can avoid generation loss for a

prolonged period for the replacement

of the inlet pipes, by way of timely

replacement in the scheduled COH

period.

1.200 1.200 - - - - - -

Page 89

Page 107: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17FY 2017-

18FY 2018-19

FY 2016-

17

FY 2017-

18FY 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

S.

No.

Name of the

Scheme

Details of work furnishing list of major

itemsTechnical justification

Estimated

Cost (Rs.

Crore)

Details of

Board

approval

Cost benefit analysis

TANGEDCO's Submission Approved by the Commission

Capital Investment Plan for control period from FY 2016-17 to 2018-19

CapitalisationCapital Expenditure

74ECHS/MII/CAP

Works

i) ST-2000 Steel cord Conveyor Belt 2000

mm Belt width, Qty - 4000Metrs

ii)ST-1600 Steel cord Conveyor Belt 2000

mm Belt width, Qty-1800 meters

iii)ST-1400 Steel cord Conveyor Belt 2000

mm Belt width.Qty-1000 meters

iv)ST-1150 Steel cord Conveyor Belt 1600

mm Belt width, Qty-1200 meters (BCN-

59)

Quantity are Required for Replacement as and when

required to restore the conveyor system in operating

condition.

9.75 BLTC

For coal unloading from ship and coal

feeding to NCTPS-II(1 Unit) in

addition to Wagon Loading &

Transportation to ETPS/MTPS

9.750 9.750 - - - - - - - -

75ECHS/MII/CAP

WorksED Screen shaft & Disc pack Qty-1Set

Quantity are Required for Replacement required to

restore the equipment in EDS 3A for Revamping . 3.19

Administrative

Approval

obtained from

BLTC

To feed crushed coal to stage II units

for maintaining the generation.3.190 3.190 - - - - - -

76ECHS/MII/CAP

Works

Design, Engineering, Fabrication,

Supply, Erection, Testing,

Commissioning of two stream of

conveyors from JTB1at KPL CB-3 to JNT

61A at NCTPS and interlink with existing

ECHS including Operation &

Maintenance for the period of 5 years

To cater the coal requirement of ETPS Super critical

expansion project (1 x 660MW)291.00 Full Board

In order to ensure coal unloading from

ship at CB-III and coal feeding to

NCTPS-II(1 Unit) IN addition to the

coal feeding ETPS super critical Project

(1x660MW)

- 150.000 99.000 291.000 42.000 - 100.00 191.00 - - 291.00

77 ECHS/R&M

Improvement and modification in the

existing Dust Extraction System DE-2 at

JNT 50

To meet the statuary norms issued by TNPCB 1.50 BLTCTo meet the statutory norms isued by

TNPCB1.500 1.500 - - - - - - - -

78 ECHS/R&M

Revamping of conveyor structures,

renewal of purlin strctures and providing

metal sheet in BCN 45.

The existing Gallery, purlin structurals are severely

corroded conditon and the roof sheets also in damaged

condition. This single stream conveyor catering coal

feeding to stage-I and and also stage- II for units, the

work is essential

6.56 BLTCTo feed crushed coal to stage I &II

units for maintaining the generation6.560 6.560 - - - - - -

79 ECHS/R&MRenovation of existing Railway tracks of

NCTPS & AIP sidings

The existing Railway track in various locations are

provided with old version CST-9 sleepers. It has to be

replaced with new version of PSC sleepers as per the

railway norms for healthy track and movement of

wagon. Hence the above works are essentially required.

2.00 CE/NCTPS

For uninterupted coal transportation

to ETPS/MTPS for maintaining power

generation

2.000 2.000 2.00 - - 2.00 - -

80 ECHS/R&M

Design, supply, erection, testing and

commissioning of additional standby

parallel conveyor for BCN-45.

The existing BCN-45 is the single stream conveyor to

convey the crushed coal for ICHS/ECHS. Any

breakdown in this conveyor will affect the coal feeding

to stage I & II units. In order to avert this problem, the

proposal is evolved and it is essentially required.

80.00 Full Board

For coal unloading from ship and coal

feeding to NCTPS-I & II in addition to

& transportation to ETPS/MTPS.

40.000 80.000 40.000 40.00 40.00 - - 80.00 -

81 ECHS/R&M

Revamping of existing corroded

conveyor structure / JNT's/ hydrant

lines / DS lines in Conveyors BCN

43A/B, 45, 52 & 53.

To meet the statutory norms isued by TNPCB 1.50 CE/NCTPSTo meet the statutory norms issued by

TNPCB1.500 1.500 - - - - - -

82 ECHS/R&M

Design, Engineering, Supply,

Fabrication, Erection, testing and

Commissioning of Inter- Link Belt

Conveyors 3A/ 3B, Connecting ECHS

yards and ICHS yards.including

operation and maintenance for the period

of 3Years.

Increase the turn around of ships 55.10 Full Board Increase the turn around of ship 55.100 55.100 - - - 55.10 - - 55.10 -

83 ECHS/R&MSpares for Dust Exraction system DE-3,

DE-9, & DE-10,DE -11To meet the statuary norms issued by TNPCB 1.00 CE/NCTPS

To meet the statutory norms isued by

TNPCB1.000 1.000 - - - - - -

84 ECHS/R&M

Anti Wear plates for conveyors BCN 40

A/B , 41 A/B, 42 A/B, 44, 46 A/B &

51,52,53 & 45 & SCH-II

Essential spares to minimize breakdown 1.75 CE/NCTPS

For coal unloading from ship and coal

feeding to NCTPS-I & II in addition to

& transportation to ETPS/MTPS.

1.750 1.750 - - - - - -

Page 90

Page 108: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17FY 2017-

18FY 2018-19

FY 2016-

17

FY 2017-

18FY 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

S.

No.

Name of the

Scheme

Details of work furnishing list of major

itemsTechnical justification

Estimated

Cost (Rs.

Crore)

Details of

Board

approval

Cost benefit analysis

TANGEDCO's Submission Approved by the Commission

Capital Investment Plan for control period from FY 2016-17 to 2018-19

CapitalisationCapital Expenditure

85 ECHS/R&MConveyor mesh guard for BCN 40 A/B,

41 A/B & 42 A/BEssential spares to minimize breakdown 1.30 CE/NCTPS 1.300 1.300 - - - - - -

86 ECHS/R&MRailway track spares and PSC set of

crossing sleepersRequired for Emergency replacement 2.00 CE/NCTPS For movement of coal to other TPS 2.000 2.000 - - - - - -

87 ECHS/R&M Supply of ballast, moorum Required for Emergency replacement 1.00 CE/NCTPS 1.000 1.000 - - - - - -

88 ECHS/R&MSteel Cord Conveyor Belt of various sizes

for ECHS Conveyors

Quantity are Required for Replacement as and when

required to restore the conveyor system in operating

condition.

9.75 BLTC

For coal unloading from ship and coal

feeding to NCTPS-II(1 Unit) IN

addition TO Wagon Loading &

Transportation TO ETPS/MTPS

9.750 9.750 - - - - - -

89 ECHS/R&M

Design, Engineering, supply and

Erection of Electrical operated Hoist to

lift counter weight in BCN 42A/B

To reduce the down time of equipment during the

breakdown of Conveyor/Equipment.1.20 BLTC

For coal unloading from ship and coal

feeding to NCTPS-II(1 Unit) IN

addition TO Wagon Loading &

Transportation TO ETPS/MTPS

1.200 1.200 1.20 - - 1.20 - -

90 ECHS/R&M

Design,Engineering,supply and Erection

of Electrical operated Hoist to liftr

counter weight in BCN 57

To reduce the down time of eqipment during

breakdown of Conveyor/Equipment.1.20 BLTC

For coal unloading from ship and coal

feeding to NCTPS-II(1 Unit) IN

addition TO Wagon Loading &

Transportation TO ETPS/MTPS

1.200 1.200 1.20 - - 1.20 - -

91 ECHS/R&M Strengthening of conveyor BCN 41A/B

The existing Conveyor Structurals erected 14 Years

Back. Some portion of structurals are showing sign of

corrosion. Hence the proposal is evolved.

1.50 BLTC

For coal unloading from ship and coal

feeding to NCTPS-II(1 Unit) IN

addition TO Wagon Loading &

Transportation TO ETPS/MTPS

1.500 1.500 - - - - - -

92 ECHS/R&M

Revamping of conveyor structures ,

renewal of purlin structures and

providing metal sheet in BCN 45.

The existing Conveyor Structurals erected 14 Years

Back. Some portion of structurals are showing sign of

corrosion. Hence the proposal is evolved.

6.70 BLTC

For coal unloading from ship and coal

feeding to NCTPS-II(1 Unit) IN

addition TO Wagon Loading &

Transportation TO ETPS/MTPS

3.000 6.700 3.700 - - - - - -

93ICHS/MII/ Capital

Works

Renovation of BFD -1A & 1B

technological structures, Chutes of

conveyor 4A/B, 5A/B & modification

sector gate at JT-8

The technological structures of BFD-1A/B, Chutes of

conveyor 4A/B, 5A/B are in wornout condition and

needs complete replacement & modification sector gate

into flap gate at JT-8

4.65 NIL

It is replacement of wornout

technological structures, Chutes of

conveyor 4A/B, 5A/B & modification

sector gate at JT-8 and to ensure

uninterrupted coal stacking

4.650 4.650 - - - - - -

94ICHS/MII/ Capital

Works

Renovation of Dust Extraction system

5A&5B at SCH - I

The equipments of Dust Extraction System 5A&5B at

SCH-I is in wornout condition and has to be completely

renovated and bring it to operation for containing the

coal dust emanating from the discharge chutes at SCH-I

1.00 NIL

To reduce pollution at SCH-I and to

meet the statutory norms issued by

TNPCB

1.000 1.000 - - - - - -

95ICHS/MII/Capital

Works

Design, Supply, Erection, Testing and

Commissioning of new DS pump house

with tank, pumps, pipes and valves @ JT-

4 including Mechanical, Elecrical & Civil

works

Construction of new tank for storage of raw water for

effective operation of dust suppression, sprinkler and

hydrant system to contain coal fires due to spontaneous

combustion of coal in the coal yards of ICHS

2.30 NIL

To reduce the loss of coal properties

and shortage of coal due to windage

and spontaneous combustion

2.300 2.300 - 2.30 - - 2.30 -

96ICHS/MII/Capital

Works

Supply of gear boxes, wheel bogies and

bucket wheel assy. for reclaimer and

stacker

The gear boxes, wheel bogies and bucket wheel assy. of

stacker and reclaimers are in wornout condition and

needs replacement with new ones to ensure Un-

interrupted coal feeding to the units of stage - I & II

3.25 NIL

To reduce the outage of the conveyor

system and ensure uninterrupted coal

stacking & feeding and sustain

continuous power generation

3.250 3.250 - - - - - -

97ICHS/MII/Capital

Works

Design, supply, erection, testing and

commmissioning of ILMS in conveyor

12A/B.

Provision of new ILMS at conveyor 12A/B drive end

before bunker conveyor is to reduce / prevent entry of

foreign materials into the mills and avoid breakdown

of mills for Un-interrupted coal feeding to the units of

stage - I & II

2.80 NIL Pay back period is 13 months 2.800 2.800 - - - 2.80 - - 2.80 -

98ICHS/MII/Capital

Works

Design, supply, erection, testing and

commmissioning of Flow divider at

conv.11A/B discharge chute

Provision of new flow divider at 11A/B discharge

chute is proposed for flexibilitiy routing for conveyor

12A/B, and to ensure Un-interrupted coal feeding to

the units of stage - I & II

3.30 NIL Pay back period is 1 to 2 years 3.300 3.300 - 3.30 - - 3.30 -

Page 91

Page 109: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17FY 2017-

18FY 2018-19

FY 2016-

17

FY 2017-

18FY 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

S.

No.

Name of the

Scheme

Details of work furnishing list of major

itemsTechnical justification

Estimated

Cost (Rs.

Crore)

Details of

Board

approval

Cost benefit analysis

TANGEDCO's Submission Approved by the Commission

Capital Investment Plan for control period from FY 2016-17 to 2018-19

CapitalisationCapital Expenditure

99ICHS/MII/Capital

WorksStrengthening of conv.11A/B. and JT-I

The technological structures of conveyor 11A/B and

junction tower-1 structures are badly corroded and

need strengthening to prolong its life priod for another

10 years and ensure Un-interrupted coal feeding to the

units of stage - I & II

4.80 NIL

It is replacement of wornout

technological structures and to ensure

uninterrupted coal feeding

4.800 4.800 - - - - - -

100ICHS/MII/Capital

Works

Supply, Erection, Testing and

Commissioning of Hydraulic Brake

System for Reclaimer-I & Travelling

Tripper - B.

The Reclaimer-I and Travelling Tripper-B are in

continuous service and also due to normal wear & tear

the Electro Hydraulic Thrust Brakes which arrest the

movement of the machine is wornout condition.

Because of this the reclaimers / Travelling Tripper-B

tend to move backwards while reclaiming/feeding

causing decrease in loading of coal and also move

forward or backwards. Because of this movement the

Reclaimers have overshot the stoppers and causes

heavy damage to the structures. In order to arrest this

movement of the machines it has been proposed to

replace by a new Hydraulic Braking System.

1.55 NIL Pay back period is 2 months 1.550 1.550 - - - - - -

101ICHS/MII/Capital

Works

Replacement of the existing damaged

rails for Travelling Tripper-B with new

one at bunker floor.

The Travelling Tripper rails are in service for more

than 19 years. The prolonged service of this rails leads

to misalignment and change in rails surface level, due

to normal wear and tear and ageing of rails.This causes

to Tripper collision with stopper and leads to more

damage on rails. Hence it is essential to change the

rails set to avoid break down of the Travelling Tripper

and to maintain uninterrupted coal feeding to Stage-I

& Stage-II Unit bunkers.

1.40 NIL

It is a replacement of wornout rails

and to ensure uninterrupted coal

feeding to Stage-I & II units

1.400 1.400 - - - - - -

102ICHS/MII/Capital

Works

Renovation ,testing and commiissioning

of Dust Extraction System at bunker floor

for 3 units

The Dust Extraction System was erected 20 years back

at bunker floor for prevent the coal pollution at bunker

floor while coal feeding.It is essential to renovate the

wornout / damaged pipe lines, structures, bag filters ,

pumps etc., for bring back the Dust Extraction System

effective operative condition.

3.30 NILAs it comes under the pollution

control measures required by TNPCB3.300 3.300 - - - - - -

103ICHS/MII/Capital

Works

Design, Supply, Erection and

commissioning of Electrical Hoist for

lifting of counter weight of horizontal

gravity takeup of conveyor 7 & 9

For lifting of counter weight of 40MT while carrying

out any break down works in con-7 & 9 and thereby

reducing the down time of conveyors and bring back

the system in the shortest time.

2.00 NIL Pay back period is 2 years 2.000 2.000 - 2.00 - - 2.00 -

104ICHS/MII/ Capital

Works

Renovation of the Reclaimer Bucket

wheel Assy. of Reclaimer I and drive

system of stacker I & reclaimer I boom

conveyor

The bucket wheel assy., Drive system of stacker-I and

Boom conveyor of stacker and reclaimers are in

wornout condition and needs replacement with new

ones to ensure Un-interrupted coal feeding to the units

of stage - I & II

4.50 NIL

It is a replacement of wornout spares

and to ensure uninterrupted coal

feeding to Stage-I & II units

4.500 4.500 - - - - - -

105ICHS/MII/ Capital

Works

Renovation of conveyor equipments of

ICHS conveyors.

The various conveyor equipments are in wornout

condition and needs replacement with new ones to

ensure Un-interrupted coal feeding to the units of

stage - I & II

14.00 NIL

It is a replacement of wornout spares

and to ensure uninterrupted coal

feeding to Stage-I & II units

14.000 14.000 - - - - - -

106ICHS/MII/Capital

Works

Renovation of HFO return pipeline from

Unit -I

The HFO Pipelines are in wornout condition and needs

replacement with new ones to ensure Un-interrupted

coal feeding to the units of stage - I & II

1.00 NIL

It is a replacement of wornout

pipelines and to ensure uninterrupted

power generation at Stage-I units

1.000 1.000 - - - - - -

107ICHS/MII/Capital

Works

Modification of DFC 1040 model fluid

coupling to sc- 14 for Ring granulator A1

& B1

The existing DFC 1040 Fluid coupling have to be

modified with SC-14 coupling for Ring Granulator

A1&B1. To ensure uninterraped coal stacking to stage I

& II units

1.00 NIL Pay back period is 2 years 1.000 1.000 - 1.00 - - 1.00 -

Page 92

Page 110: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17FY 2017-

18FY 2018-19

FY 2016-

17

FY 2017-

18FY 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

S.

No.

Name of the

Scheme

Details of work furnishing list of major

itemsTechnical justification

Estimated

Cost (Rs.

Crore)

Details of

Board

approval

Cost benefit analysis

TANGEDCO's Submission Approved by the Commission

Capital Investment Plan for control period from FY 2016-17 to 2018-19

CapitalisationCapital Expenditure

108ICHS/MII/Capital

Works

Design, supply, Erection and

commissioning of Electrical Hoist for

conveyors 11A/B, 12A/B & 13 A/B

For lifting of counter weight and other equipments

while carrying out any break down works in con-

11A/B, 12A/B & 13A/B thereby reducing the down

time of conveyors and bring back the system in the

shortest time.

3.00 NIL Pay back period is 2 years 3.000 3.000 - 3.00 - - 3.00 -

109ICHS/MII/Capital

Works

Renovation of Reclaimer and stacker

Drive systems.

The Drive system of stacker and reclaimers are in

wornout condition and needs replacement with new

ones to ensure Un-interrupted coal feeding to the units

of stage - I & II

5.00 NIL

It is a replacement of wornout spares

and to ensure uninterrupted coal

feeding to Stage-I & II units

5.000 5.000 - - - - - -

110ICHS/MII/Capital

Works

Renovation of HFO return pipeline form

Unit 2 & 3

The HFO Pipelines are in wornout condition and needs

replacement with new ones to ensure Un-interrupted

coal feeding to the units of stage - I & II

2.00 NIL

It is a replacement of wornout

pipelines and to ensure uninterrupted

power generation at Stage-I units

2.000 2.000 - - - - - -

111ICHS/MII/Capital

Works

Renovation of conveyor structurals and

junction towers

The structures of ICHS Conveyor and junction towers

are in wornout condition and needs complete

replacement to ensure Un-interrupted coal feeding &

stacking to the units of stage - I & II

15.00 NIL

It is a replacement of wornout

structures, of ICHS Conveyor and

junction towers to ensure

uninterrupted coal stacking and

feeding

15.000 15.000 - - - - - -

112ICHS/MII/Capital

Works

Renovation of Dust Extraction System

DE-5B, 5C and DE-7

The Dust Extraction System was erected 20 years back

at SCH-I for prevent the coal pollution at SCH-I while

coal feeding. It is essential to renovate the wornout /

damaged pipe lines, structures,bag filters , pumps etc.,

for bring back the Dust Extraction System effective

operative condition.

3.00 NIL

To reduce pollution at SCH-I and to

meet the statutory norms issued by

TNPCB

3.000 3.000 - - - - - -

113EM-CHP/MII/

Capital Works

procurement of 3 phase Squirrel cage HT

Induction motors for coal crushers

available in ECHS and ICHS

Spare motors for coal crushers for emergency

replacement1.07

TANGEDCO

Proceedings

No.65/Dt.

06.02.2015

For immediate replacement during

breakdown of the existing BHEL

motors in the crushers of ECHS and

ICHS and to ensure uninterrupted

operation in connection with

unloading of coal ships, coal stacking

and feeding to NCTPS Stage-I & II

Unit Bunkers

1.070 1.070 - - - - - -

114 CM I/CAP Construction of effluent treatment plant

for stage-I As per TNPCB norms 20.00

Estimate will

be sent after

consultancy

study

As per the TNPCB norms this work

has to be carried out20.000 20.000 20.00 - - 20.00 - -

115 CM I/CAP Construction of sewage treatment plant

for stage-I As per TNPCB norms 8.00

Estimate will

be sent.

As per the TNPCB norms this work

has to be carried out8.000 8.000 8.00 - - 8.00 - -

116 CM I/CAP Construction of motor repair bay and

stage building near switch yard

Inadiquate space for storing vital equipments in the

existing repair bay and reconditioning the motors in

time during overhaul

4.00Estimate to be

sent

Inadiquate space for storing vital

equipments in the existing repair bay

and reconditioning the motors in time

during overhaul

4.000 4.000 4.00 - - 4.00 - -

117 CMII/CAPImprovement to the ash dyke road & ash

slurry pipe line road.

This road formation is regard for safe mainteance of

ash dyke.1.50

Estimate to be

sent

This road formation is regard for safe

mainteance of ash dyke.1.500 1.500 1.50 - - 1.50 - -

118 CMII/CAP

Additional school building with other

improvement works to the existing

school building at Vallur camp.

This for the benefit of Vallur camp residents. 1.00 AwaitedThis for the benefit of Vallur camp

residents.1.000 1.000 1.00 - - 1.00 - -

119

Establishing a

desalination plant

of 10MLD capacity

inside NCTPS Stage-

I premises to meet

the raw water

requirement of

NCTPS Stage-I & II.

Establishing a desalination plant

including pipe lines for intake and brine

disposal.

To meet out the requirement of Raw water for the

power Generation.219.42

Proposal to be

submitted- 50.000 - 150.000 219.420 19.420 - 20.00 150.00 - - -

Page 93

Page 111: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditur

e (Rs.

Crore)

FY 2016-17FY 2017-

18FY 2018-19

FY 2016-

17

FY 2017-

18FY 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

S.

No.

Name of the

Scheme

Details of work furnishing list of major

itemsTechnical justification

Estimated

Cost (Rs.

Crore)

Details of

Board

approval

Cost benefit analysis

TANGEDCO's Submission Approved by the Commission

Capital Investment Plan for control period from FY 2016-17 to 2018-19

CapitalisationCapital Expenditure

120

Improvement to

the roads in ICHS

& ECHS area

Hydrogen plant

sides & CWPH area

formation of RCC roads and drains To reach the site in time to attend the works. 10.00Proposal to be

submitted10.000 10.000 - - - - - -

121

Extension of Ware

house building by

Constructing

Compound wall,

Formation of Yard

and other Civil

works

Consuction of Compound wallTo stack the essential spares now at central stores near

ADM building.1.00

Proposal to be

submitted1.000 1.000 1.00 - - 1.00 - -

122

Colour washing

and other civil

works all junction

towers, Control

rooms, LCSS and

crusher rooms at

ICHS and ECHS

area

Replacing alu. Windows, brick work and

other civil works.To maintain the Coal handling system. 1.30

Proposal to be

submitted1.300 1.300 - - - - - -

123

Improvement

works around New

Ash silo including

providing vehicles

parking platforms,

widening of

existing road and

other civil works.

widening of RCC road, plot form for

vechiles and other civil works.

As per the TNPCB instruction Ash silo has to be

shiflied to outer area from Power House.2.00

Proposal to be

submitted1.000 2.000 1.000 1.00 1.00 - - 2.00 -

124

Construction of

cooling towers for

power house.

construction of cooling tower. As per the TNPCB instruction. 300.00Proposal to be

submitted- 170.000 300.000 130.000 - 10.00 100.00 - - -

125

Improvement to the

peripheral

compound wall

Compound wall work For security 1.00Proposal to be

submitted1.000 1.000 - 1.00 - - 1.00 -

126Miscellaneous

PaymentsAll SE's of NCTPS below 1 Crore Misc. Payments 30.00

Proposal to be

submitted10.000 10.000 30.000 10.000 - - - - - -

1661.88 483.24 807.92 260.82 610.14 917.82 243.82 194.85 276.39 451.40 128.07 191.17 323.40 Grand total............

Page 94

Page 112: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisatio

n (Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisation

(Rs. Crore)

Capital

Expendit

ure (Rs.

Crore)

Capitalisatio

n (Rs. Crore)

Capital

Expenditure

(Rs. Crore)

FY 2016-

17

FY 2017-

18

FY 2018-

19FY 2016-17 FY 2017-18 FY 2018-19

1  Division Oil & Ash

Handling division fly

ash conveying lines

Providing spare line for ash

conveying lines from ESP to

fly ash silos

There are two lines available for fly ash conveying from

ESP (A,B,C,D passes) buffer hopper to fly ash silo. These

lines are getting punctured frequently due to errosion.

There is no standby or spare line available due to which

the ash conveying is stopped frequently for attending the

damaged portions causing the raise of level in ESP hoppers

due to which the fields are got shot. Hence this spare line

is essentially required  for continuous evacuation of fly ash

from ESP hoppers and to maintain a sustained

generation.   

4.75 Approved vide

CMD No: 395 dt

30.08.16

The amount spent for

new additional fly

ash conveying lines

will be recovered in

34 days.

4.75 4.75

4.75 - - 4.75 - -

2 Mill Plant Division

Providing of

maintenance platform

Providing of maintenance

platform approach at mill

area, providing of sun shield

roof platform over the mill

repair bay, Extension of hoist

moving rails at mill repair

bay etc.,

Hoist approach repair bay (Half area) area is not sufficient

while keeping of mill retrieved spares during mill

overhauling. Hence it is proposed to cover the unroofed

repair bay and extension of Hoist moving rails for

handling of heavy weight mill retrieved spares during

overhauling of coal mills. Hot air gates, Hot air dampers,

cold air gates and cold air dampers were provided at

various levels. Necessary approach platforms are not

provided by the M/s.EPC contractor during erection.

Much difficulties are being faced for maintenance of above

said gates and dampers while unit is in service condition.

  

1.00 1.00 1.00

1.00 - - 1.00 - -

3 Mill Plant Division -

Milling system

Procurement of coal mill

roller tyre complete

assembly – 1 set. Complete

set: Roller shaft – 3 No’s

Roller tyre – 3 No’s., Hub - 3

No’s Thrust piece - 3 No’s,

Yoke assembly – 3 No’s Two

types of bearing – 3 No’s.,

Rotary shaft seal – 3 No’s.

This proposal is for procurement of 1 set of roller tyre 

complete assembly complete set(1 set consists of  3 Nos

Roller assemblies) for keeping the assemblies as ready for

replacing the wornout roller assembly, to be retrived from

any mill which will be taken up for overhaul within the

shortest possible time and hence the period of overhaul

could be minimised from 30 days to 15 days and thus

increasing the availability of the mills for trouble free

operation and sustained generation for which the

proposed 1 set of Roller Tyre complete assembly (1 set

consists of roller assemblies ie., for 1 mill requirement) is

very much essential. This type of coal mills are not in

service in TANGEDCO Thermal Power Plant.  

2.60 TANGEDCO pro

(CMD) No. 153

dt.24.05.16

2.60 2.60

- - - - - -

4 Boiler Maintenance

division, Boiler water

heating system

Procurement of spares  for 

Boiler Water Wall Auxiliary

steam Heating system

To Preheat the water in water walls of boiler during light

up periods to bring the unit early for generation. This will

reduce the light up time by 3 to 4 hours

2.00 To be approved

since it is a new

one.

2.00 2.00

- - - - - -

5 Boiler Maintenance

division Boiler water

system

Procurement of spares  for 

Modification of Super Heater

Drain

Existing line sizes are in smaller due to that draining of

water process takes large duration.  To reduce the time

duration modification is essential.

2.00 To be approved

since it is a new

one.

2.00 2.00

- - - - - -

Sl.

No.

Details of Board

approval

MECHANICAL-I CIRCLE

Cost benefit analysis

TANGEDCO's Submission Approved by the Commission

CAPITAL INVESTMENT PLAN FOR THE CONTROL PERIOD - 2016-17 TO 2018-19 (AFTER COD 12.10.2013)

METTUR THERMAL POWER STATION-II(1 X 600MW)

ANNEXURE 4

Capital Expenditure Capitalisation FY 2018-19FY 2016-17 FY 2017-18

Name of the schemeDetails of work furnishing

list of major itemsTechnical Justification

Estimated Cost

(Rs.in Crs.)

Page 114

Page 113: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisatio

n (Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisation

(Rs. Crore)

Capital

Expendit

ure (Rs.

Crore)

Capitalisatio

n (Rs. Crore)

Capital

Expenditure

(Rs. Crore)

FY 2016-

17

FY 2017-

18

FY 2018-

19FY 2016-17 FY 2017-18 FY 2018-19

Sl.

No.

Details of Board

approvalCost benefit analysis

Capital Expenditure Capitalisation FY 2018-19FY 2016-17 FY 2017-18

Name of the schemeDetails of work furnishing

list of major itemsTechnical Justification

Estimated Cost

(Rs.in Crs.)

- - - - - -

6 EM Division HV

Breaker and EHV

Insulator of SAB type

230 kV GIS HV Breaker

Compartment (Single pole)

Essentially required for failure replacement in case of

emergency.  SABs transfer power from GIS to

Transmission lines.  Failures are susceptible in joints. 

Hence, availability of spare SABs are required to ensure

continuous evacuation of power.  Failure of breaker pole

will result in the non-availability of 230 kV circuit.  If spare

active part is available, the downtime can be minimized to

restore the circuit early.  

2.50 Proposal is being

evolved for

obtaining

administrative

approval

2.50 2.50

- - - - - -

7 TGM & CA Dn

Procurement of Spare

cartridge  

Procurement of 1 No

cartridge for TDBFP

To maintain generation of 600 MW, 2 Nos. TDBFPs will

have to  be in  service. If any problem arises in any one of

the TDBFP, MDBFP will be put into service which

increases the auxiliary consumption by 8 MW and also the

unit will be in service without standby Feed pump. In that

condition if any problem arises in the running TDBFP, the

unit load has to be reduced to 300MW and in case of any

problem in MDBFP the unit  could not be lit up which will

further result in forced outage of the unit. Hence

procurement of 1 No TDBFP as spare is very much

essential.

5.50 Request for

Admininstrative

approval has been

sent already and

approval awaited

5.50 5.50

- - - - - -

8 TGM & CA Dn

Procurement of LP

Turbine blades

LP Turbine Last 3 Stage fixed

and moving blades including

fasteners – 1 set

In LP Turbine there is a probability that the last three

stage blades may fail in long run. Failure of LP Turbine

blades will result in shutdown of the unit. Hence spare

blades are necessary for replacement in case of failure of

the last three stage blades. 

15.00 To be approved

since it is new one

15.00 15.00

- - - - - -

9 TGM & CA

DnProcurement of

Generator rotor

Generator Rotor -1 No In Case of failure of Generator rotor, repair of the rotor

will take long time.  For emergency replacement to bring

back the unit early spare rotor is necessary.

25.00 To be approved

since it is new one

25.00 25.00

- - - - - -

10 TGM & CA

DnProcurement of Spare

cartridge

Procurement of Motor driven

Boiler Feed Pump Cartridge

One No. MDBFP will be in service during lit up and as

auto standby for Feed pumps during full load. Incase of

any failure of MDBFP the unit could not be lit up.  Hence 

spare cartridge for

5.50 To be approved

since it is new one

5.50 5.50

- - - - - -

- - - - - -

11 Coal Conveying System Design, Engineering,

Manufacture, Supply,

Erection, testing and

Commissioning of a New

Single Conveyor connecting

the Existing Junction Tower

#6 and Junction Tower # 2

At present, the feeding of coal from wagon tipplers are

being carried out through a series of Conveyors 1A/B, 2

A/B ,3 A/B , 4 A/B , 5 A/B , 6 A/B , 8 A/B , 10 A/B , 11

A/B, 12 A/B and 13 A/B, RBF by introducing the

proposed new Conveyors, the running of the following

equipments could be avoided. Conveyor 6 A/B, 8 A/B, 10

A/B, 11 A/B and RBF 8 to 12, which results i) savings in

energy consumption, ii) reduction in wear and tear of

equipments, iii)minimzing downtime due to the

breakdown of the above equipments, iv)reduced risk of

fire due to non-spillage of coal, v)better working

environment due to non-spillage of coal.

18.83 To be approved

since it is a new

proposal

Yet to be awarded 13.80 18.83 5.03

13.80 5.03 - - 18.83 -

12 Project & Environment Continuous Ambient Air

Quality monitoring station

To meet out the statutory requirement of TNPCB Norms 2.07 To be approved

since it is a new

proposal

statutory requirement

of TNPCB Norms

2.07 2.07

2.07 - - 2.07 - -

ELECTRICAL SYSTEM/MTPS-II

MECHANICAL-II/MTPS-II

Page 115

Page 114: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisatio

n (Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisation

(Rs. Crore)

Capital

Expendit

ure (Rs.

Crore)

Capitalisatio

n (Rs. Crore)

Capital

Expenditure

(Rs. Crore)

FY 2016-

17

FY 2017-

18

FY 2018-

19FY 2016-17 FY 2017-18 FY 2018-19

Sl.

No.

Details of Board

approvalCost benefit analysis

Capital Expenditure Capitalisation FY 2018-19FY 2016-17 FY 2017-18

Name of the schemeDetails of work furnishing

list of major itemsTechnical Justification

Estimated Cost

(Rs.in Crs.)

- - - - - -

13 Construction of 2 blocks

of ‘U’ type and 2 blocks

of ‘T’ type 6 Blocks of ‘R’

type Residential

Quarters including

internal Electrification

water supply, protection

wall and Sewage and

Drainage arrangements

Construction of new quarters For the accommodation of MTPS II officers and Staff 12.00 B.P (FB) No: 158

(TB) dt.

For the

accommodation of

MTPS II officers and

Staff

6.00 12.00 6.00

6.00 6.00 - - 12.00 -

14 Construction of balance

P, Q, R, S, T, U and V

Type permanent

Residential quarters

(168 tenements)

including internal

electrification works,

Sewage, Drainage, Water

line and Compound wall

arrangements.

Construction of new quarters For the accommodation of MTPS II officers and Staff 46.58 TANGEDCO

P.No: 34 (TB)

dt 7.6.16

For the

accommodation of

MTPS II officers and

Staff

6.58 20.00 46.58 20.00

6.58 20.00 20.00 - - 46.58

145.33 18.42 44.80 74.83 75.03 52.08 25.50 34.20 31.03 20.00 7.82 30.83 46.58 Grand total..........

Civil circle/MTPS-II

Page 116

Page 115: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisatio

n (Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisatio

n (Rs. Crore)

Capital

Expenditure

(Rs. Crore)

FY 2016-17 FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19

Operation

1

Procurement: Installation & Commissioning of

4Nos Continuous Ambient Air Quality Monitoring

Station with data uploading facility to TNPCB.

To ensure compliance of conditions stipulated

by TNPCB/CPCB3.00 yet to be obtained 2.00 2.00 1.00 1.00 0.00 0.00 2.00 1.00 - 2.00 1.00 -

- - - - - -

2Exciter set for 600MW

Generator

Spare for Unit-I & II incase of failure of existing

one.20.00 Anticipated 0.00 0.00 20.00 20.00 - - 20.00 - - 20.00

3 Boiler circulating water pump with motorSpare for Unit-I & II incase of failure of existing

one.3.67 FB No:4 Dt: 29.01.2016 3.67 3.67 0.00 0.00 3.67 - - 3.67 - -

4 Rotor for 600 MW Generation Spare for Unit-I & II 45.00 0.00 0.00 45.00 45.00 - - 45.00 - - 45.00

- - - - - -

5Impeller Blades and its accessories for PA Fan

(PAF 20/10-6-2)

Expert Committee approval has been accorded

vide Page No,94, Sl.No.25 of CE/MTS

Lr.No.D.2002/ 13,dated 18.10.2013

2.00

Note approved by the

CMD/ TANGEDCO ON

11.09.2014

PROCEEDINGS (cmd)

No.405 )

Spares to avoid the loss of

Generation (Loss= Rs.6 Crs per

day as per Generation cost Rs.4

per Unit

2.00 2.00 0.00 0.00 - - - - - -

6

Hot Air Dampers for PA Fan (PAF 20/10.06-2) and

FD fan (FAF24.5/11-2) and FD Fan Impeller Blades

and its accessories.

Expert Committee approval has been accorded

vide item No.2 of CE/MTS Dt. 18.09.15, 19.09.15,

22.09.15, 23.09.15 & 29.09.15.

2.50Proposal sent for HQ

approval

Spares to avoid the loss of

generation (Loss-Rs. 6 Crs per

day as per generation Cost Rs. 4

per Unit).

0.00 2.50 2.50 0.00 - - - - - -

7Complete Fan rotor assembly for PA Fan (PAF

20/10.6-2) and FD fan (FAF 24.5/11-2).

Expert Committee approval has been accorded

vide item No.2 of CE/MTS Dt. 18.09.15, 19.09.15,

23.09.15 & 29.09.15.

6.00

Spares to avoid the loss of

generation (Loss= Rs. 6 Crs per

day as per generation cost Rs. 4

per Unit).

0.00 6.00 6.00 0.00 - - - - - -

8 Mill Planetary Gear Box for XRP 1043 Bowl Mill

NCTPS-II is the first 600MW units of BHEL

make in the TANGEDCO, Hence, interchanged

possibility could not be carried out.

3.00 Under Progress

In order to avoid loss of

generation due to planetary gear

box.

0.00 0.00 3.00 3.00 - - - - - -

- - - - - -

9

Bottom Ash Handling System - Modification work

(Phase-I) of the existing bottom ash handling

system with new primary clinker grinder and

modified hydro ejection (jet pump) to improve the

efficiency and performance of unit - II including

supply, erection, Commissioning and complete

design in a phased Manner

1st Phase: 1) Providing one new primary

clinker grinder/crusher to reduce the 150 to

200mm lumps into (-) 25mm size.

2) The existing clinker grinder to be placed

under the bottom ash silo to act as secondary

crusher. 3)The new jet

pump/hydro ejectors to be erected for faster

formation and disposal of slurry

3.31

Per. TANGEDCO Pro.

(CMD) No. 401 Dt.

11.09.15

Pay Back Period 5 month 0.00 0.91 0.00 0.91 3.31 1.49 - - - - - -

10

Carrying out modification work in BCN 48A/B by

providing mechanical drive instead of existing

hydraulic drive for tube free operation and

maintenance. (Tech pro (800 T/Hr) incomplete to

be modified for (2000 T/Hr)

Coupling, resilient coupling, structural

materials, civil works, all pulley, conveyor belts,

drive frames, HT motor 650KW, Electrical

HT3.3kV cables for scoops 50sq and cooler fan.

IDB for JN, structural materials and other civil

materials to achieve the conveying capacity of

2000TPH

9.81

Per. TANGEDCO Pro.

(CMD) No. 486 Dt.

06.11.15

Pay Back Period 2.01 Years 0.00 4.90 9.81 4.91 0.00 - - - - - -

98.29 7.67 13.48 19.31 15.32 71.31 69.49 5.67 1.00 65.00 5.67 1.00 65.00

Capital Investment Plan for control period from FY 2016-17 to 2018-19(After COD 20.03.2014 & 08.05.2014)

NORTH CHENNAI THERMAL POWER STATION-STAGE-II(2X600MW)

ANNEXURE 5

Approved by the Commission

Sl. No. Technical justification

Estimated

Cost

(Rs.in Crs)

Details of Board approval Cost benefit analysis

Capital Expenditure Capitalisation

TANGEDCO's Submission

FY 2018-19

Electrical System

Mechanical - I

Mechanical - II

Grand Total

FY 2016-17 FY 2017-18Name of the

CircleDetails of work furnishing list of major items

Page 122

Page 116: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisat

ion (Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expendit

ure (Rs.

Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

FY 2016-

17

FY 2017-

18

FY 2018-

19

FY 2016-

17

FY 2017-

18FY 2018-19

1 Power House

2

Static excitation provision to all

Units

At present all the units of Kundah Power House-2 are being

operated with conventional rotating Excitation system.

Whenever the voltage varies in the grid, the terminal

voltage of the Generator to be adjusted automatically to

avoid over voltage in the stator winding. In order to

establish safe operation, the entire excitation to be modified

to static excitation system.

3.00 To be obtained By avoiding the outage of the

units and cost of new winding

of 35 MW, the incurred cost

will be made good within 3

years.

0.00 1.00 3.00 2.00 0.00

1.00 2.00 - - 3.00 -

2 Power House

2

Providing steel barriguard

supporting arrangements on the

upstream side of switchyard at

KPH-2.

Huge mass of boulders and debris slided from the upstream

of switch yard and damaged most of the equipment in

230kV switch yard of KPH-2. This barricade is essential to

avoid similar incident in future.

1.20 M.No.CE/H/SE/H(E)/Sec NI/

AEE2/F.EST/D.81/2013 Dt.16.04.13

The entire cost shall be

realeased within 2 years by

way of outages and

replacement of equipments.

1.20 1.20 0.00 0.00

1.20 - - 1.20 - -

3 Power House

3

Providing 230/22 kV SS at switch

yard

At present the outdoor L.T.supply of Kundah PH.2, PH.3, &

PH.4 is fed from Mettupalayam SS. If any breakdown ocurrs

in 22 kV feeder which is passing through several K.M in the

dense forest, the outdoor L.T. supply will not be available

in these Power Houses at that time the units cannot be

started in cases of blackout of the entire grid. Hence for

reliability a new 230 kV/22kV is proposed at Kundah Power

House-3.

7.51 M.No.CE/H/SE/H(E)EEH/AEE6/F.

EST/KPH3/D.2114/15 Dt.07.11.15

The entire amount can be

realised with in 5 years.

7.51 7.51 0.00 0.00

7.51 - - 7.51 - -

4 Moyar Power

House

Conversion of existing Leopard

conductor of 110 kV Moyar to

Singara DC feeder by panther

conductor

At present both the 110kV feeders of Moyar to Singara are

over loaded and the replacement of existing leopard

conductor with panther conductor is necessary

2.15 Proposal is being evolved. Amount can be realised with

in 5 years.

0.00 1.00 2.15 1.15 0

1.00 1.15 - - 2.15 -

5 RMU of Moyar Power House, i.e.

uprating the existing 3x12 MW

Units to 3x14 MW Units.

The uprating of all the 12 MW units by 14 MW is possible to

meetout the peak demand of the grid by the additional

6MW .

65.45 To be obtained. The proposal is yet

be evolved

The expenditure can be

realised with in 2 years.

0.00 0.00 0.00 20.00 65.45 45.45

- - 20.00 - - -

6 Providing 110/11 kV substation at

moyar for power evacuation and

OSS supply to the Moyar,

PUSHEPH and Singara

At present the Moyar winch and the power evacuation of

Maravakandy Mini Power House depend on 11kV Singara

to Moyar feeder. Also several loads of Nilgiris Distn. Circle

were connected in this feeder. Several breakdown occurs in

this feeder regularly causing interruption in operation of

winch & Maravakandy Power House. Hence a 110kV/11kV

S.S. is proposed at Moyar switchyard.

2.35 To be obtained. The proposal is

under process.

The expenditure can be

realised with in 5 years.

0.00 1.00 2.35 1.35 0.00

1.00 1.35 - - 2.35 -

7 Provision of 1 No new 18,000hp

Pelton turbine runner

At present the released runner 2Nos have served more than

60 years and could not be reconditioned further for trouble

free operation of all 3 Units a new spare runner is essential

2.50 Estimate submitted to head quarters

vide Lr. No. SE/ G/ K/ AEE/ GL/

HD/ F.MOYAR PH/ PR.39/ 16,

DTD. 25.01.2016.

By reducing the outage of the

units the expenditure could be

released with in 2yrs.

2.50 2.50 0.00 0.00

2.50 - - 2.50 - -

DIVISION-I

ANNEXURE 6

KUNDAH GENERATION CIRCLE(843.65 MW)

Capital Investment Plan for control period from FY 2016-17 to 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

Cost benefit analysis

TANGEDCO's Submission Approved by the Commission

S. No.Name of the

Scheme

Details of work furnishing list of

major itemsTechnical justification

Estimated Cost

(Rs.in Crs.)Details of Board approval

Capital Expenditure Capitalisation

Page 127

Page 117: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisat

ion (Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expendit

ure (Rs.

Crore)

Capitalisat

ion (Rs.

Crore)

Capital

Expenditu

re (Rs.

Crore)

FY 2016-

17

FY 2017-

18

FY 2018-

19

FY 2016-

17

FY 2017-

18FY 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

Cost benefit analysisS. No.Name of the

Scheme

Details of work furnishing list of

major itemsTechnical justification

Estimated Cost

(Rs.in Crs.)Details of Board approval

Capital Expenditure Capitalisation

8 Common to

all Power

House

Provision of multifunctional relays

in major power house ( 28 Units)

and other relays a.Numerical

Distance Protection Relay 230kV

class =9 Nos b.Numerical

Distance Protection Relay 110kV

class =15 Nos c.Directional over

current Relay =10 Nos.

D.Check Synchronizing relay = 5

Nos e.Earth Fault Relay

=5 Nos.

All the old version relays of Power House's are to be

replaced with latest version protection system for safety to

the equipments of Power House's

1.90 Obtained periodically By ensuring safety of costly

equipments of Power House's

the amount can be realised

with in 5 years.

0.00 0.90 0.00 0.50 1.90 0.50

0.90 0.50 0.50 - - 1.90

86.06 11.21 15.11 7.50 25.00 67.35 45.95 15.11 5.00 20.50 11.21 7.50 1.90 Sub total.......

Page 128

Page 118: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditure (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

FY 2016-17 FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19

1 PERIYAR RMU Works

Periyar PH

Periyar PH machine 1, 2 & 3

commissioned during 1958 and

4th machine during 1965.

Since the machine served more

than 50 years, RMU for all the

4 old machines has been taken

up and works under progress.

29.17 CE/POH/ 688 Considering

Generaion loss

from the outage

of aged old

machines, the

revenue can be

realised through

RMU of old

machines

29.17 29.17

29.17 - - 29.17 - -

2 RMU Works of

Kodayar PH I

78.59 After getting

approval from the

Board

Payback period

is 1.91 years

78.59 78.59

- 5.00 25.00 - - -

3 RMU Works of

Kodayar PH II

60.00 After getting

approval from the

Board

Payback period

is 1.91 years

60.00 60.00

- - 20.00 - - -

4 PAPANASAM Upgradation of

governor at

Servalar Power

House

Existing governor is outdated

and hence, it is proposed to

upgrade the governor.

5.00 After getting

approval from the

Board

Payback period

is 1.91 years

5.00 5.00

- - - - - -

5 83 schemes which

are below the

monetory limit of

Rs.1crore

Essential for smooth

functioning of Power House

1.32 1.32 1.32

1.32 - - 1.32 - -

174.08 174.08 174.08 0.00 0.00 0.00 0.00 30.49 5.00 45.00 30.49 - - Sub total............

ANNEXURE 7

TIRUNELVELI GENERATION CIRCLE(372.80 MW)

Capital Investment Plan for control period from FY 2016-17 to 2018-19

TANGEDCO's Submission

DIVISION-I

KODAYAR

Since the machines have

served more than 45 years, it is

proposed to improve the

efficiency of the machines so as

to increase the generation with

the same quantity of water

inflow.

FY 2018-19FY 2017-18FY 2016-17

Approved by the Commission

S. No.Name of the

Scheme

Details of work

furnishing list

of major items

Technical justificationEstimated Cost

(Rs.in Crs.)

Details of Board

approval

Cost benefit

analysis

Capital Expenditure Capitalisation

Page 129

Page 119: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditure (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

FY 2016-17 FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19

Capital Investment Plan for control period from FY 2016-17 to 2018-19

TANGEDCO's Submission

FY 2018-19FY 2017-18FY 2016-17

Approved by the Commission

S. No.Name of the

Scheme

Details of work

furnishing list

of major items

Technical justificationEstimated Cost

(Rs.in Crs.)

Details of Board

approval

Cost benefit

analysis

Capital Expenditure Capitalisation

Page 130

Page 120: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation

(Rs. Crore)

Capital

Expenditure (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisatio

n (Rs. Crore)

Capital

Expenditure (Rs.

Crore)

FY 2016-17 FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19

1 Kadamparai

Pumped

Storage PH

Rectification works in stator and

rotor colis and re-insulation of

entire stator coils with class'F'

Insulation,and Rotor coils with

Class'H' insulation, mechanical

works, re-fixing, dynamic

balancing, including

supervision, erection, testing

and commissioning of UnitIV

Generator.

To bring the Unit.4 into

service for Generator

and pump mode

operation

3.68 Lr.No.CE/H/SE/H(

E)/EH/A8/F.HE231

3/WCT.No.80/D.52

7/18.dt.10.03.15

3.68 3.68

- - - - - -

2 Aliyar Power

House

Provision of 1 no. 3 MVA 110/22

KV Station Transformer to

Aliyar PH

Maintaining

uninterupted Power

Supply to Aliyar Power

House (1x60MW) and

230/110KV Aliyar Sub

Station

2.50 1.00 2.50 1.50

1.00 1.50 - - 2.50 -

3 Kadamparai

Pumped

Storage PH

Replacing & Commissioning of

existing GSX - 5e (Generator

protection system) by numerical

relay system for generator Unit-

I, III & IV at Kadamparai PH

To prevent unnecessary

tripping during

generation

1.50 0.60 1.50 0.90

0.60 0.90 - - 1.50 -

4 Kadamparai

Pumped

Storage PH

Replacing of existing Auto

sequencer panel by new digital

version and governer for unit

I,II,III,IV supply, erection,

testing and commissioning work

For upgrading the PLC

from Hardware to

software operation to

avoid frequent failure

in the old system and to

operate the unit

without any

interruption due to old

system

40.00 12.00 12.00 40.00 16.00

12.00 12.00 16.00 - - 40.00

5 Kadamparai

Pumped

Storage PH

Refurbishment , Fabrication,

Supply Installation,Testing and

Commissiong of Air Ventilation

System, after dismantling of the

existing damaged & deteriorated

HVAC - Equipments from the

Cavern and switchyard of

Kadamparai Power House

To maintain air

temperature humidity

inside the cavern for

efficient operation of

control and relay panels

3.35 1.34 3.35 2.01

- - - - - -

6 Kadamparai

Pumped

Storage PH

Mandatory spares to

Microprocessor based digital

static frequency converter with

associated static excitation

system for four Units at

Kadamparai Power House

To run the machine

without interruption

1.10 0.44 1.10 0.66

0.44 0.66 - - 1.10 -

7 Kadamparai

Pumped

Storage PH

Procurement of BHEL Turbine

spares for 100MW Unit-1 to 4 of

kadamparai Power House.

Kept as spare for

emergency

7.02 2.21 7.02 4.81

- - - - - -

8 Kadamparai

Pumped

Storage PH

Provision of 1 no. 230 KV/ 22

KV, 12.5 MVA Station Service

Transformer for alternate supply

at 230 KV Switch yard,

Kadamparai PH.

For alternate

arrangements

2.25 0.90 2.25 1.35

- 0.90 1.35 - - 2.25

ANNEXURE 8

KADAMPARAI GENERATION CIRCLE(595.45 MW)

Capital Investment Plan for control period from FY 2016-17 to 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

TANGEDCO's Submission

Details of Board

approval

Estimated Cost

(Rs.in Crores)Technical justification

Details of work furnishing list

of major items

Name of the

Scheme

S.

No.

Capital Expenditure Capitalisation

Approved by the Commission

Page 130

Page 121: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation

(Rs. Crore)

Capital

Expenditure (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisatio

n (Rs. Crore)

Capital

Expenditure (Rs.

Crore)

FY 2016-17 FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

Details of Board

approval

Estimated Cost

(Rs.in Crores)Technical justification

Details of work furnishing list

of major items

Name of the

Scheme

S.

No.

Capital Expenditure Capitalisation

9 Kadamparai

Pumped

Storage PH

Estimate for providing lighting

arrangements from 501 entry to

power house cavern by new

bright lights at KPH( LED

Energy Saving)

To save energy 2.00 1.00 2.00 1.00

- 1.00 1.00 - - 2.00

10 Kadamparai

Pumped

Storage PH

KGC- KPH - EM-I Estimate for

the replacement of transformer

oil for 3 Nos. (U.V.W Phases)

45MVA 11/230 KV Single Phase

Power Transformer of Unit-3&4

at KPH -sanctioned -Regarding.

To replace aged oil by

new oil

1.00 1.00 1.00

- - - - - -

11 Kadamparai

Pumped

Storage PH

KGC-KPH-EM-I-Estimate for

Unit - 3 stator Coils with F Class

insulation & rotor pole Coils

with H class insulation

improvement works at KPH

To replace aged coil by

new higher insulated

coil

5.00 5.00 5.00

- - - - - -

12 Kadamparai

Pumped

Storage PH

KGC-KPH-EM-I-Estimate for

Unit - 1 stator Coils with F

Class insulation improvement

works at KPH

To replace aged coil by

new higher insulated

coil

3.00 3.00 3.00

- - - - - -

13 Kadamparai

Pumped

Storage PH

KGC-KPH-EM-I-Estimate for

Spare New stator Coil with F

Class insulation for 1 No Unit

works at KPH (396 Nos )

To be kept as spares 2.00 2.00 2.00

- - - - - -

14 Kadamparai

Pumped

Storage PH

KGC-KPH-EM-I-Estimate for

Spare New Rotor Coil with H

Class insulation for 1 No Unit

works at KPH (12 Nos )

To be kept as spares 2.00 2.00 2.00

- - - - - -

15 Sholayar.

PH's

Renovation, Modernisation

and Uprating(RMU) of Sholayar

Power House.I From 2x35 MW

to 2x42 MW

Upgradation the

machine 35 MW to 42

MW

84.10 1.(Rt) CMD

TANGEDCO

Proceedings No.23

dt.26.02.2015

2. FB TANGEDCO

Proceedings No.22

dt.16.02.2015

Rs.90.44Rt CMD

TANGEDCO

Proceedings No.5

dt.19.01.2015

Rs.2.47

16.82 16.82 84.10 50.46

16.82 16.82 50.46 - - 84.10

160.50 3.68 35.88 14.45 44.00 142.37 80.62 30.86 33.78 68.81 - 5.10 128.35

Note:- For Sl.Nos.5,7,11,12,13,14, the capital expenditure has not been allowed as it is to covered under Repairs and Maintenance since this station has not covered its full life period .

