Target Committee Review Meeting 2016-2017 Contents 1. 2/5 years approved plans 2. DGMS observations 3. Status of critical manpower 4. Action plan for achievement of targets 2015-16 5. Realistic potential for 2016-17 6. Critical resources required 7. Status of surveyed off machinery K.T.K 1 incline “Don’t Compromise with Safety” Page No. 1
Transcript
Page 1: Target committee review meeting

Target Committee Review Meeting 2016-2017

Contents

1. 2/5 years approved plans

2. DGMS observations

3. Status of critical manpower

4. Action plan for achievement of targets 2015-16

5. Realistic potential for 2016-17

6. Critical resources required

7. Status of surveyed off machinery

8. Assets register

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 1

Page 2: Target committee review meeting

Target Committee Review Meeting 2016-2017

DGMS Observations

THE VIOLATIONS POINTED OUT BY SRI SK GANGHOPADYAY, DIRECTOR OF MINES SAFETY ON 13-01-2015, HYDERABAD, REGION-I AT KTK 1 INCLINE, BHPL IN 1S/C11 PANEL OF No.1SEAM

Places inspected Regulation Contravention observed

ComplianceDate of

Rectification

C-11 PANEL Reg.123 (i)Water spraying was not provided. Dust suppression was not effective.

Arrangement for water spraying & suppression and it is working effectively. 19-01-2015

Reg.109 (3a)Square set cogs members were not properly locked and not set leveled.

Square set cogs members set properly leveled with locking arrangements. 16-01-2015

109 (1a) Props were not set properly. Props set as per your guidelines. 16-01-2015

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 2

Page 3: Target committee review meeting

Target Committee Review Meeting 2016-2017

THE VIOLATIONS POINTED OUT BY SRI MUKESH KUMAR SINHA Dy. DIRECTOR OF MINES SAFETY ON 22-04-2015, HYDERABAD, REGION-I AT KTK 1 INCLINE, BHPL IN 1S/C12 PANEL OF No.1SEAM

Date of Inspection : 22-04-2015SL.No.

Regulation Observations Compliance Date ofRectification

1 Reg. 100

(1) of

CMR,1957

In C-12 caving panel, area of extraction is about 8000Sq.m.

As per past experience, main fall is expected to occur

between 8000 – 9000Sq.m. In view of above, special attention

shall be given in strata monitoring and precaution against air

blast.

The main fall occurred on 28-04-2015 in IIIrd shift at

about 2.15AM, the fall was preceded by adequate

indications of sounds in the goaf for about 45minutes

all the persons were withdrawn and kept in air blast

station (ABS).

Strata monitoring was done regularly how ever there

was no indication of any load cell, convergence

recorder and auto warning telltales.

All the precautions are taken against air blast, mock

rehearsals were conducted in all the 3 shifts, the

main fall was predicted, the persons were withdrawn

& sent to the air blast station.

28-04-2015

2 Reg. 130

of CMR,

1957

Adequate quantity of air was not found in the slices due to

improper coursing of intake airway.

Total quantity 2600 m3/min intake air has been given to the district; the air is adequately coursed to the working faces. The temperatures are below 280C in the panel.

23-04-2015

3 Reg. 108

of CMR,

1957

Vertically of the roof bolts during grouting was not maintained

in the slices.

Being ensured.

23-04-2015

4 Reg 63 of Though flat storage facility we provided, statutory mine plans Being followed 23-04-2015

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 3

Page 4: Target committee review meeting

Target Committee Review Meeting 2016-2017

CMR, 1957 were not kept flatly.

5 Reg 190 of

CMR, 1957

Contractor workers engaged in the sand transportation & coal

transportation were not trained before being engaged for work

in mine premises. Road worthiness of contractual trucks were

not belong checked before being deployed in mine.

Training has been given for contractor workmen and

further training programme will be conducted by

month of June-2015.

List of lorries having fitness certificates are given at

mine entrance check post and those lorries are only

allowed.

