Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring Office Jl. KS Tubun I/2 Petamburan, Jakarta prepared by Department of Civil and Environmental Engineering UGM for MHI Heavy Industries, Ltd. Tohosago, Japan
Transcript
Page 1: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

Tanjung Priok GFPPEP

Presentation and discussion, 22 October 2009PT. PLN (Persero) Jasa Enjiniring OfficeJl. KS Tubun I/2 Petamburan, Jakarta

prepared byDepartment of Civil and Environmental Engineering UGMforMHI Heavy Industries, Ltd.Tohosago, Japan

Page 2: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

Physical model test to evaluate hydraulic performance of the CW discharge line and seal pit at Tanjung Priok GFPPEP Discharge capacity of the seal pit

▪ no flooding

Water surface profile along the seal pit and outfall▪ no overflow

▪ overflow, turbulence, washout

Energy dissipation at the outfall▪ effective dissipation at the outfall

▪ smooth transition of flow from outfall into the sea

2

Page 3: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

General layout

inner dia. 3.2 mlength ±60 m

3

Page 4: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

Model scale is defined at 1:15 considering

Availability of space

Pump capacity

Measuring instruments

A non-distorted model, i.e. similar horizontal and vertical length scale, is selected

4

Page 5: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

ParametersModel Scale

Notation Calculation Magnitude

Length, Width nL nL 15

Depth nL nL 15

Area nA nL2 225

Volume nV nL3 3,375

Time nT nL1/2 3.87

Velocity nU nL1/2 3.87

Discharge nQ nL5/2 871.42

5

Page 6: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

6

Model scale 1:15made of acrylic material

Page 7: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

7

Page 8: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

8

Page 9: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

ParametersPrototype Model

Magnitude Unit Magnitude Unit

Discharge structure

length 24 m 160 cm

width 16 m 106.7 cm

depth 7.9 m 52.7 cm

Discharge

2-pump operation 65,200 m3/h 20.8 ℓ/s

1-pump operation 39,120 m3/h 12.5 ℓ/s

Downstream flow depth

(at the Outfall)

HWL 5.4 m 36 cm

LWL 4.4 m 29.3 cm

9

Model scale 1:15

Page 10: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

Water Surface ProfileEnergy Dissipation

10

Page 11: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

Water surface profile computation

Standard step method

One dimensional calculation

Use of HEC-RAS model

Energy dissipation computation

Analytical calculation

Calculation procedure follows the method explained in the USBS Design of Small Dams

11

Page 12: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

12

Channel

CW D i scha r ge

None of the XS's are Geo-Referenced ( Geo-Ref user entered XS Geo-Ref interpolated XS Non Geo-Ref user entered XS Non Geo-Ref interpolated XS)

None of the XS's are Geo-Referenced ( Geo-Ref user entered XS Geo-Ref interpolated XS Non Geo-Ref user entered XS Non Geo-Ref interpolated XS)

Head tank (pump pit)

Seal PitDischarge line

Computational Domain

0 2 4 6 8 10 12 14-4

-3

-2

-1

0

1

2

3

HEC RAS Tanjung Priok Plan: CW discharge 1 and 2 pump operation

Station (m)

Ele

vati

on (

m)

Legend

Ground

Bank Sta

0 2 4 6 8 10 12 14-4

-3

-2

-1

0

1

2

3

HEC RAS Tanjung Priok Plan: CW discharge 1 and 2 pump operation

Station (m)

Ele

vati

on (

m)

Legend

Ground

Bank Sta

Examples of cross sectionsJava Sea

Seal Pit

Stilling Basin

Page 13: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

13

Parameter Magnitude

Discharge 39,120 m3/h (one-pump operation)

65,200 m3/h (two-pump operation)

Sea water level −0.56 m (LWL)

+0.42 m (HWL)

Manning roughness coefficient 0.015

Discharge coefficient of the sill 1.4

Values of parameters applied in the water surface profile computation

Page 14: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

14

0 10 20 30 40

-6

-4

-2

0

2

4

HEC RAS Tanjung Priok Plan: CW discharge 1 and 2 pump operation

Main Channel Distance (m)