Sub total...........

Page 131

Page 122: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation (Rs.

Crore)

Capital

Expenditure (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditure (Rs.

Crore)

Capitalisatio

n (Rs. Crore)

Capital

Expenditure (Rs.

Crore)

FY 2016-

17

FY 2017-

18

FY 2018-

19

FY 2016-

17

FY 2017-

18

FY 2018-

19

1 Procurement of materials

for 230 KV switchyard as

per CEA's task force at

TUNNEL PH.

5 Core CT CVT &

LAS.

As per CEA's task

force

recommendation.

1.25 M.No.CE/H/SE/H(E

)/EE/HP/AEE9/F.TP

H/ESST/D.2291/15,D

T.18.12.15

CR.No:194/ 2015-16

dt 16.12.15

For protection of Power

Transformer of

switchyard equipments.

0.50 1.25 0.75 0.00

0.50 0.75 - - 1.25 -

2 RLA Study at Tunnel PH. Proposal

submitted.

To improve the

Generation

2.00 ---- Since the machines have

served more than 15

years. If RLA study has

been done the

equipment can be

served further 30 years

and the capacity can be

increased to about 5 to

10 MW with available

resources.

2.00 2.00

- - 2.00 - - 2.00

- - - - - -

3 Provision of ATRCM at

BPH-1 / CKR.

ATRCM Grabler

and other

accessories.

To reduce the loss of

generation due to

chocking.

3.50 ---- While considering the

generation loss due to

chocking the erection of

ATRCM will impove

the generation.

0.00 0.00 3.50 3.50

- - 3.50 - - 3.50

4 Two nos. of lift type barrage

gates ( 15m x 9m) and

dismantling of old barrage

gates , erection and

commissioning of new

barrage gates at gate no. 3&

14 at BPH-1 / CKR.

Design ,

manufacturing &

supplying of

barrage gates - 2

nos.

The gates 3 & 14 had

suddenly broken &

collapsed on

24.06.2015 and

01.08.2015

respectively.

2.03 TANGEDCO

Proceeding no.512 dt.

28.11.2015.

For generation of power

and to regulate the flow

during surplus and

flood condition.

Replacement of new

gates is must for good

operation conditions.

0.00 2.03 2.03 0.00

- 2.03 - - 2.03 -

5 Strengthening ,

Reconditioning and

painting of 7 nos. of barrage

gates at BHP-2 / NPT.

Replacement of 3

bottom three ducts

& strengthening of

top 3 ducts , rollers

, bearings & seals.

duct

The gates are in

corroded condition

due to continuously

immersed in water

and needs

replacement

&strengthening to

ensure good operating

conditions.

4.06 TANGEDCO

Proceeding no.422 dt

26.09.2015

For generation of power

and to regulate the flow

during surplus and

flood condition.

Strengthening and

reconditioning of gates

must for good operation

conditions.

2.03 4.06 2.03 0.00

- - - - - -

6 5 nos. of lift type barrage

gates ( 15m x 9m) and

dismantling of old barrage

gates , erection and

commissioning of new

barrage gates at BPH-2 /

NPT.

Design ,

manufacturing &

supplying of

barrage gates - 5

nos.

The gates are in

corroded condition

due to continuously

immersed in water

and needs

replacement to ensure

good operating

conditions.

5.08 ---- For generation of power

and to regulate the flow

during surplus and

flood condition.

Replacement of new

gates is must for good

operation conditions.

0.00 0.00 5.08 5.08

- - 5.08 - - 5.08

- - - - - -

Division Mettur PHS

DIVISION BPH-1/Chekkanur

DivisionBKB-II/Vendipalayam

ANNEXURE 9

ERODE GENERATION CIRCLE(483.50 MW)

Capital Investment Plan for control period from FY 2016-17 to 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

TANGEDCO's Submission Approved by the Commission

S. No. Name of the Scheme

Details of work

furnishing list of

major items

Technical

justification

Estimated Cost

(Rs.in Crs.)

Details of Board

approvalCost benefit analysis

Capital Expenditure Capitalisation

Page 134

Page 123: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisation (Rs.

Crore)

Capital

Expenditure (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditure (Rs.

Crore)

Capitalisatio

n (Rs. Crore)

Capital

Expenditure (Rs.

Crore)

FY 2016-

17

FY 2017-

18

FY 2018-

19

FY 2016-

17

FY 2017-

18

FY 2018-

19

Capital Investment Plan for control period from FY 2016-17 to 2018-19

FY 2016-17 FY 2017-18 FY 2018-19

TANGEDCO's Submission Approved by the Commission

S. No. Name of the Scheme

Details of work

furnishing list of

major items

Technical

justification

Estimated Cost

(Rs.in Crs.)

Details of Board

approvalCost benefit analysis

Capital Expenditure Capitalisation

7 provision of ATRCM at BKB

PH-2/ Vendipalayam

Design ,

procurment

manufacturing, site

erection of ATRCM

with Hydraulic

grabler and trash

disposal vehicle.

Civil structure for

trash unloading

and tractor placing

area

Trash rack chocking

creates heavy loss

and the load could be

increased to the rated

capacity. Also

underneath chocking

could be removed

only with help of

TRCM

3.50

----

While considering

generation loss due to

trash rack chocking,

erection of ATRCM will

improve generation

0.00 0.00 3.50 3.50

- - 3.50 - - 3.50

21.42 0.00 2.53 7.34 4.81 14.08 14.08 0.50 2.78 14.08 - 3.28 14.08 Sub total....

Page 135

Page 124: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisatio

n (Rs. Crore)

Capital

Expenditur

e (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisatio

n (Rs. Crore)

Capital

Expendit

ure (Rs.

Crore)

FY

2016-

17

FY 2017-

18

FY 2018-

19

FY 2016-

17

FY 2017-

18FY 2018-19

1 Capital Fuel Nozzle Assemblies, Combustion Liners, Cross Fire

Tubes & Retainers in Combustion chamber are to be

inspected & damaged parts if any will be replaced.

Combustion Inspection is a Mandatory inspection & it has to be

done for every 8000hours of running to improve efficiency of GT.

12.87 To be obtained Due to overhauling of combustion chambers

specific gas Consumption will be reduced

thereby Heat rate will be reduced.

12.87 12.87

- - - - - -

2 Capital Refurbishement of the damaged Turbine Parts so as to

bring back the Gas Turbine and the Steam Turbine of

Phase-II into service.

Major Parts to be replaced . Turbine Stator Blades -

Stage- 1 , Turbine Stator Blades - Stage 2 , Turbine

Stator Blades - Stage 3, Turbine Rotor Blades - Stage 1,

Turbine Rotor Blades - Stage- 2, Turbine Rotor Blades -

Stage- 3 & Hub Assembly

Repair of major used parts : Blade Carrier, Diagonal

Swirlers & Oil Boxes

The unit is under shutdown from 23.1.15 due to high vibration in

GT. Hence the damaged turbine parts are to be refurbished.

78.30 B.P.16/ dt

9.2.16

To bring back the unit which is under long shut

down therby avoiding loss of generation & MGO

charges payable for nonusage of gas.

70.30 78.30 8.00

- - - - - -

3 Capital TWAD Water Storage Reservoir RCC Additional raw water to be collected from TWAD Board & stored in

the storage tank for use in HRSG so as to reduce the cost of

chemical which is being used in the water treatment and also

reduce the ground water conservation .

1.75 This raw water is used in HRSG so as to reduce

the cost of chemical which is being used in

water treatment and also reduce the ground

water conservation

1.75 1.75

1.75 - - 1.75 - -

4 Capital TWAD Board Water initial deposit Additional raw water to be collected from TWAD Board & stored in

the storage tank for use in HRSG so as to reduce the cost of

chemical which is being used in the water treatment and also

reduce the ground water conservation .

2.25 This raw water used in HRSG so as to reduce

the cost of chemical which is being used in

water treatment and also reduce the ground

water conservation

2.25 2.25

- - - - - -

5 Capital GT and Generator Major Overhauling work of Phase-II It is a Mandatory inspection to be carried out after every 50,000

firing hours recommended by OEM. During that inspection the

combustion chamber,Fuel Nozzle , Nozzle arrangements, Buckets

and shrouds are being inspected and the deteriorated items will be

replaced with the refurbished/ New items, as the combustion

chambers & internals were overhauled specific gas consumption is

reduced thereby Heat rate is also improved. Further, Major

overhauling was carried out in 2014-15 at the first time in VGTPS-II

from the date of commissioning in the year 2008.

2.70 Board. Vide

B.P.32/dt

1.3.14

Improvement in Power generation at GTG . 2.70 2.70

- - - - - -

6 Capital Security Deposit, Advance water charges for 6 months

and Infra structure charges to be paid in respect of TWAD

Water scheme.

Additional raw water to be collected from TWAD Board & stored in

the reservoir for Plant usage .

1.18 This raw water is used in HRSG so as to reduce

the cost of chemical which is being used in

water treatment and also reduce the ground

water conservation

1.18 1.18

- - - - - -

7 Capital Solar Evaporation Pond (SEP) SEP is Mandatory as per TNPCB norms and this amount was

already recovered from M/s.BGR while closing the P.O.

2.41 Effulent from DM Plant, Boiler & Neutralising pit

are to be disposed off after treatment as per

TNPCB Norms.

2.41 2.412.41 - - 2.41 - -

8 Capital Entire GT comprising of Combustion chamber, Hot Gas

path zone and Gas Turbine is to be inspected in Major

inspection and damaged parts if any will be replaced.

Major Inspection is a Mandatory inspection & it has to be

carriedout every 48000 hours of opeartion

96.00 To be obtained Less Gas Consumption which will reflect in the

cost of gas

96.00 96.00

- - - - - -

9 Capital Installation of new Gas Booster Compressor The compressor at Phase-I is being used in Phase-II. Hence there

will be no standby GBC for both units. Hence it is proposed to

provide a new Centrifugal type compressor thereby reducing the

loss of generation for want of standby GBC.

30.00 To be obtained GBC is a Critical item and standby GBC is very

much essential to avoid loss of generation in

the case of breakdown due to problem in GBC.

30.00 30.00

- - 30.00 - - 30.00

10 Capital Overhauling of Steam Turbine and replacement of

damaged parts.

Overhauling of Steam Turbine is Mandatory as per OEM

recommendation. For ensuring healthiness and for better

performance of the Steam Turbine, it is to be overhauled.

5.00 To be obtained Efficiency of ST will improve thereby generation

will inCrs.ease.

5.00 5.00- - 5.00 - - 5.00

11 Capital GTG Mark V Operating system upgradation DOS to

Windows in Phase-I

Existing system CPU spares obsolete 1.00 To be obtained Upgradation of system resulted in reducing the

trip due to failure of cards which was obsolete

and irrepairable condition .

1.00 1.00- 1.00 - - 1.00 -

12 Capital GT and GBC I,II Upgradation of GT and GBC I, II-

Vibration and temperature monitoring and control panel

in Phase-I

Existing electronic cards obsolete 1.20 To be obtained 1.20 1.20- 1.20 - - 1.20 -

13 Capital STG and BOP Upgradation of DCS WS POSE Server

I,II,HMI system in Phase-I

Existing system obsolete-Upgradation as per OEM recommendation 5.80 To be obtained 5.80 5.80 - 5.80 - - 5.80 -

ANNEXURE 10

VALUTHUR GAS TURBINE POWER STATION(187MW)

Capital Investment Plan for control period from FY 2016-17 to 2018-19

2018-192016-17 2017-18

TANGEDCO's Submission Approved by the Commission

Cost benefit analysis

Details of

Board

approval

Estimated

Cost

(Rs.in Crs.)

S.

No.

Name of

the

Scheme

Details of work furnishing list of major items Technical justification

Capital Expenditure Capitalisation

Page 139

Page 125: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisatio

n (Rs. Crore)

Capital

Expenditur

e (Rs.

Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisatio

n (Rs. Crore)

Capital

Expendit

ure (Rs.

Crore)

FY

2016-

17

FY 2017-

18

FY 2018-

19

FY 2016-

17

FY 2017-

18FY 2018-19

2018-192016-17 2017-18

Cost benefit analysis

Details of

Board

approval

Estimated

Cost

(Rs.in Crs.)

S.

No.

Name of

the

Scheme

Details of work furnishing list of major items Technical justification

Capital Expenditure Capitalisation

14 Capital Configuration of DCS control for GBC k4 and GBC k2 in

existing Siemens DCS system including spares

Instrumentation interface panels in Phase-II

for smooth operation of Gas Turbine 1.50 To be obtained The compressor at Phase-I is being used in

Phase-II. Hence there will no standby GBC for

both units. Hence it is proposed to provide new

standby Centrifugal type compressor for

continuous running of both units thereby

reduction in loss of generation. Hence the

exsiting DCS is to be configurated.

1.50 1.50

- - - - - -

15 Capital UPS-I, UPS-II Battery Bank for Steam Turbine Battery

Bank containing 277 X2Cells

For smooth operation of Plant 1.30 To be obtained To reduce the outages thereby reduction in loss

of generation.

1.30 1.30 - 1.30 - - 1.30 -

16 Capital Land for K4 GBC building For erection of new GBC K4 3.00 To be obtained To accommodate new GBC,land is necessary 3.00 3.00 - 3.00 - - 3.00 -

17 Capital Construction of buildings for K4 GBC and auxilliaries For erection of new GBC K4 3.00 To be obtained 3.00 3.00 - 3.00 - - 3.00 -

18 Capital Fuel Nozzle Assemblies, Combustion Liners, Cross Fire

Tubes & Retainers in Combustion chamber are to be

inspected & damage parts if any will be replaced.

Mandatory inspection to be done for every 8000hours of running to

improve efficiency of GT.

10.00 To be obtained Due to overhauling of combustion chambers

specific gas Consumption will be reduced

thereby Heat rate will be reduced.

10.00 10.00

- - 10.00 - - 10.00

19 Capital Minor inspection in Combustion chamber and the

damaged if any will be replaced

Minor Inspection is a Mandatory inspection & it has to be done for

every 8000hours of running to improve efficiency of GT.

2.00 To be obtained Due to overhauling of combustion chambers

specific gas Consumption will be reduced

thereby Heat rate will be reduced.

2.00 2.00- - 2.00 - - 2.00

20 Capital Spare Steam Turbine Generator overhauling in Phase-I at

VGTPS.

Overhauling of Steam Turbine Generator is Mandatory as per OEM

recommendation. For ensuring healthiness and for better

performance the Steam Turbine Generator,it is to be overhauled.

3.00 To be obtained There will be improve-ment in the STG power

output thereby inCrs.ease in revenue .

3.00 3.00

- - - - - -

264.26 23.16 93.46 226.1 155.8 15 15 4.16 15.30 47.00 4.16 15.30 47.00 Sub total...........

Page 140

Page 126: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisatio

n (Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisatio

n (Rs. Crore)

Capital

Expenditur

e (Rs.

Crore)

Capitalisatio

n (Rs. Crore)

Capital

Expenditure (Rs.

Crore)

FY 2016-

17FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19

1 Capital Upgradation of MMI

System of pro control p13

DCS system

The existing DCS system is

obsolete & hence the company

suggested for upgradation of

MMI system

2.50 To be

obtained

The frequent trips due to card

failure will be reduced thereby loss

of generation will be reduced.

2.50 2.50

- 2.50 - - 2.50 -

2 Capital Fuel Nozzle Assemblies,

Combustion Liners, Cross

Fire Tubes & Retainers in

Combustion chamber are

to be inspected &

damaged parts if any will

be replaced.

Combustion Inspection is a

Mandatory inspection & it has to

be done for every 8000hours of

running to improve efficiency of

GT.

12.87 To be

obtained

Due to overhauling of combustion

chambers specific gas

Consumption will be reduced

thereby Heat rate will be reduced.

12.87 12.87

- - - - - -

3 Capital Replacement of inlet air

filter house.

Major parts to be replaced

Inlet air filtration system,

Evaporative cooler,

Transition piece.

The existing inlet air filter house

is in corroded condition and

many holes have developed due

to corrosion. At present these

holes are covered by providing

metal patches. The air admitted

into the Gas Turbine should be

free from any dust and other

solid particles, otherwise would

cause severe physical damages

to the rotating Gas Turbine parts.

The OEM authorised Service

Agency, M/s.BHEL-GE Gas

Turbine Services Pvt.Ltd., have

also advised to replace the inlet

air filter house with a new one.

Hence, the replacement is

essential.

6.87 To be

obtained.

Avoidance of unexpected damage

to the Gas Turbine Parts due to

entry of foreign material thereby

reducing forced outages and loss

of generation.

6.53 6.87 0.34

6.53 0.34 - - 6.87 -

4 Capital Supply, Erection &

commissioning of Air

Cooled condensor

The STG is having surface water

cooled condenser to condense

126.8 TPH exhaust steam flow at

a pressure of 0.115 bar.The

surface condenser cooling

medium is ground water drawn

through deep bore well, whose

conductivity is in the order of

3000µS /cm, as against

1000µS/cm during the

commissioning of the plant

during 2001.Frequent condenser

tube failures is experienced. To

avoid frequent tube failure, it is

proposed to replace the existing

worn out water cooled surface

condenser by new Air Cooled

Condenser.

32.00 B.P.No.401/

dt 9.9.14

The Condenser Tube puncture will

be reduced after commissioning of

ACC thereby reduction in loss of

generation . Further effective

cooling result in increase in

generation

0.00 20.00 32.00 12.00

- 20.00 12.00 - - 32.00

ANNEXTURE 11THIRUMAKKOTTAI GAS TURBINE POWER STATION(107.88MW)

Capital Investment Plan for control period from FY 2016-17 to 2018-19

2018-192016-17 2017-18

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of

the

Scheme

Details of work

furnishing list of major

items

Technical justification

Estimated

Cost

(Rs.in Crs.)

Details of

Board

approval

Cost benefit analysis

Capital Expenditure Capitalisation

Page 144

Page 127: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisatio

n (Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisatio

n (Rs. Crore)

Capital

Expenditur

e (Rs.

Crore)

Capitalisatio

n (Rs. Crore)

Capital

Expenditure (Rs.

Crore)

FY 2016-

17FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19

2018-192016-17 2017-18S.

No.

Name of

the

Scheme

Details of work

furnishing list of major

items

Technical justification

Estimated

Cost

(Rs.in Crs.)

Details of

Board

approval

Cost benefit analysis

Capital Expenditure Capitalisation

5 Capital Entire GT comprising of

Combustion chamber, Hot

Gas path zone and Gas

Turbine is to be inspected

in Major inspection and

damaged parts if any will

be replaced.

Combustion Inspection is a

Mandatory inspection & it has to

be carriedout every 48000 hours

of opeartion

96.00 To be

obtained

Less Gas Consumption which will

reflect in the cost of gas .

96.00 96.00

- 96.00 - - 96.00 -

6 Capital Overhauling of Steam

Turbine and replacement

of damaged parts.

Overhauling of Steam Turbine is

Mandatory. For ensuring

healthiness and for better

performance of the Steam

Turbine, it is to be overhauled.

5.00 To be

obtained

Efficiency of ST will improve

thereby generation will increase.

5.00 5.00

- 5.00 - - 5.00 -

7 Capital Fuel Nozzle Assemblies,

Combustion Liners, Cross

Fire Tubes & Retainers in

Combustion chamber are

to be inspected & damage

parts if any will be

replaced/ refurbished.

Mandatory inspection to be done

for every 8000hours of running

to improve efficiency of GT.

10.00 To be

obtained

Due to overhauling of combustion

chambers specific gas

Consumption will be reduced

thereby Heat rate will be reduced.

10.00 10.00

- - 10.00 - - 10.00

8 Capital Major overhauling of STG

Generator

STG Overhauling is Mandatory as

per OEM recommendation. It was

made in Dec'15. However, STG

rotor blades are to be replaced

with new one during 2018-19

since the existing blades are

slightly damaged condition &

generation at STG is slightly

lesser than the previous

generation. Hence the repairing

works will be carriedout in FY

2018-19 after procuring the new

blades.

1.00 To be

obtained

There is vibration in STG. Full load

in STG could not be reached.After

replacing the STG rotor new

blades there will be improvement

in STG generation

1.00 1.00

- - - - - -

9 Capital Stage-III Bucket Combustion Inspection is a

Mandatory inspection & it has to

be carriedout after every 8000

Hours as per OEM

recommendation. During that

inspection the combustion

chambers are being inspected

and the deteriorated items will

be replaced with the refurbished/

New items. Further, these items

were released during Hot Gas

Path Inspection held in Sep'14

and the same was sent to BHEL-

GE for refurbishment. The same

will be used as common spare

for T(K)GTPS, KGTPS &VGTPS-I.

2.15 Board

approved

BP:25 dt

04.03.15

Refurbished item will be 77.956%

lesser than the original cost of this

item.

2.15 2.15

- 2.15 - - 2.15 -

168.52 17.52 32.52 108.00 119.00 43.00 17.00 6.53 125.99 22.00 - 112.52 42.00 Sub total...........

Page 145

Page 128: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisati

on (Rs.

Crore)

Capital

Expenditur

e (Rs.

Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisati

on (Rs.

Crore)

Capital

Expenditure

(Rs. Crore)

FY 2016-

17

FY 2017-

18

FY 2018-

19

FY 2016-

17

FY 2017-

18

FY 2018-

19

1 Capital Fuel Nozzle Assemblies,

Combustion Liners, Cross Fire

Tubes & Retainers in

Combustion chamber are to

be inspected & damaged

parts if any will be replaced.

Combustion Inspection is a

Mandatory inspection & it

has to be done for every

8000hours of running to

improve efficiencyof GT.

12.87 To be obtained Due to overhauling of

combustion chambers

specific gas Consumption

will be reduced thereby

Heat rate will be reduced.

12.87 12.87

- - - - - -

2 Capital Construction of quarters Due to non-availability of

quarters, operating

personnel are coming from

the nearby towns. Normally

1 hour to 2 hour will be

taken for pooling the

operating personnels when

the outage occurs in odd

hours and Holidays.

7.42 Adm. approval

obtained vide

(Per) (F.B)

TANGEDCO

PROCEEDING

NO:47 Dated

02.04.2014 for

Rs.8.42 Crs..

The loss of generation will

be reduced as the outage

will be attended at the

earliest possible time.

7.42 2.97 4.45 7.42

2.97 4.45 - - - 7.42

3 Capital Fuel Nozzle Assemblies,

Combustion Liners, Cross Fire

Tubes & Retainers in

Combustion chamber are to

be inspected & damage parts

if any will be replaced.

Combustion Inspection is a

Mandatory inspection & it

has to be done for every

8000hours of running to

improve efficiency of GT.

12.00 To be obtained Due to overhauling of

combustion chambers

specific gas Consumption

will be reduced thereby

Heat rate will be reduced.

12.00 12.00

- - - - - -

4 Capital Entire GT comprising of

Combustion chamber, Hot Gas

path zone and Gas Turbine is

to be inspected in Major

inspection and damaged parts

if any will be replaced.

Major inspection is a

Mandatory inspection & it

has to be carriedout every

48000 hours of opeartion

35.00 To be obtained Less Gas Consumption

which will reflect in the

cost of gas .

35.00 35.00

- - - - - -

5 Capital Overhauling of Steam Turbine

and replacement of damaged

parts.

Overhauling of Steam

Turbine is Mandatory as

per OEM recommendation.

For ensuring healthiness

and for better performance

of the Steam Turbine, it is

to be overhauled.

5.00 To be obtained Efficiency of ST will

improve thereby

generation will increase.

5.00 5.00

- - - - - -

72.29 20.29 20.29 12.00 12.00 40.00 40.00 2.97 4.45 - - - 7.42 Sub total.........

ANNEXTURE 12

KUTTALAM GAS TURBINE POWER STATION(101 MW)

Capital Investment Plan for control period from FY 2016-17 to 2018-19

TANGEDCO's Submission Approved by the Commission

2016-17 2017-18 2018-19

S.

No.

Name of

the

Scheme

Details of work furnishing

list of major itemsTechnical justification

Estimated

Cost

(Rs.in

Crs.)

Details of Board

approvalCost benefit analysis

Capital Expenditure Capitalisation

Page 147

Page 129: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisatio

n (Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

Capitalisation

(Rs. Crore)

Capital

Expenditure

(Rs. Crore)

FY 2016-17 FY 2017-18FY 2018-

19

FY 2016-

17

FY 2017-

18

FY 2018-

19

1 Capital Procurement of 1 set of III stage

shroud & Nozzle for Hot Gas Path

Inspection in Unit-IV at BBGTPS

Hot Gas Path Inspection is a Mandatory & it

has to be carriedout at every 1200 starts as

per OEM recommendation. During that

inspection , the Combustion chambers &

internal parts of the Gas Turbine (All

shrouds & Nozzles) will be inspected and

the deteriorated items will be replaced with

the refurbished/ New items

1.00 Administrative

approval is to

be obtained.

Due to overhauling of

Combustion chambers

specific gas Consumption

will be reduced thereby

Heat rate will be reduced.

1.00 1.00

- - 1.00 - - 1.00

2 Capital Procurement of 1 set of III stage

shroud & Nozzle for Hot Gas Path

Inspection in Unit-I at BBGTPS

These spares are to be replaced during the

above inspection.

1.00 Administrative

approval is to

be obtained

Less Naphtha Consum-

ption which will reflect in

the cost of generation

1.00 1.00

- 1.00 - - 1.00 -

3 Capital Compressor discharge casing &

Turbine casing of Gas Turbine of

Unit-III

As there is a crack in the Turbine casing this

unit could not be operated under Genration

mode. In order to use this unit for real

power generation this work has to be

carried out.

10.79 Administrative

approval is to

be obtained

As the units at BBGTPS re

to kept standby to meet

any emeregency tomaintain

Grid Stability.

10.79 10.79

3.50 7.29 - - 10.79 -

12.79 0.00 0.00 12.79 12.79 0.00 0.00

517.86 60.97 146.27 358.89 299.59 98.00 72.00 3.50 8.29 1.00 - 11.79 1.00 Sub total.....

Grand total(Annexures-I to IV).....

ANNEXTURE 13

BASIN BRIDGE GAS TURBINE POWER STATION(120 MW)

Capital Investment Plan for control period from FY 2016-17 to 2018-19

2018-192016-17 2017-18

TANGEDCO's Submission Approved by the Commission

S.

No.

Name of

the

Scheme

Details of work furnishing list

of major itemsTechnical justification

Estimated

Cost

(Rs.in Crs.)

Details of

Board

approval

Cost benefit analysis

Capital Expenditure Capitalisation

Page 149

Page 130: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalis

ation

(Rs.in

Crs.)

Capital

Expendit

ure

(Rs.in

Crs.)

Capitalisat

ion

(Rs.in

Crs.)

Capital

Expendit

ure

(Rs.in

Crs.)

Capitalis

ation

(Rs.in

Crs.)

Capital

Expendit

ure

(Rs.in

Crs.)

FY 2016-

17

FY 2017-

18

FY 2018-

19

FY 2016-

17

FY 2017-

18

FY 2018-

19

1

DRIP

WORKS

UNDER

WORLD

BANK

FUNDED

Dam Rehabilitation and

Improvement Project

Works Under World

Bank Funded Scheme

(38 Dams)

General Improvement

Works and

E & M Works

272.00

G.O.(MS)

No.341.,

dated

26.11.2010

B.P. (F-B)

No.126

(Tech

Branch)

dt.11.09.

2008

Does not arise 0.00 104.00 272.00 160.82 0.00 104.00 160.82 0.00 0.00 272.00 0.00

272.00 0.00 104.00 272.00 160.82 0.00 0.00 104.00 160.82 0.00 0.00 272.00 0.00

1

2

3

4

Approved by the Commission

Capital Expenditure Capitalisation

Cost benefit

analysis

ANNEXURE 14

DAM REHABILITATION AND IMPROVEMENT PROJECT

Capital Investment Plan 2016-17 & FY 2017 - 18

FY 2016-17 FY 2017-18 FY 2018-19

Sl.

No.

Details of

Board

approval

Estimated

Cost

(Rs.in Crs.)

Technical

justification

Details of work

furnishing list of

major items

TANGEDCO's Submission

Sub total.......

Avalanche dam CE/CD/Chennai/accept No. 01/D.348/Dt.12.12.2014

Name of

the

Scheme

Glenmorgan dam CE/CD/Chennai/accept No.02/D.349, dt.12.12.2014

Kadamparai dam CE/CD/Chennai/accept No. 04/D.16/Dt.12.01.2015

Mukkurthy dam CE/CD/Chennai/D.384, dt.30.01.2015

Page 170

Page 131: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 172

Page 132: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisatio

n

(Rs.in Crs.)

Capital

Expenditure

(Rs.in Crs.)

Capitalisat

ion

(Rs.in Crs.)

Capital

Expenditure

(Rs.in Crs.)

Capitalisatio

n

(Rs.in Crs.)

Capital

Expenditure

(Rs.in Crs.)

FY 2016-

17FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19

1 Land AcquisitionCompensation value

towards land acquired3.54

Per BP

TANGEDCO

Proc. No. 16

(TB) dt. 10.12.10

1.75 1.75 1.79 1.79 0.00 0.00 1.75 1.79 0.00 1.75 1.79 0.00

2

Construction of boundary

pillars at submergible

lands at LF & RF

To demarcate the

boundary of land0.55 0.05 0.05 0.50 0.50 0.00 0.00 0.05 0.50 0.00 0.05 0.50 0.00

3Improvement work to

railway pump works

To increase the water level

on the upstream side to

FRL

0.60 0.60 0.60 0.00 0.00 0.00 0.00 0.60 0.00 0.00 0.60 0.00 0.00

4

Providing protection

arrangement in the

upstream side of left Flank

To increase the water level

on the upstream side to

FRL

0.10 0.10 0.10 0.00 0.00 0.00 0.00 0.10 0.00 0.00 0.10 0.00 0.00

4.79 2.50 2.50 2.29 2.29 0.00 0.00 2.50 2.29 0.00 2.50 2.29 0.00

Approved by the Commission

Capital Expenditure Capitalisation

All works are

completed

satisfactorily and

both units are

put into

commercial

operation in

generation

continuously

TANGEDCO

Proceeding

No:16 DT

10.12.2010

ANNEXURE 15

Bhavani Kattalai Barrage-II, Hydro Project (2x15MW)

Capital Investment Plan for control period from FY 2016-17 to 2018-19

FY 2018-19

S.NoName of

the scheme

Details of work

Furnishing list of Major

items

Technical justification

Estimated

Cost

(Rs.in Crs.)

Details Board

approval

Cost benefit

analysis

TANGEDCO's Submission

Total

FY 2016-17 FY 2017-18

Page 173

Page 133: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 174

Page 134: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 175

Page 135: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 176

Page 136: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisatio

n

(Rs.in Crs.)

Capital

Expenditure

(Rs.in Crs.)

Capitalisat

ion

(Rs.in Crs.)

Capital

Expenditure

(Rs.in Crs.)

Capitalisatio

n

(Rs.in Crs.)

Capital

Expenditure

(Rs.in Crs.)

FY 2016-

17FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19

1 Land Acquisition Compensation value

towards land acquired13.15

Per FB

TANGEDCO

Proc. No. 55

(TB) dt. 09.05.11

3.15 3.15 10.00 10.00 0.00 0.00 3.15 10.00 0.00 3.15 10.00 0.00

2

Construction of protection

wall at BB-II (Machine

nagar +Head race channel

73 to 103)

To protect the lands from

getting submerged1.70

Awaiting for

administrative

approval

0.70 0.70 1.00 1.00 0.00 0.00 0.70 1.00 0.00 0.70 1.00 0.00

3Removal of Rock

projection at BB-II

To increase power

generation1.45

Awaiting for

administrative

approval

1.00 1.00 0.45 0.45 0.00 0.00 1.00 0.45 0.00 1.00 0.45 0.00

4

Protection wall to

submergible land

( court case )

To protect the lands from

getting submerged0.38 Under progress 0.38 0.38 0.00 0.00 0.00 0.00 0.38 0.00 0.00 0.38 0.00 0.00

5 Survey work FRL 295To identify the lands that

will get submerged0.25 Under progress 0.15 0.15 0.10 0.10 0.00 0.00 0.15 0.10 0.00 0.15 0.10 0.00

6

Construction of protection

wall to the seerangarayan

oadai at

Chikathasampalayam/

mettupalayam

To protect the lands from

getting submerged0.50 Under progress 0.50 0.50 0.00 0.00 0.00 0.00 0.50 0.00 0.00 0.50 0.00 0.00

17.43 5.88 5.88 11.55 11.55 0.00 0.00 5.88 11.55 0.00 5.88 11.55 0.00

Approved by the Commission

Capital Expenditure Capitalisation

TANGEDCO's Submission

Cost benefit

analysis

Details Board

approval

ANNEXURE 16

Bhavani Barrage-II, Hydro Project (2x5MW)

Capital Investment Plan for control period from FY 2016-17 to 2018-19

Estimated

Cost

(Rs.in Crs.)

Technical justification

Details of work

Furnishing list of Major

items

Name of

the scheme S.No

Total

FY 2016-17 FY 2017-18 FY 2018-19

Page 177

Page 137: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Page 178

Page 138: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

ABSTRACT -DISTRIBUTION FUNCTION

FY 2016-

17

FY 2017-

18

FY 2018-

19

FY 2016-

17

FY 2017-

18

FY 2018-

19

FY 2016-

17

FY 2017-

18

FY 2018-

19

FY 2016-

17

FY 2017-

18FY 2018-19

I Region :Chennai North

1 Chennai Central 406.02 204.10 108.22 93.70 199.32 106.82 90.51 198.40 108.22 93.70 193.62 106.82 90.51

2 Chennai West 145.02 99.34 27.18 18.50 97.00 27.67 18.50 99.34 27.18 18.50 97.00 27.67 18.50

3 Chennai North 214.94 122.11 58.16 34.67 118.71 57.71 35.29 122.11 58.16 34.67 118.71 57.71 35.29

Sub total 765.98 425.55 193.56 146.87 415.03 192.20 144.30 419.85 193.56 146.87 409.33 192.20 144.30

II Region : Chennai South

4 Chennai South 981.30 916.39 39.51 25.40 906.61 45.34 26.81 866.39 39.51 25.40 856.61 45.34 26.81

5 Kancheepuram 378.31 114.86 147.90 115.55 103.38 144.59 120.53 113.90 146.40 113.95 102.52 143.14 118.78

6 Chengalpattu 424.11 147.28 137.54 139.29 134.67 137.53 138.69 147.28 137.54 139.29 134.67 137.53 138.69

Sub total 1,783.72 1,178.53 324.95 280.24 1,144.66 327.46 286.03 1,127.57 323.45 278.64 1,093.80 326.01 284.28

III Region : Coimbatore

7 Coimbatore Metro 295.36 213.11 39.50 42.75 209.93 38.73 43.40 181.54 32.00 34.25 178.96 31.38 34.15

8 Coimbatore North 189.35 109.60 39.88 39.87 106.41 39.48 41.66 100.42 34.88 33.87 97.73 34.48 35.16

9 Coimbatore South 198.41 94.19 58.50 45.72 91.31 55.53 49.54 81.46 53.50 39.72 79.08 50.53 43.04

10 Tiruppur 319.52 132.50 96.00 91.02 125.72 93.18 95.92 113.91 86.00 79.02 107.93 83.38 82.92

11 Udumalpet 200.16 110.37 45.00 44.79 108.09 42.78 46.99 98.80 38.00 36.79 97.02 35.98 38.29

12 Nilgiris 88.64 38.37 30.85 19.42 36.40 30.93 21.04 37.73 30.35 18.42 35.81 30.43 19.99

Sub total 1,291.44 698.14 309.73 283.57 677.86 300.63 298.55 613.86 274.73 242.07 596.53 266.18 253.55

IV Region : Erode

13 Erode 388.85 214.74 143.77 30.34 193.76 157.04 36.66 201.28 131.61 19.24 181.55 144.85 24.34

14 Gobi 210.94 99.52 70.59 40.83 90.60 72.75 44.73 97.08 68.09 37.98 88.38 70.28 41.63

15 Mettur 224.62 97.45 69.62 57.55 88.22 71.87 60.72 90.25 63.97 54.55 81.73 66.08 57.15

16 Salem 303.37 126.39 102.41 74.57 116.08 105.60 76.16 119.96 95.83 67.33 110.25 99.08 68.26

17 Namakkal 265.17 87.78 101.48 75.91 79.68 99.44 79.26 71.79 93.75 71.00 65.09 91.08 73.58

Sub total 1,392.95 625.88 487.87 279.20 568.34 506.70 297.53 580.36 453.25 250.10 527.00 471.37 264.96

V Region : Madurai

18 Sivaganga 275.59 111.49 106.58 57.52 102.86 109.34 59.78 99.49 94.58 45.52 92.06 97.34 46.58

19 Theni 103.54 52.35 30.95 20.24 49.24 30.96 23.34 51.81 30.95 20.24 48.70 30.96 23.34

20 Madurai Metro 374.19 238.46 35.17 100.56 236.24 37.39 90.50 238.46 35.17 100.56 236.24 37.39 90.50

21 Ramnad 41.85 21.35 10.25 10.25 20.32 10.25 10.28 21.35 10.25 10.25 20.32 10.25 10.28

22 Dindigul 210.23 175.47 29.96 4.80 172.02 31.59 6.14 174.33 29.96 4.80 170.88 31.59 6.14

23 Madurai 141.42 113.40 2.42 25.60 113.16 2.66 25.60 113.40 2.42 25.60 113.16 2.66 25.60

Sub total 1,146.82 712.52 215.33 218.97 693.84 222.19 215.64 698.84 203.33 206.97 681.36 210.19 202.44

VI Region : Tirunelveli

24 Virudhunagar 100.99 42.82 39.99 18.18 40.97 40.18 18.85 42.82 39.99 18.18 40.97 40.18 18.85

25 Tirunelveli 316.15 207.45 70.84 37.86 200.66 72.78 40.98 196.95 70.84 37.86 190.16 72.78 40.98

26 Kanyakumari 223.23 113.73 71.16 38.34 106.36 74.90 39.84 98.73 55.16 21.34 92.86 59.00 21.24

27 Tuticorin 107.61 58.79 21.43 27.39 54.31 24.22 28.12 58.79 21.43 27.39 54.31 24.22 28.12

Sub total 747.98 422.79 203.42 121.77 402.30 212.08 127.79 397.29 187.42 104.77 378.30 196.18 109.19

VII Region : Trichy

28 Trichy Metro 240.21 121.00 76.31 42.90 116.15 76.03 45.86 121.00 76.31 42.90 116.15 76.03 45.86

29 Thiruvarur 123.73 53.69 39.17 30.87 49.96 39.55 31.96 50.75 36.23 27.93 47.31 36.61 28.73

30 Karur 110.39 64.13 36.48 9.78 59.87 38.78 11.74 63.62 36.48 9.78 59.36 38.78 11.74

31 Pudukkottai 305.74 134.55 99.83 71.36 123.15 104.24 72.35 104.55 90.33 63.86 96.15 92.69 63.90

32 Perambalur 95.16 57.97 27.79 9.40 56.42 28.10 9.89 57.97 27.79 9.40 56.42 28.10 9.89

33 Thanjavur 132.73 77.72 40.61 14.40 71.53 43.53 16.87 77.72 40.61 14.40 71.53 43.53 16.87

34 Nagapattinam 324.90 160.98 132.42 31.50 144.88 138.92 40.24 159.69 131.45 30.56 143.72 137.92 39.20

Total Amount 1,332.86 670.04 452.61 210.21 621.96 469.15 228.91 635.30 439.20 198.83 590.64 453.66 216.19

VIII Region : Vellore

35 Vellore 242.55 89.21 98.04 55.30 81.74 100.59 55.82 81.21 89.04 45.30 74.54 91.69 44.92

Sl.

No.

Capital Expenditure Capitalisation CapitalisationName of the Circles

Estimated

Cost (Rs.

Crore)

TANGEDCO PETITION COMMISSION'S APPROVAL

Capital Expenditure

Page 1

Page 139: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

FY 2016-

17

FY 2017-

18

FY 2018-

19

FY 2016-

17

FY 2017-

18

FY 2018-

19

FY 2016-

17

FY 2017-

18

FY 2018-

19

FY 2016-

17

FY 2017-

18FY 2018-19

Sl.

No.

Capital Expenditure Capitalisation CapitalisationName of the Circles

Estimated

Cost (Rs.

Crore)

Capital Expenditure

36 Tirupattur 173.24 75.72 61.72 35.80 69.64 64.49 36.07 73.22 58.52 32.50 67.39 61.36 32.45

37 Dharmapuri 235.94 102.17 76.15 57.62 93.74 78.22 59.02 98.42 72.15 52.87 90.37 74.24 53.87

38 Krishnagiri 295.93 99.03 104.80 92.10 91.20 104.64 90.88 99.03 104.80 92.10 91.20 104.64 90.88

Sub total 947.66 366.13 340.71 240.82 336.32 347.94 241.79 351.88 324.51 222.77 323.50 331.93 222.12

IX Region : Villupuram

39 Cuddalore 589.26 202.80 206.86 179.60 182.51 207.92 192.46 200.55 204.36 176.85 180.49 205.44 189.46

40 Thiruvannamalai 281.57 91.77 138.18 51.62 87.51 137.28 52.08 91.77 138.18 51.62 87.51 137.28 52.08

41 villupuram 252.73 95.22 93.51 64.00 87.51 94.92 63.90 94.61 93.51 64.00 86.90 94.92 63.90

42 Kallakurichi 161.82 87.75 49.66 24.41 80.63 54.56 24.34 86.48 48.27 22.87 79.49 53.18 22.66

Sub total 1,285.38 477.54 488.21 319.63 438.16 494.68 332.78 473.41 484.32 315.34 434.39 490.82 328.10

Grand total 10,694.79 5,577.12 3,016.39 2,101.28 5,298.47 3,073.03 2,173.32 5,298.36 2,883.77 1,966.36 5,034.85 2,938.54 2,025.13

Page 2

Page 140: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Capitalisati

on (Rs.

Crore)

Capital

Ependiture

(Rs. Crore)

Capitalis

ation (Rs.

Crore)

Capital

Ependi

ture

(Rs.

Crore)

Capitalisa

tion (Rs.

Crore)

Capital

Ependitur

e (Rs.

Crore)

FY 2016-

17

FY 2017-

18

FY 2018-

19

FY 2016-

17

FY 2017-

18

FY

2018-19

1Chennai

North

Chennai

Central EDCCapital

Extension of LT & LT CT, HT Supply to

53130 Nos various tariff servicesNew service connections effected 28.01

Based on the application from

the consumers, approval was

accorded by the competent

authorities

Adding consumers 28.01 28.01 - - - - 28.01 - - 28.01 - -

2Chennai

North

Chennai

Central EDCCapital

Anticipated Extension of LT & LT CT

Supply to 47067 Nos. various tariff

services

New service connections 66.64 To be approved by the

competent authoritiesAdding consumers 9.06 10.07 25.89 27.65 28.80 28.92 10.07 27.65 28.92 9.06 25.89 28.80

3Chennai

North

Chennai

Central EDCCapital

Anticipated Extension of HT Supply

(New & Additional loads)New service connections 1.34

To be approved by the

competent authoritiesAdding consumers 0.37 0.41 0.44 0.45 0.48 0.48 0.41 0.45 0.48 0.37 0.44 0.48

4Chennai

North

Chennai

Central EDCImprovement

Old Jail 110/11 kV SS, 2x16 MVA Pr.Trs,

11kV, VCB -8nos. 11kV, BC-1 nos

(anticipated)

To meet out load growth 8.00

Proposal under preparation.

Approximate estimated value

indicated.

To meet out load

growth - - 3.60 4.00 4.00 4.00 - 4.00 4.00 - 3.60 4.00

5Chennai

North

Chennai

Central EDCImprovement

Establishment of 33/11kV, Indoor SS at

Wall tax Raod. 2x8 MVA Pr.Trs,

33kV VCB -5 nos. (HV+IC)

11kV VCB -10nos. (LV+Feeder)

33kV & 11kV BC-2 nos (anticipated)

To give load relief to 33kV East GT

SS and 33 kV West GT SS to improve

the voltage regulation of the feeders and

to accommodate future load growth

8.70

Proposal under preparation.

Approximate estimated value

indicated.

To be done while

submission of

proposal

- - - - 7.83 8.70 - - 8.70 - - 7.83

6Chennai

North

Chennai

Central EDCImprovement

Establishment of 33/11kV, Indoor SS at

Pudupet. 2x16 MVA Pr.Trs,

33kV VCB -5 nos. (HV+IC)

11kV VCB -10nos. (LV+Feeder)

33kV & 11kV BC-2 nos (anticipated )

To give load relief to 110/33/11kV

Chindadripet SS to improve the

voltage regulation of the transformers

and to accommodate future load growth

9.30

Proposal under preparation.

Approximate estimated value

indicated.

To be done while

submission of

proposal

- - - - 8.37 9.30 - - 9.30 - - 8.37

7Chennai

North

Chennai

Central EDCImprovement

Erection of new 33 kV # from 110/ 33kV,

Govt Estate SS to 33/11 kV Port trust SS.

33 kV, 1x630 Sq.mm XLPE Cable R.L.:

3.8 KM

For providing reliable 33 kV alternate

source to Port trust SS 1.76

Proposal Submitted to CE/

Planning

For Providing

Reliable Source - - 1.76 1.76 - - - 1.76 - - 1.76 -

8Chennai

North

Chennai

Central EDCImprovement

Enhancement of Pr.Tr. at East GT 33kV

SS. 2x16MVA Power transformerLoad growth 2.42

Per CMD TANGEDCO

Proc.No. 330dt 04.08.15

To meet out load

Growth 2.42 2.42 - - - - 2.42 - - 2.42 - -

9Chennai

North

Chennai

Central EDCImprovement

Enhancement of Pr. Tr. at Govt. Esate 110

kV GIS SS 2x50MVA Power transformerTo meet out Load growth 5.50 Proposal under preparation.

To meet out load

Growth - - 5.50 5.50 - - - 5.50 - - 5.50 -

10Chennai

North

Chennai

Central EDCImprovement

Addl. Pr. Tr. at Flower Bazaar 33kV SS.

1x8MVA Power transformerTo meet out Load growth 1.31 Proposal under preparation.

To meet out load

Growth - - - - 1.18 1.31 - - 1.31 - - 1.18

11Chennai

North

Chennai

Central EDCImprovement Erection of DT's. -165 no. DT's To meet out load Growth 19.80

Approved by the competent

authority as per the field

proposal

To meet out load

Growth 5.94 6.60 6.60 6.60 6.60 6.60 6.60 6.60 6.60 5.94 6.60 6.60

12Chennai

North

Chennai

Central EDCImprovement HT Improvement works, 150 Kms

Strengthening of Network and

replacement of aged conductor 54.92

Approved by the competent

authority as per the field

proposal

To meet out load

growth 16.90 18.78 18.14 18.07 18.07 18.07 18.78 18.07 18.07 16.90 18.14 18.07

13Chennai

North

Chennai

Central EDCImprovement

LT Impt Works 370Kms and erection of

pillar boxes.

Strengthening of Network and

replacement of aged conductor 14.70

Approved by the competent

authority as per the field

proposal

To meet out load

growth 4.41 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.41 4.90 4.90

14Chennai

North

Chennai

Central EDCImprovement

Establishment of 33/11kV Indoor SS at

Mandaveli. 2x16 MVA Pr.Trs, 33kV

VCB -5 nos(HV+IC)

11kV VCB -10 nos. (LV+ Feeder) 33kV

&11kV BC- 2 nos (anticipated)

To give load relief to 33 kV Luz SS to

improve the voltage regulation of the

feeders and to accommodate future load

growth

9.30

Proposal under preparation.

Approximate estimated value

indicated.

To be done while

submission of

proposal

- - - - 8.37 9.30 - - 9.30 - - 8.37

FY 2016-17 FY 2017-18 FY 2018-19

ANNEXURE - 17

DISTRIBUTION CAPITAL EXPENDITURE SCHEMES

TANGEDCO's Submission Approved by the Commission

Sr.

No.Region Area

Name of the

Scheme

Details of work furnishing list of major

itemsTechnical justification

Estimated

Cost

(Rs.in Crs.)

Details of Board approvalCost benefit

analysis

Capital Expenditure Capitalisation

Page 141: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

15Chennai

North

Chennai

Central EDCImprovement

Additional Pr.Tr. at EDC 33kV SS.

1x8MVA Power transformerTo meet out Load growth 1.25 Proposal under preparation

To meet out load

growth - - 1.25 1.25 - - - 1.25 - - 1.25 -

16Chennai

North

Chennai

Central EDCImprovement

Establishment of 33/11 kV Indoor SS at

Sarathy Nagar (West Jones

Road,Saidapet).2x16 MVA Pr.Trs,

33kV VCB -5 nos(HV+IC)

11kV VCB -10nos (LV+Feeder)

33kV &11kV BC-2 nos (anticipated )

To give load relief to 33kV Saidapet

SS to improve the voltage regulation of

the feeders and to accommodate future

load growth

8.70

Proposal under preparation.

Approximate estimated value

indicated.

To be done while

submission of

proposal

- - 8.70 8.70 - - - 8.70 - - 8.70 -

17Chennai

North

Chennai

Central EDCImprovement

Establishment of 33/11 kV Indoor SS at

Muthu Rangan Salai (Kannamapet).2x16

MVA Pr.Trs, 33kV VCB -5 nos

(HV+IC) 11kV VCB -10nos(LV+Feeder)

33kV &11kV BC-2 nos (anticipated )

To give load relief to 33kV West

Mambalam SS to improve the voltage

regulation of the feeders and to

accommodate future load growth

8.90

Proposal under preparation.

Approximate estimated value

indicated.

To be done while

submission of

proposal

- - 8.90 8.90 - - - 8.90 - - 8.90 -

18Chennai

North

Chennai

Central EDCImprovement

Additional Pr.Tr. at DMS 33kV SS.

1x16MVA Power transformerTo meet out Load growth 1.63

Per CMD TANGEDCO

Proceedings No. 455 dt

08.10.14

To meet out load

growth 1.63 1.63 - - - - 1.63 - - 1.63 - -

19Chennai

North

Chennai

Central EDCImprovement

Additional Pr.Tr.at Nandanam 33kV SS.

1x16MVA Power transformerTo meet out Load growth 1.67

Per CMD TANGEDCO

Proceedings No.483, dt

4.11.15

To meet out load

growth 1.67 1.67 - - - - 1.67 - - 1.67 - -

20Chennai

North

Chennai

Central EDCImprovement

Establishment of 33/11kV Indoor SS at

George Town. 2x16 MVA Pr.Trs,

33kV VCB -5 nos(HV+IC)

11kV VCB -10nos(LV+Feeder)

33kV &11kV BC-2 nos (anticipated )

To give load relief to 110/33/11 kV

Seven wells SS and 33 kV Flower

Bazzar SS to improve the voltage

regulation of the feeders and to

accommodate future load growth

8.30

Proposal under preparation.

Approximate estimated value

indicated.

To be done while

submission of

proposal

- - 8.30 8.30 - - - 8.30 - - 8.30 -

21Chennai

North

Chennai

Central EDCImprovement

Erection of new 33 kV feeder from 110/33-

11kV Cooks Road SS to 33/11 kV Kilpauk

SS & accessaries. 33 kV 1x630 Sq.mm

XLPE Cable R.L.: 3.5 K.m

For providing reliable 33 kV alternate

source to Kilpauk SS 2.30

B.P.(Per ) CMD

TANGEDCO Procedings

no.269 dt.29.06.15

For Providing

Reliable Source - - 2.30 2.30 - - - 2.30 - - 2.30 -

22Chennai

North

Chennai

Central EDCImprovement

Additional Pr.Tr.at Kilpauk 33kV SS.

1x16MVA Power transformerTo meet out Load growth 1.84

Per CMD TANGEDCO

Proceedings No. 524 dt

05.12.14

To meet out load

growth - - 1.84 1.84 - - - 1.84 - - 1.84 -

23Chennai

North

Chennai

Central EDCImprovement

Additional Pr.Tr.at Spurtank road 33kV

SS. 1x16MVA Power transformerTo meet out Load growth 2.12

Proposal under preparation.

Appr.est. value indicated.