26-04-2015

6 Reg 41 (8)

of CMR,

1957

Though investigation of accidents & incidents are bring done,

but no action has been taken to rectify them, in most of the

cases,

Action has been taken against all the persons

connected with accidents. 27-04-2015

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 4

Page 5: Target committee review meeting

Target Committee Review Meeting 2016-2017

THE VIOLATIONS POINTED OUT BY SRI MUKESH KUMAR SINHA Dy. DIRECTOR OF MINES SAFETY ON 08-07-2015, HYDERABAD, REGION-I AT KTK 1 INCLINE, BHPL IN SURFACE NALLA, SUBSIDENCES OF CAVED, C-7, C-10 & C-11 PANELS

Date of Inspection : 08-07-2015SL.No.

Regulation Observations Compliance Date ofRectification

1 Reg. 143 &

118 a (3)

(C) of

CMR,1957

Report regarding inspection of old & un-used workings was

not maintained properly.

Being maintained 14-07-2015

2 Reg. 63 (2)

of CMR,

1957

Flat storage facilities were not provided for proper storage of

statutory mine plans. Flat storage facility is under preparation. 10-08-2015

COMPLIANCE REPORT FOR THE VIOLATIONS POINTED OUT IN GENERAL INSPECTION BY SRI ANAND AGRAWAL. D.D.M.S(ELEC) FROM 03-08-2015 TO 06.08.2015, HYDERABAD, REGION-I AT KTK 1 INCLINE, BHUPALPALLI

Date of Inspection: 03.08.2015SL.No.

Regulation Observations COMPLIANCE DATE OF RECTIFICATION

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 5

Page 6: Target committee review meeting

Target Committee Review Meeting 2016-2017

1 Reg. 74(1) of

CEAR,2010

Suitably rated lightning arrestor was found not provided at both the sending and receiving end of over head transmission line supplying power of 3.3KV, to 3 Lakh fan house and 1 incline sub station. It shall be provided.

5KA,3KV Lighting Arrestors provided for both OHT lines at the sending and receiving ends.

16.08.2015

2 Reg. 12 of

CEAR,2010

(i) .The provision of reliable 220V backup supply for controlling protective mechanism of 33KV circuit breaker and their remote operation was found not provided at 1Seam/surface sub station. It shall be provided urgently.(ii) The out door electrical installations of the mine 33KV sub station yard including structures shall be painted to rust proof conditions to protect the health of installations.

The supply of 50KVA ,3.3KV/440V Transformer is under process for provision of reliable 220V back up supply for controlling protective mechanism of 33KV circuit breaker and their remote operation.

The out door electrical installations of the mine 33KV sub station yard including structures painting work will be taken up shortly.

Probable date of rectification 30.09.2015

Probable date of rectification 30.09.2015

3 Reg 100(3)Of

CEAR,2010

E/L protection of A/Y make 3.3KV VCB controlling main for hauler unit at 150HP surface hauler room was found not working during test. It shall be put in order immediately.

E/L mechanism repaired, rectifier unit changed and E/L kept in working order

04.08.2015

4 Reg12(1) of

CEAR,2010

At 3seam surface indoor sub station,3 no.s Kilburn make OCB’s working as group main and feeder control breaker for surface 440V installation were checked for effectiveness of protective relays for E/L and O/L and found that their tripping mechanism was worn out and failed to trip the circuit . All the three switches shall be replaced.

3 No.s ACB’s will be provided in place of OCB’s Probable date of rectification 30.09.2015

Date of Inspection : 04-08-20151 Reg. 100(3)

of CEAR,2010

E/L Protection relays in the following equipment was found not working during test.(i) Lighting Transformer at Q dip/36L endless hauler station.(ii) Kilburn make,R/F starter of Z1dip/37L direct

Lighting Transformer at Qdip/36L endless hauler E/L kept in orderK/B make R/F starter of Z1dip/37L direct hauler E/L module fixed and kept in order

09.08.2015

08.08.2015

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 6

Page 7: Target committee review meeting

Target Committee Review Meeting 2016-2017

hauler.(iii) Mine line make ACB controlling power to FDIP/28L compressor.It shall be set right forthwith.

M/L make ACB E/L kept in working order 06.08.2015

2 Reg. 110 (1) (ii) of

CEAR,2010

FLP features of Rana make coal drill machine at FD/33L and 20HP auxiliary fan motor at Z1 dip/ 41L were found disturbed due to use of ordinary hex head bolts and locally fabricated cable terminal box respectively. It shall be restored immediately.