Ele

vation

(m

)

Legend

WS Q 39120 HWL

WS Q 39120 LWL

Ground

ROB

CW Discharge Channel

Stilling Basin Seal Pit

Java Sea

Pipe

Training wall +2.90m

WS +0.62mHWL +0.42m

LWL −0.56m

WS +2.31m

One-pump operation, Q = 39,120 m3/s

Page 15: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

0 10 20 30 40

-6

-4

-2

0

2

4

HEC RAS Tanjung Priok Plan: CW discharge 1 and 2 pump operation

Main Channel Distance (m)

Ele

vation

(m

)

Legend

WS Q 65200 HWL

WS Q 65200 LWL

Ground

ROB

CW Discharge Channel

15

Stilling Basin Seal Pit

Java Sea

Pipe

Training wall +2.90m

WS +0.86mHWL +0.42m

LWL −0.56m

WS +2.56m

Two-pump operation, Q = 65,200 m3/s

Page 16: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

Conclusion

Distance of the maximum water surface at the Seal Pit from the training wall crest is only 30 cm

… but at the Stilling Basin is 2 m

Free-board at the Seal Pit is thus not sufficient

… but at the Stilling Basin is too high

16

Page 17: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

Recommendation

Increase of training wall along the Seal Pit from +2.90 m to +3.20 m

Lower down the training wall crest at the Stilling Basin from +2.90 m to 1.90 m

17

Page 18: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

18

hd

dTW ≥ 2.15dcP

He

He

PY

Lp 0.8dc

LB ≥ LP + 2.55dc

0.8dc

hd

Page 19: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

19

Parameter SymbolCooling water discharge

39,120 m3/h 65,200 m3/h

Width of sill crest b 16 m 16 m

Unit discharge q 0.6791 m3/s/m 1.1319 m3/s/m

Critical depth dc 0.36 m 0.51 m

Upstream head He 0.62 m 0.87 m

Drop height hd 1.70 m 1.70 m

Seal Pit water surface elevation +2.32 m +2.57 m

Stilling Basin water surface elevation +0.62 m +0.87 m

Stilling Basin water depth dTW 5.62 m 5.87 m

Distance of impinging jet from the sill Lp 3.35 m 4.69 m

Minimum distance of impact block from the

sill

Lp + 0.8dc 3.64 m 5.09 m

Minimum length of Stilling Basin LB ≥ Lp + 2.55dc 4.27 m 5.78 m

Minimum water depth in the Stilling Basin dTW ≥ 2.15 dc 0.78 m 1.09 m

Page 20: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

Conclusion The energy dissipation (by free overfall and

Stilling Basin) satisfies the requirement

Recommendation Displacement of the impact block farther away

from the overflow

present position at 3.25 m to 5.10 m

This is not critical since the basin depth is much deeper than the requirement

20

Page 21: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

Water Surface ProfileEnergy DissipationFlow VelocityFlow Pattern

21

Page 22: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

Two measurements are done Water surface profile

▪ Electronic device

Flow velocity▪ Imaging technique (PIV)▪ Acoustic Doppler (ADV)

Additional instuments Distance, level

▪ Staff gauge▪ Meter tape

Discharge▪ V-notch

22

Page 23: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

23

Imaging technique to measure flow pattern

Acoustic Doppler Velocimeterto measure flow velocity

Capacitance level meterto measure water level (dynamic)

Page 24: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

24

Staff gauge, meter tapeto measure distance, depth, elevation

Page 25: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

Water surface profile Energy dissipation Flow pattern Flow velocity

25

Page 26: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

26

Software EXEL

H=421mmH=375mm

H=334.5mm

Data of Water Level At Q h=14.6cm

Page 27: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

27

Camera

Light SheetSource

Model

Flow Pattern(PIV)

Page 28: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

28

Page 29: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

Instantaneous velocity

(time average) velocity

turbulence intensity and stress

29

Page 30: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

30

Page 31: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

31

Page 32: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

32

Page 33: Tanjung Priok GFPPEP - istiarto.staff.ugm.ac.id Test for CW Discharge Line and... · Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring

33