To meet out load

growth - - - - 1.91 2.12 - - 2.12 - - 1.91

24Chennai

North

Chennai

Central EDCImprovement

Enhancement of Power Transformer at

Mambalam 33kV SS, 3rd 8 MVA to

16MVA Power transformer

To meet out load growth 1.22

Per CMD TANGEDCO

Proceedings No. 29 dt

23.01.15

To meet out load

growth 1.22 1.22 - - - - 1.22 - - 1.22 - -

25Chennai

North

Chennai

Central EDCRAPDRP

Establishment of 33/11kV indoor SS with

2x8MVA, 33/11kV Power Transformers at

Ammaiyappan lane. 33 kV 1x630 Sq.mm

XLPE cable (SC) RL: 2.5Km from 230/

33kV Mylapore SS & Ammaiyap pan lane

SS

To meet out Load growth 21.07 CED/CNR No.1524/13-14 dt

17.12.2013

Anticipated revenue

due to sale of energy

Rs.56 lakh on capital

revenue

21.07 21.07 - - - - 21.07 - - 21.07 - -

26Chennai

North

Chennai

Central EDCRAPDRP

Establishment of 33/11kV indoor SS with

2x8MVA, 33/11kV Power Transformers at

Woods Road- 33 kV 1x630 Sq.mm XLPE

Cable (Double Circuit) RL : 1.56 Km by

making In and Out of existing 33kV 1x630

sq mm Mylapore Express Avenue # cable

at Woods Rd SS

To meet out Load growth 5.09 CED/CNR No.21/11-12

dt16.11.11

Anticipated revenue

due to sale of energy

Rs.45 lakh on capital

revenue

5.09 5.09 - - - - 5.09 - - 5.09 - -

27Chennai

North

Chennai

Central EDCRAPDRP

Erection of new11kV feeders (3x300 sq

mm cable-26.56Km)

Load bifurcation and to reduce outages

and enhance operation flexibility 3.47

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Reduction of AT&C

Loss 3.47 3.47 - - - - 3.47 - - 3.47 - -

28Chennai

North

Chennai

Central EDCRAPDRP

Laying of new 11kV, 3x120 sq mm cable-

4.8Km

Load bifurcation and to reduce outages

and enhance operation flexibility 0.63

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Reduction of AT&C

Loss 0.63 0.63 - - - - 0.63 - - 0.63 - -

Page 142: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

29Chennai

North

Chennai

Central EDCRAPDRP

11kV Strengthening - 3x300 sq mm

Replacement of existing 11kV lower size

cable-4.78Km

To improve current carrying capacity of

the conductor to meet load growth 0.35

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Reduction of AT&C

Loss 0.35 0.35 - - - - 0.35 - - 0.35 - -

30Chennai

North

Chennai

Central EDCRAPDRP

11kV Strengthening - 3x120 sq mm.

Replacement of existing 11kV lower size

cable-12.11Km

To improve current carrying capacity of

the conductor, to meet load growth 1.39

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Reduction of AT&C

Loss 1.39 1.39 - - - - 1.39 - - 1.39 - -

31Chennai

North

Chennai

Central EDCRAPDRP

Erection of conventional structure 250kVA-

209 nos.To meet out load growth 6.15

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Reduction of AT&C

Loss 6.15 6.15 - - - - 6.15 - - 6.15 - -

32Chennai

North

Chennai

Central EDCRAPDRP

Erection of conventional structure 100kVA-

249 nos.To improve HT: LT ratio. 3.78

CMD TANGEDCO

proceedings No:124

dt 8.04.2011

Reduction of AT&C

Loss 3.78 3.78 - - - - 3.78 - - 3.78 - -

33Chennai

North

Chennai

Central EDCRAPDRP Erection of (HVDS) 63kVA-100 nos. To improve HT: LT ratio. 5.25

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Reduction of AT&C

Loss 5.25 5.25 - - - - 5.25 - - 5.25 - -

34Chennai

North

Chennai

Central EDCRAPDRP

Conversion of Existing Structure to RMU

and Erection of new RMU-765 nos.

To improve reliable supply and

operational flexibility 32.34

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Reduction of AT&C

Loss 32.34 32.34 - - - - 32.34 - - 32.34 - -

35Chennai

North

Chennai

Central EDCRAPDRP

Erection of Type - B FRTU (3 way)

Panels-470 nos., To monitor and control the network 0.52

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Reduction of AT&C

Loss 0.52 0.52 - - - - 0.52 - - 0.52 - -

36Chennai

North

Chennai

Central EDCRAPDRP

Erection of Type - A FRTU (5 way) Panels-

295 nos.To monitor and control the network 4.07

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Reduction of AT&C

Loss 4.07 4.07 - - - - 4.07 - - 4.07 - -

37Chennai

North

Chennai

Central EDCRAPDRP

Replacement of single phase meters 5-20A

consumer meters-365023 nos.

Accurate Measurement of Energy

Consumption 14.23

CMD TANGEDCO

Proceedings No:124 dt

8.04.2011

Reduction of AT&C

Loss 14.23 14.23 - - - - 14.23 - - 14.23 - -

38Chennai

North

Chennai

Central EDCRAPDRP

Replacement of 3phase meters 10-60A

consumer meters 211819 nos.

Accurate Measurement of Energy

Consumption 11.04

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To improve the

revenue to

TANGEDCO

(Acurate Billing)

11.04 11.04 - - - - 11.04 - - 11.04 - -

39Chennai

North

Chennai

Central EDCRAPDRP

33kV cable & accessories

From OCF 230/33 kV SS to

Ammaiyappan Lane

To meet out the load growth 3.29 255/ dt.16.7.11

To improve the

revenue to

TANGEDCO

(Accurate Billing)

3.29 3.29 - - - - 3.29 - - 3.29 - -

40Chennai

North

Chennai

Central EDCREC

RMU Conversion

(REC Funding). 150nosTo improve reliable supply 15.00

B.P.(Per ) FB TANGEDCO

Proc. no.15 dt.9.02.16

To improve reliable

supply 6.30 7.00 8.70 8.00 - - 7.00 8.00 - 6.30 8.70 -

41Chennai

North

Chennai

Central EDCREC

Enhancement of Pr.Tr. at Lady Wellington

33kV SS.2x 16MVA Power transformerTo meet out Load growth 2.35

Per CMD TANGEDCO Proc

No. 367, dt 24.08.15Load growth 2.35 2.35 - - - - 2.35 - - 2.35 - -

42Chennai

North

Chennai

Central EDCDCW

Shifting of HT/LT cables, Pillars,

Distribution Transformers, RMUs,

Conversion of DT to RMU, replacement of

RMG etc.,at the request of consumer.

As per Consumer request for

convenience 5.70

Approved by the competent

authority as per the field

proposal

As per Consumer

request for

convenience

5.70 5.70 - - - - - - - - - -

43Chennai

North

Chennai

Central EDCOthers

Computer operated chairs- Office

Automation and Replacement of HHDs-

Office Automation and Computer, Thin

Clients, DOT Matrix printers, Lasejet

Printers, LED Monitors

Office Automation and quick service to

consumers 0.67

Approved by the competent

authority as per the field

proposal

Quick service to

consumers 0.67 0.67 - - - - 0.67 - - 0.67 - -

1Chennai

North

Chennai West

EDCCapital

Extension of LT & LT CT, HT Supply to

64709 Nos various tariff servicesNew service connections effected 29.72

Based on the application from

the consumers, approval was

accorded by the competent

authorities

Adding consumers 8.75 9.72 9.97 10.00 10.00 10.00 9.72 10.00 10.00 8.75 9.97 10.00

2Chennai

North

Chennai West

EDCCapital

Establishment of 33 kV sub stations at

……… - - - - - - - - - - - - -

3Chennai

North

Chennai West

EDCImprovement

Improvement works- SS, Enhancement of

Pr.Trs in sub stations, sub station

related works.

To improve the network and Load

growth - - - - - - - - - - - - -

Page 143: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

4Chennai

North

Chennai West

EDCImprovement

Improvement works- Erection of DT, New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 25.12

Approved by the competent

authority as per the field

proposal

To reduce the Line

Loss, etc 7.31 8.12 8.46 8.50 8.50 8.50 8.12 8.50 8.50 7.31 8.46 8.50

5Chennai

North

Chennai West

EDC

RAPDRP

Scheme I (Part

A)

DT meteringTo measure energy consumed by the

consumer fed by the DT to data centre 15.79 To Energy audit 15.79 15.79 - - - - 15.79 - - 15.79 - -

6Chennai

North

Chennai West

EDC

Fixing of CAMR in DTs, Ring fencing &

HT serviceTo transfer data to data centre 2.38

Per. BP (TANGEDCO) No.

53, dt. 04.05.2012To Energy audit 2.38 2.38 - - - - 2.38 - - 2.38 - -

7Chennai

North

Chennai West

EDC

RAPDRP B

Schemes

Vaigai Colony 33/11kV SS

Construction of control room building,

inclusive of cost of 33& 11 kV Breakers,

33 kV &

11kV, 1x630 sq mm Cable, Battery and

Control cable and other Elecl. accessories

To meet out load growth 2.95 255/16.7.11To meet out load

growth 2.95 2.95 - - - - 2.95 - - 2.95 - -

8Chennai

North

Chennai West

EDC

RAPDRP B

Schemes

Mitnamallee 33/11 kV SS Construction of

control room building, 33& 11 kV

Breakers,33 kV & 11kV 1x630 sq mm

Cable,Battery and Control cable and other

Elecl accessories

To meet out load growth 2.75 255/

16.7.11

To meet out load

growth 1.57 1.75 1.18 1.00 - - 1.75 1.00 - 1.57 1.18 -

9Chennai

North

Chennai West

EDC

RAPDRP

Schemes

Adayalampattu 33/11 kV SS Construction

of control room building, 33& 11 kV

Breakers, 33 kV & 11kV, 1x630 sq mm

Cable,Battery and Control cable and other

Elecl accessories

To meet out load growth 6.66 11/

9.01.15

To meet out load

growth 1.57 1.75 5.09 4.91 - - 1.75 4.91 - 1.57 5.09 -

10Chennai

North

Chennai West

EDC

RAPDRP B

Schemes

33kV cable & accessories

LILO of Korattur-Periyar Nagar feeder II at

Annai Nagar

To meet out load growth 0.90 To meet out load

growth 0.90 0.90 - - - - 0.90 - - 0.90 - -

11Chennai

North

Chennai West

EDC

RAPDRP B

Schemes

33kV cable & accessories

From Alamathy-MitnamalleeTo meet out load growth 0.81

255/

16.7.11

To meet out load

growth 0.81 0.81 - - - - 0.81 - - 0.81 - -

12Chennai

North

Chennai West

EDC

RAPDRP B

Schemes

33kV cable & accessories

From Ambattur 3rd main Road SS to

Adayalampattu

To meet out load growth 2.32 255/

16.7.11

To meet out load

growth 2.32 2.32 - - - - 2.32 - - 2.32 - -

13Chennai

North

Chennai West

EDC

RAPDRP B

Schemes

33kV cable & accessories

From Thiruverkadu 110 kV SS to

Adayalampattu

To meet out load growth 5.30 11/

9.01.15

To meet out load

growth 5.30 5.30 - - - - 5.30 - - 5.30 - -

14Chennai

North

Chennai West

EDC

RAPDRP B

Schemes

Replacement of 11 kV Breaker

JJ Nagar SSTo meet out load growth 0.19

CMD Proceedings No.413

dt.21.9.15

To meet out load

growth 0.19 0.19 - - - - 0.19 - - 0.19 - -

15Chennai

North

Chennai West

EDC

RAPDRP B

Schemes

18 kVAR, 36 kVAR & 72 kVAR, APFC

panels installed and commissioned in 100

kVA, 250 kVA & 500 kVA DTs

Power factor improvement 1.81

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

1.81 1.81 - - - - 1.81 - - 1.81 - -

16Chennai

North

Chennai West

EDCRAPDRP

Erection of FRTU panels at RMUs and

sectionalisers locationsRemote operation 0.61

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

0.61 0.61 - - - - 0.61 - - 0.61 - -

17Chennai

North

Chennai West

EDC

RAPDRP -

DSW

New 11 kV UG Cable feeder for New

33/11 kV Indoor SS

Load bifurcation to reduce outages and

to enhance operation flexibility 4.38

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

4.38 4.38 - - - - 4.38 - - 4.38 - -

18Chennai

North

Chennai West

EDC

RAPDRP -

DSW

New 11kV OH line for new 33/11kV

Indoor SS with ACSR Raccoon 1.02 1.02 1.02 - - - - 1.02 - - 1.02 - -

19Chennai

North

Chennai West

EDC

RAPDRP -

DSW

(i) New feeders with 11kV 3x300 sqmm

XLPE 11.04 11.04 11.04 - - - - 11.04 - - 11.04 - -

Page 144: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

20Chennai

North

Chennai West

EDC

RAPDRP -

DSW

(ii) New feeders 11kV 3x120 sqmm

XLPE(Rs. 7.05 crs), 11kV 3x120 sqmm

XLPE - Segregation of industrial loads at

Ambattur IE areas involving (Rs. 0.93 crs)

4.30 4.30 4.30 - - - - 4.30 - - 4.30 - -

21Chennai

North

Chennai West

EDC

RAPDRP -

DSW

(iii) New feeders 11kV 7/3.35 mm OH

(ACSR Rabbit) 3.25 3.25 3.25 - - - - 3.25 - - 3.25 - -

22Chennai

North

Chennai West

EDC

RAPDRP -

DSW

Erection of new 11 kV, ACSR 3.35 mm

conductor for new DTs

Load bifurcation to reduce outages and

to enhance operation flexibility 0.48

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

0.48 0.48 - - - - 0.48 - - 0.48 - -

23Chennai

North

Chennai West

EDC

RAPDRP -

DSW

Erection of new 11kV ACSR 3.35 mm

conductor for new HVDS 2.00 2.00 2.00 - - - - 2.00 - - 2.00 - -

24Chennai

North

Chennai West

EDC

RAPDRP -

DSW

Strengthening of existing 11 kV OH feeder

from ACSR 7/2.59 mm to 7/3.35 mm

To augument the current carrying

capacity of the conductor 0.95 0.95 0.95 - - - - 0.95 - - 0.95 - -

25Chennai

North

Chennai West

EDC

RAPDRP -

DSW

Strengthening of existing 11 kV UG cable

from lower size to 11kV 3* 300 sqmm 0.54 0.54 0.54 - - - - 0.54 - - 0.54 - -

26Chennai

North

Chennai West

EDC

RAPDRP -

DSW

Strengthening of existing 11 kV UG cable

from lower size to 11kV 3* 120 sqmm 1.00 1.00 1.00 - - - - 1.00 - - 1.00 - -

27Chennai

North

Chennai West

EDC

RAPDRP -

DSW

Erection of New 100 kVA DTs OH

connectivityTo offer load relief to the existing DTs 2.59

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

2.59 2.59 - - - - 2.59 - - 2.59 - -

28Chennai

North

Chennai West

EDC

RAPDRP -

DSW

Erection of New 250 kVA DTs (Rs. 4.52

crs), Erection of New 500 kVA DTs (Rs.

0.95 crs) OH connectivity

1.75 1.75 1.75 - - - - 1.75 - - 1.75 - -

29Chennai

North

Chennai West

EDC

RAPDRP -

DSW

Erection of New 100 kVA DTs UG

connectivity To offer load relief to the existing DTs 1.10

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

1.10 1.10 - - - - 1.10 - - 1.10 - -

30Chennai

North

Chennai West

EDC

RAPDRP -

DSW

Erection of New 250 kVA DTs UG

Connectivity 1.50 1.50 1.50 - - - - 1.50 - - 1.50 - -

31Chennai

North

Chennai West

EDC

RAPDRP -

DSW

Strengthening of existing LT OH feeder

from ACSR 7/2.59 mm to ACSR 7/3.35

mm

To augument the current carrying

capacity of the conductor 1.50 1.50 1.50 - - - - 1.50 - - 1.50 - -

32Chennai

North

Chennai West

EDC

RAPDRP -

DSW Laying LT AB cable

Easy identification of fault and to avoid

electrical accident. 2.50 2.50 2.50 - - - - 2.50 - - 2.50 - -

33Chennai

North

Chennai West

EDC

RAPDRP -

DSW

Erection of New 25 kVA DTs (Rs. 4.32

crs), Erection of New 16 kVA DTs

(Rs.0.41 crs)

To reduce HT - LT ratio to ensure

reduction of 0.20

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

0.20 0.20 - - - - 0.20 - - 0.20 - -

34Chennai

North

Chennai West

EDC

RAPDRP -

DSW Erection of New 40 kVA DTs 0.80 0.80 0.80 - - - - 0.80 - - 0.80 - -

35Chennai

North

Chennai West

EDC

RAPDRP -

DSW Erection of New 60 kVA DTs 0.50 0.50 0.50 - - - - 0.50 - - 0.50 - -

36Chennai

North

Chennai West

EDC

RAPDRP -

DSW Erection of 6 way pillar boxes

Easy isolation of LT cable fault and

reduce the duration of outage. 1.24

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

1.24 1.24 - - - - 1.24 - - 1.24 - -

37Chennai

North

Chennai West

EDC

RAPDRP -

DSW

Erection of 4 way pillar boxes(Rs.1.78 crs)

, Erection of Mini pillar boxes (Rs. 0.08

crs)

0.30 0.30 0.30 - - - - 0.30 - - 0.30 - -

38Chennai

North

Chennai West

EDC

RAPDRP

Scheme II - - - - - - - - - - - - -

39Chennai

North

Chennai West

EDC

RAPDRP

Scheme III etc - - - - - - - - - - - - -

40Chennai

North

Chennai West

EDC

RGGVY

Schemes - - - - - - - - - - - - -

41Chennai

North

Chennai West

EDCDDUGJY - - - - - - - - - - - - -

42Chennai

North

Chennai West

EDCIPDS - - - - - - - - - - - - -

Page 145: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

43Chennai

North

Chennai West

EDC

Others

(REC/PFC)

Nelson Manickam Road 33/11 kV SS.

Construction of control room building,

33& 11 kV Breakers, 33 kV & 11kV,

1x630 sq mm Cable, Battery and Control

cable and other Elecl accessories

To meet out load growth 4.77 445/11.10.13To meet out load

growth 1.80 2.00 2.97 2.77 - - 2.00 2.77 - 1.80 2.97 -

44Chennai

North

Chennai West

EDCDCW - - - - - - - - - - - - -

45Chennai

North

Chennai West

EDC

Any other related

works including

less than one

crore works

totally

- - - - - - - - - - - - -

1Chennai

North

Chennai North

EDCCapital EOS to 651 HT/LT service connection New service connections effected 3.16

Based on the application from

the consumers, approval was

accorded by the competent

authorities

Adding consumers 3.16 3.16 - - - - 3.16 - - 3.16 - -

2Chennai

North

Chennai North

EDCCapital EOS to 651 HT/LT service connection New service connections to be effected 23.38

Based on the application from

the consumers, approval was

accorded by the competent

authorities

Adding consumers 5.83 6.48 7.56 7.68 9.07 9.22 6.48 7.68 9.22 5.83 7.56 9.07

3Chennai

North

Chennai North

EDCCapital CD Hospital To meet out load growth 8.00 74/3.11.15

To meet out load

growth - - 3.60 4.00 4.00 4.00 - 4.00 4.00 - 3.60 4.00

4Chennai

North

Chennai North

EDCCapital Establishment of 33 kV sub stations . - - - - - - - - - - - - -

5Chennai

North

Chennai North

EDCImprovement

Improvement works- SS,Enhancement of

Pr.Trs in sub stations & sub station related

works.

To improve the network and Load

growth - - - - - - - - - - - - -

6Chennai

North

Chennai North

EDC

Estimate for

enhancement of

Power

Transformer 8

MVA to 16

MVA at 33/11

kV Thiruvottiyur

SS.

33/11 kV, 16 MVA Power Transformer To accommodate future load growth 1.06 Proposal under scrutiny. 1.06 1.06 - - - - 1.06 - - 1.06 - -

7Chennai

North

Chennai North

EDC

Estimate for

enhancement of

Power

Transformer 8

MVA to 16

MVA at 33/11

kV CMBTT SS.

33/11 kV 16 MVA Power Transformer To accommodate future load growth 1.10 Proposal under scrutiny. 1.10 1.10 - - - - 1.10 - - 1.10 - -

8Chennai

North

Chennai North

EDC

Estimate for

enhancement of

Power

Transformer 8

MVA to 16

MVA at 33/11

kV Periyar SS.

33/11 kV 16 MVA Power Transformer To accommodate future load growth 1.06

Proposal under preparation.

Approximate estimated value

indicated.

1.06 1.06 - - - - 1.06 - - 1.06 - -

Page 146: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

9Chennai

North

Chennai North

EDC

Estimate for

enhancement of

Power

Transformer 8

MVA to 16

MVA at 33/11

kV ICF SS.

33/11 kV 16 MVA Power Transformer To accommodate future load growth 1.06

Proposal under preparation.

Approximate estimated value

indicated.

1.06 1.06 - - - - 1.06 - - 1.06 - -

10Chennai

North

Chennai North

EDC

Estimate for

enhancement of

Power

Transformer 8

MVA to 16

MVA at 33/11

kV OHP SS.

33/11 kV 16 MVA Power Transformer To accommodate future load growth 1.06

Proposal under preparation.

Approximate estimated value

indicated.

1.06 1.06 - - - - 1.06 - - 1.06 - -

11Chennai

North

Chennai North

EDC

Estimate for

enhancement of

Power

Transformer 8

MVA to 16

MVA at 33/11

kV Kaladipet

SS.

33/11 kV 16 MVA Power Transformer To accommodate future load growth 1.06

Proposal under preparation.

Approximate estimated value

indicated.

1.06 1.06 - - - - 1.06 - - 1.06 - -

12Chennai

North

Chennai North

EDC

Estimate for

enhancement of

Power

Transformer 8

MVA to 16

MVA at 33/11

kV Napalayam

SS.

33/11 kV 16 MVA Power Transformer To accommodate future load growth 1.06

Proposal under preparation.

Approximate estimated value

indicated.

1.06 1.06 - - - - 1.06 - - 1.06 - -

13Chennai

North

Chennai North

EDC

Estimate for

enhancement of

Power

Transformer 8

MVA to 16

MVA at 33/11

kV Ennore SS.

33/11 kV 16 MVA Power Transformer To accommodate future load growth 1.06

Proposal under preparation.

Approximate estimated value

indicated.

1.06 1.06 - - - - 1.06 - - 1.06 - -

14Chennai

North

Chennai North

EDC

Estimate for

enhancement of

Power

Transformer 8

MVA to 16

MVA at 33/11

kV Irulipattu SS

REG

33/11 kV 16 MVA Power Transformer To accommodate future load growth 1.06 Proposal under scrutiny.

To be done while

submission of

proposal

1.06 1.06 - - - - 1.06 - - 1.06 - -

15Chennai

North

Chennai North

EDC

Improvement

estimate for

enhancement of

existing 33/11

kV, 8 mva pwer

transformer II

into 33/11 kV,

16 MVA power

transformer at

110/33/11 kV

Melur SS in

respect of 110

kV Melur SS.

33/11 kV 16 MVA Power Transformer To accommodate future load growth 1.42 Proposal under scrutiny

To be done while

submission of

proposal

1.42 1.42 - - - - 1.42 - - 1.42 - -

Page 147: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

16Chennai

North

Chennai North

EDC

Establishment of

new 33/11 kV

SS at Elavoor

2x8MVA Pr.Trs,

33kV VCB -4 nos(HV+IC)

11kV VCB -10nos(LV+Feeder)

11kV BC-1 no (anticipated)

To improve the voltage regulation of

the feeders and for accommodating

future load growth

9.85 Land acquisition under

processing - - 9.85 9.85 - - - 9.85 - - 9.85 -

17Chennai

North

Chennai North

EDC

Establishment of

new 33/11 kV

SS at

Arambakkam

2x8MVA Pr.Trs,

33kV VCB -4 nos(HV+IC)

11kV VCB -10nos(LV+Feeder)

11kV BC-1 no (anticipated)

To improve the voltage regulation of

the feeders and for accommodating

future load growth

9.85 Land acquisition under

processing - - 9.85 9.85 - - - 9.85 - - 9.85 -

18Chennai

North

Chennai North

EDC

Replacement of 11 kV Breaker

Stanley SSTo meet out load growth 0.27 0.27 0.27 - - - - 0.27 - - 0.27 - -

19Chennai

North

Chennai North

EDC

Replacement of 11 kV Breaker

Vyasarpadi Industrial Estate SSTo meet out load growth 0.21 0.21 0.21 - - - - 0.21 - - 0.21 - -

20Chennai

North

Chennai North

EDCImprovement

Improvement works- Erection of DT, New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth - - - - - - - - - - - - -

21Chennai

North

Chennai North

EDCImprovement

Improvement works in certain HT/LT

Lines, Provision of DTs in required area &

Upgradation of DTs

Improving network strength & Quality,

Replacement of aged conductors, poles,

etc

2.22

Approved by the competent

authority as per the field

proposal

To reduce the Line

Loss, etc 2.22 2.22 - - - - 2.22 - - 2.22 - -

22Chennai

North

Chennai North

EDCImprovement

Improvement works in certain HT/LT

Lines, Provision of DTs in required area &

Upgradation of DTs

Improving network strength & Quality,

Replacement of aged conductors,

poles,etc

52.15 To be approved by the

competent authorities

To reduce the Line

Loss, etc 14.17 15.75 17.15 17.30 18.92 19.10 15.75 17.30 19.10 14.17 17.15 18.92

23Chennai

North

Chennai North

EDC

RAPDRP

Scheme I

AIR Land 33/11kV SS

Construction of control room building,

inclusive of cost of 33 & 11 kV

Breakers,33 kV & 11kV, 1x630 sq mm

Cable, Battery and Control cable and other

Elecl accessories

To meet out load growth 3.60 255/16.7.11To meet out load

growth 3.60 3.60 - - - - 3.60 - - 3.60 - -

24Chennai

North

Chennai North

EDC

Distribution

Strengthening

Works

(RAPDRP)

Erection of New DTs, Strengthening of

HT/LT lines, Convertion of OH line into

UG cable,etc.

To reduce AT&C loss of the project

towns 45.71

To reduce AT&C

loss of the project

towns

45.71 45.71 - - - - 45.71 - - 45.71 - -

25Chennai

North

Chennai North

EDC

APFC(RAPDRP

)

Erection of APFC panel to improve the

voltageTo improve the distribution network 7.57

To improve the

distribution network 7.57 7.57 - - - - 7.57 - - 7.57 - -

26Chennai

North

Chennai North

EDC

Sectionalisers

(RAPDRP)

Erection of Sectionaliser for Power

Distribution monitoring & digitalized

control room

Easy identification of break down

location 0.56

Easy identification of

break down location 0.56 0.56 - - - - 0.56 - - 0.56 - -

27Chennai

North

Chennai North

EDC

FRTU

(RAPDRP)

Erection of FRTU for Power Distribution

monitoring & digitalized control room

Easy identification of break down

location 10.89

Easy identification of

break down location 10.89 10.89 - - - - 10.89 - - 10.89 - -

28Chennai

North

Chennai North

EDC

RGGVY

Schemes - - - - - - - - - - - - -

29Chennai

North

Chennai North

EDCDDUGJY - - - - - - - - - - - - -

30Chennai

North

Chennai North

EDCIPDS

Strengthening of sub transmission and

distribution net works 23.52

B.P.No.31 dt.14.05.2015 &

B.P.No.15 dt. 08.01.2016 10.52 11.69 9.70 9.48 3.30 2.35 11.69 9.48 2.35 10.52 9.70 3.30

31Chennai

North

Chennai North

EDC

Others

(REC/PFC) - - - - - - - - - - - - -

32Chennai

North

Chennai North

EDCDCW - - - - - - - - - - - - -

33Chennai

North

Chennai North

EDC

Any other related

works including

less than one

crore works

totally

- - - - - - - - - - - - -

Page 148: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

34Chennai

North

Chennai North

EDCNEFS

Reconductoring the existing damaged OH

line & replacement & insertion of RCC

poles

To improve the distribution network 3.00 B.P.No.100 dt.08.03.2013To improve the

distribution network 3.00 3.00 - - - - 3.00 - - 3.00 - -

1Chennai

South

Chennai South

EDCCapital

Extension of LT & LT CT, HT Supply to

2,06,444 Nos various tariff servicesNew service connections effected 193.07

Based on the application from

the consumers, approval was

accorded by comp authorities

Adding consumers 193.07 193.07 - - - - 193.07 - - 193.07 - -

2Chennai

South

Chennai South

EDCCapital Establishment of 33 kV Substations Purchase of land cost 8.84

To meet out load

growth 8.84 8.84 - - - - 8.84 - - 8.84 - -

3Chennai

South

Chennai South

EDCImprovement

Improvement works- SS, Enhancement of

Pr.Trs in subs tations, sub station related

works.(including CDC)

To improve the network and Load

growth 162.75

Approved by the competent

authority

To meet out load

growth 88.06 97.84 45.34 39.51 26.81 25.40 97.84 39.51 25.40 88.06 45.34 26.81

4Chennai

South

Chennai South

EDCImprovement

Improvement works- Erection of DT, New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 350.93

Approved by the competent

authority as per the field

proposal

To reduce the Line

Loss, etc 350.93 350.93 - - - - 350.93 - - 350.93 - -

5Chennai

South

Chennai South

EDC

RAPDRP

Scheme I (Part

A/Part B)

Work executed by TKC & Board 215.71

CMD TANGEDCO

Proceedings No:124 dt:

08.04.2011

215.71 215.71 - - - - 215.71 - - 215.71 - -

6Chennai

South

Chennai South

EDC

RAPDRP

Scheme II - - - - - - - - - - - - -

7Chennai

South

Chennai South

EDC

RAPDRP

Scheme III etc - - - - - - - - - - - - -

8Chennai

South

Chennai South

EDC

RGGVY

Schemes - - - - - - - - - - - - -

9Chennai

South

Chennai South

EDCDDUGJY - - - - - - - - - - - - -

10Chennai

South

Chennai South

EDCIPDS - - - - - - - - - - - - -

11Chennai

South

Chennai South

EDC

Others

(REC/PFC) - - - - - - - - - - - - -

12Chennai

South

Chennai South

EDCDCW 50.00

Based on the application from

the consumers, approval was

accorded by comp authorities

50.00 50.00 - - - - - - - - - -

1Chennai

South

Kanchipuram

EDCCapital

Extension of LT & LT CT, HT Supply to

26000 Nos various tariff servicesNew service connections effected 74.66

Based on the application from

the consumers, approval was

accorded by the competent

authorities

To meet the growing

demand of the

consumers

13.19 14.66 27.12 28.50 31.20 31.50 14.66 28.50 31.50 13.19 27.12 31.20

2Chennai

South

Kanchipuram

EDCCapital Establishment of 33 kV Substations Improving network strength & Quality 89.23

Based on the application from

the consumers, Substation

sanction approval was

accorded by the competent

authority

To meet the growing

demand of the

consumers

26.31 29.23 28.57 28.50 31.20 31.50 29.23 28.50 31.50 26.31 28.57 31.20

3Chennai

South

Kanchipuram

EDCImprovement

Improvement works, SS enhancement of

Pr.Trs in Substations in Substation related

works.

Improving network strength & Quality, 8.59

Based on the application from

the consumers, approval was

accorded by the competent

authority

To meet the growing

demand of the

consumers

1.48 1.64 3.22 3.40 3.53 3.55 1.64 3.40 3.55 1.48 3.22 3.53

4Chennai

South

Kanchipuram

EDCImprovement

Improvement works in certain HT/LT

Lines, Provision of DTs in required area &

Upgradation of DTs

Improving network strength & Quality,

Replacement of aged conductors,

poles,etc

89.23

Based on the application from

the consumers, approval was

accorded by the competent

authority

To meet the growing

demand of the

consumers

26.31 29.23 28.57 28.50 31.20 31.50 29.23 28.50 31.50 26.31 28.57 31.20

5Chennai

South

Kanchipuram

EDC

RAPDRP

Scheme I (Part

A/Part B)

Erection of New DTs, Strengthening of

HT/LT lines, Convertion of OH line in to

UG cable,etc.

To reduce AT&C loss of the project

towns 15.03

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

For eneregy

accounting and to

reduce AT&C loss of

the project towns

6.33 7.03 6.10 6.00 2.60 2.00 7.03 6.00 2.00 6.33 6.10 2.60

6Chennai

South

Kanchipuram

EDC

RAPDRP

Scheme II - - - - - - - - - - - - - - -

Page 149: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

7Chennai

South

Kanchipuram

EDC

RAPDRP

Scheme III etc - - - - - - - - - - - - - - -

8Chennai

South

Kanchipuram

EDC

RGGVY

Schemes - - - - - - - - - - - - - - -

9Chennai

South

Kanchipuram

EDCDDUGJY

Erection of New 33 /11 kV SS and

enhancement of Power Transfomer

To reduce AT&C loss of the project in

rural areas 51.00 During 2015

Reduction of AT&C

Loss 18.00 20.00 25.40 26.00 7.60 5.00 20.00 26.00 5.00 18.00 25.40 7.60

10Chennai

South

Kanchipuram

EDCIPDS

Erection of New 33 /11 kV SS and

enhancement/ addition of Power

Transfomer, HVDS,new 11 kV & 33 kV &

LT line work

To reduce AT&C loss of the project in

Town Panchayat 33.00

CMD TANGEDCO

proceedings No:15 dt

8.01.2016

Reduction of AT&C

Loss 8.10 9.00 18.90 20.00 6.00 4.00 9.00 20.00 4.00 8.10 18.90 6.00

11Chennai

South

Kanchipuram

EDC

Others

(REC/PFC) - - - - - - - - - - - - -

12Chennai

South

Kanchipuram

EDCDCW Shifting of equipments/lines

On request from consumers and as per

norms in force 4.06

Based on the application from

the consumers, approval was

accorded by the competent

authority

To meet the growing

demand of the

consumers

0.86 0.96 1.45 1.50 1.75 1.60 - - - - - -

13Chennai

South

Kanchipuram

EDC

Any other related

works including

less than one

crore works

totally

Vehicles,T&P,Civil works,ComputerFor the improvement of Board

infratructure 13.51

Based on the infrastructure

needs

For the improvement

of Board infratruc

ture

2.80 3.11 5.26 5.50 5.45 4.90 3.11 5.50 4.90 2.80 5.26 5.45

1Chennai

South

Chengalpattu

EDCCapital

Extension of LT & LTCT, HT supply to

71500 Nos at various tariff servicesNew service connection effected 212.19

Based on the application from

the consumers, approval was

accorded by the competent

authorities

Adding consumers 60.62 67.36 70.40 70.73 73.76 74.10 67.36 70.73 74.10 60.62 70.40 73.76

2Chennai

South

Chengalpattu

EDCImprovement

Improvement works in certain HT/LT

Lines, Provision of DTs in required area &

Upgradation of DTs

Improving network strength & Quality,

Replacement of aged conductors and

poles

166.56

Approved by the competent

authority as per the field

proposal

To reduce the Line

Loss, etc 47.63 52.92 55.26 55.52 57.86 58.12 52.92 55.52 58.12 47.63 55.26 57.86

3Chennai

South

Chengalpattu

EDC

Other

Transmission

Enhancement of power Transformer at

Guduvanchery 33/11 kV SS (3X8MVA

into 2X16MVA)

To meet out Load growth 1.44

CMD TANGEDCO

Proceedings No:365/

20.08.2014

To meet out Load

growth 1.44 1.44 - - - - 1.44 - - 1.44 - -

4Chennai

South

Chengalpattu

EDC

Other

Transmission

Enhancement of power Transformer at

Maduranthakam 33/11 kV SS (Additional

1X8MVA pr.Tr)

To meet out Load growth 0.79

CMD TANGEDCO

Proceedings No:168/

30.04.2013

To meet out Load

growth 0.79 0.79 - - - - 0.79 - - 0.79 - -

5Chennai

South

Chengalpattu

EDC

Other

Transmission

Establishment of Pudupakkam 33/11 kV

(Cosmo city)To meet out Load growth 6.84

CMD TANGEDCO

Proceedings No:224/

30.05.2014

To meet out Load

growth 3.08 3.42 3.76 3.42 - - 3.42 3.42 - 3.08 3.76 -

6Chennai

South

Chengalpattu

EDC

Other

Transmission

Enhancement of power Transformer at

Nerumbur 33/11 kV SS (1X8MVA into

2X8MVA)

To meet out Load growth 0.72

CMD TANGEDCO

Proceedings No:427/

26.09.2014

To meet out Load

growth 0.72 0.72 - - - - 0.72 - - 0.72 - -

7Chennai

South

Chengalpattu

EDC

Other

Transmission

Enhancement of power Transformer at

Orathy 33/11 kV SS (2X5MVA into

2X8MVA)

To meet out Load growth 1.44

CMD TANGEDCO

Proceedings No:245/

18.06.2015

To meet out Load

growth 0.65 0.72 0.79 0.72 - - 0.72 0.72 - 0.65 0.79 -

8Chennai

South

Chengalpattu

EDC

Other

Transmission

Enhancement of power Transformer at

Palayanur 33/11 kV SS(1X8MVA into

2X8MVA)

To meet out Load growth 1.12 To meet out Load

growth 1.12 1.12 - - - - 1.12 - - 1.12 - -

9Chennai

South

Chengalpattu

EDC

Other

Transmission

Enhancement of power Transformer at

Veerapuram 33/11 kV SS(2X8MVA into

1X8MVA+1X16)

To meet out Load growth 1.02 To meet out Load

growth 1.02 1.02 - - - - 1.02 - - 1.02 - -

10Chennai

South

Chengalpattu

EDC

Other

Transmission

Enhancement of power Transformer at

Poonchery 33/11 kV SS(1X8MVA into

2X8)

To meet out Load growth 1.12 To meet out Load

growth 1.12 1.12 - - - - 1.12 - - 1.12 - -

11Chennai

South

Chengalpattu

EDC

Other

TransmissionEstablishment of Vallanchery 33/11 kV To meet out Load growth 2.71

To meet out Load

growth 2.71 2.71 - - - - 2.71 - - 2.71 - -

12Chennai

South

Chengalpattu

EDC

Other

TransmissionProposed VGN 33/11 kV SS To meet out Load growth 2.71

To meet out Load

growth - - 2.71 2.71 - - - 2.71 - - 2.71 -

13Chennai

South

Chengalpattu

EDC

Other

Transmission

Establishment of Sembarambakkam

(Godraj) 33/11 kVTo meet out Load growth 2.71

To meet out Load

growth - - 2.71 2.71 - - - 2.71 - - 2.71 -

Page 150: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

14Chennai

South

Chengalpattu

EDC

Other

Transmission

Establishment of Ramapuram 33/11 kV SS

(2X8 MVA)To meet out Load growth 1.65 97/08.03.2013

To meet out Load

growth - - - - 1.65 1.65 - - 1.65 - - 1.65

15Chennai

South

Chengalpattu

EDC

Other

Transmission

Establishment of Mambakkam ETA 33/11

kVTo meet out Load growth 2.71

To meet out Load

growth - - - - 2.71 2.71 - - 2.71 - - 2.71

16Chennai

South

Chengalpattu

EDC

Other

TransmissionEstablishment of Urapakkam 33/11 kV To meet out Load growth 2.71

To meet out Load

growth - - - - 2.71 2.71 - - 2.71 - - 2.71

17Chennai

South

Chengalpattu

EDCRAPDRP

33kV OH Line with 6/4.72 and 7/1.75

DOG ConductorTo improve network strength 0.34

CMD TANGEDCO

Proceedings No.124,

dt:08.04.2011

0.34 0.34 - - - - 0.34 - - 0.34 - -

18Chennai

South

Chengalpattu

EDCRAPDRP 1 Phase tamper proof meters

Accurate recording of consumption and

also to avoid human error in taking

reading

0.38

CMD TANGEDCO

Proceedings

No.124,dt:08.04.2011

0.38 0.38 - - - - 0.38 - - 0.38 - -

19Chennai

South

Chengalpattu

EDCRAPDRP

New HT line with ACSR Raccoon

conductor for HVDS & DTsTo avoid low voltage problem 1.15

CMD TANGEDCO

Proceedings No.124,

dt:08.04.2011

1.15 1.15 - - - - 1.15 - - 1.15 - -

20Chennai

South

Chengalpattu

EDCRAPDRP

Erection of 11kV line for new DTs with

ACSR Racoon conductorTo avoid low voltage problem 0.15

CMD TANGEDCO

Proceedings No.124,

dt:08.04.2011

0.15 0.15 - - - - 0.15 - - 0.15 - -

21Chennai

South

Chengalpattu

EDCRAPDRP

Strengthening of Existing Conductor

ACSR weasel(7/3.35) in to Racoon(7/4.09)

to a distance of (0.635+8.05)KM

0.19

CMD TANGEDCO

Proceedings No.124,

dt:08.04.2011

0.19 0.19 - - - - 0.19 - - 0.19 - -

22Chennai

South

Chengalpattu

EDCRAPDRP

New Double pole mounted 100kVA-

11000/433V Distribution TransformerTo offer load relief to the existing Dt's 0.08

CMD TANGEDCO

Proceedings No.124,

dt:08.04.2011

0.08 0.08 - - - - 0.08 - - 0.08 - -

23Chennai

South

Chengalpattu

EDCRAPDRP

New Double pole mounted 250kVA-

11000/433V Distribution Transformer 0.34

CMD TANGEDCO

Proceedings No.124,

dt:08.04.2011

0.34 0.34 - - - - 0.34 - - 0.34 - -

24Chennai

South

Chengalpattu

EDCRAPDRP

New LT Line: New feeder for 1.6KM with

ACSR Rabbit wherever new DT is

proposed

To avoid low voltage problem 0.05

CMD TANGEDCO

Proceedings

No.124,dt:08.04.2011

0.05 0.05 - - - - 0.05 - - 0.05 - -

25Chennai

South

Chengalpattu

EDCRAPDRP Single Pole Mounted 25 kVA To reduce HT-LT ratio 0.48

CMD TANGEDCO

Proceedings No.124,

dt:08.04.2011

0.48 0.48 - - - - 0.48 - - 0.48 - -

26Chennai

South

Chengalpattu

EDCRAPDRP

Erection of Wedge connector and Lugs for

for DT structure 0.12

CMD TANGEDCO

Proceedings No.124,

dt:08.04.2011

0.12 0.12 - - - - 0.12 - - 0.12 - -

27Chennai

South

Chengalpattu

EDCRAPDRP

Wedge Connectors for LT Cut Point

locatrion 0.25

CMD TANGEDCO

Proceedings No.124,

dt:08.04.2011

0.25 0.25 - - - - 0.25 - - 0.25 - -

28Chennai

South

Chengalpattu

EDCIPDS

Establishment of 2Nos of new 33-11 kV

SS at Maraimalai nagar and GuduvancheriTo meet out load growth 7.35

(Per) CMD TANGEDCO

Proceedings No. 15(T.B)

dt.08.01.2016

7.35 7.35 - - - - 7.35 - - 7.35 - -

29Chennai

South

Chengalpattu

EDCIPDS

Enhancement of 1 x 8 MVA Additional

Transformer in 33/11kV Poonjeri SS with

2 Feeders

To improve network strength 1.27

(Per) CMD TANGEDCO

Proceedings No. 15(T.B)

dt.08.01.2019

1.27 1.27 - - - - 1.27 - - 1.27 - -

30Chennai

South

Chengalpattu

EDCIPDS

Enhancement of 8MVA to 16MVA in

33/11kV SIDCO SS(Indoor)To improve network strength 1.48

(Per) CMD TANGEDCO

Proceedings No. 15(T.B)

dt.08.01.2022

0.67 0.74 0.81 0.74 - - 0.74 0.74 - 0.67 0.81 -

31Chennai

South

Chengalpattu

EDCIPDS New 33 kV feeders for newly proposed SS To improve network strength 0.30

(Per) CMD TANGEDCO

Proceedings No. 15(T.B)

dt.08.01.2023

0.13 0.15 0.17 0.15 - - 0.15 0.15 - 0.13 0.17 -

32Chennai

South

Chengalpattu

EDCIPDS

Bay extension for 33kV line in 110/141kV

MMN SSTo improve network strength 0.28

(Per) CMD TANGEDCO

Proceedings No. 15(T.B)

dt.08.01.2028

0.13 0.14 0.15 0.14 - - 0.14 0.14 - 0.13 0.15 -

33Chennai

South

Chengalpattu

EDCIPDS

Erection of 11 kV Line : New Feeder/

Feeder BifurcationTo avoid low voltage problem 0.24

(Per) CMD TANGEDCO

Proceedings No. 15(T.B)

dt.08.01.2029

0.11 0.12 0.13 0.12 - - 0.12 0.12 - 0.11 0.13 -

Page 151: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

34Chennai

South

Chengalpattu

EDCIPDS Arial Bunched Cable - HT & LT To avoid low voltage problem 0.18

(Per) CMD TANGEDCO

Proceedings No. 15(T.B)

dt.08.01.2033

0.08 0.09 0.10 0.09 - - 0.09 0.09 - 0.08 0.10 -

35Chennai

South

Chengalpattu

EDCIPDS UG Cable - HT & LT To avoid low voltage problem 0.74

(Per) CMD TANGEDCO

Proceedings No. 15(T.B)

dt.08.01.2036

0.33 0.37 0.41 0.37 - - 0.37 0.37 - 0.33 0.41 -

36Chennai

South

Chengalpattu

EDCIPDS

New 100kVA DT only for rerating existing

1 no 250kVATransformersTo avoid low voltage problem 0.02

(Per) CMD TANGEDCO

Proceedings No. 15(T.B)

dt.08.01.2041

0.01 0.01 0.01 0.01 - - 0.01 0.01 - 0.01 0.01 -

37Chennai

South

Chengalpattu

EDCIPDS

Erection of LT Line : New Feeder/ Feeder

BifurcationTo avoid low voltage problem 0.14

(Per) CMD TANGEDCO

Proceedings No. 15(T.B)

dt.08.01.2042

0.06 0.07 0.08 0.07 - - 0.07 0.07 - 0.06 0.08 -

38Chennai

South

Chengalpattu

EDCIPDS LT Line : Augmentation/Reconductoring To avoid low voltage problem 0.08

(Per) CMD TANGEDCO

Proceedings No. 15(T.B)

dt.08.01.2047

0.04 0.04 0.04 0.04 - - 0.04 0.04 - 0.04 0.04 -

39Chennai

South

Chengalpattu

EDCIPDS Erection of HVDS Dt's To offer load relief to the existing Dt's 0.03

(Per) CMD TANGEDCO

Proceedings No. 15(T.B)

dt.08.01.2051

0.03 0.03 - - - - 0.03 - - 0.03 - -

40Chennai

South

Chengalpattu

EDCIPDS Metering

Accurate recording of consumption and

also to avoid human error in taking

reading

0.01

(Per) CMD TANGEDCO

Proceedings No. 15(T.B)

dt.08.01.2055

0.01 0.01 - - - - 0.01 - - 0.01 - -

41Chennai

South

Chengalpattu

EDCIPDS

Boundry Meters for Ring Fencing of Non -

RAPDRP Towns with population more

than 5000

0.01

(Per) CMD TANGEDCO

Proceedings No. 15(T.B)

dt.08.01.2056

0.01 0.01 - - - - 0.01 - - 0.01 - -

42Chennai

South

Chengalpattu

EDCIPDS Provisioning of solar panel 0.01

(Per) CMD TANGEDCO

Proceedings No. 15(T.B)

dt.08.01.2063

0.01 0.01 - - - - 0.01 - - 0.01 - -

1 CoimbatoreCoimbatore

Metro EDC

Capital (Balance

work from 2015-

16)

Extension of LT & LT CT, HT Supply to

19600 Nos various tariff servicesNew service connections effected 12.39

Based on the application from

the consumers, approval

accorded by comptent

authorities

Adding consumers 12.39 12.39 - - - - 12.39 - - 12.39 - -

2 CoimbatoreCoimbatore

Metro EDCCapital

Extension of LT & LT CT, HT Supply to

30000 nos various tariff servicesNew service connections effected 38.00

To be approved by the

competent authorityAdding consumers 10.80 12.00 14.70 15.00 11.40 11.00 12.00 15.00 11.00 10.80 14.70 11.40

3 CoimbatoreCoimbatore

Metro EDCCapital

Establishment of 33 kV sub stations at

Gandhimaanagar & Ganapathy in 2016-17

& Pappampatty Privu , Kalangal in 18-19

Improvement in Distribution network 16.00 To be proposedReduction of AT & C

Loss 3.60 4.00 4.00 4.00 7.60 8.00 4.00 4.00 8.00 3.60 4.00 7.60

4 CoimbatoreCoimbatore

Metro EDC

Improvement

(Balance work

from 2015-16)

Improvement works- Erection of DT, New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 16.27

To be approved by the

competent authority

To reduce Line Loss,

etc 16.27 16.27 - - - - 16.27 - - 16.27 - -

5 CoimbatoreCoimbatore

Metro EDCImprovement

Improvement works- SS, Enhancement of

Pr.Trs in sub stations, sub station related

works.

To improve the network and Load

growth - - - - - - - - - - - - -

6 CoimbatoreCoimbatore

Metro EDCImprovement

Improvement works- Erection of DT, New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 35.00

To be approved by the

competent authority

To reduce Line Loss,

etc 8.10 9.00 11.70 12.00 13.80 14.00 9.00 12.00 14.00 8.10 11.70 13.80

7 CoimbatoreCoimbatore

Metro EDC

RAPDRP

Scheme I (Part

B) - Balance

work from 2015-

16

Erection of New DTs, Strengtheing of

HT/LT lines, Conversion of OH Line in to

UG Cable, etc

To reduce AT & C Loss in Coimbatore

UA 127.13

CMD TANGEDCO

Proceedings No.124, dt.

08.04.2011

Reduction of AT & C

Loss 127.13 127.13 - - - - 127.13 - - 127.13 - -

8 CoimbatoreCoimbatore

Metro EDC

RAPDRP

Scheme-II (Part-

B)

- - - - - - - - - - - - -

9 CoimbatoreCoimbatore

Metro EDC

RAPDRP

Scheme III etc - - - - - - - - - - - - -

Page 152: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

10 CoimbatoreCoimbatore

Metro EDC

RGGVY

Schemes - - - - - - - - - - - - -

11 CoimbatoreCoimbatore

Metro EDCDDUGJY - - - - - - - - - - - - -

12 CoimbatoreCoimbatore

Metro EDCIPDS - - - - - - - - - - - - -

13 CoimbatoreCoimbatore

Metro EDC

Others

(REC/PFC) - - - - - - - - - - - - -

14 CoimbatoreCoimbatore

Metro EDC

DCW (Balance

work from 2015-

16)

Shifting of HT/LT Lines, Structures,etc,

(Including road widening projects) and

Dedicated Feeder

Infrastrcture development by the

Highways, Local authorities and

Consumer request

25.57

Based on the application from

the consumers, NHAI,

Highways, Local Bodies

approval accorded by

comptent authorities

Renewals &

Replacements 25.57 25.57 - - - - - - - - - -

15 CoimbatoreCoimbatore

Metro EDCDCW

Shifting of HT/LT Lines, Structures, etc,

(Including road widening projects) and

Dedicated Feeder

Infrastrcture development by the

Highways, Local authorities and

Consumer request

22.00

Based on the application from

the consumers, NHAI,

Highways, Local Bodies

approval accorded by

comptent authorities

Renewals &

Replacements 5.40 6.00 7.35 7.50 9.25 8.50 - - - - - -

16 CoimbatoreCoimbatore

Metro EDC

Any other related

works including

less than one

crore works

totally

Civil Works, IT Procurement, Purchase of

new vehicle

Improvement works in internal

efficiency 3.00

Certain improvement taken in

the required areaImproving efficiency 0.67 0.75 0.98 1.00 1.35 1.25 0.75 1.00 1.25 0.67 0.98 1.35

1 CoimbatoreCoimbatore

North EDC

Capital (Balance

work from 2015-

16)

Extension of LT & LT CT, HT Supply to

12150 Nos various tariff servicesNew service connections effected 27.04

Based on the application from

the consumers, approval

accorded by comptent

authorities

Adding consumers 27.04 27.04 - - - - 27.04 - - 27.04 - -

2 CoimbatoreCoimbatore

North EDCCapital

Extension of LT & LT CT, HT Supply to

19000 nos various tariff servicesNew service connections effected 25.00

To be approved by the

competent authorityAdding consumers 5.85 6.50 7.40 7.50 10.65 11.00 6.50 7.50 11.00 5.85 7.40 10.65

3 CoimbatoreCoimbatore

North EDCCapital

Establishment of 33 kV sub stations at

Thondamuthur 2016-17 & Vedapatty 17-

18

Improvement in Distribution network 8.00 To be proposedReduction of AT & C

Loss 3.60 4.00 4.40 4.00 - - 4.00 4.00 - 3.60 4.40 -

4 CoimbatoreCoimbatore

North EDC

Improvement

(Balance work

from 2015-16)

Improvement works- Erection of DT,

New HT feeders, strengthening of HT

cables, Laying LT cable and erection of

pillar boxes.

To improve the network and Load

growth 13.08

Approved by the competent

authority as per the field

proposal

To reduce Line Loss,

etc 13.08 13.08 - - - - 13.08 - - 13.08 - -

5 CoimbatoreCoimbatore

North EDCImprovement

Improvement works- SS, Enhancement of

Pr.Trs in sub stations, sub station related

works.

To improve the network and Load

growth - - - - - - - - - - - - -

6 CoimbatoreCoimbatore

North EDCImprovement

Improvement works- Erection of DT, New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 20.00

To be approved by the

competent authority

To reduce Line Loss,

etc 5.40 6.00 6.90 7.00 7.00 7.00 6.00 7.00 7.00 5.40 6.90 7.00

7 CoimbatoreCoimbatore

North EDC

RAPDRP

Scheme I (Part

B) - Balance

work from 2015-

16

Erection of New DTs, Strengtheing of

HT/LT lines, Conversion of OH Line in to

UG Cable, etc

To reduce AT & C Loss in Coimbatore

UA 33.48

CMD TANGEDCO

Proceedings No 124, dt.

08.04.2011

Reduction of AT & C

Loss 33.48 33.48 - - - - 33.48 - - 33.48 - -

8 CoimbatoreCoimbatore

North EDC

RAPDRP

Scheme-II (Part-

B)

- - - - - - - - - - - - -

9 CoimbatoreCoimbatore

North EDC

RAPDRP

Scheme III etc - - - - - - - - - - - - -

10 CoimbatoreCoimbatore

North EDC

RGGVY

Schemes - - - - - - - - - - - - -

11 CoimbatoreCoimbatore

North EDCDDUGJY - - - - - - - - - - - - -

Page 153: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

12 CoimbatoreCoimbatore

North EDCIPDS

Erection of HVDS DTs, LT line

reconductoring and agumentation ,

replacement of electro mechanical meter

To reduce AT & C Loss in project

towns 39.57

CMD TANGEDCO

Proceedings No 15, dt.

