Project SLOPE1
T 1.1 – User requirements
Trento, January 08th, 2014
Index2
1. Scope
2. Workplan
3. Methodology
4. Time Schedule
5. Contact info
1. Scope3
This task aims to: Identify users that will use SLOPE tools Understand their needs of SLOPE Understand the system requirements so it is useful for users
To be developed from M1 to M3
Includes development of “D1.0.1 user requirements report” Due to Month 3.
Partners involved: all ITENE (leader), GRAPHITECH, CNR, KESLA, COAST, MHG,
BOKU, FLY, GRE, TRE
2. Proposed Workplan4
1. Identify user groups ITENE will contact the partners to develop a join classification
based on each partners experience. : Foresters, and other decision makers also logistic operators,
brokers, end-users, and forest owners Final classification needs to be validated by consortium Ends with agreed classification.
2. Define questionnaires Questionnaires for each use group will be developed by ITENE
with the help of partners Final questionnaires needs to be validated by consortium Ends with developed questionnaries.
2. Proposed Workplan5
3. Perform questionnaires Each partner will contact a small quantity of users
(to be defined) from different user groups.
4. Gather and analyse data By ITENE Validated by consortium
Development of D1.0.1 ITENE will ask for contribution from partners
3. Methodology6
Partners contribution GRAPHITECH (IT): input for system requirements (3D
technologies and simulation of planning operations) CNR- Trees and Timber Institute- IVALSA (IT), input
for systems requirements, contact with end users KESLA (FI): input for system requirements(cranes,
harvester heads, strokes), contact with end users Coastway Ltd (IR): input for system requirements
(forest mapping, routes, planning requirements).
3. Methodology7
Partners contribution MHG (Fin): system requirements (ERP material
quantity, quality and availability ) BOKU (AU): system requirements (near infrared
spectroscopic measurements and hyperspectral imaging for model-based quality control of mountain forest production)
Flyby S.r.l.(IT):system requirements (forest inventory) Greifenberg teleferiche sas (IT): system requirements
(machinery for wires, cranes )and contact with ens users
3. Methodology8
Work will be done based on specific methodologies for data gathering i.e. Métrica v3 methodology used by MAP (Spanish
Public Management Ministry) to gather methodological needs for TIC developments
i.e. Guide to the Software Engineering Body of Knowledge (IEEE)
3. Methodology9
Preliminary groups Logistic operators (transport of timber)
MHG Systems Land owners (own the land)
CNR- IVALSA BOKU
End users (cut down trees, sell timber and wood) KESLA, GREIFENBERG
Other?
1 questionnaire model per each group
Minimum of 5 questionnaires filled per group
3. Methodology10
Filling the questionnaires Each SLOPE partner should:
Explain the Project to the selected user Read and explain the questionnaire to him Write down his answers
Example questions: Which information would you be interested in
receiving from the management system? What information do other platforms provide? What
do you find lacking?
4. Time Schedule11
5. Contact info12
Juan de Dios Díaz [email protected]
Emilio Gonzalez [email protected]
Patricia Bellver [email protected]