Rana make coal drill machine ordinary hex head bolts replaced with socket head bolts.20HP Auxiliary fan motor terminal box replanting with OEM supplied terminal box

05.08.2015

12.08.2015

3 Reg. 106(iv)(d)

Of CEAR,2010

The cable armour got rusted and damage in the cable supply power to Fdip/33L air compressors 40HP motor thereby reducing the conductivity to less then 50% power core. It shall be replaced with new cable

Motor cable replaced with new one 13.08.2015

4 Reg12(1) of

CEAR,2010

(i) Restraining arrangement for plug & socket in A/Y make GEB’s installed at Z1dip/40L; Xdip/401/2L; Ydip/40L and Ydip/41L was found defunct. It shall be provided immediately.(ii) The resistance provided with start stop switch in all SDL’s of C-12 panel (SDL no.839,855,732,747) was found bypassed, which may lead to inadvertent starting of motor, It shall be restored immediately in the interest of safety.

Restraining arrangement for plug & socket in A/Y make GEB’s provided

Holding resistance was provided for all C12 panel SDL’s and start/stop switches were kept in order

13.08.2015

06.08.2015

Date of Inspection : 05-08-20151 Reg. 100(3)

of CEAR,2010

The E/L protection provided in following switches was tested and found not working.

(i) M/L make, 440V ACB controlling power to

DR/4L 40HP hauler at 2dip/1L sub station.

E/L kept in working order

E/L kept in working order

06.08.2015

07.08.2015

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 7

Page 8: Target committee review meeting

Target Committee Review Meeting 2016-2017

(ii) ET make,3.3KV VCB,sl.No.VCF-1248 working as group main at 2D/1L sub station.(iii) M/L make,550V ACB controlling power

to 4D/9L compressor at 4D/8L(iV) A/Y make,3.3KV,VCB controlling power to 2D/9L,190HP pump at 2D/8L.(V) E/T make,3.3KV,190HP DOL starter at 2D/9L pump station.(vi) A/Y make transwitch unit

sl.no.FLP/TS/1667 at 2D/6L sub station. It shall be put in order forthwith.

E/L kept in working order

E/L kept in working order

E/L kept in working order

E/L kept in working order

06.08.2015

09.08.2015

08.08.2015

09.08.2015

2 Reg. 106 (v) of

CEAR,2010

Cable sealing compound was found not provided at cable termination in 2 No.s of 125HP, 440V pumps motor. It shall be provided to prevent diminution of its insulation and to avoid open sparking.

Bitumen compound filled in the motor terminal boxes 06.08.2015

3 Reg 12(1)Of

CEAR,2010

HRC fuse protection was found bypassed in Volga make, 440V, 125HP DOL starter at 2D/1L. Suitably rated HRC fuses shall be provided immediately.

HRC fuses arranged 06.08.2015

4 Reg12(1) of CEAR,2010

Start stop switch protection in all the three SDL’s (SDL No.834, 800 and 731) was found defunct. It shall be put in order.

Start/ stop switch for the ‘3’ SDL’s kept in working order 08.08.2015

Date of Inspection : 06-08-2015

1 Reg. 45(2) of

CEAR,2010

(ii) E/L protection was found not provided in BHEL make, 3.3KV stator, Rotor control panel of 150HP hauler unit at 4R/5L. It shall be provided to disconnect the supply automatically in the event of

Prayog make E/L relays provided and kept in working order

23.08.2015

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 8

Page 9: Target committee review meeting

Target Committee Review Meeting 2016-2017

fault condition.

2 Reg. 100 (3) of

CEAR,2010

E/L protection of following switches was found not working during test.

(i) A/Y make,3.3KV VCB controlling power to 190HP pump unit (at site) at 1D/39L.

(ii) A/Y make,3.3KV VCB working as group main at MWD/16L sub station.

(iii) Biecco make, 3.3KV VCB controlling power to 250KW fan motor at fan house.

The effectiveness of protective system shall always be kept and maintained in working order.