08.01.2016

Reduction of AT & C

Loss 8.61 9.57 14.80 15.38 16.16 14.62 9.57 15.38 14.62 8.61 14.80 16.16

14 CoimbatoreCoimbatore

North EDC

DCW (Balance

work from 2015-

16)

Shifting of HT/LT Lines, Structures,etc,

(Including road widening projects) and

Dedicated Feeder

Infrastrcture development by the

Highways, Local authorities and

Consumer request

4.18

Based on the application from

the consumers, NHAI,

Highways, Local Bodies

approval accorded by

comptent authorities

Renewals &

Replacements 4.18 4.18 - - - - - - - - - -

15 CoimbatoreCoimbatore

North EDCDCW

Shifting of HT/LT Lines, Structures,etc,

(Including road widening projects) and

Dedicated Feeder

Infrastrcture development by the

Highways, Local authorities and

Consumer request

16.00

Based on the application from

the consumers, NHAI,

Highways, Local Bodies

approval accorded by

comptent authorities

Renewals &

Replacements 4.50 5.00 5.00 5.00 6.50 6.00 - - - - - -

16 CoimbatoreCoimbatore

North EDC

Any other related

works including

less than one

crore works

totally

Civil Works, IT Procurement, Purchase of

new vehicle

Improvement works in internal

efficiency 3.00

Certain improvement taken in

the required areaImproving efficiency 0.67 0.75 0.98 1.00 1.35 1.25 0.75 1.00 1.25 0.67 0.98 1.35

1 CoimbatoreCoimbatore

South EDC

Capital (Balance

work from 2015-

16)

Extension of LT & LT CT, HT Supply to

10250 Nos various tariff servicesNew service connections effected 32.57

Based on the application from

the consumers, approval

accorded by comptent

authorities

Adding consumers 32.57 32.57 - - - - 32.57 - - 32.57 - -

2 CoimbatoreCoimbatore

South EDCCapital

Extension of LT & LT CT, HT Supply to

17000 nos various tariff servicesNew service connections effected 21.50

To be approved by the

competent authorityAdding consumers 7.20 8.00 6.65 6.50 6.95 7.00 8.00 6.50 7.00 7.20 6.65 6.95

3 CoimbatoreCoimbatore

South EDCCapital

Establishment of 33 kV sub stations at

Elachipalayam, Karumathampatty, Anna

Indl Park (2016-17) & Vadavalli

(NegamamDn) 2018-19

Improvement in Distribution network 18.30 To be proposedReduction of AT & C

Loss 3.60 4.00 7.60 8.00 6.47 6.30 4.00 8.00 6.30 3.60 7.60 6.47

4 CoimbatoreCoimbatore

South EDC

Improvement

(Balance work

from 2015-16)

Improvement works- Erection of DT,New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 15.71

Approved by the competent

authority as per the field

proposal

To reduce Line Loss,

etc 15.71 15.71 - - - - 15.71 - - 15.71 - -

5 CoimbatoreCoimbatore

South EDCImprovement

Improvement works- SS,Enhancement of

Pr.Trs in sub stations, sub station related

works.

To improve the network and Load

growth - - - - - - - - - - - - -

6 CoimbatoreCoimbatore

South EDCImprovement

Improvement works- Erection of DT,New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 20.00

To be approved by the

competent authority

To reduce Line Loss,

etc 5.40 6.00 6.90 7.00 7.00 7.00 6.00 7.00 7.00 5.40 6.90 7.00

7 CoimbatoreCoimbatore

South EDC

RAPDRP

Scheme I (Part

B) - Balance

work from 2015-

16

Erection of New DTs, Strengtheing of

HT/LT lines, Conversion of OH Line in to

UG Cable, etc

To reduce AT & C Loss in Coimbatore

UA 9.43

CMD TANGEDCO

Proceedings No 124, dt.

08.04.2011

Reduction of AT & C

Loss 9.43 9.43 - - - - 9.43 - - 9.43 - -

8 CoimbatoreCoimbatore

South EDC

RAPDRP

Scheme-II (Part-

B)

- - - - - - - - - - - - -

9 CoimbatoreCoimbatore

South EDC

RAPDRP

Scheme III etc - - - - - - - - - - - - -

10 CoimbatoreCoimbatore

South EDC

RGGVY

Schemes - - - - - - - - - - - - -

11 CoimbatoreCoimbatore

South EDCDDUGJY - - - - - - - - - - - - -

12 CoimbatoreCoimbatore

South EDCIPDS

Erection of HVDS DTs, LT line

reconductoring and agumentation ,

replacement of electro mechanical meter,

etc & 33kv SS @ Kalipalayam

To reduce AT & C Loss in project

towns 54.17

CMD TANGEDCO

Proceedings No 15, dt.

08.01.2016

Reduction of AT & C

Loss 4.50 5.00 28.40 31.00 21.27 18.17 5.00 31.00 18.17 4.50 28.40 21.27

13 CoimbatoreCoimbatore

South EDC

Others

(REC/PFC) - - - - - - - - - - - - -

Page 154: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

14 CoimbatoreCoimbatore

South EDC

DCW (Balance

work from 2015-

16)

Shifting of HT/LT Lines, Structures,etc,

(Including road widening projects) and

Dedicated Feeder

Infrastrcture development by the

Highways, Local authorities and

Consumer request

7.73

Based on the application from

the consumers, NHAI,

Highways, Railways, Local

Bodies approval accorded by

comptent authorities

Renewals &

Replacements 7.73 7.73 - - - - - - - - - -

15 CoimbatoreCoimbatore

South EDCDCW

Shifting of HT/LT Lines, Structures,etc,

(Including road widening projects) and

Dedicated Feeder

Infrastrcture development by the

Highways, Local authorities and

Consumer request

16.00

Based on the application from

the consumers, NHAI,

Highways, Local Bodies

approval accorded by

comptent authorities

Renewals &

Replacements 4.50 5.00 5.00 5.00 6.50 6.00 - - - - - -

16 CoimbatoreCoimbatore

South EDC

Any other related

works including

less than one

crore works

totally

Civil Works, IT Procurement, Purchase of

new vehicle

Improvement works in internal

efficiency 3.00

Certain improvement taken in

the required areaImproving efficiency 0.67 0.75 0.98 1.00 1.35 1.25 0.75 1.00 1.25 0.67 0.98 1.35

1 Coimbatore Tiruppur EDC

Capital (Balance

work from 2015-

16)

Extension of LT & LT CT, HT Supply to

23360 Nos various tariff servicesNew service connections effected 26.93

Based on the application from

the consumers, approval

accorded by comptent

authorities

Adding consumers 26.93 26.93 - - - - 26.93 - - 26.93 - -

2 Coimbatore Tiruppur EDC CapitalExtension of LT & LT CT, HT Supply to

33000 nos various tariff servicesNew service connections effected 40.00

To be approved by the

competent authorityAdding consumers 9.00 10.00 13.60 14.00 15.80 16.00 10.00 14.00 16.00 9.00 13.60 15.80

3 Coimbatore Tiruppur EDC Capital

Establishment of 33 kV sub stations at

Kallapalayam,

Amravathipalayam,Uthukuli, Padiyur,

Ayyampalayam, Nallathupalayam (

2016-17), Kongunagar, Koolipalayam,

Pappampatty, Nochipalayam,

Panapalayam, Aavin, Chengapalli,

Pudupai, Vellamadai, Palayakottai Road,

Thayampalayam ( 2017-18) RK

Palayam, Neruperichal, Avinashipalayam,

Pappini, Padiyandipalayam,

Kuttapalayam(2018-19)

Improvement in Distribution network 96.00 To be proposedReduction of AT & C

Loss 36.00 40.00 36.40 36.00 21.60 20.00 40.00 36.00 20.00 36.00 36.40 21.60

4 Coimbatore Tiruppur EDC

Improvement

(Balance work

from 2015-16)

Improvement works- Erection of DT, New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 23.25

Approved by the competent

authority as per the field

proposal

To reduce Line Loss,

etc 23.25 23.25 - - - - 23.25 - - 23.25 - -

5 Coimbatore Tiruppur EDC Improvement

Improvement works- SS,Enhancement of

Pr.Trs in sub stations, sub station related

works.

To improve the network and Load

growth - - - - - - - - - - - - -

6 Coimbatore Tiruppur EDC Improvement

Improvement works- Erection of DT,New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 30.00

To be approved by the

competent authority

To reduce Line Loss,

etc 8.10 9.00 9.90 10.00 10.90 11.00 9.00 10.00 11.00 8.10 9.90 10.90

7 Coimbatore Tiruppur EDC

RAPDRP

Scheme I (Part

B) - Balance

work from 2015-

16

Erection of New DTs, Strengtheing of

HT/LT lines, Conversion of OH Line in to

UG Cable, etc

To reduce AT & C Loss in Coimbatore

UA 3.98

CMD TANGEDCO

Proceedings No 124, dt.

08.04.2011

Reduction of AT & C

Loss 3.98 3.98 - - - - 3.98 - - 3.98 - -

8 Coimbatore Tiruppur EDC

RAPDRP

Scheme-II (Part-

B)

- - - - - - - - - - - - -

9 Coimbatore Tiruppur EDCRAPDRP

Scheme III etc - - - - - - - - - - - - -

10 Coimbatore Tiruppur EDCRGGVY

Schemes - - - - - - - - - - - - -

11 Coimbatore Tiruppur EDC DDUGJY - - - - - - - - - - - - -

Page 155: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

12 Coimbatore Tiruppur EDC IPDS

Erection of HVDS DTs, LT line

reconductoring and agumentation ,

replacement of electro mechanical meter,

etc

To reduce AT & C Loss in project

towns 55.77

CMD TANGEDCO

Proceedings No 15, dt.

08.01.2016

Reduction of AT & C

Loss - - 22.50 25.00 33.27 30.77 - 25.00 30.77 - 22.50 33.27

13 Coimbatore Tiruppur EDCOthers

(REC/PFC) - - - - - - - - - - - - -

14 Coimbatore Tiruppur EDC

DCW (Balance

work from 2015-

16)

Shifting of HT/LT Lines, Structures,etc,

(Including road widening projects) and

Dedicated Feeder

Infrastrcture development by the

Highways, Local authorities and

Consumer request

10.59

Based on the application from

the consumers, NHAI,

Highways, Railways, Local

Bodies approval accorded by

comptent authorities

Renewals &

Replacements 10.59 10.59 - - - - - - - - - -

15 Coimbatore Tiruppur EDC DCW

Shifting of HT/LT Lines, Structures,etc,

(Including road widening projects) and

Dedicated Feeder

Infrastrcture development by the

Highways, Local authorities and

Consumer request

30.00

Based on the application from

the consumers, NHAI,

Highways, Local Bodies

approval accorded by

comptent authorities

Renewals &

Replacements 7.20 8.00 9.80 10.00 13.00 12.00 - - - - - -

16 Coimbatore Tiruppur EDC

Any other related

works including

less than one

crore works

totally

Civil Works, IT Procurement, Purchase of

new vehicle

Improvement works in internal

efficiency 3.00

Certain improvement taken in

the required areaImproving efficiency 0.67 0.75 0.98 1.00 1.35 1.25 0.75 1.00 1.25 0.67 0.98 1.35

1 CoimbatoreUdumalpet

EDC

Capital (Balance

work from 2015-

16)

Extension of LT & LT CT, HT Supply to

8060 Nos various tariff servicesNew service connections effected 29.40

Based on the application from

the consumers, approval

accorded by comptent

authorities

Adding consumers 29.40 29.40 - - - - 29.40 - - 29.40 - -

2 CoimbatoreUdumalpet

EDCCapital

Extension of LT & LT CT, HT Supply to

13000 nos various tariff servicesNew service connections effected 30.00

To be approved by the

competent authorityAdding consumers 7.20 8.00 9.80 10.00 11.80 12.00 8.00 10.00 12.00 7.20 9.80 11.80

3 CoimbatoreUdumalpet

EDCCapital Establishment of 33 kV sub stations Not Proposed - - - - - - - - - - - - -

4 CoimbatoreUdumalpet

EDC

Improvement

(Balance work

from 2015-16)

Improvement works- Erection of DT, New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 33.79

Approved by the competent

authority as per the field

proposal

To reduce Line Loss,

etc 33.79 33.79 - - - - 33.79 - - 33.79 - -

5 CoimbatoreUdumalpet

EDCImprovement

Improvement works- SS, Enhancement of

Pr.Trs in sub stations, sub station related

works.

To improve the network and Load

growth - - - - - - - - - - - - -

6 CoimbatoreUdumalpet

EDCImprovement

Improvement works- Erection of DT,New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 30.00

To be approved by the

competent authority

To reduce Line Loss,

etc 8.10 9.00 9.90 10.00 10.90 11.00 9.00 10.00 11.00 8.10 9.90 10.90

7 CoimbatoreUdumalpet

EDC

RAPDRP

Scheme I (Part

B) - Balance

work from 2015-

16

Erection of New DTs, Strengtheing of

HT/LT lines, Conversion of OH Line in to

UG Cable, etc

To reduce AT & C Loss in Coimbatore

UA 17.86

CMD TANGEDCO

Proceedings No 124, dt.

08.04.2011

Reduction of AT & C

Loss 17.86 17.86 - - - - 17.86 - - 17.86 - -

8 CoimbatoreUdumalpet

EDC

RAPDRP

Scheme-II (Part-

B)

- - - - - - - - - - - - -

9 CoimbatoreUdumalpet

EDC

RAPDRP

Scheme III etc - - - - - - - - - - - - -

10 CoimbatoreUdumalpet

EDC

RGGVY

Schemes - - - - - - - - - - - - -

11 CoimbatoreUdumalpet

EDCDDUGJY - - - - - - - - - - - - -

12 CoimbatoreUdumalpet

EDCIPDS

Erection of HVDS DTs, LT line

reconductoring and agumentation ,

replacement of electro mechanical meter,

etc

To reduce AT & C Loss in project

towns 29.54

CMD TANGEDCO

Proceedings No 15, dt.

08.01.2016

Reduction of AT & C

Loss - - 15.30 17.00 14.24 12.54 - 17.00 12.54 - 15.30 14.24

Page 156: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

13 CoimbatoreUdumalpet

EDC

Others

(REC/PFC) - - - - - - - - - - - - -

14 CoimbatoreUdumalpet

EDC

DCW (Balance

work from 2015-

16)

Shifting of HT/LT Lines, Structures,etc,

(Including road widening projects) and

Dedicated Feeder

Infrastrcture development by the

Highways, Local authorities and

Consumer request

6.57

Based on the application from

the consumers, NHAI,

Highways, Railways, Local

Bodies approval accorded by

comptent authorities

Renewals &

Replacements 6.57 6.57 - - - - - - - - - -

15 CoimbatoreUdumalpet

EDCDCW

Shifting of HT/LT Lines, Structures,etc,

(Including road widening projects) and

Dedicated Feeder

Infrastrcture development by the

Highways, Local authorities and

Consumer request

20.00

Based on the application from

the consumers, NHAI,

Highways, Local Bodies

approval accorded by

comptent authorities

Renewals &

Replacements 4.50 5.00 6.80 7.00 8.70 8.00 - - - - - -

16 CoimbatoreUdumalpet

EDC

Any other related

works including

less than one

crore works

totally

Civil Works, IT Procurement, Purchase of

new vehicle

Improvement works in internal

efficiency 3.00

Certain improvement taken in

the required areaImproving efficiency 0.67 0.75 0.98 1.00 1.35 1.25 0.75 1.00 1.25 0.67 0.98 1.35

1 Coimbatore Nilgiis EDC

Capital (Balance

work from 2015-

16)

Extension of LT & LT CT, HT Supply to

3040 Nos various tariff servicesNew service connections effected 6.24

Based on the application from

the consumers, approval

accorded by comptent

authorities

Adding consumers 6.24 6.24 - - - - 6.24 - - 6.24 - -

2 Coimbatore Nilgiis EDC CapitalExtension of LT & LT CT, HT Supply to

5000 nos various tariff servicesNew service connections effected 3.65

To be approved by the

competent authorityAdding consumers 0.90 1.00 1.00 1.00 1.58 1.65 1.00 1.00 1.65 0.90 1.00 1.58

3 Coimbatore Nilgiis EDC Capital

Establishment of 33 kV sub stations in

Keradamattam ( 2016-17),

Contonment (2017-18), M.Pallada &

Doddabetta ( 2018-19)

Improvement in Distribution network 28.88 To be proposedReduction of AT & C

Loss 15.19 16.88 13.69 12.00 - - 16.88 12.00 - 15.19 13.69 -

4 Coimbatore Nilgiis EDC

Improvement

(Balance work

from 2015-16)

Improvement works- Erection of DT, New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 0.59

Approved by the competent

authority as per the field

proposal

To reduce Line Loss,

etc 0.59 0.59 - - - - 0.59 - - 0.59 - -

5 Coimbatore Nilgiis EDC Improvement

Improvement works- SS, Enhancement of

Pr.Trs in sub stations, sub station related

works.

To improve the network and Load

growth - - - - - - - - - - - - -

6 Coimbatore Nilgiis EDC Improvement

Improvement works- Erection of DT, New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 3.00

To be approved by the

competent authority

To reduce Line Loss,

etc 0.90 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.90 1.00 1.00

7 Coimbatore Nilgiis EDC

RAPDRP

Scheme I (Part

B) - Balance

work from 2015-

16

Erection of New DTs, Strengtheing of

HT/LT lines, Conversion of OH Line in to

UG Cable, etc

To reduce AT & C Loss in Coimbatore

UA 11.77

CMD TANGEDCO

Proceedings No 124, dt.

08.04.2011

Reduction of AT & C

Loss 11.77 11.77 - - - - 11.77 - - 11.77 - -

8 Coimbatore Nilgiis EDC

RAPDRP

Scheme-II (Part-

B)

- - - - - - - - - - - - -

9 Coimbatore Nilgiis EDCRAPDRP

Scheme III etc - - - - - - - - - - - - -

10 Coimbatore Nilgiis EDCRGGVY

Schemes - - - - - - - - - - - - -

11 Coimbatore Nilgiis EDC DDUGJY - - - - - - - - - - - - -

12 Coimbatore Nilgiis EDC IPDS

Erection of HVDS DTs, LT line

reconductoring and agumentation ,

replacement of electro mechanical meter,

etc

To reduce AT & C Loss in project

towns 31.37

CMD TANGEDCO

Proceedings No 15, dt.

08.01.2016

Reduction of AT & C

Loss - - 14.40 16.00 16.97 15.37 - 16.00 15.37 - 14.40 16.97

13 Coimbatore Nilgiis EDCOthers

(REC/PFC) - - - - - - - - - - - - -

Page 157: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

14 Coimbatore Nilgiis EDC

DCW (Balance

work from 2015-

16)

Shifting of HT/LT Lines, Structures, etc,

(Including road widening projects) and

Dedicated Feeder

Infrastrcture development by the

Highways, Local authorities and

Consumer request

0.14

Based on the application from

the consumers, NHAI,

Highways, Local Bodies

approval accorded by

comptent authorities

Renewals &

Replacements 0.14 0.14 - - - - - - - - - -

15 Coimbatore Nilgiis EDC DCW

Shifting of HT/LT Lines, Structures etc,

(Including road widening projects) and

Dedicated Feeder

Infrastrcture development by the

Highways, Local authorities and

Consumer request

2.00

Based on the application from

the consumers, NHAI,

Highways, Local Bodies

approval accorded by

comptent authorities

Renewals &

Replacements 0.45 0.50 0.50 0.50 1.05 1.00 - - - - - -

16 Coimbatore Nilgiis EDC

Any other related

works including

less than one

crore works

totally

Civil Works, IT Procurement, Purchase of

new vehicle

Improvement works in internal

efficiency 1.00

Cetain improvement taken in

the required areaImproving efficiency 0.22 0.25 0.34 0.35 0.44 0.40 0.25 0.35 0.40 0.22 0.34 0.44

1 Erode Erode EDC Capital Extension of LT & LT CT Supply to

20675 Nos various tariff servicesEffecting new services 1.00

Approval was accorded by the

relevant competent authorities

for effecting new service

connections.

To meet the growing

demand of the

consumers

1.00 1.00 - - - - 1.00 - - 1.00 - -

2 Erode Erode EDC Capital Extension of HT Supply to 30 Nos.

( New & Additional loads)Effecting new & addl load services 1.00

Approval was accorded by the

relevant competent authorities

for effecting new and addl.

service connections.

To meet the growing

demand of the

consumers

1.00 1.00 - - - - 1.00 - - 1.00 - -

3 Erode Erode EDC Improvement

Improvement works in certain HT/LT

Lines, Provision of DTs in the required

area & Upgradation of DTs

To reduce the line losses 1.00 Approval was accorded by the

relevant competent authorities

To meet the growing

demand of the

consumers

1.00 1.00 - - - - 1.00 - - 1.00 - -

4 Erode Erode EDC RAPDRP

Erection of New DTs, Strengthening of

HT/LT lines, Conversion of OH line into

UG Cable, etc.

To reduce the AT&C losses 0.02 Scheme is funded by the

MOP/GOI

To reduce the AT&C

Losses 0.02 0.02 - - - - 0.02 - - 0.02 - -

5 Erode Erode EDC DCW DCW Connected works To comply the consumer's obligation 1.00 Approval was accorded by the

relevant competent authorities

To comply the

consumer's obligation 1.00 1.00 - - - - - - - - - -

6 Erode Erode EDC

Operation and

Maintenance

work

Estimated 50 Nos of checkmeters each

2.75 lakhs & 1200 Nos damaged poles

each 0.15 lakh (per year)

To reduce AT&C losses 1.00 Approval was accorded by the

relevant competent authorities

To reduce AT&C

losses 1.00 1.00 - - - - 1.00 - - 1.00 - -

7 Erode Erode EDC CapitalAnticipated Extension of LT & LT CT

Supply to 20675 Nos various tariff servicesEffecting new services 31.98

To be Approved by the

relevant competent authorities

To meet the growing

demand of the

consumers

16.16 17.96 12.51 11.90 3.10 2.12 17.96 11.90 2.12 16.16 12.51 3.10

8 Erode Erode EDC CapitalAnticipated Extension of HT Supply to 30

Nos ( New & Additional loads)Effecting new services 35.97

To be Approved by the

relevant competent authorities

To meet the growing

demand of the

consumers

18.23 20.26 14.09 13.40 3.42 2.31 20.26 13.40 2.31 18.23 14.09 3.42

9 Erode Erode EDC Improvement

Anticipated Improvement works in certain

HT/LT Lines, Provision of DTs in the

required area & Upgradation of DTs

To reduce AT&C losses 64.14 To be Approved by the

relevant competent authorities

To meet the growing

demand of the

consumers

28.28 31.42 24.00 23.18 10.91 9.54 31.42 23.18 9.54 28.28 24.00 10.91

10 Erode Erode EDC DDUGJY

New 33/11 kV SS in Kullampalayam,

Karattupudur, Aval poondurai, Anjur,

K.B.Gramam (2016-17), Static meter, HT

& LT line

New 33/11 kV sub-stations-

2 Nos and Enhancement of 33/11 kV

Sub-stations - 3Nos, Replacement of

Static meter 34794 Nos , Line

conversion-25.28 Kms,

15.06 To be Approved by the

relevant competent authorities

To avoid overloading

of existing Power

Transformers

8.12 9.02 6.94 6.04 - - 9.02 6.04 - 8.12 6.94 -

11 Erode Erode EDC DDUGJY Kodumanal, Vallipuram, Karattupudur,

Perundurai, Nallampatti, Nanjai Uthukuli,

Land cost for each Sub-station

Rs.11.10 lakhs Approximately 0.67

To be Approved by the

relevant competent authorities

To avoid overloading

of existing Power

Transformers

0.31 0.34 0.24 0.23 0.12 0.10 0.34 0.23 0.10 0.31 0.24 0.12

12 Erode Erode EDC IPDS

Erection of 33/11 kV SS , 33 kV lines,

22/11 kV Lines, New LT lines, HVDS

DTs, UG cables,& Provision of Bay

extension, capacitor bank, Metering, Solar

panels, & conversion of LT lines

CMD TANGEDCO proceedings No:15

dt 8.01.2016 155.70

To be Approved by the

relevant competent authorities

To reduce the over

loading of lines &

Line Loss and

improve the revenue

augmentation etc

85.50 95.00 70.20 60.70 - - 95.00 60.70 - 85.50 70.20 -

Page 158: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

13 Erode Erode EDC DCW DCW Connected works To achieve Consumer satisfaction 35.72 To be Approved by the

relevant competent authorities

To comply the

consumer's obligation 11.21 12.46 12.19 12.16 12.32 11.10 - - - - - -

14 Erode Erode EDC Civil works

Solar system, Division offices, Section

offices, Community Hall, Manufacturing of

RCC ploes, weathering course in circle

office, Supplying 20 mm metal for all sub-

stations, Supplying precast slab for all sub-

station,

Anticipated cost for execution of the

improvement civil work 16.60

To be Approved by the

relevant competent authorities

To minimise the

Revenue Expenditure 6.84 7.60 5.93 5.75 3.83 3.25 7.60 5.75 3.25 6.84 5.93 3.83

15 Erode Erode EDC

Operation and

Maintenance

work

Provision of Check meters and

Replacement of Damaged poles

Estimated 50 Nos of checkmeters each

2.75 lakhs & 1200 Nos damaged poles

each 0.15 lakh (per year)

27.99 To be Approved by the

relevant competent authorities

To reduce AT&C

losses 14.09 15.66 10.94 10.41 2.96 1.92 15.66 10.41 1.92 14.09 10.94 2.96

1 Erode Gobi EDC CapitalExtension of LT & LT CT Supply to

15120 Nos various tariff servicesEffecting of new service connections 2.00

Approval was accorded by the

relevant competent authorities

for effecting new and addl.

service connections.

To meet the growing

demand of the

consumers

2.00 2.00 - - - - 2.00 - - 2.00 - -

2 Erode Gobi EDC CapitalExtension of HT Supply(New : 4 Nos &

Additional loads:13 Nos)Effecting of new service connections 0.24

Approval was accorded by the

relevant competent authorities

for effecting new and addl.

service connections.

To meet the growing

demand of the

consumers

0.24 0.24 - - - - 0.24 - - 0.24 - -

3 Erode Gobi EDC Capital New 33/11 kVSS at ChimtahalliTo reduce line loss and to improve the

tailend voltage regulation 0.22

Tangedco Proceeding No.347

dt: 03.11.12

To meet the growing

demand of the

consumers

0.22 0.22 - - - - 0.22 - - 0.22 - -

4 Erode Gobi EDC Improvement

Improvement works in certain HT/LT

Lines, Provision of DTs in the required

areas & Upgradation of DTs.

For reduction of AT&C Loss & to

improve the voltage level 1.00

Approval was accorded by the

relevant competent authorities

To reduce the Line

Loss, etc 1.00 1.00 - - - - 1.00 - - 1.00 - -

5 Erode Gobi EDCRAPDRP

Scheme I

Erection of 7 Nos 100 kVA DT, 19 Nos 25

kVA DT , Strengthening of HT/LT lines in

Bhavani Town, Gobi EDC

To improve voltage regulation of

existing feeders, to reduce the line loss

and to provide quality power supply to

the consumers

1.37 TANGEDCO proceedings

434/29.9.14

To reduce the AT&C

Losses 1.37 1.37 - - - - 1.37 - - 1.37 - -

6 Erode Gobi EDCRAPDRP

Scheme II

Erection of 33/11 kV SS, Erection of DTs,

63 kVA -5 Nos, 100 kVA -13 Nos, 250

kVA , 500 kVA -1 No, conversion of lines

16.36 Km, New HT OH lines 23 Kms, LT

line strengthening 24 Kms, HVDS Dt -152

Nos in Sathyamangalam town, Gobi Edc

To improve voltage regulation of

existing feeders , to reduce the line

loss and to provide quality power

supply to the consumers

5.26 TANGEDCO proceedings

123/01.04.14

To reduce the AT&C

Losses 5.26 5.26 - - - - 5.26 - - 5.26 - -

7 Erode Gobi EDC DCWDeviation of existing HT/LT lines and

structuresAs per the request of consumer 0.29

Approval was accorded by the

relevant competent authorities

for effecting new service

connections.

To comply the

consumer's obligation 0.29 0.29 - - - - - - - - - -

8 Erode Gobi EDC CapitalAnticipated Extension of LT & LT CT

Supply to 24000 Nos various tariff servicesNew SCs 110.97

Approval was accorded by the

relevant competent authorities

To meet the growing

demand of the

consumers

50.32 55.91 39.79 38.00 19.15 17.06 55.91 38.00 17.06 50.32 39.79 19.15

9 Erode Gobi EDC CapitalAnticipated Extension of HT Supply(New-

7 Nos & Additional loads-20Nos)New SCs 6.91

Approval was accorded by the

relevant competent authorities

To meet the growing

demand of the

consumers

3.14 3.49 2.48 2.37 1.18 1.05 3.49 2.37 1.05 3.14 2.48 1.18

10 Erode Gobi EDC CapitalNew 33/11 kV SS proposed at Elur in

Sathy Division.

To avoid low voltage problems and

reduce 11 kV line loss 4.00 Sanction to be obtained

To meet the growing

demand of the

consumers

- - 2.52 2.80 1.36 1.20 - 2.80 1.20 - 2.52 1.36

11 Erode Gobi EDC CapitalNew 33/11 kV SS proposed at

Punjaiduraiyam palayam in Gobi Division

To avoid low voltage problems and

reduce 11 kV line loss 4.00 Sanction to be obtained

To meet the growing

demand of the

consumers

- - 1.80 2.00 2.00 2.00 - 2.00 2.00 - 1.80 2.00

12 Erode Gobi EDC CapitalNew 33/11 kV SS proposed at

N.Mettupalayam in Gobi Division.

To avoid low voltage problems and

reduce 11 kV line loss 4.00 Sanction to be obtained

To meet the growing

demand of the

consumers

- - - - 3.60 4.00 - - 4.00 - - 3.60

Page 159: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

13 Erode Gobi EDC Improvement

Anticipated Improvement works in certain

HT/LT Lines, Provision of DTs in required

area & Upgradation of DTs

To avoid overloding of exisiting

Transformers and lines 20.81

Approval was accorded by the

relevant competent authorities

To reduce the over

loading of lines &

Line Loss, etc

9.44 10.49 7.46 7.12 3.59 3.20 10.49 7.12 3.20 9.44 7.46 3.59

14 Erode Gobi EDC DDUGJY

Erection of 1 No. new 33/11 kV SS at

Periyakallipatty in Sathy division and

enhancement of power transformer

capacity at Ganapathy Nagar, Perumpallam

and Erankattur 33 kV SSs and replacement

of Electromechanical meters etc.,

To avoid low voltage problems, to

provide quality supply and reduce 11

kV line loss and to improve the revenue

of the TANGEDCO by replacement of

EM meters.

10.50 REC/Chennai/DDUGJY/201

5-16/702/ Dt.05.01.2016

To avoid overloading

of existing Power

Transformers

6.75 7.50 3.75 3.00 - - 7.50 3.00 - 6.75 3.75 -

15 Erode Gobi EDC IPDS

Erection of 33/11 kV SS at

Makkainakombai , Section of HVDS

DTs , LT line reconductoring and

Agumentation, Replacement of electro

mechanical meters, Arial bunched cable ,

UG Cable, etc.

To reduce the line loss and to provide

quality supply to the consumers. 31.87 B.P.No:15 Dt.08.01.16

To reduce the over

loading of lines &

Line Loss and

improve the revenue

augmentation etc

8.64 9.60 12.48 12.80 10.75 9.47 9.60 12.80 9.47 8.64 12.48 10.75

16 Erode Gobi EDC DCWDeviation of existing HT/LT lines and

structuresAs per the request of consumer 7.50

Approval was accorded by the

relevant competent authorities

for effecting new service

connections.

To comply the

consumer's obligation 1.93 2.15 2.47 2.50 3.10 2.85 - - - - - -

1 Erode Mettur EDC CapitalExtension of LT & LT CT Supply to

40190 nos various tariff servicesEffecting of New Services 0.50

Approval was accorded by the

relevant competent authorities

for effecting new service

connections.

To meet the growing

demand of the

consumers

0.50 0.50 - - - - 0.50 - - 0.50 - -

2 Erode Mettur EDC Capital

Extension of HT Line, Line Materials,

Conductors/ UG Cable, Metering set and

HT Meter FOR 31 services

Effecting of New Services 0.10

Approval was accorded by the

relevant competent authorities

for effecting new and addl.

service connections.

To meet the growing

demand of the

consumers

0.10 0.10 - - - - 0.10 - - 0.10 - -

3 Erode Mettur EDC Improvement

Improvement of LT distribution lines &

erection of New & Enhancement of

existing DTs.

To improve the voltage level, and

reduce AT&C loss 0.20

Approval was accorded by the

relevant competent authorities

To reduce the line

loss. 0.20 0.20 - - - - 0.20 - - 0.20 - -

4 Erode Mettur EDCR-APDRP,

Part-B

R-APDRP, Part-B Distribution

Strengthening works in all in Mettur

Division

To arrive AT&C Loss and to reduce the

loss 1.00

Schemes were funded by the

MOP/GOI

To reduce the AT&C

Loss below 15%. 1.00 1.00 - - - - 1.00 - - 1.00 - -

5 Erode Mettur EDC DCWWidening of Roads, Deviation LT/HT

Lines,shifting of DT StructureTo comply the consumer's obligations 0.10

Approval was accorded by the

relevant competent authorities

To comply the

consumer's

obligations

0.10 0.10 - - - - - - - - - -

6 Erode Mettur EDC othersConstruction of Division offices, Store

room and other civil worksTo minimise the Revenue Expenditure 0.10

Approval was accorded by the

relevant competent authorities

To minimise the

Revenue Expenditure 0.10 0.10 - - - - 0.10 - - 0.10 - -

7 Erode Mettur EDC CapitalAnticipated Extension of LT & LT CT

Supply to 55000 Nos various tariff services Effecting of New Service connections 105.50

To be Approved by the

relevant competent authorities

To meet the growing

demand of the

consumers

31.95 35.50 37.07 37.25 33.20 32.75 35.50 37.25 32.75 31.95 37.07 33.20

8 Erode Mettur EDC CapitalAnticipated Extension of HT Supply to 45

services( New & Additional loads) Effecting of New Services 3.55

To be Approved by the

relevant competent authorities

To meet the growing

demand of the

consumers

0.99 1.10 1.14 1.15 1.29 1.30 1.10 1.15 1.30 0.99 1.14 1.29

9 Erode Mettur EDC Improvement

Improvement of LT distribution lines &

erection of New & Enhancement of

existing DTs.

To improve the voltage level, and

reduce AT&C loss 31.50

To be Approved by the

relevant competent authorities

To meet the growing

demand of the

consumers

17.10 19.00 9.55 8.50 4.45 4.00 19.00 8.50 4.00 17.10 9.55 4.45

10 Erode Mettur EDC R-APDRP

Erection of New DTs, Strengthening of

HT/LT lines, Convertion of OH line in to

UG cable,etc.

To reduce AT&C loss of the project

towns 3.20

Approved by the relevant

competent authorities

Reduction of AT&C

Loss 3.20 3.20 - - - - 3.20 - - 3.20 - -

11 Erode Mettur EDC DDUGJY

Establishment of 33/11 kV Substations at

Sathiya Nagar, Pottneri, Selavadai &

Vanavasi

To avoid overloading of existing Power

Transformers 13.40

To be Approved by the

relevant competent authorities

To avoid overloading

of existing Power

Transformers

3.81 4.23 5.09 5.19 4.50 3.98 4.23 5.19 3.98 3.81 5.09 4.50

Page 160: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

12 Erode Mettur EDC IPDS

Eection of HVDS DTs , LT line

reconductoring and Agumentation,

Replacement of electro mechanical meters,

etc.

To reduce AT&C loss of the project

towns 42.22

CMD TANGEDCO

proceedings No:15 dt

8.01.2016

Reduction of AT&C

Loss and improve the

revenue

augmentation.

19.50 21.67 10.11 8.82 12.61 11.73 21.67 8.82 11.73 19.50 10.11 12.61

13 Erode Mettur EDC DCWWidening of Roads, Deviation LT/HT

Lines,shifting of DT StructureTo comply the consumer's obligations 15.75

Approval was accorded by the

relevant competent authorities

To comply the

consumer's

obligations

6.39 7.10 5.79 5.65 3.57 3.00 - - - - - -

14 Erode Mettur EDC othersConstruction of Division offices, Store

room and other civil worksTo minimise the Revenue Expenditure 7.50

Approval was accorded by the

relevant competent authorities

To minimise the

Revenue Expenditure 3.28 3.65 3.12 3.06 1.10 0.79 3.65 3.06 0.79 3.28 3.12 1.10

1 Erode Salem EDC Capital

(i) Extension of new LT & LT CT Supply

to 63515 nos effected to various tariff

services ( 2014-15-33821 no's &2015-

2016-29694 no's); (ii) Extension of HT

line, Line materials, Conductors/UG Cable

& LT Metering

Effecting new service connections 1.50 Approval was accorded by the

relevant competent authorities

To meet the growing

demand of the

consumers

1.50 1.50 - - - - 1.50 - - 1.50 - -

2 Erode Salem EDC Capital

Extension of HT supply to 20 nos HT Line,

Line Materials, Conductors/UG Cable,

Metering set and HT Meter(2014-2015-14

nos & 2015-2016 - 6 nos)

Effecting new service connections 0.50 Approval was accorded by the

relevant competent authorities

To meet the growing

demand of the

consumers

0.50 0.50 - - - - 0.50 - - 0.50 - -

3 Erode Salem EDC Improvement

Improvement of LT distribution lines &

erection of New & Enhancement of

existing DTs.

To improve the voltage level, and

reduce AT&C loss 0.60

Approval was accorded by the

relevant competent authorities

To meet the growing

demand of the

consumers

0.60 0.60 - - - - 0.60 - - 0.60 - -

4 Erode Salem EDC RAPDRP

Erection of New DTs, strenghthening of

lines, conversion of OH by UG cable,

replacement of meters, Provision of DT

Metering and conversion of OH by AB

cable

For reduction of AT&C loss and

Consumer satisfaction 19.84 06.04.2013

Reduction of AT&C

Loss 19.84 19.84 - - - - 19.84 - - 19.84 - -

5 Erode Salem EDC DCWDeviation and Shifting of LT Line,HT Line

, Poles, DT structures and DP structures

As per Consumer request Existing

LT,HT line,DT's , DP's shifted from

Exiating location to new location.

0.45 Approval was accorded by the

relevant competent authorities

To comply the

consumer's

obligations

0.45 0.45 - - - - - - - - - -

6 Erode Salem EDC Others

Civil works, etc., (like construction of

section office, compound wall of Stores,

etc.,)

Accommodate the Board's offices &

safeguard the Stores,etc., 0.50

Approval was accorded by the

relevant competent authorities

To minimise the

Revenue Expenditure 0.50 0.50 - - - - 0.50 - - 0.50 - -

7 Erode Salem EDC Capital

(i) Extension of new LT & LT CT Supply

to 96034 nos effected to various tariff

services (2016-17-32182 no's & 2017-

2018-31694 no's); 2018-19 32158 (ii)

Extension of HT line, Line materials,

Conductors/UG Cable & LT Metering

Effecting new service connections 111.48 Approval was accorded by the

relevant competent authorities

To meet the growing

demand of the

consumers

33.62 37.36 36.85 36.79 37.28 37.33 37.36 36.79 37.33 33.62 36.85 37.28

8 Erode Salem EDC Capital

Extension of HT supply to 23 nos HT Line,

Line Materials, Conductors/UG Cable,

Metering set and HT Meter(2016-17-8 nos;

2017-18-7 nos. & 2018-19 - 8 nos)

Effecting new service connections 4.91 Approval was accorded by the

relevant competent authorities

To meet the growing

demand of the

consumers

1.39 1.55 1.38 1.36 1.94 2.00 1.55 1.36 2.00 1.39 1.38 1.94

9 Erode Salem EDC Improvement

Improvement of LT distribution lines &

erection of New & Enhancement of

existing DTs.

To improve the voltage level, and

reduce AT&C loss 46.69

Approval was accorded by the

relevant competent authorities

To meet the growing

demand of the

consumers

13.68 15.20 15.44 15.47 15.97 16.02 15.20 15.47 16.02 13.68 15.44 15.97

10 Erode Salem EDC DDUGJY

Electrification of rural households by

effecting of 1191 SC under 3 phase & 1

phase extension

Improvement of rural infrastructure 5.01 REC/CHN/DDUGJY/ 2015-

16/ 702/5.1.16

To avoid overloading

of existing Power

Transformers

2.71 3.01 2.30 2.00 - - 3.01 2.00 - 2.71 2.30 -

11 Erode Salem EDC IPDS

HVDS, New DTs, Line strengthening,

Bifurcation of feeders, Meter replacement,

provision of capacitor bank & DT

metering.

For reduction of AT&C loss and

Consumer satisfaction 59.32 8.1.16 ; B.P.no.15

Reduction of AT&C

Loss and improve the

revenue

augmentation.

27.00 30.00 32.32 29.32 - - 30.00 29.32 - 27.00 32.32 -

12 Erode Salem EDC DCWDeviation and Shifting of LT Line,HT Line

, Poles, DT structures and DP structures

As per Consumer request Existing

LT,HT line,DT's , DP's shifted from

Exiating location to new location.

19.80 Approval was accorded by the

relevant competent authorities

To comply the

consumer's

obligations

5.38 5.98 6.52 6.58 7.90 7.24 - - - - - -

Page 161: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

13 Erode Salem EDC Others

Civil works, etc.,(like construction of

section office, compound wall of Stores,

etc.,)

Accommodate the Board's offices &

safeguard the Stores,etc., 32.77

Approval was accorded by the

relevant competent authorities

To minimise the

Revenue Expenditure 8.91 9.90 10.79 10.89 13.07 11.98 9.90 10.89 11.98 8.91 10.79 13.07

1 ErodeNamakkal

EDCCapital

Extension of LT & LT CT Supply to

36164 Nos various tariff servicesEffecting of New SC 2.00

Approval was accorded by the

relevant competent authorities

for effecting new service

connections.

To meet the growing

demands of the

consumer

2.00 2.00 - - - - 2.00 - - 2.00 - -

2 ErodeNamakkal

EDCCapital

Extension of HT Supply ( New 10 Nos &

Additional loads16 Nos ) -26 Nos.Effecting of New SC 1.00

Approval was accorded by the

relevant competent authorities

To meet the growing

demands of the

consumer

1.00 1.00 - - - - 1.00 - - 1.00 - -

3 ErodeNamakkal

EDCImprovement

Improvement of HT/LT line, enhancement,

New & Addl DTs/Lines etc

To improve the voltage level and

reduce the line loss 1.00

Approval was accorded by the

relevant competent authorities

To reduce the Line

Loss, etc 1.00 1.00 - - - - 1.00 - - 1.00 - -

4 ErodeNamakkal

EDCAPDRP

Erection of New DTs, Strengthening of

HT/LT lines,etc.Erection of New DTs, Strengthening 0.50

To be Approved by the

relevant competent authorities

Reduction of AT&C

Loss and improve the

revenue

augmentation.

0.50 0.50 - - - - 0.50 - - 0.50 - -

5 ErodeNamakkal

EDCDDUGJY

Electrification of Unelectrified House

Holds and alternate HT supply to Kolli

Hills

To improve the voltage level and

reduce the line loss & improve the

revenue

9.44 To be Approved by the

relevant competent authorities

To meet the growing

demands of the

consumer

3.46 3.85 5.09 5.22 0.89 0.37 3.85 5.22 0.37 3.46 5.09 0.89

6 ErodeNamakkal

EDCIPDS

Erection of HVDS DTs , LT line

reconductoring and Augmentation,

Replacement of electro mechanical meters,

etc.

To improve the voltage level and

reduce the line loss & improve the

revenue

36.59 To be Approved by the

relevant competent authorities

Reduction of AT&C

Loss and improve the

revenue

augmentation.

15.90 17.67 18.62 18.72 2.07 0.20 17.67 18.72 0.20 15.90 18.62 2.07

7 ErodeNamakkal

EDCDCW

Widening of Roads, Deviation LT/HT

Lines, shifting of DT StrcutureTo comply the conasumer cost 2.00

Approval was accorded by the

relevant competent authorities

To comply the

consumer's

obligations

2.00 2.00 - - - - - - - - - -

8 ErodeNamakkal

EDCCivil works

Construction of Division offices, Store

room and other civil worksTo minimise the Revenue Expenditure 0.50

Approval was accorded by the

relevant competent authorities

To minimise the

Revenue Expenditure 0.50 0.50 - - - - 0.50 - - 0.50 - -

9 ErodeNamakkal

EDCCapital

Anticipated Extension of LT & LT CT

Supply to 47500 Nos various tariff

services

Effecting of New SC 120.22 Approval was accorded by the

relevant competent authorities

To meet the growing

demands of the

consumer

25.34 28.16 44.19 45.97 46.08 46.09 28.16 45.97 46.09 25.34 44.19 46.08

10 ErodeNamakkal

EDCCapital

Anticipated Extension of HT Supply 30

Nos. ( New 15& Additional -15loads)Effecting of New SC 18.78

To be Approved by the

relevant competent authorities

To meet the growing

demands of the

consumer

4.45 4.95 8.59 8.99 5.26 4.84 4.95 8.99 4.84 4.45 8.59 5.26

11 ErodeNamakkal

EDCImprovement

Improvement of HT/LT line,enhancement,

New & Addl DTs/Lines etc

To improve the voltage level and

reduce the line loss 35.29

To be Approved by the

relevant competent authorities

To meet the growing

demands of the

consumer

5.20 5.78 11.86 12.53 16.53 16.98 5.78 12.53 16.98 5.20 11.86 16.53

12 ErodeNamakkal

EDCDCW

Widening of Roads, Deviation LT/HT

Lines, shifting of DTStrcutureTo comply the consumer cost 26.63

To be Approved by the

relevant competent authorities

Operational

convenience 12.59 13.99 8.36 7.73 5.68 4.91 - - - - - -

13 ErodeNamakkal

EDCCivil works

Construction of Division offices, Store

room and other civil worksTo minimse the Revenue Expenditure 11.22

To be Approved by the

relevant competent authorities

Operational

convenience 5.74 6.38 2.73 2.32 2.75 2.52 6.38 2.32 2.52 5.74 2.73 2.75

1 MaduraiSivaganga

EDCCapital

Extension of LT & LT CT, HT Supply to

17650 Nos various tariff servicesNew service connections effected 61.81

To be approved by the

competent authoritiesAdding consumers 18.56 20.62 21.13 21.19 20.12 20.00 20.62 21.19 20.00 18.56 21.13 20.12

2 MaduraiSivaganga

EDCCapital

Establishment of 33 kV sub stations at

Keelasevalpatty and PoovanthiTo meet out the load growth 24.00

To be approved by the

competent authorities

To reduce the Line

Loss, etc - - 24.00 24.00 - - - 24.00 - - 24.00 -

3 MaduraiSivaganga

EDCImprovement

Improvement works- SS, Enhancement of

Pr.Trs in subs tations, sub station related

works.

To improve the network and Load

growth - - - - - - - - - - - - -

4 MaduraiSivaganga

EDCImprovement

Improvement works- Erection of DT, New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 47.44

To be approved by the

competent authorities

To reduce the Line

Loss, etc 13.68 15.20 16.03 16.12 16.12 16.12 15.20 16.12 16.12 13.68 16.03 16.12

Page 162: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

5 MaduraiSivaganga

EDC

RAPDRP

Scheme I

(Part A/Part B)

Erection of New DTs, Strengthening of

HT/LT lines, Implementation of IT

activities, HVDS erection works,

replacement of EM & HQ

Meters(Sivagangai & Devakottai Town)

To reduce AT&C loss of the project

towns 0.50

DPR sanction No: SIVA

001/V1/ 23.07.2010,DEVI

001/V1 / 0507.2010

Reduction of AT&C

Loss 0.50 0.50 - - - - 0.50 - - 0.50 - -

6 MaduraiSivaganga

EDC

RAPDRP

Scheme II

Erection of New DTs, Strengthening of

HT/LT lines, Implementation of IT

activities, HVDS erection works,

replacement of EM&HQ Meters(Karaikudi

UA)

To reduce AT&C loss of the project

towns 39.35

DPR sanction No: SIVA

001/V4/25.02.2014

Reduction of AT&C

Loss 18.00 20.00 21.35 19.35 - - 20.00 19.35 - 18.00 21.35 -

7 MaduraiSivaganga

EDC

RAPDRP

Scheme III etc - - - - - - - - - - - - -

8 MaduraiSivaganga

EDC

RGGVY

Schemes - - - - - - - - - - - - -

9 MaduraiSivaganga

EDCDDUGJY

450 Nos New service connections are to be

effected New service connections 0.57

To be approved by the

competent authoritiesAdding consumers 0.57 0.57 - - - - 0.57 - - 0.57 - -

10 MaduraiSivaganga

EDCDDUGJY 33/11kV Pottapalayam SS Improvement of system network 12.60

To be approved by the

competent authorities

Reduction of AT&C

Loss 12.60 12.60 - - - - 12.60 - - 12.60 - -

11 MaduraiSivaganga

EDCDDUGJY

13317 Nos Single phase and 544 Nos

Three EM meters are to be replaced by

static meters in services where the

consumption is more than 200 units.

Reduction of commercial Loss 11.50 To be approved by the

competent authorities

Reduction of AT&C

Loss 11.50 11.50 - - - - 11.50 - - 11.50 - -

12 MaduraiSivaganga

EDCIPDS

Erection of New DTs, Strengthening of

HT/LT lines, Implementation of IT

activities, HVDS erection works,

replacement of EM & High quality meters

To reduce AT&C loss of the project

towns 14.52 CMD.No.15/8.1.2016

Reduction of AT&C

Loss 9.00 10.00 5.52 4.52 - - 10.00 4.52 - 9.00 5.52 -

13 MaduraiSivaganga

EDC

Others

(REC/PFC)

Erection of New DTs, HT/LT lines, Agri.

New Service connection.New service connections effected 26.10

Approval was accorded by the

relevent competent authoritiesAdding consumers 7.29 8.10 8.91 9.00 9.90 9.00 8.10 9.00 9.00 7.29 8.91 9.90

14 MaduraiSivaganga

EDCDCW Due to Road widening and party request Line shifting work 36.00

Approval was accorded by the

relevent competent authorities

Line Deviation

Works 10.80 12.00 12.00 12.00 13.20 12.00 - - - - - -

15 MaduraiSivaganga

EDC

Any other related

works including

less than one

crore works

totally

Civil works Construction and Repair works 1.20 Approval was accorded by the

relevent competent authorities

Construction and

Repair works 0.36 0.40 0.40 0.40 0.44 0.40 0.40 0.40 0.40 0.36 0.40 0.44

1 Madurai Theni EDC CapitalExtension of LT & LT CT, HT Supply to

23427 Nos various tariff servicesNew service connections effected 5.92 5.92 5.92 - - - - 5.92 - - 5.92 - -

2 Madurai Theni EDC CapitalEstablishment of 33 kV sub stations at

……… - - - - - - - - - - - - -

3 Madurai Theni EDC Improvement

Improvement works- SS, Enhancement of

Pr.Trs in subs tations, sub station related

works.

To improve the network and Load

growth - - - - - - - - - - - - -

4 Madurai Theni EDC Improvement

Improvement works- Erection of DT, New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 4.94

Approved by the competent

authority as per the field

proposal

To reduce the Line

Loss, etc 4.94 4.94 - - - - 4.94 - - 4.94 - -

5 Madurai Theni EDC

RAPDRP

Scheme I (Part

A/Part B)

(i) New feeders 22kV , 7/4.09 mm OH

with breaker, ii) Erection of new 22kV,

ACSR 3.35 mm conductor for new HVDS,

iii)Strengthening of existing 22 kV OH

feeder , iv)Erection of New 100 kVA DTs

, v)Strengthening of existing LT OH

feeder from ACSR 7/2.59 mm to ACSR

7/3.35 mm , vi)Erection of New 25 kVA

DTs , 40 kVA DTs, 63 kVA DTs

8.86 To meet out load

growth 8.86 8.86 - - - - 8.86 - - 8.86 - -

Page 163: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

6 Madurai Theni EDCRAPDRP

Scheme II - - - - - - - - - - - - -

7 Madurai Theni EDCRAPDRP

Scheme III etc - - - - - - - - - - - - -

8 Madurai Theni EDCRGGVY

Schemes - - - - - - - - - - - - -

9 Madurai Theni EDC DDUGJY Electrification of 421 Nos Rural House

Holds New service connections effected 0.96 ….

Adding Rural

Consumer 0.96 0.96 - - - - 0.96 - - 0.96 - -

10 Madurai Theni EDC IPDSErection of DT's, H.T Line, LT Line

Replacement of Meters 42.38

CMD Proceeding No 15 Dt

08.01.16Adding consumers 19.07 21.19 17.37 16.95 5.94 4.24 21.19 16.95 4.24 19.07 17.37 5.94

11 Madurai Theni EDC NEFS

Conductor (ACSR/AAAC)

7/4.09 -95 KM

7/3.15 - 4719.449 KM

7/2.59 - 4036.12 KM

Poles

RCC- 9.14 Mtr-2530 Nos

RCC- 8.00 Mtr-3601 Nos

PSC- 7.50 Mtr-1778 Nos

To avoid accidents and to avoid public

complaints the aged and detoriated

conductor and poles are identified and

to be replaced . Also in lengthy spans

insertion of poles are to be provided

39.94

Per CMD /TANGEDCO

proceeding no.100,

dt.08.03.13

To avoid the

possibility of

accident and to

maintain the quality

of power supply.

8.95 9.94 13.59 14.00 17.40 16.00 9.94 14.00 16.00 8.95 13.59 17.40

12 Madurai Theni EDC DCWDeviation of HT & LT lines, providing

22kV dedicated feeder and shifting of SC's

As per TANGEDECO norms based on

the request of consumer 0.54

As per the request of

the consumers 0.54 0.54 - - - - - - - - - -

13 Madurai Theni EDC

Any other related

works including

less than one

crore works

totally

- - - - - - - - - - - - -

1 MaduraiMadurai Metro

EDCCapital

Extension of LT & LT CT, HT Supply to

44350 Nos various tariff servicesNew service connections effected 35.75

Based on the application from

the consumers, approval was

accorded by the competent

authorities

Adding consumers 12.40 13.78 23.35 21.97 - - 13.78 21.97 - 12.40 23.35 -

2 MaduraiMadurai Metro

EDCCapital

Establishment of New SS - Sellur, Anna

Nagar & Ponmeni, Muthupatti, TNHB,

Iravathanallur 33/11kV SS, Purchase of

Land, Construction of control room

building, inclusive of cost of 33& 11 kV

Breakers,33 kV &

11kV, 1x 630 sq mm Cable, Battery and

Control cable and other Elecl accessories

To meet out load growth 100.56 To be proposedTo meet out load

growth - - - - 90.50 100.56 - - 100.56 - - 90.50

3 MaduraiMadurai Metro

EDCImprovement

Improvement works in certain HT/LT

Lines, provision of DTs in required area &

Upgradation of DTs

Improving network strength & Quality,

Replacement of aged conductors,

poles,etc

21.43

Approved by the competent

authority as per the field

proposal

To reduce the Line

Loss, etc 7.45 8.28 13.98 13.15 - - 8.28 13.15 - 7.45 13.98 -

4 MaduraiMadurai Metro

EDCRAPDRP

18 kVAR, 36 kVAR & 72 kVAR, APFC

panels installed and commissioned in 100

kVA, 250 kVA & 500 kVA DTs

Power factor improvement 5.52

CMD TANGEDCO

proceedings No:124 dt

8.04.11

To improve the

voltage stability and

to improve the VAR

Compensation

5.52 5.52 - - - - 5.52 - - 5.52 - -

5 MaduraiMadurai Metro

EDCRAPDRP

Establishment of SCADA Control system

in Madurai UA Town with 19 Nos RTU

To minimize the supply outage by

remote operation at SCADA end. 18.69

CMD TANGEDCO

proceedings No:124 dt

8.04.11

To improve the

voltage stability and

to improve the VAR

compensation

18.69 18.69 - - - - 18.69 - - 18.69 - -

6 MaduraiMadurai Metro

EDCRAPDRP

Erection of RMU at 100 kVA , 250 kVA &

500 kVA DT locations

Reduction of outages and ensuring

consumer satisfaction 27.56

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To mainitain the

Uninterrupted power

supply to the

consumers and to

Maintain the GRID

network

27.56 27.56 - - - - 27.56 - - 27.56 - -

Page 164: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

7 MaduraiMadurai Metro

EDCRAPDRP

Erection of FRTU panels at RMUs and

sectionalisers locationsRemote operation 3.87

CMD TANGEDCO

proceedings No:124 dt

8.04.11

For remote

controlling the RMU

and Sectionalizer to

maintain

Uninerrupted power

supply

3.87 3.87 - - - - 3.87 - - 3.87 - -

8 MaduraiMadurai Metro

EDCRAPDRP Erection of 11kV sectionalisers

Easy isolation of 11 kV fault portion

and reduce the duration of outage. 18.86

CMD TANGEDCO

proceedings No:124 dt

8.04.11

To mainitain the

Uninterrupted power

supply to the

consumers and to

Maintain the GRID

network

18.86 18.86 - - - - 18.86 - - 18.86 - -

9 MaduraiMadurai Metro

EDCRAPDRP

Replacement of single phase and three

phase EM/HQ meter with static meters

Accurate recording of consumption and

also to avoid human error in taking

reading

35.96

CMD TANGEDCO

proceedings No:124 dt

8.04.11

For improving the

Revenue

Augumentation

35.96 35.96 - - - - 35.96 - - 35.96 - -

10 MaduraiMadurai Metro

EDC

RAPDRP -

DSW

i) New feeders 11kV, ACSR 7/4.09mm

Conductor, ii) New feeders 11kV

7/3.35 mm OH (ACSR Rabbit), iii)

Strengthening of existing 11 kV OH feeder

from ACSR 7/2.59 mm to 4.09 mm ,

iv)Strengthening of existing 11 kV OH

feeder from ACSR 7/2.59 mm to 7/3.35

mm , v) New LT feeders with ACSR

7/3.35 mm Conductor,

vi) Strengthening of existing LT OH kV

OH feeder from ACSR 7/2.59 mm to

7/3.35 mm , vii)

Conversion of Existing LT 2 Wire in to 4

Wire and 5 Wire System with ACSR

7/3.35 Conductor

Load bifurcation to reduce over loading

and to reduce the Line losses 16.22

CMD TANGEDCO

proceedings No:124 dt

8.04.11

To improve the

voltage stability and

to minimize the

AT&C Losses

16.22 16.22 - - - - 16.22 - - 16.22 - -

11 MaduraiMadurai Metro

EDC

RAPDRP -

DSW

Derating with 63 kVA , 100kVA &

250kVA DTs and New feeders with 11kV,

3x300 sqmm XLPE , Laying of AB cables

HT & LT.

To offer load relief to the existing DTs 12.75

CMD TANGEDCO

proceedings No:124

dt 8.04.11

To reduce LT Long

lines and to minimize

the AT&C losses

12.75 12.75 - - - - 12.75 - - 12.75 - -

12 MaduraiMadurai Metro

EDC

RAPDRP -

DSW

Erection of New 16 kVA , 40 kVA ,63

kVA ,100kVA DTs

To reduce HT - LT ratio Transmission

losses 65.43

CMD TANGEDCO

proceedings No:124

dt 8.04.11

To Minimize the

AT&C Losses and to

improve the Power

quality

65.43 65.43 - - - - 65.43 - - 65.43 - -

13 MaduraiMadurai Metro

EDC

RAPDRP

Schemes

Enhancement of Existing 2 X 8 MVA,

33/11 kV Power transformer in to 2 X 16

MVA Power Transformer in Anna Bus

stand SS, K.Pudur SS,Theppam SS,

Mahalipatty SS, Erection of Additional

Power Transformer Koil SS, Replacement

of Existing KIOSK type 33 kV & 11 kV

Breakers and CTs.

To meet out load growth 11.42 To meet out load

growth 11.42 11.42 - - - - 11.42 - - 11.42 - -

14 MaduraiMadurai Metro

EDCImprovement

Replacement of 11 kV Breaker, battery set

and battery charger.Obsolete items replacement 0.17

Obsolete items

replacement 0.11 0.12 0.06 0.05 - - 0.12 0.05 - 0.11 0.06 -

1 Madurai Ramnad EDC RAPDRP

18 kVAR, 36 kVAR & 72 kVAR, APFC

panels installed and commissioned in

100kVA, 250 kVA & 500 kVA DTs

Power factor improvement 0.07

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

0.07 0.07 - - - - 0.07 - - 0.07 - -

2 Madurai Ramnad EDCRAPDRP -

DSW

New feeders 11kV, 7/3.35 mm OH (ACSR

Rabbit) 3.83 -do- 3.83 3.83 - - - - 3.83 - - 3.83 - -

3 Madurai Ramnad EDCRAPDRP -

DSW

Erection of new 11 kV ACSR 3.35 mm

conductor for new DTs and HVDS 0.61 -do- 0.61 0.61 - - - - 0.61 - - 0.61 - -

4 Madurai Ramnad EDCRAPDRP -

DSW

Strengthening of existing 11 kV OH feeder

from ACSR 7/2.59 mm to 7/3.35 mm

To augument the current carrying

capacity of the conductor 0.15 -do- 0.15 0.15 - - - - 0.15 - - 0.15 - -

Page 165: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

5 Madurai Ramnad EDCRAPDRP -

DSW

Strengthening of existing LT OH feeder

from ACSR 7/2.59 mm to ACSR 7/3.35

mm

To augument the current carrying

capacity of the conductor 0.95

CMD TANGEDCO

proceedings No:15 dt

08.01.2016

0.95 0.95 - - - - 0.95 - - 0.95 - -

6 Madurai Ramnad EDC IPDS - DSW Erection of New 25 kVA & 40 kVA DTs 0.95 0.95 0.95 - - - - 0.95 - - 0.95 - -

7 Madurai Ramnad EDC IPDS - DSW

Providing Addl.Pr.Tr in 33/11 kV

Abiramam SS & Mudukulathur SS with

breakers

To meet out load growth 1.83 255/16.7.11To meet out load

growth 1.83 1.83 - - - - 1.83 - - 1.83 - -

8 Madurai Ramnad EDC T & D Plan Establishment of 33/11 kV SS at Erwadi To improve voltage profile 1.10

CMD TANGEDCO

proceedings No:67 dt

22.07.14

To improve voltage

profile 1.10 1.10 - - - - 1.10 - - 1.10 - -

9 Madurai Ramnad EDC DDUGJY

Enhancement of power Transformer from

1*5 MVA to 1*8 MVA at 33/11 kV

Devipattinam SS

To avoid over loading of Power

Transformer 0.66 655/c/43/14-15dt:03.01.2015

To avoid over

loading of Power

Transformer

0.66 0.66 - - - - 0.66 - - 0.66 - -

10 Madurai Ramnad EDC Effecting new services adding consumers 0.30 sanction to be accorded by

competent authorityadding consumers 0.30 0.30 - - - - 0.30 - - 0.30 - -

11 Madurai Ramnad EDC

Replacement of Electromechanical metres

to static metres, Single phase -6018,Three

phase -215V.

To improve ocuracy of metering 0.65 sanction to be accorded by

competent authority

To improve occuracy

of metering 0.65 0.65 - - - - 0.65 - - 0.65 - -

12 Madurai Ramnad EDC O&M

Replacement of damaged pole and

reconductoring

7/2.15-821 KM

7/2.59-1283 KM 9.14 mtr

pole-793 Nos 8.0 mtr pole-

2420 Nos 7.5 mtr pole-721 Nos

System Strengthening 0.75 sanction to be accorded by

competent authoritySystem Strengthening 0.22 0.25 0.25 0.25 0.28 0.25 0.25 0.25 0.25 0.22 0.25 0.28

13 Madurai Ramnad EDC Capital Effecting new services adding consumers 30.00 sanction to be accorded by

competent authorityadding consumers 9.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 9.00 10.00 10.00

1 Madurai Dindigul EDC CapitalExtension of LT & LT CT, HT Supply to

44350 Nos various tariff servicesNew service connections effected 38.93

Based on the application from

the consumers, approval was

accorded by the competent

authorities

Adding consumers 14.34 15.93 17.97 18.20 6.14 4.80 15.93 18.20 4.80 14.34 17.97 6.14

2 Madurai Dindigul EDC Capital

Establishment of New SS - Viruveedu,

D.Gudalur 33/11 kV SS purchase of Land,

Construction of control room building,

inclusive of cost of 33& 11 kV Breakers,

33 kV &

11kV 1x630 sq mm Cable,

Battery and Control cable and other Elecl

accessories

To meet out load growth 12.46 To be proposedTo meet out load

growth 5.31 5.90 7.15 6.56 - - 5.90 6.56 - 5.31 7.15 -

3 Madurai Dindigul EDC Improvement

Improvement works in certain HT/LT

Lines, provision of DTs in required area &

Upgradation of DTs

Improving network strength & Quality,

Replacement of aged conductors,

poles,etc

17.93

Approved by the competent

authority as per the field

proposal

To reduce the Line

Loss, etc 11.46 12.73 6.47 5.20 - - 12.73 5.20 - 11.46 6.47 -

4 Madurai Dindigul EDC

RAPDRP Part A

under Dindigul,

Palani &

Kodaikkanal

Towns

IT ImplementationTo Collect the Geographical

information and computerised 3.66

PER CMD TangedGo

Proceding No 123 dt1.4.11

To Collect the

Geographical

information and

computerised

3.66 3.66 - - - - 3.66 - - 3.66 - -

5 MaduraiPart - B

Palani TownRAPDRP DSW

i) 18 kVAR APFC for 100 kVA DT

ii) 27 kVAR APFC for 250 kVA DTs

iii) 36 kVAR APFC for 250 kVA DTs

To reduce AT&C loss of the project

towns 0.25 255/16.7.11

To reduce AT&C

loss of the project

towns

0.25 0.25 - - - - 0.25 - - 0.25 - -

6 MaduraiPart - B

Palani TownRAPDRP DSW

i) Replacement of existing 1 Ph meters by

tamper proof 1 Ph static meters &

ii) Replacement of existing 3 Ph- 60A,

meters by tamper proof 3 Ph 10-60 A,

static meters

Accurate recording of consumption and

also to avoid human error in taking

reading

1.44 255/16.7.11

Accurate recording of

consumption and also

to avoid human error

in taking reading

1.44 1.44 - - - - 1.44 - - 1.44 - -

Page 166: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

7 MaduraiPart - B

Palani TownRAPDRP DSW

i) 22 kV HT line with ACSR 7/4.09 mm

(Raccoon) Feeder,

ii) 22 kV HT line with ACSR 7/3.35 mm

(Rabbit) for HVDS DT's,

iii)ACSR 7/2.59 mm (Weasel) to ACSR

7/3.35 mm (Rabbit)

Load bifurcation to reduce outages and

to enhance operation flexibility 1.17 255/16.7.11

Load bifurcation to

reduce outages and to

enhance operation

flexibility

1.17 1.17 - - - - 1.17 - - 1.17 - -

8 MaduraiPart - B

Palani TownRAPDRP DSW

i) Erection of new 200kVA/22kV DT's

ii)Erection of new 100 kVA/22kV DT's for

derating existing 250kVA/22kV DT by

introduction of HVDS

To offer load relief to the existing DTs 1.10 255/16.7.11To offer load relief to

the existing DTs 1.10 1.10 - - - - 1.10 - - 1.10 - -

9 MaduraiPart - B

Palani TownRAPDRP DSW

i) Proposed conversion of existing LT

Single Phase 3 Wire line into LT 3 Phase 5

Wire Line with ACSR (7/3.35 mm &

7/2.59mm) Rabbit and Weasel.

ii) LT ABC Cable 3x70+1x16+1x50 Sq

mm

To augument the current carrying

capacity of the conductor 0.98 255/16.7.11

To augment the

current carrying

capacity of the

conductor

0.98 0.98 - - - - 0.98 - - 0.98 - -

10 MaduraiPart - B

Palani TownRAPDRP DSW

i) Erection of single pole mounted DT

structure with 25 Kva

ii)Erection of Double pole mounted DT

structure with 40 kVA

iii) Erection of Double pole mounted DT

structure with 63 kVA

iv) Erection of Double pole mounted DT

structure with 100 kVA

To reduce HT - LT ratio. 2.82 255/16.7.11To reduce HT - LT

ratio. 2.82 2.82 - - - - 2.82 - - 2.82 - -

11 MaduraiPart - B

Palani TownRAPDRP DSW

i) Wedge connector for DTs

ii) Wedge connector for LT Cut PointTo reduce HT - LT ratio. 0.06 255/16.7.11

To reduce HT - LT

ratio. 0.06 0.06 - - - - 0.06 - - 0.06 - -

12 MaduraiPart - B

Palani TownRAPDRP DSW

i) Renovation of DT Earthing ii) E-

Provision of Railway Crossing Structure

iii) DP Structure with AB Switch

To reduce HT - LT ratio. 0.72 255/16.7.11To reduce HT - LT

ratio. 0.72 0.72 - - - - 0.72 - - 0.72 - -

13 MaduraiPart - B

Palani TownRAPDRP DSW Bay Extensions To meet out load growth 0.16 255/16.7.11

To meet out load

growth 0.16 0.16 - - - - 0.16 - - 0.16 - -

14 MaduraiPart - B

Palani TownRAPDRP DSW

i) 18 kVAR APFC for 100 kVA DT

ii) 27 kVAR APFC for 250 kVA DTs iii)

36 kVAR APFC for 250 kVA DTs

To reduce AT&C loss of the project

towns 0.31 255/16.7.11

To reduce AT&C

loss of the project

towns

0.31 0.31 - - - - 0.31 - - 0.31 - -

15 MaduraiPart - B

Palani TownRAPDRP DSW

i) Replacement of existing 1 Ph meters by

tamper proof 1 Ph static meters

ii) Replacement of existing 3 Ph- 60 A

meters by tamper proof 3 Ph 10-60 A

static meters

Accurate recording of consumption and

also to avoid human error in taking

reading

2.17 255/16.7.11

Accurate recording of

consumption and also

to avoid human error

in taking reading

2.17 2.17 - - - - 2.17 - - 2.17 - -

16 MaduraiPart - B

Palani TownRAPDRP DSW

i) 22 kV HT line with ACSR 7/4.09 mm

(Raccoon) for TV Station Feeder

ii) 22 kV HT line with ACSR 7/3.35 mm

(Rabbit) for HVDS DT's

Load bifurcation to reduce outages and

to enhance operation flexibility 4.25 255/16.7.11

Load bifurcation to

reduce outages and to

enhance operation

flexibility

4.25 4.25 - - - - 4.25 - - 4.25 - -

17 MaduraiPart - B

Palani TownRAPDRP DSW Erection of new 200kVA/22kV DT's To offer load relief to the existing DTs 0.10 255/16.7.11

To offer load relief to

the existing DTs 0.10 0.10 - - - - 0.10 - - 0.10 - -

18 MaduraiPart - B

Palani TownRAPDRP DSW

i) Erection of new 200kVA/22kV DT's for

derating existing 500kVA/ 22kV DT by

introduction of HVDS

ii) Erection of new 100 kVA/ 22kV DT's

for derating existing 250kVA/22kV DT by

introduction of HVDS iii)

Erection of new 63 kVA/22kV DT's for

derating existing 100 kVA/22kV DT by

introduction of HVDS iv)

Erection of new 40 kVA/ 22kV DT's for

derating existing 100 kVA/22kV DT by

introduction of HVDS

To offer load relief to the existing DTs 2.10 255/16.7.11To offer load relief to

the existing DTs 2.10 2.10 - - - - 2.10 - - 2.10 - -

Page 167: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

19 MaduraiPart - B

Palani TownRAPDRP DSW

Proposed conversion of existing LT Single

Phase 3 Wire line into LT 3 Phase 5 Wire

Line with ACSR (7/3.35 mm & 7/2.59mm)

Rabbit and Weasel.

To augument the current carrying

capacity of the conductor 1.23 255/16.7.11

To augument the

current carrying

capacity of the

conductor

1.23 1.23 - - - - 1.23 - - 1.23 - -

20 MaduraiPart - B

Palani TownRAPDRP DSW

i) Erection of single pole mounted DT

structure with 25 kVA

ii) Erection of Double pole mounted DT

structure with 40 kVA, 63kVA, 100kVA

To reduce HT - LT ratio 2.71 255/16.7.11To reduce HT - LT

ratio 2.71 2.71 - - - - 2.71 - - 2.71 - -

21 MaduraiPart - B

Palani TownRAPDRP DSW

i) Wedge connector for DTs ii)Wedge

connector for LT Cut PointTo reduce HT - LT ratio 0.09 255/16.7.11

To reduce HT - LT

ratio 0.09 0.09 - - - - 0.09 - - 0.09 - -

22 MaduraiPart - B

Palani TownRAPDRP DSW

i) Replacement of existing 1 Ph meters by

tamper proof 1 Ph static meters

ii) Replacement of existing 3 Ph- 60 A

meters by tamper proof 3 Ph 10-60 A

static meters iii) Replacement of existing

3 Ph- 100 A meters by tamper proof 3 Ph

50-100 A static meters

Accurate recording of consumption and

also to avoid human error in taking

reading

0.66 255/16.7.11

Accurate recording of

consumption and also

to avoid human error

in taking reading

0.66 0.66 - - - - 0.66 - - 0.66 - -

23 MaduraiPart - B

Palani TownRAPDRP DSW

22 kV HT line with ACSR 7/4.09 mm

(Raccoon)

Load bifurcation to reduce outages and

to enhance operation flexibility 0.39 255/16.7.11

Load bifurcation to

reduce outages and to

enhance operation

flexibility

0.39 0.39 - - - - 0.39 - - 0.39 - -

24 MaduraiPart - B

Palani TownRAPDRP DSW

i) 22 kV HT line with ACSR 7/3.35 mm

(Rabbit) for HVDS DT's,

ii)ACSR 7/3.35 mm (Rabbit) to ACSR

7/4.09 mm (Raccon)

Load bifurcation to reduce outages and

to enhance operation flexibility

Improving network strength & Quality,

Replacement of aged conductors,

poles,etc

2.71 255/16.7.11

Load bifurcation to

reduce outages and to

enhance operation

flexibility

2.71 2.71 - - - - 2.71 - - 2.71 - -

25 MaduraiPart - B

Palani TownRAPDRP DSW

i) Erection of new 200kVA/22kV DT's for

derating existing 500kVA/22kV DT by

introduction of HVDS ii)Erection of new

100 kVA/22kV DT's for derating existing

250kVA/22kV DT by introduction of

HVDS iii) Erection of new

63 kVA/ 22kV DT's for derating existing

200 kVA/22kV DT by introduction of

HVDS iv)Erection of new 40 kVA/ 22kV

DT's for derating existing 100 kVA/22kV

DT by introduction of HVDS

To offer load relief to the existing DTs 1.03 255/16.7.11To offer load relief to

the existing DTs 1.03 1.03 - - - - 1.03 - - 1.03 - -

26 MaduraiPart - B

Palani TownRAPDRP DSW

Proposed conversion of existing LT Single

Phase 3 Wire line into LT 3 Phase 5 Wire

Line with ACSR (7/3.35 mm & 7/2.59mm)

Rabbit and Weasel.

To augument the current carrying

capacity of the conductor 0.28 255/16.7.11

To augument the

current carrying

capacity of the

conductor

0.28 0.28 - - - - 0.28 - - 0.28 - -

27 MaduraiPart - B

Palani TownRAPDRP DSW LT ABC Cable 3x70+1x16+1x50 Sq mm

Easy identification of fault and to avoid

electrical accident. 2.81 255/16.7.11

Easy identification of

fault and to avoid

electrical accident.

2.81 2.81 - - - - 2.81 - - 2.81 - -

28 MaduraiPart - B

Palani TownRAPDRP DSW

i) Erection of single pole mounted DT

structure with 25 kVA,

ii)Erection of Double pole mounted DT

structure with 40 kVA,

iii) Erection of Double pole mounted DT

structure with 63 kVA,

iv)Erection of Double pole mounted DT

structure with 100 kVA

To reduce HT - LT ratio 6.08 255/16.7.11To reduce HT - LT

ratio 6.08 6.08 - - - - 6.08 - - 6.08 - -

29 MaduraiPart - B

Palani TownRAPDRP DSW DP Structure with AB Switch

Easy isolation of 11 kV fault portion

and reduce the duration of outage. 0.27 255/16.7.11

Easy isolation of 11

kV fault portion and

reduce the duration of

outage.

0.27 0.27 - - - - 0.27 - - 0.27 - -

Page 168: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

30 MaduraiPart - B

Palani TownRAPDRP DSW

i)22 kV HT line with ACSR 7/4.09 mm

(Raccoon) for TV Station Feeder

ii)22 kV HT line with ACSR 7/3.35 mm

(Rabbit) for HVDS DT's

Load bifurcation to reduce outages and

to enhance operation flexibility 4.25 255/16.7.11

Load bifurcation to

reduce outages and to

enhance operation

flexibility

4.25 4.25 - - - - 4.25 - - 4.25 - -

31 MaduraiPart - B

Palani TownRAPDRP DSW

i) Erection of new 200kVA / 22kV DT's

ii) Erection of new 200kVA/22kV DT's for

derating existing 500kVA/ 22kV DT by

introduction of HVDS

iii) Erection of new 100 kVA/22kV DT's

for derating existing 250kVA/ 22kV DT by

introduction of HVDS iv)

Erection of new 63 kVA/22kV DT's for

derating existing 100 kVA/22kV DT by

introduction of HVDS v)Erection of new

40 kVA/22kV DT's for derating existing

100 kVA/22kV DT by introduction of

HVDS

To offer load relief to the existing DTs 2.20 255/16.7.11To offer load relief to

the existing DTs 2.20 2.20 - - - - 2.20 - - 2.20 - -

32 MaduraiPart - B

Palani TownRAPDRP DSW

Proposed conversion of existing LT Single

Phase 3 Wire line into LT 3 Phase

5 Wire Line with ACSR (7/3.35 mm &

7/2.59mm) Rabbit and Weasel.

To augument the current carrying

capacity of the conductor 1.23 255/16.7.11

To augument the

current carrying

capacity of the

conductor

1.23 1.23 - - - - 1.23 - - 1.23 - -

33 MaduraiPart - B

Palani TownRAPDRP DSW

i)Erection of single pole mounted DT

structure with 25 kVA

ii)Erection of Double pole mounted DT

structure with 40 kVA

iii) Erection of Double pole mounted DT

structure with 63 kVA

iv)Erection of Double pole mounted DT

structure with 100 kVA

To reduce HT - LT ratio 2.71 255/16.7.11To reduce HT - LT

ratio 2.71 2.71 - - - - 2.71 - - 2.71 - -

34 MaduraiPart - B

Palani TownRAPDRP DSW

i) Wedge connector for DTs ii)Wedge

connector for LT Cut PointTo reduce HT - LT ratio 0.09 255/16.7.11

To reduce HT - LT

ratio 0.09 0.09 - - - - 0.09 - - 0.09 - -

35 MaduraiPart - B

Palani TownRAPDRP DSW

22 kV HT line with ACSR 7/4.09 mm

(Raccoon) for TV Station Feeder

Load bifurcation to reduce outages and

to enhance operation flexibility 0.39 255/16.7.11

Load bifurcation to

reduce outages and to

enhance operation

flexibility

0.39 0.39 - - - - 0.39 - - 0.39 - -

36 MaduraiPart - B

Palani TownRAPDRP DSW

i) 22 kV HT line with ACSR 7/3.35 mm

(Rabbit) for HVDS DT's

ii)ACSR 7/3.35 mm (Rabbit) to ACSR

7/4.09 mm (Raccon)

Load bifurcation to reduce outages and

to enhance operation flexibility 1.80 255/16.7.11

Load bifurcation to

reduce outages and to

enhance operation

flexibility

1.80 1.80 - - - - 1.80 - - 1.80 - -

37 MaduraiPart - B

Palani TownRAPDRP DSW

i) Erection of new 200kVA/22kV DT's for

derating existing 500kVA/22kV DT by

introduction of HVDS ii)

Erection of new 100 kVA/22kV DT's for

derating existing 250kVA/22kV DT by

introduction of HVDS iii)

Erection of new 63 kVA/22kV DT's for

derating existing 200 kVA/22kV DT by

introduction of HVDS iv)Erection of new

40 kVA/22kV DT's for derating existing

100 kVA/22kV DT by introduction of

HVDS

To offer load relief to the existing DTs 1.03 255/16.7.11To offer load relief to

the existing DTs 1.03 1.03 - - - - 1.03 - - 1.03 - -

38 MaduraiPart - B

Palani TownRAPDRP DSW

Proposed conversion of existing LT Single

Phase 3 Wire line into LT 3 Phase 5 Wire

Line with ACSR (7/3.35 mm & 7/2.59mm)

Rabbit and Weasel.

To augument the current carrying

capacity of the conductor 0.28 255/16.7.11

To augument the

current carrying

capacity of the

conductor

0.28 0.28 - - - - 0.28 - - 0.28 - -

39 MaduraiPart - B

Palani TownRAPDRP DSW LT ABC Cable 3x70+1x16 + 1x50 Sq mm

Easy identification of fault and to avoid

electrical accident. 2.81 255/16.7.11

Easy identification of

fault and to avoid

electrical accident.

2.81 2.81 - - - - 2.81 - - 2.81 - -

Page 169: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

40 MaduraiPart - B

Palani TownRAPDRP DSW

i) Erection of single pole mounted DT

structure with 25 kVA

ii)Erection of Double pole mounted DT

structure with 40 kVA

iii)Erection of Double pole mounted DT

structure with 63 kVA

iv)Erection of Double pole mounted DT

structure with 100 kVA

To reduce HT - LT ratio 6.08 255/16.7.11To reduce HT - LT

ratio 6.08 6.08 - - - - 6.08 - - 6.08 - -

41 MaduraiPart - B

Palani TownRAPDRP DSW DP STRUCTURE WITH AB SWITCH

Easy isolation of 11 kV fault portion

and reduce the duration of outage. 0.27 255/16.7.11

Easy isolation of 11

kV fault portion and

reduce the duration of

outage.

0.27 0.27 - - - - 0.27 - - 0.27 - -

42 MaduraiPart - B

Palani Town33 / 11 kV New SS 1.52 CMD no:15(T.B) dt:8.1.16

To reduce HT - LT

ratio 1.52 1.52 - - - - 1.52 - - 1.52 - -

43 MaduraiPart - B

Palani TownSS Works New 33 kV feeder Erection 0.44 CMD no:15(T.B) dt:8.1.16

To reduce HT - LT

ratio 0.44 0.44 - - - - 0.44 - - 0.44 - -

44 MaduraiPart - B

Palani Town

RAPDRP

Schemes

i) 22 kV / 11 kV new feeder / feeder

bifrication ii)Arial

bunched cable iii)UG Cable

To meet out load growth 16.93 CMD no:15(T.B) dt:8.1.16To reduce HT - LT

ratio 16.93 16.93 - - - - 16.93 - - 16.93 - -

45 MaduraiPart - B

Palani TownDDUGJY 2.49

To reduce the HT and

LT Losses 2.49 2.49 - - - - 2.49 - - 2.49 - -

46 MaduraiPart - B

Palani TownIPDS

33 / 11 kV New SS , New 33 kV feeder

Erection, 22 kV / 11 kV new feeder /

feeder bifrication , Arial bunched cable ,

UG Cable, LT Line new feeder / feeder

bifrication , LT Line new feeder

augumentation / Re conductoring,

Capacitor bank, 22 kV / 11 kV HVDS,

Metering, Provision of solar panal etc.,

To reduce the system line loss and to

improve system stability. 55.70 CMD no:15(T.B) dt:8.1.16

To reduce HT - LT

ratio 55.70 55.70 - - - - 55.70 - - 55.70 - -

47 MaduraiPart - B

Palani Town

Others

(REC/PFC) - - - - - - - - - - - - -

48 MaduraiPart - B

Palani TownDCW Erection of HT and LT lines 1.14 Sanction by CE/SE/EE/AEE 1.14 1.14 - - - - - - - - - -

49 MaduraiPart - B

Palani Town

Any other related

works including

less than one

crore works

totally

- - - - - - - - - - - - -

1 Madurai Madurai EDCRevised 12th

Master plan New 33 /11 kV Nattarmangalam ss

To improve the Poor voltage regulation

of ex.11kV , Vaibhav # of 110/11kV

Uranganpatty SS

3.76 TANTRANSCO Proceedings

No.53 dt. 27.06.14

To improve the Poor

voltage regulation of

ex.11kV Vaibhav #

of 110/11kV

Uranganpatty SS

3.76 3.76 - - - - 3.76 - - 3.76 - -

2 Madurai Madurai EDCRevised 12th

Master plan New 33/11kV Valandhur SS

To improve the Poor voltage regulation

of ex.11kV Valandhur # of 110/11kV

Usilampatty SS

2.54 TANTRANSCO proceedings

no 21. dt. 13.01.14

To meet out load

growth 2.54 2.54 - - - - 2.54 - - 2.54 - -

3 Madurai Madurai EDCRevised 12th

Master plan

Establishment of 33/11kV Melavalavu

SS, Solankuruni SS, Kondayampatty SS,

Kailampatty SS, Kalyanipatty

(Theppathupatty) SS, Thadayampatty SS,

Karadipatty SS, Nilaiyur SS, Maravapatty

SS,Virathanur SS, Sakkimangalam SS,

Vappadapu SS,Ramianpatty SS,

Chokkanathanpatty SS, Mannadimangalam

SS, Melakkal SS, Mangulam SS,

Pappapattyl SS, Kanbur SS, Keelavalavu

SS, k.s.kotta iSS, Kumaram SS,

Nedukulam SS

To improve the Poor voltage regulation

of ex.11kV AV Rural # of 110/11kV

Narasingampatty SS

84.36 To Be approved by BoardTo improve the Poor

voltage regulation. 84.36 84.36 - - - - 84.36 - - 84.36 - -

Page 170: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

4 Madurai Madurai EDC DDUGJY Establishment of 33/11 kV Panaiyur ss

To improve the Poor voltage regulation

of ex.11kV Panaiyur # of 110/11kV

Anuappnadi SS

3.89

CMD/ TANGEDCO

proceedings no. 172 Dt.

25.04.15

To improve the Poor

voltage regulation of

ex.11kV Panaiyur #

of 110/11kV

Anuappnadi SS

3.89 3.89 - - - - 3.89 - - 3.89 - -

5 Madurai Madurai EDC DDUGJY

Establishment of 33/11kV Thiruvathavur

ss, Kottanathampatty SS, T.Krishnapuram

(M.kallupatty SS), Mangalrevu SS,

A.Kokkulam(Checkanurai SS),Edayapatty

SS, Nagari (Ayyankottai) SS, Alanganallur

SS

To improve the Poor voltage regulation

of ex.11kV Amoor r# of 110/11kV

Narasingampatty SS and 11kV

Thiruvathavur of 110/11kV Melur SS

- To Be approved by BoardTo improve the Poor

voltage regulation. - - - - - - - - - - - -

6 Madurai Madurai EDC DDUGJY

i) To Errect LT Over head line (3Ph 4 wire

Line- 6.26 KM) ii)To Errect New 11 kV

link Line work( Line- 15.35 KM)

iii)Errection of New 33 kV Pay & 33 kV

Line

To improve the Voltage Regulation 9.77 Approved DPRTo improve the

Voltage Regulation 9.77 9.77 - - - - 9.77 - - 9.77 - -

7 Madurai Madurai EDC NEFS Reconducting of aged conductors To reduce the line loss 4.84 Approved by RECTo reduce the line

loss 2.18 2.42 2.66 2.42 - - 2.42 2.42 - 2.18 2.66 -

8 Madurai Madurai EDCRevised 12th

Master plan

To Errect New11 kV OH Line & UG

Cabel Work at Various SS To Improve the Voltage Regulation 2.76 Approved By TANGEDCO

To Improve the

Voltage Regulation 2.76 2.76 - - - - 2.76 - - 2.76 - -

9 Madurai UsilampattyRAPDRP -

DSW

i) New feeders 11kV, ACSR 7/4.09mm

Conductor, ii)New

feeders 11kV 7/3.35 mm OH (ACSR

Rabbit)

Load bifurcation to reduce over loading

and to reduce the Line losses 0.92

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To improve the

voltage stability and

to minimize the

AT&C Losses

0.92 0.92 - - - - 0.92 - - 0.92 - -

10 Madurai UsilampattyRAPDRP -

DSW

i)Strengthening of existing 11 kV OH

feeder from ACSR 7/2.59 mm to 7/4.09

mm with DP Structures ii)Strengthening of

existing 11 kV OH feeder from ACSR

7/2.59 mm to 7/3.35 mm iii)New LT

feeders with ACSR 7/3.35 mm Conductor

To strengthen the existing conductor to

improve the Line stability and to reduce

IR losses

0.42

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To improve the

voltage stability and

to minimize the

AT&C Losses

0.42 0.42 - - - - 0.42 - - 0.42 - -

11 Madurai UsilampattyRAPDRP -

DSW

Derating with 40 kVA, 63kVA, 250kVA

DTs To offer load relief to the existing DTs 0.06

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To reduce LT Long

lines and to minimize

the AT&C losses

0.06 0.06 - - - - 0.06 - - 0.06 - -

12 Madurai UsilampattyRAPDRP -

DSW Erection of New 25, 40, 63, 100 kVA DTs 2.50 2.50 2.50 - - - - 2.50 - - 2.50 - -

13 Madurai Usilampatty IPDS

i) Establishment of 2 X 8 MVA, 33/11 kV

SS in Alanganallur with land cost

ii)Extension of 33 kV HT Line from

110kV Manickampatty SS to Proposed

Alanganallur SS

iii)Erection of 1 No 11 kV Capacitor Bank

with a capacity of 2.47 MVAR

To meet out the load growth and to

reduce the over loading of nearby Sub-

stations

3.90

(Per.) CMD TANGEDCO

Proceedings No:15 Dt:

08.01.2016.

To improve the

voltage stability, to

minimize the AT& C

Losses and to

improve the

efficiency of the

Power system and

Capacitor bank for

VAR Compensation

- - - - 3.90 3.90 - - 3.90 - - 3.90

14 Madurai Usilampatty IPDSReplacement of single phase and three

phase EM/HQ meter with static meters

Accurate recording of consumption and

also to avoid human error in taking

reading

4.82

(Per.) CMD TANGEDCO

Proceedings No:15 Dt:

08.01.2016.

For improving the

Revenue

Augumentation

- - - - 4.82 4.82 - - 4.82 - - 4.82

15 Madurai Usilampatty IPDS - DSW

i)11 kV New feeders ACSR 7/4.09mm &

7/3.35mm Conductor

ii)New LT feeders with ACSR 7/3.35 mm

Conductor iii)

Strengthening of existing LT OH kV OH

feeder from ACSR 7/2.59 mm to 7/3.35

mm

Load bifurcation to reduce over loading

and to reduce the Line losses 11.14

(Per.) CMD TANGEDCO

Proceedings No:15 Dt:

08.01.2016.

To improve the

voltage stability and

to minimize the

AT&C Losses

- - - - 11.14 11.14 - - 11.14 - - 11.14

16 Madurai Usilampatty IPDS - DSW Derating with 100 kVA DTs 0.32

(Per.) CMD TANGEDCO

Proceedings No:15 Dt:

08.01.2016.

To reduce LT Long

lines and to minimize

the AT&C losses

- - - - 0.32 0.32 - - 0.32 - - 0.32

Page 171: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

17 Madurai Usilampatty IPDS - DSW Laying of AB cables HT & LT 1.02

(Per.) CMD TANGEDCO

Proceedings No:15 Dt:

08.01.2016.

To Maintain the

safety and to

minimize the theft of

Energy

- - - - 1.02 1.02 - - 1.02 - - 1.02

18 Madurai Usilampatty IPDS - DSW Erection of New 25 , 40, 63 kVA DTs 3.49

(Per.) CMD TANGEDCO

Proceedings No:15 Dt:

08.01.2016.

- - - - 3.49 3.49 - - 3.49 - - 3.49

19 Madurai Usilampatty IPDSErection of 7 No 11 kV Breaker with bay

extension

To meet out the load growth and to

reduce the over loading in VCB 0.91

(Per.) CMD TANGEDCO

Proceedings No:15 Dt:

08.01.2016.

- - - - 0.91 0.91 - - 0.91 - - 0.91

1 TirunelveliVirudhunagar

EDCCapital

Extension of LT & LT CT, HT Supply to

9200 Nos various tariff services during 16-

17

New service connections effected 2.40 Various approval from

CE/Dist, SE/Dist & EE/Dist

Rev from Sale of

Power will be

increased by 120

crores

2.40 2.40 - - - - 2.40 - - 2.40 - -

2 TirunelveliVirudhunagar

EDCCapital

Extension of LT & LT CT, HT Supply to

10000 Nos various tariff services during 17-

18

New service connections effected 2.50 Various approval from

CE/Dist, SE/Dist & EE/Dist

Rev from Sale of

Power will be

increased by 130

crores

- - 2.50 2.50 - - - 2.50 - - 2.50 -

3 TirunelveliVirudhunagar

EDCCapital

Extension of LT & LT CT, HT Supply to

11000 .Nos various tariff services during

18-19

New service connections effected 2.75 Various approval from

CE/Dist, SE/Dist & EE/Dist

Rev from Sale of

Power will be

increased by 140

crores

- - - - 2.47 2.75 - - 2.75 - - 2.47

4 TirunelveliVirudhunagar

EDCCapital

33 kV and 11 kV link line with

Velayauthapuram 110/33 kV New SS at

Sivakasi Division

To improve HT Regulation and line

loss 12.38 BP NO 10 dt 10.1.2014

To improve

distribution capacity

and to reduce line

loss

12.38 12.38 - - - - 12.38 - - 12.38 - -

5 TirunelveliVirudhunagar

EDCCapital

Feeder bifurcation of 11 kV Boomalaipatty

feeder at Aruppukottai Division

To improve HT Regulation and line

loss 0.80 Yet to be sanctioned

To improve HT

Regulation and line

loss

0.80 0.80 - - - - 0.80 - - 0.80 - -

6 TirunelveliVirudhunagar

EDCCapital

New 11kV and 33 kV link line with

Naranapuram 33/11kV New SS at Sivakasi

Division

To improve HT Regulation and line

loss 3.08 Yet to be sanctioned

To improve

distribution capacity

and to reduce line

loss

- - 3.08 3.08 - - - 3.08 - - 3.08 -

7 TirunelveliVirudhunagar

EDCCapital

New 11kV and 33 kV link line with

Nallamanaickenpatty 33/11kV New SS at

Sivakasi Division

To improve HT Regulation and line

loss 1.11 Yet to be sanctioned

To improve

distribution capacity

and to reduce line

loss

- - 1.11 1.11 - - - 1.11 - - 1.11 -

8 TirunelveliVirudhunagar

EDCCapital

33 kV link line with Nenmeni 33/11 kV

New SS at Sivakasi Division

To improve HT Regulation and line

loss 0.58 BP NO 10 dt 10.1.2014

To improve

distribution capacity

and to reduce line

loss

- - 0.58 0.58 - - - 0.58 - - 0.58 -

9 TirunelveliVirudhunagar

EDCCapital

Feeder bifurcation of 11 kV

Venkateshwarapuram feeder at

Srivilliputhur Division

To improve HT Regulation and line

loss 0.70 Yet to be sanctioned

To improve

distribution capacity

and to reduce line

loss

- - - - 0.63 0.70 - - 0.70 - - 0.63

10 TirunelveliVirudhunagar

EDCCapital

New 11kV and 33 kV link line with

A.Thulukapatty 33/11kV New SS at

Srivilliputhur Division

To improve HT Regulation and line

loss 3.93 Yet to be sanctioned

To improve

distribution capacity

and to reduce line

loss

- - 3.93 3.93 - - - 3.93 - - 3.93 -

11 TirunelveliVirudhunagar

EDCImprovement

To improve regulation of 33 kV line Aged

conductor G.N.Patty feeder

To improve HT Regulation and line

loss 0.63 Yet to be sanctioned

To improve

distribution capacity

and to reduce line

loss

- - - - 0.57 0.63 - - 0.63 - - 0.57

12 TirunelveliVirudhunagar

EDCImprovement

Replacement & Enhancement of Dist

Transformers during 16-17To improve & stabilise voltage 0.75 Yet to be sanctioned

To stabilise the

voltage and to initiate

new LT & HT

services

0.75 0.75 - - - - 0.75 - - 0.75 - -

Page 172: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

13 TirunelveliVirudhunagar

EDCImprovement

Replacement & Enhancement of Dist

Transformers during 17-18To improve & stabilise voltage 0.80 Yet to be sanctioned

To stabilise the

voltage and to initiate

new LT & HT

services

- - 0.80 0.80 - - - 0.80 - - 0.80 -

14 TirunelveliVirudhunagar

EDCImprovement

Replacement & Enhancement of Dist

Transformers during 18-19To improve & stabilise voltage 0.80 Yet to be sanctioned

To stabilise the

voltage and to initiate

new LT & HT

services

- - - - 0.72 0.80 - - 0.80 - - 0.72

15 TirunelveliVirudhunagar

EDCImprovement

Replacement and strengthening of old

conductors during 16-17

To avoid line loss and to improve

voltage regulation 5.00 Yet to be sanctioned

To stabilise the

voltage and to initiate

new LT & HT

services

5.00 5.00 - - - - 5.00 - - 5.00 - -

16 TirunelveliVirudhunagar

EDCImprovement

Replacement and strengthening of old

conductors during 17-18

To avoid line loss and to improve

voltage regulation 5.00 Yet to be sanctioned

To stabilise the

voltage and to initiate

new LT & HT

services

- - 5.00 5.00 - - - 5.00 - - 5.00 -

17 TirunelveliVirudhunagar

EDCImprovement

Replacement and strengthening of old

conductors during 18-19

To avoid line loss and to improve

voltage regulation 5.00 Yet to be sanctioned

To stabilise the

voltage and to initiate

new LT & HT

services

- - - - 4.50 5.00 - - 5.00 - - 4.50

18 TirunelveliVirudhunagar

EDCDDUGJY

Establishment of 33 kV sub stations at

Sivakasi ESI SS

To improve HT Regulation and line

loss 3.08 BP no 63 dt 25.7.2015

To improve

distribution capacity

and to reduce line

loss

3.08 3.08 - - - - 3.08 - - 3.08 - -

19 TirunelveliVirudhunagar

EDCDDUGJY

Establishment of 33 kV sub stations at

A.Thullukapatty (Srivilliputhur Divisiopn)

To improve HT Regulation and line

loss 3.88 BP no 202 dt 31.5.2016

To improve

distribution capacity

and to reduce line

loss

- - 3.88 3.88 - - - 3.88 - - 3.88 -

20 TirunelveliVirudhunagar

EDCDDUGJY

Additional 1 No 8 MVA Power

Transformer at Palayampatty 33/11 kV SSTo adjust over load in SS 0.78

CE Sanctioon No 29 dt

29.10.2013

To adjust over load

in SS - - 0.78 0.78 - - - 0.78 - - 0.78 -

21 TirunelveliVirudhunagar

EDCDDUGJY

Additional 1 No 8 MVA Power

Transformer at Narikudi 33/11 kV SSTo adjust over load in SS 1.71

CE Sanctioon No 29 dt

13.11.2015

To adjust over load

in SS - - 1.71 1.71 - - - 1.71 - - 1.71 -

22 TirunelveliVirudhunagar

EDCDDUGJY

Enhancement of Power Transformer 5

MVA to 8 MVA at Mallipudur 33/11 kV

SS

To adjust over load in SS 1.71 Yet to be sanctionedTo adjust over load

in SS - - - - 1.71 1.71 - - 1.71 - - 1.71

23 TirunelveliVirudhunagar

EDCDDUGJY

Enhancement of Power Transformer 5

MVA to 8 MVA at Vembakottai 33/11 kV

SS

To adjust over load in SS 1.71 Yet to be sanctionedTo adjust over load

in SS - - - - 1.71 1.71 - - 1.71 - - 1.71

24 TirunelveliVirudhunagar

EDCIPDS

New SS & DT erection at Aruppukottai

Division

To improve distribution capacity and to

reduce line loss 1.60

(Per) CMD TANGEDCO

Proceedings No.15 dt.

08.01.16

To improve

distribution capacity

and to reduce line

loss

0.72 0.80 0.66 0.64 0.22 0.16 0.80 0.64 0.16 0.72 0.66 0.22

25 TirunelveliVirudhunagar

EDCIPDS

New SS & DT erection at Virudhunagar

Division

To improve distribution capacity and to

reduce line loss 2.96

(Per) CMD TANGEDCO

Proceedings No.15 dt.

08.01.16

To improve

distribution capacity

and to reduce line

loss

1.34 1.49 1.21 1.18 0.41 0.29 1.49 1.18 0.29 1.34 1.21 0.41

26 TirunelveliVirudhunagar

EDCIPDS

New SS & DT erection at Sivakasi

Division

To improve distribution capacity and to

reduce line loss 8.90

(Per) CMD TANGEDCO

Proceedings No.15 dt.

08.01.16

To improve

distribution capacity

and to reduce line

loss

4.00 4.45 3.65 3.56 1.25 0.89 4.45 3.56 0.89 4.00 3.65 1.25

27 TirunelveliVirudhunagar

EDCIPDS

New SS & DT erection at Rajapalayam

Division

To improve distribution capacity and to

reduce line loss 9.02

(Per) CMD TANGEDCO

Proceedings No.15 dt.

08.01.16

To improve

distribution capacity

and to reduce line

loss

4.06 4.51 3.70 3.61 1.26 0.90 4.51 3.61 0.90 4.06 3.70 1.26

28 TirunelveliVirudhunagar

EDCIPDS

New SS & DT erection at Srivilliputhur

Division

To improve distribution capacity and to

reduce line loss 14.32

(Per) CMD TANGEDCO

Proceedings No.15 dt.

08.01.16

To improve

distribution capacity

and to reduce line

loss

6.44 7.16 5.88 5.73 2.00 1.43 7.16 5.73 1.43 6.44 5.88 2.00

Page 173: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

29 TirunelveliVirudhunagar

EDC

Others

(REC/PFC) - - - - - - - - - - - - -

30 TirunelveliVirudhunagar

EDC

Any other related

works including

less than one

crore works

totally

Land cost for Perianaickenpatty,

Rajapalayam, Mudukkankulam,

Veeracholam, Iyankollankondan,

Rajapalayam Urban 33/11 kV SS

To improve distribution capacity and to

reduce line loss 3.11 Yet to approved

To improve

distribution capacity

and to reduce line

loss

- - 1.71 1.90 1.40 1.21 - 1.90 1.21 - 1.71 1.40

1 TirunelveliTirunelveli

EDCCapital

Extension of LT & LT CT, HT Supply to

59806 Nos various tariff services

[except Agri]

New service connections effected 58.00 To be approved by the

competent authority

To improve

distribution capacity

and reduce line loss

58.00 58.00 - - - - 58.00 - - 58.00 - -

2 TirunelveliTirunelveli

EDCCapital New SC's Agriculture Normal Perioty New service connections effected 4.00

To be approved by the

competent authority

To improve

distribution capacity

and reduce line loss

4.00 4.00 - - - - 4.00 - - 4.00 - -

3 TirunelveliTirunelveli

EDCCapital

Establishment of 33 kV sub stations at 37

of 7 Division New service connections effected 3.72

To be approved by the

competent authority

To improve

distribution capacity

and reduce line loss

3.72 3.72 - - - - 3.72 - - 3.72 - -

4 TirunelveliTirunelveli

EDCCapital

Proposed for STatIC Meter [ Singl Phase &

Three Phase] for 7 division New service connections effected 30.69

To be approved by the

competent authority

To improve

distribution capacity

and reduce line loss

30.69 30.69 - - - - 30.69 - - 30.69 - -

5 TirunelveliTirunelveli

EDCCapital

HT New feeder from SS

[11kV/22kV/33kV] , Feeder Bifurcation

HT link line works

New service connections effected 8.93 To be approved by the

competent authority

To improve

distribution capacity

and reduce line loss

8.93 8.93 - - - - 8.93 - - 8.93 - -

6 TirunelveliTirunelveli

EDCCapital

proposed for 2 x 8 MVA power

Transformer of various sub station of 7

division [Master plan ]

Essentially needed to bring the 11 kV

Kadamadai feeder of Valliyoor SS

Regulation within limit, low voltage

packets removal and line loss reduction

51.80 To be approved by the

competent authority

To improve

distribution capacity

and reduce line loss

15.53 17.26 17.26 17.26 17.28 17.28 17.26 17.26 17.28 15.53 17.26 17.28

7 TirunelveliTirunelveli

EDCImprovement

Improvement works- SS, Enhancement of

DT & Pr.Trs in sub station, sub station

related works.