E/L kept in working order

E/L kept in working order

E/L kept in working order

08.08.2015

09.08.2015

09.08.2015

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 9

Page 10: Target committee review meeting

Target Committee Review Meeting 2016-2017

COMPLIANCE REPORT FOR THE PENDING VIOLATIONS POINTED OUT IN GENERAL INSPECTION BY SRI ANAND AGRAWAL. D.D.M.S(ELEC) FROM 03-08-2015 TO 06.08.2015, HYDERABAD, REGION-I AT KTK 1 INCLINE, BHUPALPALLI

Date of Inspection: 03.08.2015SL.No.

Regulation Observations COMPLIANCE DATE OF RECTIFICATION

1 Reg. 12 of

CEAR,2010

(i) .The provision of reliable 220V backup supply for controlling protective mechanism of 33KV circuit breaker and their remote operation was found not provided at 1Seam/surface sub station. It shall be provided urgently.

(ii) The out door electrical installations of the mine 33KV sub station yard including structures shall be painted to rust proof conditions to protect the health of installations.

50KVA ,33KV/440V Transformer for provision of reliable 220V back up supply for controlling protective mechanism of 33KV circuit breaker and their remote operation is going to receive by 26.09.2015 and the same will be commissioned soon as it received.

The out door electrical installations of the mine 33KV sub station yard including structures painting work carried out.

Probable date of rectification 30.09.2015

13.09.2015

2 Reg12(1) of

CEAR,2010

At 3seam surface indoor sub station,3 no.s Kilburn make OCB’s working as group main and feeder control breaker for surface 440V installation were checked for effectiveness of protective relays for E/L and O/L and found that their tripping mechanism was worn out and failed to trip the circuit . All the three switches shall be replaced.

3 No.s ACB’s were commissioned in place of OCB’s 13.09.2015

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 10

Page 11: Target committee review meeting

Target Committee Review Meeting 2016-2017

Requirement of DGMS permissions

SL.No Seam Panel No Time Remarks

1 1 Seam C 15 October - 2015 Caving panel

2 1 Seam S 1 January – 2016 Sand stowing panel

3 1 Seam C 16 April - 2016 Caving panel

4 3 Seam S 7 November - 2015 Sand Stowing panel

5 3 Seam S 8 April – 2016 Sand Stowing panel

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 11

Page 12: Target committee review meeting

Target Committee Review Meeting 2016-2017

Status of critical manpower

1 Status of manpower as on 07-10-2015 15072 Man shifts required to engage 12 SDLs per day is 12953 Leaves and absenteeism @ 30% is 3884 Total manpower required 16835 Shortage of manpower -173

In which the following critical designations are required (Including 30% leaves & absenteeism)

Sl.No Design Relay - A Relay - B Relay - C Total

On roll Reqd Shortage On roll Reqd Shortage On roll Reqd Shortage1. Sirdars & S F 15 20 -5 15 20 -5 16 20 -4 -142. SDL Operators 12 16 -4 12 16 -4 16 16 - -83. Trammers 62 74 -12 64 74 -10 63 74 -11 -334. HOPs 22 27 -5 19 27 -8 26 27 -1 -14

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 12

Page 13: Target committee review meeting

Target Committee Review Meeting 2016-2017

Action plan for achievement of target 2015-16 Bottle necks of haulage circuits identified & reduced. Tubs derailments reduced by replacing of 30 lbs rails by 40 lbs in all main tramming circuits from surface to upto 27L in

No1 seam and surface to upto 5L in No.3 Seam. 65 Nos of new tubs added to increase the tub circulation factor both 1 and 3 Seams. Drilling of Induced holes by contract work men for Caving panels. Advanced Roof bolting work by contract work men for all in new depillaring panels. C15 panel & S1 (Stowing) permissions in No 1 seam. S7 Panel & S 8 (Stowing) permissions required before Nov, 2015. 108000 cumtrs (approximately) of sand required to achieve the targeted production for 2015-16. 136 nos. of 56.25 CFT tubs required before December, 2015. 150 HP Hauler set required in the underground. Spare GEBs required to improving the SDL production. SDL working hours & avoid the marching time. Requirement of SDL spares i.e. Idlers, recoiling springs, guide rollers, traction chains, sprockets and trailing cable etc. Requirement 4000 mtrs of Telephone 20 pair cable to establish the better communication system from Underground to

surface as well as to avoid time lag. 1.75 K.M length 6” HDPE pipes required. Wage incentive plan to be modified for motivation of work men to improve the production. Spot incentive scheme to be implemented for remaining months. Executive incentive plan to be modified by 96% to 90% to motivate the executives.