To improve the network and Load

growth 10.00

To be approved by the

competent authority

To improve

distribution capacity

and reduce line loss

10.00 10.00 - - - - 10.00 - - 10.00 - -

8 TirunelveliTirunelveli

EDCImprovement

Improvement works- Erection of DT, New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes of various sub station

To improve the network and Load

growth 14.00

To be approved by the

competent authority

To improve

distribution capacity

and reduce line loss

14.00 14.00 - - - - 14.00 - - 14.00 - -

9 TirunelveliTirunelveli

EDCRGGVY

Erection of HVDS with HT & LT line

25kVA at 7 divisionTo improve village infra structure 12.77

[BP] TANGEDCO Pro No 63

Dt 05-06-2012

To improve

distribution capacity

and reduce line loss

2.57 2.86 10.20 9.91 - - 2.86 9.91 - 2.57 10.20 -

10 TirunelveliTirunelveli

EDCDDUGJY

Erection of 33/11kV New ss of

Moodraaippu Parappadi & Vellankulam ,

Enhancement of Power transformer of

MOOLakaraipatti , Reddiyarpatti and

provision for additional Power transformer

at Mangammasali

To improve the network and Load

growth 9.90

SE/RE&I[D]/EE/PCI-1/AEE-

1/FDDUGJY/D62/15 DT 08-

04-2015

To improve

distribution capacity

and reduce line loss

4.45 4.95 5.45 4.95 - - 4.95 4.95 - 4.45 5.45 -

11 TirunelveliTirunelveli

EDCDDUGJY

Erection of 11kV line 7/4/09 ACSR

conductor for new feeder , Erection of

33kV line with 7/4.09 DOG and consumer

meters

To improve the network and Load

growth 11.45

SE/RE&I[D]/EE/PCI-1/AEE-

1/FDDUGJY/D62/15 DT 08-

04-2015

To improve

distribution capacity

and reduce line loss

5.16 5.73 6.29 5.72 - - 5.73 5.72 - 5.16 6.29 -

12 TirunelveliTirunelveli

EDCIPDS

33kV OH Line New feeder with ACSR

Dog conuctor from 110/33/11kV various

33/11kV sub Station of 7 Division of this

circle

To improve the network and Load

growth 5.75

[Per] CMD BP No 13 Dt 08-

01-2016

To improve

distribution capacity

and reduce line loss

1.80 2.00 2.00 2.00 1.95 1.75 2.00 2.00 1.75 1.80 2.00 1.95

13 TirunelveliTirunelveli

EDCIPDS

33/11 Alwarkurichi manned outdoor SS

with 2 X 8 MVA power transformer

at Alwarkuruchi & Chermadevi

[Kallidaikuruchi division] Nanguneri

[Rural division] Keelpavoor and S.PV

karai [ Tenkasi division and Pangudi [

Valliyoor]

To Improve the T & D losses

to the maximum extent and improve

the infra structure of the system

17.94 [Per] CMD BP No 13 Dt 08-

01-2016

To improve

distribution capacity

and reduce line loss

8.07 8.97 7.37 7.19 2.50 1.78 8.97 7.19 1.78 8.07 7.37 2.50

Page 174: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

14 TirunelveliTirunelveli

EDCIPDS

Erection of 11kV new line for HVDS

erection , New feeders link the line work

To Improve the T & D losses

to the maximum extent and improve

the infra structure of the system

17.04 [Per] CMD BP No 13 Dt 08-

01-2016

To improve

distribution capacity

and reduce line loss

7.80 8.67 6.85 6.64 2.39 1.73 8.67 6.64 1.73 7.80 6.85 2.39

15 TirunelveliTirunelveli

EDCIPDS

Erection of 11kV AB cable with 3 x

95sq.mm, Erection of LT AB cable with

1.1 kV class 3 phase aerial bunched cable

of size 3 x 70 +1x16+1x50 sq mm and

Laying cable 11kV UG cable with 3 x 630

& 3x 300 sq mm for HVDS erection in

religious important places

To Improve the T & D losses to

the maximum extent and improve the

infra structure of the system

3.72 [Per] CMD BP No 13 Dt 08-

01-2016

To improve

distribution capacity

and reduce line loss

1.67 1.86 2.05 1.86 - - 1.86 1.86 - 1.67 2.05 -

16 TirunelveliTirunelveli

EDCIPDS

11kV New feeder breaker at existing

110/11kV all 33kV ss, Erection of

100kVA DT , Ltnew line HVDS with

feeder bifurcation , conversion of existing

single phase 2wire line into three phase 4

wire line with rabbit condut and provision

for 2.4 MVAR capacitor bank with 11kV

bay extension in 110/11kV at 34 towns in 7

division

To Improve the T & D losses to the

maximum extent and improve the

infra structure of the system

10.44 [Per] CMD BP No 13 Dt 08-

01-2016

To improve

distribution capacity

and reduce line loss

3.13 3.48 3.48 3.48 3.83 3.48 3.48 3.48 3.48 3.13 3.48 3.83

17 TirunelveliTirunelveli

EDCIPDS

Erection of Single pole mounted DT

structure with 16kVA and 25kVA and

erection of double pole mounted DT

structure with 40kVA and 63kVA at 34

Towers in 7 divisiom

To Improve the T & D losses to the

maximum extent and improve the

infra structure of the system

25.06 [Per] CMD BP No 13 Dt 08-

01-2016

[Per] CMD BP No

13 Dt 08-01-2016 7.51 8.35 8.35 8.35 9.20 8.36 8.35 8.35 8.36 7.51 8.35 9.20

18 TirunelveliTirunelveli

EDCIPDS

Consumer for existing unmetered

connection replacement of faulty meteres

electro mechanical meter of Single phase

and three phase , Erection of Solar panel in

CE/SE / office proposed new SS and EE

office with own building

10.44 [Per] CMD BP No 13 Dt 08-

01-2016

To improve

distribution capacity

and reduce line loss

3.13 3.48 3.48 3.48 3.83 3.48 3.48 3.48 3.48 3.13 3.48 3.83

19 TirunelveliTirunelveli

EDCDCW

New Agriculture SC's [SFS] No of service

875New service connections effected 10.50

To be approved by the

competent authority

To improve

distribution capacity

and reduce line loss

10.50 10.50 - - - - - - - - - -

1 TirunelveliKanyakumari

EDCCapital

Extension of LT & LT CT, HT Supply to

1,50,000 Nos various tariff servicesNew service connections effected 40.00 Increase in revenue 11.25 12.50 13.40 13.50 13.95 14.00 12.50 13.50 14.00 11.25 13.40 13.95

2 TirunelveliKanyakumari

EDCCapital

Establishment of 33 kV sub stations at

Aloor

Due to Load growth in and around

Aloor area 7.83 Approved in 12th master plan 4.35 4.83 3.48 3.00 - - 4.83 3.00 - 4.35 3.48 -

3 TirunelveliKanyakumari

EDCCapital

Establishment of 33 kV sub stations at

Suralacode

Due to Load growth in and around

Suralacode area 2.40 Approved in 12th master plan 0.72 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.72 0.80 0.80

4 TirunelveliKanyakumari

EDCImprovement

Improvement works- SS, Enhancement of

Pr.Trs in sub station, sub station related

works.

To improve the network and Load

growth 5.36 Estimate submitted

to meet out load

growth 5.36 5.36 - - - - 5.36 - - 5.36 - -

5 TirunelveliKanyakumari

EDCImprovement

Improvement works- Erection of DT, New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 18.00

to avoid line loss &

to initiate new HT &

LT services

4.91 5.46 5.95 6.00 6.49 6.54 5.46 6.00 6.54 4.91 5.95 6.49

6 TirunelveliKanyakumari

EDC

RAPDRP

Scheme I

(Part B)

Enhancement of power transformer in

Valankumaravilai 33kVSSAdm.Appl. Accorded by CMD 0.51

CMD TANGEDCO

Proceedings PB.No.123 dt

1.4.14

To improve infra

structure of the

distribution system

0.51 0.51 - - - - 0.51 - - 0.51 - -

7 TirunelveliKanyakumari

EDC

RAPDRP

Scheme I (Part

A)

Provision of IT equipments , metering of

DTs, Feeders and ring fencing

locations(Part-A).

Adm.Appl. Accorded by CMD 4.09 Loan no 36133011 dt

27.02.09

To improve infra

structure of the

distribution system

4.09 4.09 - - - - 4.09 - - 4.09 - -

8 TirunelveliKanyakumari

EDC

RAPDRP

Scheme I (Part

A)

Erection of new33 kV line, new 11 kV line,

provision of new HVDS, Wedge

Connectors. Part-B Nagercoil Distribution

Strengthening Works

Adm.Appl. Accorded by CMD 23.68

CMD TANGEDCO

Proceedings PB.No.123 dt

1.4.14

To improve

distribution System

and to reduce line

loss

23.68 23.68 - - - - 23.68 - - 23.68 - -

Page 175: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

9 TirunelveliKanyakumari

EDC

RAPDRP

Scheme I (Part

A)

Provision of IT equipments , metering of

DTs, Feeders and ring fencing locations.

Kollencode PartA Project Area

Adm.Appl. Accorded by CMD 0.80 Loan no 36133009 dt

27.02.09

To improve infra

structure of the

distribution system

0.80 0.80 - - - - 0.80 - - 0.80 - -

10 TirunelveliKanyakumari

EDC

RAPDRP

Scheme I (Part

A)

Erection of new 11 kV line, provision of

new HVDS, Lt strengthening &

Conversion Kollencode PartA Distribution

Strengthening Works

Adm.Appl. Accorded by CMD 1.56 TANGEDCO Proceedings

NO.124 dt 8.4.11

To improve

distribution system

and to reduce line

loss

1.56 1.56 - - - - 1.56 - - 1.56 - -

11 TirunelveliKanyakumari

EDC

RAPDRP

Scheme I (Part

B)

Establishment of 33 kV sub stations at

VadaseryTransformers & Other civil works 2.13

TANGEDCO Proceedings

NO.123 Dated 01.04.14

To improve infra

structure of the

distribution system

2.13 2.13 - - - - 2.13 - - 2.13 - -

12 TirunelveliKanyakumari

EDCDDUGJY

Introduction of 33kV source at

Thengampudur SS

For 33/11kV indoor cap SS under

DDUGJY scheme 3.00

Reduction of AT&C

Loss 1.80 2.00 1.20 1.00 - - 2.00 1.00 - 1.80 1.20 -

13 TirunelveliKanyakumari

EDCDDUGJY Rajakkamangalam 33/11kV Sub-Station 2.12

REC/CHN/DDUGJY/2015-

16/ dt.05.01.16

Reduction of AT&C

Loss 1.01 1.12 1.11 1.00 - - 1.12 1.00 - 1.01 1.11 -

14 TirunelveliKanyakumari

EDCIPDS

Introduction of 33kV source at

Kanyakumari SS

For 33/11kV indoor cap SS under IPDS

scheme 3.00

Reduction of AT&C

Loss 1.80 2.00 1.20 1.00 - - 2.00 1.00 - 1.80 1.20 -

15 TirunelveliKanyakumari

EDCIPDS

Introduction of 33kV source at

cheramangalam SS

For 33/11kV muttom SS under IPDS

scheme 1.89 1.89 1.89 - - - - 1.89 - - 1.89 - -

16 TirunelveliKanyakumari

EDCIPDS

Erection of New 33/11 kV sub stations,

New 33 kV & 11 kV line, HVDS

Distribution Strengthening Works

Adm.Appl. Accorded by CMD 58.86 TANGEDCO Proceedings

No. 15, DT..08.01.2016 27.00 30.00 31.86 28.86 - - 30.00 28.86 - 27.00 31.86 -

17 TirunelveliKanyakumari

EDCDCW

Consumer contribution for extension of

lines, erection of poles, line materials,

vehicle dashing of poles etc

48.00 13.50 15.00 15.90 16.00 18.60 17.00 - - - - - -

1 Tirunelveli Tuticorin EDC CapitalExtension of LT & LT CT, HT Supply to

35807 .Nos various tariff services

New service connections effected

32.13 (Estimate cost for the 2014to

2016)

3.90 3.90 3.90 - - - - 3.90 - - 3.90 - -

2 Tirunelveli Tuticorin EDC Capital

EO HT Supply to M/s.Power Grid at

Ettayapuram for a demand of 150 kVA at

33kV level.

0.49 Pro.No.238 /02.09.14

Separate feeder from

Eppodum-vendran to

Ettayapuram.

0.49 0.49 - - - - 0.49 - - 0.49 - -

3 Tirunelveli Tuticorin EDC Capital Baba atomic (expected) 3.50 New HT demand. - - 3.50 3.50 - - - 3.50 - - 3.50 -

4 Tirunelveli Tuticorin EDC Capital KITCO Ltd. (expected) 4.00 New HT demand. - - - - 3.60 4.00 - - 4.00 - - 3.60

5 Tirunelveli Tuticorin EDC Capital 33/11kV Vemboor (Vilathikulam)To improve the voltage and reduce line

loss . 0.42

(Per) CMD Pro.No. 479/

4.11.2013

Improve the H.T.

regulation and reduce

line loss.

0.42 0.42 - - - - 0.42 - - 0.42 - -

6 Tirunelveli Tuticorin EDC Capital Vallanadu 33/11kV SSTo improve the voltage and reduce line

loss 3.40

(Per) CMD TAN-GEDCO

Pro.No. 447/ 9.10.15

New SS/New HT

service 3.40 3.40 - - - - 3.40 - - 3.40 - -

7 Tirunelveli Tuticorin EDC Capital Chettikurichi 33/11kV SSTo improve the voltage and reduce line

loss 2.88

New SS. to Elimate

66/11kV Line Tap

SS.

- - - - 2.59 2.88 - - 2.88 - - 2.59

8 Tirunelveli Tuticorin EDC Capital Padukkapathu 33/11kV SS To improve the voltage and reduce line

loss 2.30

New SS. to improve

voltage. - - - - 2.07 2.30 - - 2.30 - - 2.07

9 Tirunelveli Tuticorin EDC Improvement

Improvement works- Erection of DT, New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 0.38 - - - - 0.34 0.38 - - 0.38 - - 0.34

10 Tirunelveli Tuticorin EDC

RAPDRP

Scheme I

(Part A/

Part B)

- - - - - - - - - - - - -

Page 176: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

11 Tirunelveli Tuticorin EDC

110/22KVSS Enhancement Transformer

from 16MVA to 25MVA, and Erection of

2 Nos. 33/11KV new unmaned SS,

Erection of New DTs 100KVA&250KVA,

New 33 & 11KV line line feeders, APFC

panels, metering, 22KV line feeder,

strengthning conductor, Augmentation,

HVDS, wedge connectiors, mobile service

center and Auto reclosure and FPIs.

Distribution box at DTs & Poles .

Adm. Appl. Accorded by CMD 49.41 LOAN Ref. No. 36334015,

36334023 & 36133016

To improve

distribution capacity

and to reduce line

loss

26.68 29.65 7.41 4.93 15.32 14.83 29.65 4.93 14.83 26.68 7.41 15.32

12 Tirunelveli Tuticorin EDCRAPDRP

Scheme II - - - - - - - - - - - - -

13 Tirunelveli Tuticorin EDCRAPDRP

Scheme III etc - - - - - - - - - - - - -

14 Tirunelveli Tuticorin EDCRGGVY

Schemes - - - - - - - - - - - - -

15 Tirunelveli Tuticorin EDC DDUGJY

Enhancment of 33/11KV PT capacity from

1*5MVA to 1*8MVA at Kulathur

33/11KV SS - 1 No.

To avoid over loading 0.50 (Per)CMDTANGEDCO

No.357/ dt.23.08.13. 0.50 0.50 - - - - 0.50 - - 0.50 - -

16 Tirunelveli Tuticorin EDC DDUGJY

Enhancment of 33/11KV PT capacity from

2*5MVA to 2*8MVA at Srivaikundam

33/11KV SS - 2 Nos.

To avoid over loading 1.00 (Per)CMDTANGEDCO

No.356/ dt.23.08.2013 - - 1.00 1.00 - - - 1.00 - - 1.00 -

17 Tirunelveli Tuticorin EDC DDUGJY

Enhancment of 33/11KV PT capacity from

2*5MVA to 2*8MVA at Tiruchendur

33/11KV SS - 2 Nos.

To avoid over loading 1.00 (Per)CMDTANGEDCO

No.161/ dt.29.04.2014. 1.00 1.00 - - - - 1.00 - - 1.00 - -

18 Tirunelveli Tuticorin EDC DDUGJY

Enhancment of 33/11KV PT capacity from

1*3MVA to 1*8MVA at Ottanatham

33/11KV SS - 1 No.

To avoid over loading 0.57 (Per)CMDTANGEDCO

No.367/ dt.30.8.13. 0.57 0.57 - - - - 0.57 - - 0.57 - -

19 Tirunelveli Tuticorin EDC DDUGJY

Conversion of Single phase

Electromechanical meter to static meter. -

50000 Nos.

To fetch correct revenue 3.85 3.85 3.85 - - - - 3.85 - - 3.85 - -

20 Tirunelveli Tuticorin EDC DDUGJY

Conversion of Three phase

Electromechanical meter to static meter. -

27049 Nos.

To fetch correct revenue - - - - - - - - - - - - -

21 Tirunelveli Tuticorin EDC DDUGJY

33/11KV Nazareth SS to bifurcation of

existing Mill feeder & Enhancement of PT

& HVDS&Replacement of meters.

Adm.Appl.Accorded by CMD 3.08 (Per)CMD TAN-

GEDCO/Pro.No.15/dt. 8.1.16

To improve

distribution capacity

and to reduce line

loss

1.39 1.54 1.26 1.23 0.43 0.31 1.54 1.23 0.31 1.39 1.26 0.43

22 Tirunelveli Tuticorin EDC DDUGJY Erection of HVDS and Replacement of

Meters

To improve the HT Regulation and line

loss 16.70

(Per)CMD TANGEDCO

Pro.No.15/ dt. 8.1.16

To improve

distribution capacity

and to reduce line

loss

7.51 8.35 6.85 6.68 2.34 1.67 8.35 6.68 1.67 7.51 6.85 2.34

23 Tirunelveli Tuticorin EDC DDUGJY

33/11KV Kurumbur SS to bifurcation of

existing feeder & Addl. Power Transformer

& HVDS & Replacement of meters

To improve the HT Regulation and line

loss 2.70

(Per)CMD TANGEDCO

Pro.No.15/ dt. 8.1.16

To improve

distribution capacity

and to reduce line

loss

1.21 1.35 1.11 1.08 0.38 0.27 1.35 1.08 0.27 1.21 1.11 0.38

24 Tirunelveli Tuticorin EDC DDUGJY New SS & HVDSTo improve the HT Regulation and line

loss 4.50

(Per)CMD TAN-GEDCO

Pro.No.15/ dt. 8.1.16

To improve

distribution capacity

and to reduce line

loss

2.02 2.25 1.85 1.80 0.63 0.45 2.25 1.80 0.45 2.02 1.85 0.63

25 Tirunelveli Tuticorin EDC DDUGJY Enhancement of Power Transformer &

HVDS

To improve the HT Regulation and line

loss 3.03

(Per)CMD TAN-GEDCO

Pro.No.15/dt. 8.1.16

To improve

distribution capacity

and to reduce line

loss

1.37 1.52 1.24 1.21 0.42 0.30 1.52 1.21 0.30 1.37 1.24 0.42

Page 177: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

26 Tirunelveli Tuticorin EDC

Any other related

works including

less than one

crore works

totally

- - - - - - - - - - - - -

1 TrichyTrichy Metro

EDCCapital

Extension of LT & LT CT, HT Supply to

various tariff services 2016-19

1,00,000scs

To provide new scs 40.00

Based on the application from

consumer and approved by

the competent authorities

Increase the revenue

to Tangedco 11.70 13.00 13.90 14.00 13.10 13.00 13.00 14.00 13.00 11.70 13.90 13.10

2 TrichyTrichy Metro

EDC

CAPITAL -

National

Electricity Fund

Scheme (NEFS)

Replacement of aged conductor Capital works for system improvement 16.38

(Per) CMD TANGEDCO

Proceedings No.100 dt

08.03.2013 and tecnically

sanctioneded as

14.645/C.72/2015-16

To avoid accident 4.91 5.46 5.46 5.46 6.01 5.46 5.46 5.46 5.46 4.91 5.46 6.01

3 TrichyTrichy Metro

EDC

CAPITAL -

National

Electricity Fund

Scheme (NEFS)

Replacement of damaged poles Capital works for system improvement 9.03

(Per) CMD TANGEDCO

Proceedings No.100 dt

08.03.2013 and tecnically

sanctioneded as

14.645/C.72/2015-17

To avoid accident 2.71 3.01 3.01 3.01 3.31 3.01 3.01 3.01 3.01 2.71 3.01 3.31

4 TrichyTrichy Metro

EDCCapital

Erection of 2 Nos 8 MVA Power

Transformer at Pannankombu 33/11 kV SST& D Plan 6.31

Land available.Proposal sent

on 29.07.15To reduce line loss 6.31 6.31 - - - - 6.31 - - 6.31 - -

5 TrichyTrichy Metro

EDCCapital

Indoor compact 33 kV SS atMalaikoil

33/11 kV SST& D Plan 6.00

Land available. Proposal sent

on 30.05.2016To reduce line loss 6.00 6.00 - - - - 6.00 - - 6.00 - -

6 TrichyTrichy Metro

EDCCapital

Proposed new 33 kV SS at Elurpatty 33/11

kV SST& D Plan 5.00

Land acquisition under

progress & proposal yet to be

submitted to Head quarters

To reduce line loss - - 5.00 5.00 - - - 5.00 - - 5.00 -

7 TrichyTrichy Metro

EDCCapital

Proposed new 33 kV SS at Sethurapatty

33/11 kV SST& D Plan 5.00

Land acquisition under

progress & proposal yet to be

submitted to Head quarters

To effect more

number of industrial

services

- - 5.00 5.00 - - - 5.00 - - 5.00 -

8 TrichyTrichy Metro

EDCCapital

Proposed new 33 kV SS at Pachamalai

33/11 kV SST& D Plan 5.00

Land acquisition under

progress & proposal yet to be

submitted to Head quarters

To avoid breakdown

& line loss - - 5.00 5.00 - - - 5.00 - - 5.00 -

9 TrichyTrichy Metro

EDCCapital

Proposed new 33 kV SS AT UKT malai

33/11 kV SS

T& D

Plan 10.00

Land acquisition under

progress & proposal yet to be

submitted to Head quarters

to avoid low

voltage& line loss - - 10.00 10.00 - - - 10.00 - - 10.00 -

10 TrichyTrichy Metro

EDCImprovement

Improvement works- SS, Enhancement of

Pr.Trs in sub stations, sub station related

works.

To improve the network and Load

growth 6.82

Based on the necessity and

approved by the competent

authorities

To improve the

network 2.89 3.21 2.12 2.00 1.65 1.61 3.21 2.00 1.61 2.89 2.12 1.65

11 TrichyTrichy Metro

EDCImprovement

Improvement works- Erection of DT, New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 15.95

Based on the necessity and

approved by the competent

authorities

To improve the

network 2.64 2.93 5.60 5.90 7.00 7.12 2.93 5.90 7.12 2.64 5.60 7.00

12 TrichyTrichy Metro

EDCRAPDRP

33/11kV New Sub Station at

Mainguardgate (Devadhanam) with 2*8

MVA Power Transformers

To meet out load growth 0.30

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To meet out load

growth 0.30 0.30 - - - - 0.30 - - 0.30 - -

13 TrichyTrichy Metro

EDCRAPDRP

33/11kV New Sub Station at

Edamalaipattipudur with 2 *8 MVA Power

Transformers (instead of Cholanparai)

To meet out load growth 1.12

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To meet out load

growth 1.12 1.12 - - - - 1.12 - - 1.12 - -

14 TrichyTrichy Metro

EDCRAPDRP

33/11kV New Sub Station at Varaganeri

with 2*8 MVA Power transformersTo meet out load growth 0.87

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To meet out load

growth 0.87 0.87 - - - - 0.87 - - 0.87 - -

Page 178: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

15 TrichyTrichy Metro

EDCRAPDRP

Provision of 33 kV Bay extensions at 110

kV SS for the Sub stations & 11 kV Bay

extension for SCADA feeder in

Mannarpuram SS

Source for the new SS 0.39

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

For provision of

source 0.39 0.39 - - - - 0.39 - - 0.39 - -

16 TrichyTrichy Metro

EDCRAPDRP

Extension of new 33 kV Line with ACSR

6/4.72mm and 7/1.57 mm DOG

Conductor & Laying of 33 kV UG cable

Source line for the newly proposed 33

kV SS 5.95

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Reduction of AT&C

loss 5.95 5.95 - - - - 5.95 - - 5.95 - -

17 TrichyTrichy Metro

EDCRAPDRP

Extension of new 11 kV feeder using

ACSR conductors & ABC cable and laying

of 11 kV UG cable

To meet out load growth 3.99

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Reduction of AT&C

loss 3.99 3.99 - - - - 3.99 - - 3.99 - -

18 TrichyTrichy Metro

EDCRAPDRP

Strengthening of 1 Km of 11kV

Line from lower size conductors to ACSR

Raccoon 7/4.09 mm with insertion of poles

Load bifurcation to reduce outages and

to enhance operation flexibility 3.63

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Reduction of AT&C

loss 3.63 3.63 - - - - 3.63 - - 3.63 - -

19 TrichyTrichy Metro

EDCRAPDRP

Strengthening of existing LT 3 phase 4

wire line with lower size conductor to

7/3.35 ACSR Rabbit

Load bifurcation to reduce outages and

to enhance operation flexibility 6.17

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Reduction of AT&C

loss 6.17 6.17 - - - - 6.17 - - 6.17 - -

20 TrichyTrichy Metro

EDCRAPDRP Erection of new DTs and HVDS DTs To offer load relief to the existing DTs 29.34

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Reduction of AT&C

loss 29.34 29.34 - - - - 29.34 - - 29.34 - -

21 TrichyTrichy Metro

EDCRAPDRP

Replacement of 3 phase & single phase

electromechanical meters by static meters

Accurate recording of consumption and

also to avoid human error in taking

reading

6.97

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Reduction of AT&C

loss 6.97 6.97 - - - - 6.97 - - 6.97 - -

22 TrichyTrichy Metro

EDCRAPDRP

18 kVAR, 36 kVAR & 72 kVAR APFC

panels installed and commiSSioned in 100

kVA, 250 kVA & 500 kVA DTs

Power factor improvement 1.05

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Reduction of AT&C

loss 0.28 0.31 0.31 0.31 0.46 0.43 0.31 0.31 0.43 0.28 0.31 0.46

23 TrichyTrichy Metro

EDCRAPDRP Erection of 141 nos of RMU

Reduction of outages and ensuring

consumer satisfaction 0.29

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Remote operation for

back feeding purpose 0.29 0.29 - - - - 0.29 - - 0.29 - -

24 TrichyTrichy Metro

EDCRAPDRP

XLPE UG cable & acceSSories required

for 11kV RMU

Reduction of outages and ensuring

consumer satisfaction 0.07

CMD TANGEDCO

proceedings No:124 dt

8.04.2012

Remote operation for

back feeding purpose 0.07 0.07 - - - - 0.07 - - 0.07 - -

25 TrichyTrichy Metro

EDCRAPDRP Erection of 241 nos of Sectionalisers

Easy isolation of 11 kV fault portion

and reduce the duration of outage. 1.05

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Remote operation for

back feeding purpose 1.05 1.05 - - - - 1.05 - - 1.05 - -

26 TrichyTrichy Metro

EDCIPDS

Erection of 1 no new 33 kV SS

Vidhathilampatty at Manaparai To meet out load growth 2.12

CMD TANGEDCO

proceedings No:15 dt

8.01.2016

To meet out load

growth 0.90 1.00 1.00 1.00 0.22 0.12 1.00 1.00 0.12 0.90 1.00 0.22

27 TrichyTrichy Metro

EDCIPDS

Erection of 1 no new 33 kV Kallakudy SS

at Kallakudy To meet out load growth 1.46

CMD TANGEDCO

proceedings No:15 dt

8.01.2016

To meet out load

growth 0.45 0.50 0.50 0.50 0.51 0.46 0.50 0.50 0.46 0.45 0.50 0.51

28 TrichyTrichy Metro

EDCIPDS

Erection of 1 no new 33 kV Sirugamani SS

at Sirugamani town panchayat To meet out load growth 2.12

CMD TANGEDCO

proceedings No:15 dt

8.01.2016

To meet out load

growth 0.90 1.00 1.00 1.00 0.22 0.12 1.00 1.00 0.12 0.90 1.00 0.22

29 TrichyTrichy Metro

EDCIPDS

Erection of 1 no new 33 kV

Balakrishanampatty SS at

Balakrishnampatty town panchayat

To meet out load growth 1.46

CMD TANGEDCO

proceedings No:15 dt

8.01.2016

To meet out load

growth 0.45 0.50 0.50 0.50 0.51 0.46 0.50 0.50 0.46 0.45 0.50 0.51

30 TrichyTrichy Metro

EDCIPDS

Renovation & modernisation of 33 kV

Kattuputhur SSAged breaker replacement 0.30

CMD TANGEDCO

proceedings No:15 dt

8.01.2016

Reduction of AT&C

loss 0.09 0.10 0.10 0.10 0.11 0.10 0.10 0.10 0.10 0.09 0.10 0.11

31 TrichyTrichy Metro

EDCIPDS

Erection of new 33 kV feeders with ACSR

conductor & laying of UG cable

Source line for the newly proposed 33

kV SS 1.83

CMD TANGEDCO

proceedings No:15 dt

8.01.2016

Reduction of AT&C

loss 0.54 0.60 0.60 0.60 0.69 0.63 0.60 0.60 0.63 0.54 0.60 0.69

32 TrichyTrichy Metro

EDCIPDS

Erection of new 11 kV feeders with ACSR

conductor

Load bifurcation to reduce outages and

to enhance operation flexibility 9.99

CMD TANGEDCO

proceedings No:15 dt

8.01.2016

Reduction of AT&C

loss 2.70 3.00 3.00 3.00 4.29 3.99 3.00 3.00 3.99 2.70 3.00 4.29

33 TrichyTrichy Metro

EDCIPDS

Replacement of existing OH line by Aerial

Bunched Cable (Both HT & LT)

Easy identification of fault and to avoid

electrical accident. 2.24

CMD TANGEDCO

proceedings No:15 dt

8.01.2016

Reduction of AT&C

loss 0.90 1.00 1.00 1.00 0.34 0.24 1.00 1.00 0.24 0.90 1.00 0.34

Page 179: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

34 TrichyTrichy Metro

EDCIPDS

Replacement of existing LT OH line by

UG Cable

Easy identification of fault and to avoid

electrical accident. 0.73

CMD TANGEDCO

proceedings No:15 dt

8.01.2016

Reduction of AT&C

loss 0.18 0.20 0.20 0.20 0.35 0.33 0.20 0.20 0.33 0.18 0.20 0.35

35 TrichyTrichy Metro

EDCIPDS

22/11 kV Bay Extension at 110 kV SS for

the newly proposed feeders

Load bifurcation to reduce outages and

to enhance operation flexibility 0.56

CMD TANGEDCO

proceedings No:15 dt

8.01.2016

Reduction of AT&C

loss 0.18 0.20 0.20 0.20 0.18 0.16 0.20 0.20 0.16 0.18 0.20 0.18

36 TrichyTrichy Metro

EDCIPDS

Erection of new LT line using ACSR

conductor

Load bifurcation to reduce outages and

to enhance operation flexibility 1.55

CMD TANGEDCO

proceedings No:15 dt

8.01.2016

Reduction of AT&C

loss 0.45 0.50 0.50 0.50 0.60 0.55 0.50 0.50 0.55 0.45 0.50 0.60

37 TrichyTrichy Metro

EDCIPDS

Strengthening of LT line of lower size to

7/3.55 mm ACSR conductor

To augument the current carrying

capacity of the conductor 1.95

CMD TANGEDCO

proceedings No:15 dt

8.01.2016

Reduction of AT&C

loss 0.63 0.70 0.70 0.70 0.62 0.55 0.70 0.70 0.55 0.63 0.70 0.62

38 TrichyTrichy Metro

EDCIPDS

Erection of 5 nos 1 X 2.4 MVAR

capacitor bank in the newly proposed 33

kV SS & in the existing 33 kV Kattupudur

SS

Power factor improvement 1.23

CMD TANGEDCO

proceedings No:15 dt

8.01.2016

Reduction of AT&C

loss 0.45 0.50 0.50 0.50 0.28 0.23 0.50 0.50 0.23 0.45 0.50 0.28

39 TrichyTrichy Metro

EDCIPDS

Erection of 179 nos of HVDS Distribution

Transformers

To reduce HT - LT ratio to ensure

reduction of 4.03

CMD TANGEDCO

proceedings No:15 dt

8.01.2016

Reduction of AT&C

loss 1.35 1.50 1.50 1.50 1.18 1.03 1.50 1.50 1.03 1.35 1.50 1.18

40 TrichyTrichy Metro

EDCIPDS

Replacement of Three phase & single

phase electromechanical meters by static

meters

Accurate recording of consumption and

also to avoid human error in taking

reading

8.37

CMD TANGEDCO

proceedings No:15 dt

8.01.2016

Reduction of AT&C

loss 2.70 3.00 3.00 3.00 2.67 2.37 3.00 3.00 2.37 2.70 3.00 2.67

41 TrichyTrichy Metro

EDCIPDS

Provision of Solar panel on roof top of

TNEB buildings wirthin project area & on

roof top of proposed SS and exisiting

Kattupudur SS

To meet out load growth 0.88

CMD TANGEDCO

proceedings No:15 dt

8.01.2016

Reduction of AT&C

loss 0.30 0.33 0.33 0.33 0.25 0.22 0.33 0.33 0.22 0.30 0.33 0.25

42 TrichyTrichy Metro

EDCIPDS

Others (Such as 33 kV Railway

croSSing,33 kV DP & 11 kV DP)To meet out load growth 2.55

CMD TANGEDCO

proceedings No:15 dt

8.01.2016

Reduction of AT&C

loss 0.90 1.00 1.00 1.00 0.65 0.55 1.00 1.00 0.55 0.90 1.00 0.65

43 TrichyTrichy Metro

EDCIPDS

Land to be purchased for the newly

proposed 3 nos 33 kV substationsTo meet out load growth 10.16

CMD TANGEDCO

proceedings No:15 dt

8.01.2016

Reduction of AT&C

loss 4.50 5.00 5.00 5.00 0.66 0.16 5.00 5.00 0.16 4.50 5.00 0.66

1 Trichy

Thiruvarur

EDC -

Thiruvarur

CapitalExtension of LT & LT CT, HT Supply to

27900 Nos various tariff servicesNew service connections effected 45.22

TANGEDCO, Thiurvarur

Circle

Adding of

Consumers 13.56 15.07 15.07 15.07 15.08 15.08 15.07 15.07 15.08 13.56 15.07 15.08

2 Trichy

Thiruvarur

EDC -

Thiruvarur

Improvement

Improvement works- Erection of DT, New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 11.16

TANGEDCO, Thiurvarur

Circle

To reduce line loss

and improve system

voltage

3.35 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.35 3.72 3.72

3 Trichy

Thiruvarur

EDC -

Thiruvarur

NEFS Reconductoring of LT/HT line under NEFS

Scheme

To improve the tail end voltage and

reduce the line loss 9.83

TANGEDCO, Thiurvarur

Circle

To improve the tail

end voltage and

reduce the line loss

2.95 3.28 3.28 3.28 3.60 3.27 3.28 3.28 3.27 2.95 3.28 3.60

4 Trichy

Thiruvarur

EDC -

Thiruvarur

ImprovementEstablishment of 33 kVsub stations at

Edamelaiyur

To improve the tail end voltage and

reduce the line loss 2.50 To be sanctioned by board

To improve the tail

end voltage and

reduce the line loss

2.50 2.50 - - - - 2.50 - - 2.50 - -

5 Trichy

Thiruvarur

EDC -

Thiruvarur

ImprovementEstablishment of additional power

transformer in Sitheri 33 kV SS

To improve the tail end voltage and

reduce the line loss 1.25 To be sanctioned by board

To improve the tail

end voltage and

reduce the line loss

- - 1.25 1.25 - - - 1.25 - - 1.25 -

6 Trichy

Thiruvarur

EDC -

Thiruvarur

ImprovementEstablishment of 33 kV sub stations at

Arasavanakadu

To improve the tail end voltage and

reduce the line loss 2.50 To be sanctioned by board

To improve the tail

end voltage and

reduce the line loss

- - 2.50 2.50 - - - 2.50 - - 2.50 -

7 Trichy

Thiruvarur

EDC -

Thiruvarur

ImprovementEstablishment of additional power

transformer in Tiruvarur 33 kV urban SS

To improve the tail end voltage and

reduce the line loss 1.25 To be sanctioned by board

To improve the tail

end voltage and

reduce the line loss

- - - - 1.12 1.25 - - 1.25 - - 1.12

8 Trichy

Thiruvarur

EDC -

Thiruvarur

ImprovementEstablishment of 33 kV sub stations at

Katchanam SS

To improve the tail end voltage and

reduce the line loss 2.50 To be sanctioned by board

To improve the tail

end voltage and

reduce the line loss

- - - - 2.25 2.50 - - 2.50 - - 2.25

Page 180: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

9 Trichy

Thiruvarur

EDC-

Mannargudi

Town

RAPDRP -

DSW

40.3 KM Extension of 11 kV line with

7/4.09 mm ACSR

Load Bifurcation to reduce outages and

to enhance operation flexibility 1.28

CMD TANGEDCO

Proceedings No.124

dt.08.04.11

To reduce the Line

loss, etc 1.28 1.28 - - - - 1.28 - - 1.28 - -

10 Trichy

Thiruvarur

EDC-

Mannargudi

Town

RAPDRP -

DSW

6.6 KM Strengthening of 11 kV line from

lower size conductor to 7/4.09 mm ACSR

with insertion of poles

System strengthening works 0.15

CMD TANGEDCO

Proceedings No.124

dt.08.04.11

To reduce the Line

loss, etc 0.15 0.15 - - - - 0.15 - - 0.15 - -

11 Trichy

Thiruvarur

EDC-

Mannargudi

Town

RAPDRP -

DSW

30.04 KM Strengthening of LT 3 phase

4wire line with lower size/equivalent

conductor into 7/3.35 mm ACSR

conductor on same supports.

System strengthening works 0.58

CMD TANGEDCO

Proceedings No.124

dt.08.04.11

To reduce the Line

loss, etc 0.58 0.58 - - - - 0.58 - - 0.58 - -

12 Trichy

Thiruvarur

EDC-

Mannargudi

Town

RAPDRP -

DSW

8.0 KM conversion of LT single phase to

three phase 4 wire lineSystem strengthening works 0.21

CMD TANGEDCO

Proceedings No.124

dt.08.04.11

To reduce the Line

loss, etc 0.21 0.21 - - - - 0.21 - - 0.21 - -

13 Trichy

Thiruvarur

EDC-

Mannargudi

Town

RAPDRP -

DSW

74 No erection of 25 kVA , 11 kV /433V,

Single pole mounted transformer on 9 Mtrs

RCC pole(square section)

To reduce HT/LT ratio to ensure

reduction of affecting consumers during

outages.

1.07

CMD TANGEDCO

Proceedings No.124

dt.08.04.11

To reduce the Line

loss, etc 1.07 1.07 - - - - 1.07 - - 1.07 - -

14 Trichy

Thiruvarur

EDC-

Mannargudi

Town

RAPDRP -

DSW

88 Nos erection of double pole Distribution

transformer structure with 40 kVA , 11 kV

/433 v Distribution transformer

To reduce HT/LT ratio 1.10

CMD TANGEDCO

Proceedings No.124

dt.08.04.11

To reduce the Line

loss, etc 1.10 1.10 - - - - 1.10 - - 1.10 - -

15 Trichy

Thiruvarur

EDC-

Mannargudi

Town

RAPDRP -

DSW

20 Nos erection of 100 kVA distribution

transformer

Replacing of existing higher capacity

DT(Degrading) 0.31

CMD TANGEDCO

Proceedings No.124

dt.08.04.11

To reduce the Line

loss, etc 0.31 0.31 - - - - 0.31 - - 0.31 - -

16 Trichy

Thiruvarur

EDC-

Mannargudi

Town

RAPDRP -

DSW

Provision of wedge connectors for DT

structure -99 Nos.

To reduce contact resistance and ensure

proper connection at joints 0.11

CMD TANGEDCO

Proceedings No.124

dt.08.04.11

To reduce the Line

loss, etc 0.11 0.11 - - - - 0.11 - - 0.11 - -

17 Trichy

Thiruvarur

EDC-

Mannargudi

Town

RAPDRP -

DSW

Provision of wedge connectors at LT

cutpoints and joints - 1350 Nos

To reduce contact resistance and ensure

proper connection at joints 0.14

CMD TANGEDCO

Proceedings No.124

dt.08.04.11

To reduce the Line

loss, etc 0.14 0.14 - - - - 0.14 - - 0.14 - -

18 Trichy

Thiruvarur

EDC-

Mannargudi

Town

RAPDRP -

DSW 25 Nos. Renovation of DT earthing For effective earthing 0.02

CMD TANGEDCO

Proceedings No.124

dt.08.04.11

For effective earthing 0.02 0.02 - - - - 0.02 - - 0.02 - -

19 Trichy

Thiruvarur

EDC-

Mannargudi

Town

RAPDRP -

DSW APFC Pannel For power factor Improvement 0.04

CMD TANGEDCO

Proceedings No.124

dt.08.04.11

For power factor

improvement 0.04 0.04 - - - - 0.04 - - 0.04 - -

20 Trichy

Thiruvarur

EDC-

Thiruvarur

town

RAPDRP -

DSW

19.55 KM Extension of 11 kV line with

7/4.09 mm ACSR

Load Bifurcation to reduce outages and

to enhance operation flexibility 0.51

CMD TANGEDCO

Proceedings No.124

dt.08.04.11

To reduce the Line

loss, etc 0.51 0.51 - - - - 0.51 - - 0.51 - -

21 Trichy

Thiruvarur

EDC-

Thiruvarur

town

RAPDRP -

DSW

11.75 KM Strengthening of 11 kV line

from lower size conductor to 7/4.09 mm

ACSR with insertion of poles

System strengthening works 0.25

CMD TANGEDCO

Proceedings No.124

dt.08.04.11

To reduce the Line

loss, etc 0.25 0.25 - - - - 0.25 - - 0.25 - -

22 Trichy

Thiruvarur

EDC-

Thiruvarur

town

RAPDRP -

DSW

18.005 KM Strengthening of LT 3 phase

4wire line with lower size/equivalent

conductor into 7/3.35 mm ACSR

conductor on same supports.

System strengthening works 0.35

CMD TANGEDCO

Proceedings No.124

dt.08.04.11

To reduce the Line

loss, etc 0.35 0.35 - - - - 0.35 - - 0.35 - -

Page 181: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

23 Trichy

Thiruvarur

EDC-

Thiruvarur

town

RAPDRP -

DSW

28 No erection of 25 kVA , 11 kV /433 V

,Single pole mounted transformer on 9

Mtrs RCC pole (square section)

To reduce HT/LT ratio to ensure

reduction of affecting consumers during

outages.

0.35

CMD TANGEDCO

Proceedings No.124

dt.08.04.11

To reduce the Line

loss, etc 0.35 0.35 - - - - 0.35 - - 0.35 - -

24 Trichy

Thiruvarur

EDC-

Thiruvarur

town

RAPDRP -

DSW

62 Nos erection of double pole Distribution

transformer structure with 40 kVA , 11 kV

/433V Distribution transformer

To reduce HT/LT ratio 0.58

CMD TANGEDCO

Proceedings No.124

dt.08.04.11

To reduce the Line

loss, etc 0.58 0.58 - - - - 0.58 - - 0.58 - -

25 Trichy

Thiruvarur

EDC-

Thiruvarur

town

RAPDRP -

DSW

Provision of wedge connectors for DT

structure -90 Nos.

To reduce contact resistance and ensure

proper connection at joints 0.10

CMD TANGEDCO

Proceedings No.124

dt.08.04.11

To reduce the Line

loss, etc 0.10 0.10 - - - - 0.10 - - 0.10 - -

26 Trichy

Thiruvarur

EDC-

Thiruvarur

town

RAPDRP -

DSW

Provision of wedge connectors at LT

cutpoints and joints - 1000 Nos

To reduce contact resistance and ensure

proper connection at joints 0.11

CMD TANGEDCO

Proceedings No.124

dt.08.04.11

To reduce the Line

loss, etc 0.11 0.11 - - - - 0.11 - - 0.11 - -

27 Trichy

Thiruvarur

EDC-

Thiruvarur

town

RAPDRP -

DSW

Replacement of electromechanical meters

single phase 5-20 Amps.For accurate assessment 0.30

CMD TANGEDCO

Proceedings No.124

dt.08.04.11

For effective energy

audit 0.30 0.30 - - - - 0.30 - - 0.30 - -

28 Trichy

Thiruvarur

EDC-

Thiruvarur

town

RAPDRP -

DSW APFC Pannel For power factor Improvement 0.06

CMD TANGEDCO

Proceedings No.124

dt.08.04.11

For power factor

improvement 0.06 0.06 - - - - 0.06 - - 0.06 - -

29 Trichy

Thiruvarur

EDC-

Thiruvarur

town

DDUGJY Consumer metering TANGEDCO Revenue augumentation 3.96 As per DPR

TANGEDCO

Revenue

augmentation

1.78 1.98 2.18 1.98 - - 1.98 1.98 - 1.78 2.18 -

30 Trichy

Thiruvarur

EDC-

Thiruvarur

town

DDUGJY Establishment of 33 kV new Neelakudi SS 11 kV line loss savings 2.50

Per TANTRANSCO

Proceedings No.44 dt

19.05.2015

11 kV line loss

savings 2.50 2.50 - - - - 2.50 - - 2.50 - -

31 Trichy

Thiruvarur

EDC-

Thiruvarur

town

DDUGJY Establishment of 33 kV new Kottur SS 11 kV line loss savings 3.58

Per TANGEDCO

Proceedings No.538 dt

17.12.2015

3.58 3.58 - - - - 3.58 - - 3.58 - -

32 Trichy

IPDS - (8

Nos.Town

Panchayat)

IPDS1 No 33/11 kV SS: New SS at

Thiruthuraipoondi.System strengthening works 2.12

CMD TANGEDCO

Proceedings No.15dt.8.1.16

To reduce the Line

loss, etc 0.95 1.06 0.87 0.85 0.30 0.21 1.06 0.85 0.21 0.95 0.87 0.30

33 Trichy

IPDS - (8

Nos.Town

Panchayat)

IPDS1*8MVA Additional Power Transformer at

33/11 kV SS Koothanallur.System strengthening works 1.26

CMD TANGEDCO

Proceedings No.15dt.8.1.16

To reduce the Line

loss, etc 0.57 0.63 0.52 0.51 0.17 0.12 0.63 0.51 0.12 0.57 0.52 0.17

34 Trichy

IPDS - (8

Nos.Town

Panchayat)

IPDS6.0 KM 33 kV new feeders/Bifurcation of

feedersSystem strengthening works 0.48

CMD TANGEDCO

Proceedings No.15dt.8.1.16

To reduce the Line

loss, etc 0.22 0.24 0.19 0.19 0.07 0.05 0.24 0.19 0.05 0.22 0.19 0.07

35 Trichy

IPDS - (8

Nos.Town

Panchayat)

IPDS63.5 KM 11 kV Line New Feeder/ Feeder

BifurcationSystem strengthening works 4.49

CMD TANGEDCO

Proceedings No.15dt.8.1.16

To reduce the Line

loss, etc 2.02 2.24 1.84 1.80 0.63 0.45 2.24 1.80 0.45 2.02 1.84 0.63

36 Trichy

IPDS - (8

Nos.Town

Panchayat)

IPDS 1 KM Arial Bunched Cable System strengthening works 0.07 CMD TANGEDCO

Proceedings No.15dt.8.1.16

To reduce the Line

loss, etc 0.03 0.03 0.03 0.03 0.01 0.01 0.03 0.03 0.01 0.03 0.03 0.01

37 Trichy

IPDS - (8

Nos.Town

Panchayat)

IPDS UG Cable (LT -1KM & HT- 1.2 KM) System strengthening works 0.48 CMD TANGEDCO

Proceedings No.15dt.8.1.16

To reduce the Line

loss, etc 0.22 0.24 0.19 0.19 0.07 0.05 0.24 0.19 0.05 0.22 0.19 0.07

38 Trichy

IPDS - (8

Nos.Town

Panchayat)

IPDS24.75 KM LT Line : New Feeder/ Feeder

Bifurcation

To reduce AT&C loss in Town

panchayat area. 1.22

CMD TANGEDCO

Proceedings No.15dt.8.1.16

To reduce the Line

loss, etc 0.55 0.61 0.50 0.49 0.17 0.12 0.61 0.49 0.12 0.55 0.50 0.17

Page 182: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

39 Trichy

IPDS - (8

Nos.Town

Panchayat)

IPDS67.0 KM LT Line Augmentation/

Reconductoring

To reduce AT&C loss in Town

panchayat area. 2.14

CMD TANGEDCO

Proceedings No.15dt.8.1.16

To reduce the Line

loss, etc 0.96 1.07 0.88 0.86 0.30 0.21 1.07 0.86 0.21 0.96 0.88 0.30

40 Trichy

IPDS - (8

Nos.Town

Panchayat)

IPDS

HVDS - 143 Nos.Distribution Transformer

(63 kVA - 30 , 40kVA - 42 & 25 kVA -

71)

To reduce HT - LT ratio to ensure

reduction of Affecting consumers

during outages

2.92 CMD TANGEDCO

Proceedings No.15dt.8.1.16

To reduce the Line

loss, etc 1.31 1.46 1.20 1.17 0.41 0.29 1.46 1.17 0.29 1.31 1.20 0.41

41 Trichy

IPDS - (8

Nos.Town

Panchayat)

IPDS

Metering - 37274 Nos.(Feeder ,

Ringfencing,DT,Single phase & Three

phase meters).

For accurate assessment 5.07 CMD TANGEDCO

Proceedings No.15dt.8.1.16

For accurate

assessment 2.28 2.53 2.08 2.03 0.71 0.51 2.53 2.03 0.51 2.28 2.08 0.71

42 Trichy

IPDS - (8

Nos.Town

Panchayat)

IPDS Provision of solar panel - 40 KW For alternate source 0.28 CMD TANGEDCO

Proceedings No.15dt.8.1.16For alternate source 0.13 0.14 0.11 0.11 0.04 0.03 0.14 0.11 0.03 0.13 0.11 0.04

43 Trichy

IPDS - (8

Nos.Town

Panchayat)

IPDSProvision of Deposited Bank (1*2.4

MVAR)To Improve Power Factor 0.25

CMD TANGEDCO

Proceedings No.15dt.8.1.16

To Improve Power

Factor 0.11 0.12 0.10 0.10 0.04 0.03 0.12 0.10 0.03 0.11 0.10 0.04

44 Trichy

IPDS - (8

Nos.Town

Panchayat)

IPDSOther Works (Street control switches &

Railway croSSings)For Safety 0.26

CMD TANGEDCO

Proceedings No.15dt.8.1.16To Provide Safety 0.12 0.13 0.10 0.10 0.04 0.03 0.13 0.10 0.03 0.12 0.10 0.04

45 Trichy

IPDS - (8

Nos.Town

Panchayat)

DCWShifting of HT/LT line, poles, strcutrue on

party requestRoad infrastructure development 8.82

TANGEDCO, Thiurvarur

Circle

Road infrastructure

development 2.65 2.94 2.94 2.94 3.23 2.94 - - - - - -

1 Trichy Karur EDC CapitalExtension of LT & LT CT, HT Supply to

15000 Nos various tariff servicesNew service connections effected 2.80

Based on the application from

the consumers, approval was

accorded by the competent

authorities

Adding consumers 2.80 2.80 - - - - 2.80 - - 2.80 - -

2 Trichy Karur EDC Capital

Establishment of 33 kV sub stations at

S.Vellalapatty & Vairamadai and Karur

Town North

To improve the network and Load

growth 22.20

Approved by the competent

authority as per the field

proposal

To reduce the Line

loss, etc 12.69 14.10 9.51 8.10 - - 14.10 8.10 - 12.69 9.51 -

3 Trichy Karur EDC Improvement

Improvement works- SS, Enhancement of

Pr.Trs in sub stations, sub station related

works.

To improve the network and Load

growth 4.52

Approved by the competent

authority as per the field

proposal

To reduce the Line

loss, etc 4.52 4.52 - - - - 4.52 - - 4.52 - -

4 Trichy Karur EDC Improvement

Improvement works- Erection of DT, New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 4.09

Approved by the competent

authority as per the field

proposal

To reduce the Line

loss, etc 4.09 4.09 - - - - 4.09 - - 4.09 - -

5 Trichy Karur EDC

RAPDRP

Scheme I (Part

A/Part B)

Erection of New DTs-100, HVDS 345,

APFC, Capacitor Bank etc.

To reduce AT&C loss of the project

towns 9.72

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Reduction of AT&C

loss 9.72 9.72 - - - - 9.72 - - 9.72 - -

6 Trichy Karur EDC DDUGJY

D.connection/ Unconnecting Households

by erection of LT lines, E.Metering,

replacement of Electromechanical meter by

Static meter

Improvement in Distribution network 3.31 REC/Chn/DDUGJY/215-

16/702 dt 05.01.2016

Reduction of AT&C

loss 1.49 1.66 1.82 1.65 - - 1.66 1.65 - 1.49 1.82 -

7 Trichy Karur EDC DDUGJY

System strengthening, New 33/11 kV SS

Proposed in Kosur, Kuppuchiplayam and

Renganathapuram , capacitor Bank,

Erection of 33 kV and 11 kV associated

lines etc

Improvement in Distribution network 14.34 REC/Chn/DDUGJY/215-

16/702 dt 05.01.2016

Reduction of AT&C

loss 6.45 7.17 7.89 7.17 - - 7.17 7.17 - 6.45 7.89 -

8 Trichy Karur EDC IPDS

New 33/11 kV SS Proposed in

Aravakuruchi, Kulithalai and

Uppidamangalam , feeder bifurcation, HT

line augmentation etc.

Improvement in Distribution network 32.88

CMD TANGEDCO

proceedings No:15 dt

08.01.16

Reduction of AT&C

loss 11.83 13.15 13.15 13.15 7.90 6.58 13.15 13.15 6.58 11.83 13.15 7.90

9 Trichy Karur EDC NEFSReplacement of damaged poles &

conductorsImprovement in Distribution network 16.02

CMD TANGEDCO

proceedings No:90 dt

04.03.2013

Reduction of AT&C

loss 5.77 6.41 6.41 6.41 3.84 3.20 6.41 6.41 3.20 5.77 6.41 3.84

10 Trichy Karur EDC DCWShifting of HT/LT lines as per party's

request

Shifting of HT/LT lines as per party's

request 0.51

Approved by the competent

authority as per the field

proposal

As per party's request 0.51 0.51 - - - - - - - - - -

1 TrichyPudukkottai

EDCCapital

Extension of LT & LTCT, HT Supply to

Nos. various tariff servicesNew service connections effected 105.83 NA 27.75 30.83 34.58 35.00 39.50 40.00 30.83 35.00 40.00 27.75 34.58 39.50

Page 183: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

2 TrichyPudukkottai

EDCImprovement

Improvement works- SS,Enhancement of

Pr.Trs in sub stations, sub station related

works.

To improve the network to meetout the

Load growth 15.70 NA 4.50 5.00 5.63 5.70 5.07 5.00 5.00 5.70 5.00 4.50 5.63 5.07

3 TrichyPudukkottai

EDCImprovement

Improvement works- Erection of DT,New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network to meet out the

Load growth 35.22 NA 7.40 8.22 11.62 12.00 14.70 15.00 8.22 12.00 15.00 7.40 11.62 14.70

4 TrichyPudukkottai

EDC

RAPDRP -

DSW

Installation of 63kVA/11kV Distribution

transformers to replace higher capacity DTsTo offer load relief to the existing DTs 0.17 0.17 0.17 - - - - 0.17 - - 0.17 - -

5 TrichyPudukkottai

EDC

RAPDRP -

DSW

Installation of 100kVA/11kV Distribution

transformers to replace higher capacity DTsTo offer load relief to the existing DTs 0.18 0.18 0.18 - - - - 0.18 - - 0.18 - -

6 TrichyPudukkottai

EDC

RAPDRP -

DSW

Extension of 1 km of 11kV line with

7/3.35mm ACSR at 45m span on 9m PSC

poles 400 kg.working load and 75kg/sq.m

wind preSSure

Load bifurcation to reduce outages and

to enhance operation flexibility 0.85 0.85 0.85 - - - - 0.85 - - 0.85 - -

7 TrichyPudukkottai

EDC

RAPDRP -

DSW

Conversion of 1km of LT single phase,2

wire line into 3 phase 4 wire line on the

same support with ACSR Rabbit 7/3.35mm

conductor for both phase and neutral

To augument the current carrying

capacity of the conductor 0.17 0.17 0.17 - - - - 0.17 - - 0.17 - -

8 TrichyPudukkottai

EDC

RAPDRP -

DSW

Conversion of 1km of LT 3 phase 4 wire

line with lower size conductor to ACSR

Rabbit 7/3.35mm with insertion of 7 nos.

8m poles with 200kg working load

To augument the current carrying

capacity of the conductor 0.17 0.17 0.17 - - - - 0.17 - - 0.17 - -

9 TrichyPudukkottai

EDC

RAPDRP -

DSW

Erection of Double pole Distribution

Transformer structure with 40kVA,11kV

Distribution transformer

To reduce HT - LT ratio to ensure

reduction of Affecting consumers

during outages

0.66 0.66 0.66 - - - - 0.66 - - 0.66 - -

10 TrichyPudukkottai

EDC

RAPDRP -

DSW

Erection of Double pole Distribution

Transformer structure with 63kVA,11kV

Distribution transformer

To reduce HT - LT ratio to ensure

reduction of Affecting consumers

during outages

0.87 0.87 0.87 - - - - 0.87 - - 0.87 - -

11 TrichyPudukkottai

EDC

RAPDRP -

DSW

Erection of Double pole Distribution

Transformer structure with 100kVA, 11kV

star rated Distribution transformer on

structure with 9.14M G201 special RCC

poles

To reduce HT - LT ratio to ensure

reduction of Affecting consumers

during outages

0.64 0.64 0.64 - - - - 0.64 - - 0.64 - -

12 TrichyPudukkottai

EDC

RAPDRP -

DSW

Provision of wedge connectors per DT

structure (New D.Tr.)

To reduce contact resistance and ensure

proper connection at joints 0.06 0.06 0.06 - - - - 0.06 - - 0.06 - -

13 TrichyPudukkottai

EDC

RAPDRP -

DSW

Provision of wedge connectors at LT

cutpoints and joints per cutpoint

To reduce contact resistance and ensure

proper connection at joints 0.03 0.03 0.03 - - - - 0.03 - - 0.03 - -

14 TrichyPudukkottai

EDC

RAPDRP -

DSW Erection of 11kV double pole structure

To attend breakdown quikly &

minimise the affecting consumers due

to outages

0.05 0.05 0.05 - - - - 0.05 - - 0.05 - -

15 TrichyPudukkottai

EDC

RAPDRP -

DSW

Erection of 1 no.100 kVA 22kV/433V

Distribution transformer on structure with

9.14m G201 special RCC poles

To offer load relief to the existing DTs 0.31 0.31 0.31 - - - - 0.31 - - 0.31 - -

16 TrichyPudukkottai

EDC

RAPDRP -

DSW

Erection of new 63kVA/22kV distribution

transformers alone for derating existing

higher capacity DTs by introduction of

HVDS

To reduce HT - LT ratio to ensure

reduction of Affecting consumers

during outages

0.15 0.15 0.15 - - - - 0.15 - - 0.15 - -

17 TrichyPudukkottai

EDC

RAPDRP -

DSW

Erection of new 100kVA/22kV distribution

transformers alone for derating existing

higher capacity DTs by introduction of

HVDS

To reduce HT - LT ratio to ensure

reduction of Affecting consumers

during outages

0.66 0.66 0.66 - - - - 0.66 - - 0.66 - -

18 TrichyPudukkottai

EDC

RAPDRP -

DSW

Extension of 1 km of 22 kV line with

7/3.35mm ACSR at 45m span on 9m PSC

poles 400 kg.working load and 75kg/sq.m

wind preSSure

Load bifurcation to reduce outages and

to enhance operation flexibility 2.03 2.03 2.03 - - - - 2.03 - - 2.03 - -

Page 184: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

19 TrichyPudukkottai

EDC

RAPDRP -

DSW

Conversion of 1km of 22kV line with

7/2.59 mm ACSR Rabbit 7/3.35mm on the

same supports

To improve votage regulation, reduce

outages and to enhance operation

flexibility

0.05 0.05 0.05 - - - - 0.05 - - 0.05 - -

20 TrichyPudukkottai

EDC

RAPDRP -

DSW

Conversiom of 1km of 22kV line with

lower size/equivalent conductors toACSR

Racoon 7/4.09 mm on same supports

To improve votage regulation, reduce

outages and to enhance operation

flexibility

0.35 0.35 0.35 - - - - 0.35 - - 0.35 - -

21 TrichyPudukkottai

EDC

RAPDRP -

DSW

Conversion of 1km of LT single phase,2

wire line into 3 phase 4 wire line on the

same support with P-7/2.59mm ACSR

weasel and N-7/2.59mm ACSR weasel

To improve votage regulation, reduce

outages and to enhance operation

flexibility

0.57 0.57 0.57 - - - - 0.57 - - 0.57 - -

22 TrichyPudukkottai

EDC

RAPDRP -

DSW

Conversion of 1km of LT 3 phase 4 wire

line with lower size conductor to ACSR

Rabbit 7/3.35mm with insertion of 7 nos.

8m poles with 200kg working load

To improve votage regulation, reduce

outages and to enhance operation

flexibility

0.32 0.32 0.32 - - - - 0.32 - - 0.32 - -

23 TrichyPudukkottai

EDC

RAPDRP -

DSW

Conversion of 1km of LT 3 phase 4 wire

line with lower size/equivalent conductor to

ACSR Weasel 7/2.59mm with insertion of

poles

To improve votage regulation, reduce

outages and to enhance operation

flexibility

0.21 0.21 0.21 - - - - 0.21 - - 0.21 - -

24 TrichyPudukkottai

EDC

RAPDRP -

DSW

Erection of Double pole Distribution

Transformer structure with 40kVA,22kV

Distribution transformer(HVDS)

To reduce HT - LT ratio to ensure

reduction of Affecting consumers

during outages

1.13 1.13 1.13 - - - - 1.13 - - 1.13 - -

25 TrichyPudukkottai

EDC

RAPDRP -

DSW

Erection of conventional double pole DT

structure with 63kVA,22kV distribution

transformer(HVDS)

To reduce HT - LT ratio to ensure

reduction of Affecting consumers

during outages

3.07 3.07 3.07 - - - - 3.07 - - 3.07 - -

26 TrichyPudukkottai

EDC

RAPDRP -

DSW

Erection of double pole distribution

transformer structure with 100kVA,22kV

distribution transformer(HVDS)

To reduce HT - LT ratio to ensure

reduction of Affecting consumers

during outages

1.28 1.28 1.28 - - - - 1.28 - - 1.28 - -

27 TrichyPudukkottai

EDC

RAPDRP -

DSW

Running of 1 km single circuit 1.1kV 3

phase 5 wire power line on 9 mtr supports

with average span of 40 mtrs using

3*70+1*16+1*50 sqmm Aerial Bunched

Cables(ABC)

To avoid outages 1.93 1.93 1.93 - - - - 1.93 - - 1.93 - -

28 TrichyPudukkottai

EDC

RAPDRP -

DSW

Provision of wedge connectors per DT

structure

To reduce contact resistance and ensure

proper connection at joints 0.16 0.16 0.16 - - - - 0.16 - - 0.16 - -

29 TrichyPudukkottai

EDC

RAPDRP -

DSW

Provision of wedge connectors at LT

cutpoints and joints per cutpoint

To reduce contact resistance and ensure

proper connection at joints 0.04 0.04 0.04 - - - - 0.04 - - 0.04 - -

30 TrichyPudukkottai

EDC

RAPDRP -

DSW

Provision of wedge connector DB boxes at

LT poles for termination of SC per LT pole

To reduce contact resistance and ensure

proper connection at joints 4.12 4.12 4.12 - - - - 4.12 - - 4.12 - -

31 TrichyPudukkottai

EDC

RAPDRP -

DSW

Renovation of earthing in Distribution

TransformersTo ensure the protection and safety. 0.12 0.12 0.12 - - - - 0.12 - - 0.12 - -

32 TrichyPudukkottai

EDC

RAPDRP -

DSW Erection of 22kV double pole structure

To attend breakdown quikly &

minimise the affecting consumers due

to outages

0.13 0.13 0.13 - - - - 0.13 - - 0.13 - -

33 TrichyPudukkottai

EDCDDUGJY

Establishemnt of new 33/11kV SS,

Enhancement of Pr Tr capacity and system

strengthening

System strengthening works in rural

areas 46.77

DPR approved by monitoring

committee 21.05 23.39 25.72 23.38 - - 23.39 23.38 - 21.05 25.72 -

34 TrichyPudukkottai

EDCIPDS 33/11 kV SS: New SS System strengthening works 2.12 0.76 0.85 0.85 0.85 0.51 0.42 0.85 0.85 0.42 0.76 0.85 0.51

35 TrichyPudukkottai

EDCIPDS 33/11 kV SS : Additional Transformer System strengthening works 1.27 0.46 0.51 0.51 0.51 0.30 0.25 0.51 0.51 0.25 0.46 0.51 0.30

36 TrichyPudukkottai

EDCIPDS

New 33 kV new feeders/Bifurcation of

feedersSystem strengthening works 1.91 0.68 0.76 0.76 0.76 0.47 0.39 0.76 0.76 0.39 0.68 0.76 0.47

37 TrichyPudukkottai

EDCIPDS 33 kV Line Bay Extension at EHV station System strengthening works 0.28 0.10 0.11 0.11 0.11 0.07 0.06 0.11 0.11 0.06 0.10 0.11 0.07

Page 185: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

38 TrichyPudukkottai

EDCIPDS

11/22 kV Line : New Feeder/ Feeder

BifurcationSystem strengthening works 3.94 1.42 1.58 1.58 1.58 0.94 0.78 1.58 1.58 0.78 1.42 1.58 0.94

39 TrichyPudukkottai

EDCIPDS 22/11 kV Bay Extension System strengthening works 0.34 0.13 0.14 0.14 0.14 0.07 0.06 0.14 0.14 0.06 0.13 0.14 0.07

40 TrichyPudukkottai

EDCIPDS Installation of Distribution Transformer

To reduce HT - LT ratio to ensure

reduction of Affecting consumers

during outages

0.05 0.02 0.02 0.02 0.02 0.01 0.01 0.02 0.02 0.01 0.02 0.02 0.01

41 TrichyPudukkottai

EDCIPDS LT Line : New Feeder/ Feeder Bifurcation

To reduce AT&C loss in Town

panchayat area. 0.87 0.31 0.35 0.35 0.35 0.21 0.17 0.35 0.35 0.17 0.31 0.35 0.21

42 TrichyPudukkottai

EDCIPDS LT Line : Augmentation/ Reconductoring

To reduce AT&C loss in Town

panchayat area. 0.59 0.22 0.24 0.24 0.24 0.13 0.11 0.24 0.24 0.11 0.22 0.24 0.13

43 TrichyPudukkottai

EDCIPDS HVDS

To reduce HT - LT ratio to ensure

reduction of Affecting consumers

during outages

3.59 1.29 1.43 1.43 1.43 0.87 0.73 1.43 1.43 0.73 1.29 1.43 0.87

44 TrichyPudukkottai

EDCIPDS Metering For accurate assessment 4.08 1.47 1.63 1.63 1.63 0.98 0.82 1.63 1.63 0.82 1.47 1.63 0.98

45 TrichyPudukkottai

EDCIPDS Provisioning of solar panel For alternate source 0.32 0.12 0.13 0.13 0.13 0.07 0.06 0.13 0.13 0.06 0.12 0.13 0.07

46 TrichyPudukkottai

EDC

Others

(REC/PFC)Replacement of all aged HT & LT lines Replacement of all aged HT & LT lines 15.38

Memo.No.SE/RE&I(D)/EE/R

GGVY/A2/ F.Recond./D.

148/14 dt.26.09.14

7.99 8.88 7.39 6.50 - - 8.88 6.50 - 7.99 7.39 -

47 TrichyPudukkottai

EDCDCW

Deviation of HT / LT lines & Erection of

dedicated feeders

Shifting of lines which stands in the

consumer premises & Erection of

dedicated feeders for the new / Exg

services

47.00 Case by case approval by

competent authority 27.00 30.00 11.55 9.50 8.45 7.50 - - - - - -

1 TrichyPerambalur

EDCCapital

Extension of LT & LT CT, HT Supply to

37590 Nos various tariff servicesNew service connections effected 15.00

Based on the application from

the HT/LT consumers,

aprroval is accorded by

competent authorities

To adding consumers 15.00 15.00 - - - - 15.00 - - 15.00 - -

2 TrichyPerambalur

EDCImprovement

Enhancement of Power Transformer

Capacity on 33/11kV Side from 1x5MVA

into 2x 5MVA and Conversion of

unmanned Existing Thelur 33/11kV SS

into manned SS -Master Plan (T&D)

Improvement in Distribution Networks 1.02 BP No. 280 Dt.05-07-2014To reduce the Line

loss, etc 1.02 1.02 - - - - 1.02 - - 1.02 - -

3 TrichyPerambalur

EDCImprovement

Establisment of new 33/11kV sub station at

Venmani village - Master Plan (T&D)Improvement in Distribution Networks 4.21 To be submitted

To reduce the Line

loss, etc - - 1.51 1.68 2.45 2.53 - 1.68 2.53 - 1.51 2.45

4 TrichyPerambalur

EDCImprovement

Establisment of new 33/11kV sub station at

Mettupalayam Village - Master Plan

(T&D)

Improvement in Distribution Networks 4.21 To be submittedTo reduce the Line

loss, etc - - 1.51 1.68 2.45 2.53 - 1.68 2.53 - 1.51 2.45

5 TrichyPerambalur

EDCImprovement

Establisment of new 33/11kV sub station at

Elakurichy Village - Master Plan (T&D)Improvement in Distribution Networks 4.21 To be submitted

To reduce the Line

loss, etc - - 1.51 1.68 2.45 2.53 - 1.68 2.53 - 1.51 2.45

6 TrichyPerambalur

EDCNEFS

Replacement of aged conductor &

damaged poles

Improving network strength & Quality,

Replacement of aged conductors,

poles,etc

21.11 B.P.NO .(FB) No.90 dated

4.3.13 & No.100, dt.8.3.2013

To Improve

Distribution

Networks

21.11 21.11 - - - - 21.11 - - 21.11 - -

7 TrichyPerambalur

EDCImprovement

4 Nos. of 22 kV new feeders from 110/22

kV Esanai SSImprovement in Distribution Networks 0.20 BP No. 106 Dt. 09.12.2013

To reduce the Line

loss, etc 0.20 0.20 - - - - 0.20 - - 0.20 - -

8 TrichyPerambalur

EDCImprovement

4 Nos. of 22 kV new feeders from 110/22

kV Perali SSImprovement in Distribution Networks 0.20 BP No. 20 Dt. 03.05.2013

To reduce the Line

loss, etc 0.20 0.20 - - - - 0.20 - - 0.20 - -

9 TrichyPerambalur

EDCImprovement

4 Nos. of 22 kV new feeders from 110/22

kV A Mettur SSImprovement in Distribution Networks 0.36 BP No. 12 Dt. 07.01.2015

To reduce the Line

loss, etc 0.14 0.16 0.22 0.20 - - 0.16 0.20 - 0.14 0.22 -

10 TrichyPerambalur

EDCImprovement

4 Nos. of 22 kV new feeders from 110/22

kV Pudu kurichi SSImprovement in Distribution Networks 0.41 BP No. 11 Dt. 07.01.2015

To reduce the Line

loss, etc 0.14 0.16 0.27 0.25 - - 0.16 0.25 - 0.14 0.27 -

Page 186: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

11 TrichyPerambalur

EDCImprovement

1 No. feeder with breaker at 33/11 kV

Andimadam SSImprovement in Distribution Networks 0.12

CE/D/try's Sn No.

14.645/C/185 Dt.05.11.2014

To reduce the Line

loss, etc - - 0.12 0.12 - - - 0.12 - - 0.12 -

12 TrichyPerambalur

EDCImprovement

1 No. feeder with breaker at 33/11 kV

Keela Perambalur SSImprovement in Distribution Networks 0.10

SE/PEDC/PBLR's Sn No.

14.655/S/01/ Dt.23.05.2016

To reduce the Line

loss, etc 0.10 0.10 - - - - 0.10 - - 0.10 - -

13 TrichyPerambalur

EDCImprovement

2 Nos. feeder with 2 Nos. of breaker at

33/11 kV T Palur SS Improvement in Distribution Networks 0.70

CE/D/Try's Sn No. 14.696/C

222 Dt.22.01. 2010 & C/269

Dt.11.01.2012

To reduce the Line

loss, etc 0.70 0.70 - - - - 0.70 - - 0.70 - -

14 TrichyPerambalur

EDCRAPDRP

18 kVAR, 36 kVAR & 72 kVAR APFC

panels installed and commiSSioned in 100

kVA, 250 kVA & 500 kVA DTs

Power factor improvement 0.10

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To improve quality

of power 0.10 0.10 - - - - 0.10 - - 0.10 - -

15 TrichyPerambalur

EDCRAPDRP

Replacement of single phase and three

phase EM/HQ meter with static meters

Accurate recording of consumption and

also to avoid human error in taking

reading

0.38

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To improve revenue

to the board 0.38 0.38 - - - - 0.38 - - 0.38 - -

16 TrichyPerambalur

EDC

RAPDRP -

DSW

22 kV Line & 11 kV Line : New Feeder/

Feeder Bifurcation

Load bifurcation to reduce outages and

to enhance operation flexibility 0.42

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To reduce the Line

loss, etc 0.42 0.42 - - - - 0.42 - - 0.42 - -

17 TrichyPerambalur

EDC

RAPDRP -

DSW

11kV Breaker for Jayankondam Town

Feeder

Load bifurcation to reduce outages and

to enhance operation flexibility 0.02

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To reduce the Line

loss, etc 0.02 0.02 - - - - 0.02 - - 0.02 - -

18 TrichyPerambalur

EDC

RAPDRP -

DSW

Erection of New 100 kVA DTs & 250

kVA DTs To offer load relief to the existing DTs 0.18

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To bifurcate load of

DT's 0.18 0.18 - - - - 0.18 - - 0.18 - -

19 TrichyPerambalur

EDC

RAPDRP -

DSW

Strengthening of existing LT OH feeder

from ACSR 7/2.59 mm to ACSR 7/3.35

mm and from ACSR 7/3.35 mm to

ACSR 7/4.09 mm

To augument the current carrying

capacity of the conductor 0.08

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To reduce the Line

loss, etc 0.08 0.08 - - - - 0.08 - - 0.08 - -

20 TrichyPerambalur

EDC

RAPDRP -

DSW Laying LT AB cable

Easy identification of fault and to avoid

electrical accident. 0.15

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Easy identification of

fault and to avoid

electrical accident.

0.15 0.15 - - - - 0.15 - - 0.15 - -

21 TrichyPerambalur

EDC

RAPDRP -

DSW

Erection of HVDS New 25 kVA,40

kVA& 63 kVA DTs To offer load relief to the existing DTs 1.48

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To bifurcate load of

DT's 1.48 1.48 - - - - 1.48 - - 1.48 - -

22 TrichyPerambalur

EDCRAPDRP DSW

Wedge Connectors and Revamping of DT

earthingTo protect DT 0.05

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To protect DT's and

equipments 0.05 0.05 - - - - 0.05 - - 0.05 - -

23 TrichyPerambalur

EDCDDUGJY

Establisment of new 33/11kV sub station at

Ayyur villageImprovement in Distribution Networks 3.98

(Per.)CMD TANGEDCO

Proceedings No.56 Dated : 02-

02-16

To reduce the Line

loss, etc 1.43 1.59 2.55 2.39 - - 1.59 2.39 - 1.43 2.55 -

24 TrichyPerambalur

EDCDDUGJY

Establisment of new 33/11kV sub station at

Ambabur VillageImprovement in Distribution Networks 4.21 Proposal submitted to HQ

To reduce the Line

loss, etc 1.51 1.68 2.70 2.53 - - 1.68 2.53 - 1.51 2.70 -

25 TrichyPerambalur

EDCDDUGJY

Establisment of new 33/11kV sub station at

Thaluthalaimedu VillageImprovement in Distribution Networks 4.18 BP No. 203 dt.31.05.2016

To reduce the Line

loss, etc 1.51 1.68 2.67 2.50 - - 1.68 2.50 - 1.51 2.67 -

26 TrichyPerambalur

EDCDDUGJY

Establisment of new 33/11kV sub station at

Nannai VillageImprovement in Distribution Networks 4.21 Proposal submitted to HQ

To reduce the Line

loss, etc 1.51 1.68 2.70 2.53 - - 1.68 2.53 - 1.51 2.70 -

27 TrichyPerambalur

EDCDDUGJY

Enhancement of Power Transformer

Capacity on Existing Keelapalur 33/11kV

SS from 1x8MVA into 2x 8MVA

Improvement in Distribution Networks 0.84 BP No. 345 dt.11.08.2015To reduce the Line

loss, etc - - 0.84 0.84 - - - 0.84 - - 0.84 -

28 TrichyPerambalur

EDCDDUGJY

Enhancement of Power Transformer

Capacity on Existing T.Palur 33/11kV SS

from 1x8MVA into 2x 8MVAand

Conversion of unmanned SS into manned

SS

Improvement in Distribution Networks 1.96 BP No. 01 Dt.

02-01-2016

To reduce the Line

loss, etc 0.50 0.56 1.46 1.40 - - 0.56 1.40 - 0.50 1.46 -

29 TrichyPerambalur

EDCDDUGJY

Enhancement of Power Transformer

Capacity on Existing Olaiyur 33/11kV SS

from 1x8MVA into 2x 8MVAand

Conversion of unmanned SS into manned

SS

Improvement in Distribution Networks 1.77 BP No. 221 Dt. 21.05-2015To reduce the Line

loss, etc 0.47 0.52 1.30 1.25 - - 0.52 1.25 - 0.47 1.30 -

Page 187: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

30 TrichyPerambalur

EDCDDUGJY

Enhancement of Power Transformer

Capacity on Existing Naduvalur 33/11kV

SS from 1x8+1x5MVA into 2x 8MVA

Improvement in Distribution Networks 0.98 BP No. 189 Dt. 28.05-2016To reduce the Line

loss, etc - - 0.98 0.98 - - - 0.98 - - 0.98 -

31 TrichyPerambalur

EDCDDUGJY

Enhancement of Power Transformer

Capacity on Existing Thenoor 33/11kV SS

from 1x8+1x5MVA into 2x 8MVA

Improvement in Distribution Networks 0.53 Proposal submitted to HQTo reduce the Line

loss, etc - - 0.53 0.53 - - - 0.53 - - 0.53 -

32 TrichyPerambalur

EDCIPDS

Establishment of 33/11 kV Substations in

Ariyalur, Udayarpalayam and additional 8

MVA, 33/11 kV Power transformer in

extg.33/11 kV Kalanivasal SS

To meet out load growth 5.40

(Per.) CMD TANGEDCO

Proceedings No. 15

Dt.08.01.16

To meet out load

growth 2.16 2.40 2.40 2.40 0.84 0.60 2.40 2.40 0.60 2.16 2.40 0.84

33 TrichyPerambalur

EDCIPDS Erection of new DT's & HVDS DT's To offer load relief to the existing DTs 2.84

(Per.) CMD TANGEDCO

Proceedings No. 15

Dt.08.01.16

To bifurcate load of

DT's 1.13 1.26 1.26 1.26 0.45 0.32 1.26 1.26 0.32 1.13 1.26 0.45

34 TrichyPerambalur

EDCIPDS Erection of new OH lines

To augument the current carrying

capacity of the conductor 7.67

(Per.) CMD TANGEDCO

Proceedings No. 15

Dt.08.01.16

To reduce the Line

loss, etc 3.07 3.41 3.41 3.41 1.19 0.85 3.41 3.41 0.85 3.07 3.41 1.19

35 TrichyPerambalur

EDCIPDS Aerial Bunched Cables

Easy identification of fault and to avoid

electrical accident. 0.36

(Per.) CMD TANGEDCO

Proceedings No. 15

Dt.08.01.16

Easy identification of

fault and to avoid

electrical accident.

0.14 0.16 0.16 0.16 0.06 0.04 0.16 0.16 0.04 0.14 0.16 0.06

36 TrichyPerambalur

EDCCivil works

Construction of additional control

room,collection centres, toilet and allied

works etc.,

To improve easy operation at

Substations and acceSS to the

consumers

1.52

To improve easy

operation at

Substations and

acceSS to the

consumers

1.52 1.52 - - - - 1.52 - - 1.52 - -

1 TrichyThanjavur

EDCCapital

Extension of LT & LT CT, HT Supply to

various tariff servicesNew service connections effected 12.65

Based on the application from

the consumers, approval was

accorded by the competent

authorities

Adding consumers 3.78 4.20 4.29 4.30 4.16 4.15 4.20 4.30 4.15 3.78 4.29 4.16

2 TrichyThanjavur

EDCCapital Establishment of 33 kV sub stations

To improve the network and Load

growth 3.30

Approved by the competent

authority as per the field

proposal

To reduce the Line

loss, etc 1.98 2.20 1.32 1.10 - - 2.20 1.10 - 1.98 1.32 -

3 TrichyThanjavur

EDCImprovement

Improvement works- Erection of DT,New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 10.48

Approved by the competent

authority as per the field

proposal

To reduce the Line

loss, etc 3.06 3.40 3.31 3.30 3.73 3.78 3.40 3.30 3.78 3.06 3.31 3.73

4 TrichyThanjavur

EDCR-APDRP APFC Power factor improvement 0.64

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

0.17 0.19 0.19 0.19 0.28 0.26 0.19 0.19 0.26 0.17 0.19 0.28

5 TrichyThanjavur

EDCR-APDRP 1Phase & 3phase static meters Accuracy in consumption 0.56

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

0.56 0.56 - - - - 0.56 - - 0.56 - -

6 TrichyThanjavur

EDCR-APDRP DSW To reduce AT&C loss 15.38

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

15.38 15.38 - - - - 15.38 - - 15.38 - -

7 TrichyThanjavur

EDCDDUGJY 34.11 24.40 27.11 9.71 7.00 - - 27.11 7.00 - 24.40 9.71 -

8 TrichyThanjavur

EDCIPDS New 33/11 kV SS To reduce AT&C loss 10.54

CMD TANGEDCO

proceedings No:15 dt

08.01.2016

4.21 4.68 4.69 4.69 1.64 1.17 4.68 4.69 1.17 4.21 4.69 1.64

9 TrichyThanjavur

EDCIPDS 33 kV new feeders To reduce AT&C loss 2.25 0.90 1.00 1.00 1.00 0.35 0.25 1.00 1.00 0.25 0.90 1.00 0.35

10 TrichyThanjavur

EDCIPDS New Feeder (Raccoon) 11kV To reduce AT&C loss 8.50 3.40 3.78 3.78 3.78 1.32 0.94 3.78 3.78 0.94 3.40 3.78 1.32

11 TrichyThanjavur

EDCIPDS New Feeder (Raccoon) 22kV To reduce AT&C loss 0.34 0.13 0.15 0.15 0.15 0.06 0.04 0.15 0.15 0.04 0.13 0.15 0.06

Page 188: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

12 TrichyThanjavur

EDCIPDS

Augmentation (OH to UG) (3 x 300sqmm/

11kV)To reduce AT&C loss 3.26 1.30 1.45 1.45 1.45 0.51 0.36 1.45 1.45 0.36 1.30 1.45 0.51

13 TrichyThanjavur

EDCIPDS Augmentation (OH to UG) (4 x 240sqmm) To reduce AT&C loss 3.95 1.58 1.76 1.75 1.75 0.62 0.44 1.76 1.75 0.44 1.58 1.75 0.62

14 TrichyThanjavur

EDCIPDS New Feeder (Rabbit) To reduce AT&C loss 3.74 1.49 1.66 1.66 1.66 0.59 0.42 1.66 1.66 0.42 1.49 1.66 0.59

15 TrichyThanjavur

EDCIPDS Feeder Bifurcation (Rabbit) To reduce AT&C loss 0.23 0.09 0.10 0.10 0.10 0.04 0.03 0.10 0.10 0.03 0.09 0.10 0.04

16 TrichyThanjavur

EDCIPDS

LT OH 1 Ph 2 wire to 3 Ph 4 wire

conversion with Rabbit phase wire and

Weasel Neutral on same supports

To reduce AT&C loss 0.53 0.22 0.24 0.23 0.23 0.08 0.06 0.24 0.23 0.06 0.22 0.23 0.08

17 TrichyThanjavur

EDCIPDS

LT OH 1 Ph 3 wire to 3 Ph 5 wire

conversion with Rabbit phase wire and

Weasel Neutral on same supports

To reduce AT&C loss 3.89 1.56 1.73 1.73 1.73 0.60 0.43 1.73 1.73 0.43 1.56 1.73 0.60

18 TrichyThanjavur

EDCIPDS

LT OH 1 Ph 3 wire to 3 Ph 5 wire

conversion with Rabbit phase wire and

Weasel Neutral with insertion of 7 Nos.

8M PSC poles

To reduce AT&C loss 0.70 0.28 0.31 0.31 0.31 0.11 0.08 0.31 0.31 0.08 0.28 0.31 0.11

19 TrichyThanjavur

EDCIPDS Capacitor Bank ( 1 x 2.4 MVAR) Power factor improvement 2.22 0.88 0.98 0.99 0.99 0.35 0.25 0.98 0.99 0.25 0.88 0.99 0.35

20 TrichyThanjavur

EDCIPDS 16 kVA/ 11kV To reduce AT&C loss 0.07 0.03 0.03 0.03 0.03 0.01 0.01 0.03 0.03 0.01 0.03 0.03 0.01

21 TrichyThanjavur

EDCIPDS 25 kVA/ 11kV To reduce AT&C loss 3.07 1.22 1.36 1.37 1.37 0.48 0.34 1.36 1.37 0.34 1.22 1.37 0.48

22 TrichyThanjavur

EDCIPDS 25 kVA/ 22kV To reduce AT&C loss 0.14 0.05 0.06 0.06 0.06 0.03 0.02 0.06 0.06 0.02 0.05 0.06 0.03

23 TrichyThanjavur

EDCIPDS 40 kVA/ 11kV To reduce AT&C loss 1.69 0.67 0.75 0.75 0.75 0.27 0.19 0.75 0.75 0.19 0.67 0.75 0.27

24 TrichyThanjavur

EDCIPDS 40 kVA/ 22kV To reduce AT&C loss 0.07 0.03 0.03 0.03 0.03 0.01 0.01 0.03 0.03 0.01 0.03 0.03 0.01

25 TrichyThanjavur

EDCIPDS 63kVA/ 11kV To reduce AT&C loss 0.78 0.31 0.34 0.34 0.35 0.13 0.09 0.34 0.35 0.09 0.31 0.34 0.13

26 TrichyThanjavur

EDCIPDS 63kVA/ 22kV To reduce AT&C loss 0.05 0.02 0.02 0.02 0.02 0.01 0.01 0.02 0.02 0.01 0.02 0.02 0.01

27 TrichyThanjavur

EDCIPDS

Boundary meters for ring fencing of Non-

RAPDRP Towns with population more

than 5000

Accuracy in consumption 1.18 0.47 0.52 0.53 0.53 0.18 0.13 0.52 0.53 0.13 0.47 0.53 0.18

28 TrichyThanjavur

EDCIPDS Feeder meter Accuracy in consumption 0.09 0.04 0.04 0.04 0.04 0.01 0.01 0.04 0.04 0.01 0.04 0.04 0.01

29 TrichyThanjavur

EDCIPDS DT Meter (Existing DT) Accuracy in consumption 0.92 0.37 0.41 0.41 0.41 0.14 0.10 0.41 0.41 0.10 0.37 0.41 0.14

30 TrichyThanjavur

EDCIPDS DT Meter for 16 & 25 kVA (Proposed DT) Accuracy in consumption 0.52 0.21 0.23 0.23 0.23 0.08 0.06 0.23 0.23 0.06 0.21 0.23 0.08

Page 189: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

31 TrichyThanjavur

EDCIPDS Single phase Accuracy in consumption 4.84 1.93 2.15 2.15 2.15 0.76 0.54 2.15 2.15 0.54 1.93 2.15 0.76

32 TrichyThanjavur

EDCIPDS Three Phase 10-60 A Accuracy in consumption 1.28 0.51 0.57 0.57 0.57 0.20 0.14 0.57 0.57 0.14 0.51 0.57 0.20

33 TrichyThanjavur

EDCIPDS Solar panal in SS 5KW Utilisation of Non-conversion energy 0.25 0.10 0.11 0.11 0.11 0.04 0.03 0.11 0.11 0.03 0.10 0.11 0.04

34 TrichyThanjavur

EDCIPDS Solar panal in EE Office 10KW Utilisation of Non-conversion energy 0.32 0.13 0.14 0.14 0.14 0.05 0.04 0.14 0.14 0.04 0.13 0.14 0.05

35 TrichyThanjavur

EDCIPDS Solar panal in SE Office 30 KW Utilisation of Non-conversion energy 0.19 0.07 0.08 0.09 0.09 0.03 0.02 0.08 0.09 0.02 0.07 0.09 0.03

36 TrichyThanjavur

EDC

Others

(REC/PFC) - - - - - - - - - - - - - - -

37 TrichyThanjavur

EDCDCW

Shifting of HT/LT lines as per party's

request- - - - - - - - - - - - - - - -

38 TrichyThanjavur

EDC

Any other related

works including

leSS than one

crore works

totally

- - - - - - - - - - - - - - -

1 TrichyNagapattinam

EDCCapital

Extension of LT & LT CT, HT Supply to

12000 Nos various tariff servicesNew service connections effected 9.13

Based on the application from

the consumers, approval was

accorded by the competent

authorities

Adding consumers 2.78 3.09 3.26 3.28 2.81 2.76 3.09 3.28 2.76 2.78 3.26 2.81

2 TrichyNagapattinam

EDCCapital

Establishment of New 33 kV sub stations

at Moovalur, Sirkali urban, Nagore,

Thirukkadaiyur, Kondal, Kallimedu

To improve the network and Load

growth 21.80

Approved by the competent

authority as per the field

proposal

To reduce the Line

loss, etc 10.87 12.08 4.70 3.88 5.65 5.84 12.08 3.88 5.84 10.87 4.70 5.65

3 TrichyNagapattinam

EDCImprovement

Improvement works- SS,Enhancement of

Pr.Trs in sub stations, sub station related

works.(Mayiladuthurai Urban,

Mekkirimangalam, Malliyakollai)

To improve the network and Load

growth 3.89

Approved by the competent

authority as per the field

proposal

To reduce the Line

loss, etc 2.27 2.52 1.62 1.37 - - 2.52 1.37 - 2.27 1.62 -

4 TrichyNagapattinam

EDCImprovement

Improvement works- Erection of DT,New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 9.38

Approved by the competent

authority as per the field

proposal

To reduce the Line

loss, etc 4.13 4.59 5.25 4.79 - - 4.59 4.79 - 4.13 5.25 -

5 TrichyNagapattinam

EDC

RAPDRP

Scheme I (Part

A/Part B)

Erection of New DTs, HVDS

490,APFC,Capacitor Bank etc.

To reduce AT&C loss of the project

towns 9.54

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Reduction of AT&C

loss 4.13 4.59 5.41 4.95 - - 4.59 4.95 - 4.13 5.41 -

6 TrichyNagapattinam

EDC

RAPDRP

Scheme II - - - - - - - - - - - - -

7 TrichyNagapattinam

EDC

RAPDRP

Scheme III etc - - - - - - - - - - - - -

8 TrichyNagapattinam

EDC

RGGVY

Schemes - - - - - - - - - - - - -

9 TrichyNagapattinam

EDCDDUGJY

New SS, Enhancement of Power

Transformer,Replace by Electro

mechanical meter by Static meter

Improvement in Distribution network 23.21 REC/Chn/DDUGJY/215-

16/702 dt 05.01.2016

Reduction of AT&C

loss 10.36 11.51 12.85 11.70 - - 11.51 11.70 - 10.36 12.85 -

10 TrichyNagapattinam

EDCIPDS

New 33/11 kV SS Proposed in Kilvelur,

Thittacherry,Velankanni, feeder

bifurcation,HT line augmentation etc.

Improvement in Distribution network 25.15

CMD TANGEDCO

proceedings No:15 dt

08.01.16

Reduction of AT&C

loss 10.36 11.51 14.79 13.64 - - 11.51 13.64 - 10.36 14.79 -

11 TrichyNagapattinam

EDCNEFS

Replacement of damaged poles &

conductorsImprovement in Distribution network 76.60

CMD TANGEDCO

proceedings No:90 dt

04.03.2013

Reduction of AT&C

loss 34.47 38.30 31.41 30.64 10.72 7.66 38.30 30.64 7.66 34.47 31.41 10.72

Page 190: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

12 TrichyNagapattinam

EDCDCW

Shifting of HT/LT lines as per party's

request

Shifting of HT/LT lines as per party's

request 3.20

Approved by the competent

authority as per the field

proposal

As per party's request 1.16 1.29 1.00 0.97 1.04 0.94 - - - - - -

13 TrichyNagapattinam

EDC

Any other related

works including

leSS than one

crore works

totally

- - - - - - - - - - - - -

14 TrichyNagapattinam

EDC

CDRRP (Coastal

Disastor Risk

Reduction

Project)

EXPE UG Cable & L.T UG Cable laying

work

To maintain unintrupted Suppy and

reduce line loss 143.00 64.35 71.50 58.63 57.20 20.02 14.30 71.50 57.20 14.30 64.35 58.63 20.02

1 Vellore Vellore EDC CapitalExtension of LT & LT CT, HT Supply to

various tariff servicesNew SCs in HT & LT Tariff effected 78.00

Based on the application from

the consumers, approval was

accorded by the competent

authorities

For Energy

accounting 20.70 23.00 25.70 26.00 28.70 29.00 23.00 26.00 29.00 20.70 25.70 28.70

2 Vellore Vellore EDC CapitalEstablishment of 33 kV sub stations at

……… - - - - - - - - - - - - -

3 Vellore Vellore EDC Master PlanEstablishment of New 33/11kV SS at

Cheyyur (Nagavedu) To meet out the increasing demand 1.46 Yet to be sanctioned

To meet out future

load growth - - 1.46 1.46 - - - 1.46 - - 1.46 -

4 Vellore Vellore EDC Master Plan Establishment of New 33/11kV SS at Senji To meet out the increasing demand 1.46 Yet to be sanctionedTo meet out future

load growth - - 1.46 1.46 - - - 1.46 - - 1.46 -

5 Vellore Vellore EDC Master PlanEstablishment of New 33/11kV SS at

PoigaiTo meet out the increasing demand 1.46 Yet to be sanctioned

To meet out future

load growth - - 1.46 1.46 - - - 1.46 - - 1.46 -

6 Vellore Vellore EDC Master PlanEstablishment of New 33/11kV SS at

UssoorTo meet out the increasing demand 1.46 Yet to be sanctioned

To meet out future

load growth - - 1.46 1.46 - - - 1.46 - - 1.46 -

7 Vellore Vellore EDC Master PlanEstablishment of New 33/11kV SS at

ParavathurTo meet out the increasing demand 1.46 Yet to be sanctioned

To meet out future

load growth - - 1.46 1.46 - - - 1.46 - - 1.46 -

8 Vellore Vellore EDC Improvement

Improvement works- Erection of DT, New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 39.00

Approved by the competent

authority as per the field

proposal

Line loss saving 9.90 11.00 12.80 13.00 14.80 15.00 11.00 13.00 15.00 9.90 12.80 14.80

9 Vellore Vellore EDC

RAPDRP

Scheme I (Part

A/Part B)

- - - - - - - - - - - - -

10 Vellore Vellore EDCRAPDRP

Scheme II - - - - - - - - - - - - -

11 Vellore Vellore EDCRAPDRP

Scheme III etc - - - - - - - - - - - - -

12 Vellore Vellore EDCRGGVY

Schemes - - - - - - - - - - - - -

13 Vellore Vellore EDC DDUGJY Augmentation of Power transformer

5MVA to 8MVA at PudupadiTo meet out the increasing demand 1.44 Bp.No.183. Dt. 13.05.2013

To meet out future

load growth 1.44 1.44 - - - - 1.44 - - 1.44 - -

14 Vellore Vellore EDC DDUGJY

Installation of additional 8 MVA

power transformer with additional bay at

Peruvalayam (8MVA Pr.Tr.)

To meet out the increasing demand 1.44 BP.No. 537,Dt.17.12.15To meet out future

load growth 1.44 1.44 - - - - 1.44 - - 1.44 - -

15 Vellore Vellore EDC DDUGJY

Installation of additional 8 MVA power

transformer with additional bay at

Banavaram (8MVA Pr.Tr.)

To meet out the increasing demand 1.44 BP.No. 329, Dt. 04.08.15To meet out future

load growth 1.44 1.44 - - - - 1.44 - - 1.44 - -

16 Vellore Vellore EDC DDUGJY Establishment of New 33/11kV SS at

PonnaiTo meet out the increasing demand 1.46 Yet to be sanctioned

To meet out future

load growth 1.46 1.46 - - - - 1.46 - - 1.46 - -

17 Vellore Vellore EDC DDUGJY Establishment of New 33/11kV SS at

DamaraipakkamTo meet out the increasing demand 1.46 Yet to be sanctioned

To meet out future

load growth 1.46 1.46 - - - - 1.46 - - 1.46 - -

18 Vellore Vellore EDC DDUGJY Establishment of New 33/11kV SS at

KavanoorTo meet out the increasing demand 1.46 Yet to be sanctioned

To meet out future

load growth 1.46 1.46 - - - - 1.46 - - 1.46 - -

19 Vellore Vellore EDC DDUGJY

Installation of additional 8 MVA power

transformer with additional bay at Ozhugur

(8MVA Pr.Tr.)

To meet out the increasing demand 1.44 Bp.No.386. Dt. 04.09.2015To meet out future

load growth 1.44 1.44 - - - - 1.44 - - 1.44 - -

Page 191: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

20 Vellore Vellore EDC DDUGJY Establishment of New 33/11kV SS at

MusiriTo meet out the increasing demand 1.46 Yet to be sanctioned

To meet out future

load growth 1.46 1.46 - - - - 1.46 - - 1.46 - -

21 Vellore Vellore EDC DDUGJY Establishment of New 33/11kV SS at

ManthangalTo meet out the increasing demand 1.46 Yet to be sanctioned

To meet out future

load growth 1.46 1.46 - - - - 1.46 - - 1.46 - -

22 Vellore Vellore EDC DDUGJY Establishment of New 33/11kV SS at

ThiruvalamTo meet out the increasing demand 1.46 Yet to be sanctioned

To meet out future

load growth 1.46 1.46 - - - - 1.46 - - 1.46 - -

23 Vellore Vellore EDC IPDS

Distribution strengthening works,

Replacement of Meters, Provision of DT

Metering, Ring Fencing Points and Addl.

Pr.Transformer provision in Exg 33kV

SS,etc.,

To reduce the AT & C loss 30.67

(Per) CMD TANGEDCO

Proceedings

No.15,Dated:08.01.2016.

To reduce the AT &

C loss 5.52 6.13 25.15 24.54 - - 6.13 24.54 - 5.52 25.15 -

24 Vellore Vellore EDCOthers

(REC/PFC) - - - - - - - - - - - - -

25 Vellore Vellore EDC NEFS Replacement of exg old conductors &

damaged poles (7/4.09, 7/3.35 & Poles)To avoid accidents 42.06

CMD/Tangedco Proceedings

90 & 100 dt. 04.03.2013 &

08.03.2013

Line loss saving 22.55 25.06 19.51 17.00 - - 25.06 17.00 - 22.55 19.51 -

26 Vellore Vellore EDC DCWDCW works in HT & LT lines & net

works.Consumers request. 27.00

Based on the application from

the consumers, approval was

accorded by the competent

authorities

7.20 8.00 8.90 9.00 10.90 10.00 - - - - - -

27 Vellore Vellore EDC

Any other related

works including

less than one

crore works

totally

a). T&P Materials.

b). Plant & Mechinery 4.00 1.35 1.50 1.23 1.20 1.42 1.30 1.50 1.20 1.30 1.35 1.23 1.42

1 VelloreTirupattur

EDCCapital Extension of HT.SC New Service Connection effected 3.70

Based on the application from

the consumers, approval

accorded by the competent

authorities

Adding consumers 0.90 1.00 1.18 1.20 1.47 1.50 1.00 1.20 1.50 0.90 1.18 1.47

2 VelloreTirupattur

EDCCapital Extension of LT -SC.- New Service Connection effected 44.00

Based on the application from

the consumers, approval

accorded by the competent

authorities

Adding consumers 9.90 11.00 15.50 16.00 16.90 17.00 11.00 16.00 17.00 9.90 15.50 16.90

3 VelloreTirupattur

EDCCapital Extension of LTCT SC - New Service Connection effected 5.10

Based on the application from

the consumers, approval

accorded by the competent

authorities

Adding consumers 1.35 1.50 1.68 1.70 1.88 1.90 1.50 1.70 1.90 1.35 1.68 1.88

4 VelloreTirupattur

EDCCapital

Establishment of 33 kV SUB STATIONS

AT - - - - - - - - - - - - -

5 VelloreTirupattur

EDCImprovement

Improvement works in SS, Enhancement of

Pr Trs in substation related works

To improve the networks and load

growth - - - - - - - - - - - - -

6 VelloreTirupattur

EDCImprovement

improvement works in HT/LT lines,

provision of DT'S

IMPROVING NET WORKS

STRENTH AND QUALITY AND

REPLACEMENT OFAGED

CONDECTOR ECT…

27.00

Approvd by the competent

authority as per the field

proposel

To reduce the line

loss,etc 7.20 8.00 8.90 9.00 9.90 10.00 8.00 9.00 10.00 7.20 8.90 9.90

7 VelloreTirupattur

EDC

RAPDRP-PART

B-DSW

Provision of Wedge Connectors per DT

Structure

For redeuction of AT&C loss in HT

and LT Network 0.12

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To reduce the AT &

C loss 0.12 0.12 - - - - 0.12 - - 0.12 - -

8 VelloreTirupattur

EDC

RAPDRP-PART

B-DSW

Provision of Wedge Connectors at LT

Cutpoints and Joints per Cutpoint

For redeuction of AT&C loss in HT

and LT Network 0.03

To reduce the AT &

C loss 0.03 0.03 - - - - 0.03 - - 0.03 - -

9 VelloreTirupattur

EDC

RAPDRP-PART

B-DSW

Renovation of Earthing in Distribution

Transformers

For redeuction of AT&C loss in HT

and LT Network 0.05

To reduce the AT &

C loss 0.05 0.05 - - - - 0.05 - - 0.05 - -

10 VelloreTirupattur

EDCDDUGJY

Establishment of 33/11 kV Velakalnatham

SS with 2x8 MVATo meet future load growth 3.48 B.P.NO.521, dt.7.12.15

To meet out load

growth 2.05 2.28 1.43 1.20 - - 2.28 1.20 - 2.05 1.43 -

11 VelloreTirupattur

EDCDDUGJY

Establishment of 33/11 kV Jolarpet SS

with 2x8 MVATo meet future load growth 3.63 B.P.NO.89, dt.17.2.16

To meet out load

growth 1.44 1.60 2.19 2.03 - - 1.60 2.03 - 1.44 2.19 -

12 VelloreTirupattur

EDCDDUGJY 33/11 kV Pudur Nadu SS To meet future load growth 3.35 Yet to be sanctioned

To meet out load

growth 1.66 1.85 1.69 1.50 - - 1.85 1.50 - 1.66 1.69 -

Page 192: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

13 VelloreTirupattur

EDCDDUGJY 33/11 kV Kunichi SS To meet future load growth 3.35 Yet to be sanctioned

To meet out load

growth 1.66 1.85 1.69 1.50 - - 1.85 1.50 - 1.66 1.69 -

14 VelloreTirupattur

EDCDDUGJY 33/11 kV Eggore SS To meet future load growth 3.35 Yet to be sanctioned

To meet out load

growth 1.66 1.85 1.69 1.50 - - 1.85 1.50 - 1.66 1.69 -

15 VelloreTirupattur

EDCDDUGJY

Establishment of 33/11 kV Patchur SS with

2x8 MVATo meet future load growth 3.63 B.P.NO.506, dt.24.11.15

To meet out load

growth 2.37 2.63 1.26 1.00 - - 2.63 1.00 - 2.37 1.26 -

16 VelloreTirupattur

EDCDDUGJY 33/11 kV Bramanamangalam SS To meet future load growth 3.35 Yet to be sanctioned

To meet out load

growth 1.66 1.85 1.69 1.50 - - 1.85 1.50 - 1.66 1.69 -

17 VelloreTirupattur

EDCDDUGJY

Establishment of 33/11 kV Upparapally

with 2x8 MVATo meet future load growth 3.35 B.P.NO.111, dt.10.3.15

To meet out load

growth 1.66 1.85 1.69 1.50 - - 1.85 1.50 - 1.66 1.69 -

18 VelloreTirupattur

EDCDDUGJY 33/11 kV Anuppu SS To meet future load growth 3.35 Yet to be sanctioned

To meet out load

growth 1.66 1.85 1.69 1.50 - - 1.85 1.50 - 1.66 1.69 -

19 VelloreTirupattur

EDCDDUGJY 33/11 kV Morasapally SS To meet future load growth 3.35 Yet to be sanctioned

To meet out load

growth 1.66 1.85 1.69 1.50 - - 1.85 1.50 - 1.66 1.69 -

20 VelloreTirupattur

EDCDDUGJY

Additional 2X8 MVA to 3X8 Pr. Tr. At

Koratty 33/11 kV SS To meet future load growth 0.90 B.P.NO.3, dt.5.1.15

To meet out load

growth 0.40 0.45 0.50 0.45 - - 0.45 0.45 - 0.40 0.50 -

21 VelloreTirupattur

EDCDDUGJY

Establishment of 33/11 kV Kurusilapet SS

with 2x8 MVATo meet future load growth 1.73 B.P.NO.55, dt.2.2.16

To meet out load

growth 0.93 1.03 0.80 0.70 - - 1.03 0.70 - 0.93 0.80 -

22 VelloreTirupattur

EDCDDUGJY

Establishment of 33/11 kV Matrapally SS

with 2x8 MVATo meet future load growth 1.97 B.P.NO.55, dt.2.2.16

To meet out load

growth 1.12 1.25 0.85 0.72 - - 1.25 0.72 - 1.12 0.85 -

23 VelloreTirupattur

EDCDDUGJY

Establishment of 33/11 kV Kandili SS with

2x8 MVATo meet future load growth 1.21 B.P.NO.55, dt.2.2.16

To meet out load

growth 0.90 1.00 0.31 0.21 - - 1.00 0.21 - 0.90 0.31 -

24 VelloreTirupattur

EDCDDUGJY

Establishment of 33/11 kV Mittur SS with

2x8 MVATo meet future load growth 2.32 Yet to be sanctioned 1.19 1.32 1.13 1.00 - - 1.32 1.00 - 1.19 1.13 -

25 VelloreTirupattur

EDCDDUGJY

Enhancement of Power Transformer

capacity from 2 x 8 MVA to 3 x 8 MVA at

existing Odugathur 33/11 kV SS

To meet future load growth 1.14 Yet to be sanctionedTo meet out load

growth 0.67 0.75 0.47 0.39 - - 0.75 0.39 - 0.67 0.47 -

26 VelloreTirupattur

EDCDDUGJY

Establishment of 33/11 kV Paradarami SS

with 2x8 MVATo meet future load growth 1.76 Yet to be sanctioned 0.90 1.00 0.86 0.76 - - 1.00 0.76 - 0.90 0.86 -

27 VelloreTirupattur

EDCIPDS

Erection of New 33/11kV Manned SS

with 2x8MVA PTs

To improve the tail end voltage of the

project area 3.75

CMD Tangedco proceedings

No.15,Dt.08.01.16

To reduce the AT&C

Loss 2.29 2.54 1.46 1.21 - - 2.54 1.21 - 2.29 1.46 -

28 VelloreTirupattur

EDCIPDS Erection of New 33kV feeder

To improve the tail end voltage of the

project area 1.73

CMD Tangedco proceedings

No.15,Dt.08.01.16

To reduce the AT&C

Loss 0.62 0.69 1.11 1.04 - - 0.69 1.04 - 0.62 1.11 -

29 VelloreTirupattur

EDCIPDS

Erection of New11kV line with 7/4.09

ACSR for feeder/HVDSTo Minimize the loss 3.01

CMD Tangedco proceedings

No.15,Dt.08.01.16

To reduce the AT&C

Loss 1.08 1.20 1.93 1.81 - - 1.20 1.81 - 1.08 1.93 -

30 VelloreTirupattur

EDCIPDS Erection of 100kVA DTS

To bifurcate the load from existing

250kVA DT 0.17

CMD Tangedco proceedings

No.15,Dt.08.01.16

To reduce the AT&C

Loss 0.06 0.07 0.11 0.10 - - 0.07 0.10 - 0.06 0.11 -

31 VelloreTirupattur

EDCIPDS Erection of LT 3 Phase 4 wire line To Minimize the loss 0.80

CMD Tangedco proceedings

No.15,Dt.08.01.16

To reduce the AT&C

Loss 0.29 0.32 0.51 0.48 - - 0.32 0.48 - 0.29 0.51 -

32 VelloreTirupattur

EDCIPDS LT Augmentation

To improve the the voltage regulation

and to reduce the line loss 0.70

CMD Tangedco proceedings

No.15,Dt.08.01.16

To reduce the AT&C

Loss 0.25 0.28 0.45 0.42 - - 0.28 0.42 - 0.25 0.45 -

33 VelloreTirupattur

EDCIPDS Erection of Capacitor bank To improve the Voltage at Sub station 0.49

CMD Tangedco proceedings

No.15,Dt.08.01.16

To reduce the AT&C

Loss 0.18 0.20 0.31 0.29 - - 0.20 0.29 - 0.18 0.31 -

34 VelloreTirupattur

EDCIPDS Erection of 63kVA DTs To Minimize the loss 0.41

CMD Tangedco proceedings

No.15,Dt.08.01.16

To reduce the AT&C

Loss 0.15 0.17 0.26 0.24 - - 0.17 0.24 - 0.15 0.26 -

35 VelloreTirupattur

EDCIPDS Erection of 40kVA DTs To Minimize the loss 1.62

CMD Tangedco proceedings

No.15,Dt.08.01.16

To reduce the AT&C

Loss 0.58 0.65 1.04 0.97 - - 0.65 0.97 - 0.58 1.04 -

36 VelloreTirupattur

EDCIPDS Erection of 25kVA DTs To Minimize the loss 1.03

CMD Tangedco proceedings

No.15,Dt.08.01.16

To reduce the AT&C

Loss 0.37 0.41 0.66 0.62 - - 0.41 0.62 - 0.37 0.66 -

37 VelloreTirupattur

EDCIPDS Erection of 16kVA DTs To Minimize the loss 0.10

CMD Tangedco proceedings

No.15,Dt.08.01.16

To reduce the AT&C

Loss 0.04 0.04 0.06 0.06 - - 0.04 0.06 - 0.04 0.06 -

38 VelloreTirupattur

EDCIPDS Erection of 11kV feeder Meter at SS end For energy accounting purpose 0.04

CMD Tangedco proceedings

No.15,Dt.08.01.16

Evaluation of

townwise AT&C loss 0.02 0.02 0.02 0.02 - - 0.02 0.02 - 0.02 0.02 -

39 VelloreTirupattur

EDCIPDS

Erection of 11kV Ring Fencing Meter at

town boundaryFor energy accounting purpose 0.48

CMD Tangedco proceedings

No.15,Dt.08.01.16

Evaluation of

townwise AT&C loss 0.17 0.19 0.31 0.29 - - 0.19 0.29 - 0.17 0.31 -

Page 193: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

40 VelloreTirupattur

EDCIPDS Erection of DT Metering arrangement For energy accounting purpose 0.63

CMD Tangedco proceedings

No.15,Dt.08.01.16

Evaluation of

townwise AT&C loss 0.22 0.25 0.41 0.38 - - 0.25 0.38 - 0.22 0.41 -

41 VelloreTirupattur

EDCIPDS Static whole current meter 50-100a For accurate billing 0.01

CMD Tangedco proceedings

No.15,Dt.08.01.16

Evaluation of

townwise AT&C loss - - 0.01 0.01 - - - 0.01 - - 0.01 -

42 VelloreTirupattur

EDCIPDS

Replacement of existing 3phase EMM into

10-60A Static metersFor accurate billing 0.86

CMD Tangedco proceedings

No.15,Dt.08.01.16

Evaluation of

townwise AT&C loss 0.31 0.34 0.55 0.52 - - 0.34 0.52 - 0.31 0.55 -

43 VelloreTirupattur

EDCIPDS

Replacement of existing 1phase EMM into

5-20A Static metersFor accurate billing 1.34

CMD Tangedco proceedings

No.15,Dt.08.01.16

Evaluation of

townwise AT&C loss 0.49 0.54 0.85 0.80 - - 0.54 0.80 - 0.49 0.85 -

44 VelloreTirupattur

EDCIPDS

Provision of solar panel at Sub station and

EE office 0.11

CMD Tangedco proceedings

No.15,Dt.08.01.16 0.04 0.04 0.07 0.07 - - 0.04 0.07 - 0.04 0.07 -

45 VelloreTirupattur

EDCIPDS Erection of 11kV bay extension 0.26

CMD Tangedco proceedings

No.15,Dt.08.01.16 0.09 0.10 0.17 0.16 - - 0.10 0.16 - 0.09 0.17 -

46 VelloreTirupattur

EDCIPDS Erection of Mini Tower 0.19

CMD Tangedco proceedings

No.15,Dt.08.01.16 0.07 0.08 0.12 0.11 - - 0.08 0.11 - 0.07 0.12 -

47 VelloreTirupattur

EDCErection of UG Cable For Railway crossing 0.17

CMD Tangedco proceedings

No.15,Dt.08.01.16 0.06 0.07 0.11 0.10 - - 0.07 0.10 - 0.06 0.11 -

48 VelloreTirupattur

EDC

Others

(REC/PFC)Replacement of aged conductor and poles

To avoid accidents and improve the

voltage regulation 15.21

(Per) CMD TANGEDCO

Pro. No: 100 dt 08.03.2013 To avoid accident 15.21 15.21 - - - - 15.21 - - 15.21 - -

49 VelloreTirupattur

EDCExtension of Agl. SC New Service Connection effected 5.91

Based on the application from

the consumers, approval

accorded by the competent

authorities

Adding consumers 1.66 1.85 1.95 1.96 2.30 2.10 1.85 1.96 2.10 1.66 1.95 2.30

50 VelloreTirupattur

EDCDCW Shifting of HT / LT lines & structures

Deviation of Poles, lines & structures

obstructing consumers / public 9.00

Based on the application from

the consumers, approval

accorded by the competent

authorities

Deviation of Poles,

lines & structures

obstructing

consumers / public

2.25 2.50 3.13 3.20 3.62 3.30 - - - - - -

1 VelloreDharmapuri

EDCCapital

Extension of LT & LTCT, HT supply to

24200 Nos various Tariff services during

2016-17 and 25950 Nos during 2017-18

and 26500 Nos During 2018-19

Essential for extension of HT and LT

and LT CT 126.36

Approved by the competent

authority as per the field

proposal

To reduce T&D

Lossess & Line

Lossess in the excute

not work

35.82 39.80 41.76 41.98 44.32 44.58 39.80 41.98 44.58 35.82 41.76 44.32

2 VelloreDharmapuri

EDCCapital Establishment of 33kV Sub station - - - - - - - - - - - - -

3 VelloreDharmapuri

EDCImprovement

Enhancement of Power Transformer

capacity from 2X5 into 2X8MVA at

existing Irumathur 33/11 kV SS

To meet future load growth 1.18

(per) CMD TANGEDCO

PROCEEDINGS No.384 dt.