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 13

Page 14: Target committee review meeting

Target Committee Review Meeting 2016-2017

In addition to the following steps to be taken to achieve the target for 2015-16 Readily available of the coal in all working faces. Preventive maintenance of SDLs engaged in Pre shifts to avoid the break downs in shifts. Strengthen the tramming circuits by time to time to avoid the haulage break downs. Erection of jig haulers in every two pillars in each panel for supply of tubs in timely. Providing adequate ventilation to all working places. Providing all safety equipment to all the work men. Providing quality material to avoid the delay while working. To control the absenteeism of workmen through counseling. Motivation of workmen by incentives, spot gifts and appreciation letters. Educating the workmen through public address system and conducting meetings about importance of production in the

mine with safety. Engaging tub cleaning in every shift to improve the tub average.

Action Plan for achieving target for the year 2015-16

TARGET FOR 2015-2016 4,80,000 TonsTarget up to 30-09-2015 ( up to October 2015) 2,43,883 TonsAchieved up to 30-09-2015 ( up to October 2015) 1,75,780 Tons

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 14

Page 15: Target committee review meeting

Target Committee Review Meeting 2016-2017

% of achievement as on 30-09-2015 ( up to October 2015) 72%Variance up to 30-09-2015 ( up to October 2015) - 68,103 TonsOMS as on 30-09-2015 ( up to October 2015) 1.18Remaining balance up to 31-03-2016 including variance 3,04,220 Tons

(2,36,117 Tons + 68,103 Tons)Remaining Days 150Expected Production per day 1418Expected % of achievement up to 31-03-2016 81%Expected SDL per day 118 TonsExpected OMS 1.16Expected Out put per drill 53Expected Shots per drill 43Expected Tub average 1.4Total No of SDLs engaged 12No.1Seam 7 SDLsNo.3Seam 5 SDLsExpected production from 1Seam 818 TonsExpected production from 3Seam 600 Tons

Steps to reduce the cost of productionCost of Explosive:-

Explain the present cost of explosive per tone and invite suggestions from coal cutters and shot firers to reduce the explosive cost per tonns.

Meetings to be conducted with all supervisory staff regarding reduction of explosive cost per tonn, to improve the out put per drill shift and shots per drill.

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 15

Page 16: Target committee review meeting

Target Committee Review Meeting 2016-2017

Implement the designed blasting pattern to avoid the excess use of explosive. Surprise checks by Supervisors and officers per tallying of explosives. To increase the powder factor.

Cost of Power:- Changing the haulage circuit in No.1 Seam to save the approximately 4.5 lakhs of units by removing the 4R 150 HP hauler,

17L 40HP endless hauler and reduce the manriding running hours. By the cleaning the sumps, increasing the sump capacity and avoiding overflow of water. To arrest the delivery leakages. Stoppage of equipment during idle time. To reduce the power cost interdiction of high capacity pumps example 350HP.

COST of Store:- Developing cost conscious among employees. Avoiding material abusing. Procurement of quality material. Proper testing of material at mine level. Advance planning. Ensuring the quality and quantity at mine level.

To reduce the over all cost of production:- Improving the SDL out put 110 tonns to 120 tonns. By increasing G-5grade 450 tonns to 600 tonns. Instead of G-11 ROM separating as G-10 Round and G-11 slack in which expected 800 tonns from 1Seam (nearly 300 Tons G-

10 round and remaining 500 Tons G-11 Slack & 600 tons G 5 Grade dispatched) we get extra Rs 400 per tones. Avoiding coal dumping in the mine. Implementing the Wage incentive plan and spot incentive schemes to all workmen for improve the production. Outsourcing the roof bolting activity and induced hole drilling in underground.

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 16

Page 17: Target committee review meeting

Target Committee Review Meeting 2016-2017

Supply of quality material in advance.

MONTH WISE PRODUCTION DETAILS FROM 01-10-2015 TO 31-03-2016SL.No Month No of

DaysExpected

Production in Tonns

OMS ManShifts Cost per Tonn in Rupees

Explosive Stores Power SandTransport

1 Oct'2015 24 34032 1.16 29338 43.68 222.00 179.50 169.87

2 Nov'2015 24 34032 1.16 29338 43.68 222.00 179.50 169.87

3 Dec'2015 27 38286 1.16 33005 45.70 226.00 179.50 169.87

4 Jan'2016 25 35450 1.16 30560 44.64 224.00 179.50 169.87

5 Feb'2016 25 35450 1.16 30560 44.64 224.00 179.50 169.87

6 Mar'2016 26 36868 1.16 31782 45.11 225.00 179.50 169.87

Realistic potential for 2016-17.Action Plan for achieving target for the year 2016-17

TARGET FOR 2015-2016 4,80,000 TonsNo of SDL Engaged 12Expected SDL per Day 118 TonsExpected of Achievement for 2016-2017 4,32,000 Tons

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 17

Page 18: Target committee review meeting

Target Committee Review Meeting 2016-2017

Expected % of Achievement for 2016-2017 90 %OMS 1.22Tub Average 1.45No of working Days 300Expected Production per day 1440 TonsExpected working Hours of SDL per Day 8.5 HrsExpected Out put per drill 53Expected Shots per drill 44Expected Tub average 1.4Total No of SDLs engaged 12No.1Seam 7 SDLsNo.3Seam 5 SDLsExpected production from 1Seam 840 TonsExpected production from 3Seam 600 TonsSand required per Day 1296 Cu.m

Availability of Working Panels In Seam Wise – 2016-17

SLNO Seam Panel No of SDLs

EngagedExpected

Production(Tonns)

Method of extraction

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 18

Page 19: Target committee review meeting

Target Committee Review Meeting 2016-2017

1 1 Seam C 16 03 1,08,000 Caving

2 1 Seam S 1 03 1,08,000 Stowing

3 3 Seam S 6 03 1,08,000 Stowing

4 3 Seam S 7 03 1,08,000 Stowing

5 3 Seam S 8 Spare -- Stowing

Sand requirement for three panels i.e. S 1, S 6 and S 7 Total Sand requirement for 2016-17 - 3,88,880 Cu.Mtrs Sand requirement per day - 1296 Cu.Mtrs Sand yard capacity - 1,50,000 Cu.Mtrs

MONTH WISE PRODUCTION DETAILS FROM APRIL -2016 TO MARCH-2017SL.No Month No of

DaysExpected

Production in Tonns

OMS ManShifts Cost per Tonn in Rupees

Explosive Stores Power SandTransport

1 Apr ‘ 2016 24 33000 1.18 27966 43.68 222.00 179.50 169.87

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 19

Page 20: Target committee review meeting

Target Committee Review Meeting 2016-2017

2 May ‘ 2016 24 34000 1.18 28213 43.68 222.00 179.50 169.87

3 Jun ‘ 2016 27 35000 1.18 29661 45.70 226.00 179.50 169.87

4 July ‘ 2016 25 35000 1.18 29661 44.64 224.00 179.50 169.87

5 Aug ‘ 2016 25 36000 1.18 30508 44.64 224.00 179.50 169.87

6 Sept ‘ 2016 26 36000 1.18 30508 45.11 225.00 179.50 169.87

7 Oct ‘ 2016 34000 1.18 28213

8 Nov ‘ 2016 37000 1.18 31355

9 Dec ‘ 2016 36000 1.18 30508

10 Jan ‘ 2017 38000 1.18 32203

11 Feb ‘ 2017 39000 1.18

12 Mar ‘ 2017 40000 1.18

Critical Resources Required during 2016-17Requirements: 1. 350HP pumps (Annual Plan) : 2 Nos. 2. 8” GI Delivery pipes : 3 K.M. 3. 2” GI pipes for drinking : 3 KM

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 20

Page 21: Target committee review meeting

Target Committee Review Meeting 2016-2017

4. Stowing range for 1S & 3 Seam i. 6” HDPE pipes : 2.5 K.M

5. Transwith unit (Annual plan) : 3 Nos. 6. 70 Sq.mm Armour cable : 2000 mtrs. 7. 35 Sq.mm Armour cable : 3500 mtrs. 8. Telephone cable 20 pair : 1500 mtrs.