03.09.2014

To meet out future

load growth 1.18 1.18 - - - - 1.18 - - 1.18 - -

4 VelloreDharmapuri

EDCImprovement

Improvement works- Erection of DT, New

HT feeders, strengthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 13.11

Approved by the Competent

Authority as per the field

proposal

To reduce the line

loss 3.51 3.90 4.18 4.21 4.92 5.00 3.90 4.21 5.00 3.51 4.18 4.92

5 VelloreDharmapuri

EDC

RAPDRP - (Part

B)

Extension of 1 km., 11 kV line with 7/3.35

mm ASCR at 45 m span on 9 m psc poles,

400 kg. Working load and 75 kg/sq.m

wind pressure

For extension of supply to HVDS DTs 0.46

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

For extension of

supply to HVDS DTs 0.46 0.46 - - - - 0.46 - - 0.46 - -

6 VelloreDharmapuri

EDC

RAPDRP - (Part

B) HT ABC Cable To reduce line loss 0.34

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To reduce line loss 0.34 0.34 - - - - 0.34 - - 0.34 - -

7 VelloreDharmapuri

EDC

RAPDRP - (Part

B) Erection of New 63 kVA DTs To offer load relief to the existing DTs 0.08

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To offer load relief to

the existing DTs 0.08 0.08 - - - - 0.08 - - 0.08 - -

8 VelloreDharmapuri

EDC

RAPDRP -

Scheme -IIErection of New 100 kVA DTs To offer load relief to the existing DTs 0.30

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To offer load relief to

the existing DTs 0.30 0.30 - - - - 0.30 - - 0.30 - -

9 VelloreDharmapuri

EDC

RAPDRP - (Part

B) Erection of New 25 kVA DTs To offer load relief to the existing DTs 0.03

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To offer load relief to

the existing DTs 0.03 0.03 - - - - 0.03 - - 0.03 - -

Page 194: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

10 VelloreDharmapuri

EDC

RAPDRP - (Part

B) Erection of New 16 kVA DTs (HVDS)

To reduce HT - LT ratio to ensure

reduction of line loss 0.37

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To reduce HT - LT

ratio to ensure

reduction of line loss

0.37 0.37 - - - - 0.37 - - 0.37 - -

11 VelloreDharmapuri

EDC

RAPDRP -

Scheme-III Erection of New 25 kVA DTs (HVDS)

To reduce HT - LT ratio to ensure

reduction of line loss 0.76

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To reduce HT - LT

ratio to ensure

reduction of line loss

0.76 0.76 - - - - 0.76 - - 0.76 - -

12 VelloreDharmapuri

EDC

RAPDRP - (Part

B)

Provision of wedge connectors at LT

cutpoint and joint per cut pointTo reduce line loss 0.07

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To reduce line loss 0.07 0.07 - - - - 0.07 - - 0.07 - -

13 VelloreDharmapuri

EDCRGGVY 16kVA 11/0.4kV with DT metering

For Rural electrification and BPL

household electrification. 1.86

Lr. No. SE/RE&I(D)

/F.RGGVY-3Dist./ D03/

13DT 08.01.14

For Rural

electrification and

BPL household

electrification.

1.86 1.86 - - - - 1.86 - - 1.86 - -

14 VelloreDharmapuri

EDCRGGVY

11kV line with weasel with 9.14 m RCC

Pole

For Rural electrification and BPL

household electrification. 1.80

Lr. No. SE/RE&I(D)/

F.RGGVY-3Dist./D03/13DT

08.01.14

For Rural

electrification and

BPL household

electrification.

1.80 1.80 - - - - 1.80 - - 1.80 - -

15 VelloreDharmapuri

EDCRGGVY

LT line with weasel with 8.om PSC Pole

(LT 3 Ph. 4 w)

For Rural electrification and BPL

household electrification. 0.28

Lr. No. SE/RE&I(D)

/F.RGGVY-3Dist./

D03/13DT 08.01.14

For Rural

electrification and

BPL household

electrification.

0.28 0.28 - - - - 0.28 - - 0.28 - -

16 VelloreDharmapuri

EDCRGGVY

LT line with weasel with 8.om PSC Pole

(LT l Ph 2 W)

For Rural electrification and BPL

household electrification. 0.64

Lr. No. SE/RE&I(D)

/F.RGGVY-3Dist./

D03/13DT 08.01.14

For Rural

electrification and

BPL household

electrification.

0.64 0.64 - - - - 0.64 - - 0.64 - -

17 VelloreDharmapuri

EDCRGGVY BPL Service connections

For Rural electrification and BPL

household electrification. 0.46

Lr. No. SE/RE&I(D)

/F.RGGVY-3Dist./

D03/13DT 08.01.14

For Rural

electrification and

BPL household

electrification.

0.46 0.46 - - - - 0.46 - - 0.46 - -

18 VelloreDharmapuri

EDCDDUGJY Acquistion of Land for estt. of New SS To meet future load growth 0.25

(Per) CMD TANGEDCO

Pro. No:39 dt 23.01.16 ,Pro.

No:212 dt 18.05.2015 ,

ProNo. 335 dt.12.08.13, Pro.

No:38 dt 23.01.2016 , Pro.

No:39 dt 23.01.16 ,Pro.

No:398 dt 11.09.15 , ( Pro.

No:320 dt 31.07.15 , Pro.

No:71 dt 09.02.16

To meet out future

load growth 0.19 0.21 0.06 0.04 - - 0.21 0.04 - 0.19 0.06 -

19 VelloreDharmapuri

EDCIPDS

5Nos New Estt. of 33/11kV SS and 8Nos

SS augumentationTo meet future load growth 32.61

To meet out future

load growth 18.00 20.00 14.61 12.61 - - 20.00 12.61 - 18.00 14.61 -

20 VelloreDharmapuri

EDCIPDS New 33/11 kV SS

To improve Town Panchayat and to

reduce line loss 1.45

(per) CMD TANGEDCO

Proceedings NO.15

dt.08.01.2016

To improve Town

Panchayat and to

reduce line loss

0.66 0.73 0.59 0.58 0.20 0.14 0.73 0.58 0.14 0.66 0.59 0.20

21 VelloreDharmapuri

EDCIPDS 33/11 kV S/S : Additional Transformer

To improve Town Panchayat and to

reduce line loss 1.26

(per) CMD TANGEDCO

Proceedings NO.15

dt.08.01.2016

To improve Town

Panchayat and to

reduce line loss

0.57 0.63 0.51 0.50 0.18 0.13 0.63 0.50 0.13 0.57 0.51 0.18

22 VelloreDharmapuri

EDCIPDS

33/11 kV S/S Transformer Capacity

enhancement

To improve Town Panchayat and to

reduce line loss 1.20

(per) CMD TANGEDCO

Proceedings NO.15

dt.08.01.2016

To improve Town

Panchayat and to

reduce line loss

0.54 0.60 0.49 0.48 0.17 0.12 0.60 0.48 0.12 0.54 0.49 0.17

23 VelloreDharmapuri

EDCIPDS New 33 kV Feeder

To improve Town Panchayat and to

reduce line loss 0.80

(per) CMD TANGEDCO

Proceedings NO.15

dt.08.01.2016

To improve Town

Panchayat and to

reduce line loss

0.36 0.40 0.33 0.32 0.11 0.08 0.40 0.32 0.08 0.36 0.33 0.11

24 VelloreDharmapuri

EDCIPDS New 11 kV Line

To improve Town Panchayat and to

reduce line loss 6.45

(per) CMD TANGEDCO

Proceedings NO.15

dt.08.01.2016

To improve Town

Panchayat and to

reduce line loss

2.91 3.23 2.64 2.58 0.90 0.64 3.23 2.58 0.64 2.91 2.64 0.90

25 VelloreDharmapuri

EDCIPDS 11 kV Bay Extension

To improve Town Panchayat and to

reduce line loss 0.50

(per) CMD TANGEDCO

Proceedings NO.15

dt.08.01.2016

To improve Town

Panchayat and to

reduce line loss

0.22 0.25 0.21 0.20 0.07 0.05 0.25 0.20 0.05 0.22 0.21 0.07

Page 195: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

26 VelloreDharmapuri

EDCIPDS New LT Line

To improve Town Panchayat and to

reduce line loss 2.16

(per) CMD TANGEDCO

Proceedings NO.15

dt.08.01.2016

To improve Town

Panchayat and to

reduce line loss

0.97 1.08 0.89 0.87 0.30 0.21 1.08 0.87 0.21 0.97 0.89 0.30

27 VelloreDharmapuri

EDCIPDS LT Line Reconducturing

To improve Town Panchayat and to

reduce line loss 7.52

(per) CMD TANGEDCO

Proceedings NO.15

dt.08.01.2016

To improve Town

Panchayat and to

reduce line loss

3.38 3.76 3.09 3.01 1.05 0.75 3.76 3.01 0.75 3.38 3.09 1.05

28 VelloreDharmapuri

EDCIPDS Capacitor bank

To improve Town Panchayat and to

reduce line loss 0.23

(per) CMD TANGEDCO

Proceedings NO.15

dt.08.01.2016

To improve Town

Panchayat and to

reduce line loss

0.11 0.12 0.09 0.09 0.03 0.02 0.12 0.09 0.02 0.11 0.09 0.03

29 VelloreDharmapuri

EDCIPDS HVDS DTs

To improve Town Panchayat and to

reduce line loss 4.47

(per) CMD TANGEDCO

Proceedings NO.15

dt.08.01.2016

To improve Town

Panchayat and to

reduce line loss

2.02 2.24 1.83 1.79 0.62 0.44 2.24 1.79 0.44 2.02 1.83 0.62

30 VelloreDharmapuri

EDCIPDS Metering

To improve Town Panchayat and to

reduce line loss 6.82

(per) CMD TANGEDCO

Proceedings NO.15

dt.08.01.2016

To improve Town

Panchayat and to

reduce line loss

3.06 3.40 2.81 2.74 0.95 0.68 3.40 2.74 0.68 3.06 2.81 0.95

31 VelloreDharmapuri

EDCIPDS Provision of Solar panel

To improve Town Panchayat and to

reduce line loss 0.37

(per) CMD TANGEDCO

Proceedings NO.15

dt.08.01.2016

To improve Town

Panchayat and to

reduce line loss

0.17 0.19 0.15 0.15 0.05 0.03 0.19 0.15 0.03 0.17 0.15 0.05

32 VelloreDharmapuri

EDC

Others

(REC/PFC)

Replacement of aged conductors and poles

(NEFS Scheme)To avoid accidents 9.25

(Per) CMD TANGEDCO

Pro.No:100 dt 08.03.2013 -- 9.25 9.25 - - - - 9.25 - - 9.25 - -

33 VelloreDharmapuri

EDCDCW

Shifting / Deviation of Existing structure,

poles , lines service connection and 24 hrs

supply / dedicated supply to ex HT/ LT/

LTCT services

On Consumer request 12.50

Approved by the competent

authority as per the field

proposal

on Consumer

Request 3.37 3.75 3.98 4.00 5.15 4.75 - - - - - -

1 VelloreKrishnagiri

EDCCapital

Extension of LT & LT CT, HT Supply to

75615.Nos various tariff servicesNew service connections effected 236.60 Various approvals

For effecting new

service 58.14 64.60 78.37 79.90 90.88 92.10 64.60 79.90 92.10 58.14 78.37 90.88

2 VelloreKrishnagiri

EDCCapital

Establishment of 33 kV sub stations at

……… - - - - - - - - - - - - -

3 VelloreKrishnagiri

EDCImprovement

Improvement works- SS,Enhancement of

Pr.Trs in subs tations, sub station related

works.

- - - - - - - - - - - - -

4 VelloreKrishnagiri

EDC

RAPDRP

Scheme I (Part

A)

Provision of Data concentrator unit To Improve the work 0.69

CMD TANGEDCO

proceedings No:60 dt

14.07.2009

To Improve the work 0.69 0.69 - - - - 0.69 - - 0.69 - -

5 VelloreKrishnagiri

EDCRAPDRP

18 kVAR, 36 kVAR & 72 kVAR APFC

panels installed and commissioned in 100

kVA, 250 kVA & 500 kVA DTs

Power factor improvement 0.73

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Power factor

improvement 0.73 0.73 - - - - 0.73 - - 0.73 - -

6 VelloreKrishnagiri

EDCRAPDRP

Replacement of single phase and three

phase EM/HQ meter with static meters

Accurate recording of consumption and

also to avoid human error in taking

reading

0.01

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

Accurate recording of

consumption and also

to avoid human error

in taking reading

0.01 0.01 - - - - 0.01 - - 0.01 - -

7 VelloreKrishnagiri

EDC

RAPDRP -

DSW Strengthening of existing 11 kV line

To augment the current carrying

capacity of the conductor 0.01

CMD TANGEDCO

proceedings No:124 dt

8.04.2011

To augment the

current carrying

capacity of the

conductor

0.01 0.01 - - - - 0.01 - - 0.01 - -

8 VelloreKrishnagiri

EDC

RAPDRP -

DSW Erection of New 63 kVA DTs To offer load relief to the existing DTs 0.15

CMD TANGEDCO

proceedings No124 dt

08.4.11

To offer load relief to

the existing DTs 0.15 0.15 - - - - 0.15 - - 0.15 - -

9 VelloreKrishnagiri

EDC

RAPDRP -

DSW Erection of New 100 kVA DTs 0.03 0.03 0.03 - - - - 0.03 - - 0.03 - -

10 VelloreKrishnagiri

EDC

RAPDRP -

DSW Erection of New 16 kVA DTs

To reduce HT - LT ratio to ensure

reduction of line loss 0.12

CMD TANGEDCO

proceedings No:124 dt

08.4.11

To reduce HT - LT

ratio to ensure

reduction of line loss

0.12 0.12 - - - - 0.12 - - 0.12 - -

11 VelloreKrishnagiri

EDC

RAPDRP -

DSW Erection of New 25 kVA DTs 2.32 2.32 2.32 - - - - 2.32 - - 2.32 - -

12 VelloreKrishnagiri

EDC

RAPDRP -

DSW Erection of New 40 kVA DTs 0.24 0.24 0.24 - - - - 0.24 - - 0.24 - -

Page 196: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

13 VelloreKrishnagiri

EDC

RAPDRP -

DSW Erection of New 63kVA DTs 0.02 0.02 0.02 - - - - 0.02 - - 0.02 - -

14 VelloreKrishnagiri

EDC

RAPDRP -

DSW Erection of New 100 kVA DTs 0.08

CMD TANGEDCO

proceedings No:124dt

08.4.11

0.08 0.08 - - - - 0.08 - - 0.08 - -

15 VelloreKrishnagiri

EDC

RAPDRP-

PART B - DSW

Provision of Wedge Connectors per DT

Structure

For redeuction of AT&C loss in HT

and LT Network 0.18

CMD TANGEDCO

proceedings No:124dt

08.4.11

0.18 0.18 - - - - 0.18 - - 0.18 - -

16 VelloreKrishnagiri

EDCDDUGJY

Scheme works- SS,Enhancement of Pr.Trs

in subs tations, sub station related works.

To improve the network and Load

growth 38.63

CMD/TANGEDCO

Proceedings No:366 dt.

30.08.2013 & other 18

To reduce the line

loss and to meetout

the increasing

demand

12.36 13.73 26.27 24.90 - - 13.73 24.90 - 12.36 26.27 -

17 VelloreKrishnagiri

EDCIPDS

33/11kV NEW Ss Construction of control

room building, inclusive of cost of 33& 11

kV Breakers 33 kV & 11kV 1x630 sq mm

Cable, Battery and Control cable and other

Elecl accessories

To meet out load growth 2.12 Work to be Taken up 2.12 2.12 - - - - 2.12 - - 2.12 - -

18 VelloreKrishnagiri

EDCIPDS 33 kV NEW Feeder /Bifurcationof feedr To meet out load growth 0.14 Work to be Taken up 0.14 0.14 - - - - 0.14 - - 0.14 - -

19 VelloreKrishnagiri

EDCIPDS 11kV Line New Feedr/Feeder Bifuraction To meet out load growth 2.22 Work to be Taken up 2.22 2.22 - - - - 2.22 - - 2.22 - -

20 VelloreKrishnagiri

EDCIPDS Arial Bunched Cable 1.15 Work to be Taken up 1.15 1.15 - - - - 1.15 - - 1.15 - -

21 VelloreKrishnagiri

EDCIPDS 11 kV Bay Extension 0.26 Work to be Taken up 0.26 0.26 - - - - 0.26 - - 0.26 - -

22 VelloreKrishnagiri

EDCIPDS Installation of Distribution Transformer 0.25 Work to be Taken up 0.25 0.25 - - - - 0.25 - - 0.25 - -

23 VelloreKrishnagiri

EDCIPDS LT Line New Feeder/Feeder Bifuration 0.67 Work to be Taken up 0.67 0.67 - - - - 0.67 - - 0.67 - -

24 VelloreKrishnagiri

EDCIPDS Lt Line Augmentation / Reconductoring 1.12 Work to be Taken up 1.12 1.12 - - - - 1.12 - - 1.12 - -

25 VelloreKrishnagiri

EDCIPDS capacitor Bank 0.49 Work to be Taken up 0.49 0.49 - - - - 0.49 - - 0.49 - -

26 VelloreKrishnagiri

EDCIPDS HVDS 2.78 Work to be Taken up 2.78 2.78 - - - - 2.78 - - 2.78 - -

27 VelloreKrishnagiri

EDCIPDS Metering 4.77 Work to be Taken up 4.77 4.77 - - - - 4.77 - - 4.77 - -

28 VelloreKrishnagiri

EDCIPDS Provision of Solar Panels 0.04 Work to be Taken up 0.04 0.04 - - - - 0.04 - - 0.04 - -

29 VelloreKrishnagiri

EDCIPDS Others 0.11 Work to be Taken up 0.11 0.11 - - - - 0.11 - - 0.11 - -

1 VillupuramCuddalore

EDCCapital

Extension of LT & LT CT, HT Supply to

20000. Nos various tariff services (Year

wise)

New service connections effected 95.00

Based on the application from

the consumers, approval is

being accorded by the

Competent Authority

Adding Consumers 26.10 29.00 31.70 32.00 33.80 34.00 29.00 32.00 34.00 26.10 31.70 33.80

2 VillupuramCuddalore

EDCCapital Establishment of 33 kV sub stations

To improve the network and Load

growth 24.03

Approval is being accorded

by the Competent AuthoritySystem Strengthening 7.20 8.00 7.10 7.00 8.83 9.03 8.00 7.00 9.03 7.20 7.10 8.83

3 VillupuramCuddalore

EDCImprovement

Improvement works - SS, Enhancement of

Pr.Trs in sub stations, sub station related

works.

To improve the network and Load

growth 6.00

Approval is being accorded

by the Competent Authority

To Reduce the AT &

C losses 1.62 1.80 1.98 2.00 2.18 2.20 1.80 2.00 2.20 1.62 1.98 2.18

4 VillupuramCuddalore

EDCImprovement

Improvement works- Erection of DT,New

HT feeders, strenthening of HT cables,

Laying LT cable and erection of pillar

boxes.

To improve the network and Load

growth 51.50

Approval is being accorded

by the Competent AuthorityNil 14.17 15.75 17.10 17.25 18.38 18.50 15.75 17.25 18.50 14.17 17.10 18.38

5 VillupuramCuddalore

EDC

RAPDRP

Scheme I(Part

A/Part B)

- - - - - - - - - - - - -

6 VillupuramCuddalore

EDC

RAPDRP

Scheme II - - - - - - - - - - - - -

Page 197: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

7 VillupuramCuddalore

EDC

RAPDRP

Scheme III etc - - - - - - - - - - - - -

8 VillupuramCuddalore

EDC

RGGVY

Schemes - - - - - - - - - - - - -

9 VillupuramCuddalore

EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

To reduce AT & C Loss 80.51

Lr. No. SE/RE&I (D)/

EE/PCII/

A1/.DDUGJY/D.27/15,

dt.30.01.15.

To achieve precise

and correct Billing of

consumption of

Electricity

18.90 21.00 34.96 36.51 26.65 23.00 21.00 36.51 23.00 18.90 34.96 26.65

10 VillupuramCuddalore

EDCIPDS

Erection of HVDS DTs, LT line

reconditioning & Augmentation,

Replacement of Electromechanical meters

To reduce AT & C Loss 34.60

(per) - CMD TANGEDCO

Proceeding No. 15 dt.

08.01.16.

Reduction of AT & C

Losses 18.00 20.00 16.60 14.60 - - 20.00 14.60 - 18.00 16.60 -

11 VillupuramCuddalore

EDC

CDRRP (Coastal

Disastor Risk

Reduction

Project)

To avoid line loss To reduce AT & C Loss 217.64 Approval yet to be givenTo avoid losses from

Natural calamities 72.00 80.00 71.00 70.00 74.64 67.64 80.00 70.00 67.64 72.00 71.00 74.64

12 VillupuramCuddalore

EDCNEFS

Replacement of damaged poles, conductors

in Distribution Network.To reduce AT & C Loss 72.48

NEFS san. No. Memo.No.

SE/ RE&I (D)/ EE/

RGGVY/A2/F.Recond/D.148

/14, dt.26.09.14.

System Improvement 22.50 25.00 25.00 25.00 24.98 22.48 25.00 25.00 22.48 22.50 25.00 24.98

13 VillupuramCuddalore

EDCDCW To deviate existing Network as per request - 7.50 Nil

Line deviation work

as per Party request 2.02 2.25 2.48 2.50 3.00 2.75 - - - - - -

14 VillupuramCuddalore

EDC

Any other related

works including

less than one

crore works

totally

- - - - - - - - - - - - -

1 VillupuramThiruvannamal

ai EDCCapital

Extension of LT & LT CT, HT Supply to

various tariff services (Year wise)New service connections effected 72.03

Based on the application from

the consumers, approval is

being accorded by the

Competent Authority

Adding Consumers 18.67 20.75 24.06 24.42 26.61 26.86 20.75 24.42 26.86 18.67 24.06 26.61

2 VillupuramThiruvannamal

ai EDCImprovement

Improvement works - SS, Enhancement of

Pr.Trs in sub stations, sub station related

works.

Establishment of new 33/11 kV SS at

Kadambai 4.31 - - - - 4.31 4.31 - - - 4.31 - - 4.31 -

3 VillupuramThiruvannamal

ai EDCImprovement

Improvement works - SS, Enhancement of

Pr.Trs in sub stations, sub station related

works.

Establishment of new 33/11 kV SS at

Melpadur 4.31 - - - - 4.31 4.31 - - - 4.31 - - 4.31 -

4 VillupuramThiruvannamal

ai EDCImprovement

Improvement works - SS, Enhancement of

Pr.Trs in sub stations, sub station related

works.

Establishment of new 33/11 kV SS at

Arasampattu 4.31 - - - - 4.31 4.31 - - - 4.31 - - 4.31 -

5 VillupuramThiruvannamal

ai EDCImprovement

Improvement works - SS, Enhancement of

Pr.Trs in sub stations, sub station related

works.

Establishment of new 33/11 kV SS at

Salukkai 4.74 - - - - - - 4.27 4.74 - - 4.74 - - 4.27

6 VillupuramThiruvannamal

ai EDCImprovement

Improvement works - SS, Enhancement of

Pr.Trs in sub stations, sub station related

works.

Establishment of new 33/11 kV SS at

Ammapalayam 4.74 - - - - - - 4.27 4.74 - - 4.74 - - 4.27

7 VillupuramThiruvannamal

ai EDCImprovement

Improvement works - SS, Enhancement of

Pr.Trs in sub stations, sub station related

works.

Establishment of new 33/11 kV SS at

Randam 4.74 - - - - - - 4.27 4.74 - - 4.74 - - 4.27

8 VillupuramThiruvannamal

ai EDCImprovement

Improvement works - SS, Enhancement of

Pr.Trs in sub stations, sub station related

works.

Enhancement of Power Transformers 1.50 - - - - 1.35 1.50 - - 1.50 - - 1.35

9 VillupuramThiruvannamal

ai EDCImprovement

Improvement works - SS, Enhancement of

Pr.Trs in sub stations, sub station related

works.

11 kV line augmentation 12.60 3.24 3.60 4.41 4.50 4.50 4.50 3.60 4.50 4.50 3.24 4.41 4.50

10 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Establishment of new 33/11 kV SS at

Varagur 3.03 BP.No. 465/20.10.14 3.03 3.03 - - - - 3.03 - - 3.03 - -

Page 198: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

11 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Establishment of new 33/11 kV SS at

Melma 3.90 BP.No.396/11.09.15 3.90 3.90 - - - - 3.90 - - 3.90 - -

12 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Establishment of new 33/11 kV SS at

Ariyalam 3.92 BP.No. 13/ 6.1.16 3.92 3.92 - - - - 3.92 - - 3.92 - -

13 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Establishment of new 33/11 kV SS at

Onnupuram 3.92 - 3.92 3.92 - - - - 3.92 - - 3.92 - -

14 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Establishment of new 33/11 kV SS at

Athanur 4.31 - 4.31 4.31 - - - - 4.31 - - 4.31 - -

15 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Establishment of new 33/11 kV SS at

Melchengam 4.31 - 4.31 4.31 - - - - 4.31 - - 4.31 - -

16 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Establishment of new 33/11 kV SS at

Nambedu 4.31 - 4.31 4.31 - - - - 4.31 - - 4.31 - -

17 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Establishment of new 33/11 kV SS at

Kadalady 4.31 - 4.31 4.31 - - - - 4.31 - - 4.31 - -

18 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Establishment of new 33/11 kV SS at

Ariyapady 4.31 - 4.31 4.31 - - - - 4.31 - - 4.31 - -

19 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Establishment of new 33/11 kV SS at

Appedu 4.31 - 4.31 4.31 - - - - 4.31 - - 4.31 - -

20 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Establishment of new 33/11 kV SS at

Vasudevanpet 4.31 - 4.31 4.31 - - - - 4.31 - - 4.31 - -

21 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Establishment of new 33/11 kV SS at

Perumpallam 4.31 - 4.31 4.31 - - - - 4.31 - - 4.31 - -

22 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Establishment of new 33/11 kV SS at

Collectrate 4.31 - - - 4.31 4.31 - - - 4.31 - - 4.31 -

23 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Establishment of new 33/11 kV SS at

Anakkavur 4.31 - - - 4.31 4.31 - - - 4.31 - - 4.31 -

24 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Establishment of new 33/11 kV SS at

Mekkalur 4.31 - - - 4.31 4.31 - - - 4.31 - - 4.31 -

25 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Establishment of new 33/11 kV SS at

Sathiyavady 4.31 - - - 4.31 4.31 - - - 4.31 - - 4.31 -

26 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Enhancement of Pr.Tr capacity from

1X5 MVA to 1X8 MVA at Anaibogi

33/11 kV SS

0.57 - - - 0.57 0.57 - - - 0.57 - - 0.57 -

27 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Enhancement of Pr.Tr capacity from

1X5 MVA to 1X8 MVA at Desur

33/11 kV SS

0.57 - - 0.57 0.57 - - - 0.57 - - 0.57 -

28 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Enhancement of Pr.Tr capacity from

1X5 MVA to 1X8 MVA at

Jamunamarathur 33/11 kV SS

0.57 - - 0.57 0.57 - - - 0.57 - - 0.57 -

29 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Enhancement of Pr.Tr capacity from

1X5 MVA to 1X8 MVA at

Melravandhavadi 33/11 kV SS

0.57 - - 0.57 0.57 - - - 0.57 - - 0.57 -

Page 199: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

30 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Enhancement of Pr.Tr capacity from

1X5 MVA to 1X8 MVA at

Paramananthal 33/11 kV SS

0.57 - - 0.57 0.57 - - - 0.57 - - 0.57 -

31 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Enhancement of Pr.Tr capacity from

1X5 MVA to 1X8 MVA at

Vadamathimangalam 33/11 kV SS

0.57 - - 0.57 0.57 - - - 0.57 - - 0.57 -

32 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Enhancement of Pr.Tr capacity from

1X8 MVA to 2X8 MVA at

Kilkodungalur 33/11 kV SS

1.45 - - 1.45 1.45 - - - 1.45 - - 1.45 -

33 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Enhancement of Pr.Tr capacity from

1X8 MVA to 2X8 MVA at Kottaiyur

33/11 kV SS

1.45 - - 1.45 1.45 - - - 1.45 - - 1.45 -

34 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Enhancement of Pr.Tr capacity from

1X8 MVA to 2X8 MVA at

Mansurabath 33/11 kV SS

1.45 - - 1.45 1.45 - - - 1.45 - - 1.45 -

35 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Enhancement of Pr.Tr capacity from

2X5MVA to 2X8 MVA at Mazhaiyur

33/11 kV SS

1.15 - - 1.15 1.15 - - - 1.15 - - 1.15 -

36 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Enhancement of Pr.Tr capacity from

1X8 MVA to 2X8 MVA at

Perungulathur 33/11 kV SS

1.45 - - 1.45 1.45 - - - 1.45 - - 1.45 -

37 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Enhancement of Pr.Tr capacity from

1X8 MVA to 2X8 MVA atSomasibady

33/11 kV SS

1.45 - - 1.45 1.45 - - - 1.45 - - 1.45 -

38 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Enhancement of Pr.Tr capacity from

1X8 MVA to 2X8 MVA at Thirumani

33/11 kV SS

1.45 - - 1.45 1.45 - - - 1.45 - - 1.45 -

39 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Enhancement of Pr.Tr capacity from

1X3.15 MVA to 1X5 MVA at Doosi

LT SS

0.41 - - 0.41 0.41 - - - 0.41 - - 0.41 -

40 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

Enhancement of Pr.Tr capacity from

1X3.15 MVA to1X5 MVA atPickup

Dam LT SS

0.41 - - 0.41 0.41 - - - 0.41 - - 0.41 -

41 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

9 No's 11 kV Feeder separation at

varoius places 38.15 - - 38.15 38.15 - - - 38.15 - - 38.15 -

42 VillupuramThiruvannamal

ai EDCDDUGJY

Improvement works erection of DTs, New

HT Line, Feeder Segregation, LT

Strengthening and conversion works.

33 kV Line augmentation at various

places 4.14 - - - 4.14 4.14 - - - 4.14 - - 4.14 -

43 VillupuramThiruvannamal

ai EDCRAPDRP

DISTRIBUTION STRENGTHENING

WORKS

11 kV Line augmentation at various

places - - - - - - - - - - - - -

44 VillupuramThiruvannamal

ai EDCIPDS

DISTRIBUTION STRENGTHENING

WORKS

Work yet to be started at 12 Nos. town

of TEDC 45.42

(Per.) CMD TANGEDCO

Proceedings No.15/

Dt.08.01.2016

16.35 18.17 22.26 22.71 6.81 4.54 18.17 22.71 4.54 16.35 22.26 6.81

1 VillupuramVillupuram

EDCCapital

Extension of LT & LT CT, HT Supply to

32,220 No. various tariff servicesNew service connections effected. 138.84

To be approved by the

competent authoritiesAdding consumers 41.26 45.84 45.98 46.00 46.90 47.00 45.84 46.00 47.00 41.26 45.98 46.90

2 VillupuramVillupuram

EDCImprovement

Improvement works in certain HT/LT lines,

provision of DTs in required area &

upgradation of DTs.

Improving network strength & quality.

Replacement of aged conductors and

poles etc.,

51.03 To be approved by the

competent authorities

To reduce the line

loss etc., 15.33 17.03 17.00 17.00 17.00 17.00 17.03 17.00 17.00 15.33 17.00 17.00

3 VillupuramVillupuram

EDC

RAPDRP

Scheme I (Part

Part B)

(1) Erection of 215 Nos. New 22 kV/ 433

V HVDS DTs at Villupuram town and 110

Nos New 11 kV/433 V HVDS DT s at

Tindivanam. (2) Erection of Wedge

connectors, Distribution box etc.

To reduce AT & C loss of project

towns. 2.52

(Per.) CMD TANGEDCO

Proceedings 124/ 08.04. 2011

& 255/ 16.07.2011

Reduction of AT & C

loss 2.52 2.52 - - - - 2.52 - - 2.52 - -

4 VillupuramVillupuram

EDC

RAPDRP

Scheme II - - - - - - - - - - - - -

5 VillupuramVillupuram

EDC

RAPDRP

Scheme III etc - - - - - - - - - - - - -

Page 200: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

6 VillupuramVillupuram

EDC

RGGVY

Schemes - - - - - - - - - - - - -

7 VillupuramVillupuram

EDCDDUGJY

Improvement works (1)

Feeder segregation, (2)

Replacement of Electro Mech meters

(3) Establishment of new SS &

Enhancement of Pr.Tr.

1.Ural 33/11kV Um SS

2.Unnamandal 33/11kV Um SS

3.Periyathatchur 33/11kV Um SS

4.Nagandur 33/11kV Um SS

5.Avalurpet 33/11kV Manned SS

Electrification of Rural Habitations &

associted infrastructure development. 18.11 BP.No. 538/12.12. 2014

Development of

Rural Electrical

infrastructre

3.27 3.63 14.84 14.48 - - 3.63 14.48 - 3.27 14.84 -

8 VillupuramVillupuram

EDCIPDS

Improvement works in certain HT/LT lines,

provision of DTs in required area &

upgradation of DTs.

To reduce AT & C loss of project

towns. 26.72

(Per.) CMD TANGEDCO

Proceedings 15/08.01.2016

Reduction of AT & C

loss 9.62 10.69 17.10 16.03 - - 10.69 16.03 - 9.62 17.10 -

9 VillupuramVillupuram

EDC

Others

(REC/PFC)

Extension of LT & LT CT Supply to

29,000 No. various tariff services in Rural

areas

New service connections effected. 1.45

Based on the applications

received from consumers,

approval was accorded by the

competent authorties

Adding consumers 1.45 1.45 - - - - 1.45 - - 1.45 - -

10 VillupuramVillupuram

EDCNEFS

Replacement of damaged poles &

conductors in Rual habitationsTo avoid electrical accident. 13.45

Per CMD/ TANGEDCO

Proceedings No.

100/08.03.2013

To avoid electrical

acccident 13.45 13.45 - - - - 13.45 - - 13.45 - -

11 VillupuramVillupuram

EDCDCW To deviate existing network as per request To avoid electrical accident. 0.61

Approved based on

competent authority

To reduce the line

loss etc., 0.61 0.61 - - - - - - - - - -

1 VillupuramKallakurichi

EDCCapital

Extension of LT & LT CT, HT Supply to

39,040 Nos various tariff servicesNe service connection effected 44.50

Tobe approved by the

competent authoritiesAdding consumers 12.10 13.44 14.65 14.79 16.12 16.27 13.44 14.79 16.27 12.10 14.65 16.12

2 VillupuramKallakurichi

EDCImprovement

Improvement works- Erection of DT,New

HT feeders, strenthening of HT cables,

Laying LT cable and erection of pillar

boxes.

Improving network strength and

quality. Replacement of Aged

conductors and pols etc.,

18.05 Tobe approved by the

competent authorities

To reduce the line

loss 4.90 5.45 5.95 6.00 6.54 6.60 5.45 6.00 6.60 4.90 5.95 6.54

3 VillupuramKallakurichi

EDC

RAPDRP

Scheme I (Part

A/Part B)

Erection of New Distribution

Transformers, Strengthening of HT/LT

Lines, etc.

To reduce AT&C loss of the project

towns 3.72

(Per) CMD TANGEDCO

Proceedings No.124/

dt.08.04.2011

Reduction of AT&C

Loss 3.72 3.72 - - - - 3.72 - - 3.72 - -

4 VillupuramKallakurichi

EDC

RAPDRP

Scheme II - - - - - - - - - - - - -

5 VillupuramKallakurichi

EDC

RAPDRP

Scheme III etc - - - - - - - - - - - - -

6 VillupuramKallakurichi

EDC

RGGVY

Schemes - - - - - - - - - - - - -

7 VillupuramKallakurichi

EDCDDUGJY

Improvement works 1)

Feeder segregation, 2)

Replacement of Electro Mech meters,

3) Establishment of new SS &

Enhancement of Pr.Tr..

1) Sendhanadu 33/11 KV SS,

2)Eraiyur, 33/11 KV SS.

To extend supply upto Rural areas to

reduce line loss and improve Network

in Rural Areas.

54.75 Expected Adding consumers 35.21 39.12 19.54 15.63 - - 39.12 15.63 - 35.21 19.54 -

8 VillupuramKallakurichi

EDCIPDS

Erection of HVDS DTs, LT line

reconditioning & Augmentation,

Replacement of Electromechanical meters

To reduce line loss, to impove voltage

and to avoid accidents 23.70

CMD TANGEDCO

Proceeding No.15

dt.08.01.2016

Adding Consumers 10.66 11.85 13.04 11.85 - - 11.85 11.85 - 10.66 13.04 -

9 VillupuramKallakurichi

EDC

Others

(REC/PFC)

Extension of LT & LT CT Supply to

various tariff services in Rural areaNe service connection effected 2.00

Based on the application

received from consumer

approval was accorded by the

competent authority

Adding Consumers 2.00 2.00 - - - - 2.00 - - 2.00 - -

10 VillupuramKallakurichi

EDCNEFS

Replacement of damaged poles, conductors

in Distribution Network.

To reduce lineloss, to avoid accidents

and to improve voltage. 10.90 B.P.No.100/08.03.2013 Adding Consumers 10.90 10.90 - - - - 10.90 - - 10.90 - -

11 VillupuramKallakurichi

EDCDCW To deviate existing Network as per request To avoid accident 4.20

Approved based on

competent authority

To reduce the line

loss 1.14 1.27 1.38 1.39 1.68 1.54 - - - - - -

Page 201: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

12 VillupuramKallakurichi

EDC

Any other related

works including

less than one

crore works

totally

- 47 - - - - - - - - - - - -

Page 202: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Chennai North 765.98 415.03 425.55 192.2 193.56 144.3 146.87 419.85 193.56 146.87 409.33 192.2 144.3

Chennai South 1783.72 1144.66 1178.53 327.46 324.95 286.03 280.24 1127.57 323.45 278.64 1093.8 326.01 284.28

Coimbatore 1291.44 677.86 698.14 300.63 309.73 298.55 283.57 613.86 274.73 242.07 596.53 266.18 253.55

Erode 1392.95 568.34 625.88 506.7 487.87 297.53 279.2 580.36 453.25 250.1 527 471.37 264.96

Madurai 1146.82 693.84 712.52 222.19 215.33 215.64 218.97 698.84 203.33 206.97 681.36 210.19 202.44

Tirunelveli 747.98 402.3 422.79 212.08 203.42 127.79 121.77 397.29 187.42 104.77 378.3 196.18 109.19

Trichy 1332.86 621.96 670.04 469.15 452.61 228.91 210.21 635.3 439.2 198.83 590.64 453.66 216.19

Vellore 947.66 336.32 366.13 347.94 340.71 241.79 240.82 351.88 324.51 222.77 323.5 331.93 222.12

Villupuram 1285.38 438.16 477.54 494.68 488.21 332.78 319.63 473.41 484.32 315.34 434.39 490.82 328.1

Total 10,694.79 5,298.47 5,577.12 3,073.03 ##### 2,173.32 2,101.28 ###### 2,883.77 ###### 5,034.85 2,938.54 ######

Chennai Central EDC 406.02 199.32 204.1 106.82 108.22 90.51 93.7 198.4 108.22 93.7 193.62 106.82 90.51

Chennai West

EDC145.02 97 99.34 27.67 27.18 18.5 18.5 99.34 27.18 18.5 97 27.67 18.5

Chennai North

EDC214.94 118.71 122.11 57.71 58.16 35.29 34.67 122.11 58.16 34.67 118.71 57.71 35.29

Chennai South

EDC981.3 906.61 916.39 45.34 39.51 26.81 25.4 866.39 39.51 25.4 856.61 45.34 26.81

Kanchipuram EDC 378.31 103.38 114.86 144.59 147.9 120.53 115.55 113.9 146.4 113.95 102.52 143.14 118.78

Chengalpattu

EDC424.11 134.67 147.28 137.53 137.54 138.69 139.29 147.28 137.54 139.29 134.67 137.53 138.69

Coimbatore

Metro EDC295.36 209.93 213.11 38.73 39.5 43.4 42.75 181.54 32 34.25 178.96 31.38 34.15

Coimbatore

North EDC189.35 106.41 109.6 39.48 39.88 41.66 39.87 100.42 34.88 33.87 97.73 34.48 35.16

Coimbatore

South EDC198.41 91.31 94.19 55.53 58.5 49.54 45.72 81.46 53.5 39.72 79.08 50.53 43.04

Tiruppur EDC 319.52 125.72 132.5 93.18 96 95.92 91.02 113.91 86 79.02 107.93 83.38 82.92

Udumalpet

EDC200.16 108.09 110.37 42.78 45 46.99 44.79 98.8 38 36.79 97.02 35.98 38.29

Nilgiis EDC 88.64 36.4 38.37 30.93 30.85 21.04 19.42 37.73 30.35 18.42 35.81 30.43 19.99

Erode EDC 388.85 193.76 214.74 157.04 143.77 36.66 30.34 201.28 131.61 19.24 181.55 144.85 24.34

Gobi EDC 210.94 90.6 99.52 72.75 70.59 44.73 40.83 97.08 68.09 37.98 88.38 70.28 41.63

Mettur EDC 224.62 88.22 97.45 71.87 69.62 60.72 57.55 90.25 63.97 54.55 81.73 66.08 57.15

Salem EDC 303.37 116.08 126.39 105.6 102.41 76.16 74.57 119.96 95.83 67.33 110.25 99.08 68.26

Namakkal EDC 265.17 79.68 87.78 99.44 101.48 79.26 75.91 71.79 93.75 71 65.09 91.08 73.58

Sivaganga

EDC275.59 102.86 111.49 109.34 106.58 59.78 57.52 99.49 94.58 45.52 92.06 97.34 46.58

Theni EDC 103.54 49.24 52.35 30.96 30.95 23.34 20.24 51.81 30.95 20.24 48.7 30.96 23.34

Madurai Metro EDC 374.19 236.24 238.46 37.39 35.17 90.5 100.56 238.46 35.17 100.56 236.24 37.39 90.5

Ramnad EDC 41.85 20.32 21.35 10.25 10.25 10.28 10.25 21.35 10.25 10.25 20.32 10.25 10.28

Dindigul EDC 72.98 34.77 38.22 31.59 29.96 6.14 4.8 38.22 29.96 4.8 34.77 31.59 6.14

Part - B Palani Town 137.25 137.25 137.25 0 0 0 0 136.11 0 0 136.11 0 0

Madurai EDC 111.92 109.26 109.5 2.66 2.42 0 0 109.5 2.42 0 109.26 2.66 0

Usilampatty 29.5 3.9 3.9 0 0 25.6 25.6 3.9 0 25.6 3.9 0 25.6

Virudhunagar

EDC100.99 40.97 42.82 40.18 39.99 18.85 18.18 42.82 39.99 18.18 40.97 40.18 18.85

Tirunelveli

EDC316.15 200.66 207.45 72.78 70.84 40.98 37.86 196.95 70.84 37.86 190.16 72.78 40.98

Kanyakumari

EDC223.23 106.36 113.73 74.9 71.16 39.84 38.34 98.73 55.16 21.34 92.86 59 21.24

Tuticorin EDC 107.61 54.31 58.79 24.22 21.43 28.12 27.39 58.79 21.43 27.39 54.31 24.22 28.12

Page 203: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section

Trichy Metro EDC 240.21 116.15 121 76.03 76.31 45.86 42.9 121 76.31 42.9 116.15 76.03 45.86

Thiruvarur EDC - Thiruvarur 76.21 22.36 24.57 25.82 25.82 25.77 25.82 24.57 25.82 25.82 22.36 25.82 25.77

Thiruvarur EDC-Mannargudi Town 5.01 5.01 5.01 0 0 0 0 5.01 0 0 5.01 0 0

Thiruvarur EDC-Thiruvarur town 12.65 10.47 10.67 2.18 1.98 0 0 10.67 1.98 0 10.47 2.18 0

IPDS - (8 Nos.Town Panchayat) 29.86 12.12 13.44 11.55 11.37 6.19 5.05 10.5 8.43 2.11 9.47 8.61 2.96

Karur EDC 110.39 59.87 64.13 38.78 36.48 11.74 9.78 63.62 36.48 9.78 59.36 38.78 11.74

Pudukkottai EDC 305.74 123.15 134.55 104.24 99.83 72.35 71.36 104.55 90.33 63.86 96.15 92.69 63.9

Perambalur

EDC95.16 56.42 57.97 28.1 27.79 9.89 9.4 57.97 27.79 9.4 56.42 28.1 9.89

Thanjavur

EDC132.73 71.53 77.72 43.53 40.61 16.87 14.4 77.72 40.61 14.4 71.53 43.53 16.87

Nagapattinam

EDC324.9 144.88 160.98 138.92 132.42 40.24 31.5 159.69 131.45 30.56 143.72 137.92 39.2

Vellore EDC 242.55 81.74 89.21 100.59 98.04 55.82 55.3 81.21 89.04 45.3 74.54 91.69 44.92

Tirupattur

EDC173.24 69.64 75.72 64.49 61.72 36.07 35.8 73.22 58.52 32.5 67.39 61.36 32.45

Dharmapuri EDC 235.94 93.74 102.17 78.22 76.15 59.02 57.62 98.42 72.15 52.87 90.37 74.24 53.87

Krishnagiri

EDC295.93 91.2 99.03 104.64 104.8 90.88 92.1 99.03 104.8 92.1 91.2 104.64 90.88

Cuddalore

EDC589.26 182.51 202.8 207.92 206.86 192.46 179.6 200.55 204.36 176.85 180.49 205.44 189.46

Thiruvannamal

ai EDC281.57 87.51 91.77 137.28 138.18 52.08 51.62 91.77 138.18 51.62 87.51 137.28 52.08

Villupuram

EDC252.73 87.51 95.22 94.92 93.51 63.9 64 94.61 93.51 64 86.9 94.92 63.9

Kallakurichi

EDC161.82 80.63 87.75 54.56 49.66 24.34 24.41 86.48 48.27 22.87 79.49 53.18 22.66

Total 10694.79 5298.47 5577.12 3073.03 3016.4 2173.32 2101.28 5298.36 2883.77 1966.36 5034.85 2938.54 2025.13

TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE


Recommended