10 pair : 1500 mtrs for S7 panel. 05 pair : 2500 mtrs for S1 panel. 02 pair : 5000 mtrs for stowing S1&S7.

9. New tubs required : 240 Nos.

STATUS OF SURVEYED OFF MACHINERY SL.No SDL No Date of

commencement Actual date of surveyed off

Corporate date of surveyed off Remarks

1 305 02-03-2009 March – 2013 30-06-20132 416 01-05-2010 May – 2014 01-06-20143 444 (1) 30-05-2010

At GDK 8Ainc(2) 24-07-2012

May – 2014 01-05-2014

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 21

Page 22: Target committee review meeting

Target Committee Review Meeting 2016-2017

At KTK 1 inc

4 390

(1) 20-12-2009At KK5 inc

(2) 23-05-2013At KTK 1 inc

Dec – 2014 01-05-2014

5 361 01-10-2009 Oct – 2013 01-05-20146 411 01-04-2010 Apr – 2014 01-05-20147 460 17-09-2010 Sep – 2014 14-04-20158 463 29-0-2010 Sep – 2014 07-05-20159 470 16-10-2010 Oct – 2014 18-05-2015

10 421 01-05-2010 May – 2014 01-06-2014

11 478

(1) 01-12-2010At KTK 2 inc

(2) 14-08-2013At KTK 1 inc

31-12-2014 14-04-2015

12 461 29-09-2010 31-12-2014 18-05-2015 STATUS OF ON ROLL SDLs DETAILS

SL.No SDL No Date of

commencement Date of

surveyed off Remarks

1 657 04-05-2013 31-05-20172 731 01-06-2014 30-06-20183 732 02-05-2014 31-05-20184 736 02-05-2014 31-05-20185 747 02-05-2014 31-05-20186 800 01-06-2014 30-06-20187 803 02-05-2014 31-05-2018

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 22

Page 23: Target committee review meeting

Target Committee Review Meeting 2016-2017

8 833 07-05-2014 31-05-20199 834 14-04-2015 30-04-2019

10 838 18-05-2015 31-05-201911 839 24-04-2015 30-04-201912 844 18-05-2015 31-05-201913 847 10-07-2015 30-07-201914 855 10-07-2015 30-07-2019

Requirement of Executives in KTK1 inclineSL.No Design Requirement as per

CMR 1957Requirement as per

Permission conditions Remarks

1 Coll .Mgr 1 (First Class) - -2 Safety Officer 1 (First Class) - -3 Ventilation Officer 1 - 1st or 2nd class

4 Assist. Manager 1 (First Class) -Production more than 20,000 tons

per month5 Assist. Manager 2 (First Class) 1 for 1 Seam caving

panels-

K.T.K 1 incline “Don’t Compromise with Safety” Page No. 23

Page 24: Target committee review meeting

Target Committee Review Meeting 2016-2017

1 for 3 Seam Stowing Panels

6 Under Managers 09 (2nd Class)

C 12 and C 13 panels in No,1 Seam

&S 5 panel in No.3 Seam

Each shift 3 under managers required

7 Engineers 04 -1 Engineer in

General shift other 3 in shifts.

8 Welfare Officer 01 - -9 Survey officers 01 - -

10 Under Manager 01 - For POBTotal 22

* Total First class holders = 05, Total 2nd class holders = 11,Engineers = 04, WO=01,Surveyor =01Status of Executives in KTK1 incline

SL.No Design On Roll Required Remarks

1 First class holders 04(Excluding deputation) 05 +1 deputated from OC to KTK1inc2 Second class holders 08 (Excluding deputation) 11 -033 Welfare officer 01 01 -4 Surveyor 01 01 -5 Engineers 04 (Excluding deputation) 04 -

Total 18 22 -03

* wanted under managers = 03K.T.K 1 incline “Don’t Compromise with Safety” Page No. 24


Recommended